Does one model fit all ? Where do you want to be?




Business-PMO & IT-PMO
 What is the difference?
           Stefan Rank, PMP
     Project World November 2005
            Orlando, Florida
Agenda
   This is your agenda
   You can ask all the questions you want
   We have one hour
   This is a workshop for you




                                             2
This is why you are here!
 Project Management organizations (PMO,
  EPMO, COE for PM) are vital components of all
  types and sizes of corporations.
 Organizationally they are aligned differently
  based on size of the company and the initial
  charter when they where established.
 This session will focus on the organizational
  differences of Project Management Offices and
  the real world challenges that Project
  Management Offices face based on their
  organizational alignment in the overall structure
  of the organization.
                                                      3
Project Management Office Definition

    A shared organizational structure that serves as a repository of information
    for project reporting and disseminating best project management practices




  A Project Management Office (PMO) is a shared competency designed to
  integrate project management practices within an organization.

 Source: www.nitoc.nv.gov/PROJ/projdocs/ATC-SummerSession.pdf


 Sometimes called project office. This is the office or department responsible
 for establishing, maintaining and enforcing project management processes,
 procedures, and standards. It provides services, support, and certification
 for project managers.

Source: it.csumb.edu/departments/data/glossary.html

                                                                                   4
Program Management Definition

  The coordinated management of a portfolio of projects to achieve a set of business objectives is
  called program management. Or, a program might refer to an ongoing set of activities internal to
  the organization, for example, a Total Quality Management program, workplace safety program,
  supplier development program, etc.

Source: http://www.mapnp.org/library/prog_mng/prog_mng.htm


 A portfolio of projects selected and planned in a coordinated way so as to achieve a set of defined
 objectives, giving effect to various (and often overlapping) initiatives and/or implementing a strategy.


Source: http://maxwideman.com/pmglossary/PMG_P07.htm

 Program management is the process of managing multiple on going projects. An example would be that of
 designing, manufacturing and providing support infrastructure for an automobile make. This requires hundreds, or
 even thousands, of separate projects. In an organization or Enterprise, Program Management also reflects thebe
  Program management is the process of managing a portfolio of multiple ongoing projects. An example would
  that of designing, manufacturing and providing support infrastructure for an automobile make. This requires
 emphasis on coordinating and prioritizing resources across projects, departments, and entities to insure that
 resource contentionthousands, of separate projects. In an organization or Enterprise, Program Management also
  hundreds, or even is managed from a global focus.
  reflects the emphasis on coordinating and prioritizing resources across projects, departments, and entities to
  insure that resource contention is managed from a global focus.



Source: http://en.wikipedia.org/wiki/Program_management

                                                                                                                    5
Definitions of Project Management
 Project management is a management approach
  concerned with getting the job done, on time, within
  budget, and according to specifications

 Project Management is the art and culture of getting
  work done

 People responsible for doing something that has never
  done before – for people who don’t know what they want
  – who must first predict the unknown, make a plan to
  complete with the unforeseen, and execute the plan with
  too-limited resources that they don’t control and who are
  held responsible for the results, even when miracles are
  required
                                                          6
Type of Project Management Offices

 Project Management Office
 Program Management Office
 Program Office
 Enterprise Project Management Office
 Center of Excellence for Project Management
 Project Office
  PMO’s for program execution – temporary in

  nature – dissolved after program completion
 Product Management Office
 “PMO out of the BOX” in six weeks
                                                7
Google & Yahoo result count
Term

Business PMO            426         88

IT-PMO                  610         944


Enterprise PMO          924        1510

Project Office       2,050,000   1,490,000

Program Management   248,000      240,000
Office
                                             8
Business Program Management
Company Strategy                                                Company strategy is defined on

        Company Goals                                            executive management level
          Clearly defined
                                                                Strategy translates into business
         measurable goals?


