 Introduction
 JIT philosophy
• Elements of JIT
• Functioning of JIT
• Objective of JIT
• Capacity utilization of JIT
• Advantages of JIT
• Disadvantages of JIT
• Companies adopted JIT
 Kanban System
• Pull system-kanban system
• Advantages of Kanban
• Disadvantages of kanban
• Comparison of kanban to others
• Case studies
• Reference
 Japanese are good at manufacturing.
 They will probably tell how the Japanese captured a large share of the
global-market by creating world- class standards in design, materials, and
management.
 The concept of time-based management is nothing new for managers outside
of Japan and has been in practice for many years
 However, the Kanban process involves more than just in time deliveries and
inventory controls.
This will focus on interlinked components and features which constitute the
japanese Kanban process of time-based management
The philosophy advocates:
1. History of Just-in-Time
 Incorrectly rumored to have been invented
by Henry Ford.
 Actually invented byTaiichi Ohno ofToyota.
 Ohno’s system designed to handle varying
volumes/various parts.
 Nothing more than good, common sense
manufacturing.
2. From Supermarket to Shop Floor
 Ohno is believed to have gotten his JIT idea from U.S.
supermarkets.
Customers pull items from shelf.
Empty space on shelf is signal for stocker to replace item.
If items are not bought, no replacement required.
When item become low, stocker reorders from supplier.
Customers take only what they need because they know items will
be restocked.
 Ohno applied the same concept to manufacturing.
3. What to Expect
 JIT is more than an inventory system.
 It is an operational philosophy which includes:
A set-up time improvement system.
A maintenance improvement system.
A quality improvement system.
A productivity improvement system.
 A properly implemented JIT system should:
Produce products customers want.
Produce products only at the rate customers want them.
Produce with perfect quality.
Produce instantly with zero unnecessary lead time.
Produce with no waste of labor, material or equipment.
Respect for the contribution that Employees can make.
Good relationship with suppliers.
Reduction of set up time.
Flexible work force.
Reduce lead time and preventive maintainence.
A demand pull system in which material only flows when needed.
Involves keeping stock level to a minimum.
Stock arrives just in time to be used in production.
Works best where there is a close relationship between
manufactures and suppliers.
Goods not produced unless firm has an order from a customer.
Aims to get highest volume of output at the lowest unit cost.
Materials purchased just in time to make component parts
No demand – no production
Finished goods assembled just in time to be sold to customer.
10 20 30 40 50 60 70 80 90 100
30
10
20
% Capacity
Utilization
60
Production Lead Times (days)
40
50
Traditional
Manufacturing
JIT
Manufacturing
Increase in cash flow.
Reduced in deterioration.
Reduction in stockholding costs.
Less space required for stock.
Closer relationship with suppliers.
Dangers of lost sales.
May lose bulk-buying discounts.
High dependence on supplier.
Just-in-time (JIT): Pull vs. Push System
In a push system, such as an Material
Requirements Planning (MRP) system, we look at
the schedule to determine what to produce next
Driven by pre-determined production
schedule
In a pull system, such as JIT, we look only at
the next stage of production and determine what
is needed there, and then we produce only that
Driven by demand
JIT uses Kanban system to implement a pull
system
What is Kanban?
“card” or “visible record”
Kanban is a simple part- movement system that
depends on card and boxes to take parts from
one work station to another on a production
line
How to use it?
A Kanban is attached a container, when the
container is filled with items produced
When the container is free up, the Kanban is
removed from the container and put back to the
receiving post
 Kanbans are used to control flow of production
A free kanban at the receiving post signals need
