PRESENTATION
ON
NTPC DADRI GAS POWER
STATION
SUBMITTE BY:-
ER ABDUL HADI RAHMANI
ROLL NO-151 2740001
B.TECH(ME) 4TH
YEAR
IIMT ENGINEERING COLLEGE(127)
SUBMITTED TO:-
AST.PROF.NADEEM ALI
DEPT.OF MECHANICAL ENGG.
NTPC DADRI
TOTAL CAPACITY OF DADRI POWER PLANT
 THERMAL
04X210 MW = 840 MW
02X490 MW = 980 MW
TOTAL = 1820
GAS
817MW
SOLAR
05MW
GRAND TOTAL = 2642 MW
COMBINED CYCLE
FUELS USED IN COMBUSTION CHAMBER
COMPRESSOR
COMBUSTION CHAMBER
GAS TURBINE
WHRB
CONDENSER
COOLING TOWER
 ADVANTAGE
DISADVANTAGE
CONTROL ROOM
GRID
SWITCH YARD
POINTS TO BE COVER
GGGAS
TURBINESGA• Invented in 1930 by Frank Whittle.
• Patented in 1934.
• First used for aircraft propulsion in 1942 on Me262 by
Germans during second world war. • Currently most of
the aircrafts and ships use GT engines .
• Used for power generation.
• Manufacturers: General Electric, Pratt &Whitney,
SNECMA, Rolls Royce, Honeywell, Siemens –
Westinghouse, Alstom
• Indian take: Kaveri Engine by GTRE (DRDO). It had
developed the GTX37-14U afterburning turbojet, which
first ran in 1977, and was the first jet engine to be
designed entirely in India.
GAS TURBINE
 Combined Cycle Power Plants
COMBINED CYCLE
GT1 GT2
ST1
GT3 GT4
ST2
 COMBINED CYCLE POWER PLANTS INTEGRATES TWO POWER
CONVERSION CYCLE
 BRAYTON CYCLE (GAS TURBINE)
RANKINE CYCLE(STEAM TURBINE)
TO INCREASE THE OVERALL PLANT EFFICIENCY
BRAYTON CYCLE
HOW THEY WORK
•Firstly air is filtered through the AIR FILTERS which are mounted at the top of
the ROOM
• Air passes through the COMPRESSOR, and the pressure increases and the
volume decreases
•COMBUSTION occurs at constant pressure-air heats upvolume increases
•The rotor turns and convert the KINETIC and THERMAL ENERGY into
MECHANICAL ENERGY
•The gas passes through the TURBINE ROTOR
RANKINE CYCLE
THE CONVERSION OF HEAT ENERGY INTO MECHANICAL ENERGY WITH THE AID OF
STEAM CARRIED OUT THROUGH THIS CYCLE
INITIAL STATE OF WORKING FLUID IS WATER WHICH COMPRESSED BY THE FED
PUMP
IN THE BOILER THE COMPRESSED WATER IS HEATED AT CONSTANT
PRESSURE
AFTER THIS SUPERHEATED STEAM IS EXPAND AT STEAM TURBINE
NATURAL GAS
DIESEL
LPG(LIQUID &GASEOUS)
NAPTHA
SEWAGE GAS
COMPRESSOR
COMPRESSING THE AIR BEFORE COMBUSTOR INCREASE THE EFFICIECY
COPRESSOR COPMPRESS THE AIR UPTO 18 TIMES THE ATOMOSPHERIC PRESSURE
COMPRESSOR IS DRIVEN BBY THE TURBINE SHAFT
2/3 OF POWER OF TURBINE IS USED TO DRIVE THE SHAFT
• COMBUSTOR IGNITE THE HIGH PRESSURE AIR WHICH IS
COME FROM COMPRESSOR.
• TEMPRATURE OF HOT FLUE GASES RANGES FROM 1400C-
1500c
• CHANGE THE CHEMICAL ENERGY OF FUEL INTO THERMAL
ENERGY FOR EXPANSION IN TURBINE
WASTE HEAT RECOVERY BOILER
IT WORKS ON COMBINED CYCLE
EXHAUST OF THE GAS TURBINE USED IN A HEAT EXCHANGER CALLED WHRB
IT IS MAINLY IMPLEMENTED FOR ENHANCING THE OPERATIONAL EFFICIECY
CONDENSER
CONDENSER IS A HEAT TRANSFER DEVICE IN WHICH THE EXHAUST STEAM OF A
TURBINE IS CONDENSED BY MEANS OF COOLING WATER
IT IMPROVES THE THERMAL EFFICIENCY OF PLANT
IT AFFECTS THE SAVING IN COST OF WATER TO BE SUPPLIED TO BOILER
COOLING TOWER
COOLING TOWER IS USED TO PROVIDE THE COOL WATER TO CONDENSER
COOLING TOWER IS PROVIDE TO REUSE THE WATER WHICH COMES FROM
CHANGING THE STEAM BY THE CONDENSER
IT CONSIST OF TEN CELLS WITH LARGE FAN OF SON TOP INSIDE THE CONE LIKE
STACKS ,AND A BASIN OF WATER UNDERNEATH
ADVANTAGES OF GAS TURBINE
• Less installation Period
• Simplicity
• Less manpower requirements
• Quicker response time
• Faster Acceleration/deceleration
• Modular replacement
• Clean fuels
• Less vibrations
•Less Area Required
DISADVANTAGE OF GAS TURBINE
•High cost of generation.
• High cost of maintenance.
•High frequency of
inspection/overhauling.
• Hot gas path components under high
thermal stress.
• Needs large quantities of Clean air
.
Transmission of Generated
PowerOnto the Grid
Transformers
.
From each transformer, the power passes underground into our
switchyard. The power from all of the generators comes together
there
, where it is measured, metered and directed on to the grid.
 The proximity of the site to a large, existing PG&T substation makes it
a good place to build a power plant and the nearest transmission
tower is only about 200 feet away.
SWITCHYARD
From the control room, the plant operators monitor and operate the
facility, via the plant’s “ Distributed Control System”, with the click of a
mouse, viewing graphic representations of all MEC systems on various
screens.
 The system gives operators both audible and visual signals to keep
them informed of plant conditions at all times and to determine
when preventative maintenance is required
CONTROL ROOM
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri

