Brick Clamps

                                            Index
   Introduction                               Disadvantages of brick clamps

   Clamp size and shape                       Increasing the efficiency of brick clamps

   Wood fired clamps                          Further reading

   Coal fired clamps

   Advantages of brick clamps


Introduction

The use of brick clamps is by far the oldest and most rudimentary method of firing bricks. When
"scoved" (that is, plastered on the outside for greater efficiency), they become scove clamps or
kilns. If the clamp is enclosed within four permanent walls, it becomes a rectangular Scotch kiln,
but in its most basic form it is a carefully constructed stack or clamp of bricks.

As a method of firing bricks it is still used all over the world because it still has several
advantages over more modern and sophisticated methods. This is despite the clamp being
potentially the most energy inefficient method of firing, because so much heat is allowed into the
atmosphere during both firing and cooling, and fuel combustion is both uncontrollable and
inefficient. Brick clamps can be made moderately efficient, but they cannot compare with
updraught continuous kilns, as far as fuel used per fired brick and brick wastage is concerned.
Figure 1

                                       A basic brick clamp

Back to index



Clamp size and shape

Brick clamps come in several shapes and sizes, depending on the number of bricks to be fired at
one time and the fuel or fuels available. They are usually constructed on a level surface of pre-
fired bricks, laid side by side for a wood fired clamp, or with spaces between them for a coal,
agri-waste or fuel inclusion fired clamp. These spaces around each brick are finger width, that is,
2 to 2.5 cm wide. This is designed to facilitate the passage of air under the brick clamp to allow
for the even combustion of the fuel. Bricks are "set" (loaded onto the base) up to 40 layers high.
The bricks are placed on top of each other for the first 8 to 12 layers, above which each layer is
inset by 2 to 3 cm, so that the clamp tapers towards the top. The tapering produces greater clamp
stability, which is important as the whole structure will move with the expansion and contraction
of the bricks during firing. For greater stacking stability, clamps can be built on ground that has
been "saucered", this means the centre of the site has been scooped out to a depth of 30 cm.
Having a floor with gently sloping sides means the bricks of the clamp are set sloping towards
the centre, and the whole clamp can then be built sloping continuously from the ground upwards.
Less firing cracks will result with a clamp of this shape, and the external surface area is reduced
to help minimize heat loss.

Back to index



Wood fired clamps

Wood burning clamps have large firing tunnels placed at regular intervals, passing through the
base of the clamp. These have to be large enough to allow for the size of woodfuei available, and
are usually two bricks wide by eight brick layers high (50 x 100 cm). They are two bricks apart
(50 cm), and have corbelled arches at the top, where two layers of brick come in to create the top
of the arch. All the bricks are placed in a clamp on their sides, and these figures are for a 25 x
12.5 x 8 cm brick. The tunnels can be split in two by being bricked across in the centre of the
clamp. This is done if the clamp is large, and therefore has a wide base, or if the fuel is provided
in cut lengths. This prevents cross-draughts blowing through the clamp, and improves the central
drawing capabilities of the clamp, all better for fuel combustion. Narrow low tunnels are built if
the clamp is to be fired with portable gas or oil burners, which are moved down the clamp from
tunnel to tunnel as firing progresses.

Firebars can be built into the firing tunnels, two thirds of the way down from the top, to improve
wood combustion, which is especially useful towards the end of the firing, when maximum
temperature input is required. To avoid the expense of firebars and the added complication of
building them into the clamp, a perforated wall of fired bricks, three layers high, may be built
across the lower part of the firing tunnel's entrance. This simple modification helps to heat the
primary air as it goes into the tunnel, and pieces of wood can be placed on the wall at one end, to
allow the air to pass underneath. This improves combustion and reduces the build up of embers.




                                             Figure 2

                            A small woodfuelled brick clamp in Africa
                                      (Photo: H. Norsker)




                 Figure 3                                          Figure 4
Wood and dunkey dung fuelled clamp            West African scoved brick clamp with saucered
              (Sudan)                               foundation and fired brick wood rests
Back to index


Coal fired clamps

Coal fired clamps are constructed on a spaced brick floor, so that air can be drawn in under the
whole clamp area. A band of coal, 20 to 30 cm thick, is laid right across the base of the clamp,
being contained within walls of pre-fired brick, with the green bricks laid on top. This does result
in the slumping of the clamp during firing, but makes the kiln easier and faster to construct.
Depending on whether coal is added to the clay in the bricks and the quality of the coal, another
thinner layer of coal is added higher up the clamp. The clamp is lit with gas or kerosene burners,
applied to small ignition tunnels at regular intervals down both sides of the kiln, or with small
wood fires, placed in larger ignition tunnels. These larger ignition tunnels have to be partially
blocked off once the clamp is alight, otherwise too much air will pass through the clamp,
effectively cooling it.

