The 4P’s for Building
a Successful Capital Asset
The key to managing the unique world of complex projects
MEET THE SPEAKERS
Jim Pearson
Contracts Manager, Global at ConocoPhillips
Company
E: James.Pearson@conocophillips.com
1
Jack Leahey
VP of Global Sales & Services at 8over8
E: j.leahey@8over8.com
2
Andy Aston
Senior Vice President at Turner & Townsend
E: Andy.aston@turntown.com
3
David Strickland
Associate, King & Spalding
E: James. DStrickland@KSLAW.com
1
The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
Paul Capos
Procurement and Contracts Manager, Worley Parsons
E: Paul.Capos@WorleyParsons.com
1
Because risk and uncertainty increase with the size of a project the
most important focus for operators should be their relationships with
their contractors.
DISCOVER THE 4P’S IN TODAY’S SESSION.
We will discuss the ‘4 Ps’ that experienced practitioners have found to
be fundamental when building the relationships that build a successful
capital asset:
• Be Professional
• Be Pragmatic
• Be Proactive
• Be Personable
What will be covered?
The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
According to Bloomberg, only 20%
of capital projects are completed
within budget and on time
The challenge…
“ “
…because relationship
management is the most
effective way to reduce claims and
overruns it makes a significant
contribution to
your bottom line…
We need to change
the way we manage complex
projects.
The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
BE PROACTIVE
Systems & Processes
Anticipate next actions
Identify problems
& opportunities
BEPRAGMATIC
BE PROFESSIONAL
BE PERSONABLE
Claim management
Technology
Process
People
Analytics
Project scheduling/planning
Project delays
The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
4 P’s to success…
BE PROFESSIONAL
“ “…every time a clarification or
amendment is made to the specification
or a drawing, it is important that
both parties record any impact,
and agree the consequences…”
The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
…it is important not to lose sight of the
overall commercial objective of the
project, and the earlier a
dispute is resolved the cheaper
it is to fix.…
4 P’s to success…
BE PRAGMATIC
“ “
The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
A project stands or falls on
the strength of its relationships…
4 P’s to success…
BE PERSONABLE
“ “
The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
…at the end of the day, billion dollar
projects can’t rely on instructions
that are picked up on the
grapevine..…
4 P’s to success…
BE PROACTIVE
“ “
BE PROACTIVE
Systems & Processes
Anticipate next actions
Identify problems
& opportunities
BEPRAGMATIC
BE PROFESSIONAL
BE PERSONABLE
Claim management
Technology
Process
People
Analytics
Project scheduling/planning
Project delays
The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
CONTACT THE SPEAKERS
Jim Pearson
Contracts Manager, Global at ConocoPhillips
Company
E: James.Pearson@conocophillips.com
1
Jack Leahey
VP of Global Sales & Services at 8over8
E: j.leahey@8over8.com
2
Andy Aston
Senior Vice President at Turner & Townsend
E: Andy.aston@turntown.com
3
David Strickland
Associate, King & Spalding
E: James. DStrickland@KSLAW.com
1
Paul Capos
Procurement and Contracts Manager, Worley Parsons
E: Paul.Capos@WorleyParsons.com
1
© 2016 8over8, an AVEVA Group company. All rights reserved. All trademarks herein are the property of their
respective owners. 8over8 and the 8over8 logo are trademarks of 8over8.

Weitere ähnliche Inhalte

Was ist angesagt?