for production
Production stop, if all kanbans are used
Kanbans are recycled when a container is
unloaded at the next step of production
More kanban more containers used at the
same time larger WIP
The Kanban process utilizes two different kinds of cards- transport and production
kanban.
Both of the cards do not have to be used simultaneously in a production process.
 The Transport Kanban contains information from where the parts originated and its
destination. When only this card is used, it is know as a simple Kanban process. In
this
system component are ordered and produced according to a daily schedule
 The Production Kanban, on the other hand, outlines to what extent and when work
has to
be accomplished by a specific station on the production line. Together with the
transport
Kanban, it is known as an integrated kanban process.
 Toyota of Japan has taken the example discussed above one step further. Here,
certain
component are directly supplied from suppliers to the production line.
The transport Kanban is simultaneously used internally between the warehouse and
the
production lines. This is an excellent example of the integrated Kanban system.
Receiving post
Kanban card for
product 1
Kanban card for
product 2
Fabrication
cell
O1
O2
O3
O2
Storage
area
Empty containers
Full containers
Assembly line 1
Assembly line 2
Storage
area
Empty containers
Full containers
Kanban card for
product 1
Kanban card for
product 2
Fabrication
cell
O1
O2
O3
O2
Assembly line 1
Assembly line 2
Storage
area
Empty containers
Full containers
Receiving post
Kanban card for
product 1
Kanban card for
product 2
Fabrication
cell
O1
O2
O3
O2
Assembly line 1
Assembly line 2
Storage
area
Empty containers
Full containers
Receiving post
Kanban card for
product 1
Kanban card for
product 2
Fabrication
cell
O1
O2
O3
O2
Assembly line 1
Assembly line 2
Storage
area
Empty containers
Full containers
Receiving post
Kanban card for
product 1
Kanban card for
product 2
Fabrication
cell
O1
O2
O3
O2
Assembly line 1
Assembly line 2
Storage
area
Empty containers
Full containers
Receiving post
Kanban card for
product 1
Kanban card for
product 2
Fabrication
cell
O1
O2
O3
O2
Assembly line 1
Assembly line 2
Storage
area
Empty containers
Full containers
Receiving post
Kanban card for
product 1
Kanban card for
product 2
Fabrication
cell
O1
O2
O3
O2
Assembly line 1
Assembly line 2
1. Each container must have a card
2. Assembly always withdraws from fabrication (pull system)
3. Containers cannot be moved without a kanban
4. Containers should contain the same number of parts
5. Only good parts are passed along
6. Production should not exceed authorization
A simple and understandable process.
Provides quick and precise information.
Avoids overproduction.
Is minimizing waste.
Provide quick response to change.
Low costs associated with the transfer of information.
Control can be maintained
A breakdown in the Kanban system can results in the
entire line shutting down
Keeping the Kanban resized as demand changes can
be slow and difficult to manage
 KANBAN Vs OPENAGILE
Compared to Kanban, Open Agile takes a more philosophical approach to
project
management as can be seen from the three rules it is built on11:
1. Truthfulness
2. Consultive Decision-Making
3. The Learning Circle
Hence, Open Agile compliments the more process oriented Kanban with respect to
employee morale.
KANBAN VS. SCRUM AND XP
In Scrum, the use of a Scrum-Board is prescribed, whereas Kanban enforces
Kanban-Boards. Both are basically card walls, either physical or virtual. In
comparison, Kanban adds WIP limits which we will discuss in the next rule.
XP does not make any prescriptions on using visualisation techniques or
even attributes any big importance to workflow visualisation as it would take
too much time from programming tasks.
Another difference between Kanban and the other two is that Kanban uses
these work in progress limits to change the basic project management
paradigm from pushing work downstream, i.e. from development to testing, to