                                                                 programs (Products & Services)
                Business Programs
                                                                Projects are the building blocks
                    Define & Establish
                   programs that link to
                     company goals                               in the execution of organizational

                                                                 strategy
                             Projects

                                                                Project level experience feeds
                   Projects are prioritized and
                      executed to achieve
                    completion of programs
                                                                 back into programs and strategy
                                           Tasks
                                                                Feedback loop is key – Measure
                               Execution of project tasks to
                                achieve project completion
                                                                 at every level

                                                                                               9
Business Program Management

 Business drives technology
 Business processes are automated by
  technology
 Technology is enabler for business
  success
 Technology needs to enable & improve
  existing business processes
 Technology not for the sake of technology
 Time to market drives technology solutions
                                          10
Program Management & Project Management

 Program Management –                    Project Management –
 Doing the Right Things                   Doing Things Right
 Develop and link operational and
                                      Execute and deliver projects
  strategic plans
                                      Ensure triple constraint is met
 Support & enable strategic
                                      Deliver business solutions
  planning
                                      Execute governance and
 Maintain and leverage business
                                       control
  and operational processes
                                      Reporting and analysis
  (knowledge)
                                      Operate internal to project
 Define, refine and own project
                                       delivery
  delivery processes
 Define and use metrics and
  service level agreements
 Operation external to project
  delivery
                                                                         11
Business & IT PMO Charter
    Business - PMO Charter                      IT - PMO Charter

 CEO level alignment                      CIO level alignment
 Tied to CEO performance                  Tied to CIO performance
 Company & Enterprise level               IT Project Pipeline
  scope
                                           Technology projects enabling
 Business & product oriented
                                            business
 Drives project pipeline across
                                           Architecture & development &
  business functions
                                            system focus
       Cost, Schedule, Quality, Scope
   

                                        
 Business analysis function                IT-project managers
 Supports governance processes            IT project management
 Financial responsibility for             Interface vs. business process
  capital project cost & benefits           thinking
  and ROI
                                           IT processes improvement,
 Business portfolio management             SDLC, Architecture
 Project Life Cycle
                                                                         12
What are the major differences?
                                     Customer
 Business focus
 Organizational alignment
 Focus of work
                                      PMO
 Customer orientation
                                IT         Business
  Product orientation
 Daily exposure to business concerns and
  problems
 Integration of business areas
 Control function
 Business analysis function

                                                   13
Is this your day in the PMO?
 Stakeholders: Business owners, Executive
  owners
 New product releases & enhancements
 Sales & Marketing timelines
 Projects driven by product release schedules
 Projects driven by vendors & outside parties
 Newest product features & enhancements
 Product vs. Project
 Revenue and cost implications of projects
 Project prioritization in a “fast to market”
  environment
                                                 14
Organizational Alignment

   CIO                   CEO                          CFO                  COO



                                                   Financial              Operations
Technology           Business
                                                   • Accounting           •Customer
• Architecture        Product
                                                   • Financial            • Service
• Solutions          • Sales
                                                                          • Call center
• Systems            • Marketing                     planning
• Operations         • Logistics                   • SOX                  • Warehousing
• Databases          • Governance                  • Audit                • Engineering
• Technology                                       • other controls       • Facilities
Blueprint
                CIO Research reports – Best practices for PMO’s:
          
              At what level does your company employ a project office ?
                      2% not answered
                 

                     39% Corporate – strategic
                 

                     27% Division
                 

                     27% functional group/business unit
                 


                      6% local group or organization within function
                 




                                                                                          15
Roles and Responsibilities are split
       Business PMO           Information Technology

                               Architecture definition
   Business requirements
                               Technology design
   Business process design
                               Build technology solution
   Facilitate
                                     Hardware selection
                                
    Manage project
                                     Develop solution
                                 
   Coordinate departments           Integrate systems
                                 
   Financial tracking               Test
                                 

                              IT schedule
    Overall schedule
                               (Development /
    Budget
                                operations / Architecture)
   UAT
                               Technology selection
   Business projects
                               Technology projects

                                                          16
Roles and Responsibilities




                             17
The people side
   Project management organizations consist of people
   People are key to deliver projects
   People deliver on tasks in a project (WIFM !)
   Highest risk factor: People
        Don’t like the project
    

        Don’t like the PM
    

        ...
    

