Project Objectives
• Dissemination of improved quality fish and
shrimp seed
• Improving the nutrition and income status of farm
households
• Increasing investment, employment and
fish/shrimp production through commercial
aquaculture
• Policy and regulatory reform and institutional
capacity building to support sustainable
aquaculture growth
Working in 20
Districts with
4 hubs
KHULNA
JESSORE
BARISAL
FARIDPUR
COMPONENTS
1. Fish and Shrimp Seed
2. Household Aquaculture
3. Commercial Aquaculture
4. Institutions and Policies
PHASE 1
Phase 1 Strategy:
ï‚— Lay foundation for future commercial and
household aquaculture by focusing on fish and
shrimp seed in first 18 months to March 2013
ï‚— Rapid impacts through collaboration with
existing USAID programs (MYAPs, IPAC, CSISA),
partner NGOs and others
PHASE 2
Phase 2 Strategy:
ï‚— Concentrate on household and commercial
aquaculture, supported by implementation of
new GoB policies to September 2016.
ï‚— Management of most operations by national
public and private institutions after three years
OVERALL TARGETS
Component: 1+2+3 18 months 3 years 5 years
Total household numbers 766,922 971,524 1,172,933
Total area under fish culture (ha) 62,498 70,692 79,562
Total area under shrimp culture (ha) 38,041 75,706 123,988
Total area under vegetable cultivation (ha) 400 2,000 3,000
Increase in fish (including NDF) production (mt) 16,987 32,978 52,228
Increase in shrimp production (mt) 3,058 16,336 40,206
Increase in vegetable production (mt) 1,680 8,400 12,600
Total income gain (US$) from fish production 22,964,710 44,608,311 70,643,277
Total income gain (US$) from shrimp production 18,597,276 99,340,480 278,651,941
Total income gain (US$) from vegetable production 571,200 2,856,000 4,284,000
Total income gain (US$) 42,133,186 146,804,790 353,579,218
PARTNERSHIPS
National institutions:
DoF –
• Provide use of DOF hatchery/brood banks, PCR
lab; import improved lines from abroad
• WFC provide support for implementation of
Hatchery & Feed Laws (discussions with FAO)
BFRI –
• Provide use of farms for brood development, on-
station research, PCR labs for testing shrimp PL
PARTNERSHIPS
– MYAPs: Expand SAVE activities to reach
12,000 households; Expand CARE activities
in year 2
– Include homestead aquaculture in IPAC:
livelihoods programs for 8,000 households
in areas adjacent to the Sunderbans
– Partnership with 85 private depots to
reach 20,000 shrimp farmers
– Assist 5,000 commercial carp farmers
(2000 through by Nobo-Jibon)
– Co-ordinate with CSISA to leverage
greater impacts
Summary of major achievements
to date
ï‚— MOAs/agreements signed: 40 carp hatcheries; 14 shrimp
hatcheries; 38 depots; 1 INGO (Save the Children); 2
national NGOs (CODEC & Speedtrust); IPAC, BCCP
ï‚— Client selection: 45,000 farmers selected
(20,000 shrimp; 20,000 homestead pond; 5000 commercial
fish)
ï‚— Brood distribution: 13,000 kg to 40 carp hatcheries out of
14,000 kg
 Staff recruitment: WFC – 45; Nobo-Jibon partners - 72;
IPAC partners 45; depot staff 85, hatchery-18
Summary of major achievements
to date
ï‚— Individuals trained: 80 hatchery technicians (brood &
hatchery management); 117 partner staff (basic
aquaculture); 85 depot staff (shrimp aquaculture)
ï‚— Artificial Insemination: Introduction of milt
transfers- Provision of high quality Common Carp milt
to a number of private sector hatcheries has begun.
ï‚— National market price database: Developed with
CSISA
1: DEVELOPMENT AND DISSEMINATION OF
IMPROVED FISH & SHRIMP SEED
ï‚— Fastest impacts is through improvements in seed
therefore ≈ 60-70% of investment in Phase 1
ï‚— Main partners GOB: DOF, BFRI; working with
CIFA/ICAR (India)
ï‚— Disseminate improved quality and genetically
improved lines of tilapia, carps (rohu and catla),
shrimp/prawns
Component 1: Set up facilitiesImplementation Workplan Schedule
Detailed Interventions Unit Target
18
months
target
Implementing
partners
Time schedule (18 months)
2011 2012 2013
O N D J F M A M J J A S O N D J F M
1. Set up facilities and logistics for project operation in 20 districts of Khulna, Barisal
and Faridpur regions
1.1. Stakeholder identification and
consultation meeting (1 national and 4
regional-Jessore, Khulna (shrimp), Barisal
and Faridpur)
no of meeting 5 WFC
1.2. Technical Partners : a. DoF & BFRI b.
BARC., BFRF/Universities, BRAC etc.
no of partner 6
DoF, BFRI,
BARC, Uni.,
BRAC
1.2.1. Formation of committee for fish seed
quality improvement
no of
committee
1
Association with
all partners
1.3. Selection of implementing partners no of partner 12
DoF, BFRI,
PRICE, 10 local
NGOs
1.4. FSMF of DoF: for brood development
no of
hatchery/fam
6 to 8 DoF
1.4.1. BFRI (central & regional) for brood
management / line development
no of
hatchery/farm
4 to 5 BFRI
1.4.2. BRAC fish hatcheries (brood
development & nursery)
no of
hatchery/farm
3 to 5 BRAC
1.6. Institutional linkages (meeting,
workshop, visits, field days, fish week, etc.)
no of staff
100
to150
WFC/DoF/BFRI
1.7. Working area (as per proposal)
no of vill/
Un/Upazila
15 PNGOs
1.8. Situation appraisal/secondary/primary
data collection
no of appraisal 3 WFC
Component 1: Carp and Tilapia Seed Quality
Implementation Work plan Schedule
Detailed Interventions Unit Target
18 months
target
Implementing
partners
Time schedule (18 months)
2011 2012 2013
O N D J F M A M J J A S O N D J F M
2. Fish and shrimp seed quality improvement (component 1)
2.Distribution of existing and imported improved strains of rohu, catla, tilapia, pangas
and prawn to public and private hatcheries/centers
2.1. Catla, Rui and Mrigal (in country strain)
2.1.1. Sources: a) BFRI, b) DOF c) Private no of sourcces 3 WFC/DoF
2.1.2. Distribute quality broods among the
private hatcheries
no of hatchery 40 WFC/DoF
2.1.3. Improved quality spawn produced
amount (kg) of
spawn
6,000 WFC/DoF
2.1.4. Improved quality fingerlings produced
no of
fingerlings
(million)
600 WFC/DoF
2.2. Introduce Rui (Jayanti strain) (CIFA, India) through BFRI
2.3. Tilapia (GIFT strain)
2.3.1. Sources: BFRI [300,000] WFC/DoF/BFRI
2.3.2. Distribute quality broods among
private hatcheries
no of hatchery 20 WFC/DoF/BFRI
2.3.3. Improved quality fry will be produced
no of fry
(million)
200 WFC/DoF/BFRI
2.4. Tilapia (saline tolerant strain) WFC
2.4.1. Sources: a) TBD [80,000 Tilapia] WFC/DoF
2.4.2. Distribute quality broods among
private hatcheries
no of hatchery 20 WFC/DoF
2.4.3. Improved quality fry will be produced
no of fry
(million)
80 WFC/DoF
Component 1: Carp and Tilapia Seed Quality
Implementation Workplan Schedule
Detailed Interventions Unit Target
18
months
target
Implementing
partners
Time schedule (18 months)
2011 2012 2013
O N D J F M A M J J A S O N D J F M
2.5. Catla and Rui (Cryopeservation sperm)
2.5.1.Source: a) Bangladesh, b) India c)
Other Source
no of sources 03
WFC/DoF
2.5.2. Distribute quality broods among
private and public hatcheries
no of hatchery 10
WFC/DoF
2.5.3. Pangas and silver carp seed-
Source: abroad
3.Distribution of imported improved strains of rohu, catla, tilapia, shrimp and prawn
to public and private nurseries/centers
3.1. Situation appraisal and problem
identification (carp/tilapia/prawn/shrimp)
no of appraisal 4 WFC, DOF
3.2 Nursery establishment (carp) no of nurseries 300
WFC, DOF,
Local NGOs
3.3. Nursery establishment (tilapia) no of nurseries 100
WFC, DOF,
Local NGOs
4. Capacity building
4.1.Training & Workshops/ Seminar no of batch 3 WFC/DoF
4.2 Visits (local & overseas) no of staff 100 WFC/DoF
5. Improving lines of Jayanti rui and tilapia
5.1. Selection of insitutions/centers (DOF,
BFRI & BRAC) for improving lines
no of partners 2 BFRI and BRAC
5.3. Training & capacity building: study
tour, cross learning etc.
Person 20
WFC, BFRI,
DOF, BRAC
5.4. On-going line improvement activities
WFC, BFRI,
DOF, BRAC
Component 1: Shrimp Seed Quality
Implementation Work plan Schedule
Detailed Interventions Unit Target
18
months
target
Implementing
partners
Time schedule (18 months)
2011 2012 2013
O N D J F M A M J J A S O N D J F M
6. Support for implementation of hatchery act, rules & certification system
6.2. Assist Implementation hatchery
act and rules
DOF/BFRI
6.3. Facilitate DOF for Certification
of Hatchery System
no of system 1 DOF/BFRI
6.4. Support to develop Hatchery &
Nursery Database
no of database 1 WFC/DOF/BFRI
7. Support for policy development to use of PCR tested shrimp PLs
7.1. Develop policy support for use
of PCR tested PLs
no of
documentary
2 WFC/DoF
7.2. Support to operate PCR labs in
private and public sectors
LS WFC/DoF
7. 3 Distribution of PCR screened
PL
No. of PL
(million)
250 WFC
7.3 Establish Nurseries to promote
rearing of PLs prior to Stocking for
grow-out
No. of Shrimp
nurseries
50
WFC
7.3 Workshop for Shrimp Hatchery
owners
No. of
hatcheries
15
WFC
7.3 Experimental breeding of
freshwater prawn in ponds
No. of farms 3
WFC