pulling it from upstream.
KANBAN VS. THE REST
We could go on comparing Kanban to many other agile development methods,
as for example Dynamic Systems Development Method (DSDM)
In any case, Kanban makes no restrictions or assumptions other than to apply
the principles mentioned in this document.
1. MONEYSUPERMARKETING
 Moneysupermarkting is one of the United Kingdom’s leading comparison
website.
 This case study shows how they were able to improve their delivery process
through the introduction of kanban.
 In some way other software companies were facing too many simultaneous
tasks
 Through adopting kanban, they were able spot the bottlenecks and blockers
within there system and to address the issue’
 The visualization using kanban board gave an end-to-end flow and allowed the
resolution of bottlenecks as soon as they occurred.
 David Anderson presents a case study from 2004 on how Dragos Dumitriu managed
to improve the processes of a Microsoft development team based in India.
This team had the reputation of having the worst customer service within Microsoft
and Dumitriu was determined to change that.
By applying the Kanban method, i.e. workflow visualization and limitation as well as
mapping the value stream and implementing the pull-system, Dumitriu was able to
spot and solve most of the problems faced by the Indian team.
They were able to detect and solve bottlenecks
2.FROM WORST TO BEST IN FIVE QUATERS
In the end, even though they did not implement all the possibilities of Kanban, the
results of these few small changes were impressive:
•They managed to eliminate an originally overflowing backlog entirely in just over
a year.
•They reduced the lead time from an original 155 days to 14 days.
•The due-date performance on the 25-day delivery time target was 98 %.
•The throughput of requests had risen more than 300% and lead times dropped by
more than 90%.
3. KANBAN AND SCRUM - MAKINGTHE MOST OF BOTH
The second part of the previously introduced book “Kanban and Scrum – making the
most of both” provides an exhaustive case study about a Swedish game development
company’s transition from Scrum to Kanban.
The case study introduces how they set up teams, addressed stakeholder needs and how
they established the Kanban boards and WIP rules.The results presented were that they
managed to resolve bottlenecks, achieve a constant work flow and most importantly
that by adopting Kanban they were better able to meet deadlines
4.CONVERTING A SCRUM TEAM TO KANBAN (CRISP CASE STUDY)
This industrial success story is about a Swedish consulting company named
Crisp and a French software company named Nuxeo
 Before this conversion, Nuexo’s Scrum team had major problems in meeting
deadlines. As a result, the main client was not satisfied and a project failure
was certain. As the development team was using Scrum, their burn-down-chart
confirmed the issues and provided evidence that Scrum was not the way to go
in this case.
After transitioning to Kanban, improvement results were visible after only two
weeks.
Progress occurred also in another form, meaning that a previously unknown
bottleneck was detected. For the first time, employees were able to see that the
testing department couldn’t handle the work load
 Wikipedia, http://en.wikipedia.org/wiki/Just_In_Time
 Kanban-an Integrated JIT System,
http://www.geocities.com/TimesSquare/1848/japan21.html
 Parker, K., 1993, Manufacturing Systems. American Software Inc., Wheaton:
11(9).
 Treadwell, M. A., and Herrmann, J. W., 2005, “A Kanban Module for
Simulating Pull Production in Arena,
Institute for Systems Research,” Proceedings Winter Simulation Conference,
Orlando, FL, 1413 – 1417.
 Marek, R. P. Elkins, D. A., and Smith, D. R., 2001, “Understanding the
Fundamentals of Kanban and Conwip Pull
Systems Using Simulation,” Proceeding Winter Simulation Conference, 921 -
929.
 Akturk, M. S. and Erhun, F., 1999, “An Overview of Design and Operational
Issues of Kanban Systems,”
International Journal of Production Research, 37(17), 3859 – 3881.
kanban an integrated jit system

