SlideShare ist ein Scribd-Unternehmen logo
1 von 129
Department of Civil Engineering                                                        NPIC


                                                matika
CMBUk I..............................................................................6
eRKagsMNg;emkanik .................................................................6
Structural Mechanic .............................................................6
  1> karkMNt;bnÞúk .....................................................................6
     1>1 RbePTénbnÞúk .................................................................6
     1>2 bnÞúk (Service Loads) ..........................................................8
     1>3 emKuNbnÞúk ...................................................................9
  2> Stress and Strain ................................................................11
  2>1 Static Equilibrium .............................................................11
  2>2 Unit Stress and Strain ..........................................................12
  2>3 Hooke’s Law .................................................................12
  2>4 Constant Unit Stress ...........................................................13
  2>5 Poisson’s Ratio................................................................14
CMBUkII ³..........................................................................15
dI nig RKwH ........................................................................15
Soil and foundation ............................................................15
  1> esckþIepþIm ......................................................................15
     1>1 emkanicdI ...................................................................15
     1>2 visVkmμRKWH (Foundation Engineering) ...........................................16
  2> karsikSaRsavRCavelIkardæanpÞal; (field exploitation) ..................................16
     2>1 karsikSaelIÉksar (document Review) .........................................17
     2>2 karsikSaRsavRCavépÞeRkamdI (Subsurface Exploration ) ............................18
     2>3 sMNakKMrUdI Soil Sampling ....................................................19
Construction General                                                                     -1-
Department of Civil Engineering                                                        NPIC



     2>4 karBiesaFn_enAnwgkardæan Field testing ..........................................21
  3> RKwH Foundation ................................................................23
     3>1 RKwHrak; Shallow Foundation ..................................................24
     3>2 RKwHeRCA ....................................................................27
  4> karCIkdIsMrab;eFVIRKwH Foundation excavation ..........................................28
     4>1 karCIkdIsMrab;eCIgtag Footing Excavation .......................................28
     4>2 karxYgsMrab; Excavation of Piers ...............................................28
     4>3 karCIkdIcMhr open excavation .................................................30
     4>4 karCIkdIedaymanCnÞl; braced excavtion .........................................30
  5> viFIbegáInsßanPaBRTRTg;dI Improvement methods ......................................30
     5/1 karBRgabdI Grading ..........................................................30
     5>2 eKalkarN_énkarbgðab; Compaction Foundation ..................................33
CMBUkIII³ ..........................................................................35
eRKagsMNg;ebtugmanq¥wgr)aeEdkBRgwgnig sMPar³ebtug..............................35
Reinforcing bar concrete sturcture and concrete meterial .................35
  1> sMParsuIm:g;t_ Cementitious material ................................................35
     1>1 RbePTénsMPar³suIm:g;t_ Type of cementitious meterials ............................35
     1>2 suIm:g;t_Br½tøg; (Portland Cement) ...............................................36
     1>3 suIm:g;t_GaluymIj:Úm Aluminous Cement ........................................37
     1>4 suIm:g;t_FmμCati Natural Cements ...............................................38
     1>5 kMe)ar Limes ................................................................38
     1>6 suIm:g;t_erobdæ Masonry ament ................................................41
     1>7 Fly ashes ..................................................................41
  2>fμbMEbk Aggregate ...............................................................42
Construction General                                                                     -2-
Department of Civil Engineering                                                            NPIC



     2>1 fμbMEbkTMgn;Fmμta Normal –weigth aggregates....................................42
     2>2 fμbMEbkEdlmanTMgn;F¶n;nig Rsal Heavy weigth and light weigth aggregate ..........43
  3> TwkfñaMKImIsMrab;ebtug Admixture for concrete ........................................44
     3/1 TwkfñaMKImIBIKImI nig BIEr: Chimical and mineral admixture ............................44
  4> kMe)ar)ayGr nig ebtug Mortar and concrete .........................................47
     4>1 kMe)ar)ayGr Motar ..........................................................47
     4>2 ebtugsuIm:g;t_B½rtøg; Portland cement concrete.....................................48
     4>3 ebtugb:UlIEmr Polymer concrete................................................48
  5> karcak;ebtug Concrete Placement..................................................49
     5>1 karGnuvtþn_d¾l¥ Good Pratice .................................................49
     5>2 viFIénkarcak; Methods of Placing ...............................................50
     5>3 PaBelIsTwk Excess water ....................................................50
     5>4 kareFVIeGayhab; Consolidation ................................................51
     5>5 karcak;ebtugeRKOgbgÁúMbBaÄr Concreting vertical element ...........................52
     5>6 karcak;ebtugeRKOgbgÁúMedk concreting horizontal element...........................53
     5>7 karcak;ebtugkñúgrdUvRtCak; Concreting in cold weather .............................54
     5>8 karcak;ebtugGakasFatuekþA Concreting in hot weather...........................55
     5>9 karEfrrkSasMeNImebtug Curing concrete .......................................55
     5>10 muxtMNrsMrab;ebtug Joint in concrete .........................................56
     5>11 karRtYtBinitüBIkarcak;ebtug Inspection of Concrete placement ...................58
  6> eRKOgbgÁúMénsMNg;ebtug Members of concrete construction .............................58
     6>1 kMral Slab .................................................................58
     6>2 Fñwm Beam ..................................................................60
     6>3 CBa¢aMg Wall ................................................................60
Construction General                                                                         -3-
Department of Civil Engineering                                                      NPIC



     6>4 RKwH Foundation .............................................................61
CMBUk IV ..........................................................................64
sMNg;eRKagbgÁúMGMBIEdk.............................................................64
STRUCTURAL STEEL CONSTRUCTION ...............................64
  1> karKitbøg;éneRKOgbgÁúM Design of Members ...........................................64
     1>1 eKalkarN_sMrab; ASD nig LRFD                 BASED FOR ASD AND LRFD .....65

     1>2 CMnYyénkarKItbøg; nigeyag Design Aids and References........................66
     1>3 eRKOgbgÁúMrgnUvkMlaMgTay Tension member ...................................66
     1>4 ssr Column ..............................................................67
     1>5 Fñwm Beam ................................................................69
     1>6 Plaster girders ..............................................................70
  2> karksagsMNg;Edk Steel erection .................................................71
     2>1 ]bkrN_énkarsagsg; Erection Equipment....................................73
     2>2 RbeLaHkñúgkarsagsg;Fñwm Clearance for erecting beams ...........................74
     2>3 lMdab;énkarsagsg; Erection sequence .........................................77
     2>4 dMeNIrkarpSar Field –Welding .................................................77
CMBUk V ...........................................................................80
eRKOgbgÁMGMBIeQI nigsMPar³.........................................................80
WOOD STRUCTURE AND MATERIAL .................................80
  1> sMPar³ Material .................................................................81
     1>1 lkçN³mUldæanrbs;eQI Basic Characteristic of Wood .............................81
     1>2 lkçN³emkanicéneQI Mechanical Properties of Wood ..........................83
     1>3 lkçN³T§iBlRsUbcMhayTwkkñúgxül; Effect of hygroscopic properties ...............84
     1>4> lMdab;fñak;éneQI Grade of Wood ..............................................87
Construction General                                                                  -4-
Department of Civil Engineering                                                        NPIC



     1>5 sarFatubMpøaj nig sarFaturkSakarBar Destroyer and preservative....................90
     1>6 kavnig sarFatusMrab;eQI Glues and adhesives for wood ...........................92
     1>7 karplitkþakug)øaek nigkþabnÞHepSgeTot Plywood and fabricated wood board..........93
  2> karpliteQI timber nigkarksag timber fabrication and erection .......................95
     2>1 karpliteRKagbgÁúMeQI Fabrication of structural timber .............................95
     2>2 karsagsg;eQI timber erection ................................................97
CMBUkVI³ ........................................................................101
eRKagCBa¢aMgerob¬dæ/ bøúk/ fμ¦ nigsMPar³ ........................................101
Masonry Structure and Material............................................101
  1> esckþIepþIm Introduction ........................................................101
     1>1 CBa¢aMgerobdæ Masonry Wall ................................................101
     1>2 niymn½yénCBa¢aMgerobdæ Masonry Definition .................................101
  2> KuNPaBénsMPar³sMrab;CBa¢aMgrabdæ Quality of Material for Masonry ..................105
     2>1 tMrUvkarTUeTAsMrab;karKitCalkçN³bTdæan General Requirement of Design Standard ..106
     2>2 sMPar³sMrab;sMNg;rabdæ Materials for Masonry Construction ....................107
  3> sMNg;rabdæ Construction of masonry............................................107
     3>1 sMNg;CBa¢aMgrabdækñúgGakasFatuRtCak; Cold weather construction of masonry walls 110
     3>2 cgP¢ab;rvag Wythes sMrab;CBa¢aMgdæ Bond between wythes in Masonry wall .......110
     3>3 rabdæeday grout             grout masonry .....................................112

     3>4 lkç½xN½ÐTMrsMrab;CBa¢aMg Support Conditions for Wall ............................115
     3>5 Corbeling ................................................................115
     3>6 RbelaHRbehag/ Chases nig rescesses sMrab;CBa¢aMgerobdæ .......................116
     3>7 Flashing enAkñúgCBa¢aMgrabdæ ................................................117
  4> TMrxagsMrab;CBa¢aMgrabdænig FaturYmpSMepSg² ........................................118
Construction General                                                                     -5-
Department of Civil Engineering                                                               NPIC



  Lateral support for masonry wall and other elements     .................................118
     4>1 TMrxagsMrab;CBa¢aMgrabdæ lateral support for masonry wall ........................118
     4>2 bMBg;EpSg nigeCIgRkandMedApÞH Chimneys and fireplaces .........................122
     4>3 karpþl;nUvTMhMEdlpøas;bþÚr Provision for dimensional changes .....................123
     4>4 CYsCulmuxtMNlicTwk Repair of leaky joint ....................................126
     4>5 tMrUvkarkMras;CBa¢aMgdæ Masonry Thickness Requirement ..........................127
CMBUk     I

                                    eRKagsMNg;emkanik
                                  Structural Mechanic
                                                 3
         1> karkMNt;bnÞúk
       bnÞúk (Load) KWCakMlaMgeRkAEdlmanGMeBIelIeRKOgbgÁúMNamYy. Stress KWCakMlaMgkñúgEdl
Tb;Tl;nwgbnÞúk (Loads) . Ep¥kelIlkçN³énbnÞúkEdlRtUveKykmkGnuvtþ vaGaceFVIeGayeRKOgbgÁúMnig
smasPaBrbs;vaxUcRTg;RTay.
]TahrN_ ³ kMlaMgTajGaceFVIeGayvtßúmYyyWt kMlMagsgát;GacRc)ac;vtßúbBa©ÚlKña kMlaMgrmYlGac
Rt)aj;vtßúmYynig kMlaMgkat;pþac; (Shearing Forces) GacrujEpñkNamYyéneRKOgbgÁúMecjBIKña.
         1>1 RbePTénbnÞúk
       bnÞúkeRkAéneRKOgbgÁúMRtUveKEbgEckeTAtamRbePTepSg²Kña.enAkñúgenaHkarEbgEckmYy RtUveKBinitü
eTAelIPaBnwgfál; (Static) nig kMlaMgkat;pþac; (Shearing Forces) GacrujEpñkNamYyén eRKOgbgÁMúecjBIKña.
       - bnÞúkefr (Static Loads)KWCakMlaMgEdlRtUveKeRbIy:agyWt² ehIybnÞab;mkvaesÞIrEtefr.
       ]TahrN_ Tm¶n;/ bnÞúkefr rbs;RbB½n§GaKar b¤dMbUl.

Construction General                                                                            -6-
Department of Civil Engineering                                                               NPIC


         - bnÞúkERbRbYl (Dynamic Loads) ³ ERbRbYleTAtameBlevla. varYmbBa©ÚlTaMg Repeat and Impact
Loads .

         - Repeated Loads KWCakMlaMgEdlRtUveKykmkGnuvtþeRcIndgehIyvaGacbNþaleGayTMhM énkMlaMg
xagkñúgERbRbYl.
         ]TahrN_ Off-balance motor
         - Impact Loads: kMlaMgEdlsgát;eTAelIeRKOgbgÁúMnig smasPaBrbs;vakñúgGMLúg
eBlxøImYy. ]TahrN_ karTmøak;vtßúF¶n;mYyeTAelIkMralx½NÐ (Floor) . kMlaMgxageRkARtUveKEbg
EckCakMlaMgBRgayesμIr (Distributed Loads) nig kMlaMgcMcMnuc (Concentration Loads) .
         - Uniformly Distributed Loads: KWCakMlaMgEdlenAkñúgkarGnuvtþCak;EsþgvaRtUv)aneKcat; Tukfa
CakMlaMgEdlenAkñúgkarGnuvtþCak;Esþg.
         ]TahrN_ TMgn; efrénfñwm Edkrag I (Dead Weight of a rolled- Steel I beam is a good example)
         - Concentrated Loads KWCakMlaMgEdlsgát;eTAelIépÞRTtUcesÞIEtminRtUveKrab;bBa©Úl ebI eRbobeFob
eTAnwgépÞTMrTaMgGs;.
         ]TahrN_ fñwm (Beam) EdlRTedayrt (Girder) RtUv)aneKcat;TukCabnÞúkcMcMnuc (Concentrated Loads)
eTAelI Girder .
         viFIkMNt;énlkçN³bnÞúkd¾smBaØmYyepSgeTotenaHKW karkMNt;kMlaMgxageRkAEdlRtUv)an eKdak;
eQμaH Axial ecentric nig Torsional ³
         - An axial load ³ KWCakMlaMgrYmmYyEdlsgát;cMG½kS ehIyEkgeTAnwgépÞmuxkat;TTwg.
         - An ecentric load ³ KWCakMlaMgsgát;EdlEkgeTAnwgépÞénmuxkat; TTwg ehIyvamincMG½kS dUcenH
ehIyvaGackac;eCIgTMr.
         - Torsional load ³ KWCakMlaMgrmYlEdlzitenAmincMG½kSrbs;muxkat;TTwg ehIyvaminman TisedAeTr
b¤ kñúgbøg;rbs;muxkat;enaHdUcenHvakac;eCIgTMr.
         ]TahrN_
         - Dead Loads ³ rYmmansMPar³sMNg; sMPar³ eRbIR)as; rWk¾TMgn;epSg²eTotrbs;sMPar³enAkñúgGaKar
rYmTaMgTMgn;rbs;GaKarpÞal;EdlzitenAefrCaGcié®nþy_.

Construction General                                                                            -7-
Department of Civil Engineering                                                                    NPIC


        - Live Loads ³ rYmbBa©ÚlGñksñak;;enA sMPar³sMNg; sMPar³eRbIR)as; rWTMgn;epSgeTotenAkñúg GaKar
ehIyvaTMng nigRtUveKpøas;bþÚrTIkEnøgenAkñúgGMLúgGayukalkMNt;rbs;GaKar.
        - Impact Loads ³KWCacMENkén Live loads EdlRtUv)aneKeRbIedIm,IrYmbEnßmnUv Stress nig Deflection
EdlCalT§plénkareFVIclnarbs; Live loads .
        - Wind KWCabnÞúkF¶n;Gtibrmarbs;xül;Edlbk;mkelIGaKarkñúgGMLúgeBlNamYyrW vaCakMlaMgmYy
EdlbegáIteGayman Stress kñúgGMLúgeBlNamYy rWCakMlaMgmYyEdlbegáIteGayman Stress Rbhak;RbEhl
nwgkMlaMgxül;bk;enaH.
        - Snow Loads KWCakMlaMgGtibrmaEdlmanGMeBIelIGaKaredaykarRbmUlpþúMKñarbs;RBilEdlekIteLIg
kñúgGMLúgeBlNamYy.
        - Seismic Loads KWCakMlaMgTaMgLayNaEdlbegáIteGayman Stresses Gtibrma b¤k¾eFVIeGayGaKar
mYyxUcRTg;RTayenAkñúgeBlrBa¢ÜydI.
         1>2 bnÞúk (Service Loads)
          enAkñúgkarKNnaeRKOgbgÁúMrbs;GaKar GñkKNnaKYrEteRbIbnÞúkNak¾edayeGayFMCagbnÞúkxageRkam³
          1> bnÞúkEdlRtUv)anKNnaenAkñúg nigtYrbs;GaKar.
          2> kar):an;sμanbnÞúkGtibrma minRtwmEtBwgEp¥kelITItaMglkçx½NÐbc©úb,nñ nig KMnitedIménkareRbIR)as;
GaKarb:ueNÑaHeT bu:EnþvaRtUvEtrab;bBa©ÚlnUvehtukarN_EdlGacekIteLIgenAeBlGnaKtpgEdr. bnÞúkEdleK
min)andwgGMBITMhM rbs;vac,as;las;ehIyvaRtUveKcat;TukfaCa Statistical Vairables EdlKYrEtRtUveKeRCIserIs
eTAtamtMélRbEhlCak;lak;mYyEdlnwgminGacelIs)anenAkñúgGMLúgeBlénGayukalrbs;GaKar b¤ k¾Bwg
Ep¥kelIehtukarN_ekIteLIgkñúgry³eBl 50qñaMmþg RtUv)aneKykmkKNna. eTaHCay:agNak¾eday Interval
GacRtUveKyk 25qñaMsMrab;GaKarEdlKμanmnusSrs;enA b¤esÞIrEtKμankarb:HBal;dl;GayuCIvit b¤RtUveK
yk100qñaM sMrab;GaKarGcié®nþy_EdlpÞúkbnÞúkF¶n;ehIyGacKMramkMEhgdl;GayuCIvitmnusS nigRTBüsm,tþikñúg
karNImankardYlrlM.
          kñúgkrNIEdlKμan Local or State Building Code GñkKNnaGaceRbIbnÞúkEdleKkMNt;c,as;las;enA
kñúgKMrUGaKarfñak;Cati (National Building Code) b¤tamBt’manxageRkam³
          bnÞúkEdlRtUv)anykmkeRbIkñúgeRKOgbgÁúM rYmmandUcteTA bnÞúkeTal A lone b¤bnÞúkrYmKña
(Combination Load) . ]TahrN_ bnÞúkefr (Dead), Live, Impact, Earth Pressure, Hydrostatic Pressure, RBil

Construction General                                                                                -8-
Department of Civil Engineering                                                              NPIC


(Snow)   Twkkk (Ice) ePøóg (Rain) xül; (wind) rW rBa¢ÜydI Constraining Forces EdlmandUcCakMlaMg én
Restriction of Thermal karrYmmaD (Shrinkage) b¤ Moisture-Change Movements b¤kMlaMgEdlbNþalmkBI
Creep, Plastic Flow, Differential settlement, Or Sidways(drift)


         1>3 emKuNbnÞúk
       eRKOgbgÁúMGaKarRtUvEtKNnaeGaymanlT§PaBRKb;RKan;edIm,I            RTRTg;GaKaredayKμankarxUcxat
RTg;RTayhYsBIkarkMNt; b¤karxUcxaténkarrYmbBa©ÚlKña rbs;bnÞúkEdlniwgbegáIteGaymanT§iBlminl¥. kar
b:HBal;kñúgkrNIEbbenHrYmman Twkdk;elIdMbUl dIEq¥t smuRTdI nig karpøas;bþÚrTMhM. kñúgkarkMNt;lT§PaB
RTRTg;rbs;eRKOgbgÁúMmYy emKuNsuvtßiPaBsMPar³sMNg; nigkarKNnaminc,as;las;nuvlT§PaBRTRTg;RtUvEt
ykmkKitBicarNaEdr.
       esovePAGaKarKMrU (Building Codes) GnuBaØatieGayeyIgeRbInUvrebobKNnaBIr Allowable- Stress
Design b¤ Load and Resistance factor Design enAkñúgkarsagsg;GaKar. kñúgviFIKNnaedayKuNbnÞúk (Service

Loads) nig emKuNsuvtßiPaB. emKuNsuvtßiPaBepSg² RtUv)aneKykeRbICamYynwgbnÞúkedayeyagelIPaBmin

BitR)akdkñúgkarKNnabnÞúk.
       kñúgkarKNna Stress GnuBaØati (Allowable-Stress Design) lT§PaBEdlGacRTRTg;rbs;vaCaFmμta
RtUvkMNt;edaybnÞúkEdlnaMeGaymankareRbH b¤kMhUcRTg;RTayrbs;vaCaFmμtaRtUvkMNt;edaybnÞúkefr Live
Wind, Seismic, Snow nigbnÞúkepSg²eTot EdlGacekItmaneLIgkñgeBlEtmYyRtUveKbnÞúkrYmEdlRtUveK yk
                                                                 ú
mkeRbIkñúgkarKNna Stress GnuBaØati (Allowable- Stress Design) KW
    1.   D + L + (Lr or S or R)
    2.   D + L + (W or E/1.4)
    3.   D + L + W + S/2
    4.   D + L + S+ W/2
    5.   D + L + S + E/1.4
    6.   0.9 – E/1.4
         D ³CabnÞúkefr (Dead Load)
        L ³ Liveloads ekItmkBIeKalbMNgénkareRbIR)as;rbs;GaKarrYmbBa©ÚlTaMgkarEbgEckCabnþbnÞab; nig

karsñak;enA.
        Lr ³ Roof Liveloads

        S ³ Snow Loads

        R ³ Rain Loads


Construction General                                                                           -9-
Department of Civil Engineering                                                               NPIC


             ³
         W Wind Load

         E ³ Seismic Load

         Building Codes CaFmμtaGnuBaØatieGayeRbIemKuNtUc eBlEdlkar):an;sμanénkarekIteLIg énbnÞúkFM

sMebImrYmKñaenHmankMrittUc tYy:agdUcCa³ karrYmbBa©ÚlKñarvag Dead Load Gtibrma Liveload nigGtibrmarbs;
kMlaMgxül;bk; rWrBa¢ÜydI. ]TahrN_ CaTUeTAemKuNEdlmantMél 0>75 RtUveKeRbIsMrab;KNnaplbUkbnÞúkrYm
kñúgrUbmnþBI ¬2¦ dl;¬6¦ . emKuNRbePTenHGnuBaØatieGayÉkta én Stress GnuBaØati (Allowable Unit Stress)
sMrab;eRbIkñúglkçx½NÐbnÞúkenH FMCagkarKNnabnÞúkrYmtamrUbmnþ ¬1¦. Stress GnuBaØatiRtUveKKNnaRTg;RTay
hYsBIkarkMNt;EckCamYyemKuNsuvtßiPaBEdlmantMélFMCag 1.
         enAkñúgkarKNna emKuNbnÞúk nig PaBFn;RbePTbnÞúkepSgKñanimYy² RtUvKuNnwgemKuNbnÞúkrbs;va
ehIytMélRtUv)aneKkMNt;eTAtamkat):an;sμanénPaBEdlGacekIteLIgénRbePTbnÞúknimYy²enaH. emKuN
bnÞúkRtUveKKitbBa©ÚledIm,IeGayRbB½n§nig eRKOgbgÁúTaMgmUlGacRTRTg; nwgbnÞúkTaMgGs;)an. eRKOgbgÁúM
                                                    M
RtUv)aneKKNnaeGaylT§PaBRTRTg;bnÞúkrbs;vaFMCaglT§PaBRTRTg;bnÞúksrub. TMhMénlT§PaBRTRTg;enH KW
RtUvKNnaedayKuN The Ultimate- Load Capacity nigemKuNPaBCab; (Resistance factor) EdltMélrbs;va
pþl;eGaynUvkareCOCak;énkar):an;sμanrbs;lT§PaBRTRTg;mYy.
         lkçN³vinicä½yRtUv)aneKeRbICaTUeTAdUcxageRkam³
              1.   1.4D
              2.   1.2D+1.6L+0.5( Lr or S or R)
              3.   1.2D+1.6(Lr or S or R)+(0.5L or 0.8W)
              4.   1.2D+1.3W+0.5(Lr or S or R)
              5.   1.2D+1.0E+(0.5L or 0.2S)
              6.   0.9D6 (1.3W or 1.0E)
       sMrab;yandæankEnøgRbCuMCn nigkEnøgEdl liveloads elIsBI 100 lb/ft emKuNbnÞúkCaFmμta RtUveKyk
tMélÉktasMrab; L enAkñúgrUbmnþ 3/4 nig 5. sMrab;dMbUlEdlRBilGackkenAelIemKuNbnÞúkKYrEtmantMél
0>7sMrab; Snowload kñúgrUbmnþ ¬5¦.
       sMrab;karKNna Stress GnuBaØati (Allowable Stress Design) nig kMlaMg (Strength) eRKOgbgÁMúnig
smasPaBrbs;vaKYrEtRtUveKKNnaedIm,ITb;Tl;KYrEtmantMél 0>7 sMrab; Snow Load kñúgrUbmnþ¬5¦.
       sMrab;karKNna Stress GnuBaØati (Allowable Stress Design) nig kMlaMg (Strength) eRKOgbgÁMúnig
smasPaBrbs;vaKYrEtRtUveKKNnaedIm,ITb;Tl;nig kMlaMgBiessEdlekItLIgBIkarrMBa¢ÜydI.
         a. 1.2 D+0.5L+Em
         b. 0.9D-Em


Construction General                                                                          - 10 -
Department of Civil Engineering                                                                  NPIC


      sMrab;kMralx½NÐenATIRbCuMsaFarN³sMrab; Liveload EdlelIsBI 100psf nigsMrab;bnÞúkéncMNtrfynþ
emKuNbnÞúkRtUvmantMél 1>0 sMrab; L Em KWCakMlaMgGtibrma tamTisedk nigQr.
2> Stress and Strain
                                                KWCaTMhMmYyEdleRbIkñúgkarvas;lT§PaBRTRTg;ral;skþanuBl
         Structural Capacity or Ultimate Strength

énbnÞúkedayKμaneFVIeGayeRbH rWxUcRTRTg;F¶n;F¶rdl;GaKar. edIm,Icg¥úlbgðajnUvcMnYnkMNt;énbnÞúkGtibrma
EdleRKOgbgÁúMGacRTaMRT)an tMrUvé`nkarKNna (Design Specifications) sMrab;eRKOgbgÁMúnana RtUv)aneKbegáIt
kñúgenaHmanÉktþa Stresses GnuBaØati (Allowable Unit Stress) rW Design Strengths EdlmanTMhM rbs;vaminGac
elIsBIbnÞúkGtibrmaeLIy. RTwsþIéneKOgbgÁúM (Structural Theory) pþl;nUvviFIsa®sþsMrab;KNna Unit Stress nig
sMrab;):an;sμanPaBxUcRTg;RTay. viFIsa®sþTaMgenHnwgRtUveKelIkykmkbgðajkñúgEpñkteTAenH.
         2>1 Static Equilibrium
        ebIeRKOgbgÁúMnig smasPaBrbs;vaGacRTRTg;nwgbnÞúk bnÞab;BImankarxUcRTRTg;bnþicbnþÜcekItmaneLIg
ehIyKμankarxUcbnþeTot BYkvaRtUvekcat;famantulüPaB (Equilibrium) .
        eRkamRBwtþikarN_EbbenH kMlaMgkñúg rW Stresses Tb;Tl;y:agBitR)akdeTAnwgbnÞúk.
        karsnñidænd¾mansar³sMxan;mYycMnYn RtUv)aneKTajecjBIlkçN³én Static equilibrium edayKμankar
ERbRbYl plbUkénkMlaMgxageRkATaMgGs;esμIsUnü ehIyedayKμankarvil plbUkénm:Um:g; (Moment) EdlekIt
elIgedaykMlaMgxageRkAenARtg;cMnucNamYyesμIsUnü.
        sMrab;mUlehtudUcKña ebIeyIgykEpñkNamYyéneRKOgbgÁúMehIyeRbIbnÞúkelIva plbUkénkMlaMgeRkA nig
kñúgenAelIEpñkmYyenaH KWR)akdCasUnü. plbUkén Moment rbs;kMlaMgTaMgGs;k¾esμIsUnüEdr.
        CaTUeTAvamanPaBgayRsYlkñúgkarEvkEjkkMlaMg EdlmanGMeBIelIeRKOgbgÁúMeTACasmasPaBkMlaMg
tUc² EdlRsbeTAtamG½kSEkKñamYy dUcenHehIyvaeFVIeGaymanPaBgayRsYlkñúgkarKNna.
        ]TahrN_ sMrab;kMlaMgEdlmanGMeBIelIbøg;mYykrNI EdleKCYbRbTHRsYlbMputenaHKW bMElgkMlaMg
TaMgGs;eGayRsbtamG½kSGab;sIus nig G½kSGredaen (Vertical) . sMrab;eRKOgbgÁúMEdlmantulüPaB
(Structure in Equilibrium) ebI H tMNageGaykMlaMgtamTwsedk V kMlaMgtamTisQr nig M Ca Moment

énkMlaMgEdl sßitenAcMNucNamYyénbøg;/ ΣH = 0 ΣV = 0 nig ΣM = 0 .

Construction General                                                                              - 11 -
Department of Civil Engineering                                                               NPIC


       smIkarTaMgbIxagelIenHRtUv)aneKeRbIedIm,IKNnaGBaØti3 enAkñúg    nonconcurrent coplanar force

system.


         2>2 Unit Stress and Strain
        edIm,IeFVIeGaydwgBitR)akdfaetI eRKOgbgÁúMmanlT§plGacRTRTg;bnÞúk)an GñkKNnaCaTUeTARtUvEt
KNna Maximum Unit Stress EdlekIteLIgedaykarkMNt;bnÞúkkñúgeRKOgbgÁúMsMrab;RbePTkMlaMgkññúg kMlaMg
Taj kMlaMgsgát; rWkMlaMgkkit ehIyeRbobeFobfaetInwg Allowable Unit Stress .
        enAeBlEdlkarbnÞúkdecñH Unit stress KWefrenAelIEpñkNamYyéneRKOgbgÁúMEdleKykmkeRbIelI
Stress RtUvKNnaedayEckkMlaMgnwg épÞmuxkat. b:uEnþCaTUeTA Unit stress ERbRbYlBImYyeTAmYy. kñúgkrNIenH

Unit stress EdlzitenAcMnucNamYyénmuxkat; KWCatMélkMNt;énpleFobrvagkMlaMgkñúgelIépÞtUcNamYy nig

RklaépÞEdlvaRtUveKyktUceTA². CYnkalkñúgkarKNnaeRKOgbgÁúM Unit stress GacminEmnCacMnuccMbgEdleK
ykmkKiteT.
        GñkKNnaGaccab;GarmμN_eTAelITMhMkMNt;mYyénkarxUcRTg;RTay rW Strain . kMhUcRTg;RTayeTAtam
TisedANamYy KWCakarpøas;bþÚrTaMgRsugénTMhMrbs;eRKOgbgÁúMtamTisenaH.
        Unit strain eTAtamTisedANamYy KW karxUcRTg;RTaykñúgÉktþaRbEvgtamTisenaH.

        enAeBlEdlbnÞúkdak;dUcenH Unit strain KWefr kñugEpñkmYyéneRKOgbgÁúMvaGacRtUveKKNnaedayEck
RbEvgénkMhUcRTg;RTayCamYyRbEvgedImrbs;va. b:uEnþCaTUeTA Unitstress ERbRbYlén Unitstress tMNagnUv
tMélkMNt;énpleFobmYy.
         2>3 Hooke’s Law
        sMrab;sMPar³sMNg;CaeRcIn Unit strain KWsmamaRteTAnwg Unit stress, Until a certain stress, The
proportional limit is exceeded. Hooke’s Law RtUveKsÁal;tamTMnak;TMngEdlGacsesrdUcxageRkam³

                     rW
        Edl
         f = Unit Stress
           = Unit Strain
         E= Modulus of elasticity




Construction General                                                                          - 12 -
Department of Civil Engineering                                                                   NPIC


         dUecñHenAeBlEdl Unit stress nig Modulus of elasticity RtUveKsÁal; Unit strain RtUv)aneKsÁal;tMél
Unit stress GacnwgRtUveKKNna)an.

         enAeBlEdleRKOgbgÁúMmYyRtUvrgnUvbnÞúk ehIy Unit stress minelIsBI Proportional Limit eRKOgbgÁúMnig
RtLb;eTAPaBedImvijenAeBlEdlbnÞúkRtUv)aneKdkecj. The elastic limit KWCa Unit stress FMbMputEdlGac
ekItmaneLIgedayKμankMhUcRTg;RTayCaGcié®nþy_bnSl;TukbnÞab;BIdkbnÞúkecj. sMPar³sMNg;xøHman 1 rW2
Yield Pont . TMhMTaMgenaHKWCa Unit stress enAkñúgkEnøgEdlmankarelceLIgnUvkMenInén Strain edayKμankar

ekIneLIg b¤fycuHbnþicbnþÜcén Stress . dUcenHsMPar³sMNg;bgðajnUvPaByWtrbs;va. sMrab;sMPar³sMNg;
EdlKμankarkMNt; Yield Point c,as;las; The offset yield strength RtUveKeRbICargVas;énPaByWtdMbUg ( The
beginning of plastic deformation) .


         2>4 Constant Unit Stress
         krNIEdlsamBaØén Stess nig Strain KWCakrNIEdlkñúgenaH Unitstress nig Strain efr. ]TahrN_³
Stress EdlekIteLIgedaykMlaMgTaj rWsgát; rW Shearing Force rW bnÞúkEdleRbImþgmáal. lkçN³énkardak;

bnÞúkTaMgenHRtUveKbgðajenAkñúgrUb Figure 11 . sMrab;kMlaMgTaj nig sgát;cMG½kS eyIgyképÞmuxkat;EdlEkg
eTAnwgG½kSkNþal nig EkgeTAnwgkMlaMgsgát;. sMrab; Shearing Load épÞmuxkat;EdlzitenAkñúgbøg;kat;RtUveK
ykmkKNna. ehIysMrab; bearing load vaRtUveRCIserIsykbøg;b:HéneRKOgbgÁúMTaMgBIr.




Construction General                                                                              - 13 -
Department of Civil Engineering                                                           NPIC




                                     rUb1-1 lkNrbs;bnÞk

         2>5 Poisson’s Ratio
        enAkñúg elastic limit enAeBlEdleRKOgbgÁúMmYyrgnUvkMlaMgsgát;cMG½kSvaminRtwmEteFVIeGayxUc
RTg;RTaytamépÞbeNþayEtb:ueNÑaHeT EtvaEfmTaMgeFVIeGayxUcRTg;RTaytamépÞTTwgpgEdr. enAeRkam
kMlaMgTaj (Tension) épÞénmuxkat;rbs;eRKOgKWfycuH ehIyenAeRkamkMlaMgsgát; (Compression) vaekIneLIg
pleFobén Unit Lateral strain nwg Unit longitudinal strain RtUEtehAfa Poisson’s ratio .
sMrab;sMPar³sMNg;CaeRcInpleFobenHRtUveKyktMélesμI 0>25. sMrab;eRKOgbgÁúMEdktMélrbs;va RtUveKsnμt
yk 0>3 .

Construction General                                                                       - 14 -
Department of Civil Engineering                                                                   NPIC


]TahrN_ snμtfaEdkBüÜrmYyEdlmanépÞ 2in2 BüÜrTMgn; 40 Kip (40.000-1b) load . The Unit stress KW
40>000¼2 rW 20>000PSI Unit tensil strain KW 20>000¼30>000>000 rW 0>00067 in/ in . edayyk
Poisson’s Ration esμI 0>3 Unit lateral strain KW -0>3 x 0>00067 rW a shortening of 0>00020 in/ in .


CMBUkII ³
                                            dI nig RKwH
                                    Soil and foundation
                                                   3

1> esckþIepþIm
          1>1 emkanicdI
          emkanicdI KWRtUveKkMnt;edaykarGnuvtþn_ énc,ab; nigeKalkarN_rbs;emkanic nigTwkenAkñúgkaredaH
RsaybBaðaCamYydIEdleKcat;TukCasmÖar³visVkmμ. dImanlkçN³eRcInRbePTepSg²Kña edayEp¥keTAelIkar
sikSa. ]TahrN_kñúgekSRtviTüa (agronomy) ¬karGnuvtþn_viC¢adaMdMNaM¦dIKW RtUveKkMNt;faCakMNkénrUbFatuEr:
EdlmankMeNItmkBIsMNwkfμ nigrUbFatuxniCEdlRbmUlpþúMKña eRkayBIkarrlYyénrukçCati nigstV. sMrab;Gñk
ekSRtviTüa (agronomist) dIKWCasarFatuEdlpþl;GMbilxniCedIm,IciBa©wmkarrIklUtlas;énrukçCati. b:uEnþsMrab;
visVkrEpñkdI (geotechnical engineer) dImann½yTUlMTUlayehIyGacrab;bBa©ÚlminRtwmEt agronomic material
b:uEnþvarab;bBa©ÚlpgEdrnUv sMNwkfμ epHPñMePøIg dIl,ab; lannin sand glacial material nig sMNl;epSgénkarswk
rbs;fμ.
          tamFmμCativamankarlM)akkñúgkarrkbnÞat;EbgEckmYyrvagfμ nigdI. ]TahrN_sMrab;PUKBðviTU
(geologist) sarFatumYyRtUv)aneKdak;cMNat;fñak;eTAtamkMNkMeNIténfμBIeRBaHvasßitenAeRkamsßanPaBPUKBð

d¾Cak;lak;mYy b:uEnþsMrab;visVkrdIvaKYrEtRtUveKcat;cUlcMNat;fñak;dI.