2: HOUSEHOLD AQUACULTURE
ï‚— Improved incomes through adoption or
improvement of aquaculture as a livelihood
choice.
ï‚— Improved nutrition through education and
adoption of horticulture management
techniques including Vitamin A rich sweet
potato and increased consumption of small fish.
Implementation Work plan Schedule
Detailed Interventions Unit Target
18
months
target
Implementing
partners
Time schedule (18 months)
2011 2012 2013
O N D J F M A M J J A S O N D J F M
8. Household nutrition and income from integrated homestead fish and
vegetable cultivation (component 2)
8a. Working with MYAP implementing partners to expand existing livelihood
programs
8.1 Consultations with Save the
Children-MYAP & preparation of joint
workplan and formal agreement
No of
organization
3 MYAPS
8.2 Appointment of additional
implementing partner staff
No staff 48 MYAPS
8.3 Selection of working areas No of upazilla 3 MYAPS
8.4 Selection of participants (70-80%
women)
No participants
12,000
MYAPS
8b. Working with IPAC implementing partners to expand existing livelihood
programs
8.1 Consultations with IPAC &
preparation of joint workplan and
formal agreement
No of
organization
3 IPAC
8.2 Appointment of additional
implementing partner staff
No staff 32 IPAC
8.3 Selection of working areas No of upazilla 3 IPAC
8.4 Selection of participants (95%
women)
No participants 8,000 IPAC
Component 2: Household Nutrition
Implementation Work plan Schedule
Detailed Interventions Unit Target
18
months
target
Implementing
partners
Time schedule (18 months)
2011 2012 2013
O N D J F M A M J J A S O N D J F M
9. Research on fish in nutrition
9.1 Consultations with technical
partners and MOU signed (DoF, BFRI,
BARC, BFRF etc)
No of partners 4 WFC, DOF
9.2 Review of outcomes of SIS
production technologies under
MYAP/IPAC/IFAD, etc
No Reviews 1 WFC
9.3 Develop research strategy to
determine nutrient dense fish production
technologies
No research
strategies
1
WFC, BFRI,
BFRF
9.4. On Farm and on-station trials on
production of nutirent dense fish
Total no: on-
station trials
8
WFC, BFRI,
BFRF
9.5 Analysis of Nutrient composition of
nutrient dense fish species
No species 15
WFC, Overseas
universities,
BFRF
9.6 Development of brood pond
network and brood distribution system
for nutrient dense fish
No brood ponds
established
1,200
WFC, DOF,
MYAPs, IPAC,
New partner
NGOs, BFRI
Component 2: Household Aquaculture
3: COMMERCIAL AQUACULTURE
ï‚— Collaborate closely with private sector
Hatcheries, Nurseries and Depots to widen
impacts from commercial aquaculture
ï‚— Investment, employment and incomes - in the
southern region through increased production
and better technologies
 ‘New' commercial fish species resilient to
increasing salinity in the southern region
Implementation Workplan Schedule
Detailed Interventions Unit Target
18
months
target
Implementing
partners
Time schedule (18 months)
2011 2012 2013
O N D J F M A M J J A S O N D J F M
10. Commercial aquaculture: Promotion of commercial aquaculture (shrimp, prawn,
tilapia and pangas) in the southern region (component 3)
10.1 Assistance to small-scale shrimp and
prawn farms
no of hh 20,000 WFC /Depot
10.2 Households under carp aquaculture No of hh 5,000 WFC/Partners
10.3 Cage culture No of farmer 250 WFC/Partners
10.4 Demonatration of grow-out ponds for
shrimp/prawn
no of demo 67 WFC
10.45Strengthening gaps among depots,
farmers and inputs suppliers for
ensuring food safety
No of depots 38 WFC/DoF
10.6 Formation of Groups No. of groups 800
WFC/depots
10.7 Train Partner Depot Staff in
compliance with BMPs
No. of staff 85 WFC
10.8 Support to hatchery producing
brackish water species (Mystus
Tengara)
No. of hatcheries 1 WFC/BFRI
10.9 Demonstration of super-intensive
pangas production
No. of demo 3 WFC/DoF
Component 3: Commercial Aquaculutre
4: POLICY AND INSTITUTIONAL CAPACITY
ï‚— Implementation of the Hatchery Act and Feed Act and
India-Bangladesh MOU (coordination with FAO)
ï‚— Strengthen the institutional capacity of associations
ï‚— Support improved aquaculture statistics reporting
(discussion with FAO taking place)
ï‚— Policy support for mandatory PCR testing of shrimp
post larvae
Implementation Workplan Schedule
Detailed Interventions Unit Target
18 months
target
Implementing
partners
Time schedule (18 months)
2011 2012 2013
O N D J F M A M J J A S O N D J F M
11. Institution and policy (component 4)
Sector growth expanded through associations: Bangladesh Frozen Fish Export Association;
Hatchery Associations; Producer Associations; Community Based Organizations
Consultations with associations and signing of
MOU for cooperation
MOUs signed 1
BFFEA; Hatchery
associations;
producer assns;
CBOs
Training and communication programs to improve
service delivery, professional operations and
impacts of associations
Trained assn
staff
5
BFFEA; Hatchery
associations;
producer assns;
CBOs
Support associations to better represent industry
interests in national and international trade
events/programs
BFFEA; Hatchery
associations;
producer assns;
CBOs
Improved public and private services for rural fish farmers in the southern region
Conduct participatory review of current public and
private extension services, including community
organisations. Identify actions and strategies for
improvements to meet future industry needs.
Services
review report
1
WF; DOF; Danida;
private firms
Conduct training programs for new DOF district
staff, other NGO, association partners
WF; DOF; Danida
Identify, test, develop business models and roll out
of new extension service and communication
systems and tools (eg mobile phones) with partners,
including private investors
Investors; local
servicing firms;
CBOs; mobile
phone co;mp; DOF
Component 4: Institution and Policy
Component 4: Institution and Policy
Implementation Workplan Schedule
Detailed Interventions Unit Target
18 months
target
Implementing
partners
Time schedule (18 months)
2011 2012 2013
O N D J F M A M J J A S O N D J F M
Support implementation of Bangladesh-India MOU for fisheries/aquaculture cooperation
Assist DOF to host meeting to prepare plan to
implement Bangladesh-India aquaculture MOU
DOF, India (CIFA),
SAARC Agric.
Center
Provide support to implementation of action plan
arising from meeting
DOF, India (CIFA),
SAARC Agric.
Center
Operational system for collection, analysis and use of aquaculture statistics
Review current aquaculture statistics system and requirements for improvement
FAO (sub-
contract); DOF
Develop and test improved sampling frames/data
collection systems
FAO (sub-
contract); DOF
Provide training, tools and other supporting for
implementing improved system
FAO (sub-
contract); DOF
Established Aquaculture Research Priorities
Conduct stakeholder consultations and workshops
to establish research priorities (contract to USDA
Aquaculture Program)
Consultations
BFRF; Universities;
BARC (BFRI),
WF, technical
assistance from
USDA
Publish research priorities document
Research
review
BARC
Establish and operate with partners a competitive
research fund to address aquaculture research
priority/develop innovations
Bangladesh
Fisheries Research
Forum
Implementation Workplan Schedule
Detailed Interventions Unit Target
18
months
target
Implementing
partners
Time schedule (18 months)
2011 2012 2013
O N D J F M A M J J A S O N D J F M
Aquaculture research cooperation strengthened between Bangladesh and US
researchers
Identify Bangladesh and US partners
BARC;
Universities;
USDA
Support cross-visits to develop
agreements for research cooperation
No of visits 04
Regulations, tools and capacity to implement the new Hatchery Law
Stakeholder consultations and analysis
of implementation requirements,
preparation of implementation program
for the Hatchery Law
no of
consultations
03
IFPRI; DOF;
WF
Development of certification system,
standards, training manuals
IFPRI; DOF;
WF
Drafting regulations and supporting
manuals/educational tools
IFPRI; DOF;
WF
Training and awareness raising
activities that support implementation
IFPRI; DOF;
WF
Component 4: Institution and Policy
Implementation Workplan Schedule
Detailed Interventions Unit Target
18
months
target
Implementing
partners
Time schedule (18 months)
2011 2012 2013
O N D J F M A M J J A S O N D J F M
Regulations, tools and capacity to implement the new Feed Law
Stakeholder consultations and
preparation of implementation program
for the Feed Law
IFPRI; DOF;
WF
Consultant to analyse sources (risks) of
contamination and quality improvements
IFPRI; DOF;
WF
Improve analytical capacity to reduce
contaminant problems
IFPRI; DOF;
WF
Preparation of regulations, supporting
standards, guideline manuals
IFPRI; DOF;
WF
Provide training, major awareness
raising activities
IFPRI; DOF;
WF
Component 4: Institution and Policy
Artificial Insemination: Common Carp
Ft f aquaculture project 23 may 2012_manjurul