Another method used is to place a layer of wood chips across the base of the kiln, amongst
widely spaced bricks (4 to 5 cm spacing), and add more coal between the bricks for the first ten
layers, gradually reducing the brick spacing and amount of coal towards the top of the clamp.
Coal fines can also be added between the bricks as each layer of the clamp is built, though this
depends on how good the coal is and if fuel has already been mixed into the bricks.

Clamps are very suitable for firing bricks where fuel is included in the mixture used in the
manufacture of the bricks. The addi- tion of between 5 to 10% of sieved rice husk, sawdust, coal
fines, coke dust or animal dung

means that the clamp once started burns itself, with the bricks being fired from both internal and
external combustion. The addition of animal dung to the clay increases the workability of the
mixture when the bricks are formed, as well as acting as fuel when they are fired.

As the bricks shrink during firing and the fuel turns to ash, the spaces between the bricks get
larger, and too much cold air will be drawn through the clamp. This has to be reduced in the later
stages of firing, or an uneven firing will occur, with hot and cold spots developing within the
clamp. This is controlled by reducing the size of the vents at the top of the clamp, by adding
more bricks to close them down, or by covering them with steel sheets. Another method is to
cover the top of the kiln with a layer of ash and brick rubble, or dry soil, which still allows for
the combustion gases to escape slowly and evenly. The air that is allowed to enter the kiln is
reduced by partially closing the ignition tunnels with fired bricks or steel sheets.

The air spaces in the clamp floor tend to be self-regulating, as they tend to become blocked with
ash, when the clamp has been alight for a while.

To contain the available heat within the clamp, fired bricks are used to line the outside walls and
top. These bricks are placed tightly together to create an outer skin, reducing the cooling effect of
wind and possibly keeping out rain during firing. Regularly spaced openings are left in the fired
brick lining on the top of the clamp, which act as vents. These vents allow the steam and
combustion gases to escape from the clamp during firing. They can be reduced in size during the
later stages, to contain the heat during soaking, when the clamp has reached top temperature. The
vents are closed off altogether and sealed, when firing has finished and cooling starts.

Any steps that can be taken to increase the efficiency of a brick clamp, to both reduce the amount
of fuel used and to obtain a higher percentage of well fired bricks, is a good investment.




                                            Figure 5

                                  A coal fired scove clamp/kiln

Back to index



Advantages of brick clamps

       They are cheap and straightforward to build. There is no permanent structure to install
       and maintain. A level area of ground and a good supply of fuel and green bricks is all that
       is required.
       They can be built next to the supply of clay and fuel, so that transport costs are kept to a
       minimum.
       They can be of any size ranging from 5,000 to 100,000 bricks at a time, so they can
       accommodate fluctuations in brick production.
       Once lit, they do not require much at- tention, especially if the fuel is included in or
       amongst the bricks in the clamp.
       Very large brick clamps can be fired continuously, with fired bricks being unloaded at
       one end of the clamp and green bricks loaded at the other, while the fire moves through
       the middle. The result is a continuously firing clamp.
Clamps can be fired with a large variety of fuels, including agri-waste, such as rice husk,
       coffee husk, sawdust, coconut husk, dung, etc, as well as fossil fuels. Different fuels can
       be used at different stages of the firing and in a variety of ways. They can be mixed into
       the green bricks, sprinkled around them, placed in layers between them, or burnt in the
       tunnels under the clamp. It depends on fuel price and availability, as well as its calorific
       value, which determines the amount needed.
       As woodfuel becomes scarcer and more expensive, agri-waste or any suitable
       combustible rubbish can be used, at least for the first heating and drying stages of the
       clamp firing. For example, the clamp can be started with slow burning rice husk, to
       provide a gentle heat that needs little or no attention overnight. Then coconut husk is used
       to move the temperature through the middle ranges. And finally, split rubber wood is
       used to provide the top temperature and soaking period.




                                             Figure 6

                                    Brick clamp firing tunnels

Back to index



Disadvantages of brick clamps

       Basic brick clamps are the least energy efficient method of firing bricks, with a lot of heat
       being lost by radiation through the walls, and convection from the top of the clamp. The
       fuel is not consumed efficiently as there is little or no control over its combustion once
       the clamp is lit. Fuel consumption of 2,800 to 3,500 kJ/kg fired brick is to be expected,
       depending on the size and design of the clamp, plus the fuel and method of combustion.
       This low figure is partially due to the high percentage of broken and over or under fired
       bricks produced.
They are very labour intensive, being assembled and disassembled by hand, and if not
       built correctly and fired badly, can result in a very high percentage of incompletely fired
       bricks. Up to 20% of the bricks produced by a basic brick clamp can normally be
       expected to be over or under fired by this method.
       They are very slow to fire, taking several days to heat up and cool down, and there is
       little or no control over the firing once it has started.
       They are highly susceptible to the prevailing weather conditions, especially strong winds,
       which will result in a very uneven firing, with many more underfired and overfired
       bricks.

Back to index



Increasing the efficiency of brick clamps

Because of their versatility and low cost, especially where labour is cheap, brick clamps will
always remain in use. Coal fired clamps are still used in the northern hemisphere to produce high
value bricks of special colouring and textures. The main problem with clamps is the very low
energy efficiency, coupled with the high percentage of brick wastage. This poor efficiency can
be offset by using any available waste products to replace some of the fuel during firing.