 Projects create people development opportunities
 Projects can be seen as a major change to people
        Change management is often times forgotten
    

        Business side: New processes – perception of automation is
    
        negative
        IT: This technology is new – will it prevail? Can it be managed?
    

 Projects can take the security of a departmental
  structure away
                                                                           18
The business savvy Project Manager
   Communicator
   Business process understanding
   Business process improvement
   Business requirements
   Product orientation
   Technology understanding
        Systems, Architecture, Development
    

        Application, Testing (unit, integration)
    

 Manages UAT
 Adheres to processes and controls
 PMI certified

                                                   19
Factors for organizational alignment

 Company size
 Maturity and “age” of company
 How close for comfort – what do I know about project
  management
 Where does strategic planning happen?
       Doing the right things & Doing things right !
   

 Independence
 Control function
 Visibility into work pipeline
         Project, BAU, Other
 Financial Controls
 Today – SOX ! Control function – Project management
  processes enable controls !

                                                         20
Why Project Management Offices are created

 Strategic objectives & goals are not being met
 Major business endeavor
 Historically driven based on need – in IT -Y2K
  example (it is all over now!)
 Senior management need for control
 Project failures – schedules out of control
 Cost out of control
 Insufficient information on project status
 No decision framework
 Resource bottlenecks
 Need for better controls & visibility

                                                      21
Motivation for having a PMO
   Are we doing the right things?
   Are we doing things right?
   Where does the money go?
   What are we working on?
    Why can’t I have this earlier?

   Are we on schedule with this?
   How does this impact our customers?
   What are the dependencies?
   Which resources can work on this?
   Why is this not done yet?
   Why did we loose this account or customer?
   Lost opportunities!

                                                 22
PMO – the CIO perspective (I)
 Independent & non-political department
 Coordination and management of
  customers
 “People People” – not technologists
 Management of expectations & schedule
  cost, quality
 Rational framework for delivery of projects
 Balance and scale
 Prioritization of efforts
 Definition of business solution
                                            23
PMO – the CIO perspective (II)
 How do I exploit & leverage all the data
  collected to make informed business
  decisions
 Focus on services to the enterprise
 Do not do any business project activities
 Technology is my business
 The CIO is the technology and information
  expert
 IT focus – I need to succeed with the
  projects that I am responsible for
                                          24
PMO – the Governance Perspective

 PMO organizational alignment depends on executive
  level management setup (CEO-President-CIO-CFO)
 Strategic service department for project execution
 Enabler for cross-functional efforts
 Driver of new enterprise wide products & projects
 Independent check & balance function
       Controls around Schedule, Cost, Quality on projects
   


 Definition of processes & project controls
 Oversight and tracking of budget and spending for
  projects
 Real-time objective status reporting

                                                             25
Business PMO Real World Challenges

   Prioritization of programs & projects
   Focus projects on customer needs and impacts
   Keep cost down
   Balance governance and project delivery needs
   Schedule
        Fast to market
    

        Competition’s schedules
    


 Resources & Resource constraints
        Business resource constraints
    

        IT resource constraints
    


 Quality
        When you run you stumble more easily
    

        Build quality into the delivery process
    



                                                    26
Integration of SDLC and PMLC
Bringing all elements together !

                                   SDLC
                                                 QA



        Business
                              Integrated
         Process
                              processes
                                          PMLC


               Architecture



                                                      27
The tools that help us
A FOOL WITH A TOOL IS STILL A FOOL




                                                                          MS Project
                                                                                                Project
                                                                                                Life Cycle
                                              Standard
                                              Office Tools
                                                                                           Oracle Financials


                                               Visio
                                                                      Dashboards




                                     Organizations have implemented tools in hopes of solving business problems, only to discover
                                                   that the root cause of the problem ends up being process related.