Weitere ähnliche Inhalte

Andere mochten auch

milênio um tempo glorioso para a terra
milênio um tempo glorioso para a terramilênio um tempo glorioso para a terra
milênio um tempo glorioso para a terraCelso Napoleon
 
Amebas micro
Amebas microAmebas micro
Amebas microlinda aragon
 
البنيوية التكوينية بيير بورديو
 البنيوية التكوينية بيير بورديو البنيوية التكوينية بيير بورديو
البنيوية التكوينية بيير بورديوحسن قروق
 
Risk Assessment and Environment Management
Risk Assessment  and Environment ManagementRisk Assessment  and Environment Management
Risk Assessment and Environment Managementtabirsir
 
Noção de lógica
Noção de lógicaNoção de lógica
Noção de lógicaIsabel Moura
 
Ficha de revisões 2 teste 11
Ficha de revisões 2 teste 11Ficha de revisões 2 teste 11
Ficha de revisões 2 teste 11Isabel Moura
 
Open Innovation y modelos de negocio.
Open Innovation y modelos de negocio.Open Innovation y modelos de negocio.
Open Innovation y modelos de negocio.Eduardo Remolins
 
Anexos sobre los grupos de exposiciones
Anexos sobre los grupos de exposicionesAnexos sobre los grupos de exposiciones
Anexos sobre los grupos de exposicionesSandy Morales Alarcón
 
Low Input Fruit - Tanner - Cultivate 2016
Low Input Fruit - Tanner - Cultivate 2016 Low Input Fruit - Tanner - Cultivate 2016
Low Input Fruit - Tanner - Cultivate 2016 Cory Tanner
 