The first hours of the firing, when the bricks are being thoroughly dried, can be fuelled with agri-
waste or combustible rubbish. If fuel is incorporated into the bricks, the clamp will then fire itself
with the minimal addition of a prime fuel, such as wood.

The high percentage of brick wastage can be kept to a minimum by constructing the brick clamp
accurately and providing the maximum amount of insulation around the outside. The more the
clamp is sealed and insulated on the outside, the less underfired bricks will be produced, and a
lower amount of fuel will be required. This insulation and improved performance is obtained by
using the partially fired bricks from a previous firing, to surround the green bricks in the centre
of the clamp, and surrounding these in turn with closely fitting layers of fully fired bricks. The
whole of the outside of the clamp can then be smeared (scoved) with a thick layer of clay,
combined with ash, rice husk or dried grass, to obtain the maximum insulation.

The encasing of abrickclamp in aplaster of clay is called scoving. Clamps sealed and insulated in
this way are therefore called scove clamps or kilns.

Controlling the airflow into the combustion tunnels under the clamp, helps improve fuel
combustion and cut down on heat wastage. This can be achieved by covering the tunnel openings
with pieces of sheet metal between stoking with fuel. Fired bricks may also be used to control
airflow into the clamp more accurately, the firing tunnels being opened and closed gradually, by
the addition and removal of a couple of bricks at a time.

Maintaining a steady rise in temperature through the clean and efficient combustion of fuel is the
ideal. Stoking at regular intervals with pieces of dry wood, that has been cut and split to size, or
the addition of small charges of fuel, is preferable to over-filling the combustion tunnels with
large amounts of damp fuel at widely spaced irregular intervals.

The maximum amount of air should be allowed in after fuel is added, then the air should be
reduced once the fuel is burning well. At the end of the firing, the tunnels are sealed off
completely, along with the vents at the top of the clamp to start the cooling process slowly. After
a day or so, the tunnels and vents can be opened again to allow for accelerated cooling to take
place.

The next stage towards improved fuel efficiency is to fit fire bars and firedoors to the combustion
tunnels. This effectively converts them into much more efficient fuel burning fireboxes. This is
not often done on brick clamps, because of their temporary nature, but is a more common feature
of Scotch kilns, which represent the next stage of brick kiln development.

Controlling the exhaust gases, coming from the vents at the top of the clamp with pieces of scrap
metal during the firing, holds the maximum amount of heat in the kiln and controls combustion.
At the start of the firing, there need to be enough vents that are fully open, to allow all the water
vapour out of the clamp quickly. Later, the size of the vents can be reduced to slow down the
draft through the clamp, but still allow enough fresh air to enter the firing tunnels for effective
combustion. A balance needs to be obtained between allowing enough air through the clamp for
combustion and keeping excess air down to a minimum to prevent cooling.

By building the clamp so that the firing tunnels are at 90 to the prevailing wind, using only dry
fuel in small quantities at a time, and using bricks that are as atmospherically dry as possible,
makes a lot of difference in reducing the energy consumption and improving the efficiency of
what is a very practical, and versatile, but basically fuel hungry system for firing bricks.




                                              Figure 7

                                       A scoved brick clamp

Back to index
Further reading

       The Basics of Brick Kiln Technology, Jones, Tim, Aus der Arbeit von GATE, Vieweg,
       Braunschweig, 1995
       Brickmaking in Developing Countries, Parry, J.P.M., Review prepared for the Building
       Research Establishment, Garston, U.K., 1979
       Brick and Lime Kilns in Ecuador, En- ergy, Environment and Development Se- ries No.
       13, The Stockholm Environmental Institute, Stockholm, 1992
       Small Scale Brickmaking, ILO/ UNIDO, Technical memorandum No. 6, International
       Labour Office, Geneva, 1984
       Village Level Brickmaking, Beamish, Anne; Donovan, Will, Aus der Arbeit von GATE,
       Vieweg, Braunschweig, 1989

Back to index




                                                               Published by
Text, drawings and Figure 3 by
Tim Jones
                                                   German Appropriate Technology Exchange
Appropriate Development Consultants
                                                                  Dag-Hammarskjld-Weg 1
"Cannon Hey"
                                                                             Postfach 51 80
Storrs Park
                                                                        D - 65726 Eschborn
Bowness-on-Windermere
                                                              Federal Republic of Germany
Cumbria LA23 3LD
                                                               Phone +49 - 6196 - 79-3190
United Kingdom
                                                                  Fax +49 - 6196 - 79-7352

                                                                                      (1995)

Weitere Àhnliche Inhalte

Was ist angesagt?