Sellafield - APM PM in the Nuclear Industry Event - Wednesday 27th November 2013
Sellafield - APM PM in the Nuclear Industry Event - Wednesday 27th November 2013Sellafield - APM PM in the Nuclear Industry Event - Wednesday 27th November 2013
Sellafield - APM PM in the Nuclear Industry Event - Wednesday 27th November 2013
Association for Project Management
 
World Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 KazakhstanWorld Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 Kazakhstan
Robert Jutson
 

Was ist angesagt? (12)

6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV0110156. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
 
Crossrail: lessons in governance
Crossrail: lessons in governanceCrossrail: lessons in governance
Crossrail: lessons in governance
 
1. Roger Garrini - good governance guidance GOV011015
1. Roger Garrini - good governance guidance GOV0110151. Roger Garrini - good governance guidance GOV011015
1. Roger Garrini - good governance guidance GOV011015
 
Sellafield - APM PM in the Nuclear Industry Event - Wednesday 27th November 2013
Sellafield - APM PM in the Nuclear Industry Event - Wednesday 27th November 2013Sellafield - APM PM in the Nuclear Industry Event - Wednesday 27th November 2013
Sellafield - APM PM in the Nuclear Industry Event - Wednesday 27th November 2013
 
Nutanix Resume
Nutanix ResumeNutanix Resume
Nutanix Resume
 
Magenic - Flexability
Magenic - FlexabilityMagenic - Flexability
Magenic - Flexability
 
World Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 KazakhstanWorld Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 Kazakhstan
 
Prathibha Kamtam-Resume
Prathibha Kamtam-ResumePrathibha Kamtam-Resume
Prathibha Kamtam-Resume
 
Breakthrough competences in the development of public administration
Breakthrough competences in the development of public administrationBreakthrough competences in the development of public administration
Breakthrough competences in the development of public administration
 
Suzanne Newton - Assurance SIG Conference 2018
Suzanne Newton - Assurance SIG Conference 2018Suzanne Newton - Assurance SIG Conference 2018
Suzanne Newton - Assurance SIG Conference 2018
 
cleverti - Nearshore outsourcing IT services from Portugal
cleverti - Nearshore outsourcing IT services from Portugalcleverti - Nearshore outsourcing IT services from Portugal
cleverti - Nearshore outsourcing IT services from Portugal
 
investor Ready Energy Efficiency
investor Ready Energy Efficiency investor Ready Energy Efficiency
investor Ready Energy Efficiency
 

Andere mochten auch

Ozone - Corporate Profile Detailed
Ozone - Corporate Profile DetailedOzone - Corporate Profile Detailed
Ozone - Corporate Profile Detailed
Setu Goyal
 
SKassegne - Effective Capex Management
SKassegne - Effective Capex ManagementSKassegne - Effective Capex Management
SKassegne - Effective Capex Management
Sultana Kassegne
 
проект "РосПил". Отчет за 2011-2012 гг.
проект "РосПил". Отчет за 2011-2012 гг.проект "РосПил". Отчет за 2011-2012 гг.
проект "РосПил". Отчет за 2011-2012 гг.
ros-pil
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
CCT International
 
Chapter 4 financial forecasting and planning
Chapter 4 financial forecasting and planningChapter 4 financial forecasting and planning
Chapter 4 financial forecasting and planning
Chang Keng Kai Kent
 

Andere mochten auch (20)

Ozone - Corporate Profile Detailed
Ozone - Corporate Profile DetailedOzone - Corporate Profile Detailed
Ozone - Corporate Profile Detailed
 
About 4P research mix 2012
About 4P research mix 2012About 4P research mix 2012
About 4P research mix 2012
 
Почему ССС ?
Почему ССС ?Почему ССС ?
Почему ССС ?
 
BIM: Data Everywhere
BIM: Data EverywhereBIM: Data Everywhere
BIM: Data Everywhere
 
Hazardous Area Equipment Certification - ATEX (Zone 1 Zone 2), IEC Ex, NEMA (...
Hazardous Area Equipment Certification - ATEX (Zone 1 Zone 2), IEC Ex, NEMA (...Hazardous Area Equipment Certification - ATEX (Zone 1 Zone 2), IEC Ex, NEMA (...
Hazardous Area Equipment Certification - ATEX (Zone 1 Zone 2), IEC Ex, NEMA (...
 