Weitere ähnliche Inhalte

Was ist angesagt?

thermal power plant PTTP Parichha
thermal power plant PTTP Parichhathermal power plant PTTP Parichha
thermal power plant PTTP Parichha
Gagandeep Maan
 
Power plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikasPower plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikas
Vikas Gupta
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
AKHILESH KUMAR
 

Was ist angesagt? (20)

Presentation on Kota super thermal power station (KSTPS)
Presentation on Kota super thermal power station (KSTPS)Presentation on Kota super thermal power station (KSTPS)
Presentation on Kota super thermal power station (KSTPS)
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
Themal power plant NTPC
Themal power plant NTPCThemal power plant NTPC
Themal power plant NTPC
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
 
presentation on one month summer training at NTPC Dadri
presentation on  one month summer training at NTPC Dadripresentation on  one month summer training at NTPC Dadri
presentation on one month summer training at NTPC Dadri
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
Ramgarh-gas-thermal-power-plant- by swai singh godara BAYTU-(RAMGARH) 941453...
Ramgarh-gas-thermal-power-plant- by swai singh godara BAYTU-(RAMGARH)  941453...Ramgarh-gas-thermal-power-plant- by swai singh godara BAYTU-(RAMGARH)  941453...
Ramgarh-gas-thermal-power-plant- by swai singh godara BAYTU-(RAMGARH) 941453...
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
 
thermal power plant PTTP Parichha
thermal power plant PTTP Parichhathermal power plant PTTP Parichha
thermal power plant PTTP Parichha
 
NTPC BY PANKAJ
NTPC BY PANKAJNTPC BY PANKAJ
NTPC BY PANKAJ
 
Prashant ppt on ntpc anta
Prashant ppt on ntpc antaPrashant ppt on ntpc anta
Prashant ppt on ntpc anta
 
Power plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikasPower plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikas
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation
 
Ntpc report harsh
Ntpc report  harshNtpc report  harsh
Ntpc report harsh
 
report on VTPS
report on VTPSreport on VTPS
report on VTPS
 
Presentation sai,varun.
Presentation sai,varun.Presentation sai,varun.
Presentation sai,varun.
 