Utilization of Plastic Waste in Flexible Pavements Part1
Utilization of Plastic Waste in Flexible Pavements Part1Utilization of Plastic Waste in Flexible Pavements Part1
Utilization of Plastic Waste in Flexible Pavements Part1Uchiha TejaKumar
 
Alternate building materials
Alternate building materialsAlternate building materials
Alternate building materialsAglaia Connect
 
Damp Proof Course
Damp Proof Course Damp Proof Course
Damp Proof Course Kezar Ali. Shah
 
Tensile strength test for concrete
Tensile strength test for concreteTensile strength test for concrete
Tensile strength test for concreteAyaz khan
 
Fineness test of Cement
Fineness test of CementFineness test of Cement
Fineness test of CementPTUT Lahore
 
CONCRETE MIX DESIGN
CONCRETE MIX DESIGNCONCRETE MIX DESIGN
CONCRETE MIX DESIGNNikul Gopani
 
Use of Plastic Waste in Construction of flexible Pavement: A Creative Waste M...
Use of Plastic Waste in Construction of flexible Pavement: A Creative Waste M...Use of Plastic Waste in Construction of flexible Pavement: A Creative Waste M...
Use of Plastic Waste in Construction of flexible Pavement: A Creative Waste M...Amit Tyagi
 
Fiber reinforced concrete
Fiber reinforced concreteFiber reinforced concrete
Fiber reinforced concreteMilad Nourizadeh
 
Cement and cement concrete
Cement and cement concreteCement and cement concrete
Cement and cement concretepradip dangar
 
Fibre Reinforced Concrete
Fibre Reinforced ConcreteFibre Reinforced Concrete
Fibre Reinforced ConcreteMustafa Sonasath
 
Pointing and finishing
Pointing and finishingPointing and finishing
Pointing and finishingkajal018
 
Fiber reinforced concrete application and properties
Fiber reinforced concrete application and propertiesFiber reinforced concrete application and properties
Fiber reinforced concrete application and propertiesFayaz Ahamed A P
 
Recycled aggregate concrete
Recycled aggregate concreteRecycled aggregate concrete
Recycled aggregate concreteAhmad Shah Kakar
 
AN EXPERIMENTAL STUDY ON METAKAOLIN AND GGBS BASED GEOPOLYMER CONCRETE
AN EXPERIMENTAL STUDY ON METAKAOLIN AND GGBS BASED GEOPOLYMER CONCRETEAN EXPERIMENTAL STUDY ON METAKAOLIN AND GGBS BASED GEOPOLYMER CONCRETE
AN EXPERIMENTAL STUDY ON METAKAOLIN AND GGBS BASED GEOPOLYMER CONCRETEIAEME Publication
 

Was ist angesagt? (20)

Utilization of Plastic Waste in Flexible Pavements Part1
Utilization of Plastic Waste in Flexible Pavements Part1Utilization of Plastic Waste in Flexible Pavements Part1
Utilization of Plastic Waste in Flexible Pavements Part1
 
Alternate building materials
Alternate building materialsAlternate building materials
Alternate building materials
 
Bricks
BricksBricks
Bricks
 
Damp Proof Course
Damp Proof Course Damp Proof Course
Damp Proof Course
 
Tensile strength test for concrete
Tensile strength test for concreteTensile strength test for concrete
Tensile strength test for concrete
 
Fineness test of Cement
Fineness test of CementFineness test of Cement
Fineness test of Cement
 
CONCRETE MIX DESIGN
CONCRETE MIX DESIGNCONCRETE MIX DESIGN
CONCRETE MIX DESIGN
 
Concrete technology
Concrete technologyConcrete technology
Concrete technology
 
Use of Plastics and E-waste in Concrete
Use of Plastics and E-waste in ConcreteUse of Plastics and E-waste in Concrete
Use of Plastics and E-waste in Concrete
 
Use of Plastic Waste in Construction of flexible Pavement: A Creative Waste M...
Use of Plastic Waste in Construction of flexible Pavement: A Creative Waste M...Use of Plastic Waste in Construction of flexible Pavement: A Creative Waste M...
Use of Plastic Waste in Construction of flexible Pavement: A Creative Waste M...
 
Fiber reinforced concrete
Fiber reinforced concreteFiber reinforced concrete
Fiber reinforced concrete
 
Trucks and Hauling Equipment
Trucks and Hauling EquipmentTrucks and Hauling Equipment
Trucks and Hauling Equipment
 
Cement and cement concrete
Cement and cement concreteCement and cement concrete
Cement and cement concrete
 
Fibre Reinforced Concrete
Fibre Reinforced ConcreteFibre Reinforced Concrete
Fibre Reinforced Concrete
 
Pointing and finishing
Pointing and finishingPointing and finishing
Pointing and finishing
 
Fiber reinforced concrete application and properties
Fiber reinforced concrete application and propertiesFiber reinforced concrete application and properties
Fiber reinforced concrete application and properties
 
5 compressive strength of cement
5 compressive strength of cement5 compressive strength of cement
5 compressive strength of cement
 
Recycled aggregate concrete
Recycled aggregate concreteRecycled aggregate concrete
Recycled aggregate concrete
 