SKassegne - Effective Capex Management
SKassegne - Effective Capex ManagementSKassegne - Effective Capex Management
SKassegne - Effective Capex Management
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
 
проект "РосПил". Отчет за 2011-2012 гг.
проект "РосПил". Отчет за 2011-2012 гг.проект "РосПил". Отчет за 2011-2012 гг.
проект "РосПил". Отчет за 2011-2012 гг.
 
Advanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeAdvanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to Practice
 
PAC Webinar - CAPEX - Dec 7 2010
PAC Webinar - CAPEX - Dec 7 2010PAC Webinar - CAPEX - Dec 7 2010
PAC Webinar - CAPEX - Dec 7 2010
 
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
 
Contractors: Get BIM Ready!
Contractors: Get BIM Ready!Contractors: Get BIM Ready!
Contractors: Get BIM Ready!
 
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
 
Capital expenditure
Capital expenditureCapital expenditure
Capital expenditure
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIM
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Chapter 4 financial forecasting and planning
Chapter 4 financial forecasting and planningChapter 4 financial forecasting and planning
Chapter 4 financial forecasting and planning
 
Document Management With Workflow Presentation
Document Management With Workflow PresentationDocument Management With Workflow Presentation
Document Management With Workflow Presentation
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 

Ähnlich wie AVEVA ProCon: The 4P's for Building a Successful Capital Asset

Building an Effective Business Case in a Real Practical World? | Alexander Lum
Building an Effective Business Case in a Real Practical World? | Alexander LumBuilding an Effective Business Case in a Real Practical World? | Alexander Lum
Building an Effective Business Case in a Real Practical World? | Alexander Lum
LavaConConference
 
Project_Management_Revealed_by_IO4PM_International_Organization_For_Project_M...
Project_Management_Revealed_by_IO4PM_International_Organization_For_Project_M...Project_Management_Revealed_by_IO4PM_International_Organization_For_Project_M...
Project_Management_Revealed_by_IO4PM_International_Organization_For_Project_M...
CristinaPatio16
 
TenBroekeCo_Rail Professional article_Dec 2016
TenBroekeCo_Rail Professional article_Dec 2016TenBroekeCo_Rail Professional article_Dec 2016
TenBroekeCo_Rail Professional article_Dec 2016
Paul Tweedale
 
How to Build High Value Relationships Under Theory Z
How to Build High Value Relationships Under Theory ZHow to Build High Value Relationships Under Theory Z
How to Build High Value Relationships Under Theory Z
Anne Kohler
 
The project schedule will serve as a guide for your team and reso.docx
 The project schedule will serve as a guide for your team and reso.docx The project schedule will serve as a guide for your team and reso.docx
The project schedule will serve as a guide for your team and reso.docx
aryan532920
 

Ähnlich wie AVEVA ProCon: The 4P's for Building a Successful Capital Asset (20)

How to work with offshore teams
How to work with offshore teams How to work with offshore teams
How to work with offshore teams
 
Project portfolio management - webinar
Project portfolio management - webinarProject portfolio management - webinar
Project portfolio management - webinar
 
Webinar: Project portfolio management - slides
Webinar: Project portfolio management - slidesWebinar: Project portfolio management - slides
Webinar: Project portfolio management - slides
 
FCB Partners Webinar: 8 Questions for Your Project Sponsor
FCB Partners Webinar: 8 Questions for Your Project SponsorFCB Partners Webinar: 8 Questions for Your Project Sponsor
FCB Partners Webinar: 8 Questions for Your Project Sponsor
 
Capco Overview
Capco OverviewCapco Overview
Capco Overview
 
Building an Effective Business Case in a Real Practical World? | Alexander Lum
Building an Effective Business Case in a Real Practical World? | Alexander LumBuilding an Effective Business Case in a Real Practical World? | Alexander Lum
Building an Effective Business Case in a Real Practical World? | Alexander Lum
 
1_Project Management Foundation
1_Project Management Foundation1_Project Management Foundation
1_Project Management Foundation
 
Introduction IABPro
Introduction IABProIntroduction IABPro
Introduction IABPro
 
How will the PMO at the Future be like?
How will the PMO at the Future be like?How will the PMO at the Future be like?
How will the PMO at the Future be like?
 