Ähnlich wie Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri

Inplant training report
Inplant training reportInplant training report
Inplant training report
applesam8
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPC
richa khatri
 
SIP Presentation
SIP PresentationSIP Presentation
SIP Presentation
Amay Jain
 

Ähnlich wie Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri (20)

Inplant training report
Inplant training reportInplant training report
Inplant training report
 
Gas turbine
Gas turbineGas turbine
Gas turbine
 
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
 
Unit2 diesel engine power plant
Unit2 diesel engine power plantUnit2 diesel engine power plant
Unit2 diesel engine power plant
 
Htps
HtpsHtps
Htps
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
Improved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad MollaImproved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad Molla
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPC
 
Richappt
RichapptRichappt
Richappt
 
Energy Coservation In Gas turbine
Energy Coservation In Gas turbineEnergy Coservation In Gas turbine
Energy Coservation In Gas turbine
 
Gas turbine plant
Gas turbine plantGas turbine plant
Gas turbine plant
 
kstps training report
kstps training reportkstps training report
kstps training report
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
193411716 study-on-steam-turbines
193411716 study-on-steam-turbines193411716 study-on-steam-turbines
193411716 study-on-steam-turbines
 
Gas turbine lecture by kpm
Gas turbine lecture by kpmGas turbine lecture by kpm
Gas turbine lecture by kpm
 
Basic Scheme Open Cycle Gas Turbine Plant
Basic Scheme Open Cycle Gas Turbine Plant Basic Scheme Open Cycle Gas Turbine Plant
Basic Scheme Open Cycle Gas Turbine Plant
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andal
 
SIP Presentation
SIP PresentationSIP Presentation
SIP Presentation
 

Kürzlich hochgeladen

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Kürzlich hochgeladen (20)