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Kanban system
Kanban systemKanban system
Kanban system
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Mura muri muda
Mura muri mudaMura muri muda
Mura muri muda
 
Kanban Systems
Kanban SystemsKanban Systems
Kanban Systems
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Final year project report on Value stream mapping and Smed
Final year project report on Value stream mapping and SmedFinal year project report on Value stream mapping and Smed
Final year project report on Value stream mapping and Smed
 
Kanban
KanbanKanban
Kanban
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Lean basics
Lean basicsLean basics
Lean basics
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
OEE
OEEOEE
OEE
 
Lean Kanban Systems Training Module
Lean Kanban Systems Training ModuleLean Kanban Systems Training Module
Lean Kanban Systems Training Module
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
JIT Scheduling + Kanban + JIT Services
JIT Scheduling + Kanban + JIT ServicesJIT Scheduling + Kanban + JIT Services
JIT Scheduling + Kanban + JIT Services
 
Line balancing
Line balancingLine balancing
Line balancing
 
Traditional bundle vs single pcs system
Traditional bundle vs single pcs systemTraditional bundle vs single pcs system
Traditional bundle vs single pcs system
 

Andere mochten auch

Just in Time or JIT KANBAN system
Just in Time or JIT KANBAN systemJust in Time or JIT KANBAN system
Just in Time or JIT KANBAN systemJanak Valaki (PhD)
 
Kanban
KanbanKanban
Kanbanbramoe
 
Kanban
KanbanKanban
Kanbanatif22
 
Jit (us), kanban, lean
Jit (us), kanban, leanJit (us), kanban, lean
Jit (us), kanban, leanNishit Patel
 
Lean Management and Kanban System
Lean Management and Kanban SystemLean Management and Kanban System
Lean Management and Kanban SystemGaurav Singh
 
Kanban Lean Approach To Jit Training John Stevenson
Kanban Lean Approach To Jit Training John StevensonKanban Lean Approach To Jit Training John Stevenson
Kanban Lean Approach To Jit Training John StevensonSkills Matter
 
India- Balance of Payment analysis
India- Balance of Payment analysisIndia- Balance of Payment analysis
India- Balance of Payment analysisPrabhash Jha
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systemsravi sherasiya
 
Trends and challenges of BOP of India
Trends and challenges of BOP of India Trends and challenges of BOP of India
Trends and challenges of BOP of India Rutuja Chudnaik
 
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)Abdul Qadir Master
 
Kanban in 4 easy steps
Kanban in 4 easy steps Kanban in 4 easy steps
Kanban in 4 easy steps Shore Labs
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing pptSwati Luthra
 
Facility location and techniques
Facility location and techniquesFacility location and techniques
Facility location and techniquesPiyush Sharma
 

Andere mochten auch (17)

Just in Time or JIT KANBAN system
Just in Time or JIT KANBAN systemJust in Time or JIT KANBAN system
Just in Time or JIT KANBAN system
 
Kanban
KanbanKanban
Kanban
 
Kanban
KanbanKanban
Kanban
 
Jit (us), kanban, lean
Jit (us), kanban, leanJit (us), kanban, lean
Jit (us), kanban, lean
 
Lean Management and Kanban System
Lean Management and Kanban SystemLean Management and Kanban System
Lean Management and Kanban System
 
Kanban Lean Approach To Jit Training John Stevenson
Kanban Lean Approach To Jit Training John StevensonKanban Lean Approach To Jit Training John Stevenson
Kanban Lean Approach To Jit Training John Stevenson
 
India- Balance of Payment analysis
India- Balance of Payment analysisIndia- Balance of Payment analysis
India- Balance of Payment analysis
 
Just in time
Just in timeJust in time
Just in time
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systems
 
Trends and challenges of BOP of India
Trends and challenges of BOP of India Trends and challenges of BOP of India
Trends and challenges of BOP of India
 
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
 
Flexible Manufacturing Systems V2 090310
Flexible Manufacturing Systems V2 090310Flexible Manufacturing Systems V2 090310
Flexible Manufacturing Systems V2 090310
 
Kanban in 4 easy steps
Kanban in 4 easy steps Kanban in 4 easy steps
Kanban in 4 easy steps
 
Kanban Basics
Kanban BasicsKanban Basics
Kanban Basics
 
Introduction to Kanban
Introduction to KanbanIntroduction to Kanban
Introduction to Kanban
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Facility location and techniques
Facility location and techniquesFacility location and techniques
Facility location and techniques
 