FCB Partners Webinar: 10 Ways to Get Buy-In
FCB Partners Webinar: 10 Ways to Get Buy-InFCB Partners Webinar: 10 Ways to Get Buy-In
FCB Partners Webinar: 10 Ways to Get Buy-In
 
So you want to be a knowledge management consultant?
So you want to be a knowledge management consultant?So you want to be a knowledge management consultant?
So you want to be a knowledge management consultant?
 
Who Will Tend Your Garden
Who Will Tend Your GardenWho Will Tend Your Garden
Who Will Tend Your Garden
 
Project_Management_Revealed_by_IO4PM_International_Organization_For_Project_M...
Project_Management_Revealed_by_IO4PM_International_Organization_For_Project_M...Project_Management_Revealed_by_IO4PM_International_Organization_For_Project_M...
Project_Management_Revealed_by_IO4PM_International_Organization_For_Project_M...
 
TenBroekeCo_Rail Professional article_Dec 2016
TenBroekeCo_Rail Professional article_Dec 2016TenBroekeCo_Rail Professional article_Dec 2016
TenBroekeCo_Rail Professional article_Dec 2016
 
Building an Innovation Portfolio
Building an Innovation PortfolioBuilding an Innovation Portfolio
Building an Innovation Portfolio
 
From Project to Product: “Big Rock” Constraints and How to Overcome Them
From Project to Product: “Big Rock” Constraints and How to Overcome ThemFrom Project to Product: “Big Rock” Constraints and How to Overcome Them
From Project to Product: “Big Rock” Constraints and How to Overcome Them
 
How to Build High Value Relationships Under Theory Z
How to Build High Value Relationships Under Theory ZHow to Build High Value Relationships Under Theory Z
How to Build High Value Relationships Under Theory Z
 
The project schedule will serve as a guide for your team and reso.docx
 The project schedule will serve as a guide for your team and reso.docx The project schedule will serve as a guide for your team and reso.docx
The project schedule will serve as a guide for your team and reso.docx
 
Discussion Paper PMO And Merger Projects
Discussion Paper   PMO And Merger ProjectsDiscussion Paper   PMO And Merger Projects
Discussion Paper PMO And Merger Projects
 
The KPI - Cash Flow Modeling and Projections (Series: MBA in a Day)
The KPI - Cash Flow Modeling and Projections (Series: MBA in a Day)The KPI - Cash Flow Modeling and Projections (Series: MBA in a Day)
The KPI - Cash Flow Modeling and Projections (Series: MBA in a Day)
 

Kürzlich hochgeladen

%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
masabamasaba
 
The title is not connected to what is inside
The title is not connected to what is insideThe title is not connected to what is inside
The title is not connected to what is inside
shinachiaurasa2
 
AI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
AI Mastery 201: Elevating Your Workflow with Advanced LLM TechniquesAI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
AI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
VictorSzoltysek
 
introduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdf
introduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdfintroduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdf
introduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdf
VishalKumarJha10
 
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
masabamasaba
 

Kürzlich hochgeladen (20)

%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
 
%+27788225528 love spells in Vancouver Psychic Readings, Attraction spells,Br...
%+27788225528 love spells in Vancouver Psychic Readings, Attraction spells,Br...%+27788225528 love spells in Vancouver Psychic Readings, Attraction spells,Br...
%+27788225528 love spells in Vancouver Psychic Readings, Attraction spells,Br...
 