                                                                                                                                    28
Bottom Line
 One size does not fit all!
 Where will you place your PMO in your
  organization to be setup for success?
 How can your PMO provide value to the
  organization?
 What is it you want your PMO to be when
  it grows up?
 Are you “Doing the right things”?
 Are you “Doing things right”?

                                            29
Questions ?
 Did you get value out of the presentation?

 Suggestions ?

 Questions ?

 E-mail: srank1@gmail.com



                                           30

Weitere ähnliche Inhalte

Was ist angesagt?

PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMOfficers PMOAcademy
 
How to set up a project management office (PMO)
How to set up a project management office (PMO)How to set up a project management office (PMO)
How to set up a project management office (PMO)PM Majik
 
Pmo Gap Analysis Sample Itvamp 2008
Pmo Gap Analysis Sample Itvamp 2008Pmo Gap Analysis Sample Itvamp 2008
Pmo Gap Analysis Sample Itvamp 2008ITVAMP, LLC
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesErin Jones
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMOTURKI , PMP
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMOBusiness Beam
 
PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickJim Kendrick
 
Tips on Implementing a PMO
Tips on Implementing a PMOTips on Implementing a PMO
Tips on Implementing a PMOrmac39
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)flexibleresources
 

Was ist angesagt? (20)

PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts Overview
 
Real example of PMO deployment
Real example of PMO deploymentReal example of PMO deployment
Real example of PMO deployment
 
How to set up a project management office (PMO)
How to set up a project management office (PMO)How to set up a project management office (PMO)
How to set up a project management office (PMO)
 
PMO Frameworks
PMO FrameworksPMO Frameworks
PMO Frameworks
 
Pmo Gap Analysis Sample Itvamp 2008
Pmo Gap Analysis Sample Itvamp 2008Pmo Gap Analysis Sample Itvamp 2008
Pmo Gap Analysis Sample Itvamp 2008
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO Capabilities
 
Pmo
PmoPmo
Pmo
 
PMO 101
PMO 101PMO 101
PMO 101
 
PMO Overview June 2009
PMO Overview June 2009PMO Overview June 2009
PMO Overview June 2009
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMO
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
 
PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 
PMO Mandate
PMO MandatePMO Mandate
PMO Mandate
 
PMO Challenges and Opportunities; DIPMF Presentation
PMO Challenges and Opportunities; DIPMF PresentationPMO Challenges and Opportunities; DIPMF Presentation
PMO Challenges and Opportunities; DIPMF Presentation
 
PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - Kendrick
 
Building An Enterprise PMO
Building An Enterprise PMOBuilding An Enterprise PMO
Building An Enterprise PMO
 
PMO as a service
PMO as a servicePMO as a service
PMO as a service
 
Tips on Implementing a PMO
Tips on Implementing a PMOTips on Implementing a PMO
Tips on Implementing a PMO
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)
 
The PMO journey
The PMO journeyThe PMO journey
The PMO journey
 

Ähnlich wie Business PMO & IT Pmo What Is The Difference

Discussion Paper PMO And Merger Projects
Discussion Paper   PMO And Merger ProjectsDiscussion Paper   PMO And Merger Projects
Discussion Paper PMO And Merger Projectstheteflonpm
 
Considerations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentConsiderations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentHelene Heller, PMP
 
Cadence Presentation Eng 2011
Cadence Presentation Eng 2011Cadence Presentation Eng 2011
Cadence Presentation Eng 2011FrankKooijmans
 
KPI Partners E-Book: The Project Analytics Framework
KPI Partners E-Book: The Project Analytics FrameworkKPI Partners E-Book: The Project Analytics Framework
KPI Partners E-Book: The Project Analytics FrameworkKPI Partners
 