Construction General                                                                              - 15 -
Department of Civil Engineering                                                                    NPIC


          1>2 visVkmμRKwH (Foundation Engineering)
          RKwHRtUveKkMNt;faCaEpñkmYyén eRKOgbgÁúMEdlRTRTg;Tm¶n;rbs;eRKOgbgÁúMehIy bBa¢ÚnbnÞúkeTARsTab;
dIrW fμenAxageRkam. kñúgvisVkmμRKwH (Foundation Engineering) .emkanicdI emkanicfμ PUmivTüa nigvisμkmμeRKOg
bgÁúM tUveKeRbIkñúgkarKNna nigsagsg;RKwHGaKar rWeRKOg bgÁúM. mUldæanRKwHrbs; Foundation Engineering
KWkareRCIserIsRbePTénRKwH EdlmandUcCaRbBn½§énRKwHrak; (Shallow Foundation) rWRKwHeRCA (Deep
Foundation).

          mUldæanRKwHmYyeTotén Foundation Engineering KWTak;TgeTAnwgkarKNna Parameter dUcCaliT§PaB
RTRTg;rbs;RKwHEdlmandUcCa karkMnt;RbePT nigcenøaHEdksréskñúgeCIgtag.
2> karsikSaRsavRCavelIkardæanpÞal; (field exploitation)
         eKalbMNgénkarsikSaRsavRCavelIkardæanpÞal; KWedIm,Icg;dwgnUvcMnucxageRkam³
         1> karyl;dwgGMBIsßanPaBPUmisa®sþTUeTAénkardæan edaysarvaCHT§iBleTAelIkarKNna nigsag
sg;RKwH. ]TahrN_ sßanPaBrbs;épÞdIPaBs¥itrbs;dI RbPBTwkRtBaMgrbg; rukçCati rock outcrops nigkarGac
ecjcUl)anénrfynþdwk smÖar³sMNg;.
         2> TItaMgénkEnøgbgáb;]bkrN_eRbIR)as;dUcCa ExSkabGKiÁsnInigTUrs½BÞRbBn§½Twk nigRbBn½§lU.
         3> lkçN³TUeTArbs;PUBsa®sþénRkLaépÞ CamYynwgkarkt;sMKal;nUvkarkekIténRsTab;dI nig sRmut
dIBIkarviPaKelIRbePTdI rWkrNIepSgeTot.
         4> Rbvtþinig kareRbIR)as;kardæanrYmman Bt’manénkarxUcxat b¤)ak;Ebkrbs;sMNg;cas;² EdlbNþal
mkelIRKwH.
         5> lkçN³BiessepSg²dUcCa PaBGacekIteLIgénkarrBa¢ÜydI rWkarpøas;bþÚrénktþaFmμCatimandUcCa
TwkCMnn; karrIkb¤rYmtamrdUvkMnt;nigdIsmñwk.
         6> RbPBnigKuNPaBrbs;sMPar³ sMNg;enAkñúgRsukmandUcCaRKYssMrab;eFVIebtugfμsMrab;eFVIGaKar b¤pøÚv
nigTwksMrab;karsagsg;.
         7> sMrab;sMNg;Tak;Tgnig smuRT b¤TenøBt’manelIkMriteCarnac nigkMBs;Twkel,ÓnéncrnþeCarnac nig
crnþTenønigTinñn½y EdlTak;TgeTAnwg Hydrographic nig meteorological.


Construction General                                                                               - 16 -
Department of Civil Engineering                                                              NPIC


       8> karkt;RtaTuky:aglMGiténsßanPaBBIr b¤fμI niglkçN³TwkeRkamdIEdlenAkñúgtMbn;EdlGacman
T§iBleTAelIlT§PaBRTRTg;rbs;RKwH nigRbtibtþikarN_énkarsagsg;rW karCIkeRCAénRsTab;dIEdlGacCH
T§iBleTAelIkardæankñúgkrNINamYy.
       9> lT§iplénkareFVIBiesaFn_elIsMNakdIb¤ fμEdlRtUvnwgkarnwgkarKNna b¤sagsg;.
       2>1 karsikSaelIÉksar (document Review)
       Bt’manEdlRtUvkarcaM)ac;xøH²      mandUcCaRbvtþiénkareRbIR)as;kardæanRtUveK)anmkBIkarsikSaelI
Éksar.]TahrN_manr)aykarN_cas;² GMBI lanning Edlcg¥úlbgðajfa kardæanGacCakMNk dIRbBn½§bgðÚrTwk
s¥úyEdleKe)aHbg;ecalnig GageRcaH GagsþúkTwkkb;kñúgdIelI b¤eRkamEdlGacb:HBal;dl; KMeragGPivDÆn_ fμI².
vaGacmanpgEdrnUvBt’manEdlTak;TgeTAnwg kareRbIR)as;elInwgeRkamdIénbMBg;Twk Edl RtUvEtCIkdak; b¤bit
KMrbenAkñúgbrievnénkardæan.
       kñúgkarsikSaelIÉksarenH vamansar³sMxan;Nas;edIm,IBinitüsMPar³KMrU (reference materials)
dUcCaEpnTI PUKBðsa®sþ nigEpnTIPUmisa®sþ. EpnTIPUKBðsa®sþvamansar³sMxan;Nas;BIeRBaHvaEtgEtcg¥úl
bgðajnUv eRKaHfñak;énPUKBðsa®sþ ¬]TahrN_karxUcdI)ak;¦ nigRbePTénRsTab;dI b¤fμenAelIkardæan.

        TaMgEpnTIPUmisa®sþcas;nig fIμ Gacpþl;nUvBt’mand¾mantMélGMBIkardæansagsg;. EpnTIPUmisa®sþCa
FmμtaRtUveKeRbImaRtdæan ehIybgðajTItaMgénGaKar pøÚv pøÚvCati pøÚvEdk nig kargarepSgeTotEdlTak;TgeTA
nwgsMNg;suIvil nigTidæPaBFmμCatiEdlmandUcCa eRCaH Tenø bwg qksmuRTnig eqñrsmuRT.
        EpnTIPUmisa®sþGacg¥úlbgðajpgEdr nUvkEnøgénGagcg¥ÚrTwks¥úy nigGagsþúkTwk ehIyedayeRbIBN’
nig Rsemalvacg¥úlbgðajnUvkarGPivDÆn_cas; nigfμI. b:uEnþeKalbMNgsMxan;énEpnTIPUmisaRsþKWedIm,I
cg¥úlbgðajnUvnIvUdI. Bt’manenHGacRtUveKeRbIsMrab;KNna TidæPaBcMbgénsßanPaBPUmisa®sþ rbs;kardæan
nigsMrab;karsikSaBIRsTab;eRkamdI EdlmandUcCaRsTab;dIEdlGaceFVIeGayvakarvaybBa©úHRKwH RbRBitþieTA )an.
        RbPBd¾sMxan;mYyeToténBt’man KWrUbPaBftBIelIGakas (aerial photographs) EdlRtUveKftBIelI
ynþehaHEdlehaHenAkMBs; nigExSbnÞat;EdleKkMNt;mYy. emIlrUbftBIelIGakasBIrCamYynwg CMnYyén
Stereoscope vapþl;nUvrUbPaB 3D énsßanPaBépÞdI. rUbPaBenHGacbgðajnUvBt’man sMxan;énPUKBðsa®sþrbs;

kardæandUcCavtþmanéndI)ak; RcaMg)ak; RbePTénTMrg;dI ¬]TahrN_pñÚkxSac;¦ (alluvial fans) dIl,ab;kMNk én
Twkkk (moraines) nig (eskers) PaBsikricrilRbePTTUeTAnig lkçN³rbs;rukçCati nigKMrUénbNþajbeNþaHTwk
Construction General                                                                         - 17 -
Department of Civil Engineering                                                                  NPIC


                  . edayeRbobeFobrUbPaBBIelIGakascas; nig fμIPUKBðviTUGacsegátpgEdrnUvkarpøas;bþÚr
(drainage patterns)

edayFmμCati b¤mnusSEdl)anekIteLIgenAelIkardæan.
         2>2 karsikSaRsavRCavépÞeRkamdI (Subsurface Exploration )
         edIm,IkMNt;nUvkarkt;RtalMGiténdI nigRsTab;fμ niglkçN³énTwkeRkamdInUvkardæan karsikSaRsavRCav
épÞeRkamdI KWCanic©CakalRtUveKelIkykmksikSa. manRbePTepSg² KñaénkarsikSaRsavRCavépÞeRkamdI
dUcCa karxYg (borings) reNþABiesaFn_ (test pits) nigkarCIkcg¥ÚrCaedIm.
         karxYgeFVIeLIgedayeRbIbMBg;ragsuILaMg xYgcUlkñúgdI kñúgeKalbMNgsikSaBIlkçN³rbs;RsTab;dIxag
eRkamkarBiesaFn_enAelIkardæanpÞal; nigykdIfμI rWk¾TwkeRkamdIsMrab;eFVIBiesaFn_. reNþAxYgGacRtUveKCIkeday
éd¬]TahrN_³ CIkedaycbCIk¦ eTaHbIkñúgkarCIkFmμtaeKRtUveRbI mechanical equipment edIm,ICIkreNþA
k¾eday. eRKOgcRkeRcInRbePTRtUveKeRbIedIm,IxYgreNþA.
         Auger Boring: Mechanical Auger KWCarebobCIkreNþAy:agelOn. reNþARtUveKCIkedayEdkxYgeday

eRbIsMBaFbukEdkxYgCYykñúgkarTemøaHdI rWfμ.
         CaTUeTAmanEdkxYgBIrRbePT KW Flight auger nig bucket augers. CaFmμtaGgát;p©itrbs; flight KW 5cm-
12cm (2in eTA 4ft) ehIyrbs; bucket augers KW 0.3m eTA 2.4m (1ft eTA 8ft) . EdkxYgRtUveKdkecjBIreNþA

kñúgry³eBleTogTat;NamYy TnÞwmnigeBlenaHEdr dIEdlsßitenAelI Flight auger rWenAkñúg bucket auger RtUveK
ykecj.
         Casing CaTUeTAKW eKmineRbIsMrab; auger boring eT ehIyreNþAxYgGacRsutkñúgeBldIRtesaH rWdITn;

rWxYgRsTab;dIenAeRkamTwk. auger KWCa]bkrN_sMrab;xYgEdlCaTUeTARtUveKeRbIsMrab;xYgdI rWfμ.
         Hollow-stem flight auger; A hollow-stem flight auger manRbehagragmUlcMkNþalEdkxYgEdl

GnuBaØatieGayeyIgyksMNak;dIxageRkam)an. Hollow-stem flight auger KwdUcCaRbGb;sMrab;sMNak;dI
RtesaH b¤dITn; b¤enAeBlxYgdIeRkamRsTab;TwkeRkamdI.
         Wash-type Borings eRbIdMeNIrkarrbs;GgÁFaturav EdlGacnaMykkMeTckMTIdIeGayecjBIreNþA)an.

kMeTcdIekItmkBIkarkab; mYl nigbukrbs;EdkxYg (drill bit) EdlkMTicdI b¤fμeTACabMENktUc². Casing RtUveK
eRbIedIm,IkuMeGaymankar)ak;RsutreNþAxYg.
         edaysar drilling fluid ¬GgÁFaturav¦ EdleRbIkñúgeBlxYgvaGaceFVIeGaylM)ak;kñúgkarkMNat;dI nig
lM)akkñúgTTYl)an sMNak;EdlminxUcRTg;RTay.
Construction General                                                                             - 18 -
Department of Civil Engineering                                                                   NPIC


         Rotary     Coring  KWCa]bkrN_xYgmYyRbePTEdleKeRbIfamBlrgVilénEdkxYgeGaydUcCaclnarbs;
GgÁFaturavedIm,IRbmUlykkMeTcdIecjBIrn§.
         Percussion Drilling KWCa]bkrN_xYgmYyRbePTEdleKeRbIsMrab;xYgmYyRbePTEdleKeRbIsMrab;xYgTmøúH

fμrwgedIm,IEsVgyl;BIRsTab;dIxageRkam b¤edIm,IkarxYgGNþÚg. EdkxYgeFVIkardUcCadgjjÜreLIg ehIycuHedIm,I
bMEbknigkMeTcfμ.
         elIsBIkarxYgenHmanviFIepSgeTot sMrab;karEsVgyl;BIRsTab;dIrYmbBa©ÚlTaMg Test pits nig trenches .
Test Pits CaerOy² KWmanragCakaer:kñúgbøg;KMehIjCamYynwgTMhMRbePT 1.2 x 1.2 m (4ft KuNnwg 4ft) .

Trenches manragEvg nigceg¥ótCaFmμtakayeday backhoe b¤ bulldozer.

tarag 6>4 bgðajBIkareRbIR)as; smtßPaBnig TMhMkMNt;rbs; test pits nig trenches.
         Test Pit nig trenches pþl;nUvkarRtYtBinitüedayEPñkTeT nUvlkçxNÐénRsTab;dIxageRkam. eKk¾Gac

eRbIedIm,ITTYlnUvsMNakKMrU undisturbed éndIpgEdr. dMeNIrenHmanCIkkaydIBIxag b¤)atén Test pit b¤ trench
sMNakKMrUdI k¾GacTTYl)anBI Test pit b¤ trenches edaykarduMsgát;bBa©ÚledayédnUvbMBg; shelby, drive suILaMg
b¤bMBg;sMNakKMrUepSgeTotcUleTAkñúgdI.
         Backhoe trenchesKWCaviFId¾snSMsMécénkarGnuvtþn_nUvkarRsavRCavBIRsTab;dIxageRkam. backhoe Gac

CIky:agelOnnUv trench EdlGacbnÞab;mkRtUv)aneRbIedIm,IRtYtBinitü nigBiesaFn_dIenAnwgkEnøg. sMrab;kar
sikSaRsavRCavRsTab;dIxageRkamCaeRcIn backheo trench RtUv)aneRbIedIm,IvaytMéllkçxNÐ near- surface nig
PUmisa®sþ ¬]TahrN_rhUtCMerA 15ft¦ edayreNþAxYgEdl)aneRbIsMrab;GegátlkçxNÐRsTab;dIxageRkameRCA
CagenH.
       2>3 sMNakKMrUdI Soil Sampling
       RbePTepSgKñaCaeRcInén KMrUdIGacRtUv)aneRbIedIm,IeFVICasMNakKMrUdI b¤fμEdl)anBIkarxYg.
              1> Altered Soil: kñúgGMLúgeBlRbtibtþikarxYg dIGacRtUv)aneFVIeGayxusBIsPaBedImedaysar
karlay b¤edaysarkareFVI[kxVk;. ]TahrN_ RbsinebIkarxYgmin)anlagsMGatecjedIm,IeFVIsMNakKMrU enaH
sMNakKMrUdI EdlykecjBI)atGNþÚgxYgBitR)akdGacmansarFatukMeTckMTI (cutting) EdlRCuHBIRCugmçagén
GNþÚgxYg. kMTickMTIénGNþÚgxYgenH EdlRCuHFøak;eTA)atGNþÚgxYg nigminman vtþmansMrab;lkçxNÐenAnwg
kEnøg énsMNakKMrUEdlmanCMerAeRCA. kñúgkrNIepSgeTot sMNakKMrUdIGackøayCakxVk;eday sarGgÁFaturav
énkarxYg EdleRbIsMrab; Wash-type boring. sMNakKMrUvdIRbePTenH EdlRtUv)anlay b¤eFVI[kxVk;edaysar
Construction General                                                                              - 19 -
Department of Civil Engineering                                                                    NPIC


dMeNIrkarénkarxYgKYrminRtUv)aneRbIsMrab; karBiesaFn_eTeRBaHvanwgnaMmknUvkarsnñidæan xuscMeBaHlkçxNÐ
énRsTab;eRkamdI.
         dIEdlpøas;bþÚrsMeNImkñúgedaysarGgÁFaturavénkarxYg b¤kMedAénm:asuInePøIgkñúgGMLúgéndMeNIrkar én
karxYgk¾KYrRtUv)ancat;cUlkñúglMdab; altered soil. dIEdlRtUv)ansgát;bEnñneday over pushing b¤ over driving
KWCasMNakKMrUdIEdl k¾Gacat;Ca altered soil EdredaysarEtdMeNIrkarén over-pushing b¤ over –driving Gac
sgát;Twk[ecjBIdI.
                 2> Disturbed samples: disturbed soil KWCadIEdlRtUvcak;Bum<eLIgvijkñúgGMLúgdMeNIrkareFVI
sMNakKMrUdI. ]TahrN_ dIEdlTTYl)anBIsMNakKMrUEdlduMbBa©Úl (driven sampler) dUcCasMNakKMrUEdlbgðÚr
edaysøabRBaBIkarBiesaFn_sgát;TMluHCabTdæan (standard penetration test spilt spoon sampler) b¤duMdITaMgmUl²
Edlykmkkan;épÞdIenAkñúgRtebotEdkxYg ¬]TahrN_duMsMNakKMrU¦ Gaccat;TukCa disturbed soil. Disturbed
soil GacRtUv)aneRbIsMrab;BiesaFn_)aneRcInRbePT.

                 3> Undisturbed sample: eKTTYlsÁal;faKμansMNakKMrUdINaEdlGacykecjBIdIedaysßan-
PaBminxUcRTg;RTaytex©aHenaHeT. eTaHbICay:agNa Bakübec©keTsenHGaceRbIsMrab;sMNakKMrUdIEdlyk
edayviFId¾BitR)akd. sMNakKMrUdI Undisturbed sample CaerOy² KWCasMNakKMrUEdlTTYl)anedaykarruj
sgát;yWt² bMBg;EdlmanCBa¢aMgy:agesþIg ehIymancugkat;muxRsYc nigelonecjeRkAcUleTAkñúgdI. ):ar:aEm:Rt
2 CaerOy² RtUv)aneRbIedIm,IvaytMélBI disturbance potential énsMNakKMrUepSgKña KWCapleFobRbeLaHxag
kñúg nigpleFobépÞRkla.
         CaTUeTAbMBg;sMNakKMrUsMrab;sMNak undisturbed soil KYrRtUvmanpleFobRbeLaHxagkñúgRbEhl1°
nig pleFobRklaépÞRbEhl 10° b¤ticCagenH. karykpleFobRbelaHxagkñúgRbEhl 1°
edIm,Ipþl;[ PaBlanecjeRkAxagkMBUlénsMNakKMrUdI nigkat;bnßyPaBkkitrvag dI nig
bMBg;sMNakKMrUkñúgGMLúgeBlén                                                       dMeNIrkareFVIsMNakKMrU.
RsTab;eRbgy:agesþIgGacRtUv)anlabenAelICaymuxkaMbitedIm,Ikat;bnßypgEdr nUvPaB kkiténépÞdI
nigbMBg;EdkkñúgGMLúgdMeNIrkareFVIsMNakKMrUBum<. eKalbMNgénkarmanpleFob énépÞ Rklad¾Tab nig
cugkaMbitRsYcKWedIm,IrMkilcUleTAkñúgdICamYynwgkarraMgsÞH nigPaBbMlas;TItictYcEdlGacekIt mantictYc
cMeBaHdI. bMBg; shelby KWRtUv)anplitedIm,I[RsbeTAtamrsovePAlMGitbec©keTs (specification) nwgRtUv)an
eRbIsMrab;sMNakKMrUdI undisturbed soil samplers .
Construction General                                                                               - 20 -
Department of Civil Engineering                                                                NPIC


ktþaepSgeTot CaeRcInk¾GacbNþaleGaydIRtUv)anraMgsÞ³dUcCa ³
       • duMRKYsrwg b¤ cMENksMbkxügenAkñúgdI EdlGacbegáInrn§es<atenAtamxagénbMBg;sMNakKMrUkñúgGMLúg

       dMeNIrkareFVIsMNakKMrU.
       • karxUcxatrcnasm<½n§dIEdlbNþalmkBIkarduMjjÜr b¤rujsgát;bMBg;sMNakBum<eTAkñúgRsTab;dI.

       • cMhayPayén]sμ½nkñúgGMLúgkardkykmkvijnUvbMBg;sMNakKMrU.

       • kareFVIeGaykeRkIk b¤karb:HTgÁicénbMBg;sMNakKMrU kñúgGMLúgeBldwkCBa¢ÚneTAkan;bnÞb;BiesaFn_.

       • kardkyksMNakdIedayrdwbrdubBIbMBg;sMNakKMrU.

       • karkat;tMrwmy:ageFVsRbEhseTAtamTMhMCak;lak;sMrab;karBiesaFan_enAkñúgbnÞb;BiesaFn_.

         ral;skmμPaBEdl)anerobrab;xagelIGackat;bnßyRbsiT§iPaB Stress karkat;bnßysMrab;PaBs¥itén
GnþrRKab; nigkartMerobeLIgvijénRKab;dI. sMNakKMrUdI “undisturbed” nwgGacRtUv)antMerobeLIgvijnUvRKab;dI
y:agtictYc nigGacKμankarxUcxatelIkElgEtbNþalmkBI stress relief Edlmankarpøas;bþÚrBIlkçxNÐ stress
enAnwgkEnøgeTAlkçxNÐ stress isotropic “sMNakKMrUtex©aH” . sMNakKMrUdI disturbed Gacmanrcnasm<½n§dI
EdlxUcRTg;RTayCamYynwg kartMerobRKab;dIesÞIrEtTaMgGs;. enAeBlvas;rkPaBFn;énkMlaMgkat;pþac; (shear
strength ) b¤lkçN³xUcxatRTg;RTayéndI lT§plénkarBiesaFn_cMeBaHsMNakKMrUdI undisturbed Edl)anerob

rab;xagelI)anbgðajBIlkçN³énsßanPaBenAnwgkEnøg RbesIrCaglT§plBiesaFn_cMeBaHsMNakKMrUdI disturbed
ehIyKMrUEdl)anykecjBIrn§GNþÚgxYgKYrrkSaTukenAkñúgbMBg;sMNakKMrU b¤kgsMNakKMrU. bMBg;sMNakKMrUKYr
eRsaby:agCitcugrn§Rbehag b¤kgsMNakKMrUKYreRsaby:agsBV enAkñúgRbGb;edIm,IkarBar kar)at;bg;sMeNIm
kñúgGMLúgénkardwkCBa¢ÚneTAkan;bnÞb;BiesaFn_. sMNakKMrUvdIKYrRtUv)ankt;cMNaMCamYyÉksar b¤elxKMerag
kalbriecäTénkaryksMNakKMrU eQμaHénvisVkr b¤ GñkPUKBðsa®sþEdl)anGnuvtþcMeBaHkaryksMNakKMrU
nigcMnYnénkarxYg nigCMerA.
       2>4 karBiesaFn_enAnwgkardæan Field testing
       eKmankarBiesaFn_CaeRcInRbePT EdlGacGnuvtþn_enAeBlxYg. karBiesaFn_enAnwgkardæanbI RbePT
FmμtaCageK nwgRtUv)anykmkBiPakSakñúgEpñkenH.
         karBiesaFn_edaysarkarsgát;TMluHCabTdæan Standard Penetration test (SPT)
           KWCakarsgát;]bkrN_sMNakKMrUEdlmanCBa¢aMgRkaseTAkñúgRsTab;xSac;. ]bkrN_sMNak SPT
         SPT

RtUvEtmanGgát;p©itxagkñúg (D1) = 3.81cm(1.5in) nigGgát;p©itxageRkA (D ) = 5.08 cm(2in). ]bkrN_sMNak
                                                                    0


Construction General                                                                           - 21 -
Department of Civil Engineering                                                                      NPIC


KMrU      SPT     RtUv)ansgát;cUleTAkñúgdIxSac;edaykarTMlak;duMjjYrTMgn; 63.5kg(1401b) BIkMBs;
0.76m(30in)      . ]bkrN_sMNakKMrU SPT RtUv)ansgát;cUlsrubCMerA 45cm (18in)
CamYynwgkarTMlak;duMjjÜrCaeRcIndgeday )ankt;Rtaral;CMerAKMlat 15cm (6in) . karvas;]bkrN_ SPT
tMél         N         ¬cMnYnTMlak;ral;kMBs;       ft¦        KWCaPaBFn;          énkarsgát;TMluHéndIxSac;
EdlesμInwgplbUkéncMnYnénkarTMlak;EdltMrUvsgát;]bkrN_sMNakKMrU SPT elICMerA cenøaHBI 15 eTA 45 cm
¬6eTA 18in¦. mUlehtuEdlcMnYnénkarTMlak;duMjjÜrkñúgtMél N KWCaerOy² dMeNIr
karénkarxYgeRcIneFVIeGaydIxUcRTg;RTayenAnwg)aténrn§GNþÚgxYg nigRtUv)anGanenACMerA 15 eTA 45cm (6 eTA
18in) RtUv)aneCOCak;fa vatMNagl¥CageKénPaBFn;éndIxSac; enAnwgkEnøg. Tinñn½yBIxageRkamkarCab;Tak;Tg

KñaéneBlbc©úb,nñrvagénkarvas;Evg. karvas;Evg SPT tMél N GacRtUv)anCHT§iBledayktþaénkarBiesaFn_
CaeRcInnig lkçxNÐdI. ]TahrN_ TMhMRKab;RKYsbegáInPaBFn;énkarsgát; ¬dUcenHbegáIntMél N¦ edayERb
køayPaBs¥itenAkñúg]bkrN_sMNakKMrU SPT. ktþaepSgeTotEdlCHT§iBl dl;karBiesaFn_ SPT tMél N KWTwk
enAkñúgdI. vamansar³sMxan;kñúgkarrkSakMritkMBs;TwkenAkñúgrn§GNþÚgxYg [esμI b¤sßitBIelIkMritkMBs;TwkkñúgdI dUc
enAnwgkEnøg. eKRtUvkarBarTwkkñúgdIkuMeGayeLIgcUleTAkñúg)aténrn§GNþÚrxYgEdleFVIeGayxSac;RtsuHehIy
lT§plénkarrab;tMél N Tab. eRkABIlkçxNÐRKab;RKYs nigTwkkñúgdIEdl)anBiBN’naxagelI enAmanktþa
BiesaFn_epSgKñaeTotCaeRcIn EdlGacCHT§iBldl;PaBCak;lak;énkarGan SPT. ]TahrN_ karBiesaFn_
SPT tMél N GacRtUv)anCHT§iBledaysarRbsiT§iPaBénduMjjÜr GRtaénkarTMlak;duMjjÜr Ggát;p©iténrn§

GNþÚgxYg nigRbEvgéndgEdk.
         Van Shear Test (VST)
         SPT  nig CPT RtUv)aneRbIsMrab;karCab;Tak;TgKñaénPaBFn;énkarsgát;]bkrN_¬tMél N¦ b¤rujsgát;
duMekaNCamYynwglkçN³énvisVkmμ ¬dUcCalkçxNÐdg;suIet¦éndI. pÞúymkvij karBiesaFn_ vane test KWmanPaB
EbøkKñaBIkarBiesaFn_enAnwgkEnøgenAkardæanBIeRBaHvaRtUv)anvas;edaypÞal;nUvlkçN³BitR)akdéndI PaBFn;én
kMlaMgkat;pþac;éndIdæedayKμanbgðÚrTwk.
        karBiesaFn_ Vane test KWCakars‘kbBa©Úl vane muxsMEb:t 4eTAkñúgrn§GNþÚgxYg rYcbnÞab;mkrujsgát;
vane cUleTAkñúgRsTab;dIdæEdlsßitenA)aténrn§GNþÚgxYg. enAeBl vane RtUv)anrujcUleTAkñúgdIdærYcehIy

karmYlGtibrmatMrUvsMrab;bgVil Vane nigkarkat;pþac;dIdæRtUv)anrab;.

Construction General                                                                                  - 22 -
Department of Civil Engineering                                                                   NPIC


         VaneGacRtUv)anpþl;PaBFn;énkarpþac;edayKμankarpþac;edayKμankarbgðÚrTwkx<s;xøaMg RbsinebI Vane
RtUv)anbgVily:agelOnxøaMgenaH. karBiesaFn_ vane test pþl;nUvlT§plEdlminGaceCOCak;)an sMrab;RsTab;
dIdæ EdlmanRsTab;dIxSac; b¤RsTab; lenses/ varved clay RbsinebIdIdæmanRKab;RKYs b¤bMENksMbkxügb:unduM
RKYs.
         3> RKwH Foundation
          EpñkenHniyayBIkareRCIserIsRbePTRKwH. kareRCIserIslkçN³BiessénRbePTRKwHCaerOy² QrelI
mUldæanktþaCaeRcIndUcCa³
                    CMerARKb;RKan;. vaRtUvEtmanCMerARKb;RKan;edIm,IkarBareRKaHfñak;edaykarkkTwkkk. sMrab;
RKwHdUcCassrs<an CMerAénRKwHRtUvEtRKb;RKan;edIm,IkarBarnwgkarCIkBIeRkamedaykarduHlag.
                    karbraC½yénlT§PaBRTRTg;. RKwHRtUvEtmansuvtßiPaBRbQmnwg karbraC½yénlT§PaBRT
RTg;.
                    karRsut. RKwHminRtUvRsutdac;xatEdlGacbNþal[eRKaHfñak;dl;eRKagbgÁúMTaMgmUl.
                    KuNPaB. RKwHRtUvEtmanKuNPaBRKb;RKan;EdlvaminRbQmnwgPaBkan;Ety:ab;yWneLIg
dUcCakarvayRbhareday sulfate énebtugeCIgtag.
                    PaBFn;énkMlaMgRKb;RKan;. RKwHRtUv)anKitCamYynwgPaBFn;énkMlaMgRKb;RKan;Edlvamin
Gac)ak; b¤EbkecjBIKñaeRkambnÞúkéneRKagsMNg;xagelIEdlmanGMeBIelIva. vak¾RtUvEtsagsg;edayRtwmRtUv
edayGnuelameTAtamkarKiténesovePAlMGitbec©keTs.
                    karpøas;bþÚrdIminl¥.RKwHRtUvEtGacFn;eTAnwgkarpøas;bþÚrdIEdlminl¥yUrGEgVg. ]TahrN_
sMrab;dIEdlrIkmaD ¬dI silt b¤dIdæ¦ EdlGacrIkb¤ rYmmaDnwgeFVIeGayRKwHmanclnaehIy eFVIeGayeRKagsMNg;
maneRKaHfñak;.
                    kMlaMgrMBa¢ÜydI. RKwHRtUvEtGacRTeRKagsMNg;kñúgGMLúgeBlrBa¢ÜydIedayKμan clnaRsutcuH
xøaMg b¤eTAxag.




Construction General                                                                              - 23 -
Department of Civil Engineering                                                                  NPIC


        3>1 RKwHrak; Shallow Foundation
        RKwHrak;CaerOy² RtUv)aneRCIserIsenAeBlbnÞúkeRKagsMNg; nwgminbeNþayeGayRsTab;dIBIxag
eRkammansMrutxøaMg. CaTUeTA RKwHrak;KWmanPaBsnSMsMécCagkarsagsg;CamYyRKwHeRCA. RbePTRKwHrak;Fmμta
RtUv)anBiBN’naxageRkam³




                                              rUbTI 2-1 eCIgtag
                  eCIgtag/ RKwHrYm/ RKwHEvg spread footing/ combined footing and strip footing
                   RbePTRKwHrak;TaMgenH KWCaRbePTRKwHsMNg;FmμtaEdleRbIR)as;eRcInCageK.




Construction General                                                                             - 24 -
Department of Civil Engineering                                                              NPIC




                                       rUbTI2-2 RKwHcak;eBj
         RKwHcak;eBj Mat Foundation
        edayQrelImUldæanénkarKitesdækic© RKwHcak;eBjRtUv)ansagsg;sMrab;ehtupldUcxageRkam³
        - eCIgtagEdlmanTMhMFM. RKwHcak;eBjCaerOy² RtUv)ansagsg;enAeBlplbUkénRklaépÞeCIgtag
TaMgGs;FMCagRbEhlBak;kNþalénRklaépÞRKwHsrub.
        - RsTab; lenses EdlGacbgðab; b¤xUg. RKwHcak;eBjGacRtUv)aneRbIenAeBlNaEdldMeNIrkarrukrk
RsTab;eRkamdI bgðajfanwgmansMrutvismPaBEdlbNþalmkBIRsTab;EdlGacbgðab;)an b¤RkLúkxUgtUc²enA
BIxageRkamRKwH. RKwHcak;eBjGacRtUv)ancak;CaElVgeBjBIelIrn§xUgtUc² b¤RsTab; lenses Tn;exSay nigbegáIt
lkçxNÐsMrutÉksNæanCag.
        - sMrutrak;. RKwHcak;eBjGacRtUv)anENnaMenAeBlEdlkarRKbsgát;BIelImansMrutrak;ehIyRKwHcak;
eBjRtUv)ankat;bnßysMrut differential.
        - bnÞúkrayminesμI. sMrab;eRKagsMNg;xøH vaGacmanPaBxusKñaFMsMrab;bnÞúksMNg;EdlmanskmμPaB
enAelIépÞepSgKñaénRKwH.           karRbRBwtþeTAtamkarRBmeRBogénRKwHeCIgtagGacRtUv)anRbQmeTAnwgsMrut
differential EdlFMhYs b:uEnþRKwHcak;bMeBjnwgRtUvBRgaybnÞúkrayminesμI nigkat;bnßysMrut differential .

Construction General                                                                          - 25 -
Department of Civil Engineering                                                               NPIC


     - karedaleLIgeday hydrostatic. enAeBlRKwHnwgRtUvRbQmnwgkarehIbeLIgeday hydrostatic Edl
bNþalmkBIépÞénTwkkñúgTwk RKwHcak;eBjGacRtUv)aneRbIedIm,IFn;nwgkMlaMgedaleLIg.



         Post-tensioned slab-on-grade
        vaKWCaRbePTRKwHEdlsnSMsMécenAeBlKμankarkkTwkkkkñúgTwk b¤CMerAénkarRCabTwkkkTab. bMerI
bMras;FmμtaCageKénkMral Post-tensioned slab-on-grade KWFn;eTAnwgkMlaMgrIkéndI b¤enAeBlRbQmeTAnwg
sMrut differential FMCagtMélGnueRKaHsMrab;karRbRBwtþeTAtamkarRBmeRBogénkMral on-grade ¬EdlmanEdk
y:agesþIg¦. ]TahrN_kMral post-tensioned slab-on-grade CaerOy²RtUv)anENnaMRbsinebIkarRbQménsMrut
differential KWrMBwgfaFMCag 2cm(0.75in) . kMral post-tensioned slab-on-grade KWCaebtugEdlmanbgáb;

sésrEdkBYrEdleRsabeday)øasÞiky:agRkas;. eRsam)øasÞikkarBarsésrBYurBIkarb:HBal;CamYynwgebtug nig
GnuBaØati[sésrBYGacrGilkñúgebtugEdlkkrwgkñúgeBldMeNIrkarénkarTaj. CaFmμtasésrBYrmancugmçag
gab;¬bnÞHTMBk;¦              kñúgbrimaRt¬Cay¦Fñwm            nigcugmçageTotEdlTTYl          stress

enAbrimaRtFñwmQmedIm,IGac[ sésrBYrTTYl stress BIxagcugmçag.
         RKwHrak;déTeTot shallow foundation afternatives
       RbsinebIsMrutEdlrMBwgsMrab;RKwHrak;EdlesñImantMélFMeBk enaHbMNgepSgeTotsMrab;TMrRKwH b¤kareFVI
[dImanesßrPaBRtUvEtGacvaytMél. lkçN³d¾éTeTotFmμtaxøHEdlGacRtUveRbIRtUv)anerobrab;dUcxageRkam³
       -BRgaydI. RbtibtþikarBRgabdI GacRtUv)aneRbIsMrab;ykecjnUvRsTab;dIEdlGachab; nig CMnYs
vijedaykarbMeBjrcnasm<½n§. CaFmμtabMNgénkarBRgabdI KWmanlkçN³snSMsMécEtmYyKt;RbsinebI
RsTab;dIEdlhab;sßitenAEk,rRsTab;dIEpñkelI nigRsTab;TwkkñúgdIsßitenABIeRkamRsTab;dIEdlGachab; b¤
RsTab; TwkkñúgdIGacRtUv)andak;eGayenAeRkamedIm,IkarsnSMsMéc.
       -kardak;bnÞúkelIs. RbsinebIkardæanmanRsTab;dIsi¥t EdlGachab;enABIeRkamkardæanGacRtUv)an
dak; bnÞúkelIsedayRsTab;cak;bMeBjdak;BIelIépÞdI. karbgðÚrbBaÄr¬dUcCakarbgðÚrdUcRbeqHEdkekH
b¤karbgðÚreday xSac;¦ GacRtUv)andak;enAkñúgRsTab;dIEdlGachab;edIm,Ikat;bnßyExSénkarbgðÚr nigbegáIn
el,ÓnéndMeNIrkarbgðab;. enAeBlEdlRsTab;dIs¥itGacbgðab;)anRtUv)anTTYlnUvkarbgðab;RKb;RKan;ehIy
RsTab;EdlbMeBjelIsbnÞúk RtUv)anykecj nigsMNg;RtUv)ansagsg;.
Construction General                                                                          - 26 -
Department of Civil Engineering                                                                 NPIC


         -karbegáIndg;suIet. viFIepSgKñaCaeRcInGacRtUv)aneRbIedIm,IbegáIndg;suIetdIRtsuH b¤Tn;. ]TahrN_
karbgðab; vibro-flotation nig dynamic CaerOy² manRbsiT§iPaBkñúgkarbegáIndg;suIetRsTab;dIxSac;RtsuH.
eKalbMNgepSgeTotKWkarbgðab; grouting EdlCakarsgát;BnøicduMm:as grout EdlmankMras;Rkas;Nas;enAkñúg
dI EdlTaMgCMnYs nigbgðab;dIRtsuH.
         -RKwHGENþk. RKwHGENþtKWCaRbePTRKwHeRCABiess EdlTMgn;éneRKagsMNg;RtUv)anføwgedayykecj
nUvdI nigsagsg;nUvkMralCan;eRkamdI.
         3>2 RKwHeRCA




                                            rUbTI 2-3 RbePT pile
        RbePTénRKwHeRCAFmμtaPaKeRcInKW RKwH pile. Pile GacCaeQI ¬edImeQI¦/ EdkEdlmanmuxkat; H,
ebtugcak;rYc/ ebtugcak;enAnwgkEnøg/ ebtugEdlcak;edaysMBaF/ karbMeBjebtugkñúgbMBg; pile RbePTpSMKña.
Pile    KW)anBIkarsgát;cUlkñúgdIb¤RtUv)antMeLIgenAkñúgrn§EdlxYgmun. Pile Edl)anBIkarsgát;cUlkñúgdI
CaTUeTARtUv)ancat;Tukfa CakarykecjTab b¤x<s;GaRs½yeTAnwgbrimaNdIEdl RtUvEt)anrujecjtampøÚvEdl
Construction General                                                                            - 27 -
Department of Civil Engineering                                                                   NPIC


Pile sgát;cUl. ]TahrN_karykecjTabén Pile KWEdkmuxkat;GkSr H nig bMBg; pile EdkEdlmancugcMhr
Edlmin)anbegáItFñúkenAxagcugEpñkxagdI. ]TahrN_sMrab; pile ykecjx<s; KW Pile
EdlmanlkçN³tan;dUcCa Pile duMeQImUl b¤Pile ebtugcak;eRscmuxkat;kaernig bMBg;Pile EdkEdlman
cugbiTCit.
        Pile Edlcak;enAnwgkEnøgRtUv)anbegáItedayeFVIrn§enAkñúgdI nigbnÞab;mkbMeBjrn§edayebtug. sMrab;

Bum<d¾samBaØCageK Pile Edlcak;enAnwgkEnøgmanrn§Edl)ancak;EdlRtUvcak;bMeBjedayebtug. RbsinebIdI
GaccUlkñúgrn§enaH Pile RbePT shell GacRtUv)antMeLIg. viFIenHKWCakarsgát; shell Edk b¤RbGb;eTAkñúgdI.
RbGb;GacRtUvduMeday mandrel EdlbnÞab;mkRtUvykecjehIy RbGb;RtUv)anbMeBjedayebtug. sMrab;krNI
epSgeTotRbGb;GacRtUvduMbBa©ÚleTAkñúgdI nigbnÞab;ykbnþicmþg² RtUv)anykecjBIrn§nig bMeBjedayebtug.
         4> karCIkdIsMrab;eFVIRKwH Foundation excavation
        eKmanRbePTénkarCIkdIepSgKñaCaeRcInEdlGnuvtþkñúgGMLúgkarsagsg;énKMerag. ]TahrN_dIGacRtUv
CIkBIreNþA b¤kEnøgnigbnÞab;mkcak;bMeBjvij. ]TahrN_epSgeTotKWkarCIkCalkçN³KnøwHkat;pþac; b¤ buttress
EdlnwgRtUveRbIedIm,IeFVIeGayCMerl b¤dIEdlRtUvrGiltamxagmanesßrPaB. ]TahrN_epSgeTotsMrab;karCIk
KWdUcxageRkam³
                4>1 karCIkdIsMrab;eCIgtag Footing Excavation
        esvaRbePTenHCab;Tak;Tgnwg karvas;nUvTMhMénEpñkPUKBðsa®sþ¬dUcCaCMerA nigTMhMéneCIgtag¦ edIm,I
eFVIeGayc,as;fa vaGnuelameTAtamtMrUvkarénbøg;sMNg;. esvaenHCaerOy² RtUv)anGnuvtþn_kñúgeBldUcKña nig
karRtYtBinitüedIm,IbBa¢ak;BIlkçxNÐRTRTg;.
                4>2 karxYgsMrab; Pier Excavation of Piers
       dUcKñanwgkarCIkdIsMrab;eCIgtag visVkrPUKBðsa®sþRtUv)antMrUvsMrab;bBa¢ak;eGayc,as;BICMerA niglkçxNÐ
RTRTg;én Pier. rUbTI2>4 bgðajBICMh‘anFmμtakñúgkarsagsg;énkarxYg pier.