AN EXPERIMENTAL STUDY ON METAKAOLIN AND GGBS BASED GEOPOLYMER CONCRETE
AN EXPERIMENTAL STUDY ON METAKAOLIN AND GGBS BASED GEOPOLYMER CONCRETEAN EXPERIMENTAL STUDY ON METAKAOLIN AND GGBS BASED GEOPOLYMER CONCRETE
AN EXPERIMENTAL STUDY ON METAKAOLIN AND GGBS BASED GEOPOLYMER CONCRETE
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 

Ähnlich wie Brick clamps

Modern Building Materials.pptx
Modern Building Materials.pptxModern Building Materials.pptx
Modern Building Materials.pptxSHAIKMURTHUJAVALI4
 
IRJET- Replacement and Analysis of Clay Bricks by Replacement of Clay with In...
IRJET- Replacement and Analysis of Clay Bricks by Replacement of Clay with In...IRJET- Replacement and Analysis of Clay Bricks by Replacement of Clay with In...
IRJET- Replacement and Analysis of Clay Bricks by Replacement of Clay with In...IRJET Journal
 
Brick - " GOOD for construction but BAD for environment "
Brick - " GOOD for construction but BAD for environment "Brick - " GOOD for construction but BAD for environment "
Brick - " GOOD for construction but BAD for environment "Mohit Metlaw
 
properties,Manufacturing, types and features of bricks
properties,Manufacturing, types and features of bricksproperties,Manufacturing, types and features of bricks
properties,Manufacturing, types and features of bricksZeeshan Afzal
 
Everything you need to know about Chimney Tuckpointing
Everything you need to know about Chimney TuckpointingEverything you need to know about Chimney Tuckpointing
Everything you need to know about Chimney TuckpointingA Step in Time Chimney Sweeps
 
Manufacturingofbricks 140421135303-phpapp02
Manufacturingofbricks 140421135303-phpapp02Manufacturingofbricks 140421135303-phpapp02
Manufacturingofbricks 140421135303-phpapp02SHWETABH SINHA
 
Manufacturing of bricks for masonry construction method and process
Manufacturing of bricks for masonry construction method and processManufacturing of bricks for masonry construction method and process
Manufacturing of bricks for masonry construction method and processNaresh Kumar
 
SESSA FIRE WOOD rocket stove PRESENTATION
SESSA FIRE WOOD rocket stove PRESENTATIONSESSA FIRE WOOD rocket stove PRESENTATION
SESSA FIRE WOOD rocket stove PRESENTATIONSESSA ORG
 
Construction Techniques using clay products
Construction Techniques using clay productsConstruction Techniques using clay products
Construction Techniques using clay productsMohamed Faseehun
 
Late Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, indiaLate Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, indiaShirish Avrani
 
Cavity walls
Cavity wallsCavity walls
Cavity wallsMani Das
 
Brick PPT for engineering works helping .pdf
Brick PPT for engineering works helping .pdfBrick PPT for engineering works helping .pdf
Brick PPT for engineering works helping .pdfRajeshYadav438205
 

Ähnlich wie Brick clamps (20)

Modern Building Materials.pptx
Modern Building Materials.pptxModern Building Materials.pptx
Modern Building Materials.pptx
 
brick 2.pdf
brick 2.pdfbrick 2.pdf
brick 2.pdf
 
Report At Bricks in Detail
Report At Bricks in DetailReport At Bricks in Detail
Report At Bricks in Detail
 
Bricks
BricksBricks
Bricks
 
IRJET- Replacement and Analysis of Clay Bricks by Replacement of Clay with In...
IRJET- Replacement and Analysis of Clay Bricks by Replacement of Clay with In...IRJET- Replacement and Analysis of Clay Bricks by Replacement of Clay with In...
IRJET- Replacement and Analysis of Clay Bricks by Replacement of Clay with In...
 
Bricks
BricksBricks
Bricks
 
Brick - " GOOD for construction but BAD for environment "
Brick - " GOOD for construction but BAD for environment "Brick - " GOOD for construction but BAD for environment "
Brick - " GOOD for construction but BAD for environment "
 
properties,Manufacturing, types and features of bricks
properties,Manufacturing, types and features of bricksproperties,Manufacturing, types and features of bricks
properties,Manufacturing, types and features of bricks
 
Everything you need to know about Chimney Tuckpointing
Everything you need to know about Chimney TuckpointingEverything you need to know about Chimney Tuckpointing
Everything you need to know about Chimney Tuckpointing
 
Manufacturingofbricks 140421135303-phpapp02
Manufacturingofbricks 140421135303-phpapp02Manufacturingofbricks 140421135303-phpapp02
Manufacturingofbricks 140421135303-phpapp02
 
Manufacturing of bricks for masonry construction method and process
Manufacturing of bricks for masonry construction method and processManufacturing of bricks for masonry construction method and process
Manufacturing of bricks for masonry construction method and process
 
SESSA FIRE WOOD rocket stove PRESENTATION
SESSA FIRE WOOD rocket stove PRESENTATIONSESSA FIRE WOOD rocket stove PRESENTATION
SESSA FIRE WOOD rocket stove PRESENTATION
 