Ähnlich wie kanban an integrated jit system

Ähnlich wie kanban an integrated jit system (20)

Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel Interns
 
Overview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its ImplementationOverview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its Implementation
 
Patton kanban 1
Patton kanban 1Patton kanban 1
Patton kanban 1
 
kanban.ppt
kanban.pptkanban.ppt
kanban.ppt
 
Kanban presentation
Kanban presentationKanban presentation
Kanban presentation
 
JUST IN TIME PRODUCTION SYSTEM
JUST IN TIME PRODUCTION SYSTEMJUST IN TIME PRODUCTION SYSTEM
JUST IN TIME PRODUCTION SYSTEM
 
Patton kanban fr
Patton kanban frPatton kanban fr
Patton kanban fr
 
Sansera Project Report
Sansera Project ReportSansera Project Report
Sansera Project Report
 
Kanban for software development - Get more with less
Kanban for software development - Get more with lessKanban for software development - Get more with less
Kanban for software development - Get more with less
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory management
 
Kanban_230916
Kanban_230916Kanban_230916
Kanban_230916
 
KANBAN
KANBANKANBAN
KANBAN
 
Se ppt
Se pptSe ppt
Se ppt
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean production
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
VSM
VSMVSM
VSM
 
Ch12 jit+&+lean+systems
Ch12 jit+&+lean+systemsCh12 jit+&+lean+systems
Ch12 jit+&+lean+systems
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 

Kürzlich hochgeladen

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 

Kürzlich hochgeladen (20)