Construction General                                                                              - 28 -
Department of Civil Engineering   NPIC




Construction General              - 29 -
Department of Civil Engineering                                                          NPIC




                                  rUb 2-4 CMha‘nFmμtakñúgkarsagsg;énkarxYgpier
         4>3 karCIkdIcMhr open excavation
         karCIkdIcMhr KWCakarCIkdIEdlmanCMerlxagmanesßrPaB b¤minRtUv)anTb;Tl;.
      4>4 karCIkdIedaymanCnÞl; braced excavtion
      karCIkdIedaymanCnÞl;KWCakarCIkEdlEpñkxagRtUv)anTb;edayeRKagbgÁúMTb;dI. rUbTI 2-5 bgðajBI
RbePTFmμtaénRbBn½§Tb;nwgkarCIkdIedaymanCnÞl;
5> viFIbegáInsßanPaBRTRTg;dI Improvement methods
        5/1 karBRgabdI Grading
        enAeBlkardæansMNg;CaeRcIncab;epþImedaydITeT CMh‘anTI1sMrab;kardæansagsg;eFVIkarFmμtaCab;
Tak;Tgnig karBRgabdIénkardæan. karBRgabdIKW CadMeNIrkarEdlmankarCIkkarcak;bMeBj b¤bnSúMénkargar
enH. dMeNIrkarénkarBRgabFmμtaGacrYmbBa©ÚlnUvkarerobrab;xøH b¤TaMgGs;³



Construction General                                                                      - 30 -
Department of Civil Engineering                                                             NPIC




                           rUb2-5 RbePTFmμtaénRbBn½§Tb;dI nigkarCIkdIedaymanCnÞl;
         Eeasement
       CMha‘ndMbUgéndMeNIrkarBRgabKW kMNt;TItaMgéneRKOgeRbIR)as;enAkardæan nig easement . CaerOy²
eRKOgeRbIR)as;enAkardæan nig easement RtUvkarBarcaM)ac;EdlvaminGaceRKaHfñak;kñúgGMLúgeBlRbtibtþikar
BRgabdI.
         sMGat/ e)as/ nig QUsrMelIg/ Clearing, brushing and grubbing
        sMGat e)as nigQUsrMelIg KWCaskmμPaBykecjnUvedImrukçCati¬dUcCa/ esμA/ éRB kem<at/ edImeQI
nigRbePTdMNaMRsedogenH¦ tamn½yemkanic. vamansar³sMxan;EdlkaksMNl;TaMgenHRtUv)anykecjBIkar
dæan nigmindak;enAkñúgkarbMeBjCam:assMrab;eRKagsMNg;EdlbgánUveRKaHfñak;.
Construction General                                                                         - 31 -
Department of Civil Engineering                                                                      NPIC


         kare)assMGat
        dMeNIrkarBRgabdIenHKW edaHRsayCamYynwgkarykecjnUvsarFatuEdlminsaksmnwgRTRTg;enAkar
dæan dUcCadIl,b;EdlRtsuH b¤manrn§es<at/ collunvium, rukçCatiBuk/ vtßúesμakeRKaK nigkarbMeBjEdlminGac
bgðab;)an.
         karkat;CakaM² ¬tMbn;CMerlPñM¦          Benching (Hillside areas)

        karkat;CakaM² KWCakarCIkCakaM² EdlmankMritkMBs;bnþbnÞab;eTAkñúgsarFatuEpndIEdlenABIelIfñak;kaM
RtUv)anbMeBjedaysarFatubMeBj.
         canyon subdrain
                KWCabMBg; b¤RbB½n§bgðÚrTwkEdldak;fμ RKYs b¤sarFatuRsedogKña dak;kñúgcg¥Úr
         Subdrain                                                                                canyon   b¤
RbLaybgðÚrTwkcas;.
     bnÞab;BIkardak; subdrainrYcehIy karbMeBjrcnasm<½n§RtUv)andak;BIelIkMBUl subdrain.
         karP¢Ür nigkarbMhab;vij (scarifying and recompaction)
       sMrab;tMbn;rabesμIEdlKμankarCIkkat;CakaM²                                            karP¢Ür
nigkarbgðab;eLIgvijénépÞdIRtUv)anGnuvtþeday ]bkrN_bgðab;kñúgeKalbMNgedIm,ITTYlnUvPaBs¥itl¥rvagsar
FatuenAnigkEnøgnwg sarFatucak;bMeBjfμI.
         dMeNIrkarBRgabdIrdwbrdubedaykat; nigbMeBj Cut and fill rough grading operation
         RbtibtþikarBRgabdIrdwbrdubTak;Tgnwgkarkat;sarFatudIBIkEnøgx<s;nig bgðab;sarFatucak;bMeBjkñúg
tMbn;Tab kñúgeKalbMNgBRgabdIeGay)anrabesμI. skmμPaBepSgeTotGacRtUv)anGnuvtþkñúgGMLúgRbtibtþikar
BRgabdIrdwbrdubdUcCa³
         - relIgb¤ )aj;bMEbkduMfμ. bMEbkduMfμFM²GacRtUvykecjBIkardæan b¤dak;enAeRkArgVg;kargar.
         - PaBpøas;bþÚrKñaénkarkat;nig bMeBj. skmμPaBenHKWsßitenARTnab;sMNg;EdlmçagRtUvkat;cuHeRkam
rhUtdl;b:HRsTab;FmμCati b¤fμ enAeBlEdlEpñkmçageTotRtUv)ancak;bMeBj. viFImYysMrab;edaHRsayCamYy
nwgkarpøas;bþÚrKñaénkarkat;nig karbMeBjKWCIkEpñkEdlkat;[hYskMritEdlRtUvkat;rYceTIbcak;bMeBjeday
sarFatucak;bMeBj.
         - kareFVIeGayCMerlmanesßrPaB. ]TahrN_sMrab;kareFVIeGayCMerlmanesßrPaBedayeRbIsarFatudI
rYmbBa©ÚlTaMgkareFVIeGaymanesßrPaBcak;bMeBj/ buttress fill/ drainage buttress nig KnøwHénkarkat;pþac; (shear
key) . ]bkrN_xagelIKYrRtUv)aneRbICamYynwg RbBn§½ backdrain.

Construction General                                                                                 - 32 -
Department of Civil Engineering                                                                    NPIC


         - karbMeBjCMerl. enAeBlbegáItkarbMeBjCMerl vamankarkarBi)akkñúgkarbgðab;CayxageRkAén
m:asbMeBj. BIeRBaHvaKμansMBaFTb;xag dIGaceRClFøak;cuHEdlmin)anbegáIndg;suIet. edIm,IedaHRsay
sßanPaBEbbenH CMerlGacRtUv)ansagsg;hYsTMhM ehIybnÞab;mkkat;ykvijmkdl;Kl;Edl )anbgðab;.
viFId¾l¥bMputTI2d¾éTeTot KWeRbIdMeNIrkarsagsg;EdlmansarRbeyaCn_dUcCa bec©keTs back-rolling
b¤edayeRbI bulldozer edIm,I track walk tamCMerl.
         - rMlwkeLIgvijBIdMeNIrkarBRgabdI. ral;kargarBRgabdITaMgGs;manPaBEbøkKña nigGacmankarpøas;
bþÚrRbtibtþikarBRgabdIedayQrelImUldæanlkçxNÐkardæan.
         karBRgabdIm:t; Fine Grading
        enAeBlEdlkarBRgabdIrdwbrdub)ancb;sBVRKb;ehIy karBRgabdIm:t;RtUv)anGnuvtþedIm,ITTYl)annUv
kMritkMBs;cugeRkay EdlGnuelameTAtambøg;BRgabdI EdlmanPaBsuRkit.
         karkarBarCMerl nigRtYtBinitükarhUreRcaH slop protectin and erasion control
        eTaHbICaFmμtavaminEmnCakarTTYlxusRtUvrbs;Gñkem:AkarBRgabdIk¾eday eRkayBIkarBRgabdIm:t;)an
bBa©b; karkarBarCMerl nig]bkrN_RtYtRtakarhUreRcaHCaRbcaMRtUv)antMeLIg.
         karCIksñamePøaH Trench excavation
         sñamePøaHéneRKOgeRbIR)as;RtUv)anCIkedIm,ICakartMrg;énesckþIesñIpøÚv nigRsTab;sMNg;sMrab;tMeLIg
eRKOgeRbIR)as;enAkardæan. karCIknig karbgðab;énsñamePøaHCaerOy² CaEpñkéndMeNIrkarBRgabdI.
         enAeBlExSéneRKOgeRbIR)as;RtUv)antMelIg karP¢Ürnig karbgðab;RTnab;RKwHpøÚvRtUv)anGnuvtþnig sarFatu
RKwHRtUv)andak;ehIybgðab;.
         karCIkdIsMrab;eCIgtagnig RKwH Footing and Foundation excavatin
         eTaHbICaFmμtavaminEmnCaEpñkéndMeNIrkarBRgabdI EpñkRKwHnig eCIgtagRtUv)anCIkCabnþ.
        5>2 eKalkarN_énkarbgðab; Compaction Foundation
        Epñkd¾sMxan;énkarBRgabdIénkardæanCaerOy² rYmbBa©ÚlTaMgkarbgðab;sarFatubMeBj. karbgðab;KWCa
karbegáIndg;suIeténGgÁFatubMeBjtamviFIemkanicdMeNIrkarrUbénkareFVIeGaydImansßanPaBhab;enHGacbegáIn
PaBFn;énkMlaMgkat;pþac; kat;bnßykarEdlGachab; kat;bnßyPaBRCabTwkéndI. karmanktþaeKal4 Edl
b:HBal;dl;karbgðab;³
         RbePTdI Soil Type
Construction General                                                                               - 33 -
Department of Civil Engineering                                                               NPIC


         dIminmanlkçN³)øasÞikdUcCaxSac; nigRKYs GacRtUvbgðab;edayRbsiT§iPaBedayeRbIdMeNIrkar bgðab;
RbePTrMj½r. dIEdlmanlkçN³)øasÞik¬]TahrN_manPaBs¥it¦ dUcCa sift nigdIdæKWmankarBi)akkñúgkarbgðab;
nigtMrUveGaymandMeNIrkarbgðab;RbePTluj b¤buinRbsBV.
         RbsinebIdImanRKab;FMhYsxñat dUcCaduMRKYsfμFM nig fμ cabble GacnwgeRCotcUlCamYynwgdMeNIrkar
bgðab; nigkat;bnßyRbsiT§iPaBénkarbgðab;RKab;dIm:t;Cag.
         sarFatuEdlmanlMdab;RKab; Meterial Gradation
        dIEdlmanTMhMRKab;tamlMdab;l¥CaTUeTAGac nwgbgðab;bBa©ÚlkñúgsßanPaBENnCag dIEdlmanlMdab;
RKab;minl¥EdlmanTMhMRKab;esÞIrEtesμIKña.
         Twkxagkñúg Water content
         Water contentKWCa):ara:Em:RtsMxan;kñúgkarbgðab;dI. TwkGacCaeRKOgrMGilRKab;dIEdlCYyeGayvarGil
cUlkñúgkartMerobeGayENn. eTaHCay:agNa TwkeRcIneBk eFVIeGaydIkøayCaEq¥tTwk nigCaerOy² Bi)akkñúg
karbgðab;. eKmankMritkMBUlén Water content EdldIGacbgðab;cUlkñúgsßanPaBENnCageK Edlpþl;
edayfamBlénkarbgðab;.
        RbePT Optiimum moisure content (Modified Proctor) sMrab;RbePTdIepSgKñaKW erobrab;xageRkam³
        -dIdæEdlmanlkçN³)øasÞikx<s; (CH): Optimum moisture content 18%
        -dIdæEdlmanlkçN³)øasÞikTab (CL): Optimum moisture content 12% eTA 18%
        -xSac;manTMhMCalMdab;l¥ (SW): Optimum moisture content 10%
        -RKYsEdlmanTMhMCalMdab;l¥ (GW): Optimum moisture content 7%
RbePTdIxøHGacnwgmanTMnak;TMngedaykMr CamYynwgkarbgðab;eday Water content.]TahrN_ Open-graded
gravel nig clean coarse sand KWmansPaBRCabTwkEdlTwkGacbgðÚrecjy:agRsYlBIdI b¤CMrujecjeRkAeday

dMeNIrkarénkarbgðab;. dIRbePTenHCaerOy²GacRtUvTukeGaysßitenAkñúgsßanPaBs¶ÜtrYcehIyrMj½reGaycUl
tMerobRKab;xSac;eGayENnaM.




Construction General                                                                          - 34 -
Department of Civil Engineering                                                                   NPIC




CMBUkIII³
                 eRKagsMNg;ebtugmanq¥wgr)aeEdkBRgwgnig sMPar³ebtug
      Reinforcing bar concrete sturcture and concrete meterial
                                                   3

1> sMPar³suIm:g;t_ Cementitious material
         sMPar³suIm:t_rYmmanplitplCaeRcInEdlRtUv)anrlayCamYynwgTwk b¤sarFaturavd¾éTxøHeTot b¤
TaMgBIr edIm,IbegáIt)anCakMe)areRbg (cementing paste) EdlGacbegáItb¤ eFVIBum<enAeBlvaenACalkçN³)øasiÞk
b:uEnþva nwgkøayeTACaTMrg;rwgmaM. enAeBlxSac;RtUv)anbEnßmeTAkñúgkMe)areRbg vabegáIt)anCakMe)ar)ayGr.
karcUl pSMénRKYs nigxSac; eTAkñúgkMe)areRbgvakøayeTACaebtug.
         1>1 RbePTénsMPar³suIm:g;t_ Type of cementitious meterials
         eKmansuIm:g;t_CaeRcInRbePT ehIyviFIénkarcat;cMNat;fñak;k¾eRcInEdr. viFIénkarcat;fñak;cMNat;fñak;
mYyEdlsamBaØCageKbMput KWkarcat;cMNat;fñak;edaysarFatupSMKImI EdlCaGñkTTYlxusRtUvsMrab;kareFVIkar
nigeLIgrwgénsuIm:g;t_. enAelIeKalkrN_enH suIm:g;t_suIlIkat (silicate) nig GaluymINat (aluminate) Edl
kñúgenaHPñak;gareFVIkar (setting agent) KWkal;süÚmsuIlIkat (calsium silicate) nigkal;süÚmGaluymINat
(calcium aluminate) KWCaRkumEdlsMxan;CageKsMrab;suIm:g;t_TMenIb (modern cement) .rYmbBa©ÚlkñúgRkumenHKW

lanning/ aluminous nigsuIm:g;t_FmμCati (natural cement) .

         fμkMe)ar (lime) EdlkñúgenHPaBeLIgrwg KWbNþalmkBIkarbmøas;énGuIRduksuItkmμeTACa carbonate Edl
RtUv)aneRbICadMbUgy:agTUlayCasMPar³suIm:g;t_EtmYyKt; b:uEnþkareFVIkarnig PaBeLIgrwgyWtrbs;vaminRtUvKña
nwgtMrUvkarénsuIm:g;t_TMenIb. dUcenHtYnaTICacMbgrbs;vasBVéf¶ KWlkçN³ Plastic én Harsh cement nigbEnßm
resilience eTAelI)ayGr b¤stucco. KuNRbeyaCn_énkareRbIR)as;fμkMe)arKWPaBeFVIkaryWtrbs;va)anCMrujnUvkar

Büa)al nigkarCYsCulsñameRbHdUcséssk;.
Construction General                                                                              - 35 -
Department of Civil Engineering                                                                       NPIC


           cMNat;fñak;énsuIm:g;t_epSgeTotKW )anBIkarpSMénmñagsila calcined nigplitplTak;Tgnwgva. suIm:g;t_
mñagsilaRtUv)aneRbIy:agTUlaysMrab;kMe)arbUkxagkñúg nigsMrab;plit board nig block b:uEnþPaBGacrlay)an
énmñagsila)ankarBarxøÜnva BIkareRbIR)as;sMrab;sNg;EdlRbQmnwgGakasFatud¾éT b:uEnþl¥bMputsMrab;
                                                         M
GakasFatuekþA.
           suIm:g;t_G‘uksuItkørIt KWCacMNat;fñak;énsuIm:g;t_BiessEdlmanlkçN³xusFmμta. tMélrbs;va)an
hamXat; kareRbIR)as;TUeTAebIeFobCamYynwgsuIm:g;t_EdlefakCag b:uEnþþsMrab;kareRbIR)as;CalkçN³Biess
dUcCaplitplkMralkarBarePøIg (sparkproof floor) eKminGacRbdUc)aneT.
           suIm:g;t_sMrab;rabdæ b¤suIm:g;t_)ayGrRtUv)aneRbIy:agTUlMTUlayedaysarEt PaBgayRsYlrbs;va.
CaTUeTAenAeBlvaRtUv)anlayedaysuIm:g;t_mYyRbePTkñúgcMeNamsuIm:g;t_Edl)anerobrab;xagelICamYynwgTwk
fñaMKImIxøH vasmnwgTTYlnUvkarcab;GarmμN_BiessedaysarPaBsnSMsMécrbs;va.
           sMPar³suIm:g;t_epSgeTotdUcCa polymer/ fly ash nig silica fume GacRtUveRbIsuIm:g;t_CMnYssMrab;ebtug.
Plomer KWCa Plastic EdlmanRcvak;mU:elKulEvg. ebtugEdllayedaysuIm:gt;RbePTenHman KuNPaB

x<as;CagebtugedaysIum:g;t_Fmμta.
           Silica fume EdlRtUv)ansÁal;Ca microsilica EdrenaHKWplitplsMNl;BIkardutedayLFñÚrGKÁisnI

(electric- arc funaces) . silica manRbtikmμCamYynwgfμkMe)arbegáIt)anCasMPar³suIm:g;t_enAkñúgebtug. bMENk

énfume manGgát;p©itEt 1° énbMENkGgát;p©itsuIm:g;t_.
         1>2 suIm:g;t_Br½ELn (Portland Cement)
         smasFatusMxan;mYy ¬fμkMe)ar (Cao), Edk(Fe o ), silica (Sio ) nig alumina (Al O ) ¦ nigsmasFatu
                                                      2 3            2                  2   3


bnÞab;bnSM2eTot ¬mñagsila (CaSO -2H 0) nig magnesia (MgO) ¦ KWCavtßúFatuedIm. RbePTsarFatu
                                      4    2


calcareous (CaO) )anmkBIfμkMe)ar (limestone), calcite, mail b¤fμPaCn_ (shale) nigxSac; (sand) . sarFatu

argillaceous( SiO nig Al2O3) )anmkBIkarTajykBIdIdæ ¬Clay¦/ fμPaCn_¬Shale¦ nigxüac; (Sand) .
                    2


sarFatuEdleRbIsMrab;plitRbePTsuIm:g;t_Cak;lak;my KWGaRs½yeTAnwgTItaMgeragcRkplit nigPaBEdl
                                                 Y
Gacrk)annUvvtßúFatuedI.
         suIm:g;t_B½rELnGacplitBIplitpl ]sSahkmμCaeRcInRbePT. kñúgkarplitsuIm:g;t_dMbUgvtßúFatuedIm
RtUv)anykecjBIEr:rYcehIykineGayeTACaem:SAmunnwglayRcbUkCamYynwgsmasFatuEdlerobcMCamuneRsc.
karlayRcbUkKW eFVIeLIgedayLdutkMedAEdlvilenAEpñkxagcugx<s;CageK edaykMedABI2600 eTA 3000 F                  º


Construction General                                                                                   - 36 -
Department of Civil Engineering                                                                   NPIC


EdldutedayeRbg ]sμ½n b¤famBlFüÚgfμ. edaysarkarplitsuIm:g;t_KWCa dMeNIrkarplitEdlRtUvkarfamBl
d¾sMebIm ]bkrN_kMedA nigbMerIbMras;d¾éTeToteRkABI RbPBn§n³ dUcCaC½rekAs‘Ucas;²
RtUv)aneRbIedIm,Ikat;bnßyéfø n§n³. ¬kardutekAs‘Ukg;pþl;kMedAedIm,Iplit Clinker nigdutExSRkv:at;
Edkpþl;[FatupSMénEdk¦. kareFVI[ sItuNðPaBeLIgx<s;KW edIm,IFatuKImIénvtßúFatuedIm rlaycUlKña
begáIt)anCaduMtUc²rwgEdleKehAfa clinker. bnÞab;BITukeGayRtCak; duMtUc² clinker RtUv)andak;eGayqøgkat;
ball mill nigkinbMEbkeTACaPaKl¥itepH Edl PaKl¥itTaMgenHnwgRtUvErgqøgkat;kERBa¢gelx 200 (75µm)

CaBiess. kñúgGMLúgeBlenHkarkinbMEbk sarFatumñagsilaRtUv)anbEnßmkñúgbrimaNd¾tictYcedIm,IRtYtRtanUv
sItuNðPaBnig Fanadl;kareFVIkarénsuIm:g;t_ eTogTat;. sMPar³EdlRtUvqøgkat; ball mill KWCasIum:g;t_ lanning.
CaFmμtavaRtUv)an lk;CakBa©b;suIm:gt_ EdlmanTMgn; 941b.
         ebtugEdlFmμtaCageKeRbIsMrab;suIm:g;t_ lanning KWCasMPar³saMjauMEdlmanrYm suIm:g;t_ lanning RKYs
xSac; Twk nigTwkfñaMKImI nig Er:epSgeTotEdlGacrk)an. kareRbIR)as;suIm:g;t_ lanning EtÉgKWkMrNas;EdleRbI
sMrab;dUcCa)ayGrsuIm:g;t_sMrab;bMeBj Wellhole b¤bMeBj fine grout . dUcenH vamansarsMxan;Nas;kñúgkar
RtYtBinitüTMnak;TMngrvaglkçN³epSg² énsIum:g;t_ lanning nigT§iBld¾manskþanuBlrbs;vaeTAelIebtugcug
bBa©b;. CaTUeTAebtugsIum:gt;B½rELnRtUv)aneRCIserIssMrab;kargarsMNg;eRKagBIeRBaH edaysarPaBFn;én
kMlaMg nigPaBeRbIR)as;)anyUrGEgVgrbs;va. PaBFn;énkMlaMgKWGacvas;)any:aggay nigGaceRbIsMrab;Ca
smasPaBcg¥úlbgðajeday pÞal;CalkçN³TUeTAénPaBeRbIR)as;)anyUréneRKagTaMgRsug. PaBeRbIR)as;)an
yUrGEgVgCak;lak;minGacvas; )anedaygayeT b:uEnþvaGacbBa¢ak;y:agc,as;edaykarRtYtRta énlkçN³KImI
énsuIm:g;t_niglkçN³fμbMEbk.
        1>3 suIm:g;t_GaluymIj:Úm Aluminous Cement
        l,ayénvtßúFatu aluminous nig calcareous ¬CaTUeTA bauxite nigkMe)ar ¦ RtUv)anerobcMedaykarrMlay
cUlKñanig karkinbMEbkénplitplpÁÜb edIm,IeGay)anCaemSAm:t;.
        suIm:g;t_enHRtUv)ankMNt;lkçN³edaylkçN³ énkarqab;rwgqab; nwgPaBFn;énkMlaMgeLIgx<s;enAeBl
EdlvaGayux©IenAeLIy.
        enAeBlEdlbrimaNkMedAeRcInRtUvedaHElgy:agelOnedaysuIm:g;t_ aluminous kñúgGMLúgeBl
GuIRdatkmμ GñkKYrRbytñ½kuMeRbIsuIm:g;t_dak;bBa©ÚlkñúgeBlEdlkMedAminGacrsay. CaTUeTA eKminR)afñadak;

Construction General                                                                              - 37 -
Department of Civil Engineering                                                                   NPIC


ebtugsuIm:gt¾ aluminous eTAkñúg lift Edlx<s;Ca 12Guin ebIeTaHbICasItuNðPaBekIneLIgvaGacbNþaleGay
ebtugcuHexSayPaBFn;CaxøaMg.
         suIm:g;t_ aluminous manPaBFn;eTAnwgskmμPaBénTwks‘ulpatxøaMgCagsuIm:g;t_ lanning. vaemIlBIxag
eRkAeTAdUcCamanPaBFn;nwgkarvayRbharedayTwkEdl mansarFatuQøanBan carbon dioxide b¤GasuItEr:
exSayxøaMgCasuIm:g;t_suIlIkat. eKalkarN_énkareRbIR)as;vaenAkñúgebtug KWenAeBlEdlPaBFn;énkMlaMg
x<s;qab;CaGtßRbeyaCn_ b¤edayPaBFn;éns‘ulpatrbs;va nigenAeBlEdl tMélbEnßménsuIm:g;t_ minEmnCa
ktþa sMxan;.
         bMerIbMras;epSgeToténsuIm:g; aluminous KWrYmpSMCamYynwg firebrick edIm,IbegáItCaebtugFn;nwgkMedA
(refractory concrete) . enAeBlEdlsItuNðPaBekIneLIg karykFatuTwkecjBIplitplGuIRdatkmμGacekIt

eLIg. TIbMput smasFatuenHbegáItCa ceramic bond CamYynwgfμbMEbk.
         1>4 suIm:g;t_FmμCati Natural Cements
         sIum:g;t_FmμCatiRtUv)anbegáIt edaykarduteGayeTACapHedayFmμCatinUvl,ayEdl)anekItBIsarFatu
calcareous nig argillaceous enAsItuNðPaBeRkamGVIEdl sintering ykmkeRbIkar. enAeBlEdlsuIm:g;t_FmμCati

RtUv)andkecjBIvtßúFatuEdlekIteLIgedayFmμCatinig KμankarxMRbwgNamYyRtUv)aneFVIeGayEktMrUvsmasPaB
TaMgsmasPaB niglkçN³ERbRbYllμmy:agTUlMTUlay. suIm:gt_FmμCatixøH GaclkçN³esÞIrEtdUcKñanwg
suIm:g;t_ lanning suIm:g;t_FmμCatiepSgeTotmanPaBexSayxøaMgCag. suIm:g;t_FmμCatiRtUv)aneRbICaTUeTAenAkñúg
kMe)ar)ayGr (masonry mortar) nigeRbICaTwkfñaMKImIenAkñúgebtugsuIm:g;t_ lanning.
         1>5 kMe)ar Limes
         kMe)arenHRtUv)anbegáItCaTUeTAedaykal;süÚmG‘uksuIt (CaO) EdlkekIteLIgCaFmμCatienAkñúgfμkM)ar
(limestone) / fμm:ab (marble), chalk, coral nigsMbkxüg (Shell) .sMrab;eKalbMNgsMNg;GaKar vaRtUveRbICa

hiefly enAkñúgkMe)ar)ayGr.
         Hydaulic lime
        kMe)arenHbegáItBIkarduteGayeTACaepHénfμkMe)arEdlmansarFatu silica nig aluminia enAsItuNðPaB
d¾xøI énkarrMlaybBa©ÚlKñaEdleTIbnwgcab;maneLIg EdlbegáItCa kMe)aresrIRKb;RKan; edIm,IGnuBaØatidl;
GuIRdatkmμ nigkñúgeBlCamYyKñabeBa©jnUvkal;süÚmsuIlIkatRKb;RKan;EdlmineFVIGuIRdatkmμedIm,I[Ca em:SAs¶Üt
lkçN³ hydraulic rbs;va.
Construction General                                                                              - 38 -
Department of Civil Engineering                                                                 NPIC


       edaysarEtkarpSMy:agTabénsuIlIkat nigkMe)ary:agx<s; kMe)ar hydraulic manTMnak;TMngy:agexSay.
eKrkeXIjkareRbIR)as;CaeKalkarN_enAkñúgkMe)ar)ayGr. kMe)arGuIRdUlItmansuIlIkateRcInCag10° nwg
kkenAeRkamTwk.
         Quicklime
          enAeBlEdlfñkMe)arRtUvdutkMedAenAsItuNðPaBhYsBI                                     17008F
sarFatu]sμ½nkabUnDIGuksuItnwgRtUv )andkecj nigplitplrwgEdlenAsl;KW Quicklime.
CaBiessvaman]sμ½nkal;süÚmGuksuIt                                                          nigm:aej:süÚm
GuksuItbUknwgsarFatuminsuT§dUcCasuIlIkatGuksuItEdkGuksuIt nig GaluymIjÚ:mGuksuIt. CaFmμta sarFatu
minsuT§RtUv)ankMNt;eGayticCag5°. RbsinebIeRcInCag 10°plitplenHGackøayCakMe)ar hydraulic.
          QuicklimeRtUv)aneKsÁal;fa vaman2cMNat;fñak; KWkal;süÚmx<s; (high-calcium) nig dolomitic.

Quicklime Edlmankal;süÚmx<s;CaFmμtamanm:aejsüÚmG‘uksuItticCag5°. dolomitic quicklime CaFmμta

manm:aejsüÚmBI35° eTA 40°. Quick tictYcEdlmaneKrkeXIjfa ma nm:aej:süÚmG‘uksuItBI 5°eTA35°
EdleKehAfa magnesian lime. lkçN³d¾RbesIrén quicklime KWsmtßPaBénkarlayCamYyTwk. enAeBl
quick lime RtUv)anlay 2 eTA 3 dgénbrimaNTwkeFobCamYynwgTMgn;rbs;va RbtikmμKImIcab;epþImekItman.

kal;süÚmGuksuItpSMCamYyTwkbegáIt)anCakal;süÚmGuIRduksuIt ehIykMedARKb;RKan;RtUv)anbegáItCalMdab;
edIm,IeFVI eGaym:asTaMgGs;RtUvBuH. CalT§plplitplénkarbMEbkFatu kal;süÚmGuIRduksIuty:agesþIg
RtUv)anGENþtkñúg elIépÞTwk ¬nigm:aej:süÚmGuksuIt b¤GuIRduksuIt RbsinebI dolomitic RtUv)aneRbIR)as;va¦.
enAeBlRtCak; GgÁFatum:as;Bak;kNþalrav (semifluide) rwgeTACadIElgRbkdedaysgÁt;PaB RtUv)ancUkeLIg
edayEb:l b¤ekIb dak;Fug. dIElg Quicklime layTwkenH enAeBlRtCak;ehIyeKcUlcitþykeTAErg
EdlCasMPar³EdlRtUveRbIR)as;sMrab;sMNg;. Quicklime KYrEtgEtRtUv)andak;layTwkeGaysBV.
          TinñpléndIElgvaERbRbYl GaRs½yelIRbePTén Quicklime kMritdWeRkénkardutkMedA niglkçN³énkar
layTwk nigCaFmμtaTTYl)an 70 eTA 100 ft KIbéndIElgelI quickliem 1 ton. eKalkarN_énkareRbIR)as;
dIElgKWenAkñúgkMe)ar)ayGr enAkEnøgEdlvamantMéléRkElg edaysarEtkMrit)øasÞikrbs;vax<s; b¤PaBgay
RsYleFVIkarrbs;vacUlrYmenAkñúg)ayGr. vak¾RtUv)aneRbIkñúgeBldUcCaTwkfñaMKImIenAkñúgebtugEdr edIm,IbegáIt
PaBgayRsYleFVIkar.                  vak¾RtUv)aneRbIenAkEnøgxøHdUcCa           RsTab;kMe)arbUkbegðIyEdr
EdlKuNsm,tþid¾l¥rbs;va )anmkBIkMrit)øasÞikd¾x<s;rbs;va.
         Mson’s hydrated lime


Construction General                                                                            - 39 -
Department of Civil Engineering                                                                   NPIC


         hydrated lime   RtUv)anerobcMBI quicklime edaykarbEnßmnUvbrimaNkMNt; énTwkeTAlIva. bnÞab;BI
GuIRdatkmμbBaÄb;edIm,IvivtþkMedA plitplCalT§plKWCa emSAm:t;s¶Üt. bnÞab;mkvaRtUv)ancMnat;fñak;edayvIFI
aiz-classification edIm,IykecjnUvTMhMRKab;l¥itEdleKminR)afñacg;)anehIy manTMhMFMCagxñat ehIyRckkñúg

fg;EdlmanTMgn; 50lb. vaEtgEtCaplitplEdlplitedayeragcRk EdlcMENkÉdIElg quicklime
PaKeRcInEtg EtCaplitplEdl)anBIkarlayenAnwgkEnøgkargar.
         Mason’s hydrated lime KWCa hydrated lime EdlsmRsbeRbICamYykMe)ar)ayGr kMe)arbUkRsTab;

base-coat        nigebtug. vacaM)ac;GnuvtþtamsmasPaBén Quicklime. hydrated lime
Edlmankal;süÚmx<s;RtUv )anpSMeLIgCadMbUgedaykal;süÚmGuIRduksIut. hydrated lime dolomitic
FmμtaRtUv)anpSMeLIgedaykal;süÚm                     GuIRdúksuItbUknwg              m:aej:süÚmGuIRduksuIt.
lkçN³)øasÞikénkMe)ar)ayGrEdleFVIBI mason’s hydrated lime Fmμta ¬RbePT N¦ KWmanlkçN³mFüm.
vamanlkççN³l¥RbesIrCagkarlayedaysuIm:g;t_PaKeRcIn b:uEnþvaminman lkçN³x<s;esμInwgkMe)ar)ayGr
EdllayedaybrimaNesμIKña éndIElglayTwkeT. dMeNIrkarFmμtaén GuIRdatkmμ énQuicklime
enAsMBaFbriyakaspþl;nUvGuIRdatkmμénkal;süÚmGuksuItnwgbMElgeTACam:aejsüÚm GuIRdUsuIt.
         lT§plenHRtUv)aneGayeQμaHy:agdUcenHfa special hydrated ¬RbePT S ¦EdlminEmnmanEtsarFatu
sMxan; magnesia cUlrYmGuIRdatkmμsBVeT b:uEnþvamankMrit)øasÞikx<s;Pøam² enAeBlvaesImedayTwk. kMe)ar)ay
GrEdllayBIRbePT S gayRsYleFVIkarCag)ayGrlayCamYyRbePT N.
         tamBit hydrated lime RbePT S gayRsYleFVIkaresÞIrEtdUc)ayGrlayCamYydIElg Quicklime Edr
ehIydUcenHGñkeRbIR)as; Hydrated lime RbePTenHmanPaBgayRsYledaysarplitplenHRckkñúgkBa©b; nig
mankMriténkargayRsYleFVIkarx<s;edayKμaneRKaHfñak; EdlGacekItmandUc Quick lime layTwkeT.
         Finishing hydrated lime
         Finishing Hydrated lime  saksmübMputsMrab;eRbIR)as;enAkñúgkMe)arbUkRsTab;begðIy. vaRtUv)an
kMNt;lkçN³edaykMritBN’sx<s; nigkMrit)aøsÞikx<s;. RKb; Finishing Hydrated lime RtUv)anplit
CaBiessenAkñúg Rsuk Toledo énekaH Ohio BIfμkMe)ar Dolomitic. kMe)ar Hydrate FmμtapSMeLIgeday
kal;süÚmGuIRduksuIt nig m:aej:süÚmGuksuIt. enAeBlvaesImdMbUg vamanlkçN³)øasÞikmanxøaMgdUc mason’s
hydrated lime RbePT NeT. eTaHbICay:agNa vamanPaBxusKñaenAeBleRkay EdleRkayBIkarRtaMTwk



Construction General                                                                              - 40 -
Department of Civil Engineering                                                                   NPIC


eBjmYyyb; Finishing hydrated lime begáInnUvkMrit)øasÞikrbs;vax<s;Nas;Edl           mason’s hydarted Lime

bgðajnUvTMnak;TMngénPaBlUt las;énlkçN³)øasÞiky:agtictYcenAeBlRtaMTwk.
         1>6 suIm:g;t_erobdæ Masonry ament
         suIm:g;t_erobdæ (masonry cement) b¤CYnkaleKcUlcitþehAehAsuIm:g;t_kMe)ar)ayGr (motar cement)
EdlRtUv)anlayCamYynwgxSac; nigeRbIsMrab;begáItCaCBa¢aMgdædUcCa dæ kar:U nigfμ. vaGacCaRbePTmYyén
suIm:g;t_GuIRdUlIkEdl)anbriyayrYcehIy b¤karlayrbs;vaenAkñúgsmamaRtNamYy.
         suIm:g;t_erobdætamEbbBaNiC¢kmμxøHRtUv)anlaybBa©ÚlKñaedaysuIm:g;t_ lanning nigkMTicepHpg;fμ
kMe)ar (limestone) CaerOy² mansmamaRtfμkMe)areRcIn 50° b¤60°. enAeBlEdlKμankarkMNt;BIsarFatu
KImInig tMrUvkarlkçN³rUb lkçN³bBa¢ak;y:agc,as;BIsuIm:g;t_erobdæ KWmanlkçN³esrICamFüm.
plitkrxøH )anERbRbYlnUvsmasFatuy:agTUlMTUlayGaRs½yeTAnwgkarRbkYtRbECg lkçxNÐGakasFatu
b¤vtßúFatuesIm EdlGacrk)an. lT§plénkMe)ar)ayGrGacmanlkçN³ERbRbYly:agxøaMg.
         1>7 Fly ashes
         Pozzolans FmμCatiRtUv)anykecjBI diatomaceous earth/ opaline ehets nig fμPaCn_ (shales) nig

sarFatuepSgeTot.
         Fly ashes RtUv)anplitecjBIcMehHFüÚgfμCaTUeTA enAkñúgsßanIym:asuInGKÁisnI (electrical generating

station) . kMeTcepHEdlCaFmμta RtUv)anykecjtamry³bMBg;EpSgEdlykecjtamviFICaeRcIndUcCa

electrostatic precipitators. Fly ash GacRtUvmanTMhMeTAtamkardwkCBa¢Úntamk):al;rbs;GñkpÁt;pÁg;ebtug.