Projects FAIL if We do not Consider 5 DIMENSIONS!
Projects FAIL if We do not Consider 5 DIMENSIONS!Projects FAIL if We do not Consider 5 DIMENSIONS!
Projects FAIL if We do not Consider 5 DIMENSIONS!VSR *
 
Getting Some Respect - How to Measure and Communicate Your EA Success
Getting Some Respect - How to Measure and Communicate Your EA SuccessGetting Some Respect - How to Measure and Communicate Your EA Success
Getting Some Respect - How to Measure and Communicate Your EA SuccessDavid Baker
 
Strategic Management of Multiple Projects (aka Project Whispering)
Strategic Management of Multiple Projects (aka Project Whispering)Strategic Management of Multiple Projects (aka Project Whispering)
Strategic Management of Multiple Projects (aka Project Whispering)Phase2
 
Strategic Management of Multiple Projects (aka Project Whispering)
Strategic Management of Multiple Projects (aka Project Whispering)Strategic Management of Multiple Projects (aka Project Whispering)
Strategic Management of Multiple Projects (aka Project Whispering)Treehouse Agency
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)mandrew182
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)mandrew182
 
Project Management . The Change Agent
Project Management . The Change AgentProject Management . The Change Agent
Project Management . The Change AgentSoftServe
 
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPProject Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPSoftServe
 
Introduction to project management academic essay assignment - www.topgrade...
Introduction to project management   academic essay assignment - www.topgrade...Introduction to project management   academic essay assignment - www.topgrade...
Introduction to project management academic essay assignment - www.topgrade...Top Grade Papers
 
Creating & Maturing a PMO
Creating & Maturing a PMOCreating & Maturing a PMO
Creating & Maturing a PMOSyed Raashid
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMIChris Carson
 
Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Pedro S. Pereira
 
Complete Guide to Know How to Write a Project Management Assignment
Complete Guide to Know How to Write a Project Management AssignmentComplete Guide to Know How to Write a Project Management Assignment
Complete Guide to Know How to Write a Project Management AssignmentIndia Assignment India
 
Death Of the PMO
Death Of the PMODeath Of the PMO
Death Of the PMOLarry Dukes
 

Ähnlich wie Business PMO & IT Pmo What Is The Difference (20)

Discussion Paper PMO And Merger Projects
Discussion Paper   PMO And Merger ProjectsDiscussion Paper   PMO And Merger Projects
Discussion Paper PMO And Merger Projects
 
About LiTmus
About LiTmusAbout LiTmus
About LiTmus
 
Considerations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentConsiderations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT Investment
 
Cadence Presentation Eng 2011
Cadence Presentation Eng 2011Cadence Presentation Eng 2011
Cadence Presentation Eng 2011
 
KPI Partners E-Book: The Project Analytics Framework
KPI Partners E-Book: The Project Analytics FrameworkKPI Partners E-Book: The Project Analytics Framework
KPI Partners E-Book: The Project Analytics Framework
 
Projects FAIL if We do not Consider 5 DIMENSIONS!
Projects FAIL if We do not Consider 5 DIMENSIONS!Projects FAIL if We do not Consider 5 DIMENSIONS!
Projects FAIL if We do not Consider 5 DIMENSIONS!
 
Getting Some Respect - How to Measure and Communicate Your EA Success
Getting Some Respect - How to Measure and Communicate Your EA SuccessGetting Some Respect - How to Measure and Communicate Your EA Success
Getting Some Respect - How to Measure and Communicate Your EA Success
 
Strategic Management of Multiple Projects (aka Project Whispering)
Strategic Management of Multiple Projects (aka Project Whispering)Strategic Management of Multiple Projects (aka Project Whispering)
Strategic Management of Multiple Projects (aka Project Whispering)
 
Strategic Management of Multiple Projects (aka Project Whispering)
Strategic Management of Multiple Projects (aka Project Whispering)Strategic Management of Multiple Projects (aka Project Whispering)
Strategic Management of Multiple Projects (aka Project Whispering)
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
 
Project Management . The Change Agent
Project Management . The Change AgentProject Management . The Change Agent
Project Management . The Change Agent
 
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPProject Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
 
Introduction to project management academic essay assignment - www.topgrade...
Introduction to project management   academic essay assignment - www.topgrade...Introduction to project management   academic essay assignment - www.topgrade...
Introduction to project management academic essay assignment - www.topgrade...
 