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri

  • 1. PRESENTATION ON NTPC DADRI GAS POWER STATION SUBMITTE BY:- ER ABDUL HADI RAHMANI ROLL NO-151 2740001 B.TECH(ME) 4TH YEAR IIMT ENGINEERING COLLEGE(127) SUBMITTED TO:- AST.PROF.NADEEM ALI DEPT.OF MECHANICAL ENGG.
  • 2. NTPC DADRI TOTAL CAPACITY OF DADRI POWER PLANT  THERMAL 04X210 MW = 840 MW 02X490 MW = 980 MW TOTAL = 1820 GAS 817MW SOLAR 05MW GRAND TOTAL = 2642 MW
  • 3.
  • 4. COMBINED CYCLE FUELS USED IN COMBUSTION CHAMBER COMPRESSOR COMBUSTION CHAMBER GAS TURBINE WHRB CONDENSER COOLING TOWER  ADVANTAGE DISADVANTAGE CONTROL ROOM GRID SWITCH YARD POINTS TO BE COVER
  • 5. GGGAS TURBINESGA• Invented in 1930 by Frank Whittle. • Patented in 1934. • First used for aircraft propulsion in 1942 on Me262 by Germans during second world war. • Currently most of the aircrafts and ships use GT engines . • Used for power generation. • Manufacturers: General Electric, Pratt &Whitney, SNECMA, Rolls Royce, Honeywell, Siemens – Westinghouse, Alstom • Indian take: Kaveri Engine by GTRE (DRDO). It had developed the GTX37-14U afterburning turbojet, which first ran in 1977, and was the first jet engine to be designed entirely in India. GAS TURBINE
  • 6.  Combined Cycle Power Plants COMBINED CYCLE GT1 GT2 ST1 GT3 GT4 ST2  COMBINED CYCLE POWER PLANTS INTEGRATES TWO POWER CONVERSION CYCLE  BRAYTON CYCLE (GAS TURBINE) RANKINE CYCLE(STEAM TURBINE) TO INCREASE THE OVERALL PLANT EFFICIENCY
  • 7. BRAYTON CYCLE HOW THEY WORK •Firstly air is filtered through the AIR FILTERS which are mounted at the top of the ROOM • Air passes through the COMPRESSOR, and the pressure increases and the volume decreases •COMBUSTION occurs at constant pressure-air heats upvolume increases •The rotor turns and convert the KINETIC and THERMAL ENERGY into MECHANICAL ENERGY •The gas passes through the TURBINE ROTOR
  • 8. RANKINE CYCLE THE CONVERSION OF HEAT ENERGY INTO MECHANICAL ENERGY WITH THE AID OF STEAM CARRIED OUT THROUGH THIS CYCLE INITIAL STATE OF WORKING FLUID IS WATER WHICH COMPRESSED BY THE FED PUMP IN THE BOILER THE COMPRESSED WATER IS HEATED AT CONSTANT PRESSURE AFTER THIS SUPERHEATED STEAM IS EXPAND AT STEAM TURBINE
  • 10. COMPRESSOR COMPRESSING THE AIR BEFORE COMBUSTOR INCREASE THE EFFICIECY COPRESSOR COPMPRESS THE AIR UPTO 18 TIMES THE ATOMOSPHERIC PRESSURE COMPRESSOR IS DRIVEN BBY THE TURBINE SHAFT 2/3 OF POWER OF TURBINE IS USED TO DRIVE THE SHAFT
  • 11. • COMBUSTOR IGNITE THE HIGH PRESSURE AIR WHICH IS COME FROM COMPRESSOR. • TEMPRATURE OF HOT FLUE GASES RANGES FROM 1400C- 1500c • CHANGE THE CHEMICAL ENERGY OF FUEL INTO THERMAL ENERGY FOR EXPANSION IN TURBINE
  • 12. WASTE HEAT RECOVERY BOILER IT WORKS ON COMBINED CYCLE EXHAUST OF THE GAS TURBINE USED IN A HEAT EXCHANGER CALLED WHRB IT IS MAINLY IMPLEMENTED FOR ENHANCING THE OPERATIONAL EFFICIECY
  • 13. CONDENSER CONDENSER IS A HEAT TRANSFER DEVICE IN WHICH THE EXHAUST STEAM OF A TURBINE IS CONDENSED BY MEANS OF COOLING WATER IT IMPROVES THE THERMAL EFFICIENCY OF PLANT IT AFFECTS THE SAVING IN COST OF WATER TO BE SUPPLIED TO BOILER
  • 14. COOLING TOWER COOLING TOWER IS USED TO PROVIDE THE COOL WATER TO CONDENSER COOLING TOWER IS PROVIDE TO REUSE THE WATER WHICH COMES FROM CHANGING THE STEAM BY THE CONDENSER IT CONSIST OF TEN CELLS WITH LARGE FAN OF SON TOP INSIDE THE CONE LIKE STACKS ,AND A BASIN OF WATER UNDERNEATH
  • 15. ADVANTAGES OF GAS TURBINE • Less installation Period • Simplicity • Less manpower requirements • Quicker response time • Faster Acceleration/deceleration • Modular replacement • Clean fuels • Less vibrations •Less Area Required
  • 16. DISADVANTAGE OF GAS TURBINE •High cost of generation. • High cost of maintenance. •High frequency of inspection/overhauling. • Hot gas path components under high thermal stress. • Needs large quantities of Clean air
  • 17. . Transmission of Generated PowerOnto the Grid Transformers
  • 18. . From each transformer, the power passes underground into our switchyard. The power from all of the generators comes together there , where it is measured, metered and directed on to the grid.  The proximity of the site to a large, existing PG&T substation makes it a good place to build a power plant and the nearest transmission tower is only about 200 feet away. SWITCHYARD
  • 19. From the control room, the plant operators monitor and operate the facility, via the plant’s “ Distributed Control System”, with the click of a mouse, viewing graphic representations of all MEC systems on various screens.  The system gives operators both audible and visual signals to keep them informed of plant conditions at all times and to determine when preventative maintenance is required CONTROL ROOM