         Fly      ahses     TaMgGs;manlkçN³ Pozzolan EdlGacmanlT§PaBcUlrYmRbtikmμCamYynwg
kal;süÚmGuIRduksuItenAsItuNðPaBFmμtaedImbegáItCasmasPaBCamYynwglkçN³suIm:g;t_.
         enAeBlEdlsuIm:g;t_RtUv)anlayCamYynwgTwk RbtikmμKImI ¬GuIRdatkmμ¦ nigekIteLIg. lT§plén
RbtikmμenH KW calcium silicate hydrated (CSH) nigkal;süÚmGuIRduksuIt [Ca(OH) ] . Fly ashes manPaKryén
                                                                           2


suIlIkUnDIGuksuIt (SiO ) x<s;. enAeBlEdlmanvtþmanCamYynwgsMeNIm Ca(OH) eFVIRbtikmμCamYynwg SiO
                         2                                                     2                           2


edIm,ITTYl)an CSH epSgeTot. Fly ashes RbePT F )anBIlT§plénkardutFüÚgfμexμAPøW (anthracite) rWFüÚgfñ
ekAs‘Ub‘ÍTIm (bituminous) nwgmansarFatu Pozzolan. vaRtUv)anbgðajedaykarRsavRCavnig GnuvtþedIm,Ipþl; nUv
PaBrIkcMerInCaTUeTAénPaBFn;nwg sulfate nigedIm,Ikat;bnßynUvPaBrIkraldalénfμ alkali. Fly ahses RbePT
Construction General                                                                              - 41 -
Department of Civil Engineering                                                                      NPIC


C )anBIlT§plénkardutFüÚgfμ lignite rWFüÚgfμ subbituminous. edaysarEtlkçN³KImIénFüÚgfμ fly ashes
RbePTC manlkçN³suIm:g;t_edaybEnßmeTAkñúgsarFatu Pozzolon. Fly ash RbePT C Gackat;bnßyPaByUr
GEgVgénebtug EdlvacUlrYmlaybBa©ÚlKña.
         2> fμbMEbk Aggregate
        fμbMEbkKWCadak;bBa©ÚlKñanUvsarFatuCaeRcIndUcCafμ boulder, fμ cobble, fμkinbMEbk (crushed stone) fμ
gravel, fμ aircooled blast furnace slage, xSac;FmμCati b¤xSac;sib,nimiμtþ nigRKYssib,nimiμtþ nig RKYsFmμCati

Rsal. fμbMEbkGacRtUv)anBN’naeTAtamTMhMCaeRcIneTot.
          μ
        2>1 fμbMEbkTMgn;Fmμta Normal –weigth aggregates
        fμbMEbkRbePTenHmandg;suIetxniC (specific gravity) enAcenøaH 2>0 nig 3>0. CaTUeTAvaRtUv)anEck
eTAtamTMhMxageRkam³
        fμ Bounder manTMhMFMCag 6in
        fμ Cobble mancenøaH 3in eTA 6in
        RKYs (coarse aggregate) manTMhMcenøaHkERBa©g Nº 4 eTA 3in
        xSac; (fine aggregate) manTMhMcenøaHkERBa©g Nº 200 eTA Nº 4
        sarFatum:t;epHpg; (miniral filler material) qøgkat;kERBa©gelx Nº200
        fμbMEbkTMgn;Fmμta EdleRbIenAkñúgsMNg;ebtugPaKeRcIn KW)anBIkarbUmBI)atTenø b¤CIkykBIkñúgdI
nig )anBIkarbMEbkvtßúFatuepSg². ebtugEdlman)anBIkarlayCamYynwgRKYs nigxSac;TMgn;FmμtaCaTUeTAman
TMgn;RbEhl 144 lb/ .   1ft
                          3



        fμ Bounder nigfμ Cobble CaTUeTAmin)aneRbItamTMhMEdl)anEdl)anCIkBIkñúgdIeT b:uEnþRtUv)ankinbMEbk
edIm,IeGaymanTMhMepSg²CaRKYs (coarse aggreagate) xSac;sib,kmμ (manufactured –sand) nigkMeTcepHpg;
(mineral filler) . RKYs gravel nigxSac;EdlekIteLIgedayFmμCatiRtUv)anekIteLIgedayskmμPaBénTwknig

karpøas;bþÚrrdUvkal nigkarnaMykdImkcak;kñúg)atTenø. sarFatuTaMgenHmanragmUl épÞrelag nigkarEbgEck
TMhMénRKab;edaydMeNIrkary:agtictYc. sarFatuTaMgenHGacpÁt;pÁg;tamTMhMCaRKYsnig xSac;.


Construction General                                                                                 - 42 -
Department of Civil Engineering                                                                    NPIC


         xSac;KWCasarFatuEdlqøgkat;kERBa©gTMhM 3¼8 in 100%. RKYsmanvtßúFatuEdlmanTMhMeTIelIkERBa©g
elx 4.
         fμbMEbkmanbrimaNmaDKitCaPaKryeRcInCageK enAkñúgebtugsuIm:g;t_ lanning kMe)ar)ayGr b¤
asphaltic concrete . enAkñúgkarlayCaebtugsuIm:g;t_ lanning RKYsnwgxSac;cUlrYmRbEhlBI 65 eTA 70° én

maDrbs;l,aysarub. sMrab; asphaltic concrete fμbMEbkcUlrYm 75 eTA 85°énmaDrbs;l,ay. CalT§pl
fμμbMEbk KWCasarFatubMeBjminkMerIk. lkçN³fμbMEbkGacbgðajBIT§iBleTAelIRbBn½§CIvit nigPaByUr GEgVg
énebtugEdlRKYsfμbMEbkRtUv)aneRbIdUcCasuIm:g;t_ lanning , asphaltic concrete, kMe)ar)ayGr b¤fμRkal RKwHfñl;
(aggregate base) .

         karGnuBaØati[eRbIR)as;RKYs b¤xSac;sMrab;layenAkñúgebtug b¤kMe)ar)ayGr KWvinicä½yedaylkçN³Ca
eRcInrYmmandUcCa karErgkMNt;TMhMRKab; (gradation) brimaNxSac;qøgkat;kERBa©g Nº 200, PaBrwg (hardness) ,
soudness, TMrg;RKab;/ PaBlMnwgénmaD (volume stability) RbtikmμeTAnwg alkili y:agskþanuBl (potential alkali

reactivity) PaBFn;eTAnwgkarkkCaTwkkk nigkarrlayénTwkkk (resistance to freezing and thawing) nig

sarFatuxniCminsuT§.
       2>2 fμbMEbkEdlmanTMgn;F¶n;nig Rsal Heavy weigth and light weigth aggregate
       fμbMEbkTMgn;F¶n;rYmman magnitite Edlmandg;suIetxniC (specific gravity) 4>3 barite mandg;suIet
xniC 4>2 limonit mandg;suIetxniC 3>8 EdkpUsV½rmandg;suIetxniC 6>3 nigkMeTcEdkmandg;suIetxniC 7>4.
fμbMEbkTMgn;F¶n;xagelIGaceRbICMnYsfμ gravel b¤fμkinbMEbkedIm,IbegáItCaebtugd¾ENntan;.
         fμbMEbkTMgn;Rsal light weigth aggregate
       vaGacEbgEckCaBIrRbePTKW eRKagsMNg; (structural) nigminEmneRKagsMNg; (nonstructural) . va)an
BIkarplit ¬eFVIBIdIdæ/ fμPaCn_ b¤silaqñÜn (slate) b¤kMeTcGamn_ EdkpÞúHecjBIL (blast furnace slage) b¤eday
FmμCati (scoria nig pumice) . fμbMEbkenHGacbegáItCaebtugEdlmanPaBFn; nwgkMlaMgTUeTAenAcenøaHBI
3000 eTA 4000 psi PaBFn;énkMlaMgx<s;CagenHk¾GaceFVI)an. TMgn;Éktaxül;s¶Üt (air-dry unit weigth) én
PaBFn;énkMlaMgx<s;CagenHk¾GaceFVI)an. TMgn;Éktaxül;s¶Üt (aiz-dry unit weght) énPaBFn;énkMlaMgFmμta
énebtugTMgn;Rsal ¬ticCag 5000psi¦ enAcenøaHBI100 eTA 115 pcf . PaBFn;Edlx<s;énebtugTMgn;Rsal
manTMgn;Ékta (unitweight) kñúgcenøaH 120pcf.

Construction General                                                                               - 43 -
Department of Civil Engineering                                                                      NPIC


        fμbMEbkTMgn;RsalminEmneRKagsMNg;FmμtaKW vermiculite nig perlite sUm,IEt scoria nig pumice
k¾GacRtUv)aneRbIEdr. sMPar³TaMgenHRtUv)aneRbIenAkñúgebtugEdlmankMralxNнGuIsULg; karBarsMelg nig
kMralminEmneRKagxagelIeK. fμbMEbkTMgn;RsalbegáItebtugEdlmankarcMlgkMedATab Edlmankar
karBarePøIg)anl¥esμIKña. enAeBlebtugenHRbQmnwgkMedAxøaMg bMputsMeNImEdlmanenAkñúgebtug)anERbkøay
y:agqab;BIPaBrav eTACacMhayEdlmanmaDrhUtdl;15dgFMCagmun. cMnYnrn§es<atd¾eRcIn nigmanTMhMFMenA
cenøaHfμbMEbkTMgn;Rsal)anbegáIttMbn;sMBaFFUrRsal (pressure relief region) .
3> TwkfñaMKImIsMrab;ebtug Admixture for concrete
         TwkfñaMKImIKWCasarFatuepSgeTotBI suIm:g;t_ lanning Twk nigfμbMEbkEdlRtUv)anbEnßmeTAkñúgebtug
edIm,IEkERblkçN³rbs;ebtug. rYmbBa©ÚleTAkñúgGtßn½yenHvaKWTwkfñaMKImI TwkfñaMEr: dUcCa fly ash nig silica fume
sarFatukarBareRcH/ sarFatuEfmBN’ sarFatusésrsURt nigepSg² ¬CMnYykarbUm/ karBarsMeNIm/
bgá]sμ½n/ Pñak;garkat;bnßykarRCab¦.
         3/1 TwkfñaMKImIBIKImI nig BIEr: Chimical and mineral admixture
     TwkfñaMKImIRtUv)aneRbICaTUeTAenAkñúgebtugCaGgÁFatuCYykat;bnßybrimaNTwk GgÁFatuBenøÓn nigBnüWt
eBlkk b¤CaGgÁFaturYmpSM.
     A GgÁFatubnßybrimaNTwk

     B GgÁFatuBnüWteBlkkrwg

     C GgÁFatuBenøÓneBlkkrwg

     D GgÁFatubnßybrimaNTwk nigBnüWteBlkkrwg

     E GgÁFatubnßybrimaNTwk nigBnøÓneBlkkrwg

     F GgÁFatubnßybrimaNTwk kMritx<s;

     G GgÁFatubnßybrimaNTwk kMritx<s;nigBnüWteBlkkrwg

     TwkfñaMKImIkMritx<s;kat;bnßybrimaNTwk EdlcaM)ac;cUlrYmbegáItCaebtugCaBiessedayminpøas;bþÚr
12° b¤eRcInCagenH.
         TwkfñaMKImIkat;bnßybrimaNTwk Water-reducing admixture
Construction General                                                                                 - 44 -
Department of Civil Engineering                                                                    NPIC


         TwkfñaMenH)ankat;bnßytMrUvkarTwksMrab;layebtugedayeFVIRbtikmμKImICamYynwg
plitplGuIRdakmμ              )anqab;eLIgedIm,IbegáItRsTab;TwkfñaMKImI        m:UNUm:UelKulenATwksuIm:g;t_.
RsTab;enH)anEjkRKab;suIm:g;t_            nig        kat;bnßytMrUvkarfamBledIm,IeFVIeGayl,ayenH)anhUr.
dUcenHl,ayenHKW              “lubricated”           nwgCMrujeGayRKab;           suIm:g;t_cUlrYmGuIRdatkmμ.
TwkfñaMKImIkat;bnßybrimaNTwkCaFmμtaplitBIGasuIt              Lignosulfnic        nig           GMbilrbs;va
GasuItkabUksuIlicGuIRduksuIt nigGMbilrbs;va b¤ polymer Edl)anBI melamine b¤ naphthalene rWGuIRdUkabUns‘ul
pUNat. bnSMénTwkfñaMKImIEdleRbIenAkñúgl,ayebtugKYrEtRtUvRtYtBinitü nigeFVIBiesaFy:agRbugRbytñ½ edIm,I
Fanafa lkçN³EdleKcg;)anRtUv)anTTYl. ]TahrN_GaRs½yeday kMritlay (dosage) énTwkfñaMKImI nig
lkçN³KImIénsuIm:g;t_ vaGacmanlT§PaBeFVIeGayTwkfñaMKImIBnüWtkarkk nigBenøÓnkarkkrwgénebtug. vak¾
bgðaj nUvkarkt;sMKal;fa TwkfñaMKImIEdlCMrujkarkkrwgFmμta nigBnüWtkarkkRbsinebIkMritlayman
brimaNelIs. elIsBIenHeTot edaysarEtPaBxusKñaenAkñúgPaKry énduMsUlItrvagplitpl )anBI
Rkumh‘unepSgeTotvaEtg EtminmanTMnak;TMngKñaedaypÞal;rvagTwkfñaMKImIEdlmancMNat;fñak;dUcKña. dUcenH
vamansar³sMxan;kñúgkarkMNt;smasPaBKImIy:agRbugRbytñ½ enAeBlRtYtBinitükarRbkYtRbECgénTwkfñaMKImI.
         TwkfñaMKImIEdlbegáItBBuHxül; Air-Entraining Admixture
       TwkfñaMenH)anbegáItBBuHxül;d¾EsntUcbMputCaeRcInEdlmanenAkñúgebtug edIm,IkarBarebtugBIeGanPaB
bNþalmkBIskmμPaBRcMEdlénkarkk nigkarrlayénTwkkk b¤karEsþgénkarQøanBanénsarFatuKImI.
       sMrab;ebtug EdlRbQmnwgkarkk énkarrlayRcMdEdl enaHBBuHxül;pþl;nUvbnÞb;sMrab;rIkdalénTwk
xageRkA nigxagkñúgEdleTaHCay:agNavaGacbNþaleGayeRKaHfñak;dl;ebtug. enAeBlEdlebtugEdlman
BBuHxül;RCabecjmanvisalPaBtictYcCag ebtugKμanBBuHxül;enaHvanigekItmansésqμatictYcbnøayBIsñÚl
énebtugdl;épÞxageRkA. dUecñHsésqμad¾tictYcenHCapøÚvcUlénkarQøanBanénsarFatuKImIeTAkñúgebtug.
         TwkfñaMKImIBenøÓnkarkk Set-accelerating admixture
        vaRtUv)aneRbIsMrab;kat;bnßyeBlevlaBIcab;epþImlayTwkeTAkñúgsuIm:g;t_ dMbUgénkarcab;dMeNIrkar nig
begáInGaRtaénPaBFn;énkMlaMgEdlTTYl)anedayebtug. TwkfñaMKImIBenøÓnkarkkEdlRtUv)aneRbICaFmμta
eRcInCageK KWkal;süÚmkørIt. eTaHCay:agNa kareRbIR)as;rbs;va KWRbqaMgkñúgkrNIEdlEdkBRgwgnig Edk
prestressing manvtþman. mUlehturbs;va KWfavamanlT§PaBfa GgÁFatuBenøÓnnigbBa©Úly:agesrInUvEdkkørIt




Construction General                                                                               - 45 -
Department of Civil Engineering                                                                      NPIC


eTAkñúgebtug dUecñHvanwgbgáeGaymaneRcHsuIEdk. PaBEbøkKñaénkareRbIR)as;Twk fñaMKImImYykñúgcMeNamTwkfñaM
KImIEdlminmansarFatukørIt RtUv)aneRbI.
         TwkfñaMKImIBnüWtkarkk    Retarding Admixture

         sMrab;visalPaBxøH TwkfñaMKImIkat;bnßybrimaNTwkFmμtaTaMgGs;BnüWtkarkkdMbUgénebtug.
         TwkfñaMKImIsarFatuEr:    Mineral Admixture

         Fly ashes, pozzolans nig microsilicates RtUv)anbBa©ÚleTAnwgcMNat;fñak;fñaMTwkfñaMKImIsarFatuEr:. eBl
xøHsuIm:g;t_FmμtaGaceRbICaTwkfñaMKImI.
         karkarBareRcHsuI Corrosion inhibitor
        CaTUeTAEdkBRgwgenAkñúgebtugRtUv)ankarBarRbqaMgnwgeRcHsuIedaysarFatu             alkalinity

y:agx<s;énebtug Edl begáItnUvRsTab;GskmμenABIelIépÞEdk. RsTab;enHmansmasFatuEdkGuksuIt (ferric
oxide) EdlCasarFatulMnwg. eTaHCay:agNa enAkñúg b¤enABIelIépÞénEdkGuksuIt (ferric oxid)

KWCasmasFatuEdkGuksuIt (ferrous oxid compound) EdlmanRbtikmμy:agxøaMg. enAeBlEdlsmasFatu
EdkGuksuItcUleTATak;TgCamYynwg sarFatuQøanBan dUcCa chloride oxide vaeFVIRbtikmμCamYyGuksuIEsn
edIm,IbegáItCaduMsUlIt plitpleRcHEdk GuksuIt (iron-oxide corrosion product) . lT§plenH)anbegáIn
TMhMmaDrbs;va4dg nigbegáItkMlaMgrIkFak;kan; EtFMCagPaBFn;énkMlaMgTajpþac;énebtug. lT§plenHkan;Et
eFVIeGayebtugmanlkçN³y:ab;yWnEfmeTot.

         enAeBlEdleRcHsuIcab;epþImkekIt vtþmanrbs; chloride enAcenøaHBI1 eTA 1>5lb/yd . ]TahrN_
                                                                                             3



RbsinebIGacmanlT§PaB chloride GacRCabcUlBIxageRkAsñÚlebtug edayykTwkkkecjBIGMbil ebtugGac
RtUv)ankarBaredaypleFobTwk nigsuIm:g;t_kan;EtTabeLIg² b¤begáInbrimaNRKb;dNþb;elIEdkBRgwg b¤BBuH
xül;mankñúgebtug b¤bEnßmTwkfñaMKImIEdlmansarFatukal;süÚmnIRtat rWbEnßmTwkfñaMKImIr)aMgxagkñúg (internal-
barrier) b¤karBarkartUt (cathodic protection) b¤CabnSMénvIFITaMgenH.

         edIm,IkarBareRcHsuI TwkfñaMKImI kal;süÚmnIRtatRtUv)anbEnßmeTAkñúgebtugkñúgeBlkMBuglaymþgeTot
(batching) .vamin)anbegáItr)aMglkçN³rUbeTAnwgpøÚvcUlénEdkkørIkeT. va)anpøas;bþÚrlkçN³KImIénebtugEk,r

KYrsmépÞEdk. vtþmanénG‘uksuItEdknIRTIt )anbMElg ferrous oxid eTACa ferric oxide.
sarFatunIRTItk¾RtUv)anRsUbykenAÉépÞénsrésEdkehIy begáInkMlaMgdl;RsTab;Gskmμ ferric oxide.
Construction General                                                                                  - 46 -
Department of Civil Engineering                                                                         NPIC


sMrab;TwkfñaMKImI kal;süÚm nIRTItEdlRtUv)anykmkeRbI kMriteRbIR)as; (desoage) KYrRtUv)anEktMrUv
edaysMrbCamYynwglkçxNÐRbQmrbs;ebtugeTAnwgPñak;gareRcHsuI. épÞRbQmkan;EtFMkMriteRbIR)as;KYrEt
FMEdr. kMriteRbIR)as;d¾RtwmRtUvGacRtUv)ankMNt;eTAelIKMeragmYyeTA KMeragmYyedayQrelImUldæanCamYy
nwgTinñn½ysMrab;esckþIesñIsuMTwkfñaMKImICak;lak;. TwkfñaMKImIr)aMgxagkñúg (internal –barrier) manBIrRkum. RkumTI
mYymansmasFatukarBarRCabTwk nigkarBarRCabsMeNIm. RkumTIBIrmanPñak;garEdlbegáItRsTab;sarFatu
xniCCuMvijEdkBRgwg bEnßmBIelIRsTab;Gskmμ. TwkfñaMKImIRbePTenH)anCMrujsMrab;bEnßmBIelIGRtaEdl)an
kMNt;edayKμanKitBIkarRbQmnwgsarFatukørItdayKitfanwgekIteLIg.
         TwkfñaMKImIBN’ Coloring admixture
         sarFatuBN’RtUv)anbEnßmeTAelIebtugsMrab;ehtuplsßabtükmμ. vaGacCaG‘uksuItEr: b¤RKab;fñaMBN’
sib,kmμ. sarFatukabUneqABN’exμA RtUv)aneRbICaTUeTAsMrab;sarFatuBN¥exμAEdl)ankat;bnßybrimaNBBuH
xül;EdlekItmanenAkñúgl,ayy:ageRcIn. dUcenHRbsinebIebtugBN’exμARtUv)aneKcg;)ansMrab;ebtugEdltMrUv
eGaymanBBuHxül; ¬sMrab;ebtugEdlRbQmnwgPaBkk b¤rlayénTwkkk b¤karQøanBanénsarFatuKImI¦ enaH
kabUnexμA (carbon black) KYrRtUvEkERbeTACaBBuHxül; b¤eTACaPñak;garbEnßmkekItBBuHxül;EdlGacrYm
bBa©ÚleTAkñúgl,ay. karKitBIl,ay (mix design) KYrRtUv)aneFVIBiesaFn_eRkamlkçxNÐCak;Esþgénkardæan
edIm,IeRbIR)as;enAkñúgsMNg;kardæan. kareRbIR)as;nUvtMrUvkarBN’edayRbugRbytñ½RtYtBinitüsMPar³ ]bkrN_
nigkarbEnßmbrimaNTwkedIm,IrkSanUvPaBminpøas;bþÚrenAÉkardæan.
4> kMe)ar)ayGr nig ebtug Mortar and concrete
        4>1 kMe)ar)ayGr Motar
        )ayGrRtUv)anpSMeLIgedaysarFatusuIm:g;t_ RKYsfμl¥it xSac;nig Twk. vaRtUv)aneRbIsMrab;eFVIkMraldl;
kargarrabdæ sMrab;bUk nig stucooes nig laybEnßmCamYyRKYsfμFM² køayeTACaebtug. karKitenATIenH
RtUv )aneGayCadMbUgeTA)ayGrenaHEdlRtUveRbIR)as;sMrab;kagarrabdæ nigbUkkMe)ar.
        lkçN³rbs;)ayGrERbRbYly:agxøaMg GaRs½yeTAnwglkçN³énsarFatusuIm:g;t_EdlykmkeRbIpl
eFobénsuIm:g;t_ nigxSac; lkçN³ nigkMritcMNat;fñak;xSac; nigpleFobTwknigsarFatusUlIt.


Construction General                                                                                     - 47 -
Department of Civil Engineering                                                                    NPIC


        4>2 ebtugsuIm:g;t_B½rEln Portland cement concrete
        ebtugsuIm:g;B½rElnCal,ayénsuIm:g;t_ lanning Twk RKYsFM nigxSac; nigsmamaRt énTwkfñaMKImIedIm,I
begáItCam:as)øasÞikEdlmanlT§PaBGaccak; dak; nigbBa©ÚleTAkñúgBum<EdlvanwgrwgeTACam:assUlIt. lkçN³
EdleKcg;)anénebtug)øasÞikenH KWPaBGaceFVIkarrbs;vaPaBGacdak; nigminbMEbksmasFaturYmpSM nigEdlva
GackkeTAtameBlevlaEdleKcg;)an. ebtugEdlrwgKYrpþl;nUvlkçN³esvaEdleKcg;)an³
        1> PaBFn;énkMlaMg ¬sgát; nig flexural¦
        2> PaByUrGEgVg ¬ minmansñameRbH Fn;eTAnwgkarkk nigkarrlayénTwkkk nigkarvaylukén
sarFatuKIm/ Fn;eTAnwgPaBrMj½r nigbrimaNxül;Edlman¦
        3> rUbragemIlBIxageRkA ¬BN’/ épÞmanPaBminRKb;lkçN³¦
        lkçN³nimYy² CHT§iBldl;tMélcugeRkayénkarKitl,ay (mixdesign) nigtMélénkarcak;ebtugenA
nwgkEnøg. lkçN³TaMgenHGacTTYl)anBIebtugTMgn;Fmμta TMgn;Rsal nigTMgn;F¶n;.
          4>3 ebtugb:UlIEmr Polymer concrete
          lkçN³)øasÞikrbs;ebtugCamYynwg Rcv:ak;mU:elKuld¾EvgRtUv)aneKehAfa ebtugb:UlIEmrRtUv)aneKeRbI
R)as;kñúgviFICaeRcInedIm,IbegáInnUvlkçN³rbs;ebtug karCMnYsnUvsuIm:g;t_ lanning EdlcUlrYmpSMCamYynwgl,ay
dUcCaTwkfñaMKImI nigeFVIeGayebtugnwgs‘b;.
          ebtugb:UlIEmr dUcCa methyl methacrylate nig polyyester EdlminEq¥tTwk EdlenAkñúgenaHb:UlIEmr
CMnYssum:g;t_ lanning GacmanPaBFn;énkMlaMg nigmU:DuleGLasÞic (modulus of elasticity) FMCagebtugsuIm:g;t_
lanning 2dg. CamYynwgebtugb:UlIEmr creep RtUv)anbnßynig PaBFn;énvdþénkarkk nwgkarrlayénTwkkk

eLIgx<s;. ]TahrN_bnÞab;BIkarEfrTaMTwksMrab;ry³eBld¾xøIbMput eBjmYyyb;kñúgsituNðPaBbnÞb;
ebtugb:UlIEmr )aneRtomxøÜnCaeRscsMrab;eRbIkar EdlpÞúyBIebtugFmμtaEdlRtUvTTYlkarEfrTaMsMeNIm
RbEhlmYys)aþh_ munnwgTTYlbnÞúkBIxageRkA.
          m:UNUEmr nigb:UlIEmrGacRtUveRbICaTwkfñaMKImIsMrab;eFVIeGaydUcedImvij nigeFVIeGayépÞénebtugEdlman
PaBy:ab;yWnmanPaBdUcedImeLIgvij. latexe én methyl methacrylate, polyester, styrene, epoxy-styrene,
furan, styrence-butacliene nig vinylindene chloride RtUv)aneRbIsMrab;eKalbMNgTaMgenH. lT§plénkarkkrwg

énebtugmansPaBelOnCagebtugFmμta. TwkfñaMKImIb:UlIEmrk¾GacnwgRtUv)aneRbIedIm,IbegáInlkçN³PaBs¥it én
suIm:g;t_ Lanning. kardak;laybBa©Úlkñúgl,ayCaTwkfñaMKImIlayTwk sMrab;eKalbMNgenH TwkfñaMKImI)anpþl;
Construction General                                                                               - 48 -
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials
Structural Mechanics and Materials

Weitere ähnliche Inhalte

Was ist angesagt?

вестник южно уральского-государственного_университета._серия_математика._меха...
вестник южно уральского-государственного_университета._серия_математика._меха...вестник южно уральского-государственного_университета._серия_математика._меха...
вестник южно уральского-государственного_университета._серия_математика._меха...Иван Иванов
 
Prassl w l_-_drilling_engineer
Prassl w l_-_drilling_engineerPrassl w l_-_drilling_engineer
Prassl w l_-_drilling_engineerDaniel Cordoba
 
GoldShopHgCollector - 080313Draft
GoldShopHgCollector - 080313DraftGoldShopHgCollector - 080313Draft
GoldShopHgCollector - 080313Draftreosouthamerica
 
Drilling engineering
Drilling engineeringDrilling engineering
Drilling engineeringSteffones K
 
Modelling Time in Computation (Dynamic Systems)
Modelling Time in Computation (Dynamic Systems)Modelling Time in Computation (Dynamic Systems)
Modelling Time in Computation (Dynamic Systems)M Reza Rahmati
 
Book Selection
Book SelectionBook Selection
Book SelectionKarl Lane
 
Crypto notes
Crypto notesCrypto notes
Crypto notesvedshri
 
Hoja de datos chumaceras
Hoja de datos chumacerasHoja de datos chumaceras
Hoja de datos chumacerasArturoRamrez40
 
xMAP Cookbook 2nd Edition
xMAP Cookbook 2nd EditionxMAP Cookbook 2nd Edition
xMAP Cookbook 2nd EditionCharles Martin
 
ThinkPad® T400 M R400
ThinkPad® T400 M R400ThinkPad® T400 M R400
ThinkPad® T400 M R400zcejzr
 
CDR General Report
CDR General ReportCDR General Report
CDR General ReportElya Pardes
 
SAMPLE ABC College Data Center Assessment & Recommendations
SAMPLE ABC College Data Center Assessment & RecommendationsSAMPLE ABC College Data Center Assessment & Recommendations
SAMPLE ABC College Data Center Assessment & RecommendationsJeff Greenwood
 
Six Myths and Paradoxes of Garbage Collection
Six Myths and Paradoxes of Garbage Collection Six Myths and Paradoxes of Garbage Collection
Six Myths and Paradoxes of Garbage Collection Holly Cummins
 

Was ist angesagt? (18)

Georgios_Katsouris_MSc Thesis
Georgios_Katsouris_MSc ThesisGeorgios_Katsouris_MSc Thesis
Georgios_Katsouris_MSc Thesis
 
вестник южно уральского-государственного_университета._серия_математика._меха...
вестник южно уральского-государственного_университета._серия_математика._меха...вестник южно уральского-государственного_университета._серия_математика._меха...
вестник южно уральского-государственного_университета._серия_математика._меха...
 
Percentage tute for grade 08 students TAMIL
Percentage tute for grade 08 students TAMILPercentage tute for grade 08 students TAMIL
Percentage tute for grade 08 students TAMIL
 
Prassl w l_-_drilling_engineer
Prassl w l_-_drilling_engineerPrassl w l_-_drilling_engineer
Prassl w l_-_drilling_engineer
 
GoldShopHgCollector - 080313Draft
GoldShopHgCollector - 080313DraftGoldShopHgCollector - 080313Draft
GoldShopHgCollector - 080313Draft
 
Drilling engineering
Drilling engineeringDrilling engineering
Drilling engineering
 
Modelling Time in Computation (Dynamic Systems)
Modelling Time in Computation (Dynamic Systems)Modelling Time in Computation (Dynamic Systems)
Modelling Time in Computation (Dynamic Systems)
 
Book Selection
Book SelectionBook Selection
Book Selection
 
Gdb
GdbGdb
Gdb
 
Crypto notes
Crypto notesCrypto notes
Crypto notes
 
Hoja de datos chumaceras
Hoja de datos chumacerasHoja de datos chumaceras
Hoja de datos chumaceras
 
xMAP Cookbook 2nd Edition
xMAP Cookbook 2nd EditionxMAP Cookbook 2nd Edition
xMAP Cookbook 2nd Edition
 
Walsh_Thesis
Walsh_ThesisWalsh_Thesis
Walsh_Thesis
 
ThinkPad® T400 M R400
ThinkPad® T400 M R400ThinkPad® T400 M R400
ThinkPad® T400 M R400
 
CDR General Report
CDR General ReportCDR General Report
CDR General Report
 
SAMPLE ABC College Data Center Assessment & Recommendations
SAMPLE ABC College Data Center Assessment & RecommendationsSAMPLE ABC College Data Center Assessment & Recommendations
SAMPLE ABC College Data Center Assessment & Recommendations
 
Six Myths and Paradoxes of Garbage Collection
Six Myths and Paradoxes of Garbage Collection Six Myths and Paradoxes of Garbage Collection
Six Myths and Paradoxes of Garbage Collection
 
Hollow core slabs
Hollow core slabsHollow core slabs
Hollow core slabs
 

Andere mochten auch

A.matrix algebra for structural analysisdoc
A.matrix algebra for structural analysisdocA.matrix algebra for structural analysisdoc
A.matrix algebra for structural analysisdocChhay Teng
 
11. displacement method of analysis slope deflection equations
11. displacement method of analysis  slope deflection equations11. displacement method of analysis  slope deflection equations
11. displacement method of analysis slope deflection equationsChhay Teng
 
16. plane frame analysis using the stiffness method
16. plane frame analysis using the stiffness method16. plane frame analysis using the stiffness method
16. plane frame analysis using the stiffness methodChhay Teng
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_studentsChhay Teng
 
15. beam analysis using the stiffness method
15. beam analysis using the stiffness method15. beam analysis using the stiffness method
15. beam analysis using the stiffness methodChhay Teng
 
X. connections for prestressed concrete element
X. connections for prestressed concrete elementX. connections for prestressed concrete element
X. connections for prestressed concrete elementChhay Teng
 
Viii. prestressed compression and tension member
Viii. prestressed compression and tension memberViii. prestressed compression and tension member
Viii. prestressed compression and tension memberChhay Teng
 
Xii.lrfd and stan dard aastho design of concrete bridge
Xii.lrfd and stan dard aastho design of concrete bridgeXii.lrfd and stan dard aastho design of concrete bridge
Xii.lrfd and stan dard aastho design of concrete bridgeChhay Teng
 
13 beams and frames having nonprismatic members
13 beams and frames having nonprismatic members13 beams and frames having nonprismatic members
13 beams and frames having nonprismatic membersChhay Teng
 
Xi members in compression and bending
Xi members in compression and bendingXi members in compression and bending
Xi members in compression and bendingChhay Teng
 
6.beam columns
6.beam columns6.beam columns
6.beam columnsChhay Teng
 
8.eccentric connections
8.eccentric connections8.eccentric connections
8.eccentric connectionsChhay Teng
 
Computer graphic
Computer graphicComputer graphic
Computer graphicChhay Teng
 
Vi. indeterminate prestressed concrete structures
Vi. indeterminate prestressed concrete structuresVi. indeterminate prestressed concrete structures
Vi. indeterminate prestressed concrete structuresChhay Teng
 
Construction plan
Construction planConstruction plan
Construction planChhay Teng
 
Vii. camber, deflection, and crack control
Vii. camber, deflection, and crack controlVii. camber, deflection, and crack control
Vii. camber, deflection, and crack controlChhay Teng
 

Andere mochten auch (20)

A.matrix algebra for structural analysisdoc
A.matrix algebra for structural analysisdocA.matrix algebra for structural analysisdoc
A.matrix algebra for structural analysisdoc
 
11. displacement method of analysis slope deflection equations
11. displacement method of analysis  slope deflection equations11. displacement method of analysis  slope deflection equations
11. displacement method of analysis slope deflection equations
 
16. plane frame analysis using the stiffness method
16. plane frame analysis using the stiffness method16. plane frame analysis using the stiffness method
16. plane frame analysis using the stiffness method
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_students
 
15. beam analysis using the stiffness method
15. beam analysis using the stiffness method15. beam analysis using the stiffness method
15. beam analysis using the stiffness method
 
Type of road
Type of roadType of road
Type of road
 
Torsionprop
TorsionpropTorsionprop
Torsionprop
 
X. connections for prestressed concrete element
X. connections for prestressed concrete elementX. connections for prestressed concrete element
X. connections for prestressed concrete element
 
Viii. prestressed compression and tension member
Viii. prestressed compression and tension memberViii. prestressed compression and tension member
Viii. prestressed compression and tension member
 
Euro upe
Euro upeEuro upe
Euro upe
 
Xii.lrfd and stan dard aastho design of concrete bridge
Xii.lrfd and stan dard aastho design of concrete bridgeXii.lrfd and stan dard aastho design of concrete bridge
Xii.lrfd and stan dard aastho design of concrete bridge
 