Creating & Maturing a PMO
Creating & Maturing a PMOCreating & Maturing a PMO
Creating & Maturing a PMO
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMI
 
Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013
 
Complete Guide to Know How to Write a Project Management Assignment
Complete Guide to Know How to Write a Project Management AssignmentComplete Guide to Know How to Write a Project Management Assignment
Complete Guide to Know How to Write a Project Management Assignment
 
Death Of the PMO
Death Of the PMODeath Of the PMO
Death Of the PMO
 
Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162
 

Kürzlich hochgeladen

Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 

Kürzlich hochgeladen (20)

Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 

Business PMO & IT Pmo What Is The Difference

  • 1. Does one model fit all ? Where do you want to be? Business-PMO & IT-PMO What is the difference? Stefan Rank, PMP Project World November 2005 Orlando, Florida
  • 2. Agenda  This is your agenda  You can ask all the questions you want  We have one hour  This is a workshop for you 2
  • 3. This is why you are here!  Project Management organizations (PMO, EPMO, COE for PM) are vital components of all types and sizes of corporations.  Organizationally they are aligned differently based on size of the company and the initial charter when they where established.  This session will focus on the organizational differences of Project Management Offices and the real world challenges that Project Management Offices face based on their organizational alignment in the overall structure of the organization. 3
  • 4. Project Management Office Definition A shared organizational structure that serves as a repository of information for project reporting and disseminating best project management practices A Project Management Office (PMO) is a shared competency designed to integrate project management practices within an organization. Source: www.nitoc.nv.gov/PROJ/projdocs/ATC-SummerSession.pdf Sometimes called project office. This is the office or department responsible for establishing, maintaining and enforcing project management processes, procedures, and standards. It provides services, support, and certification for project managers. Source: it.csumb.edu/departments/data/glossary.html 4
  • 5. Program Management Definition The coordinated management of a portfolio of projects to achieve a set of business objectives is called program management. Or, a program might refer to an ongoing set of activities internal to the organization, for example, a Total Quality Management program, workplace safety program, supplier development program, etc. Source: http://www.mapnp.org/library/prog_mng/prog_mng.htm A portfolio of projects selected and planned in a coordinated way so as to achieve a set of defined objectives, giving effect to various (and often overlapping) initiatives and/or implementing a strategy. Source: http://maxwideman.com/pmglossary/PMG_P07.htm Program management is the process of managing multiple on going projects. An example would be that of designing, manufacturing and providing support infrastructure for an automobile make. This requires hundreds, or even thousands, of separate projects. In an organization or Enterprise, Program Management also reflects thebe Program management is the process of managing a portfolio of multiple ongoing projects. An example would that of designing, manufacturing and providing support infrastructure for an automobile make. This requires emphasis on coordinating and prioritizing resources across projects, departments, and entities to insure that resource contentionthousands, of separate projects. In an organization or Enterprise, Program Management also hundreds, or even is managed from a global focus. reflects the emphasis on coordinating and prioritizing resources across projects, departments, and entities to insure that resource contention is managed from a global focus. Source: http://en.wikipedia.org/wiki/Program_management 5
  • 6. Definitions of Project Management  Project management is a management approach concerned with getting the job done, on time, within budget, and according to specifications  Project Management is the art and culture of getting work done  People responsible for doing something that has never done before – for people who don’t know what they want – who must first predict the unknown, make a plan to complete with the unforeseen, and execute the plan with too-limited resources that they don’t control and who are held responsible for the results, even when miracles are required 6