Brick kiln pics
Brick kiln picsBrick kiln pics
Brick kiln pics
 
Construction Techniques using clay products
Construction Techniques using clay productsConstruction Techniques using clay products
Construction Techniques using clay products
 
bricks.pdf
bricks.pdfbricks.pdf
bricks.pdf
 
Bricks
BricksBricks
Bricks
 
Late Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, indiaLate Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, india
 
Cavity walls
Cavity wallsCavity walls
Cavity walls
 
Bricks
BricksBricks
Bricks
 
Brick PPT for engineering works helping .pdf
Brick PPT for engineering works helping .pdfBrick PPT for engineering works helping .pdf
Brick PPT for engineering works helping .pdf
 

KĂŒrzlich hochgeladen

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Call Girls In DLf Gurgaon ➄99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➄99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➄99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➄99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 

KĂŒrzlich hochgeladen (20)

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Call Girls In DLf Gurgaon ➄99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➄99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➄99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➄99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 

Brick clamps

  • 1. Brick Clamps Index Introduction Disadvantages of brick clamps Clamp size and shape Increasing the efficiency of brick clamps Wood fired clamps Further reading Coal fired clamps Advantages of brick clamps Introduction The use of brick clamps is by far the oldest and most rudimentary method of firing bricks. When "scoved" (that is, plastered on the outside for greater efficiency), they become scove clamps or kilns. If the clamp is enclosed within four permanent walls, it becomes a rectangular Scotch kiln, but in its most basic form it is a carefully constructed stack or clamp of bricks. As a method of firing bricks it is still used all over the world because it still has several advantages over more modern and sophisticated methods. This is despite the clamp being potentially the most energy inefficient method of firing, because so much heat is allowed into the atmosphere during both firing and cooling, and fuel combustion is both uncontrollable and inefficient. Brick clamps can be made moderately efficient, but they cannot compare with updraught continuous kilns, as far as fuel used per fired brick and brick wastage is concerned.
  • 2. Figure 1 A basic brick clamp Back to index Clamp size and shape Brick clamps come in several shapes and sizes, depending on the number of bricks to be fired at one time and the fuel or fuels available. They are usually constructed on a level surface of pre- fired bricks, laid side by side for a wood fired clamp, or with spaces between them for a coal, agri-waste or fuel inclusion fired clamp. These spaces around each brick are finger width, that is, 2 to 2.5 cm wide. This is designed to facilitate the passage of air under the brick clamp to allow for the even combustion of the fuel. Bricks are "set" (loaded onto the base) up to 40 layers high. The bricks are placed on top of each other for the first 8 to 12 layers, above which each layer is inset by 2 to 3 cm, so that the clamp tapers towards the top. The tapering produces greater clamp stability, which is important as the whole structure will move with the expansion and contraction of the bricks during firing. For greater stacking stability, clamps can be built on ground that has been "saucered", this means the centre of the site has been scooped out to a depth of 30 cm. Having a floor with gently sloping sides means the bricks of the clamp are set sloping towards the centre, and the whole clamp can then be built sloping continuously from the ground upwards. Less firing cracks will result with a clamp of this shape, and the external surface area is reduced to help minimize heat loss. Back to index Wood fired clamps Wood burning clamps have large firing tunnels placed at regular intervals, passing through the
  • 3. base of the clamp. These have to be large enough to allow for the size of woodfuei available, and are usually two bricks wide by eight brick layers high (50 x 100 cm). They are two bricks apart (50 cm), and have corbelled arches at the top, where two layers of brick come in to create the top of the arch. All the bricks are placed in a clamp on their sides, and these figures are for a 25 x 12.5 x 8 cm brick. The tunnels can be split in two by being bricked across in the centre of the clamp. This is done if the clamp is large, and therefore has a wide base, or if the fuel is provided in cut lengths. This prevents cross-draughts blowing through the clamp, and improves the central drawing capabilities of the clamp, all better for fuel combustion. Narrow low tunnels are built if the clamp is to be fired with portable gas or oil burners, which are moved down the clamp from tunnel to tunnel as firing progresses. Firebars can be built into the firing tunnels, two thirds of the way down from the top, to improve wood combustion, which is especially useful towards the end of the firing, when maximum temperature input is required. To avoid the expense of firebars and the added complication of building them into the clamp, a perforated wall of fired bricks, three layers high, may be built across the lower part of the firing tunnel's entrance. This simple modification helps to heat the primary air as it goes into the tunnel, and pieces of wood can be placed on the wall at one end, to allow the air to pass underneath. This improves combustion and reduces the build up of embers. Figure 2 A small woodfuelled brick clamp in Africa (Photo: H. Norsker) Figure 3 Figure 4