13 beams and frames having nonprismatic members
13 beams and frames having nonprismatic members13 beams and frames having nonprismatic members
13 beams and frames having nonprismatic members
 
Xi members in compression and bending
Xi members in compression and bendingXi members in compression and bending
Xi members in compression and bending
 
Appendix
AppendixAppendix
Appendix
 
6.beam columns
6.beam columns6.beam columns
6.beam columns
 
8.eccentric connections
8.eccentric connections8.eccentric connections
8.eccentric connections
 
Computer graphic
Computer graphicComputer graphic
Computer graphic
 
Vi. indeterminate prestressed concrete structures
Vi. indeterminate prestressed concrete structuresVi. indeterminate prestressed concrete structures
Vi. indeterminate prestressed concrete structures
 
Construction plan
Construction planConstruction plan
Construction plan
 
Vii. camber, deflection, and crack control
Vii. camber, deflection, and crack controlVii. camber, deflection, and crack control
Vii. camber, deflection, and crack control
 

Ähnlich wie Structural Mechanics and Materials

សៀវភៅមូលដ្ឋានគ្រឺះទូទៅគ្រឿងបង្គុំនៃសំណង់.pdf
សៀវភៅមូលដ្ឋានគ្រឺះទូទៅគ្រឿងបង្គុំនៃសំណង់.pdfសៀវភៅមូលដ្ឋានគ្រឺះទូទៅគ្រឿងបង្គុំនៃសំណង់.pdf
សៀវភៅមូលដ្ឋានគ្រឺះទូទៅគ្រឿងបង្គុំនៃសំណង់.pdfvapheng
 
Oil palm by-products as lightweight aggregate in concrete - a review
Oil palm by-products as lightweight aggregate in concrete - a reviewOil palm by-products as lightweight aggregate in concrete - a review
Oil palm by-products as lightweight aggregate in concrete - a reviewUniversity of Malaya
 
Water-Resources-Engineering-Chin.pdf
Water-Resources-Engineering-Chin.pdfWater-Resources-Engineering-Chin.pdf
Water-Resources-Engineering-Chin.pdfRajeshMahana2
 
Gbr Version 060209 Addendum
Gbr Version 060209 AddendumGbr Version 060209 Addendum
Gbr Version 060209 Addendummatthromatka
 
Thesis - Umberto Morelli (83190)
Thesis - Umberto Morelli (83190)Thesis - Umberto Morelli (83190)
Thesis - Umberto Morelli (83190)Umberto Morelli
 
Guidelines Haul Rpad Design
Guidelines Haul Rpad DesignGuidelines Haul Rpad Design
Guidelines Haul Rpad DesignEdgar Quiroz
 
Guide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structuresGuide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structuresTimóteo Rocha
 
Mansour_Rami_20166_MASc_thesis
Mansour_Rami_20166_MASc_thesisMansour_Rami_20166_MASc_thesis
Mansour_Rami_20166_MASc_thesisRami Mansour
 
Advanced Analytical Techniques in Dairy Chemistry.pdf
Advanced Analytical Techniques in Dairy Chemistry.pdfAdvanced Analytical Techniques in Dairy Chemistry.pdf
Advanced Analytical Techniques in Dairy Chemistry.pdfANAYNALLELYLAPON
 
Reverse engineering for_beginners-en
Reverse engineering for_beginners-enReverse engineering for_beginners-en
Reverse engineering for_beginners-enAndri Yabu
 
Precast carparks
Precast carparksPrecast carparks
Precast carparksMichal Bors
 
Effect of tool size on fracture and fatigue behaviors of friction stir spot w...
Effect of tool size on fracture and fatigue behaviors of friction stir spot w...Effect of tool size on fracture and fatigue behaviors of friction stir spot w...
Effect of tool size on fracture and fatigue behaviors of friction stir spot w...Dustin
 
Analysis and control of an in situ hydrogen generation and fuel cell power sy...
Analysis and control of an in situ hydrogen generation and fuel cell power sy...Analysis and control of an in situ hydrogen generation and fuel cell power sy...
Analysis and control of an in situ hydrogen generation and fuel cell power sy...Jupira Silva
 

Ähnlich wie Structural Mechanics and Materials (20)

សៀវភៅមូលដ្ឋានគ្រឺះទូទៅគ្រឿងបង្គុំនៃសំណង់.pdf
សៀវភៅមូលដ្ឋានគ្រឺះទូទៅគ្រឿងបង្គុំនៃសំណង់.pdfសៀវភៅមូលដ្ឋានគ្រឺះទូទៅគ្រឿងបង្គុំនៃសំណង់.pdf
សៀវភៅមូលដ្ឋានគ្រឺះទូទៅគ្រឿងបង្គុំនៃសំណង់.pdf
 
Oil palm by-products as lightweight aggregate in concrete - a review
Oil palm by-products as lightweight aggregate in concrete - a reviewOil palm by-products as lightweight aggregate in concrete - a review
Oil palm by-products as lightweight aggregate in concrete - a review
 
DNV Liquified Gas Terminal
DNV Liquified Gas TerminalDNV Liquified Gas Terminal
DNV Liquified Gas Terminal
 
Water-Resources-Engineering-Chin.pdf
Water-Resources-Engineering-Chin.pdfWater-Resources-Engineering-Chin.pdf
Water-Resources-Engineering-Chin.pdf
 
Gbr Version 060209 Addendum
Gbr Version 060209 AddendumGbr Version 060209 Addendum
Gbr Version 060209 Addendum
 
Thesis - Umberto Morelli (83190)
Thesis - Umberto Morelli (83190)Thesis - Umberto Morelli (83190)
Thesis - Umberto Morelli (83190)
 
Guidelines Haul Rpad Design
Guidelines Haul Rpad DesignGuidelines Haul Rpad Design
Guidelines Haul Rpad Design
 
Xray 1
Xray 1Xray 1
Xray 1
 
Xray 1
Xray 1Xray 1
Xray 1
 
Plastering
PlasteringPlastering
Plastering
 
Guide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structuresGuide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structures
 
Mansour_Rami_20166_MASc_thesis
Mansour_Rami_20166_MASc_thesisMansour_Rami_20166_MASc_thesis
Mansour_Rami_20166_MASc_thesis
 
Advanced Analytical Techniques in Dairy Chemistry.pdf
Advanced Analytical Techniques in Dairy Chemistry.pdfAdvanced Analytical Techniques in Dairy Chemistry.pdf
Advanced Analytical Techniques in Dairy Chemistry.pdf
 
Beneficiation ore
Beneficiation oreBeneficiation ore
Beneficiation ore
 
Reverse engineering for_beginners-en
Reverse engineering for_beginners-enReverse engineering for_beginners-en
Reverse engineering for_beginners-en
 
Frmsyl1213
Frmsyl1213Frmsyl1213
Frmsyl1213
 
Precast carparks
Precast carparksPrecast carparks
Precast carparks
 
PCI parking structures recommended practices
PCI parking structures  recommended practicesPCI parking structures  recommended practices
PCI parking structures recommended practices
 
Effect of tool size on fracture and fatigue behaviors of friction stir spot w...
Effect of tool size on fracture and fatigue behaviors of friction stir spot w...Effect of tool size on fracture and fatigue behaviors of friction stir spot w...
Effect of tool size on fracture and fatigue behaviors of friction stir spot w...
 
Analysis and control of an in situ hydrogen generation and fuel cell power sy...
Analysis and control of an in situ hydrogen generation and fuel cell power sy...Analysis and control of an in situ hydrogen generation and fuel cell power sy...
Analysis and control of an in situ hydrogen generation and fuel cell power sy...
 

Mehr von Chhay Teng

Representative flower of asian countries
Representative flower of asian countriesRepresentative flower of asian countries
Representative flower of asian countriesChhay Teng
 
Composition of mix design
Composition of mix designComposition of mix design
Composition of mix designChhay Teng
 
Technical standard specification auto content
Technical standard specification auto contentTechnical standard specification auto content
Technical standard specification auto contentChhay Teng
 
Available steel-section-list-in-cam
Available steel-section-list-in-camAvailable steel-section-list-in-cam
Available steel-section-list-in-camChhay Teng
 
Concrete basics
Concrete basicsConcrete basics
Concrete basicsChhay Teng
 
Rebar arrangement and construction carryout
Rebar arrangement and construction carryoutRebar arrangement and construction carryout
Rebar arrangement and construction carryoutChhay Teng
 
1 dimension and properties table of w shapes
1 dimension and properties table of w shapes1 dimension and properties table of w shapes
1 dimension and properties table of w shapesChhay Teng
 
2 dimension and properties table of s shape
2 dimension and properties table of s shape2 dimension and properties table of s shape
2 dimension and properties table of s shapeChhay Teng
 
3 dimension and properties table of hp shape
3 dimension and properties table of hp shape3 dimension and properties table of hp shape
3 dimension and properties table of hp shapeChhay Teng
 
4 dimension and properties table c shape
4 dimension and properties table c shape4 dimension and properties table c shape
4 dimension and properties table c shapeChhay Teng
 
5 dimension and properties table l shape
5 dimension and properties table l shape5 dimension and properties table l shape
5 dimension and properties table l shapeChhay Teng
 
6 dimension and properties table of ipe shape
6 dimension and properties table of ipe shape6 dimension and properties table of ipe shape
6 dimension and properties table of ipe shapeChhay Teng
 
7 dimension and properties table ipn
7 dimension and properties table ipn7 dimension and properties table ipn
7 dimension and properties table ipnChhay Teng
 
8 dimension and properties table of equal leg angle
8 dimension and properties table of equal leg angle8 dimension and properties table of equal leg angle
8 dimension and properties table of equal leg angleChhay Teng
 
9 dimension and properties table of upe
9 dimension and properties table of upe9 dimension and properties table of upe
9 dimension and properties table of upeChhay Teng
 
10 dimension and properties table upn
10 dimension and properties table upn10 dimension and properties table upn
10 dimension and properties table upnChhay Teng
 
11 dimension and properties table of u
11 dimension and properties table of u11 dimension and properties table of u
11 dimension and properties table of uChhay Teng
 
Construction permit (kh)
Construction permit (kh)Construction permit (kh)
Construction permit (kh)Chhay Teng
 
Concrete price and proportion
Concrete price and proportionConcrete price and proportion
Concrete price and proportionChhay Teng
 

Mehr von Chhay Teng (20)

Representative flower of asian countries
Representative flower of asian countriesRepresentative flower of asian countries
Representative flower of asian countries
 
Composition of mix design
Composition of mix designComposition of mix design
Composition of mix design
 
Technical standard specification auto content
Technical standard specification auto contentTechnical standard specification auto content
Technical standard specification auto content
 
Available steel-section-list-in-cam
Available steel-section-list-in-camAvailable steel-section-list-in-cam
Available steel-section-list-in-cam
 
Concrete basics
Concrete basicsConcrete basics
Concrete basics
 
Rebar arrangement and construction carryout
Rebar arrangement and construction carryoutRebar arrangement and construction carryout
Rebar arrangement and construction carryout
 
Mix design
Mix designMix design
Mix design
 
1 dimension and properties table of w shapes
1 dimension and properties table of w shapes1 dimension and properties table of w shapes
1 dimension and properties table of w shapes
 
2 dimension and properties table of s shape
2 dimension and properties table of s shape2 dimension and properties table of s shape
2 dimension and properties table of s shape
 
3 dimension and properties table of hp shape
3 dimension and properties table of hp shape3 dimension and properties table of hp shape
3 dimension and properties table of hp shape
 
4 dimension and properties table c shape
4 dimension and properties table c shape4 dimension and properties table c shape
4 dimension and properties table c shape
 
5 dimension and properties table l shape
5 dimension and properties table l shape5 dimension and properties table l shape
5 dimension and properties table l shape
 
6 dimension and properties table of ipe shape
6 dimension and properties table of ipe shape6 dimension and properties table of ipe shape
6 dimension and properties table of ipe shape
 
7 dimension and properties table ipn
7 dimension and properties table ipn7 dimension and properties table ipn
7 dimension and properties table ipn
 
8 dimension and properties table of equal leg angle
8 dimension and properties table of equal leg angle8 dimension and properties table of equal leg angle
8 dimension and properties table of equal leg angle
 
9 dimension and properties table of upe
9 dimension and properties table of upe9 dimension and properties table of upe
9 dimension and properties table of upe
 
10 dimension and properties table upn
10 dimension and properties table upn10 dimension and properties table upn
10 dimension and properties table upn
 
11 dimension and properties table of u
11 dimension and properties table of u11 dimension and properties table of u
11 dimension and properties table of u
 
Construction permit (kh)
Construction permit (kh)Construction permit (kh)
Construction permit (kh)
 
Concrete price and proportion
Concrete price and proportionConcrete price and proportion
Concrete price and proportion
 

Kürzlich hochgeladen

8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 

Kürzlich hochgeladen (20)