%in kempton park+277-882-255-28 abortion pills for sale in kempton park
%in kempton park+277-882-255-28 abortion pills for sale in kempton park %in kempton park+277-882-255-28 abortion pills for sale in kempton park
%in kempton park+277-882-255-28 abortion pills for sale in kempton park
 
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
Payment Gateway Testing Simplified_ A Step-by-Step Guide for Beginners.pdf
Payment Gateway Testing Simplified_ A Step-by-Step Guide for Beginners.pdfPayment Gateway Testing Simplified_ A Step-by-Step Guide for Beginners.pdf
Payment Gateway Testing Simplified_ A Step-by-Step Guide for Beginners.pdf
 
OpenChain - The Ramifications of ISO/IEC 5230 and ISO/IEC 18974 for Legal Pro...
OpenChain - The Ramifications of ISO/IEC 5230 and ISO/IEC 18974 for Legal Pro...OpenChain - The Ramifications of ISO/IEC 5230 and ISO/IEC 18974 for Legal Pro...
OpenChain - The Ramifications of ISO/IEC 5230 and ISO/IEC 18974 for Legal Pro...
 
The title is not connected to what is inside
The title is not connected to what is insideThe title is not connected to what is inside
The title is not connected to what is inside
 
AI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
AI Mastery 201: Elevating Your Workflow with Advanced LLM TechniquesAI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
AI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
 
%in Durban+277-882-255-28 abortion pills for sale in Durban
%in Durban+277-882-255-28 abortion pills for sale in Durban%in Durban+277-882-255-28 abortion pills for sale in Durban
%in Durban+277-882-255-28 abortion pills for sale in Durban
 
10 Trends Likely to Shape Enterprise Technology in 2024
10 Trends Likely to Shape Enterprise Technology in 202410 Trends Likely to Shape Enterprise Technology in 2024
10 Trends Likely to Shape Enterprise Technology in 2024
 
Announcing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK SoftwareAnnouncing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK Software
 
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park %in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
 
Right Money Management App For Your Financial Goals
Right Money Management App For Your Financial GoalsRight Money Management App For Your Financial Goals
Right Money Management App For Your Financial Goals
 
introduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdf
introduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdfintroduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdf
introduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdf
 
Software Quality Assurance Interview Questions
Software Quality Assurance Interview QuestionsSoftware Quality Assurance Interview Questions
Software Quality Assurance Interview Questions
 
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
 
8257 interfacing 2 in microprocessor for btech students
8257 interfacing 2 in microprocessor for btech students8257 interfacing 2 in microprocessor for btech students
8257 interfacing 2 in microprocessor for btech students
 