PROJECT REPORT PRESENTATION1
PROJECT  REPORT PRESENTATION1PROJECT  REPORT PRESENTATION1
PROJECT REPORT PRESENTATION1Andrew Ayuka
 

Andere mochten auch (10)

milênio um tempo glorioso para a terra
milênio um tempo glorioso para a terramilênio um tempo glorioso para a terra
milênio um tempo glorioso para a terra
 
Amebas micro
Amebas microAmebas micro
Amebas micro
 
البنيوية التكوينية بيير بورديو
 البنيوية التكوينية بيير بورديو البنيوية التكوينية بيير بورديو
البنيوية التكوينية بيير بورديو
 
Risk Assessment and Environment Management
Risk Assessment  and Environment ManagementRisk Assessment  and Environment Management
Risk Assessment and Environment Management
 
Noção de lógica
Noção de lógicaNoção de lógica
Noção de lógica
 
Ficha de revisões 2 teste 11
Ficha de revisões 2 teste 11Ficha de revisões 2 teste 11
Ficha de revisões 2 teste 11
 
Open Innovation y modelos de negocio.
Open Innovation y modelos de negocio.Open Innovation y modelos de negocio.
Open Innovation y modelos de negocio.
 
Anexos sobre los grupos de exposiciones
Anexos sobre los grupos de exposicionesAnexos sobre los grupos de exposiciones
Anexos sobre los grupos de exposiciones
 
Low Input Fruit - Tanner - Cultivate 2016
Low Input Fruit - Tanner - Cultivate 2016 Low Input Fruit - Tanner - Cultivate 2016
Low Input Fruit - Tanner - Cultivate 2016
 
PROJECT REPORT PRESENTATION1
PROJECT  REPORT PRESENTATION1PROJECT  REPORT PRESENTATION1
PROJECT REPORT PRESENTATION1
 

Ähnlich wie Ft f aquaculture project 23 may 2012_manjurul

RFLDC, Noakhali: Achievements and Challenges
RFLDC, Noakhali: Achievements and ChallengesRFLDC, Noakhali: Achievements and Challenges
RFLDC, Noakhali: Achievements and ChallengesRfldc Danida
 
FAO–KSA Cooperation Programme: Supporting Sustainability of Small Scale Agri...
FAO–KSA Cooperation Programme: Supporting Sustainability of  Small Scale Agri...FAO–KSA Cooperation Programme: Supporting Sustainability of  Small Scale Agri...
FAO–KSA Cooperation Programme: Supporting Sustainability of Small Scale Agri...Nena Agri
 
Fish Farmer Producer Organization FFPOs.ppt
Fish Farmer Producer Organization FFPOs.pptFish Farmer Producer Organization FFPOs.ppt
Fish Farmer Producer Organization FFPOs.pptB. BHASKAR
 
Kiribati Agritourism Policy Setting Workshop 2019 - Pacific Organic Standards
Kiribati Agritourism Policy Setting Workshop 2019 - Pacific Organic StandardsKiribati Agritourism Policy Setting Workshop 2019 - Pacific Organic Standards
Kiribati Agritourism Policy Setting Workshop 2019 - Pacific Organic StandardsBrussels Briefings (brusselsbriefings.net)
 
Fisheries ppp-11th-5 yr-plan
Fisheries ppp-11th-5 yr-planFisheries ppp-11th-5 yr-plan
Fisheries ppp-11th-5 yr-planprabeen singh
 
LIFSAP Project Sharing
LIFSAP Project SharingLIFSAP Project Sharing
LIFSAP Project SharingJohn Vietnam
 
Dev.ed 335, dr binoya
Dev.ed 335, dr binoyaDev.ed 335, dr binoya
Dev.ed 335, dr binoyaCarlo Cornejo
 
Africa RISING going to scale in the Eastern Province of Zambia Project: Overv...
Africa RISING going to scale in the Eastern Province of Zambia Project: Overv...Africa RISING going to scale in the Eastern Province of Zambia Project: Overv...
Africa RISING going to scale in the Eastern Province of Zambia Project: Overv...africa-rising
 
Final WISH pond workshop Report_04Mar2016
Final WISH pond workshop Report_04Mar2016Final WISH pond workshop Report_04Mar2016
Final WISH pond workshop Report_04Mar2016chea seila
 
Kiribati Agritourism Policy Setting Workshop 2019 - Pacific organic toursim ;...
Kiribati Agritourism Policy Setting Workshop 2019 - Pacific organic toursim ;...Kiribati Agritourism Policy Setting Workshop 2019 - Pacific organic toursim ;...
Kiribati Agritourism Policy Setting Workshop 2019 - Pacific organic toursim ;...Brussels Briefings (brusselsbriefings.net)
 
Organic Certification
Organic CertificationOrganic Certification
Organic CertificationAzhar Javaid
 
Cambodia: Overview of Fish on Farms Project. By Chin Da, FiA and Lek Sophat.
Cambodia: Overview of Fish on Farms Project. By Chin Da, FiA and Lek Sophat.Cambodia: Overview of Fish on Farms Project. By Chin Da, FiA and Lek Sophat.
Cambodia: Overview of Fish on Farms Project. By Chin Da, FiA and Lek Sophat.WorldFish
 
1959 manual básico de piscicultura en estanques
1959 manual básico de piscicultura en estanques1959 manual básico de piscicultura en estanques
1959 manual básico de piscicultura en estanquesJUANMANUELLOPEZZUMAE
 
EMFAF OP, NSPSA & Grant Schemes
EMFAF OP, NSPSA & Grant Schemes  EMFAF OP, NSPSA & Grant Schemes
EMFAF OP, NSPSA & Grant Schemes IrishFarmers
 
Functionnaries
FunctionnariesFunctionnaries
Functionnariesswathi swathi
 

Ähnlich wie Ft f aquaculture project 23 may 2012_manjurul (20)

Fish sub sector paln_RED
Fish sub sector paln_REDFish sub sector paln_RED
Fish sub sector paln_RED
 
Aquaculture Certification in Indonesia
Aquaculture Certification in IndonesiaAquaculture Certification in Indonesia
Aquaculture Certification in Indonesia
 
RFLDC, Noakhali: Achievements and Challenges
RFLDC, Noakhali: Achievements and ChallengesRFLDC, Noakhali: Achievements and Challenges
RFLDC, Noakhali: Achievements and Challenges
 
FAO–KSA Cooperation Programme: Supporting Sustainability of Small Scale Agri...
FAO–KSA Cooperation Programme: Supporting Sustainability of  Small Scale Agri...FAO–KSA Cooperation Programme: Supporting Sustainability of  Small Scale Agri...
FAO–KSA Cooperation Programme: Supporting Sustainability of Small Scale Agri...
 