8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 

Structural Mechanics and Materials

  • 1. Department of Civil Engineering NPIC matika CMBUk I..............................................................................6 eRKagsMNg;emkanik .................................................................6 Structural Mechanic .............................................................6 1> karkMNt;bnÞúk .....................................................................6 1>1 RbePTénbnÞúk .................................................................6 1>2 bnÞúk (Service Loads) ..........................................................8 1>3 emKuNbnÞúk ...................................................................9 2> Stress and Strain ................................................................11 2>1 Static Equilibrium .............................................................11 2>2 Unit Stress and Strain ..........................................................12 2>3 Hooke’s Law .................................................................12 2>4 Constant Unit Stress ...........................................................13 2>5 Poisson’s Ratio................................................................14 CMBUkII ³..........................................................................15 dI nig RKwH ........................................................................15 Soil and foundation ............................................................15 1> esckþIepþIm ......................................................................15 1>1 emkanicdI ...................................................................15 1>2 visVkmμRKWH (Foundation Engineering) ...........................................16 2> karsikSaRsavRCavelIkardæanpÞal; (field exploitation) ..................................16 2>1 karsikSaelIÉksar (document Review) .........................................17 2>2 karsikSaRsavRCavépÞeRkamdI (Subsurface Exploration ) ............................18 2>3 sMNakKMrUdI Soil Sampling ....................................................19 Construction General -1-
  • 2. Department of Civil Engineering NPIC 2>4 karBiesaFn_enAnwgkardæan Field testing ..........................................21 3> RKwH Foundation ................................................................23 3>1 RKwHrak; Shallow Foundation ..................................................24 3>2 RKwHeRCA ....................................................................27 4> karCIkdIsMrab;eFVIRKwH Foundation excavation ..........................................28 4>1 karCIkdIsMrab;eCIgtag Footing Excavation .......................................28 4>2 karxYgsMrab; Excavation of Piers ...............................................28 4>3 karCIkdIcMhr open excavation .................................................30 4>4 karCIkdIedaymanCnÞl; braced excavtion .........................................30 5> viFIbegáInsßanPaBRTRTg;dI Improvement methods ......................................30 5/1 karBRgabdI Grading ..........................................................30 5>2 eKalkarN_énkarbgðab; Compaction Foundation ..................................33 CMBUkIII³ ..........................................................................35 eRKagsMNg;ebtugmanq¥wgr)aeEdkBRgwgnig sMPar³ebtug..............................35 Reinforcing bar concrete sturcture and concrete meterial .................35 1> sMParsuIm:g;t_ Cementitious material ................................................35 1>1 RbePTénsMPar³suIm:g;t_ Type of cementitious meterials ............................35 1>2 suIm:g;t_Br½tøg; (Portland Cement) ...............................................36 1>3 suIm:g;t_GaluymIj:Úm Aluminous Cement ........................................37 1>4 suIm:g;t_FmμCati Natural Cements ...............................................38 1>5 kMe)ar Limes ................................................................38 1>6 suIm:g;t_erobdæ Masonry ament ................................................41 1>7 Fly ashes ..................................................................41 2>fμbMEbk Aggregate ...............................................................42 Construction General -2-
  • 3. Department of Civil Engineering NPIC 2>1 fμbMEbkTMgn;Fmμta Normal –weigth aggregates....................................42 2>2 fμbMEbkEdlmanTMgn;F¶n;nig Rsal Heavy weigth and light weigth aggregate ..........43 3> TwkfñaMKImIsMrab;ebtug Admixture for concrete ........................................44 3/1 TwkfñaMKImIBIKImI nig BIEr: Chimical and mineral admixture ............................44 4> kMe)ar)ayGr nig ebtug Mortar and concrete .........................................47 4>1 kMe)ar)ayGr Motar ..........................................................47 4>2 ebtugsuIm:g;t_B½rtøg; Portland cement concrete.....................................48 4>3 ebtugb:UlIEmr Polymer concrete................................................48 5> karcak;ebtug Concrete Placement..................................................49 5>1 karGnuvtþn_d¾l¥ Good Pratice .................................................49 5>2 viFIénkarcak; Methods of Placing ...............................................50 5>3 PaBelIsTwk Excess water ....................................................50 5>4 kareFVIeGayhab; Consolidation ................................................51 5>5 karcak;ebtugeRKOgbgÁúMbBaÄr Concreting vertical element ...........................52 5>6 karcak;ebtugeRKOgbgÁúMedk concreting horizontal element...........................53 5>7 karcak;ebtugkñúgrdUvRtCak; Concreting in cold weather .............................54 5>8 karcak;ebtugGakasFatuekþA Concreting in hot weather...........................55 5>9 karEfrrkSasMeNImebtug Curing concrete .......................................55 5>10 muxtMNrsMrab;ebtug Joint in concrete .........................................56 5>11 karRtYtBinitüBIkarcak;ebtug Inspection of Concrete placement ...................58 6> eRKOgbgÁúMénsMNg;ebtug Members of concrete construction .............................58 6>1 kMral Slab .................................................................58 6>2 Fñwm Beam ..................................................................60 6>3 CBa¢aMg Wall ................................................................60 Construction General -3-
  • 4. Department of Civil Engineering NPIC 6>4 RKwH Foundation .............................................................61 CMBUk IV ..........................................................................64 sMNg;eRKagbgÁúMGMBIEdk.............................................................64 STRUCTURAL STEEL CONSTRUCTION ...............................64 1> karKitbøg;éneRKOgbgÁúM Design of Members ...........................................64 1>1 eKalkarN_sMrab; ASD nig LRFD BASED FOR ASD AND LRFD .....65 1>2 CMnYyénkarKItbøg; nigeyag Design Aids and References........................66 1>3 eRKOgbgÁúMrgnUvkMlaMgTay Tension member ...................................66 1>4 ssr Column ..............................................................67 1>5 Fñwm Beam ................................................................69 1>6 Plaster girders ..............................................................70 2> karksagsMNg;Edk Steel erection .................................................71 2>1 ]bkrN_énkarsagsg; Erection Equipment....................................73 2>2 RbeLaHkñúgkarsagsg;Fñwm Clearance for erecting beams ...........................74 2>3 lMdab;énkarsagsg; Erection sequence .........................................77 2>4 dMeNIrkarpSar Field –Welding .................................................77 CMBUk V ...........................................................................80 eRKOgbgÁMGMBIeQI nigsMPar³.........................................................80 WOOD STRUCTURE AND MATERIAL .................................80 1> sMPar³ Material .................................................................81 1>1 lkçN³mUldæanrbs;eQI Basic Characteristic of Wood .............................81 1>2 lkçN³emkanicéneQI Mechanical Properties of Wood ..........................83 1>3 lkçN³T§iBlRsUbcMhayTwkkñúgxül; Effect of hygroscopic properties ...............84 1>4> lMdab;fñak;éneQI Grade of Wood ..............................................87 Construction General -4-
  • 5. Department of Civil Engineering NPIC 1>5 sarFatubMpøaj nig sarFaturkSakarBar Destroyer and preservative....................90 1>6 kavnig sarFatusMrab;eQI Glues and adhesives for wood ...........................92 1>7 karplitkþakug)øaek nigkþabnÞHepSgeTot Plywood and fabricated wood board..........93 2> karpliteQI timber nigkarksag timber fabrication and erection .......................95 2>1 karpliteRKagbgÁúMeQI Fabrication of structural timber .............................95 2>2 karsagsg;eQI timber erection ................................................97 CMBUkVI³ ........................................................................101 eRKagCBa¢aMgerob¬dæ/ bøúk/ fμ¦ nigsMPar³ ........................................101 Masonry Structure and Material............................................101 1> esckþIepþIm Introduction ........................................................101 1>1 CBa¢aMgerobdæ Masonry Wall ................................................101 1>2 niymn½yénCBa¢aMgerobdæ Masonry Definition .................................101 2> KuNPaBénsMPar³sMrab;CBa¢aMgrabdæ Quality of Material for Masonry ..................105 2>1 tMrUvkarTUeTAsMrab;karKitCalkçN³bTdæan General Requirement of Design Standard ..106 2>2 sMPar³sMrab;sMNg;rabdæ Materials for Masonry Construction ....................107 3> sMNg;rabdæ Construction of masonry............................................107 3>1 sMNg;CBa¢aMgrabdækñúgGakasFatuRtCak; Cold weather construction of masonry walls 110 3>2 cgP¢ab;rvag Wythes sMrab;CBa¢aMgdæ Bond between wythes in Masonry wall .......110 3>3 rabdæeday grout grout masonry .....................................112 3>4 lkç½xN½ÐTMrsMrab;CBa¢aMg Support Conditions for Wall ............................115 3>5 Corbeling ................................................................115 3>6 RbelaHRbehag/ Chases nig rescesses sMrab;CBa¢aMgerobdæ .......................116 3>7 Flashing enAkñúgCBa¢aMgrabdæ ................................................117 4> TMrxagsMrab;CBa¢aMgrabdænig FaturYmpSMepSg² ........................................118 Construction General -5-
  • 6. Department of Civil Engineering NPIC Lateral support for masonry wall and other elements .................................118 4>1 TMrxagsMrab;CBa¢aMgrabdæ lateral support for masonry wall ........................118 4>2 bMBg;EpSg nigeCIgRkandMedApÞH Chimneys and fireplaces .........................122 4>3 karpþl;nUvTMhMEdlpøas;bþÚr Provision for dimensional changes .....................123 4>4 CYsCulmuxtMNlicTwk Repair of leaky joint ....................................126 4>5 tMrUvkarkMras;CBa¢aMgdæ Masonry Thickness Requirement ..........................127 CMBUk I eRKagsMNg;emkanik Structural Mechanic 3 1> karkMNt;bnÞúk bnÞúk (Load) KWCakMlaMgeRkAEdlmanGMeBIelIeRKOgbgÁúMNamYy. Stress KWCakMlaMgkñúgEdl Tb;Tl;nwgbnÞúk (Loads) . Ep¥kelIlkçN³énbnÞúkEdlRtUveKykmkGnuvtþ vaGaceFVIeGayeRKOgbgÁúMnig smasPaBrbs;vaxUcRTg;RTay. ]TahrN_ ³ kMlaMgTajGaceFVIeGayvtßúmYyyWt kMlMagsgát;GacRc)ac;vtßúbBa©ÚlKña kMlaMgrmYlGac Rt)aj;vtßúmYynig kMlaMgkat;pþac; (Shearing Forces) GacrujEpñkNamYyéneRKOgbgÁúMecjBIKña. 1>1 RbePTénbnÞúk bnÞúkeRkAéneRKOgbgÁúMRtUveKEbgEckeTAtamRbePTepSg²Kña.enAkñúgenaHkarEbgEckmYy RtUveKBinitü eTAelIPaBnwgfál; (Static) nig kMlaMgkat;pþac; (Shearing Forces) GacrujEpñkNamYyén eRKOgbgÁMúecjBIKña. - bnÞúkefr (Static Loads)KWCakMlaMgEdlRtUveKeRbIy:agyWt² ehIybnÞab;mkvaesÞIrEtefr. ]TahrN_ Tm¶n;/ bnÞúkefr rbs;RbB½n§GaKar b¤dMbUl. Construction General -6-
  • 7. Department of Civil Engineering NPIC - bnÞúkERbRbYl (Dynamic Loads) ³ ERbRbYleTAtameBlevla. varYmbBa©ÚlTaMg Repeat and Impact Loads . - Repeated Loads KWCakMlaMgEdlRtUveKykmkGnuvtþeRcIndgehIyvaGacbNþaleGayTMhM énkMlaMg xagkñúgERbRbYl. ]TahrN_ Off-balance motor - Impact Loads: kMlaMgEdlsgát;eTAelIeRKOgbgÁúMnig smasPaBrbs;vakñúgGMLúg eBlxøImYy. ]TahrN_ karTmøak;vtßúF¶n;mYyeTAelIkMralx½NÐ (Floor) . kMlaMgxageRkARtUveKEbg EckCakMlaMgBRgayesμIr (Distributed Loads) nig kMlaMgcMcMnuc (Concentration Loads) . - Uniformly Distributed Loads: KWCakMlaMgEdlenAkñúgkarGnuvtþCak;EsþgvaRtUv)aneKcat; Tukfa CakMlaMgEdlenAkñúgkarGnuvtþCak;Esþg. ]TahrN_ TMgn; efrénfñwm Edkrag I (Dead Weight of a rolled- Steel I beam is a good example) - Concentrated Loads KWCakMlaMgEdlsgát;eTAelIépÞRTtUcesÞIEtminRtUveKrab;bBa©Úl ebI eRbobeFob eTAnwgépÞTMrTaMgGs;. ]TahrN_ fñwm (Beam) EdlRTedayrt (Girder) RtUv)aneKcat;TukCabnÞúkcMcMnuc (Concentrated Loads) eTAelI Girder . viFIkMNt;énlkçN³bnÞúkd¾smBaØmYyepSgeTotenaHKW karkMNt;kMlaMgxageRkAEdlRtUv)an eKdak; eQμaH Axial ecentric nig Torsional ³ - An axial load ³ KWCakMlaMgrYmmYyEdlsgát;cMG½kS ehIyEkgeTAnwgépÞmuxkat;TTwg. - An ecentric load ³ KWCakMlaMgsgát;EdlEkgeTAnwgépÞénmuxkat; TTwg ehIyvamincMG½kS dUcenH ehIyvaGackac;eCIgTMr. - Torsional load ³ KWCakMlaMgrmYlEdlzitenAmincMG½kSrbs;muxkat;TTwg ehIyvaminman TisedAeTr b¤ kñúgbøg;rbs;muxkat;enaHdUcenHvakac;eCIgTMr. ]TahrN_ - Dead Loads ³ rYmmansMPar³sMNg; sMPar³ eRbIR)as; rWk¾TMgn;epSg²eTotrbs;sMPar³enAkñúgGaKar rYmTaMgTMgn;rbs;GaKarpÞal;EdlzitenAefrCaGcié®nþy_. Construction General -7-
  • 8. Department of Civil Engineering NPIC - Live Loads ³ rYmbBa©ÚlGñksñak;;enA sMPar³sMNg; sMPar³eRbIR)as; rWTMgn;epSgeTotenAkñúg GaKar ehIyvaTMng nigRtUveKpøas;bþÚrTIkEnøgenAkñúgGMLúgGayukalkMNt;rbs;GaKar. - Impact Loads ³KWCacMENkén Live loads EdlRtUv)aneKeRbIedIm,IrYmbEnßmnUv Stress nig Deflection EdlCalT§plénkareFVIclnarbs; Live loads . - Wind KWCabnÞúkF¶n;Gtibrmarbs;xül;Edlbk;mkelIGaKarkñúgGMLúgeBlNamYyrW vaCakMlaMgmYy EdlbegáIteGayman Stress kñúgGMLúgeBlNamYy rWCakMlaMgmYyEdlbegáIteGayman Stress Rbhak;RbEhl nwgkMlaMgxül;bk;enaH. - Snow Loads KWCakMlaMgGtibrmaEdlmanGMeBIelIGaKaredaykarRbmUlpþúMKñarbs;RBilEdlekIteLIg kñúgGMLúgeBlNamYy. - Seismic Loads KWCakMlaMgTaMgLayNaEdlbegáIteGayman Stresses Gtibrma b¤k¾eFVIeGayGaKar mYyxUcRTg;RTayenAkñúgeBlrBa¢ÜydI. 1>2 bnÞúk (Service Loads) enAkñúgkarKNnaeRKOgbgÁúMrbs;GaKar GñkKNnaKYrEteRbIbnÞúkNak¾edayeGayFMCagbnÞúkxageRkam³ 1> bnÞúkEdlRtUv)anKNnaenAkñúg nigtYrbs;GaKar. 2> kar):an;sμanbnÞúkGtibrma minRtwmEtBwgEp¥kelITItaMglkçx½NÐbc©úb,nñ nig KMnitedIménkareRbIR)as; GaKarb:ueNÑaHeT bu:EnþvaRtUvEtrab;bBa©ÚlnUvehtukarN_EdlGacekIteLIgenAeBlGnaKtpgEdr. bnÞúkEdleK min)andwgGMBITMhM rbs;vac,as;las;ehIyvaRtUveKcat;TukfaCa Statistical Vairables EdlKYrEtRtUveKeRCIserIs eTAtamtMélRbEhlCak;lak;mYyEdlnwgminGacelIs)anenAkñúgGMLúgeBlénGayukalrbs;GaKar b¤ k¾Bwg Ep¥kelIehtukarN_ekIteLIgkñúgry³eBl 50qñaMmþg RtUv)aneKykmkKNna. eTaHCay:agNak¾eday Interval GacRtUveKyk 25qñaMsMrab;GaKarEdlKμanmnusSrs;enA b¤esÞIrEtKμankarb:HBal;dl;GayuCIvit b¤RtUveK yk100qñaM sMrab;GaKarGcié®nþy_EdlpÞúkbnÞúkF¶n;ehIyGacKMramkMEhgdl;GayuCIvitmnusS nigRTBüsm,tþikñúg karNImankardYlrlM. kñúgkrNIEdlKμan Local or State Building Code GñkKNnaGaceRbIbnÞúkEdleKkMNt;c,as;las;enA kñúgKMrUGaKarfñak;Cati (National Building Code) b¤tamBt’manxageRkam³ bnÞúkEdlRtUv)anykmkeRbIkñúgeRKOgbgÁúM rYmmandUcteTA bnÞúkeTal A lone b¤bnÞúkrYmKña (Combination Load) . ]TahrN_ bnÞúkefr (Dead), Live, Impact, Earth Pressure, Hydrostatic Pressure, RBil Construction General -8-
  • 9. Department of Civil Engineering NPIC (Snow) Twkkk (Ice) ePøóg (Rain) xül; (wind) rW rBa¢ÜydI Constraining Forces EdlmandUcCakMlaMg én Restriction of Thermal karrYmmaD (Shrinkage) b¤ Moisture-Change Movements b¤kMlaMgEdlbNþalmkBI Creep, Plastic Flow, Differential settlement, Or Sidways(drift) 1>3 emKuNbnÞúk eRKOgbgÁúMGaKarRtUvEtKNnaeGaymanlT§PaBRKb;RKan;edIm,I RTRTg;GaKaredayKμankarxUcxat RTg;RTayhYsBIkarkMNt; b¤karxUcxaténkarrYmbBa©ÚlKña rbs;bnÞúkEdlniwgbegáIteGaymanT§iBlminl¥. kar b:HBal;kñúgkrNIEbbenHrYmman Twkdk;elIdMbUl dIEq¥t smuRTdI nig karpøas;bþÚrTMhM. kñúgkarkMNt;lT§PaB RTRTg;rbs;eRKOgbgÁúMmYy emKuNsuvtßiPaBsMPar³sMNg; nigkarKNnaminc,as;las;nuvlT§PaBRTRTg;RtUvEt ykmkKitBicarNaEdr. esovePAGaKarKMrU (Building Codes) GnuBaØatieGayeyIgeRbInUvrebobKNnaBIr Allowable- Stress Design b¤ Load and Resistance factor Design enAkñúgkarsagsg;GaKar. kñúgviFIKNnaedayKuNbnÞúk (Service Loads) nig emKuNsuvtßiPaB. emKuNsuvtßiPaBepSg² RtUv)aneKykeRbICamYynwgbnÞúkedayeyagelIPaBmin BitR)akdkñúgkarKNnabnÞúk. kñúgkarKNna Stress GnuBaØati (Allowable-Stress Design) lT§PaBEdlGacRTRTg;rbs;vaCaFmμta RtUvkMNt;edaybnÞúkEdlnaMeGaymankareRbH b¤kMhUcRTg;RTayrbs;vaCaFmμtaRtUvkMNt;edaybnÞúkefr Live Wind, Seismic, Snow nigbnÞúkepSg²eTot EdlGacekItmaneLIgkñgeBlEtmYyRtUveKbnÞúkrYmEdlRtUveK yk ú mkeRbIkñúgkarKNna Stress GnuBaØati (Allowable- Stress Design) KW 1. D + L + (Lr or S or R) 2. D + L + (W or E/1.4) 3. D + L + W + S/2 4. D + L + S+ W/2 5. D + L + S + E/1.4 6. 0.9 – E/1.4 D ³CabnÞúkefr (Dead Load) L ³ Liveloads ekItmkBIeKalbMNgénkareRbIR)as;rbs;GaKarrYmbBa©ÚlTaMgkarEbgEckCabnþbnÞab; nig karsñak;enA. Lr ³ Roof Liveloads S ³ Snow Loads R ³ Rain Loads Construction General -9-
  • 10. Department of Civil Engineering NPIC ³ W Wind Load E ³ Seismic Load Building Codes CaFmμtaGnuBaØatieGayeRbIemKuNtUc eBlEdlkar):an;sμanénkarekIteLIg énbnÞúkFM sMebImrYmKñaenHmankMrittUc tYy:agdUcCa³ karrYmbBa©ÚlKñarvag Dead Load Gtibrma Liveload nigGtibrmarbs; kMlaMgxül;bk; rWrBa¢ÜydI. ]TahrN_ CaTUeTAemKuNEdlmantMél 0>75 RtUveKeRbIsMrab;KNnaplbUkbnÞúkrYm kñúgrUbmnþBI ¬2¦ dl;¬6¦ . emKuNRbePTenHGnuBaØatieGayÉkta én Stress GnuBaØati (Allowable Unit Stress) sMrab;eRbIkñúglkçx½NÐbnÞúkenH FMCagkarKNnabnÞúkrYmtamrUbmnþ ¬1¦. Stress GnuBaØatiRtUveKKNnaRTg;RTay hYsBIkarkMNt;EckCamYyemKuNsuvtßiPaBEdlmantMélFMCag 1. enAkñúgkarKNna emKuNbnÞúk nig PaBFn;RbePTbnÞúkepSgKñanimYy² RtUvKuNnwgemKuNbnÞúkrbs;va ehIytMélRtUv)aneKkMNt;eTAtamkat):an;sμanénPaBEdlGacekIteLIgénRbePTbnÞúknimYy²enaH. emKuN bnÞúkRtUveKKitbBa©ÚledIm,IeGayRbB½n§nig eRKOgbgÁúTaMgmUlGacRTRTg; nwgbnÞúkTaMgGs;)an. eRKOgbgÁúM M RtUv)aneKKNnaeGaylT§PaBRTRTg;bnÞúkrbs;vaFMCaglT§PaBRTRTg;bnÞúksrub. TMhMénlT§PaBRTRTg;enH KW RtUvKNnaedayKuN The Ultimate- Load Capacity nigemKuNPaBCab; (Resistance factor) EdltMélrbs;va pþl;eGaynUvkareCOCak;énkar):an;sμanrbs;lT§PaBRTRTg;mYy. lkçN³vinicä½yRtUv)aneKeRbICaTUeTAdUcxageRkam³ 1. 1.4D 2. 1.2D+1.6L+0.5( Lr or S or R) 3. 1.2D+1.6(Lr or S or R)+(0.5L or 0.8W) 4. 1.2D+1.3W+0.5(Lr or S or R) 5. 1.2D+1.0E+(0.5L or 0.2S) 6. 0.9D6 (1.3W or 1.0E) sMrab;yandæankEnøgRbCuMCn nigkEnøgEdl liveloads elIsBI 100 lb/ft emKuNbnÞúkCaFmμta RtUveKyk tMélÉktasMrab; L enAkñúgrUbmnþ 3/4 nig 5. sMrab;dMbUlEdlRBilGackkenAelIemKuNbnÞúkKYrEtmantMél 0>7sMrab; Snowload kñúgrUbmnþ ¬5¦. sMrab;karKNna Stress GnuBaØati (Allowable Stress Design) nig kMlaMg (Strength) eRKOgbgÁMúnig smasPaBrbs;vaKYrEtRtUveKKNnaedIm,ITb;Tl;KYrEtmantMél 0>7 sMrab; Snow Load kñúgrUbmnþ¬5¦. sMrab;karKNna Stress GnuBaØati (Allowable Stress Design) nig kMlaMg (Strength) eRKOgbgÁMúnig smasPaBrbs;vaKYrEtRtUveKKNnaedIm,ITb;Tl;nig kMlaMgBiessEdlekItLIgBIkarrMBa¢ÜydI. a. 1.2 D+0.5L+Em b. 0.9D-Em Construction General - 10 -
  • 11. Department of Civil Engineering NPIC sMrab;kMralx½NÐenATIRbCuMsaFarN³sMrab; Liveload EdlelIsBI 100psf nigsMrab;bnÞúkéncMNtrfynþ emKuNbnÞúkRtUvmantMél 1>0 sMrab; L Em KWCakMlaMgGtibrma tamTisedk nigQr. 2> Stress and Strain KWCaTMhMmYyEdleRbIkñúgkarvas;lT§PaBRTRTg;ral;skþanuBl Structural Capacity or Ultimate Strength énbnÞúkedayKμaneFVIeGayeRbH rWxUcRTRTg;F¶n;F¶rdl;GaKar. edIm,Icg¥úlbgðajnUvcMnYnkMNt;énbnÞúkGtibrma EdleRKOgbgÁúMGacRTaMRT)an tMrUvé`nkarKNna (Design Specifications) sMrab;eRKOgbgÁMúnana RtUv)aneKbegáIt kñúgenaHmanÉktþa Stresses GnuBaØati (Allowable Unit Stress) rW Design Strengths EdlmanTMhM rbs;vaminGac elIsBIbnÞúkGtibrmaeLIy. RTwsþIéneKOgbgÁúM (Structural Theory) pþl;nUvviFIsa®sþsMrab;KNna Unit Stress nig sMrab;):an;sμanPaBxUcRTg;RTay. viFIsa®sþTaMgenHnwgRtUveKelIkykmkbgðajkñúgEpñkteTAenH. 2>1 Static Equilibrium ebIeRKOgbgÁúMnig smasPaBrbs;vaGacRTRTg;nwgbnÞúk bnÞab;BImankarxUcRTRTg;bnþicbnþÜcekItmaneLIg ehIyKμankarxUcbnþeTot BYkvaRtUvekcat;famantulüPaB (Equilibrium) . eRkamRBwtþikarN_EbbenH kMlaMgkñúg rW Stresses Tb;Tl;y:agBitR)akdeTAnwgbnÞúk. karsnñidænd¾mansar³sMxan;mYycMnYn RtUv)aneKTajecjBIlkçN³én Static equilibrium edayKμankar ERbRbYl plbUkénkMlaMgxageRkATaMgGs;esμIsUnü ehIyedayKμankarvil plbUkénm:Um:g; (Moment) EdlekIt elIgedaykMlaMgxageRkAenARtg;cMnucNamYyesμIsUnü. sMrab;mUlehtudUcKña ebIeyIgykEpñkNamYyéneRKOgbgÁúMehIyeRbIbnÞúkelIva plbUkénkMlaMgeRkA nig kñúgenAelIEpñkmYyenaH KWR)akdCasUnü. plbUkén Moment rbs;kMlaMgTaMgGs;k¾esμIsUnüEdr. CaTUeTAvamanPaBgayRsYlkñúgkarEvkEjkkMlaMg EdlmanGMeBIelIeRKOgbgÁúMeTACasmasPaBkMlaMg tUc² EdlRsbeTAtamG½kSEkKñamYy dUcenHehIyvaeFVIeGaymanPaBgayRsYlkñúgkarKNna. ]TahrN_ sMrab;kMlaMgEdlmanGMeBIelIbøg;mYykrNI EdleKCYbRbTHRsYlbMputenaHKW bMElgkMlaMg TaMgGs;eGayRsbtamG½kSGab;sIus nig G½kSGredaen (Vertical) . sMrab;eRKOgbgÁúMEdlmantulüPaB (Structure in Equilibrium) ebI H tMNageGaykMlaMgtamTwsedk V kMlaMgtamTisQr nig M Ca Moment énkMlaMgEdl sßitenAcMNucNamYyénbøg;/ ΣH = 0 ΣV = 0 nig ΣM = 0 . Construction General - 11 -
  • 12. Department of Civil Engineering NPIC smIkarTaMgbIxagelIenHRtUv)aneKeRbIedIm,IKNnaGBaØti3 enAkñúg nonconcurrent coplanar force system. 2>2 Unit Stress and Strain edIm,IeFVIeGaydwgBitR)akdfaetI eRKOgbgÁúMmanlT§plGacRTRTg;bnÞúk)an GñkKNnaCaTUeTARtUvEt KNna Maximum Unit Stress EdlekIteLIgedaykarkMNt;bnÞúkkñúgeRKOgbgÁúMsMrab;RbePTkMlaMgkññúg kMlaMg Taj kMlaMgsgát; rWkMlaMgkkit ehIyeRbobeFobfaetInwg Allowable Unit Stress . enAeBlEdlkarbnÞúkdecñH Unit stress KWefrenAelIEpñkNamYyéneRKOgbgÁúMEdleKykmkeRbIelI Stress RtUvKNnaedayEckkMlaMgnwg épÞmuxkat. b:uEnþCaTUeTA Unit stress ERbRbYlBImYyeTAmYy. kñúgkrNIenH Unit stress EdlzitenAcMnucNamYyénmuxkat; KWCatMélkMNt;énpleFobrvagkMlaMgkñúgelIépÞtUcNamYy nig RklaépÞEdlvaRtUveKyktUceTA². CYnkalkñúgkarKNnaeRKOgbgÁúM Unit stress GacminEmnCacMnuccMbgEdleK ykmkKiteT. GñkKNnaGaccab;GarmμN_eTAelITMhMkMNt;mYyénkarxUcRTg;RTay rW Strain . kMhUcRTg;RTayeTAtam TisedANamYy KWCakarpøas;bþÚrTaMgRsugénTMhMrbs;eRKOgbgÁúMtamTisenaH. Unit strain eTAtamTisedANamYy KW karxUcRTg;RTaykñúgÉktþaRbEvgtamTisenaH. enAeBlEdlbnÞúkdak;dUcenH Unit strain KWefr kñugEpñkmYyéneRKOgbgÁúMvaGacRtUveKKNnaedayEck RbEvgénkMhUcRTg;RTayCamYyRbEvgedImrbs;va. b:uEnþCaTUeTA Unitstress ERbRbYlén Unitstress tMNagnUv tMélkMNt;énpleFobmYy. 2>3 Hooke’s Law sMrab;sMPar³sMNg;CaeRcIn Unit strain KWsmamaRteTAnwg Unit stress, Until a certain stress, The proportional limit is exceeded. Hooke’s Law RtUveKsÁal;tamTMnak;TMngEdlGacsesrdUcxageRkam³ rW Edl f = Unit Stress = Unit Strain E= Modulus of elasticity Construction General - 12 -
  • 13. Department of Civil Engineering NPIC dUecñHenAeBlEdl Unit stress nig Modulus of elasticity RtUveKsÁal; Unit strain RtUv)aneKsÁal;tMél Unit stress GacnwgRtUveKKNna)an. enAeBlEdleRKOgbgÁúMmYyRtUvrgnUvbnÞúk ehIy Unit stress minelIsBI Proportional Limit eRKOgbgÁúMnig RtLb;eTAPaBedImvijenAeBlEdlbnÞúkRtUv)aneKdkecj. The elastic limit KWCa Unit stress FMbMputEdlGac ekItmaneLIgedayKμankMhUcRTg;RTayCaGcié®nþy_bnSl;TukbnÞab;BIdkbnÞúkecj. sMPar³sMNg;xøHman 1 rW2 Yield Pont . TMhMTaMgenaHKWCa Unit stress enAkñúgkEnøgEdlmankarelceLIgnUvkMenInén Strain edayKμankar ekIneLIg b¤fycuHbnþicbnþÜcén Stress . dUcenHsMPar³sMNg;bgðajnUvPaByWtrbs;va. sMrab;sMPar³sMNg; EdlKμankarkMNt; Yield Point c,as;las; The offset yield strength RtUveKeRbICargVas;énPaByWtdMbUg ( The beginning of plastic deformation) . 2>4 Constant Unit Stress krNIEdlsamBaØén Stess nig Strain KWCakrNIEdlkñúgenaH Unitstress nig Strain efr. ]TahrN_³ Stress EdlekIteLIgedaykMlaMgTaj rWsgát; rW Shearing Force rW bnÞúkEdleRbImþgmáal. lkçN³énkardak; bnÞúkTaMgenHRtUveKbgðajenAkñúgrUb Figure 11 . sMrab;kMlaMgTaj nig sgát;cMG½kS eyIgyképÞmuxkat;EdlEkg eTAnwgG½kSkNþal nig EkgeTAnwgkMlaMgsgát;. sMrab; Shearing Load épÞmuxkat;EdlzitenAkñúgbøg;kat;RtUveK ykmkKNna. ehIysMrab; bearing load vaRtUveRCIserIsykbøg;b:HéneRKOgbgÁúMTaMgBIr. Construction General - 13 -
  • 14. Department of Civil Engineering NPIC rUb1-1 lkNrbs;bnÞk 2>5 Poisson’s Ratio enAkñúg elastic limit enAeBlEdleRKOgbgÁúMmYyrgnUvkMlaMgsgát;cMG½kSvaminRtwmEteFVIeGayxUc RTg;RTaytamépÞbeNþayEtb:ueNÑaHeT EtvaEfmTaMgeFVIeGayxUcRTg;RTaytamépÞTTwgpgEdr. enAeRkam kMlaMgTaj (Tension) épÞénmuxkat;rbs;eRKOgKWfycuH ehIyenAeRkamkMlaMgsgát; (Compression) vaekIneLIg pleFobén Unit Lateral strain nwg Unit longitudinal strain RtUEtehAfa Poisson’s ratio . sMrab;sMPar³sMNg;CaeRcInpleFobenHRtUveKyktMélesμI 0>25. sMrab;eRKOgbgÁúMEdktMélrbs;va RtUveKsnμt yk 0>3 . Construction General - 14 -
  • 15. Department of Civil Engineering NPIC ]TahrN_ snμtfaEdkBüÜrmYyEdlmanépÞ 2in2 BüÜrTMgn; 40 Kip (40.000-1b) load . The Unit stress KW 40>000¼2 rW 20>000PSI Unit tensil strain KW 20>000¼30>000>000 rW 0>00067 in/ in . edayyk Poisson’s Ration esμI 0>3 Unit lateral strain KW -0>3 x 0>00067 rW a shortening of 0>00020 in/ in . CMBUkII ³ dI nig RKwH Soil and foundation 3 1> esckþIepþIm 1>1 emkanicdI emkanicdI KWRtUveKkMnt;edaykarGnuvtþn_ énc,ab; nigeKalkarN_rbs;emkanic nigTwkenAkñúgkaredaH RsaybBaðaCamYydIEdleKcat;TukCasmÖar³visVkmμ. dImanlkçN³eRcInRbePTepSg²Kña edayEp¥keTAelIkar sikSa. ]TahrN_kñúgekSRtviTüa (agronomy) ¬karGnuvtþn_viC¢adaMdMNaM¦dIKW RtUveKkMNt;faCakMNkénrUbFatuEr: EdlmankMeNItmkBIsMNwkfμ nigrUbFatuxniCEdlRbmUlpþúMKña eRkayBIkarrlYyénrukçCati nigstV. sMrab;Gñk ekSRtviTüa (agronomist) dIKWCasarFatuEdlpþl;GMbilxniCedIm,IciBa©wmkarrIklUtlas;énrukçCati. b:uEnþsMrab; visVkrEpñkdI (geotechnical engineer) dImann½yTUlMTUlayehIyGacrab;bBa©ÚlminRtwmEt agronomic material b:uEnþvarab;bBa©ÚlpgEdrnUv sMNwkfμ epHPñMePøIg dIl,ab; lannin sand glacial material nig sMNl;epSgénkarswk rbs;fμ. tamFmμCativamankarlM)akkñúgkarrkbnÞat;EbgEckmYyrvagfμ nigdI. ]TahrN_sMrab;PUKBðviTU (geologist) sarFatumYyRtUv)aneKdak;cMNat;fñak;eTAtamkMNkMeNIténfμBIeRBaHvasßitenAeRkamsßanPaBPUKBð d¾Cak;lak;mYy b:uEnþsMrab;visVkrdIvaKYrEtRtUveKcat;cUlcMNat;fñak;dI. Construction General - 15 -
  • 16. Department of Civil Engineering NPIC 1>2 visVkmμRKwH (Foundation Engineering) RKwHRtUveKkMNt;faCaEpñkmYyén eRKOgbgÁúMEdlRTRTg;Tm¶n;rbs;eRKOgbgÁúMehIy bBa¢ÚnbnÞúkeTARsTab; dIrW fμenAxageRkam. kñúgvisVkmμRKwH (Foundation Engineering) .emkanicdI emkanicfμ PUmivTüa nigvisμkmμeRKOg bgÁúM tUveKeRbIkñúgkarKNna nigsagsg;RKwHGaKar rWeRKOg bgÁúM. mUldæanRKwHrbs; Foundation Engineering KWkareRCIserIsRbePTénRKwH EdlmandUcCaRbBn½§énRKwHrak; (Shallow Foundation) rWRKwHeRCA (Deep Foundation). mUldæanRKwHmYyeTotén Foundation Engineering KWTak;TgeTAnwgkarKNna Parameter dUcCaliT§PaB RTRTg;rbs;RKwHEdlmandUcCa karkMnt;RbePT nigcenøaHEdksréskñúgeCIgtag. 2> karsikSaRsavRCavelIkardæanpÞal; (field exploitation) eKalbMNgénkarsikSaRsavRCavelIkardæanpÞal; KWedIm,Icg;dwgnUvcMnucxageRkam³ 1> karyl;dwgGMBIsßanPaBPUmisa®sþTUeTAénkardæan edaysarvaCHT§iBleTAelIkarKNna nigsag sg;RKwH. ]TahrN_ sßanPaBrbs;épÞdIPaBs¥itrbs;dI RbPBTwkRtBaMgrbg; rukçCati rock outcrops nigkarGac ecjcUl)anénrfynþdwk smÖar³sMNg;. 2> TItaMgénkEnøgbgáb;]bkrN_eRbIR)as;dUcCa ExSkabGKiÁsnInigTUrs½BÞRbBn§½Twk nigRbBn½§lU. 3> lkçN³TUeTArbs;PUBsa®sþénRkLaépÞ CamYynwgkarkt;sMKal;nUvkarkekIténRsTab;dI nig sRmut dIBIkarviPaKelIRbePTdI rWkrNIepSgeTot. 4> Rbvtþinig kareRbIR)as;kardæanrYmman Bt’manénkarxUcxat b¤)ak;Ebkrbs;sMNg;cas;² EdlbNþal mkelIRKwH. 5> lkçN³BiessepSg²dUcCa PaBGacekIteLIgénkarrBa¢ÜydI rWkarpøas;bþÚrénktþaFmμCatimandUcCa TwkCMnn; karrIkb¤rYmtamrdUvkMnt;nigdIsmñwk. 6> RbPBnigKuNPaBrbs;sMPar³ sMNg;enAkñúgRsukmandUcCaRKYssMrab;eFVIebtugfμsMrab;eFVIGaKar b¤pøÚv nigTwksMrab;karsagsg;. 7> sMrab;sMNg;Tak;Tgnig smuRT b¤TenøBt’manelIkMriteCarnac nigkMBs;Twkel,ÓnéncrnþeCarnac nig crnþTenønigTinñn½y EdlTak;TgeTAnwg Hydrographic nig meteorological. Construction General - 16 -