AVEVA ProCon: The 4P's for Building a Successful Capital Asset

  • 1. The 4P’s for Building a Successful Capital Asset The key to managing the unique world of complex projects
  • 2. MEET THE SPEAKERS Jim Pearson Contracts Manager, Global at ConocoPhillips Company E: James.Pearson@conocophillips.com 1 Jack Leahey VP of Global Sales & Services at 8over8 E: j.leahey@8over8.com 2 Andy Aston Senior Vice President at Turner & Townsend E: Andy.aston@turntown.com 3 David Strickland Associate, King & Spalding E: James. DStrickland@KSLAW.com 1 The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016 Paul Capos Procurement and Contracts Manager, Worley Parsons E: Paul.Capos@WorleyParsons.com 1
  • 3. Because risk and uncertainty increase with the size of a project the most important focus for operators should be their relationships with their contractors. DISCOVER THE 4P’S IN TODAY’S SESSION. We will discuss the ‘4 Ps’ that experienced practitioners have found to be fundamental when building the relationships that build a successful capital asset: • Be Professional • Be Pragmatic • Be Proactive • Be Personable What will be covered? The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
  • 4. According to Bloomberg, only 20% of capital projects are completed within budget and on time The challenge… “ “ …because relationship management is the most effective way to reduce claims and overruns it makes a significant contribution to your bottom line… We need to change the way we manage complex projects. The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
  • 5. BE PROACTIVE Systems & Processes Anticipate next actions Identify problems & opportunities BEPRAGMATIC BE PROFESSIONAL BE PERSONABLE Claim management Technology Process People Analytics Project scheduling/planning Project delays The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
  • 6. 4 P’s to success… BE PROFESSIONAL “ “…every time a clarification or amendment is made to the specification or a drawing, it is important that both parties record any impact, and agree the consequences…” The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
  • 7. …it is important not to lose sight of the overall commercial objective of the project, and the earlier a dispute is resolved the cheaper it is to fix.… 4 P’s to success… BE PRAGMATIC “ “ The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
  • 8. The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016 A project stands or falls on the strength of its relationships… 4 P’s to success… BE PERSONABLE “ “
  • 9. The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016 …at the end of the day, billion dollar projects can’t rely on instructions that are picked up on the grapevine..… 4 P’s to success… BE PROACTIVE “ “
  • 10. BE PROACTIVE Systems & Processes Anticipate next actions Identify problems & opportunities BEPRAGMATIC BE PROFESSIONAL BE PERSONABLE Claim management Technology Process People Analytics Project scheduling/planning Project delays The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016
  • 11. The 4 P's for building a successful capital asset | AVEVA ProCon | Copyright © 2016 CONTACT THE SPEAKERS Jim Pearson Contracts Manager, Global at ConocoPhillips Company E: James.Pearson@conocophillips.com 1 Jack Leahey VP of Global Sales & Services at 8over8 E: j.leahey@8over8.com 2 Andy Aston Senior Vice President at Turner & Townsend E: Andy.aston@turntown.com 3 David Strickland Associate, King & Spalding E: James. DStrickland@KSLAW.com 1 Paul Capos Procurement and Contracts Manager, Worley Parsons E: Paul.Capos@WorleyParsons.com 1
  • 12. © 2016 8over8, an AVEVA Group company. All rights reserved. All trademarks herein are the property of their respective owners. 8over8 and the 8over8 logo are trademarks of 8over8.

Hinweis der Redaktion

  1. The key to success factors in project delivery are: • A highly developed culture of project delivery excellence • Efficient and timely decision making • An integrated project management methodology, including guidelines and tools • Systematic use of key performance indicators (KPIs) to monitor the delivery of capital projects • Significantly lower numbers of changes introduced during the construction phase • Increased access to performance data on projects • Effective management of the transition from a capital project to an operating asset.Especially important is the contract life cycle since this life cycle can have a substantial effect of the success or failure of a project. The key to success factors in the contract life cycle are: •Highly skilled contract management resources •Tools to manage contract development, risk and administration •Processes that are aligned with the project strategies
  2. The key to success factors in project delivery are: • A highly developed culture of project delivery excellence • Efficient and timely decision making • An integrated project management methodology, including guidelines and tools • Systematic use of key performance indicators (KPIs) to monitor the delivery of capital projects • Significantly lower numbers of changes introduced during the construction phase • Increased access to performance data on projects • Effective management of the transition from a capital project to an operating asset.Especially important is the contract life cycle since this life cycle can have a substantial effect of the success or failure of a project. The key to success factors in the contract life cycle are: •Highly skilled contract management resources •Tools to manage contract development, risk and administration •Processes that are aligned with the project strategies
  3. The key to success factors in project delivery are: • A highly developed culture of project delivery excellence • Efficient and timely decision making • An integrated project management methodology, including guidelines and tools • Systematic use of key performance indicators (KPIs) to monitor the delivery of capital projects • Significantly lower numbers of changes introduced during the construction phase • Increased access to performance data on projects • Effective management of the transition from a capital project to an operating asset.Especially important is the contract life cycle since this life cycle can have a substantial effect of the success or failure of a project. The key to success factors in the contract life cycle are: •Highly skilled contract management resources •Tools to manage contract development, risk and administration •Processes that are aligned with the project strategies