Fish Farmer Producer Organization FFPOs.ppt
Fish Farmer Producer Organization FFPOs.pptFish Farmer Producer Organization FFPOs.ppt
Fish Farmer Producer Organization FFPOs.ppt
 
Kiribati Agritourism Policy Setting Workshop 2019 - Pacific Organic Standards
Kiribati Agritourism Policy Setting Workshop 2019 - Pacific Organic StandardsKiribati Agritourism Policy Setting Workshop 2019 - Pacific Organic Standards
Kiribati Agritourism Policy Setting Workshop 2019 - Pacific Organic Standards
 
POS (1)
POS (1)POS (1)
POS (1)
 
Fisheries ppp-11th-5 yr-plan
Fisheries ppp-11th-5 yr-planFisheries ppp-11th-5 yr-plan
Fisheries ppp-11th-5 yr-plan
 
Bfar
BfarBfar
Bfar
 
LIFSAP Project Sharing
LIFSAP Project SharingLIFSAP Project Sharing
LIFSAP Project Sharing
 
Dev.ed 335, dr binoya
Dev.ed 335, dr binoyaDev.ed 335, dr binoya
Dev.ed 335, dr binoya
 
Bio Resource Centres
Bio Resource Centres Bio Resource Centres
Bio Resource Centres
 
Africa RISING going to scale in the Eastern Province of Zambia Project: Overv...
Africa RISING going to scale in the Eastern Province of Zambia Project: Overv...Africa RISING going to scale in the Eastern Province of Zambia Project: Overv...
Africa RISING going to scale in the Eastern Province of Zambia Project: Overv...
 
Final WISH pond workshop Report_04Mar2016
Final WISH pond workshop Report_04Mar2016Final WISH pond workshop Report_04Mar2016
Final WISH pond workshop Report_04Mar2016
 
Kiribati Agritourism Policy Setting Workshop 2019 - Pacific organic toursim ;...
Kiribati Agritourism Policy Setting Workshop 2019 - Pacific organic toursim ;...Kiribati Agritourism Policy Setting Workshop 2019 - Pacific organic toursim ;...
Kiribati Agritourism Policy Setting Workshop 2019 - Pacific organic toursim ;...
 
Organic Certification
Organic CertificationOrganic Certification
Organic Certification
 
Cambodia: Overview of Fish on Farms Project. By Chin Da, FiA and Lek Sophat.
Cambodia: Overview of Fish on Farms Project. By Chin Da, FiA and Lek Sophat.Cambodia: Overview of Fish on Farms Project. By Chin Da, FiA and Lek Sophat.
Cambodia: Overview of Fish on Farms Project. By Chin Da, FiA and Lek Sophat.
 
1959 manual básico de piscicultura en estanques
1959 manual básico de piscicultura en estanques1959 manual básico de piscicultura en estanques
1959 manual básico de piscicultura en estanques
 
EMFAF OP, NSPSA & Grant Schemes
EMFAF OP, NSPSA & Grant Schemes  EMFAF OP, NSPSA & Grant Schemes
EMFAF OP, NSPSA & Grant Schemes
 
Functionnaries
FunctionnariesFunctionnaries
Functionnaries
 

Mehr von AASBD

Iwm g4 22 may 2012_kamal
Iwm g4  22 may 2012_kamalIwm g4  22 may 2012_kamal
Iwm g4 22 may 2012_kamalAASBD
 
Csisa wfc 22 may 2012_sattya
Csisa wfc 22 may 2012_sattyaCsisa wfc 22 may 2012_sattya
Csisa wfc 22 may 2012_sattyaAASBD
 
Cpwf g2 22 may 2012_manoranjan
Cpwf g2 22 may 2012_manoranjanCpwf g2 22 may 2012_manoranjan
Cpwf g2 22 may 2012_manoranjanAASBD
 
Bari khulna 23 may 2012 proshanta
Bari khulna 23 may 2012 proshantaBari khulna 23 may 2012 proshanta
Bari khulna 23 may 2012 proshantaAASBD
 
Csisa cimmyt 22 may 2012_sajahan
Csisa cimmyt 22 may 2012_sajahanCsisa cimmyt 22 may 2012_sajahan
Csisa cimmyt 22 may 2012_sajahanAASBD
 
Bari 09
Bari  09Bari  09
Bari 09AASBD
 
Aas crp 1.3 bangladesh 23 may 2012_kevin
Aas crp 1.3 bangladesh 23 may 2012_kevinAas crp 1.3 bangladesh 23 may 2012_kevin
Aas crp 1.3 bangladesh 23 may 2012_kevinAASBD
 
Alignment phillips
Alignment   phillipsAlignment   phillips
Alignment phillipsAASBD
 
Gender csisa aas alignment meeting-6 may 2013_afrina
Gender csisa aas alignment meeting-6 may 2013_afrinaGender csisa aas alignment meeting-6 may 2013_afrina
Gender csisa aas alignment meeting-6 may 2013_afrinaAASBD
 
Csisa aas allignment workshop-presentation 1 by israt zahura
Csisa   aas allignment  workshop-presentation 1 by israt zahuraCsisa   aas allignment  workshop-presentation 1 by israt zahura
Csisa aas allignment workshop-presentation 1 by israt zahuraAASBD
 
6. csisa aquaculture production economics and poverty surveys by ben
6. csisa aquaculture production economics and poverty surveys by ben6. csisa aquaculture production economics and poverty surveys by ben
6. csisa aquaculture production economics and poverty surveys by benAASBD
 
5. adaptive research trials under csisa bd progress and future plan - benoy
5. adaptive research trials under csisa bd  progress and future plan - benoy5. adaptive research trials under csisa bd  progress and future plan - benoy
5. adaptive research trials under csisa bd progress and future plan - benoyAASBD
 
2. aas csisa integration planning mtg may 2013 by charlie
2. aas csisa integration planning mtg may 2013 by charlie2. aas csisa integration planning mtg may 2013 by charlie
2. aas csisa integration planning mtg may 2013 by charlieAASBD
 
3. aas program overview may csisa by kevin kamp
3. aas program overview may csisa by kevin kamp3. aas program overview may csisa by kevin kamp
3. aas program overview may csisa by kevin kampAASBD
 
1. why a csisa aas alignment by craig meisner
1. why a csisa aas alignment by craig meisner1. why a csisa aas alignment by craig meisner
1. why a csisa aas alignment by craig meisnerAASBD
 

Mehr von AASBD (15)

Iwm g4 22 may 2012_kamal
Iwm g4  22 may 2012_kamalIwm g4  22 may 2012_kamal
Iwm g4 22 may 2012_kamal
 
Csisa wfc 22 may 2012_sattya
Csisa wfc 22 may 2012_sattyaCsisa wfc 22 may 2012_sattya
Csisa wfc 22 may 2012_sattya
 
Cpwf g2 22 may 2012_manoranjan
Cpwf g2 22 may 2012_manoranjanCpwf g2 22 may 2012_manoranjan
Cpwf g2 22 may 2012_manoranjan
 
Bari khulna 23 may 2012 proshanta
Bari khulna 23 may 2012 proshantaBari khulna 23 may 2012 proshanta
Bari khulna 23 may 2012 proshanta
 