  • 17. Department of Civil Engineering NPIC 8> karkt;RtaTuky:aglMGiténsßanPaBBIr b¤fμI niglkçN³TwkeRkamdIEdlenAkñúgtMbn;EdlGacman T§iBleTAelIlT§PaBRTRTg;rbs;RKwH nigRbtibtþikarN_énkarsagsg;rW karCIkeRCAénRsTab;dIEdlGacCH T§iBleTAelIkardæankñúgkrNINamYy. 9> lT§iplénkareFVIBiesaFn_elIsMNakdIb¤ fμEdlRtUvnwgkarnwgkarKNna b¤sagsg;. 2>1 karsikSaelIÉksar (document Review) Bt’manEdlRtUvkarcaM)ac;xøH² mandUcCaRbvtþiénkareRbIR)as;kardæanRtUveK)anmkBIkarsikSaelI Éksar.]TahrN_manr)aykarN_cas;² GMBI lanning Edlcg¥úlbgðajfa kardæanGacCakMNk dIRbBn½§bgðÚrTwk s¥úyEdleKe)aHbg;ecalnig GageRcaH GagsþúkTwkkb;kñúgdIelI b¤eRkamEdlGacb:HBal;dl; KMeragGPivDÆn_ fμI². vaGacmanpgEdrnUvBt’manEdlTak;TgeTAnwg kareRbIR)as;elInwgeRkamdIénbMBg;Twk Edl RtUvEtCIkdak; b¤bit KMrbenAkñúgbrievnénkardæan. kñúgkarsikSaelIÉksarenH vamansar³sMxan;Nas;edIm,IBinitüsMPar³KMrU (reference materials) dUcCaEpnTI PUKBðsa®sþ nigEpnTIPUmisa®sþ. EpnTIPUKBðsa®sþvamansar³sMxan;Nas;BIeRBaHvaEtgEtcg¥úl bgðajnUv eRKaHfñak;énPUKBðsa®sþ ¬]TahrN_karxUcdI)ak;¦ nigRbePTénRsTab;dI b¤fμenAelIkardæan. TaMgEpnTIPUmisa®sþcas;nig fIμ Gacpþl;nUvBt’mand¾mantMélGMBIkardæansagsg;. EpnTIPUmisa®sþCa FmμtaRtUveKeRbImaRtdæan ehIybgðajTItaMgénGaKar pøÚv pøÚvCati pøÚvEdk nig kargarepSgeTotEdlTak;TgeTA nwgsMNg;suIvil nigTidæPaBFmμCatiEdlmandUcCa eRCaH Tenø bwg qksmuRTnig eqñrsmuRT. EpnTIPUmisa®sþGacg¥úlbgðajpgEdr nUvkEnøgénGagcg¥ÚrTwks¥úy nigGagsþúkTwk ehIyedayeRbIBN’ nig Rsemalvacg¥úlbgðajnUvkarGPivDÆn_cas; nigfμI. b:uEnþeKalbMNgsMxan;énEpnTIPUmisaRsþKWedIm,I cg¥úlbgðajnUvnIvUdI. Bt’manenHGacRtUveKeRbIsMrab;KNna TidæPaBcMbgénsßanPaBPUmisa®sþ rbs;kardæan nigsMrab;karsikSaBIRsTab;eRkamdI EdlmandUcCaRsTab;dIEdlGaceFVIeGayvakarvaybBa©úHRKwH RbRBitþieTA )an. RbPBd¾sMxan;mYyeToténBt’man KWrUbPaBftBIelIGakas (aerial photographs) EdlRtUveKftBIelI ynþehaHEdlehaHenAkMBs; nigExSbnÞat;EdleKkMNt;mYy. emIlrUbftBIelIGakasBIrCamYynwg CMnYyén Stereoscope vapþl;nUvrUbPaB 3D énsßanPaBépÞdI. rUbPaBenHGacbgðajnUvBt’man sMxan;énPUKBðsa®sþrbs; kardæandUcCavtþmanéndI)ak; RcaMg)ak; RbePTénTMrg;dI ¬]TahrN_pñÚkxSac;¦ (alluvial fans) dIl,ab;kMNk én Twkkk (moraines) nig (eskers) PaBsikricrilRbePTTUeTAnig lkçN³rbs;rukçCati nigKMrUénbNþajbeNþaHTwk Construction General - 17 -
  • 18. Department of Civil Engineering NPIC . edayeRbobeFobrUbPaBBIelIGakascas; nig fμIPUKBðviTUGacsegátpgEdrnUvkarpøas;bþÚr (drainage patterns) edayFmμCati b¤mnusSEdl)anekIteLIgenAelIkardæan. 2>2 karsikSaRsavRCavépÞeRkamdI (Subsurface Exploration ) edIm,IkMNt;nUvkarkt;RtalMGiténdI nigRsTab;fμ niglkçN³énTwkeRkamdInUvkardæan karsikSaRsavRCav épÞeRkamdI KWCanic©CakalRtUveKelIkykmksikSa. manRbePTepSg² KñaénkarsikSaRsavRCavépÞeRkamdI dUcCa karxYg (borings) reNþABiesaFn_ (test pits) nigkarCIkcg¥ÚrCaedIm. karxYgeFVIeLIgedayeRbIbMBg;ragsuILaMg xYgcUlkñúgdI kñúgeKalbMNgsikSaBIlkçN³rbs;RsTab;dIxag eRkamkarBiesaFn_enAelIkardæanpÞal; nigykdIfμI rWk¾TwkeRkamdIsMrab;eFVIBiesaFn_. reNþAxYgGacRtUveKCIkeday éd¬]TahrN_³ CIkedaycbCIk¦ eTaHbIkñúgkarCIkFmμtaeKRtUveRbI mechanical equipment edIm,ICIkreNþA k¾eday. eRKOgcRkeRcInRbePTRtUveKeRbIedIm,IxYgreNþA. Auger Boring: Mechanical Auger KWCarebobCIkreNþAy:agelOn. reNþARtUveKCIkedayEdkxYgeday eRbIsMBaFbukEdkxYgCYykñúgkarTemøaHdI rWfμ. CaTUeTAmanEdkxYgBIrRbePT KW Flight auger nig bucket augers. CaFmμtaGgát;p©itrbs; flight KW 5cm- 12cm (2in eTA 4ft) ehIyrbs; bucket augers KW 0.3m eTA 2.4m (1ft eTA 8ft) . EdkxYgRtUveKdkecjBIreNþA kñúgry³eBleTogTat;NamYy TnÞwmnigeBlenaHEdr dIEdlsßitenAelI Flight auger rWenAkñúg bucket auger RtUveK ykecj. Casing CaTUeTAKW eKmineRbIsMrab; auger boring eT ehIyreNþAxYgGacRsutkñúgeBldIRtesaH rWdITn; rWxYgRsTab;dIenAeRkamTwk. auger KWCa]bkrN_sMrab;xYgEdlCaTUeTARtUveKeRbIsMrab;xYgdI rWfμ. Hollow-stem flight auger; A hollow-stem flight auger manRbehagragmUlcMkNþalEdkxYgEdl GnuBaØatieGayeyIgyksMNak;dIxageRkam)an. Hollow-stem flight auger KwdUcCaRbGb;sMrab;sMNak;dI RtesaH b¤dITn; b¤enAeBlxYgdIeRkamRsTab;TwkeRkamdI. Wash-type Borings eRbIdMeNIrkarrbs;GgÁFaturav EdlGacnaMykkMeTckMTIdIeGayecjBIreNþA)an. kMeTcdIekItmkBIkarkab; mYl nigbukrbs;EdkxYg (drill bit) EdlkMTicdI b¤fμeTACabMENktUc². Casing RtUveK eRbIedIm,IkuMeGaymankar)ak;RsutreNþAxYg. edaysar drilling fluid ¬GgÁFaturav¦ EdleRbIkñúgeBlxYgvaGaceFVIeGaylM)ak;kñúgkarkMNat;dI nig lM)akkñúgTTYl)an sMNak;EdlminxUcRTg;RTay. Construction General - 18 -
  • 19. Department of Civil Engineering NPIC Rotary Coring KWCa]bkrN_xYgmYyRbePTEdleKeRbIfamBlrgVilénEdkxYgeGaydUcCaclnarbs; GgÁFaturavedIm,IRbmUlykkMeTcdIecjBIrn§. Percussion Drilling KWCa]bkrN_xYgmYyRbePTEdleKeRbIsMrab;xYgmYyRbePTEdleKeRbIsMrab;xYgTmøúH fμrwgedIm,IEsVgyl;BIRsTab;dIxageRkam b¤edIm,IkarxYgGNþÚg. EdkxYgeFVIkardUcCadgjjÜreLIg ehIycuHedIm,I bMEbknigkMeTcfμ. elIsBIkarxYgenHmanviFIepSgeTot sMrab;karEsVgyl;BIRsTab;dIrYmbBa©ÚlTaMg Test pits nig trenches . Test Pits CaerOy² KWmanragCakaer:kñúgbøg;KMehIjCamYynwgTMhMRbePT 1.2 x 1.2 m (4ft KuNnwg 4ft) . Trenches manragEvg nigceg¥ótCaFmμtakayeday backhoe b¤ bulldozer. tarag 6>4 bgðajBIkareRbIR)as; smtßPaBnig TMhMkMNt;rbs; test pits nig trenches. Test Pit nig trenches pþl;nUvkarRtYtBinitüedayEPñkTeT nUvlkçxNÐénRsTab;dIxageRkam. eKk¾Gac eRbIedIm,ITTYlnUvsMNakKMrU undisturbed éndIpgEdr. dMeNIrenHmanCIkkaydIBIxag b¤)atén Test pit b¤ trench sMNakKMrUdI k¾GacTTYl)anBI Test pit b¤ trenches edaykarduMsgát;bBa©ÚledayédnUvbMBg; shelby, drive suILaMg b¤bMBg;sMNakKMrUepSgeTotcUleTAkñúgdI. Backhoe trenchesKWCaviFId¾snSMsMécénkarGnuvtþn_nUvkarRsavRCavBIRsTab;dIxageRkam. backhoe Gac CIky:agelOnnUv trench EdlGacbnÞab;mkRtUv)aneRbIedIm,IRtYtBinitü nigBiesaFn_dIenAnwgkEnøg. sMrab;kar sikSaRsavRCavRsTab;dIxageRkamCaeRcIn backheo trench RtUv)aneRbIedIm,IvaytMéllkçxNÐ near- surface nig PUmisa®sþ ¬]TahrN_rhUtCMerA 15ft¦ edayreNþAxYgEdl)aneRbIsMrab;GegátlkçxNÐRsTab;dIxageRkameRCA CagenH. 2>3 sMNakKMrUdI Soil Sampling RbePTepSgKñaCaeRcInén KMrUdIGacRtUv)aneRbIedIm,IeFVICasMNakKMrUdI b¤fμEdl)anBIkarxYg. 1> Altered Soil: kñúgGMLúgeBlRbtibtþikarxYg dIGacRtUv)aneFVIeGayxusBIsPaBedImedaysar karlay b¤edaysarkareFVI[kxVk;. ]TahrN_ RbsinebIkarxYgmin)anlagsMGatecjedIm,IeFVIsMNakKMrU enaH sMNakKMrUdI EdlykecjBI)atGNþÚgxYgBitR)akdGacmansarFatukMeTckMTI (cutting) EdlRCuHBIRCugmçagén GNþÚgxYg. kMTickMTIénGNþÚgxYgenH EdlRCuHFøak;eTA)atGNþÚgxYg nigminman vtþmansMrab;lkçxNÐenAnwg kEnøg énsMNakKMrUEdlmanCMerAeRCA. kñúgkrNIepSgeTot sMNakKMrUdIGackøayCakxVk;eday sarGgÁFaturav énkarxYg EdleRbIsMrab; Wash-type boring. sMNakKMrUvdIRbePTenH EdlRtUv)anlay b¤eFVI[kxVk;edaysar Construction General - 19 -
  • 20. Department of Civil Engineering NPIC dMeNIrkarénkarxYgKYrminRtUv)aneRbIsMrab; karBiesaFn_eTeRBaHvanwgnaMmknUvkarsnñidæan xuscMeBaHlkçxNÐ énRsTab;eRkamdI. dIEdlpøas;bþÚrsMeNImkñúgedaysarGgÁFaturavénkarxYg b¤kMedAénm:asuInePøIgkñúgGMLúgéndMeNIrkar én karxYgk¾KYrRtUv)ancat;cUlkñúglMdab; altered soil. dIEdlRtUv)ansgát;bEnñneday over pushing b¤ over driving KWCasMNakKMrUdIEdl k¾Gacat;Ca altered soil EdredaysarEtdMeNIrkarén over-pushing b¤ over –driving Gac sgát;Twk[ecjBIdI. 2> Disturbed samples: disturbed soil KWCadIEdlRtUvcak;Bum<eLIgvijkñúgGMLúgdMeNIrkareFVI sMNakKMrUdI. ]TahrN_ dIEdlTTYl)anBIsMNakKMrUEdlduMbBa©Úl (driven sampler) dUcCasMNakKMrUEdlbgðÚr edaysøabRBaBIkarBiesaFn_sgát;TMluHCabTdæan (standard penetration test spilt spoon sampler) b¤duMdITaMgmUl² Edlykmkkan;épÞdIenAkñúgRtebotEdkxYg ¬]TahrN_duMsMNakKMrU¦ Gaccat;TukCa disturbed soil. Disturbed soil GacRtUv)aneRbIsMrab;BiesaFn_)aneRcInRbePT. 3> Undisturbed sample: eKTTYlsÁal;faKμansMNakKMrUdINaEdlGacykecjBIdIedaysßan- PaBminxUcRTg;RTaytex©aHenaHeT. eTaHbICay:agNa Bakübec©keTsenHGaceRbIsMrab;sMNakKMrUdIEdlyk edayviFId¾BitR)akd. sMNakKMrUdI Undisturbed sample CaerOy² KWCasMNakKMrUEdlTTYl)anedaykarruj sgát;yWt² bMBg;EdlmanCBa¢aMgy:agesþIg ehIymancugkat;muxRsYc nigelonecjeRkAcUleTAkñúgdI. ):ar:aEm:Rt 2 CaerOy² RtUv)aneRbIedIm,IvaytMélBI disturbance potential énsMNakKMrUepSgKña KWCapleFobRbeLaHxag kñúg nigpleFobépÞRkla. CaTUeTAbMBg;sMNakKMrUsMrab;sMNak undisturbed soil KYrRtUvmanpleFobRbeLaHxagkñúgRbEhl1° nig pleFobRklaépÞRbEhl 10° b¤ticCagenH. karykpleFobRbelaHxagkñúgRbEhl 1° edIm,Ipþl;[ PaBlanecjeRkAxagkMBUlénsMNakKMrUdI nigkat;bnßyPaBkkitrvag dI nig bMBg;sMNakKMrUkñúgGMLúgeBlén dMeNIrkareFVIsMNakKMrU. RsTab;eRbgy:agesþIgGacRtUv)anlabenAelICaymuxkaMbitedIm,Ikat;bnßypgEdr nUvPaB kkiténépÞdI nigbMBg;EdkkñúgGMLúgdMeNIrkareFVIsMNakKMrUBum<. eKalbMNgénkarmanpleFob énépÞ Rklad¾Tab nig cugkaMbitRsYcKWedIm,IrMkilcUleTAkñúgdICamYynwgkarraMgsÞH nigPaBbMlas;TItictYcEdlGacekIt mantictYc cMeBaHdI. bMBg; shelby KWRtUv)anplitedIm,I[RsbeTAtamrsovePAlMGitbec©keTs (specification) nwgRtUv)an eRbIsMrab;sMNakKMrUdI undisturbed soil samplers . Construction General - 20 -
  • 21. Department of Civil Engineering NPIC ktþaepSgeTot CaeRcInk¾GacbNþaleGaydIRtUv)anraMgsÞ³dUcCa ³ • duMRKYsrwg b¤ cMENksMbkxügenAkñúgdI EdlGacbegáInrn§es<atenAtamxagénbMBg;sMNakKMrUkñúgGMLúg dMeNIrkareFVIsMNakKMrU. • karxUcxatrcnasm<½n§dIEdlbNþalmkBIkarduMjjÜr b¤rujsgát;bMBg;sMNakBum<eTAkñúgRsTab;dI. • cMhayPayén]sμ½nkñúgGMLúgkardkykmkvijnUvbMBg;sMNakKMrU. • kareFVIeGaykeRkIk b¤karb:HTgÁicénbMBg;sMNakKMrU kñúgGMLúgeBldwkCBa¢ÚneTAkan;bnÞb;BiesaFn_. • kardkyksMNakdIedayrdwbrdubBIbMBg;sMNakKMrU. • karkat;tMrwmy:ageFVsRbEhseTAtamTMhMCak;lak;sMrab;karBiesaFan_enAkñúgbnÞb;BiesaFn_. ral;skmμPaBEdl)anerobrab;xagelIGackat;bnßyRbsiT§iPaB Stress karkat;bnßysMrab;PaBs¥itén GnþrRKab; nigkartMerobeLIgvijénRKab;dI. sMNakKMrUdI “undisturbed” nwgGacRtUv)antMerobeLIgvijnUvRKab;dI y:agtictYc nigGacKμankarxUcxatelIkElgEtbNþalmkBI stress relief Edlmankarpøas;bþÚrBIlkçxNÐ stress enAnwgkEnøgeTAlkçxNÐ stress isotropic “sMNakKMrUtex©aH” . sMNakKMrUdI disturbed Gacmanrcnasm<½n§dI EdlxUcRTg;RTayCamYynwg kartMerobRKab;dIesÞIrEtTaMgGs;. enAeBlvas;rkPaBFn;énkMlaMgkat;pþac; (shear strength ) b¤lkçN³xUcxatRTg;RTayéndI lT§plénkarBiesaFn_cMeBaHsMNakKMrUdI undisturbed Edl)anerob rab;xagelI)anbgðajBIlkçN³énsßanPaBenAnwgkEnøg RbesIrCaglT§plBiesaFn_cMeBaHsMNakKMrUdI disturbed ehIyKMrUEdl)anykecjBIrn§GNþÚgxYgKYrrkSaTukenAkñúgbMBg;sMNakKMrU b¤kgsMNakKMrU. bMBg;sMNakKMrUKYr eRsaby:agCitcugrn§Rbehag b¤kgsMNakKMrUKYreRsaby:agsBV enAkñúgRbGb;edIm,IkarBar kar)at;bg;sMeNIm kñúgGMLúgénkardwkCBa¢ÚneTAkan;bnÞb;BiesaFn_. sMNakKMrUvdIKYrRtUv)ankt;cMNaMCamYyÉksar b¤elxKMerag kalbriecäTénkaryksMNakKMrU eQμaHénvisVkr b¤ GñkPUKBðsa®sþEdl)anGnuvtþcMeBaHkaryksMNakKMrU nigcMnYnénkarxYg nigCMerA. 2>4 karBiesaFn_enAnwgkardæan Field testing eKmankarBiesaFn_CaeRcInRbePT EdlGacGnuvtþn_enAeBlxYg. karBiesaFn_enAnwgkardæanbI RbePT FmμtaCageK nwgRtUv)anykmkBiPakSakñúgEpñkenH. karBiesaFn_edaysarkarsgát;TMluHCabTdæan Standard Penetration test (SPT) KWCakarsgát;]bkrN_sMNakKMrUEdlmanCBa¢aMgRkaseTAkñúgRsTab;xSac;. ]bkrN_sMNak SPT SPT RtUvEtmanGgát;p©itxagkñúg (D1) = 3.81cm(1.5in) nigGgát;p©itxageRkA (D ) = 5.08 cm(2in). ]bkrN_sMNak 0 Construction General - 21 -
  • 22. Department of Civil Engineering NPIC KMrU SPT RtUv)ansgát;cUleTAkñúgdIxSac;edaykarTMlak;duMjjYrTMgn; 63.5kg(1401b) BIkMBs; 0.76m(30in) . ]bkrN_sMNakKMrU SPT RtUv)ansgát;cUlsrubCMerA 45cm (18in) CamYynwgkarTMlak;duMjjÜrCaeRcIndgeday )ankt;Rtaral;CMerAKMlat 15cm (6in) . karvas;]bkrN_ SPT tMél N ¬cMnYnTMlak;ral;kMBs; ft¦ KWCaPaBFn; énkarsgát;TMluHéndIxSac; EdlesμInwgplbUkéncMnYnénkarTMlak;EdltMrUvsgát;]bkrN_sMNakKMrU SPT elICMerA cenøaHBI 15 eTA 45 cm ¬6eTA 18in¦. mUlehtuEdlcMnYnénkarTMlak;duMjjÜrkñúgtMél N KWCaerOy² dMeNIr karénkarxYgeRcIneFVIeGaydIxUcRTg;RTayenAnwg)aténrn§GNþÚgxYg nigRtUv)anGanenACMerA 15 eTA 45cm (6 eTA 18in) RtUv)aneCOCak;fa vatMNagl¥CageKénPaBFn;éndIxSac; enAnwgkEnøg. Tinñn½yBIxageRkamkarCab;Tak;Tg KñaéneBlbc©úb,nñrvagénkarvas;Evg. karvas;Evg SPT tMél N GacRtUv)anCHT§iBledayktþaénkarBiesaFn_ CaeRcInnig lkçxNÐdI. ]TahrN_ TMhMRKab;RKYsbegáInPaBFn;énkarsgát; ¬dUcenHbegáIntMél N¦ edayERb køayPaBs¥itenAkñúg]bkrN_sMNakKMrU SPT. ktþaepSgeTotEdlCHT§iBl dl;karBiesaFn_ SPT tMél N KWTwk enAkñúgdI. vamansar³sMxan;kñúgkarrkSakMritkMBs;TwkenAkñúgrn§GNþÚgxYg [esμI b¤sßitBIelIkMritkMBs;TwkkñúgdI dUc enAnwgkEnøg. eKRtUvkarBarTwkkñúgdIkuMeGayeLIgcUleTAkñúg)aténrn§GNþÚrxYgEdleFVIeGayxSac;RtsuHehIy lT§plénkarrab;tMél N Tab. eRkABIlkçxNÐRKab;RKYs nigTwkkñúgdIEdl)anBiBN’naxagelI enAmanktþa BiesaFn_epSgKñaeTotCaeRcIn EdlGacCHT§iBldl;PaBCak;lak;énkarGan SPT. ]TahrN_ karBiesaFn_ SPT tMél N GacRtUv)anCHT§iBledaysarRbsiT§iPaBénduMjjÜr GRtaénkarTMlak;duMjjÜr Ggát;p©iténrn§ GNþÚgxYg nigRbEvgéndgEdk. Van Shear Test (VST) SPT nig CPT RtUv)aneRbIsMrab;karCab;Tak;TgKñaénPaBFn;énkarsgát;]bkrN_¬tMél N¦ b¤rujsgát; duMekaNCamYynwglkçN³énvisVkmμ ¬dUcCalkçxNÐdg;suIet¦éndI. pÞúymkvij karBiesaFn_ vane test KWmanPaB EbøkKñaBIkarBiesaFn_enAnwgkEnøgenAkardæanBIeRBaHvaRtUv)anvas;edaypÞal;nUvlkçN³BitR)akdéndI PaBFn;én kMlaMgkat;pþac;éndIdæedayKμanbgðÚrTwk. karBiesaFn_ Vane test KWCakars‘kbBa©Úl vane muxsMEb:t 4eTAkñúgrn§GNþÚgxYg rYcbnÞab;mkrujsgát; vane cUleTAkñúgRsTab;dIdæEdlsßitenA)aténrn§GNþÚgxYg. enAeBl vane RtUv)anrujcUleTAkñúgdIdærYcehIy karmYlGtibrmatMrUvsMrab;bgVil Vane nigkarkat;pþac;dIdæRtUv)anrab;. Construction General - 22 -
  • 23. Department of Civil Engineering NPIC VaneGacRtUv)anpþl;PaBFn;énkarpþac;edayKμankarpþac;edayKμankarbgðÚrTwkx<s;xøaMg RbsinebI Vane RtUv)anbgVily:agelOnxøaMgenaH. karBiesaFn_ vane test pþl;nUvlT§plEdlminGaceCOCak;)an sMrab;RsTab; dIdæ EdlmanRsTab;dIxSac; b¤RsTab; lenses/ varved clay RbsinebIdIdæmanRKab;RKYs b¤bMENksMbkxügb:unduM RKYs. 3> RKwH Foundation EpñkenHniyayBIkareRCIserIsRbePTRKwH. kareRCIserIslkçN³BiessénRbePTRKwHCaerOy² QrelI mUldæanktþaCaeRcIndUcCa³ CMerARKb;RKan;. vaRtUvEtmanCMerARKb;RKan;edIm,IkarBareRKaHfñak;edaykarkkTwkkk. sMrab; RKwHdUcCassrs<an CMerAénRKwHRtUvEtRKb;RKan;edIm,IkarBarnwgkarCIkBIeRkamedaykarduHlag. karbraC½yénlT§PaBRTRTg;. RKwHRtUvEtmansuvtßiPaBRbQmnwg karbraC½yénlT§PaBRT RTg;. karRsut. RKwHminRtUvRsutdac;xatEdlGacbNþal[eRKaHfñak;dl;eRKagbgÁúMTaMgmUl. KuNPaB. RKwHRtUvEtmanKuNPaBRKb;RKan;EdlvaminRbQmnwgPaBkan;Ety:ab;yWneLIg dUcCakarvayRbhareday sulfate énebtugeCIgtag. PaBFn;énkMlaMgRKb;RKan;. RKwHRtUv)anKitCamYynwgPaBFn;énkMlaMgRKb;RKan;Edlvamin Gac)ak; b¤EbkecjBIKñaeRkambnÞúkéneRKagsMNg;xagelIEdlmanGMeBIelIva. vak¾RtUvEtsagsg;edayRtwmRtUv edayGnuelameTAtamkarKiténesovePAlMGitbec©keTs. karpøas;bþÚrdIminl¥.RKwHRtUvEtGacFn;eTAnwgkarpøas;bþÚrdIEdlminl¥yUrGEgVg. ]TahrN_ sMrab;dIEdlrIkmaD ¬dI silt b¤dIdæ¦ EdlGacrIkb¤ rYmmaDnwgeFVIeGayRKwHmanclnaehIy eFVIeGayeRKagsMNg; maneRKaHfñak;. kMlaMgrMBa¢ÜydI. RKwHRtUvEtGacRTeRKagsMNg;kñúgGMLúgeBlrBa¢ÜydIedayKμan clnaRsutcuH xøaMg b¤eTAxag. Construction General - 23 -
  • 24. Department of Civil Engineering NPIC 3>1 RKwHrak; Shallow Foundation RKwHrak;CaerOy² RtUv)aneRCIserIsenAeBlbnÞúkeRKagsMNg; nwgminbeNþayeGayRsTab;dIBIxag eRkammansMrutxøaMg. CaTUeTA RKwHrak;KWmanPaBsnSMsMécCagkarsagsg;CamYyRKwHeRCA. RbePTRKwHrak;Fmμta RtUv)anBiBN’naxageRkam³ rUbTI 2-1 eCIgtag eCIgtag/ RKwHrYm/ RKwHEvg spread footing/ combined footing and strip footing RbePTRKwHrak;TaMgenH KWCaRbePTRKwHsMNg;FmμtaEdleRbIR)as;eRcInCageK. Construction General - 24 -
  • 25. Department of Civil Engineering NPIC rUbTI2-2 RKwHcak;eBj RKwHcak;eBj Mat Foundation edayQrelImUldæanénkarKitesdækic© RKwHcak;eBjRtUv)ansagsg;sMrab;ehtupldUcxageRkam³ - eCIgtagEdlmanTMhMFM. RKwHcak;eBjCaerOy² RtUv)ansagsg;enAeBlplbUkénRklaépÞeCIgtag TaMgGs;FMCagRbEhlBak;kNþalénRklaépÞRKwHsrub. - RsTab; lenses EdlGacbgðab; b¤xUg. RKwHcak;eBjGacRtUv)aneRbIenAeBlNaEdldMeNIrkarrukrk RsTab;eRkamdI bgðajfanwgmansMrutvismPaBEdlbNþalmkBIRsTab;EdlGacbgðab;)an b¤RkLúkxUgtUc²enA BIxageRkamRKwH. RKwHcak;eBjGacRtUv)ancak;CaElVgeBjBIelIrn§xUgtUc² b¤RsTab; lenses Tn;exSay nigbegáIt lkçxNÐsMrutÉksNæanCag. - sMrutrak;. RKwHcak;eBjGacRtUv)anENnaMenAeBlEdlkarRKbsgát;BIelImansMrutrak;ehIyRKwHcak; eBjRtUv)ankat;bnßysMrut differential. - bnÞúkrayminesμI. sMrab;eRKagsMNg;xøH vaGacmanPaBxusKñaFMsMrab;bnÞúksMNg;EdlmanskmμPaB enAelIépÞepSgKñaénRKwH. karRbRBwtþeTAtamkarRBmeRBogénRKwHeCIgtagGacRtUv)anRbQmeTAnwgsMrut differential EdlFMhYs b:uEnþRKwHcak;bMeBjnwgRtUvBRgaybnÞúkrayminesμI nigkat;bnßysMrut differential . Construction General - 25 -
  • 26. Department of Civil Engineering NPIC - karedaleLIgeday hydrostatic. enAeBlRKwHnwgRtUvRbQmnwgkarehIbeLIgeday hydrostatic Edl bNþalmkBIépÞénTwkkñúgTwk RKwHcak;eBjGacRtUv)aneRbIedIm,IFn;nwgkMlaMgedaleLIg. Post-tensioned slab-on-grade vaKWCaRbePTRKwHEdlsnSMsMécenAeBlKμankarkkTwkkkkñúgTwk b¤CMerAénkarRCabTwkkkTab. bMerI bMras;FmμtaCageKénkMral Post-tensioned slab-on-grade KWFn;eTAnwgkMlaMgrIkéndI b¤enAeBlRbQmeTAnwg sMrut differential FMCagtMélGnueRKaHsMrab;karRbRBwtþeTAtamkarRBmeRBogénkMral on-grade ¬EdlmanEdk y:agesþIg¦. ]TahrN_kMral post-tensioned slab-on-grade CaerOy²RtUv)anENnaMRbsinebIkarRbQménsMrut differential KWrMBwgfaFMCag 2cm(0.75in) . kMral post-tensioned slab-on-grade KWCaebtugEdlmanbgáb; sésrEdkBYrEdleRsabeday)øasÞiky:agRkas;. eRsam)øasÞikkarBarsésrBYurBIkarb:HBal;CamYynwgebtug nig GnuBaØati[sésrBYGacrGilkñúgebtugEdlkkrwgkñúgeBldMeNIrkarénkarTaj. CaFmμtasésrBYrmancugmçag gab;¬bnÞHTMBk;¦ kñúgbrimaRt¬Cay¦Fñwm nigcugmçageTotEdlTTYl stress enAbrimaRtFñwmQmedIm,IGac[ sésrBYrTTYl stress BIxagcugmçag. RKwHrak;déTeTot shallow foundation afternatives RbsinebIsMrutEdlrMBwgsMrab;RKwHrak;EdlesñImantMélFMeBk enaHbMNgepSgeTotsMrab;TMrRKwH b¤kareFVI [dImanesßrPaBRtUvEtGacvaytMél. lkçN³d¾éTeTotFmμtaxøHEdlGacRtUveRbIRtUv)anerobrab;dUcxageRkam³ -BRgaydI. RbtibtþikarBRgabdI GacRtUv)aneRbIsMrab;ykecjnUvRsTab;dIEdlGachab; nig CMnYs vijedaykarbMeBjrcnasm<½n§. CaFmμtabMNgénkarBRgabdI KWmanlkçN³snSMsMécEtmYyKt;RbsinebI RsTab;dIEdlhab;sßitenAEk,rRsTab;dIEpñkelI nigRsTab;TwkkñúgdIsßitenABIeRkamRsTab;dIEdlGachab; b¤ RsTab; TwkkñúgdIGacRtUv)andak;eGayenAeRkamedIm,IkarsnSMsMéc. -kardak;bnÞúkelIs. RbsinebIkardæanmanRsTab;dIsi¥t EdlGachab;enABIeRkamkardæanGacRtUv)an dak; bnÞúkelIsedayRsTab;cak;bMeBjdak;BIelIépÞdI. karbgðÚrbBaÄr¬dUcCakarbgðÚrdUcRbeqHEdkekH b¤karbgðÚreday xSac;¦ GacRtUv)andak;enAkñúgRsTab;dIEdlGachab;edIm,Ikat;bnßyExSénkarbgðÚr nigbegáIn el,ÓnéndMeNIrkarbgðab;. enAeBlEdlRsTab;dIs¥itGacbgðab;)anRtUv)anTTYlnUvkarbgðab;RKb;RKan;ehIy RsTab;EdlbMeBjelIsbnÞúk RtUv)anykecj nigsMNg;RtUv)ansagsg;. Construction General - 26 -
  • 27. Department of Civil Engineering NPIC -karbegáIndg;suIet. viFIepSgKñaCaeRcInGacRtUv)aneRbIedIm,IbegáIndg;suIetdIRtsuH b¤Tn;. ]TahrN_ karbgðab; vibro-flotation nig dynamic CaerOy² manRbsiT§iPaBkñúgkarbegáIndg;suIetRsTab;dIxSac;RtsuH. eKalbMNgepSgeTotKWkarbgðab; grouting EdlCakarsgát;BnøicduMm:as grout EdlmankMras;Rkas;Nas;enAkñúg dI EdlTaMgCMnYs nigbgðab;dIRtsuH. -RKwHGENþk. RKwHGENþtKWCaRbePTRKwHeRCABiess EdlTMgn;éneRKagsMNg;RtUv)anføwgedayykecj nUvdI nigsagsg;nUvkMralCan;eRkamdI. 3>2 RKwHeRCA rUbTI 2-3 RbePT pile RbePTénRKwHeRCAFmμtaPaKeRcInKW RKwH pile. Pile GacCaeQI ¬edImeQI¦/ EdkEdlmanmuxkat; H, ebtugcak;rYc/ ebtugcak;enAnwgkEnøg/ ebtugEdlcak;edaysMBaF/ karbMeBjebtugkñúgbMBg; pile RbePTpSMKña. Pile KW)anBIkarsgát;cUlkñúgdIb¤RtUv)antMeLIgenAkñúgrn§EdlxYgmun. Pile Edl)anBIkarsgát;cUlkñúgdI CaTUeTARtUv)ancat;Tukfa CakarykecjTab b¤x<s;GaRs½yeTAnwgbrimaNdIEdl RtUvEt)anrujecjtampøÚvEdl Construction General - 27 -
  • 28. Department of Civil Engineering NPIC Pile sgát;cUl. ]TahrN_karykecjTabén Pile KWEdkmuxkat;GkSr H nig bMBg; pile EdkEdlmancugcMhr Edlmin)anbegáItFñúkenAxagcugEpñkxagdI. ]TahrN_sMrab; pile ykecjx<s; KW Pile EdlmanlkçN³tan;dUcCa Pile duMeQImUl b¤Pile ebtugcak;eRscmuxkat;kaernig bMBg;Pile EdkEdlman cugbiTCit. Pile Edlcak;enAnwgkEnøgRtUv)anbegáItedayeFVIrn§enAkñúgdI nigbnÞab;mkbMeBjrn§edayebtug. sMrab; Bum<d¾samBaØCageK Pile Edlcak;enAnwgkEnøgmanrn§Edl)ancak;EdlRtUvcak;bMeBjedayebtug. RbsinebIdI GaccUlkñúgrn§enaH Pile RbePT shell GacRtUv)antMeLIg. viFIenHKWCakarsgát; shell Edk b¤RbGb;eTAkñúgdI. RbGb;GacRtUvduMeday mandrel EdlbnÞab;mkRtUvykecjehIy RbGb;RtUv)anbMeBjedayebtug. sMrab;krNI epSgeTotRbGb;GacRtUvduMbBa©ÚleTAkñúgdI nigbnÞab;ykbnþicmþg² RtUv)anykecjBIrn§nig bMeBjedayebtug. 4> karCIkdIsMrab;eFVIRKwH Foundation excavation eKmanRbePTénkarCIkdIepSgKñaCaeRcInEdlGnuvtþkñúgGMLúgkarsagsg;énKMerag. ]TahrN_dIGacRtUv CIkBIreNþA b¤kEnøgnigbnÞab;mkcak;bMeBjvij. ]TahrN_epSgeTotKWkarCIkCalkçN³KnøwHkat;pþac; b¤ buttress EdlnwgRtUveRbIedIm,IeFVIeGayCMerl b¤dIEdlRtUvrGiltamxagmanesßrPaB. ]TahrN_epSgeTotsMrab;karCIk KWdUcxageRkam³ 4>1 karCIkdIsMrab;eCIgtag Footing Excavation esvaRbePTenHCab;Tak;Tgnwg karvas;nUvTMhMénEpñkPUKBðsa®sþ¬dUcCaCMerA nigTMhMéneCIgtag¦ edIm,I eFVIeGayc,as;fa vaGnuelameTAtamtMrUvkarénbøg;sMNg;. esvaenHCaerOy² RtUv)anGnuvtþn_kñúgeBldUcKña nig karRtYtBinitüedIm,IbBa¢ak;BIlkçxNÐRTRTg;. 4>2 karxYgsMrab; Pier Excavation of Piers dUcKñanwgkarCIkdIsMrab;eCIgtag visVkrPUKBðsa®sþRtUv)antMrUvsMrab;bBa¢ak;eGayc,as;BICMerA niglkçxNÐ RTRTg;én Pier. rUbTI2>4 bgðajBICMh‘anFmμtakñúgkarsagsg;énkarxYg pier. Construction General - 28 -
  • 29. Department of Civil Engineering NPIC Construction General - 29 -
  • 30. Department of Civil Engineering NPIC rUb 2-4 CMha‘nFmμtakñúgkarsagsg;énkarxYgpier 4>3 karCIkdIcMhr open excavation karCIkdIcMhr KWCakarCIkdIEdlmanCMerlxagmanesßrPaB b¤minRtUv)anTb;Tl;. 4>4 karCIkdIedaymanCnÞl; braced excavtion karCIkdIedaymanCnÞl;KWCakarCIkEdlEpñkxagRtUv)anTb;edayeRKagbgÁúMTb;dI. rUbTI 2-5 bgðajBI RbePTFmμtaénRbBn½§Tb;nwgkarCIkdIedaymanCnÞl; 5> viFIbegáInsßanPaBRTRTg;dI Improvement methods 5/1 karBRgabdI Grading enAeBlkardæansMNg;CaeRcIncab;epþImedaydITeT CMh‘anTI1sMrab;kardæansagsg;eFVIkarFmμtaCab; Tak;Tgnig karBRgabdIénkardæan. karBRgabdIKW CadMeNIrkarEdlmankarCIkkarcak;bMeBj b¤bnSúMénkargar enH. dMeNIrkarénkarBRgabFmμtaGacrYmbBa©ÚlnUvkarerobrab;xøH b¤TaMgGs;³ Construction General - 30 -
  • 31. Department of Civil Engineering NPIC rUb2-5 RbePTFmμtaénRbBn½§Tb;dI nigkarCIkdIedaymanCnÞl; Eeasement CMha‘ndMbUgéndMeNIrkarBRgabKW kMNt;TItaMgéneRKOgeRbIR)as;enAkardæan nig easement . CaerOy² eRKOgeRbIR)as;enAkardæan nig easement RtUvkarBarcaM)ac;EdlvaminGaceRKaHfñak;kñúgGMLúgeBlRbtibtþikar BRgabdI. sMGat/ e)as/ nig QUsrMelIg/ Clearing, brushing and grubbing sMGat e)as nigQUsrMelIg KWCaskmμPaBykecjnUvedImrukçCati¬dUcCa/ esμA/ éRB kem<at/ edImeQI nigRbePTdMNaMRsedogenH¦ tamn½yemkanic. vamansar³sMxan;EdlkaksMNl;TaMgenHRtUv)anykecjBIkar dæan nigmindak;enAkñúgkarbMeBjCam:assMrab;eRKagsMNg;EdlbgánUveRKaHfñak;. Construction General - 31 -
  • 32. Department of Civil Engineering NPIC kare)assMGat dMeNIrkarBRgabdIenHKW edaHRsayCamYynwgkarykecjnUvsarFatuEdlminsaksmnwgRTRTg;enAkar dæan dUcCadIl,b;EdlRtsuH b¤manrn§es<at/ collunvium, rukçCatiBuk/ vtßúesμakeRKaK nigkarbMeBjEdlminGac bgðab;)an. karkat;CakaM² ¬tMbn;CMerlPñM¦ Benching (Hillside areas) karkat;CakaM² KWCakarCIkCakaM² EdlmankMritkMBs;bnþbnÞab;eTAkñúgsarFatuEpndIEdlenABIelIfñak;kaM RtUv)anbMeBjedaysarFatubMeBj. canyon subdrain KWCabMBg; b¤RbB½n§bgðÚrTwkEdldak;fμ RKYs b¤sarFatuRsedogKña dak;kñúgcg¥Úr Subdrain canyon b¤ RbLaybgðÚrTwkcas;. bnÞab;BIkardak; subdrainrYcehIy karbMeBjrcnasm<½n§RtUv)andak;BIelIkMBUl subdrain. karP¢Ür nigkarbMhab;vij (scarifying and recompaction) sMrab;tMbn;rabesμIEdlKμankarCIkkat;CakaM² karP¢Ür nigkarbgðab;eLIgvijénépÞdIRtUv)anGnuvtþeday ]bkrN_bgðab;kñúgeKalbMNgedIm,ITTYlnUvPaBs¥itl¥rvagsar FatuenAnigkEnøgnwg sarFatucak;bMeBjfμI. dMeNIrkarBRgabdIrdwbrdubedaykat; nigbMeBj Cut and fill rough grading operation RbtibtþikarBRgabdIrdwbrdubTak;Tgnwgkarkat;sarFatudIBIkEnøgx<s;nig bgðab;sarFatucak;bMeBjkñúg tMbn;Tab kñúgeKalbMNgBRgabdIeGay)anrabesμI. skmμPaBepSgeTotGacRtUv)anGnuvtþkñúgGMLúgRbtibtþikar BRgabdIrdwbrdubdUcCa³ - relIgb¤ )aj;bMEbkduMfμ. bMEbkduMfμFM²GacRtUvykecjBIkardæan b¤dak;enAeRkArgVg;kargar. - PaBpøas;bþÚrKñaénkarkat;nig bMeBj. skmμPaBenHKWsßitenARTnab;sMNg;EdlmçagRtUvkat;cuHeRkam rhUtdl;b:HRsTab;FmμCati b¤fμ enAeBlEdlEpñkmçageTotRtUv)ancak;bMeBj. viFImYysMrab;edaHRsayCamYy nwgkarpøas;bþÚrKñaénkarkat;nig karbMeBjKWCIkEpñkEdlkat;[hYskMritEdlRtUvkat;rYceTIbcak;bMeBjeday sarFatucak;bMeBj. - kareFVIeGayCMerlmanesßrPaB. ]TahrN_sMrab;kareFVIeGayCMerlmanesßrPaBedayeRbIsarFatudI rYmbBa©ÚlTaMgkareFVIeGaymanesßrPaBcak;bMeBj/ buttress fill/ drainage buttress nig KnøwHénkarkat;pþac; (shear key) . ]bkrN_xagelIKYrRtUv)aneRbICamYynwg RbBn§½ backdrain. Construction General - 32 -
  • 33. Department of Civil Engineering NPIC - karbMeBjCMerl. enAeBlbegáItkarbMeBjCMerl vamankarkarBi)akkñúgkarbgðab;CayxageRkAén m:asbMeBj. BIeRBaHvaKμansMBaFTb;xag dIGaceRClFøak;cuHEdlmin)anbegáIndg;suIet. edIm,IedaHRsay sßanPaBEbbenH CMerlGacRtUv)ansagsg;hYsTMhM ehIybnÞab;mkkat;ykvijmkdl;Kl;Edl )anbgðab;. viFId¾l¥bMputTI2d¾éTeTot KWeRbIdMeNIrkarsagsg;EdlmansarRbeyaCn_dUcCa bec©keTs back-rolling b¤edayeRbI bulldozer edIm,I track walk tamCMerl. - rMlwkeLIgvijBIdMeNIrkarBRgabdI. ral;kargarBRgabdITaMgGs;manPaBEbøkKña nigGacmankarpøas; bþÚrRbtibtþikarBRgabdIedayQrelImUldæanlkçxNÐkardæan. karBRgabdIm:t; Fine Grading enAeBlEdlkarBRgabdIrdwbrdub)ancb;sBVRKb;ehIy karBRgabdIm:t;RtUv)anGnuvtþedIm,ITTYl)annUv kMritkMBs;cugeRkay EdlGnuelameTAtambøg;BRgabdI EdlmanPaBsuRkit. karkarBarCMerl nigRtYtBinitükarhUreRcaH slop protectin and erasion control eTaHbICaFmμtavaminEmnCakarTTYlxusRtUvrbs;Gñkem:AkarBRgabdIk¾eday eRkayBIkarBRgabdIm:t;)an bBa©b; karkarBarCMerl nig]bkrN_RtYtRtakarhUreRcaHCaRbcaMRtUv)antMeLIg. karCIksñamePøaH Trench excavation sñamePøaHéneRKOgeRbIR)as;RtUv)anCIkedIm,ICakartMrg;énesckþIesñIpøÚv nigRsTab;sMNg;sMrab;tMeLIg eRKOgeRbIR)as;enAkardæan. karCIknig karbgðab;énsñamePøaHCaerOy² CaEpñkéndMeNIrkarBRgabdI. enAeBlExSéneRKOgeRbIR)as;RtUv)antMelIg karP¢Ürnig karbgðab;RTnab;RKwHpøÚvRtUv)anGnuvtþnig sarFatu RKwHRtUv)andak;ehIybgðab;. karCIkdIsMrab;eCIgtagnig RKwH Footing and Foundation excavatin eTaHbICaFmμtavaminEmnCaEpñkéndMeNIrkarBRgabdI EpñkRKwHnig eCIgtagRtUv)anCIkCabnþ. 5>2 eKalkarN_énkarbgðab; Compaction Foundation Epñkd¾sMxan;énkarBRgabdIénkardæanCaerOy² rYmbBa©ÚlTaMgkarbgðab;sarFatubMeBj. karbgðab;KWCa karbegáIndg;suIeténGgÁFatubMeBjtamviFIemkanicdMeNIrkarrUbénkareFVIeGaydImansßanPaBhab;enHGacbegáIn PaBFn;énkMlaMgkat;pþac; kat;bnßykarEdlGachab; kat;bnßyPaBRCabTwkéndI. karmanktþaeKal4 Edl b:HBal;dl;karbgðab;³ RbePTdI Soil Type Construction General - 33 -
  • 34. Department of Civil Engineering NPIC dIminmanlkçN³)øasÞikdUcCaxSac; nigRKYs GacRtUvbgðab;edayRbsiT§iPaBedayeRbIdMeNIrkar bgðab; RbePTrMj½r. dIEdlmanlkçN³)øasÞik¬]TahrN_manPaBs¥it¦ dUcCa sift nigdIdæKWmankarBi)akkñúgkarbgðab; nigtMrUveGaymandMeNIrkarbgðab;RbePTluj b¤buinRbsBV. RbsinebIdImanRKab;FMhYsxñat dUcCaduMRKYsfμFM nig fμ cabble GacnwgeRCotcUlCamYynwgdMeNIrkar bgðab; nigkat;bnßyRbsiT§iPaBénkarbgðab;RKab;dIm:t;Cag. sarFatuEdlmanlMdab;RKab; Meterial Gradation dIEdlmanTMhMRKab;tamlMdab;l¥CaTUeTAGac nwgbgðab;bBa©ÚlkñúgsßanPaBENnCag dIEdlmanlMdab; RKab;minl¥EdlmanTMhMRKab;esÞIrEtesμIKña. Twkxagkñúg Water content Water contentKWCa):ara:Em:RtsMxan;kñúgkarbgðab;dI. TwkGacCaeRKOgrMGilRKab;dIEdlCYyeGayvarGil cUlkñúgkartMerobeGayENn. eTaHCay:agNa TwkeRcIneBk eFVIeGaydIkøayCaEq¥tTwk nigCaerOy² Bi)akkñúg karbgðab;. eKmankMritkMBUlén Water content EdldIGacbgðab;cUlkñúgsßanPaBENnCageK Edlpþl; edayfamBlénkarbgðab;. RbePT Optiimum moisure content (Modified Proctor) sMrab;RbePTdIepSgKñaKW erobrab;xageRkam³ -dIdæEdlmanlkçN³)øasÞikx<s; (CH): Optimum moisture content 18% -dIdæEdlmanlkçN³)øasÞikTab (CL): Optimum moisture content 12% eTA 18% -xSac;manTMhMCalMdab;l¥ (SW): Optimum moisture content 10% -RKYsEdlmanTMhMCalMdab;l¥ (GW): Optimum moisture content 7% RbePTdIxøHGacnwgmanTMnak;TMngedaykMr CamYynwgkarbgðab;eday Water content.]TahrN_ Open-graded gravel nig clean coarse sand KWmansPaBRCabTwkEdlTwkGacbgðÚrecjy:agRsYlBIdI b¤CMrujecjeRkAeday dMeNIrkarénkarbgðab;. dIRbePTenHCaerOy²GacRtUvTukeGaysßitenAkñúgsßanPaBs¶ÜtrYcehIyrMj½reGaycUl tMerobRKab;xSac;eGayENnaM. Construction General - 34 -