  • 4. Wood and dunkey dung fuelled clamp West African scoved brick clamp with saucered (Sudan) foundation and fired brick wood rests Back to index Coal fired clamps Coal fired clamps are constructed on a spaced brick floor, so that air can be drawn in under the whole clamp area. A band of coal, 20 to 30 cm thick, is laid right across the base of the clamp, being contained within walls of pre-fired brick, with the green bricks laid on top. This does result in the slumping of the clamp during firing, but makes the kiln easier and faster to construct. Depending on whether coal is added to the clay in the bricks and the quality of the coal, another thinner layer of coal is added higher up the clamp. The clamp is lit with gas or kerosene burners, applied to small ignition tunnels at regular intervals down both sides of the kiln, or with small wood fires, placed in larger ignition tunnels. These larger ignition tunnels have to be partially blocked off once the clamp is alight, otherwise too much air will pass through the clamp, effectively cooling it. Another method used is to place a layer of wood chips across the base of the kiln, amongst widely spaced bricks (4 to 5 cm spacing), and add more coal between the bricks for the first ten layers, gradually reducing the brick spacing and amount of coal towards the top of the clamp. Coal fines can also be added between the bricks as each layer of the clamp is built, though this depends on how good the coal is and if fuel has already been mixed into the bricks. Clamps are very suitable for firing bricks where fuel is included in the mixture used in the manufacture of the bricks. The addi- tion of between 5 to 10% of sieved rice husk, sawdust, coal fines, coke dust or animal dung means that the clamp once started burns itself, with the bricks being fired from both internal and external combustion. The addition of animal dung to the clay increases the workability of the mixture when the bricks are formed, as well as acting as fuel when they are fired. As the bricks shrink during firing and the fuel turns to ash, the spaces between the bricks get larger, and too much cold air will be drawn through the clamp. This has to be reduced in the later stages of firing, or an uneven firing will occur, with hot and cold spots developing within the clamp. This is controlled by reducing the size of the vents at the top of the clamp, by adding more bricks to close them down, or by covering them with steel sheets. Another method is to cover the top of the kiln with a layer of ash and brick rubble, or dry soil, which still allows for the combustion gases to escape slowly and evenly. The air that is allowed to enter the kiln is reduced by partially closing the ignition tunnels with fired bricks or steel sheets. The air spaces in the clamp floor tend to be self-regulating, as they tend to become blocked with ash, when the clamp has been alight for a while. To contain the available heat within the clamp, fired bricks are used to line the outside walls and top. These bricks are placed tightly together to create an outer skin, reducing the cooling effect of
  • 5. wind and possibly keeping out rain during firing. Regularly spaced openings are left in the fired brick lining on the top of the clamp, which act as vents. These vents allow the steam and combustion gases to escape from the clamp during firing. They can be reduced in size during the later stages, to contain the heat during soaking, when the clamp has reached top temperature. The vents are closed off altogether and sealed, when firing has finished and cooling starts. Any steps that can be taken to increase the efficiency of a brick clamp, to both reduce the amount of fuel used and to obtain a higher percentage of well fired bricks, is a good investment. Figure 5 A coal fired scove clamp/kiln Back to index Advantages of brick clamps They are cheap and straightforward to build. There is no permanent structure to install and maintain. A level area of ground and a good supply of fuel and green bricks is all that is required. They can be built next to the supply of clay and fuel, so that transport costs are kept to a minimum. They can be of any size ranging from 5,000 to 100,000 bricks at a time, so they can accommodate fluctuations in brick production. Once lit, they do not require much at- tention, especially if the fuel is included in or amongst the bricks in the clamp. Very large brick clamps can be fired continuously, with fired bricks being unloaded at one end of the clamp and green bricks loaded at the other, while the fire moves through the middle. The result is a continuously firing clamp.
  • 6. Clamps can be fired with a large variety of fuels, including agri-waste, such as rice husk, coffee husk, sawdust, coconut husk, dung, etc, as well as fossil fuels. Different fuels can be used at different stages of the firing and in a variety of ways. They can be mixed into the green bricks, sprinkled around them, placed in layers between them, or burnt in the tunnels under the clamp. It depends on fuel price and availability, as well as its calorific value, which determines the amount needed. As woodfuel becomes scarcer and more expensive, agri-waste or any suitable combustible rubbish can be used, at least for the first heating and drying stages of the clamp firing. For example, the clamp can be started with slow burning rice husk, to provide a gentle heat that needs little or no attention overnight. Then coconut husk is used to move the temperature through the middle ranges. And finally, split rubber wood is used to provide the top temperature and soaking period. Figure 6 Brick clamp firing tunnels Back to index Disadvantages of brick clamps Basic brick clamps are the least energy efficient method of firing bricks, with a lot of heat being lost by radiation through the walls, and convection from the top of the clamp. The fuel is not consumed efficiently as there is little or no control over its combustion once the clamp is lit. Fuel consumption of 2,800 to 3,500 kJ/kg fired brick is to be expected, depending on the size and design of the clamp, plus the fuel and method of combustion. This low figure is partially due to the high percentage of broken and over or under fired bricks produced.