Csisa cimmyt 22 may 2012_sajahan
Csisa cimmyt 22 may 2012_sajahanCsisa cimmyt 22 may 2012_sajahan
Csisa cimmyt 22 may 2012_sajahan
 
Bari 09
Bari  09Bari  09
Bari 09
 
Aas crp 1.3 bangladesh 23 may 2012_kevin
Aas crp 1.3 bangladesh 23 may 2012_kevinAas crp 1.3 bangladesh 23 may 2012_kevin
Aas crp 1.3 bangladesh 23 may 2012_kevin
 
Alignment phillips
Alignment   phillipsAlignment   phillips
Alignment phillips
 
Gender csisa aas alignment meeting-6 may 2013_afrina
Gender csisa aas alignment meeting-6 may 2013_afrinaGender csisa aas alignment meeting-6 may 2013_afrina
Gender csisa aas alignment meeting-6 may 2013_afrina
 
Csisa aas allignment workshop-presentation 1 by israt zahura
Csisa   aas allignment  workshop-presentation 1 by israt zahuraCsisa   aas allignment  workshop-presentation 1 by israt zahura
Csisa aas allignment workshop-presentation 1 by israt zahura
 
6. csisa aquaculture production economics and poverty surveys by ben
6. csisa aquaculture production economics and poverty surveys by ben6. csisa aquaculture production economics and poverty surveys by ben
6. csisa aquaculture production economics and poverty surveys by ben
 
5. adaptive research trials under csisa bd progress and future plan - benoy
5. adaptive research trials under csisa bd  progress and future plan - benoy5. adaptive research trials under csisa bd  progress and future plan - benoy
5. adaptive research trials under csisa bd progress and future plan - benoy
 
2. aas csisa integration planning mtg may 2013 by charlie
2. aas csisa integration planning mtg may 2013 by charlie2. aas csisa integration planning mtg may 2013 by charlie
2. aas csisa integration planning mtg may 2013 by charlie
 
3. aas program overview may csisa by kevin kamp
3. aas program overview may csisa by kevin kamp3. aas program overview may csisa by kevin kamp
3. aas program overview may csisa by kevin kamp
 
1. why a csisa aas alignment by craig meisner
1. why a csisa aas alignment by craig meisner1. why a csisa aas alignment by craig meisner
1. why a csisa aas alignment by craig meisner
 

Kürzlich hochgeladen

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Trucks in Minnesota
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 