  • 35. Department of Civil Engineering NPIC CMBUkIII³ eRKagsMNg;ebtugmanq¥wgr)aeEdkBRgwgnig sMPar³ebtug Reinforcing bar concrete sturcture and concrete meterial 3 1> sMPar³suIm:g;t_ Cementitious material sMPar³suIm:t_rYmmanplitplCaeRcInEdlRtUv)anrlayCamYynwgTwk b¤sarFaturavd¾éTxøHeTot b¤ TaMgBIr edIm,IbegáIt)anCakMe)areRbg (cementing paste) EdlGacbegáItb¤ eFVIBum<enAeBlvaenACalkçN³)øasiÞk b:uEnþva nwgkøayeTACaTMrg;rwgmaM. enAeBlxSac;RtUv)anbEnßmeTAkñúgkMe)areRbg vabegáIt)anCakMe)ar)ayGr. karcUl pSMénRKYs nigxSac; eTAkñúgkMe)areRbgvakøayeTACaebtug. 1>1 RbePTénsMPar³suIm:g;t_ Type of cementitious meterials eKmansuIm:g;t_CaeRcInRbePT ehIyviFIénkarcat;cMNat;fñak;k¾eRcInEdr. viFIénkarcat;fñak;cMNat;fñak; mYyEdlsamBaØCageKbMput KWkarcat;cMNat;fñak;edaysarFatupSMKImI EdlCaGñkTTYlxusRtUvsMrab;kareFVIkar nigeLIgrwgénsuIm:g;t_. enAelIeKalkrN_enH suIm:g;t_suIlIkat (silicate) nig GaluymINat (aluminate) Edl kñúgenaHPñak;gareFVIkar (setting agent) KWkal;süÚmsuIlIkat (calsium silicate) nigkal;süÚmGaluymINat (calcium aluminate) KWCaRkumEdlsMxan;CageKsMrab;suIm:g;t_TMenIb (modern cement) .rYmbBa©ÚlkñúgRkumenHKW lanning/ aluminous nigsuIm:g;t_FmμCati (natural cement) . fμkMe)ar (lime) EdlkñúgenHPaBeLIgrwg KWbNþalmkBIkarbmøas;énGuIRduksuItkmμeTACa carbonate Edl RtUv)aneRbICadMbUgy:agTUlayCasMPar³suIm:g;t_EtmYyKt; b:uEnþkareFVIkarnig PaBeLIgrwgyWtrbs;vaminRtUvKña nwgtMrUvkarénsuIm:g;t_TMenIb. dUcenHtYnaTICacMbgrbs;vasBVéf¶ KWlkçN³ Plastic én Harsh cement nigbEnßm resilience eTAelI)ayGr b¤stucco. KuNRbeyaCn_énkareRbIR)as;fμkMe)arKWPaBeFVIkaryWtrbs;va)anCMrujnUvkar Büa)al nigkarCYsCulsñameRbHdUcséssk;. Construction General - 35 -
  • 36. Department of Civil Engineering NPIC cMNat;fñak;énsuIm:g;t_epSgeTotKW )anBIkarpSMénmñagsila calcined nigplitplTak;Tgnwgva. suIm:g;t_ mñagsilaRtUv)aneRbIy:agTUlaysMrab;kMe)arbUkxagkñúg nigsMrab;plit board nig block b:uEnþPaBGacrlay)an énmñagsila)ankarBarxøÜnva BIkareRbIR)as;sMrab;sNg;EdlRbQmnwgGakasFatud¾éT b:uEnþl¥bMputsMrab; M GakasFatuekþA. suIm:g;t_G‘uksuItkørIt KWCacMNat;fñak;énsuIm:g;t_BiessEdlmanlkçN³xusFmμta. tMélrbs;va)an hamXat; kareRbIR)as;TUeTAebIeFobCamYynwgsuIm:g;t_EdlefakCag b:uEnþþsMrab;kareRbIR)as;CalkçN³Biess dUcCaplitplkMralkarBarePøIg (sparkproof floor) eKminGacRbdUc)aneT. suIm:g;t_sMrab;rabdæ b¤suIm:g;t_)ayGrRtUv)aneRbIy:agTUlMTUlayedaysarEt PaBgayRsYlrbs;va. CaTUeTAenAeBlvaRtUv)anlayedaysuIm:g;t_mYyRbePTkñúgcMeNamsuIm:g;t_Edl)anerobrab;xagelICamYynwgTwk fñaMKImIxøH vasmnwgTTYlnUvkarcab;GarmμN_BiessedaysarPaBsnSMsMécrbs;va. sMPar³suIm:g;t_epSgeTotdUcCa polymer/ fly ash nig silica fume GacRtUveRbIsuIm:g;t_CMnYssMrab;ebtug. Plomer KWCa Plastic EdlmanRcvak;mU:elKulEvg. ebtugEdllayedaysuIm:gt;RbePTenHman KuNPaB x<as;CagebtugedaysIum:g;t_Fmμta. Silica fume EdlRtUv)ansÁal;Ca microsilica EdrenaHKWplitplsMNl;BIkardutedayLFñÚrGKÁisnI (electric- arc funaces) . silica manRbtikmμCamYynwgfμkMe)arbegáIt)anCasMPar³suIm:g;t_enAkñúgebtug. bMENk énfume manGgát;p©itEt 1° énbMENkGgát;p©itsuIm:g;t_. 1>2 suIm:g;t_Br½ELn (Portland Cement) smasFatusMxan;mYy ¬fμkMe)ar (Cao), Edk(Fe o ), silica (Sio ) nig alumina (Al O ) ¦ nigsmasFatu 2 3 2 2 3 bnÞab;bnSM2eTot ¬mñagsila (CaSO -2H 0) nig magnesia (MgO) ¦ KWCavtßúFatuedIm. RbePTsarFatu 4 2 calcareous (CaO) )anmkBIfμkMe)ar (limestone), calcite, mail b¤fμPaCn_ (shale) nigxSac; (sand) . sarFatu argillaceous( SiO nig Al2O3) )anmkBIkarTajykBIdIdæ ¬Clay¦/ fμPaCn_¬Shale¦ nigxüac; (Sand) . 2 sarFatuEdleRbIsMrab;plitRbePTsuIm:g;t_Cak;lak;my KWGaRs½yeTAnwgTItaMgeragcRkplit nigPaBEdl Y Gacrk)annUvvtßúFatuedI. suIm:g;t_B½rELnGacplitBIplitpl ]sSahkmμCaeRcInRbePT. kñúgkarplitsuIm:g;t_dMbUgvtßúFatuedIm RtUv)anykecjBIEr:rYcehIykineGayeTACaem:SAmunnwglayRcbUkCamYynwgsmasFatuEdlerobcMCamuneRsc. karlayRcbUkKW eFVIeLIgedayLdutkMedAEdlvilenAEpñkxagcugx<s;CageK edaykMedABI2600 eTA 3000 F º Construction General - 36 -
  • 37. Department of Civil Engineering NPIC EdldutedayeRbg ]sμ½n b¤famBlFüÚgfμ. edaysarkarplitsuIm:g;t_KWCa dMeNIrkarplitEdlRtUvkarfamBl d¾sMebIm ]bkrN_kMedA nigbMerIbMras;d¾éTeToteRkABI RbPBn§n³ dUcCaC½rekAs‘Ucas;² RtUv)aneRbIedIm,Ikat;bnßyéfø n§n³. ¬kardutekAs‘Ukg;pþl;kMedAedIm,Iplit Clinker nigdutExSRkv:at; Edkpþl;[FatupSMénEdk¦. kareFVI[ sItuNðPaBeLIgx<s;KW edIm,IFatuKImIénvtßúFatuedIm rlaycUlKña begáIt)anCaduMtUc²rwgEdleKehAfa clinker. bnÞab;BITukeGayRtCak; duMtUc² clinker RtUv)andak;eGayqøgkat; ball mill nigkinbMEbkeTACaPaKl¥itepH Edl PaKl¥itTaMgenHnwgRtUvErgqøgkat;kERBa¢gelx 200 (75µm) CaBiess. kñúgGMLúgeBlenHkarkinbMEbk sarFatumñagsilaRtUv)anbEnßmkñúgbrimaNd¾tictYcedIm,IRtYtRtanUv sItuNðPaBnig Fanadl;kareFVIkarénsuIm:g;t_ eTogTat;. sMPar³EdlRtUvqøgkat; ball mill KWCasIum:g;t_ lanning. CaFmμtavaRtUv)an lk;CakBa©b;suIm:gt_ EdlmanTMgn; 941b. ebtugEdlFmμtaCageKeRbIsMrab;suIm:g;t_ lanning KWCasMPar³saMjauMEdlmanrYm suIm:g;t_ lanning RKYs xSac; Twk nigTwkfñaMKImI nig Er:epSgeTotEdlGacrk)an. kareRbIR)as;suIm:g;t_ lanning EtÉgKWkMrNas;EdleRbI sMrab;dUcCa)ayGrsuIm:g;t_sMrab;bMeBj Wellhole b¤bMeBj fine grout . dUcenH vamansarsMxan;Nas;kñúgkar RtYtBinitüTMnak;TMngrvaglkçN³epSg² énsIum:g;t_ lanning nigT§iBld¾manskþanuBlrbs;vaeTAelIebtugcug bBa©b;. CaTUeTAebtugsIum:gt;B½rELnRtUv)aneRCIserIssMrab;kargarsMNg;eRKagBIeRBaH edaysarPaBFn;én kMlaMg nigPaBeRbIR)as;)anyUrGEgVgrbs;va. PaBFn;énkMlaMgKWGacvas;)any:aggay nigGaceRbIsMrab;Ca smasPaBcg¥úlbgðajeday pÞal;CalkçN³TUeTAénPaBeRbIR)as;)anyUréneRKagTaMgRsug. PaBeRbIR)as;)an yUrGEgVgCak;lak;minGacvas; )anedaygayeT b:uEnþvaGacbBa¢ak;y:agc,as;edaykarRtYtRta énlkçN³KImI énsuIm:g;t_niglkçN³fμbMEbk. 1>3 suIm:g;t_GaluymIj:Úm Aluminous Cement l,ayénvtßúFatu aluminous nig calcareous ¬CaTUeTA bauxite nigkMe)ar ¦ RtUv)anerobcMedaykarrMlay cUlKñanig karkinbMEbkénplitplpÁÜb edIm,IeGay)anCaemSAm:t;. suIm:g;t_enHRtUv)ankMNt;lkçN³edaylkçN³ énkarqab;rwgqab; nwgPaBFn;énkMlaMgeLIgx<s;enAeBl EdlvaGayux©IenAeLIy. enAeBlEdlbrimaNkMedAeRcInRtUvedaHElgy:agelOnedaysuIm:g;t_ aluminous kñúgGMLúgeBl GuIRdatkmμ GñkKYrRbytñ½kuMeRbIsuIm:g;t_dak;bBa©ÚlkñúgeBlEdlkMedAminGacrsay. CaTUeTA eKminR)afñadak; Construction General - 37 -
  • 38. Department of Civil Engineering NPIC ebtugsuIm:gt¾ aluminous eTAkñúg lift Edlx<s;Ca 12Guin ebIeTaHbICasItuNðPaBekIneLIgvaGacbNþaleGay ebtugcuHexSayPaBFn;CaxøaMg. suIm:g;t_ aluminous manPaBFn;eTAnwgskmμPaBénTwks‘ulpatxøaMgCagsuIm:g;t_ lanning. vaemIlBIxag eRkAeTAdUcCamanPaBFn;nwgkarvayRbharedayTwkEdl mansarFatuQøanBan carbon dioxide b¤GasuItEr: exSayxøaMgCasuIm:g;t_suIlIkat. eKalkarN_énkareRbIR)as;vaenAkñúgebtug KWenAeBlEdlPaBFn;énkMlaMg x<s;qab;CaGtßRbeyaCn_ b¤edayPaBFn;éns‘ulpatrbs;va nigenAeBlEdl tMélbEnßménsuIm:g;t_ minEmnCa ktþa sMxan;. bMerIbMras;epSgeToténsuIm:g; aluminous KWrYmpSMCamYynwg firebrick edIm,IbegáItCaebtugFn;nwgkMedA (refractory concrete) . enAeBlEdlsItuNðPaBekIneLIg karykFatuTwkecjBIplitplGuIRdatkmμGacekIt eLIg. TIbMput smasFatuenHbegáItCa ceramic bond CamYynwgfμbMEbk. 1>4 suIm:g;t_FmμCati Natural Cements sIum:g;t_FmμCatiRtUv)anbegáIt edaykarduteGayeTACapHedayFmμCatinUvl,ayEdl)anekItBIsarFatu calcareous nig argillaceous enAsItuNðPaBeRkamGVIEdl sintering ykmkeRbIkar. enAeBlEdlsuIm:g;t_FmμCati RtUv)andkecjBIvtßúFatuEdlekIteLIgedayFmμCatinig KμankarxMRbwgNamYyRtUv)aneFVIeGayEktMrUvsmasPaB TaMgsmasPaB niglkçN³ERbRbYllμmy:agTUlMTUlay. suIm:gt_FmμCatixøH GaclkçN³esÞIrEtdUcKñanwg suIm:g;t_ lanning suIm:g;t_FmμCatiepSgeTotmanPaBexSayxøaMgCag. suIm:g;t_FmμCatiRtUv)aneRbICaTUeTAenAkñúg kMe)ar)ayGr (masonry mortar) nigeRbICaTwkfñaMKImIenAkñúgebtugsuIm:g;t_ lanning. 1>5 kMe)ar Limes kMe)arenHRtUv)anbegáItCaTUeTAedaykal;süÚmG‘uksuIt (CaO) EdlkekIteLIgCaFmμCatienAkñúgfμkM)ar (limestone) / fμm:ab (marble), chalk, coral nigsMbkxüg (Shell) .sMrab;eKalbMNgsMNg;GaKar vaRtUveRbICa hiefly enAkñúgkMe)ar)ayGr. Hydaulic lime kMe)arenHbegáItBIkarduteGayeTACaepHénfμkMe)arEdlmansarFatu silica nig aluminia enAsItuNðPaB d¾xøI énkarrMlaybBa©ÚlKñaEdleTIbnwgcab;maneLIg EdlbegáItCa kMe)aresrIRKb;RKan; edIm,IGnuBaØatidl; GuIRdatkmμ nigkñúgeBlCamYyKñabeBa©jnUvkal;süÚmsuIlIkatRKb;RKan;EdlmineFVIGuIRdatkmμedIm,I[Ca em:SAs¶Üt lkçN³ hydraulic rbs;va. Construction General - 38 -
  • 39. Department of Civil Engineering NPIC edaysarEtkarpSMy:agTabénsuIlIkat nigkMe)ary:agx<s; kMe)ar hydraulic manTMnak;TMngy:agexSay. eKrkeXIjkareRbIR)as;CaeKalkarN_enAkñúgkMe)ar)ayGr. kMe)arGuIRdUlItmansuIlIkateRcInCag10° nwg kkenAeRkamTwk. Quicklime enAeBlEdlfñkMe)arRtUvdutkMedAenAsItuNðPaBhYsBI 17008F sarFatu]sμ½nkabUnDIGuksuItnwgRtUv )andkecj nigplitplrwgEdlenAsl;KW Quicklime. CaBiessvaman]sμ½nkal;süÚmGuksuIt nigm:aej:süÚm GuksuItbUknwgsarFatuminsuT§dUcCasuIlIkatGuksuItEdkGuksuIt nig GaluymIjÚ:mGuksuIt. CaFmμta sarFatu minsuT§RtUv)ankMNt;eGayticCag5°. RbsinebIeRcInCag 10°plitplenHGackøayCakMe)ar hydraulic. QuicklimeRtUv)aneKsÁal;fa vaman2cMNat;fñak; KWkal;süÚmx<s; (high-calcium) nig dolomitic. Quicklime Edlmankal;süÚmx<s;CaFmμtamanm:aejsüÚmG‘uksuItticCag5°. dolomitic quicklime CaFmμta manm:aejsüÚmBI35° eTA 40°. Quick tictYcEdlmaneKrkeXIjfa ma nm:aej:süÚmG‘uksuItBI 5°eTA35° EdleKehAfa magnesian lime. lkçN³d¾RbesIrén quicklime KWsmtßPaBénkarlayCamYyTwk. enAeBl quick lime RtUv)anlay 2 eTA 3 dgénbrimaNTwkeFobCamYynwgTMgn;rbs;va RbtikmμKImIcab;epþImekItman. kal;süÚmGuksuItpSMCamYyTwkbegáIt)anCakal;süÚmGuIRduksuIt ehIykMedARKb;RKan;RtUv)anbegáItCalMdab; edIm,IeFVI eGaym:asTaMgGs;RtUvBuH. CalT§plplitplénkarbMEbkFatu kal;süÚmGuIRduksIuty:agesþIg RtUv)anGENþtkñúg elIépÞTwk ¬nigm:aej:süÚmGuksuIt b¤GuIRduksuIt RbsinebI dolomitic RtUv)aneRbIR)as;va¦. enAeBlRtCak; GgÁFatum:as;Bak;kNþalrav (semifluide) rwgeTACadIElgRbkdedaysgÁt;PaB RtUv)ancUkeLIg edayEb:l b¤ekIb dak;Fug. dIElg Quicklime layTwkenH enAeBlRtCak;ehIyeKcUlcitþykeTAErg EdlCasMPar³EdlRtUveRbIR)as;sMrab;sMNg;. Quicklime KYrEtgEtRtUv)andak;layTwkeGaysBV. TinñpléndIElgvaERbRbYl GaRs½yelIRbePTén Quicklime kMritdWeRkénkardutkMedA niglkçN³énkar layTwk nigCaFmμtaTTYl)an 70 eTA 100 ft KIbéndIElgelI quickliem 1 ton. eKalkarN_énkareRbIR)as; dIElgKWenAkñúgkMe)ar)ayGr enAkEnøgEdlvamantMéléRkElg edaysarEtkMrit)øasÞikrbs;vax<s; b¤PaBgay RsYleFVIkarrbs;vacUlrYmenAkñúg)ayGr. vak¾RtUv)aneRbIkñúgeBldUcCaTwkfñaMKImIenAkñúgebtugEdr edIm,IbegáIt PaBgayRsYleFVIkar. vak¾RtUv)aneRbIenAkEnøgxøHdUcCa RsTab;kMe)arbUkbegðIyEdr EdlKuNsm,tþid¾l¥rbs;va )anmkBIkMrit)øasÞikd¾x<s;rbs;va. Mson’s hydrated lime Construction General - 39 -
  • 40. Department of Civil Engineering NPIC hydrated lime RtUv)anerobcMBI quicklime edaykarbEnßmnUvbrimaNkMNt; énTwkeTAlIva. bnÞab;BI GuIRdatkmμbBaÄb;edIm,IvivtþkMedA plitplCalT§plKWCa emSAm:t;s¶Üt. bnÞab;mkvaRtUv)ancMnat;fñak;edayvIFI aiz-classification edIm,IykecjnUvTMhMRKab;l¥itEdleKminR)afñacg;)anehIy manTMhMFMCagxñat ehIyRckkñúg fg;EdlmanTMgn; 50lb. vaEtgEtCaplitplEdlplitedayeragcRk EdlcMENkÉdIElg quicklime PaKeRcInEtg EtCaplitplEdl)anBIkarlayenAnwgkEnøgkargar. Mason’s hydrated lime KWCa hydrated lime EdlsmRsbeRbICamYykMe)ar)ayGr kMe)arbUkRsTab; base-coat nigebtug. vacaM)ac;GnuvtþtamsmasPaBén Quicklime. hydrated lime Edlmankal;süÚmx<s;RtUv )anpSMeLIgCadMbUgedaykal;süÚmGuIRduksIut. hydrated lime dolomitic FmμtaRtUv)anpSMeLIgedaykal;süÚm GuIRdúksuItbUknwg m:aej:süÚmGuIRduksuIt. lkçN³)øasÞikénkMe)ar)ayGrEdleFVIBI mason’s hydrated lime Fmμta ¬RbePT N¦ KWmanlkçN³mFüm. vamanlkççN³l¥RbesIrCagkarlayedaysuIm:g;t_PaKeRcIn b:uEnþvaminman lkçN³x<s;esμInwgkMe)ar)ayGr EdllayedaybrimaNesμIKña éndIElglayTwkeT. dMeNIrkarFmμtaén GuIRdatkmμ énQuicklime enAsMBaFbriyakaspþl;nUvGuIRdatkmμénkal;süÚmGuksuItnwgbMElgeTACam:aejsüÚm GuIRdUsuIt. lT§plenHRtUv)aneGayeQμaHy:agdUcenHfa special hydrated ¬RbePT S ¦EdlminEmnmanEtsarFatu sMxan; magnesia cUlrYmGuIRdatkmμsBVeT b:uEnþvamankMrit)øasÞikx<s;Pøam² enAeBlvaesImedayTwk. kMe)ar)ay GrEdllayBIRbePT S gayRsYleFVIkarCag)ayGrlayCamYyRbePT N. tamBit hydrated lime RbePT S gayRsYleFVIkaresÞIrEtdUc)ayGrlayCamYydIElg Quicklime Edr ehIydUcenHGñkeRbIR)as; Hydrated lime RbePTenHmanPaBgayRsYledaysarplitplenHRckkñúgkBa©b; nig mankMriténkargayRsYleFVIkarx<s;edayKμaneRKaHfñak; EdlGacekItmandUc Quick lime layTwkeT. Finishing hydrated lime Finishing Hydrated lime saksmübMputsMrab;eRbIR)as;enAkñúgkMe)arbUkRsTab;begðIy. vaRtUv)an kMNt;lkçN³edaykMritBN’sx<s; nigkMrit)aøsÞikx<s;. RKb; Finishing Hydrated lime RtUv)anplit CaBiessenAkñúg Rsuk Toledo énekaH Ohio BIfμkMe)ar Dolomitic. kMe)ar Hydrate FmμtapSMeLIgeday kal;süÚmGuIRduksuIt nig m:aej:süÚmGuksuIt. enAeBlvaesImdMbUg vamanlkçN³)øasÞikmanxøaMgdUc mason’s hydrated lime RbePT NeT. eTaHbICay:agNa vamanPaBxusKñaenAeBleRkay EdleRkayBIkarRtaMTwk Construction General - 40 -
  • 41. Department of Civil Engineering NPIC eBjmYyyb; Finishing hydrated lime begáInnUvkMrit)øasÞikrbs;vax<s;Nas;Edl mason’s hydarted Lime bgðajnUvTMnak;TMngénPaBlUt las;énlkçN³)øasÞiky:agtictYcenAeBlRtaMTwk. 1>6 suIm:g;t_erobdæ Masonry ament suIm:g;t_erobdæ (masonry cement) b¤CYnkaleKcUlcitþehAehAsuIm:g;t_kMe)ar)ayGr (motar cement) EdlRtUv)anlayCamYynwgxSac; nigeRbIsMrab;begáItCaCBa¢aMgdædUcCa dæ kar:U nigfμ. vaGacCaRbePTmYyén suIm:g;t_GuIRdUlIkEdl)anbriyayrYcehIy b¤karlayrbs;vaenAkñúgsmamaRtNamYy. suIm:g;t_erobdætamEbbBaNiC¢kmμxøHRtUv)anlaybBa©ÚlKñaedaysuIm:g;t_ lanning nigkMTicepHpg;fμ kMe)ar (limestone) CaerOy² mansmamaRtfμkMe)areRcIn 50° b¤60°. enAeBlEdlKμankarkMNt;BIsarFatu KImInig tMrUvkarlkçN³rUb lkçN³bBa¢ak;y:agc,as;BIsuIm:g;t_erobdæ KWmanlkçN³esrICamFüm. plitkrxøH )anERbRbYlnUvsmasFatuy:agTUlMTUlayGaRs½yeTAnwgkarRbkYtRbECg lkçxNÐGakasFatu b¤vtßúFatuesIm EdlGacrk)an. lT§plénkMe)ar)ayGrGacmanlkçN³ERbRbYly:agxøaMg. 1>7 Fly ashes Pozzolans FmμCatiRtUv)anykecjBI diatomaceous earth/ opaline ehets nig fμPaCn_ (shales) nig sarFatuepSgeTot. Fly ashes RtUv)anplitecjBIcMehHFüÚgfμCaTUeTA enAkñúgsßanIym:asuInGKÁisnI (electrical generating station) . kMeTcepHEdlCaFmμta RtUv)anykecjtamry³bMBg;EpSgEdlykecjtamviFICaeRcIndUcCa electrostatic precipitators. Fly ash GacRtUvmanTMhMeTAtamkardwkCBa¢Úntamk):al;rbs;GñkpÁt;pÁg;ebtug. Fly ahses TaMgGs;manlkçN³ Pozzolan EdlGacmanlT§PaBcUlrYmRbtikmμCamYynwg kal;süÚmGuIRduksuItenAsItuNðPaBFmμtaedImbegáItCasmasPaBCamYynwglkçN³suIm:g;t_. enAeBlEdlsuIm:g;t_RtUv)anlayCamYynwgTwk RbtikmμKImI ¬GuIRdatkmμ¦ nigekIteLIg. lT§plén RbtikmμenH KW calcium silicate hydrated (CSH) nigkal;süÚmGuIRduksuIt [Ca(OH) ] . Fly ashes manPaKryén 2 suIlIkUnDIGuksuIt (SiO ) x<s;. enAeBlEdlmanvtþmanCamYynwgsMeNIm Ca(OH) eFVIRbtikmμCamYynwg SiO 2 2 2 edIm,ITTYl)an CSH epSgeTot. Fly ashes RbePT F )anBIlT§plénkardutFüÚgfμexμAPøW (anthracite) rWFüÚgfñ ekAs‘Ub‘ÍTIm (bituminous) nwgmansarFatu Pozzolan. vaRtUv)anbgðajedaykarRsavRCavnig GnuvtþedIm,Ipþl; nUv PaBrIkcMerInCaTUeTAénPaBFn;nwg sulfate nigedIm,Ikat;bnßynUvPaBrIkraldalénfμ alkali. Fly ahses RbePT Construction General - 41 -
  • 42. Department of Civil Engineering NPIC C )anBIlT§plénkardutFüÚgfμ lignite rWFüÚgfμ subbituminous. edaysarEtlkçN³KImIénFüÚgfμ fly ashes RbePTC manlkçN³suIm:g;t_edaybEnßmeTAkñúgsarFatu Pozzolon. Fly ash RbePT C Gackat;bnßyPaByUr GEgVgénebtug EdlvacUlrYmlaybBa©ÚlKña. 2> fμbMEbk Aggregate fμbMEbkKWCadak;bBa©ÚlKñanUvsarFatuCaeRcIndUcCafμ boulder, fμ cobble, fμkinbMEbk (crushed stone) fμ gravel, fμ aircooled blast furnace slage, xSac;FmμCati b¤xSac;sib,nimiμtþ nigRKYssib,nimiμtþ nig RKYsFmμCati Rsal. fμbMEbkGacRtUv)anBN’naeTAtamTMhMCaeRcIneTot. μ 2>1 fμbMEbkTMgn;Fmμta Normal –weigth aggregates fμbMEbkRbePTenHmandg;suIetxniC (specific gravity) enAcenøaH 2>0 nig 3>0. CaTUeTAvaRtUv)anEck eTAtamTMhMxageRkam³ fμ Bounder manTMhMFMCag 6in fμ Cobble mancenøaH 3in eTA 6in RKYs (coarse aggregate) manTMhMcenøaHkERBa©g Nº 4 eTA 3in xSac; (fine aggregate) manTMhMcenøaHkERBa©g Nº 200 eTA Nº 4 sarFatum:t;epHpg; (miniral filler material) qøgkat;kERBa©gelx Nº200 fμbMEbkTMgn;Fmμta EdleRbIenAkñúgsMNg;ebtugPaKeRcIn KW)anBIkarbUmBI)atTenø b¤CIkykBIkñúgdI nig )anBIkarbMEbkvtßúFatuepSg². ebtugEdlman)anBIkarlayCamYynwgRKYs nigxSac;TMgn;FmμtaCaTUeTAman TMgn;RbEhl 144 lb/ . 1ft 3 fμ Bounder nigfμ Cobble CaTUeTAmin)aneRbItamTMhMEdl)anEdl)anCIkBIkñúgdIeT b:uEnþRtUv)ankinbMEbk edIm,IeGaymanTMhMepSg²CaRKYs (coarse aggreagate) xSac;sib,kmμ (manufactured –sand) nigkMeTcepHpg; (mineral filler) . RKYs gravel nigxSac;EdlekIteLIgedayFmμCatiRtUv)anekIteLIgedayskmμPaBénTwknig karpøas;bþÚrrdUvkal nigkarnaMykdImkcak;kñúg)atTenø. sarFatuTaMgenHmanragmUl épÞrelag nigkarEbgEck TMhMénRKab;edaydMeNIrkary:agtictYc. sarFatuTaMgenHGacpÁt;pÁg;tamTMhMCaRKYsnig xSac;. Construction General - 42 -
  • 43. Department of Civil Engineering NPIC xSac;KWCasarFatuEdlqøgkat;kERBa©gTMhM 3¼8 in 100%. RKYsmanvtßúFatuEdlmanTMhMeTIelIkERBa©g elx 4. fμbMEbkmanbrimaNmaDKitCaPaKryeRcInCageK enAkñúgebtugsuIm:g;t_ lanning kMe)ar)ayGr b¤ asphaltic concrete . enAkñúgkarlayCaebtugsuIm:g;t_ lanning RKYsnwgxSac;cUlrYmRbEhlBI 65 eTA 70° én maDrbs;l,aysarub. sMrab; asphaltic concrete fμbMEbkcUlrYm 75 eTA 85°énmaDrbs;l,ay. CalT§pl fμμbMEbk KWCasarFatubMeBjminkMerIk. lkçN³fμbMEbkGacbgðajBIT§iBleTAelIRbBn½§CIvit nigPaByUr GEgVg énebtugEdlRKYsfμbMEbkRtUv)aneRbIdUcCasuIm:g;t_ lanning , asphaltic concrete, kMe)ar)ayGr b¤fμRkal RKwHfñl; (aggregate base) . karGnuBaØati[eRbIR)as;RKYs b¤xSac;sMrab;layenAkñúgebtug b¤kMe)ar)ayGr KWvinicä½yedaylkçN³Ca eRcInrYmmandUcCa karErgkMNt;TMhMRKab; (gradation) brimaNxSac;qøgkat;kERBa©g Nº 200, PaBrwg (hardness) , soudness, TMrg;RKab;/ PaBlMnwgénmaD (volume stability) RbtikmμeTAnwg alkili y:agskþanuBl (potential alkali reactivity) PaBFn;eTAnwgkarkkCaTwkkk nigkarrlayénTwkkk (resistance to freezing and thawing) nig sarFatuxniCminsuT§. 2>2 fμbMEbkEdlmanTMgn;F¶n;nig Rsal Heavy weigth and light weigth aggregate fμbMEbkTMgn;F¶n;rYmman magnitite Edlmandg;suIetxniC (specific gravity) 4>3 barite mandg;suIet xniC 4>2 limonit mandg;suIetxniC 3>8 EdkpUsV½rmandg;suIetxniC 6>3 nigkMeTcEdkmandg;suIetxniC 7>4. fμbMEbkTMgn;F¶n;xagelIGaceRbICMnYsfμ gravel b¤fμkinbMEbkedIm,IbegáItCaebtugd¾ENntan;. fμbMEbkTMgn;Rsal light weigth aggregate vaGacEbgEckCaBIrRbePTKW eRKagsMNg; (structural) nigminEmneRKagsMNg; (nonstructural) . va)an BIkarplit ¬eFVIBIdIdæ/ fμPaCn_ b¤silaqñÜn (slate) b¤kMeTcGamn_ EdkpÞúHecjBIL (blast furnace slage) b¤eday FmμCati (scoria nig pumice) . fμbMEbkenHGacbegáItCaebtugEdlmanPaBFn; nwgkMlaMgTUeTAenAcenøaHBI 3000 eTA 4000 psi PaBFn;énkMlaMgx<s;CagenHk¾GaceFVI)an. TMgn;Éktaxül;s¶Üt (air-dry unit weigth) én PaBFn;énkMlaMgx<s;CagenHk¾GaceFVI)an. TMgn;Éktaxül;s¶Üt (aiz-dry unit weght) énPaBFn;énkMlaMgFmμta énebtugTMgn;Rsal ¬ticCag 5000psi¦ enAcenøaHBI100 eTA 115 pcf . PaBFn;Edlx<s;énebtugTMgn;Rsal manTMgn;Ékta (unitweight) kñúgcenøaH 120pcf. Construction General - 43 -
  • 44. Department of Civil Engineering NPIC fμbMEbkTMgn;RsalminEmneRKagsMNg;FmμtaKW vermiculite nig perlite sUm,IEt scoria nig pumice k¾GacRtUv)aneRbIEdr. sMPar³TaMgenHRtUv)aneRbIenAkñúgebtugEdlmankMralxNнGuIsULg; karBarsMelg nig kMralminEmneRKagxagelIeK. fμbMEbkTMgn;RsalbegáItebtugEdlmankarcMlgkMedATab Edlmankar karBarePøIg)anl¥esμIKña. enAeBlebtugenHRbQmnwgkMedAxøaMg bMputsMeNImEdlmanenAkñúgebtug)anERbkøay y:agqab;BIPaBrav eTACacMhayEdlmanmaDrhUtdl;15dgFMCagmun. cMnYnrn§es<atd¾eRcIn nigmanTMhMFMenA cenøaHfμbMEbkTMgn;Rsal)anbegáIttMbn;sMBaFFUrRsal (pressure relief region) . 3> TwkfñaMKImIsMrab;ebtug Admixture for concrete TwkfñaMKImIKWCasarFatuepSgeTotBI suIm:g;t_ lanning Twk nigfμbMEbkEdlRtUv)anbEnßmeTAkñúgebtug edIm,IEkERblkçN³rbs;ebtug. rYmbBa©ÚleTAkñúgGtßn½yenHvaKWTwkfñaMKImI TwkfñaMEr: dUcCa fly ash nig silica fume sarFatukarBareRcH/ sarFatuEfmBN’ sarFatusésrsURt nigepSg² ¬CMnYykarbUm/ karBarsMeNIm/ bgá]sμ½n/ Pñak;garkat;bnßykarRCab¦. 3/1 TwkfñaMKImIBIKImI nig BIEr: Chimical and mineral admixture TwkfñaMKImIRtUv)aneRbICaTUeTAenAkñúgebtugCaGgÁFatuCYykat;bnßybrimaNTwk GgÁFatuBenøÓn nigBnüWt eBlkk b¤CaGgÁFaturYmpSM. A GgÁFatubnßybrimaNTwk B GgÁFatuBnüWteBlkkrwg C GgÁFatuBenøÓneBlkkrwg D GgÁFatubnßybrimaNTwk nigBnüWteBlkkrwg E GgÁFatubnßybrimaNTwk nigBnøÓneBlkkrwg F GgÁFatubnßybrimaNTwk kMritx<s; G GgÁFatubnßybrimaNTwk kMritx<s;nigBnüWteBlkkrwg TwkfñaMKImIkMritx<s;kat;bnßybrimaNTwk EdlcaM)ac;cUlrYmbegáItCaebtugCaBiessedayminpøas;bþÚr 12° b¤eRcInCagenH. TwkfñaMKImIkat;bnßybrimaNTwk Water-reducing admixture Construction General - 44 -
  • 45. Department of Civil Engineering NPIC TwkfñaMenH)ankat;bnßytMrUvkarTwksMrab;layebtugedayeFVIRbtikmμKImICamYynwg plitplGuIRdakmμ )anqab;eLIgedIm,IbegáItRsTab;TwkfñaMKImI m:UNUm:UelKulenATwksuIm:g;t_. RsTab;enH)anEjkRKab;suIm:g;t_ nig kat;bnßytMrUvkarfamBledIm,IeFVIeGayl,ayenH)anhUr. dUcenHl,ayenHKW “lubricated” nwgCMrujeGayRKab; suIm:g;t_cUlrYmGuIRdatkmμ. TwkfñaMKImIkat;bnßybrimaNTwkCaFmμtaplitBIGasuIt Lignosulfnic nig GMbilrbs;va GasuItkabUksuIlicGuIRduksuIt nigGMbilrbs;va b¤ polymer Edl)anBI melamine b¤ naphthalene rWGuIRdUkabUns‘ul pUNat. bnSMénTwkfñaMKImIEdleRbIenAkñúgl,ayebtugKYrEtRtUvRtYtBinitü nigeFVIBiesaFy:agRbugRbytñ½ edIm,I Fanafa lkçN³EdleKcg;)anRtUv)anTTYl. ]TahrN_GaRs½yeday kMritlay (dosage) énTwkfñaMKImI nig lkçN³KImIénsuIm:g;t_ vaGacmanlT§PaBeFVIeGayTwkfñaMKImIBnüWtkarkk nigBenøÓnkarkkrwgénebtug. vak¾ bgðaj nUvkarkt;sMKal;fa TwkfñaMKImIEdlCMrujkarkkrwgFmμta nigBnüWtkarkkRbsinebIkMritlayman brimaNelIs. elIsBIenHeTot edaysarEtPaBxusKñaenAkñúgPaKry énduMsUlItrvagplitpl )anBI Rkumh‘unepSgeTotvaEtg EtminmanTMnak;TMngKñaedaypÞal;rvagTwkfñaMKImIEdlmancMNat;fñak;dUcKña. dUcenH vamansar³sMxan;kñúgkarkMNt;smasPaBKImIy:agRbugRbytñ½ enAeBlRtYtBinitükarRbkYtRbECgénTwkfñaMKImI. TwkfñaMKImIEdlbegáItBBuHxül; Air-Entraining Admixture TwkfñaMenH)anbegáItBBuHxül;d¾EsntUcbMputCaeRcInEdlmanenAkñúgebtug edIm,IkarBarebtugBIeGanPaB bNþalmkBIskmμPaBRcMEdlénkarkk nigkarrlayénTwkkk b¤karEsþgénkarQøanBanénsarFatuKImI. sMrab;ebtug EdlRbQmnwgkarkk énkarrlayRcMdEdl enaHBBuHxül;pþl;nUvbnÞb;sMrab;rIkdalénTwk xageRkA nigxagkñúgEdleTaHCay:agNavaGacbNþaleGayeRKaHfñak;dl;ebtug. enAeBlEdlebtugEdlman BBuHxül;RCabecjmanvisalPaBtictYcCag ebtugKμanBBuHxül;enaHvanigekItmansésqμatictYcbnøayBIsñÚl énebtugdl;épÞxageRkA. dUecñHsésqμad¾tictYcenHCapøÚvcUlénkarQøanBanénsarFatuKImIeTAkñúgebtug. TwkfñaMKImIBenøÓnkarkk Set-accelerating admixture vaRtUv)aneRbIsMrab;kat;bnßyeBlevlaBIcab;epþImlayTwkeTAkñúgsuIm:g;t_ dMbUgénkarcab;dMeNIrkar nig begáInGaRtaénPaBFn;énkMlaMgEdlTTYl)anedayebtug. TwkfñaMKImIBenøÓnkarkkEdlRtUv)aneRbICaFmμta eRcInCageK KWkal;süÚmkørIt. eTaHCay:agNa kareRbIR)as;rbs;va KWRbqaMgkñúgkrNIEdlEdkBRgwgnig Edk prestressing manvtþman. mUlehturbs;va KWfavamanlT§PaBfa GgÁFatuBenøÓnnigbBa©Úly:agesrInUvEdkkørIt Construction General - 45 -
  • 46. Department of Civil Engineering NPIC eTAkñúgebtug dUecñHvanwgbgáeGaymaneRcHsuIEdk. PaBEbøkKñaénkareRbIR)as;Twk fñaMKImImYykñúgcMeNamTwkfñaM KImIEdlminmansarFatukørIt RtUv)aneRbI. TwkfñaMKImIBnüWtkarkk Retarding Admixture sMrab;visalPaBxøH TwkfñaMKImIkat;bnßybrimaNTwkFmμtaTaMgGs;BnüWtkarkkdMbUgénebtug. TwkfñaMKImIsarFatuEr: Mineral Admixture Fly ashes, pozzolans nig microsilicates RtUv)anbBa©ÚleTAnwgcMNat;fñak;fñaMTwkfñaMKImIsarFatuEr:. eBl xøHsuIm:g;t_FmμtaGaceRbICaTwkfñaMKImI. karkarBareRcHsuI Corrosion inhibitor CaTUeTAEdkBRgwgenAkñúgebtugRtUv)ankarBarRbqaMgnwgeRcHsuIedaysarFatu alkalinity y:agx<s;énebtug Edl begáItnUvRsTab;GskmμenABIelIépÞEdk. RsTab;enHmansmasFatuEdkGuksuIt (ferric oxide) EdlCasarFatulMnwg. eTaHCay:agNa enAkñúg b¤enABIelIépÞénEdkGuksuIt (ferric oxid) KWCasmasFatuEdkGuksuIt (ferrous oxid compound) EdlmanRbtikmμy:agxøaMg. enAeBlEdlsmasFatu EdkGuksuItcUleTATak;TgCamYynwg sarFatuQøanBan dUcCa chloride oxide vaeFVIRbtikmμCamYyGuksuIEsn edIm,IbegáItCaduMsUlIt plitpleRcHEdk GuksuIt (iron-oxide corrosion product) . lT§plenH)anbegáIn TMhMmaDrbs;va4dg nigbegáItkMlaMgrIkFak;kan; EtFMCagPaBFn;énkMlaMgTajpþac;énebtug. lT§plenHkan;Et eFVIeGayebtugmanlkçN³y:ab;yWnEfmeTot. enAeBlEdleRcHsuIcab;epþImkekIt vtþmanrbs; chloride enAcenøaHBI1 eTA 1>5lb/yd . ]TahrN_ 3 RbsinebIGacmanlT§PaB chloride GacRCabcUlBIxageRkAsñÚlebtug edayykTwkkkecjBIGMbil ebtugGac RtUv)ankarBaredaypleFobTwk nigsuIm:g;t_kan;EtTabeLIg² b¤begáInbrimaNRKb;dNþb;elIEdkBRgwg b¤BBuH xül;mankñúgebtug b¤bEnßmTwkfñaMKImIEdlmansarFatukal;süÚmnIRtat rWbEnßmTwkfñaMKImIr)aMgxagkñúg (internal- barrier) b¤karBarkartUt (cathodic protection) b¤CabnSMénvIFITaMgenH. edIm,IkarBareRcHsuI TwkfñaMKImI kal;süÚmnIRtatRtUv)anbEnßmeTAkñúgebtugkñúgeBlkMBuglaymþgeTot (batching) .vamin)anbegáItr)aMglkçN³rUbeTAnwgpøÚvcUlénEdkkørIkeT. va)anpøas;bþÚrlkçN³KImIénebtugEk,r KYrsmépÞEdk. vtþmanénG‘uksuItEdknIRTIt )anbMElg ferrous oxid eTACa ferric oxide. sarFatunIRTItk¾RtUv)anRsUbykenAÉépÞénsrésEdkehIy begáInkMlaMgdl;RsTab;Gskmμ ferric oxide. Construction General - 46 -
  • 47. Department of Civil Engineering NPIC sMrab;TwkfñaMKImI kal;süÚm nIRTItEdlRtUv)anykmkeRbI kMriteRbIR)as; (desoage) KYrRtUv)anEktMrUv edaysMrbCamYynwglkçxNÐRbQmrbs;ebtugeTAnwgPñak;gareRcHsuI. épÞRbQmkan;EtFMkMriteRbIR)as;KYrEt FMEdr. kMriteRbIR)as;d¾RtwmRtUvGacRtUv)ankMNt;eTAelIKMeragmYyeTA KMeragmYyedayQrelImUldæanCamYy nwgTinñn½ysMrab;esckþIesñIsuMTwkfñaMKImICak;lak;. TwkfñaMKImIr)aMgxagkñúg (internal –barrier) manBIrRkum. RkumTI mYymansmasFatukarBarRCabTwk nigkarBarRCabsMeNIm. RkumTIBIrmanPñak;garEdlbegáItRsTab;sarFatu xniCCuMvijEdkBRgwg bEnßmBIelIRsTab;Gskmμ. TwkfñaMKImIRbePTenH)anCMrujsMrab;bEnßmBIelIGRtaEdl)an kMNt;edayKμanKitBIkarRbQmnwgsarFatukørItdayKitfanwgekIteLIg. TwkfñaMKImIBN’ Coloring admixture sarFatuBN’RtUv)anbEnßmeTAelIebtugsMrab;ehtuplsßabtükmμ. vaGacCaG‘uksuItEr: b¤RKab;fñaMBN’ sib,kmμ. sarFatukabUneqABN’exμA RtUv)aneRbICaTUeTAsMrab;sarFatuBN¥exμAEdl)ankat;bnßybrimaNBBuH xül;EdlekItmanenAkñúgl,ayy:ageRcIn. dUcenHRbsinebIebtugBN’exμARtUv)aneKcg;)ansMrab;ebtugEdltMrUv eGaymanBBuHxül; ¬sMrab;ebtugEdlRbQmnwgPaBkk b¤rlayénTwkkk b¤karQøanBanénsarFatuKImI¦ enaH kabUnexμA (carbon black) KYrRtUvEkERbeTACaBBuHxül; b¤eTACaPñak;garbEnßmkekItBBuHxül;EdlGacrYm bBa©ÚleTAkñúgl,ay. karKitBIl,ay (mix design) KYrRtUv)aneFVIBiesaFn_eRkamlkçxNÐCak;Esþgénkardæan edIm,IeRbIR)as;enAkñúgsMNg;kardæan. kareRbIR)as;nUvtMrUvkarBN’edayRbugRbytñ½RtYtBinitüsMPar³ ]bkrN_ nigkarbEnßmbrimaNTwkedIm,IrkSanUvPaBminpøas;bþÚrenAÉkardæan. 4> kMe)ar)ayGr nig ebtug Mortar and concrete 4>1 kMe)ar)ayGr Motar )ayGrRtUv)anpSMeLIgedaysarFatusuIm:g;t_ RKYsfμl¥it xSac;nig Twk. vaRtUv)aneRbIsMrab;eFVIkMraldl; kargarrabdæ sMrab;bUk nig stucooes nig laybEnßmCamYyRKYsfμFM² køayeTACaebtug. karKitenATIenH RtUv )aneGayCadMbUgeTA)ayGrenaHEdlRtUveRbIR)as;sMrab;kagarrabdæ nigbUkkMe)ar. lkçN³rbs;)ayGrERbRbYly:agxøaMg GaRs½yeTAnwglkçN³énsarFatusuIm:g;t_EdlykmkeRbIpl eFobénsuIm:g;t_ nigxSac; lkçN³ nigkMritcMNat;fñak;xSac; nigpleFobTwknigsarFatusUlIt. Construction General - 47 -
  • 48. Department of Civil Engineering NPIC 4>2 ebtugsuIm:g;t_B½rEln Portland cement concrete ebtugsuIm:g;B½rElnCal,ayénsuIm:g;t_ lanning Twk RKYsFM nigxSac; nigsmamaRt énTwkfñaMKImIedIm,I begáItCam:as)øasÞikEdlmanlT§PaBGaccak; dak; nigbBa©ÚleTAkñúgBum<EdlvanwgrwgeTACam:assUlIt. lkçN³ EdleKcg;)anénebtug)øasÞikenH KWPaBGaceFVIkarrbs;vaPaBGacdak; nigminbMEbksmasFaturYmpSM nigEdlva GackkeTAtameBlevlaEdleKcg;)an. ebtugEdlrwgKYrpþl;nUvlkçN³esvaEdleKcg;)an³ 1> PaBFn;énkMlaMg ¬sgát; nig flexural¦ 2> PaByUrGEgVg ¬ minmansñameRbH Fn;eTAnwgkarkk nigkarrlayénTwkkk nigkarvaylukén sarFatuKIm/ Fn;eTAnwgPaBrMj½r nigbrimaNxül;Edlman¦ 3> rUbragemIlBIxageRkA ¬BN’/ épÞmanPaBminRKb;lkçN³¦ lkçN³nimYy² CHT§iBldl;tMélcugeRkayénkarKitl,ay (mixdesign) nigtMélénkarcak;ebtugenA nwgkEnøg. lkçN³TaMgenHGacTTYl)anBIebtugTMgn;Fmμta TMgn;Rsal nigTMgn;F¶n;. 4>3 ebtugb:UlIEmr Polymer concrete lkçN³)øasÞikrbs;ebtugCamYynwg Rcv:ak;mU:elKuld¾EvgRtUv)aneKehAfa ebtugb:UlIEmrRtUv)aneKeRbI R)as;kñúgviFICaeRcInedIm,IbegáInnUvlkçN³rbs;ebtug karCMnYsnUvsuIm:g;t_ lanning EdlcUlrYmpSMCamYynwgl,ay dUcCaTwkfñaMKImI nigeFVIeGayebtugnwgs‘b;. ebtugb:UlIEmr dUcCa methyl methacrylate nig polyyester EdlminEq¥tTwk EdlenAkñúgenaHb:UlIEmr CMnYssum:g;t_ lanning GacmanPaBFn;énkMlaMg nigmU:DuleGLasÞic (modulus of elasticity) FMCagebtugsuIm:g;t_ lanning 2dg. CamYynwgebtugb:UlIEmr creep RtUv)anbnßynig PaBFn;énvdþénkarkk nwgkarrlayénTwkkk eLIgx<s;. ]TahrN_bnÞab;BIkarEfrTaMTwksMrab;ry³eBld¾xøIbMput eBjmYyyb;kñúgsituNðPaBbnÞb; ebtugb:UlIEmr )aneRtomxøÜnCaeRscsMrab;eRbIkar EdlpÞúyBIebtugFmμtaEdlRtUvTTYlkarEfrTaMsMeNIm RbEhlmYys)aþh_ munnwgTTYlbnÞúkBIxageRkA. m:UNUEmr nigb:UlIEmrGacRtUveRbICaTwkfñaMKImIsMrab;eFVIeGaydUcedImvij nigeFVIeGayépÞénebtugEdlman PaBy:ab;yWnmanPaBdUcedImeLIgvij. latexe én methyl methacrylate, polyester, styrene, epoxy-styrene, furan, styrence-butacliene nig vinylindene chloride RtUv)aneRbIsMrab;eKalbMNgTaMgenH. lT§plénkarkkrwg énebtugmansPaBelOnCagebtugFmμta. TwkfñaMKImIb:UlIEmrk¾GacnwgRtUv)aneRbIedIm,IbegáInlkçN³PaBs¥it én suIm:g;t_ Lanning. kardak;laybBa©Úlkñúgl,ayCaTwkfñaMKImIlayTwk sMrab;eKalbMNgenH TwkfñaMKImI)anpþl; Construction General - 48 -