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 

kanban an integrated jit system

  • 1.
  • 2.  Introduction  JIT philosophy • Elements of JIT • Functioning of JIT • Objective of JIT • Capacity utilization of JIT • Advantages of JIT • Disadvantages of JIT • Companies adopted JIT  Kanban System • Pull system-kanban system • Advantages of Kanban • Disadvantages of kanban • Comparison of kanban to others • Case studies • Reference
  • 3.  Japanese are good at manufacturing.  They will probably tell how the Japanese captured a large share of the global-market by creating world- class standards in design, materials, and management.  The concept of time-based management is nothing new for managers outside of Japan and has been in practice for many years  However, the Kanban process involves more than just in time deliveries and inventory controls. This will focus on interlinked components and features which constitute the japanese Kanban process of time-based management
  • 5. 1. History of Just-in-Time  Incorrectly rumored to have been invented by Henry Ford.  Actually invented byTaiichi Ohno ofToyota.  Ohno’s system designed to handle varying volumes/various parts.  Nothing more than good, common sense manufacturing.
  • 6. 2. From Supermarket to Shop Floor  Ohno is believed to have gotten his JIT idea from U.S. supermarkets. Customers pull items from shelf. Empty space on shelf is signal for stocker to replace item. If items are not bought, no replacement required. When item become low, stocker reorders from supplier. Customers take only what they need because they know items will be restocked.  Ohno applied the same concept to manufacturing.
  • 7. 3. What to Expect  JIT is more than an inventory system.  It is an operational philosophy which includes: A set-up time improvement system. A maintenance improvement system. A quality improvement system. A productivity improvement system.  A properly implemented JIT system should: Produce products customers want. Produce products only at the rate customers want them. Produce with perfect quality. Produce instantly with zero unnecessary lead time. Produce with no waste of labor, material or equipment.
  • 8. Respect for the contribution that Employees can make. Good relationship with suppliers. Reduction of set up time. Flexible work force. Reduce lead time and preventive maintainence. A demand pull system in which material only flows when needed.
  • 9. Involves keeping stock level to a minimum. Stock arrives just in time to be used in production. Works best where there is a close relationship between manufactures and suppliers. Goods not produced unless firm has an order from a customer. Aims to get highest volume of output at the lowest unit cost.
  • 10. Materials purchased just in time to make component parts No demand – no production Finished goods assembled just in time to be sold to customer.
  • 11. 10 20 30 40 50 60 70 80 90 100 30 10 20 % Capacity Utilization 60 Production Lead Times (days) 40 50 Traditional Manufacturing JIT Manufacturing
  • 12. Increase in cash flow. Reduced in deterioration. Reduction in stockholding costs. Less space required for stock. Closer relationship with suppliers.
  • 13. Dangers of lost sales. May lose bulk-buying discounts. High dependence on supplier.
  • 14.
  • 15. Just-in-time (JIT): Pull vs. Push System In a push system, such as an Material Requirements Planning (MRP) system, we look at the schedule to determine what to produce next Driven by pre-determined production schedule In a pull system, such as JIT, we look only at the next stage of production and determine what is needed there, and then we produce only that Driven by demand JIT uses Kanban system to implement a pull system
  • 16. What is Kanban? “card” or “visible record” Kanban is a simple part- movement system that depends on card and boxes to take parts from one work station to another on a production line How to use it? A Kanban is attached a container, when the container is filled with items produced When the container is free up, the Kanban is removed from the container and put back to the receiving post
  • 17.  Kanbans are used to control flow of production A free kanban at the receiving post signals need for production Production stop, if all kanbans are used Kanbans are recycled when a container is unloaded at the next step of production More kanban more containers used at the same time larger WIP
  • 18. The Kanban process utilizes two different kinds of cards- transport and production kanban. Both of the cards do not have to be used simultaneously in a production process.  The Transport Kanban contains information from where the parts originated and its destination. When only this card is used, it is know as a simple Kanban process. In this system component are ordered and produced according to a daily schedule  The Production Kanban, on the other hand, outlines to what extent and when work has to be accomplished by a specific station on the production line. Together with the transport Kanban, it is known as an integrated kanban process.  Toyota of Japan has taken the example discussed above one step further. Here, certain component are directly supplied from suppliers to the production line. The transport Kanban is simultaneously used internally between the warehouse and the production lines. This is an excellent example of the integrated Kanban system.
  • 19. Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O1 O2 O3 O2 Storage area Empty containers Full containers Assembly line 1 Assembly line 2
  • 20. Storage area Empty containers Full containers Kanban card for product 1 Kanban card for product 2 Fabrication cell O1 O2 O3 O2 Assembly line 1 Assembly line 2
  • 21. Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O1 O2 O3 O2 Assembly line 1 Assembly line 2
  • 22. Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O1 O2 O3 O2 Assembly line 1 Assembly line 2
  • 23. Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O1 O2 O3 O2 Assembly line 1 Assembly line 2