Kürzlich hochgeladen (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 

Ft f aquaculture project 23 may 2012_manjurul

  • 1. Presented in AAS Hub Scoping at Khulna
  • 2. Project Objectives • Dissemination of improved quality fish and shrimp seed • Improving the nutrition and income status of farm households • Increasing investment, employment and fish/shrimp production through commercial aquaculture • Policy and regulatory reform and institutional capacity building to support sustainable aquaculture growth
  • 3. Working in 20 Districts with 4 hubs KHULNA JESSORE BARISAL FARIDPUR
  • 4. COMPONENTS 1. Fish and Shrimp Seed 2. Household Aquaculture 3. Commercial Aquaculture 4. Institutions and Policies
  • 5. PHASE 1 Phase 1 Strategy: ï‚— Lay foundation for future commercial and household aquaculture by focusing on fish and shrimp seed in first 18 months to March 2013 ï‚— Rapid impacts through collaboration with existing USAID programs (MYAPs, IPAC, CSISA), partner NGOs and others
  • 6. PHASE 2 Phase 2 Strategy: ï‚— Concentrate on household and commercial aquaculture, supported by implementation of new GoB policies to September 2016. ï‚— Management of most operations by national public and private institutions after three years
  • 7. OVERALL TARGETS Component: 1+2+3 18 months 3 years 5 years Total household numbers 766,922 971,524 1,172,933 Total area under fish culture (ha) 62,498 70,692 79,562 Total area under shrimp culture (ha) 38,041 75,706 123,988 Total area under vegetable cultivation (ha) 400 2,000 3,000 Increase in fish (including NDF) production (mt) 16,987 32,978 52,228 Increase in shrimp production (mt) 3,058 16,336 40,206 Increase in vegetable production (mt) 1,680 8,400 12,600 Total income gain (US$) from fish production 22,964,710 44,608,311 70,643,277 Total income gain (US$) from shrimp production 18,597,276 99,340,480 278,651,941 Total income gain (US$) from vegetable production 571,200 2,856,000 4,284,000 Total income gain (US$) 42,133,186 146,804,790 353,579,218
  • 8. PARTNERSHIPS National institutions: DoF – • Provide use of DOF hatchery/brood banks, PCR lab; import improved lines from abroad • WFC provide support for implementation of Hatchery & Feed Laws (discussions with FAO) BFRI – • Provide use of farms for brood development, on- station research, PCR labs for testing shrimp PL
  • 9. PARTNERSHIPS – MYAPs: Expand SAVE activities to reach 12,000 households; Expand CARE activities in year 2 – Include homestead aquaculture in IPAC: livelihoods programs for 8,000 households in areas adjacent to the Sunderbans – Partnership with 85 private depots to reach 20,000 shrimp farmers – Assist 5,000 commercial carp farmers (2000 through by Nobo-Jibon) – Co-ordinate with CSISA to leverage greater impacts
  • 10. Summary of major achievements to date ï‚— MOAs/agreements signed: 40 carp hatcheries; 14 shrimp hatcheries; 38 depots; 1 INGO (Save the Children); 2 national NGOs (CODEC & Speedtrust); IPAC, BCCP ï‚— Client selection: 45,000 farmers selected (20,000 shrimp; 20,000 homestead pond; 5000 commercial fish) ï‚— Brood distribution: 13,000 kg to 40 carp hatcheries out of 14,000 kg ï‚— Staff recruitment: WFC – 45; Nobo-Jibon partners - 72; IPAC partners 45; depot staff 85, hatchery-18
  • 11. Summary of major achievements to date ï‚— Individuals trained: 80 hatchery technicians (brood & hatchery management); 117 partner staff (basic aquaculture); 85 depot staff (shrimp aquaculture) ï‚— Artificial Insemination: Introduction of milt transfers- Provision of high quality Common Carp milt to a number of private sector hatcheries has begun. ï‚— National market price database: Developed with CSISA
  • 12. 1: DEVELOPMENT AND DISSEMINATION OF IMPROVED FISH & SHRIMP SEED ï‚— Fastest impacts is through improvements in seed therefore ≈ 60-70% of investment in Phase 1 ï‚— Main partners GOB: DOF, BFRI; working with CIFA/ICAR (India) ï‚— Disseminate improved quality and genetically improved lines of tilapia, carps (rohu and catla), shrimp/prawns
  • 13. Component 1: Set up facilitiesImplementation Workplan Schedule Detailed Interventions Unit Target 18 months target Implementing partners Time schedule (18 months) 2011 2012 2013 O N D J F M A M J J A S O N D J F M 1. Set up facilities and logistics for project operation in 20 districts of Khulna, Barisal and Faridpur regions 1.1. Stakeholder identification and consultation meeting (1 national and 4 regional-Jessore, Khulna (shrimp), Barisal and Faridpur) no of meeting 5 WFC 1.2. Technical Partners : a. DoF & BFRI b. BARC., BFRF/Universities, BRAC etc. no of partner 6 DoF, BFRI, BARC, Uni., BRAC 1.2.1. Formation of committee for fish seed quality improvement no of committee 1 Association with all partners 1.3. Selection of implementing partners no of partner 12 DoF, BFRI, PRICE, 10 local NGOs 1.4. FSMF of DoF: for brood development no of hatchery/fam 6 to 8 DoF 1.4.1. BFRI (central & regional) for brood management / line development no of hatchery/farm 4 to 5 BFRI 1.4.2. BRAC fish hatcheries (brood development & nursery) no of hatchery/farm 3 to 5 BRAC 1.6. Institutional linkages (meeting, workshop, visits, field days, fish week, etc.) no of staff 100 to150 WFC/DoF/BFRI 1.7. Working area (as per proposal) no of vill/ Un/Upazila 15 PNGOs 1.8. Situation appraisal/secondary/primary data collection no of appraisal 3 WFC
  • 14. Component 1: Carp and Tilapia Seed Quality Implementation Work plan Schedule Detailed Interventions Unit Target 18 months target Implementing partners Time schedule (18 months) 2011 2012 2013 O N D J F M A M J J A S O N D J F M 2. Fish and shrimp seed quality improvement (component 1) 2.Distribution of existing and imported improved strains of rohu, catla, tilapia, pangas and prawn to public and private hatcheries/centers 2.1. Catla, Rui and Mrigal (in country strain) 2.1.1. Sources: a) BFRI, b) DOF c) Private no of sourcces 3 WFC/DoF 2.1.2. Distribute quality broods among the private hatcheries no of hatchery 40 WFC/DoF 2.1.3. Improved quality spawn produced amount (kg) of spawn 6,000 WFC/DoF 2.1.4. Improved quality fingerlings produced no of fingerlings (million) 600 WFC/DoF 2.2. Introduce Rui (Jayanti strain) (CIFA, India) through BFRI 2.3. Tilapia (GIFT strain) 2.3.1. Sources: BFRI [300,000] WFC/DoF/BFRI 2.3.2. Distribute quality broods among private hatcheries no of hatchery 20 WFC/DoF/BFRI 2.3.3. Improved quality fry will be produced no of fry (million) 200 WFC/DoF/BFRI 2.4. Tilapia (saline tolerant strain) WFC 2.4.1. Sources: a) TBD [80,000 Tilapia] WFC/DoF 2.4.2. Distribute quality broods among private hatcheries no of hatchery 20 WFC/DoF 2.4.3. Improved quality fry will be produced no of fry (million) 80 WFC/DoF
  • 15. Component 1: Carp and Tilapia Seed Quality Implementation Workplan Schedule Detailed Interventions Unit Target 18 months target Implementing partners Time schedule (18 months) 2011 2012 2013 O N D J F M A M J J A S O N D J F M 2.5. Catla and Rui (Cryopeservation sperm) 2.5.1.Source: a) Bangladesh, b) India c) Other Source no of sources 03 WFC/DoF 2.5.2. Distribute quality broods among private and public hatcheries no of hatchery 10 WFC/DoF 2.5.3. Pangas and silver carp seed- Source: abroad 3.Distribution of imported improved strains of rohu, catla, tilapia, shrimp and prawn to public and private nurseries/centers 3.1. Situation appraisal and problem identification (carp/tilapia/prawn/shrimp) no of appraisal 4 WFC, DOF 3.2 Nursery establishment (carp) no of nurseries 300 WFC, DOF, Local NGOs 3.3. Nursery establishment (tilapia) no of nurseries 100 WFC, DOF, Local NGOs 4. Capacity building 4.1.Training & Workshops/ Seminar no of batch 3 WFC/DoF 4.2 Visits (local & overseas) no of staff 100 WFC/DoF 5. Improving lines of Jayanti rui and tilapia 5.1. Selection of insitutions/centers (DOF, BFRI & BRAC) for improving lines no of partners 2 BFRI and BRAC 5.3. Training & capacity building: study tour, cross learning etc. Person 20 WFC, BFRI, DOF, BRAC 5.4. On-going line improvement activities WFC, BFRI, DOF, BRAC
  • 16. Component 1: Shrimp Seed Quality Implementation Work plan Schedule Detailed Interventions Unit Target 18 months target Implementing partners Time schedule (18 months) 2011 2012 2013 O N D J F M A M J J A S O N D J F M 6. Support for implementation of hatchery act, rules & certification system 6.2. Assist Implementation hatchery act and rules DOF/BFRI 6.3. Facilitate DOF for Certification of Hatchery System no of system 1 DOF/BFRI 6.4. Support to develop Hatchery & Nursery Database no of database 1 WFC/DOF/BFRI 7. Support for policy development to use of PCR tested shrimp PLs 7.1. Develop policy support for use of PCR tested PLs no of documentary 2 WFC/DoF 7.2. Support to operate PCR labs in private and public sectors LS WFC/DoF 7. 3 Distribution of PCR screened PL No. of PL (million) 250 WFC 7.3 Establish Nurseries to promote rearing of PLs prior to Stocking for grow-out No. of Shrimp nurseries 50 WFC 7.3 Workshop for Shrimp Hatchery owners No. of hatcheries 15 WFC 7.3 Experimental breeding of freshwater prawn in ponds No. of farms 3 WFC