  • 7. Type of Project Management Offices  Project Management Office  Program Management Office  Program Office  Enterprise Project Management Office  Center of Excellence for Project Management  Project Office PMO’s for program execution – temporary in  nature – dissolved after program completion  Product Management Office  “PMO out of the BOX” in six weeks 7
  • 8. Google & Yahoo result count Term Business PMO 426 88 IT-PMO 610 944 Enterprise PMO 924 1510 Project Office 2,050,000 1,490,000 Program Management 248,000 240,000 Office 8
  • 9. Business Program Management Company Strategy  Company strategy is defined on Company Goals executive management level Clearly defined  Strategy translates into business measurable goals? programs (Products & Services) Business Programs  Projects are the building blocks Define & Establish programs that link to company goals in the execution of organizational strategy Projects  Project level experience feeds Projects are prioritized and executed to achieve completion of programs back into programs and strategy Tasks  Feedback loop is key – Measure Execution of project tasks to achieve project completion at every level 9
  • 10. Business Program Management  Business drives technology  Business processes are automated by technology  Technology is enabler for business success  Technology needs to enable & improve existing business processes  Technology not for the sake of technology  Time to market drives technology solutions 10
  • 11. Program Management & Project Management Program Management – Project Management – Doing the Right Things Doing Things Right  Develop and link operational and  Execute and deliver projects strategic plans  Ensure triple constraint is met  Support & enable strategic  Deliver business solutions planning  Execute governance and  Maintain and leverage business control and operational processes  Reporting and analysis (knowledge)  Operate internal to project  Define, refine and own project delivery delivery processes  Define and use metrics and service level agreements  Operation external to project delivery 11
  • 12. Business & IT PMO Charter Business - PMO Charter IT - PMO Charter  CEO level alignment  CIO level alignment  Tied to CEO performance  Tied to CIO performance  Company & Enterprise level  IT Project Pipeline scope  Technology projects enabling  Business & product oriented business  Drives project pipeline across  Architecture & development & business functions system focus Cost, Schedule, Quality, Scope    Business analysis function IT-project managers  Supports governance processes  IT project management  Financial responsibility for  Interface vs. business process capital project cost & benefits thinking and ROI  IT processes improvement,  Business portfolio management SDLC, Architecture  Project Life Cycle 12
  • 13. What are the major differences? Customer  Business focus  Organizational alignment  Focus of work PMO  Customer orientation  IT Business Product orientation  Daily exposure to business concerns and problems  Integration of business areas  Control function  Business analysis function 13
  • 14. Is this your day in the PMO?  Stakeholders: Business owners, Executive owners  New product releases & enhancements  Sales & Marketing timelines  Projects driven by product release schedules  Projects driven by vendors & outside parties  Newest product features & enhancements  Product vs. Project  Revenue and cost implications of projects  Project prioritization in a “fast to market” environment 14
  • 15. Organizational Alignment CIO CEO CFO COO Financial Operations Technology Business • Accounting •Customer • Architecture Product • Financial • Service • Solutions • Sales • Call center • Systems • Marketing planning • Operations • Logistics • SOX • Warehousing • Databases • Governance • Audit • Engineering • Technology • other controls • Facilities Blueprint CIO Research reports – Best practices for PMO’s:  At what level does your company employ a project office ? 2% not answered  39% Corporate – strategic  27% Division  27% functional group/business unit  6% local group or organization within function  15
  • 16. Roles and Responsibilities are split Business PMO Information Technology  Architecture definition  Business requirements  Technology design  Business process design  Build technology solution  Facilitate Hardware selection   Manage project Develop solution   Coordinate departments Integrate systems   Financial tracking Test    IT schedule Overall schedule  (Development / Budget operations / Architecture)  UAT  Technology selection  Business projects  Technology projects 16