  • 24. Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O1 O2 O3 O2 Assembly line 1 Assembly line 2
  • 25. Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O1 O2 O3 O2 Assembly line 1 Assembly line 2
  • 26. 1. Each container must have a card 2. Assembly always withdraws from fabrication (pull system) 3. Containers cannot be moved without a kanban 4. Containers should contain the same number of parts 5. Only good parts are passed along 6. Production should not exceed authorization
  • 27. A simple and understandable process. Provides quick and precise information. Avoids overproduction. Is minimizing waste. Provide quick response to change. Low costs associated with the transfer of information. Control can be maintained
  • 28. A breakdown in the Kanban system can results in the entire line shutting down Keeping the Kanban resized as demand changes can be slow and difficult to manage
  • 29.  KANBAN Vs OPENAGILE Compared to Kanban, Open Agile takes a more philosophical approach to project management as can be seen from the three rules it is built on11: 1. Truthfulness 2. Consultive Decision-Making 3. The Learning Circle Hence, Open Agile compliments the more process oriented Kanban with respect to employee morale. KANBAN VS. SCRUM AND XP In Scrum, the use of a Scrum-Board is prescribed, whereas Kanban enforces Kanban-Boards. Both are basically card walls, either physical or virtual. In comparison, Kanban adds WIP limits which we will discuss in the next rule. XP does not make any prescriptions on using visualisation techniques or even attributes any big importance to workflow visualisation as it would take too much time from programming tasks.
  • 30. Another difference between Kanban and the other two is that Kanban uses these work in progress limits to change the basic project management paradigm from pushing work downstream, i.e. from development to testing, to pulling it from upstream. KANBAN VS. THE REST We could go on comparing Kanban to many other agile development methods, as for example Dynamic Systems Development Method (DSDM) In any case, Kanban makes no restrictions or assumptions other than to apply the principles mentioned in this document.
  • 31. 1. MONEYSUPERMARKETING  Moneysupermarkting is one of the United Kingdom’s leading comparison website.  This case study shows how they were able to improve their delivery process through the introduction of kanban.  In some way other software companies were facing too many simultaneous tasks  Through adopting kanban, they were able spot the bottlenecks and blockers within there system and to address the issue’  The visualization using kanban board gave an end-to-end flow and allowed the resolution of bottlenecks as soon as they occurred.  David Anderson presents a case study from 2004 on how Dragos Dumitriu managed to improve the processes of a Microsoft development team based in India. This team had the reputation of having the worst customer service within Microsoft and Dumitriu was determined to change that. By applying the Kanban method, i.e. workflow visualization and limitation as well as mapping the value stream and implementing the pull-system, Dumitriu was able to spot and solve most of the problems faced by the Indian team. They were able to detect and solve bottlenecks 2.FROM WORST TO BEST IN FIVE QUATERS
  • 32. In the end, even though they did not implement all the possibilities of Kanban, the results of these few small changes were impressive: •They managed to eliminate an originally overflowing backlog entirely in just over a year. •They reduced the lead time from an original 155 days to 14 days. •The due-date performance on the 25-day delivery time target was 98 %. •The throughput of requests had risen more than 300% and lead times dropped by more than 90%. 3. KANBAN AND SCRUM - MAKINGTHE MOST OF BOTH The second part of the previously introduced book “Kanban and Scrum – making the most of both” provides an exhaustive case study about a Swedish game development company’s transition from Scrum to Kanban. The case study introduces how they set up teams, addressed stakeholder needs and how they established the Kanban boards and WIP rules.The results presented were that they managed to resolve bottlenecks, achieve a constant work flow and most importantly that by adopting Kanban they were better able to meet deadlines
  • 33. 4.CONVERTING A SCRUM TEAM TO KANBAN (CRISP CASE STUDY) This industrial success story is about a Swedish consulting company named Crisp and a French software company named Nuxeo  Before this conversion, Nuexo’s Scrum team had major problems in meeting deadlines. As a result, the main client was not satisfied and a project failure was certain. As the development team was using Scrum, their burn-down-chart confirmed the issues and provided evidence that Scrum was not the way to go in this case. After transitioning to Kanban, improvement results were visible after only two weeks. Progress occurred also in another form, meaning that a previously unknown bottleneck was detected. For the first time, employees were able to see that the testing department couldn’t handle the work load
  • 34.  Wikipedia, http://en.wikipedia.org/wiki/Just_In_Time  Kanban-an Integrated JIT System, http://www.geocities.com/TimesSquare/1848/japan21.html  Parker, K., 1993, Manufacturing Systems. American Software Inc., Wheaton: 11(9).  Treadwell, M. A., and Herrmann, J. W., 2005, “A Kanban Module for Simulating Pull Production in Arena, Institute for Systems Research,” Proceedings Winter Simulation Conference, Orlando, FL, 1413 – 1417.  Marek, R. P. Elkins, D. A., and Smith, D. R., 2001, “Understanding the Fundamentals of Kanban and Conwip Pull Systems Using Simulation,” Proceeding Winter Simulation Conference, 921 - 929.  Akturk, M. S. and Erhun, F., 1999, “An Overview of Design and Operational Issues of Kanban Systems,” International Journal of Production Research, 37(17), 3859 – 3881.