  • 17. 2: HOUSEHOLD AQUACULTURE ï‚— Improved incomes through adoption or improvement of aquaculture as a livelihood choice. ï‚— Improved nutrition through education and adoption of horticulture management techniques including Vitamin A rich sweet potato and increased consumption of small fish.
  • 18. Implementation Work plan Schedule Detailed Interventions Unit Target 18 months target Implementing partners Time schedule (18 months) 2011 2012 2013 O N D J F M A M J J A S O N D J F M 8. Household nutrition and income from integrated homestead fish and vegetable cultivation (component 2) 8a. Working with MYAP implementing partners to expand existing livelihood programs 8.1 Consultations with Save the Children-MYAP & preparation of joint workplan and formal agreement No of organization 3 MYAPS 8.2 Appointment of additional implementing partner staff No staff 48 MYAPS 8.3 Selection of working areas No of upazilla 3 MYAPS 8.4 Selection of participants (70-80% women) No participants 12,000 MYAPS 8b. Working with IPAC implementing partners to expand existing livelihood programs 8.1 Consultations with IPAC & preparation of joint workplan and formal agreement No of organization 3 IPAC 8.2 Appointment of additional implementing partner staff No staff 32 IPAC 8.3 Selection of working areas No of upazilla 3 IPAC 8.4 Selection of participants (95% women) No participants 8,000 IPAC Component 2: Household Nutrition
  • 19. Implementation Work plan Schedule Detailed Interventions Unit Target 18 months target Implementing partners Time schedule (18 months) 2011 2012 2013 O N D J F M A M J J A S O N D J F M 9. Research on fish in nutrition 9.1 Consultations with technical partners and MOU signed (DoF, BFRI, BARC, BFRF etc) No of partners 4 WFC, DOF 9.2 Review of outcomes of SIS production technologies under MYAP/IPAC/IFAD, etc No Reviews 1 WFC 9.3 Develop research strategy to determine nutrient dense fish production technologies No research strategies 1 WFC, BFRI, BFRF 9.4. On Farm and on-station trials on production of nutirent dense fish Total no: on- station trials 8 WFC, BFRI, BFRF 9.5 Analysis of Nutrient composition of nutrient dense fish species No species 15 WFC, Overseas universities, BFRF 9.6 Development of brood pond network and brood distribution system for nutrient dense fish No brood ponds established 1,200 WFC, DOF, MYAPs, IPAC, New partner NGOs, BFRI Component 2: Household Aquaculture
  • 20. 3: COMMERCIAL AQUACULTURE ï‚— Collaborate closely with private sector Hatcheries, Nurseries and Depots to widen impacts from commercial aquaculture ï‚— Investment, employment and incomes - in the southern region through increased production and better technologies ï‚— ‘New' commercial fish species resilient to increasing salinity in the southern region
  • 21. Implementation Workplan Schedule Detailed Interventions Unit Target 18 months target Implementing partners Time schedule (18 months) 2011 2012 2013 O N D J F M A M J J A S O N D J F M 10. Commercial aquaculture: Promotion of commercial aquaculture (shrimp, prawn, tilapia and pangas) in the southern region (component 3) 10.1 Assistance to small-scale shrimp and prawn farms no of hh 20,000 WFC /Depot 10.2 Households under carp aquaculture No of hh 5,000 WFC/Partners 10.3 Cage culture No of farmer 250 WFC/Partners 10.4 Demonatration of grow-out ponds for shrimp/prawn no of demo 67 WFC 10.45Strengthening gaps among depots, farmers and inputs suppliers for ensuring food safety No of depots 38 WFC/DoF 10.6 Formation of Groups No. of groups 800 WFC/depots 10.7 Train Partner Depot Staff in compliance with BMPs No. of staff 85 WFC 10.8 Support to hatchery producing brackish water species (Mystus Tengara) No. of hatcheries 1 WFC/BFRI 10.9 Demonstration of super-intensive pangas production No. of demo 3 WFC/DoF Component 3: Commercial Aquaculutre
  • 22. 4: POLICY AND INSTITUTIONAL CAPACITY ï‚— Implementation of the Hatchery Act and Feed Act and India-Bangladesh MOU (coordination with FAO) ï‚— Strengthen the institutional capacity of associations ï‚— Support improved aquaculture statistics reporting (discussion with FAO taking place) ï‚— Policy support for mandatory PCR testing of shrimp post larvae
  • 23. Implementation Workplan Schedule Detailed Interventions Unit Target 18 months target Implementing partners Time schedule (18 months) 2011 2012 2013 O N D J F M A M J J A S O N D J F M 11. Institution and policy (component 4) Sector growth expanded through associations: Bangladesh Frozen Fish Export Association; Hatchery Associations; Producer Associations; Community Based Organizations Consultations with associations and signing of MOU for cooperation MOUs signed 1 BFFEA; Hatchery associations; producer assns; CBOs Training and communication programs to improve service delivery, professional operations and impacts of associations Trained assn staff 5 BFFEA; Hatchery associations; producer assns; CBOs Support associations to better represent industry interests in national and international trade events/programs BFFEA; Hatchery associations; producer assns; CBOs Improved public and private services for rural fish farmers in the southern region Conduct participatory review of current public and private extension services, including community organisations. Identify actions and strategies for improvements to meet future industry needs. Services review report 1 WF; DOF; Danida; private firms Conduct training programs for new DOF district staff, other NGO, association partners WF; DOF; Danida Identify, test, develop business models and roll out of new extension service and communication systems and tools (eg mobile phones) with partners, including private investors Investors; local servicing firms; CBOs; mobile phone co;mp; DOF Component 4: Institution and Policy
  • 24. Component 4: Institution and Policy Implementation Workplan Schedule Detailed Interventions Unit Target 18 months target Implementing partners Time schedule (18 months) 2011 2012 2013 O N D J F M A M J J A S O N D J F M Support implementation of Bangladesh-India MOU for fisheries/aquaculture cooperation Assist DOF to host meeting to prepare plan to implement Bangladesh-India aquaculture MOU DOF, India (CIFA), SAARC Agric. Center Provide support to implementation of action plan arising from meeting DOF, India (CIFA), SAARC Agric. Center Operational system for collection, analysis and use of aquaculture statistics Review current aquaculture statistics system and requirements for improvement FAO (sub- contract); DOF Develop and test improved sampling frames/data collection systems FAO (sub- contract); DOF Provide training, tools and other supporting for implementing improved system FAO (sub- contract); DOF Established Aquaculture Research Priorities Conduct stakeholder consultations and workshops to establish research priorities (contract to USDA Aquaculture Program) Consultations BFRF; Universities; BARC (BFRI), WF, technical assistance from USDA Publish research priorities document Research review BARC Establish and operate with partners a competitive research fund to address aquaculture research priority/develop innovations Bangladesh Fisheries Research Forum
  • 25. Implementation Workplan Schedule Detailed Interventions Unit Target 18 months target Implementing partners Time schedule (18 months) 2011 2012 2013 O N D J F M A M J J A S O N D J F M Aquaculture research cooperation strengthened between Bangladesh and US researchers Identify Bangladesh and US partners BARC; Universities; USDA Support cross-visits to develop agreements for research cooperation No of visits 04 Regulations, tools and capacity to implement the new Hatchery Law Stakeholder consultations and analysis of implementation requirements, preparation of implementation program for the Hatchery Law no of consultations 03 IFPRI; DOF; WF Development of certification system, standards, training manuals IFPRI; DOF; WF Drafting regulations and supporting manuals/educational tools IFPRI; DOF; WF Training and awareness raising activities that support implementation IFPRI; DOF; WF Component 4: Institution and Policy
  • 26. Implementation Workplan Schedule Detailed Interventions Unit Target 18 months target Implementing partners Time schedule (18 months) 2011 2012 2013 O N D J F M A M J J A S O N D J F M Regulations, tools and capacity to implement the new Feed Law Stakeholder consultations and preparation of implementation program for the Feed Law IFPRI; DOF; WF Consultant to analyse sources (risks) of contamination and quality improvements IFPRI; DOF; WF Improve analytical capacity to reduce contaminant problems IFPRI; DOF; WF Preparation of regulations, supporting standards, guideline manuals IFPRI; DOF; WF Provide training, major awareness raising activities IFPRI; DOF; WF Component 4: Institution and Policy