  • 18. The people side  Project management organizations consist of people  People are key to deliver projects  People deliver on tasks in a project (WIFM !)  Highest risk factor: People Don’t like the project  Don’t like the PM  ...   Projects create people development opportunities  Projects can be seen as a major change to people Change management is often times forgotten  Business side: New processes – perception of automation is  negative IT: This technology is new – will it prevail? Can it be managed?   Projects can take the security of a departmental structure away 18
  • 19. The business savvy Project Manager  Communicator  Business process understanding  Business process improvement  Business requirements  Product orientation  Technology understanding Systems, Architecture, Development  Application, Testing (unit, integration)   Manages UAT  Adheres to processes and controls  PMI certified 19
  • 20. Factors for organizational alignment  Company size  Maturity and “age” of company  How close for comfort – what do I know about project management  Where does strategic planning happen? Doing the right things & Doing things right !   Independence  Control function  Visibility into work pipeline  Project, BAU, Other  Financial Controls  Today – SOX ! Control function – Project management processes enable controls ! 20
  • 21. Why Project Management Offices are created  Strategic objectives & goals are not being met  Major business endeavor  Historically driven based on need – in IT -Y2K example (it is all over now!)  Senior management need for control  Project failures – schedules out of control  Cost out of control  Insufficient information on project status  No decision framework  Resource bottlenecks  Need for better controls & visibility 21
  • 22. Motivation for having a PMO  Are we doing the right things?  Are we doing things right?  Where does the money go?  What are we working on? Why can’t I have this earlier?   Are we on schedule with this?  How does this impact our customers?  What are the dependencies?  Which resources can work on this?  Why is this not done yet?  Why did we loose this account or customer?  Lost opportunities! 22
  • 23. PMO – the CIO perspective (I)  Independent & non-political department  Coordination and management of customers  “People People” – not technologists  Management of expectations & schedule cost, quality  Rational framework for delivery of projects  Balance and scale  Prioritization of efforts  Definition of business solution 23
  • 24. PMO – the CIO perspective (II)  How do I exploit & leverage all the data collected to make informed business decisions  Focus on services to the enterprise  Do not do any business project activities  Technology is my business  The CIO is the technology and information expert  IT focus – I need to succeed with the projects that I am responsible for 24
  • 25. PMO – the Governance Perspective  PMO organizational alignment depends on executive level management setup (CEO-President-CIO-CFO)  Strategic service department for project execution  Enabler for cross-functional efforts  Driver of new enterprise wide products & projects  Independent check & balance function Controls around Schedule, Cost, Quality on projects   Definition of processes & project controls  Oversight and tracking of budget and spending for projects  Real-time objective status reporting 25
  • 26. Business PMO Real World Challenges  Prioritization of programs & projects  Focus projects on customer needs and impacts  Keep cost down  Balance governance and project delivery needs  Schedule Fast to market  Competition’s schedules   Resources & Resource constraints Business resource constraints  IT resource constraints   Quality When you run you stumble more easily  Build quality into the delivery process  26
  • 27. Integration of SDLC and PMLC Bringing all elements together ! SDLC QA Business Integrated Process processes PMLC Architecture 27
  • 28. The tools that help us A FOOL WITH A TOOL IS STILL A FOOL MS Project Project Life Cycle Standard Office Tools Oracle Financials Visio Dashboards Organizations have implemented tools in hopes of solving business problems, only to discover that the root cause of the problem ends up being process related. 28
  • 29. Bottom Line  One size does not fit all!  Where will you place your PMO in your organization to be setup for success?  How can your PMO provide value to the organization?  What is it you want your PMO to be when it grows up?  Are you “Doing the right things”?  Are you “Doing things right”? 29
  • 30. Questions ?  Did you get value out of the presentation?  Suggestions ?  Questions ?  E-mail: srank1@gmail.com 30