  • 7. They are very labour intensive, being assembled and disassembled by hand, and if not built correctly and fired badly, can result in a very high percentage of incompletely fired bricks. Up to 20% of the bricks produced by a basic brick clamp can normally be expected to be over or under fired by this method. They are very slow to fire, taking several days to heat up and cool down, and there is little or no control over the firing once it has started. They are highly susceptible to the prevailing weather conditions, especially strong winds, which will result in a very uneven firing, with many more underfired and overfired bricks. Back to index Increasing the efficiency of brick clamps Because of their versatility and low cost, especially where labour is cheap, brick clamps will always remain in use. Coal fired clamps are still used in the northern hemisphere to produce high value bricks of special colouring and textures. The main problem with clamps is the very low energy efficiency, coupled with the high percentage of brick wastage. This poor efficiency can be offset by using any available waste products to replace some of the fuel during firing. The first hours of the firing, when the bricks are being thoroughly dried, can be fuelled with agri- waste or combustible rubbish. If fuel is incorporated into the bricks, the clamp will then fire itself with the minimal addition of a prime fuel, such as wood. The high percentage of brick wastage can be kept to a minimum by constructing the brick clamp accurately and providing the maximum amount of insulation around the outside. The more the clamp is sealed and insulated on the outside, the less underfired bricks will be produced, and a lower amount of fuel will be required. This insulation and improved performance is obtained by using the partially fired bricks from a previous firing, to surround the green bricks in the centre of the clamp, and surrounding these in turn with closely fitting layers of fully fired bricks. The whole of the outside of the clamp can then be smeared (scoved) with a thick layer of clay, combined with ash, rice husk or dried grass, to obtain the maximum insulation. The encasing of abrickclamp in aplaster of clay is called scoving. Clamps sealed and insulated in this way are therefore called scove clamps or kilns. Controlling the airflow into the combustion tunnels under the clamp, helps improve fuel combustion and cut down on heat wastage. This can be achieved by covering the tunnel openings with pieces of sheet metal between stoking with fuel. Fired bricks may also be used to control airflow into the clamp more accurately, the firing tunnels being opened and closed gradually, by the addition and removal of a couple of bricks at a time. Maintaining a steady rise in temperature through the clean and efficient combustion of fuel is the ideal. Stoking at regular intervals with pieces of dry wood, that has been cut and split to size, or
  • 8. the addition of small charges of fuel, is preferable to over-filling the combustion tunnels with large amounts of damp fuel at widely spaced irregular intervals. The maximum amount of air should be allowed in after fuel is added, then the air should be reduced once the fuel is burning well. At the end of the firing, the tunnels are sealed off completely, along with the vents at the top of the clamp to start the cooling process slowly. After a day or so, the tunnels and vents can be opened again to allow for accelerated cooling to take place. The next stage towards improved fuel efficiency is to fit fire bars and firedoors to the combustion tunnels. This effectively converts them into much more efficient fuel burning fireboxes. This is not often done on brick clamps, because of their temporary nature, but is a more common feature of Scotch kilns, which represent the next stage of brick kiln development. Controlling the exhaust gases, coming from the vents at the top of the clamp with pieces of scrap metal during the firing, holds the maximum amount of heat in the kiln and controls combustion. At the start of the firing, there need to be enough vents that are fully open, to allow all the water vapour out of the clamp quickly. Later, the size of the vents can be reduced to slow down the draft through the clamp, but still allow enough fresh air to enter the firing tunnels for effective combustion. A balance needs to be obtained between allowing enough air through the clamp for combustion and keeping excess air down to a minimum to prevent cooling. By building the clamp so that the firing tunnels are at 90 to the prevailing wind, using only dry fuel in small quantities at a time, and using bricks that are as atmospherically dry as possible, makes a lot of difference in reducing the energy consumption and improving the efficiency of what is a very practical, and versatile, but basically fuel hungry system for firing bricks. Figure 7 A scoved brick clamp Back to index
  • 9. Further reading The Basics of Brick Kiln Technology, Jones, Tim, Aus der Arbeit von GATE, Vieweg, Braunschweig, 1995 Brickmaking in Developing Countries, Parry, J.P.M., Review prepared for the Building Research Establishment, Garston, U.K., 1979 Brick and Lime Kilns in Ecuador, En- ergy, Environment and Development Se- ries No. 13, The Stockholm Environmental Institute, Stockholm, 1992 Small Scale Brickmaking, ILO/ UNIDO, Technical memorandum No. 6, International Labour Office, Geneva, 1984 Village Level Brickmaking, Beamish, Anne; Donovan, Will, Aus der Arbeit von GATE, Vieweg, Braunschweig, 1989 Back to index Published by Text, drawings and Figure 3 by Tim Jones German Appropriate Technology Exchange Appropriate Development Consultants Dag-Hammarskjld-Weg 1 "Cannon Hey" Postfach 51 80 Storrs Park D - 65726 Eschborn Bowness-on-Windermere Federal Republic of Germany Cumbria LA23 3LD Phone +49 - 6196 - 79-3190 United Kingdom Fax +49 - 6196 - 79-7352 (1995)