SlideShare ist ein Scribd-Unternehmen logo
1 von 25
PRESENTED BY:
K.B.S.Gangadhar (08B21A0248)
J.V.V.RamaRao (09B25A0203)
R.Sekhar        (08B21A0231)
MD.Khader vali (08B21A0211)
PLANT   DESCRIPTION

ELECRICAL   EQUIPMENTS

PROTECTION     SCHEMES

SPECIFIED   RATINGS

ALTERNATIVE    SYSTEMS

DC&   UPS SYSTEM
   LOCATION    : SAMALKOT

   CAPACITY    : 469MW

   OPERATION : COMBINED CYCLE

   INPUTS      : RELIANCE KG BASIN

   OUTPUTS     :   VEMAGIRI SUBSTATION
                    APTRANSCO

   EQUIPMENT   :   ALSTOM
   COMBINATION OF TWO CYCLES
     GAS CYCLE
     STEAM CYCLE

   TWO GAS TURBINES

   ONE STEAM TURBINE

   TWO HRSG SYSTEMS

   MORE EFFICIENT

   ECO FRIENDLY

   NO WASTAGE
PRINCIPLE:
 In a combined cycle power plant, a gas turbine generator generates
electricity and the heat in the gas turbine’s exhaust gases is used to generate
steam in a Heat Recovery Steam Generator that in turns used to generate
electricity with steam turbine generator which enhances the efficiency in
power generation.
   PRINCIPLE

   DOMINANT ROLE

   CONSISTS OF STATOR AND ROTOR

   NEED OF PROTECTION

   GAS TURBINE GENERATOR(GTG)
   STEAM TURBINE GENERATOR(STG)

   RATINGS
                  GTG        STG
RATED VOLTAGE    15.75 KV    11KV
RATED CURRENT    7698 A     12543 A
POWERFACTOR       0.8        0.8
COOLING TYPE     WATER      WATER
ROTOR:
   ROTATORY PART IN THE MACHINERY

   SPECIFIED DETAILS OF ROTOR
    Diameter of body                      1050 mm
    No. Of wound slots per half pole      8
    Conductor material                    CuAg

STATOR :
   Supports armature core with laminations.

   SPECIFIED DETAILS OF STATOR:
   Core length 4620mm
   Inside diameter of core 1150mm
   No. of slots 60
 Core losses
  Hysteresis losses-reversal of magnetization
  Eddy current losses-induced emf
 Stray losses
  1.Mechanical losses
      friction and windage losses
  2.Magnetic losses

    Losses                 value( kw )
   Core losses             381
   Stator copper losses    230
   Stray load losses       275
   Rotor copper loss       422
   Excitation losses       23
   Windage losses          822
   Bearing losses           95
   Total losses            2248
During fault and abnormal conditions
   Generator Differential Protection.
   Loss of excitation
   Overvoltage Protection
   Earth fault protection
   Negative Sequence Protection
   Over current/Under voltage Protection.
   95% Stator Earth Fault protection
   Reverse Power protection


Cooling system:
   CACW means circulating air circulating water.
   For circulation of the air two fans are mounted on both ends of
    the generator rotor.
   PRINCIPLE -ELECTROMAGNETIC INDUCTION
   MAGNETICAL COUPLING
   DESIRED VOLTAGE LEVELS FOR MACHINERY
Description       units
No. of phases            3

Rated power              210MVA


No. of windings per phase 2

Rated Voltage(no load) on
H.V side                  400KV

Rated Voltage(no load) on
L.V side                  15.75Kv


Rated Current on H.V side 303.7A


Rated Current on L.V side 7707.1A

Rated frequency          50Hz
TYPES OF TRANSFORMERS
   step-up transformer
   step-down transformer
   current transformer
   potential transformer
   ideal transformer


Cooling system
   Oil Forced Air Forced unit
   Five units coolers each having 25% cooling capacity
   4 working and 1 standby with selective switching


Protection system
   Differential Protection         Buchhlolz Relay
   Over current                    Earth Fault Protection
Mv system:
   Bus-duct of GT generator via station service
    transformer with 6.6kv
    low resistance earthed system
   Vaccum circuit breaker(VCB)
   Microprocessor based protection system


Lv system :
   Rating up to maximum 250 KW, including the UPS system,
    chargers & batteries.
   Automatic dead-bus changeover
   motors rated 160-250 KW CB are provided motors rated < 160
    KW, contactor-controlled feeders
   ONE AND HALF BREAKER SWITCHING SCHEME
   400 KV SWITCHYARD
   STARTUP POWER SUPPLY FOR BACK CHARGING
INTERCONNECTION PURPOSE
Loads and source of electrical power systems
Generators and main transformer

Types of bus    bars according to voltages
Voltage levels   Bus bars
Low              Rigid
Medium            Rigid, insulated phase,sf6
High             Rigid,strain,sf6
 CIRCUIT BREAKERS
SF6 CIRCUIT BREAKER
Rated voltage 420v
Normal current 2000A

   ISOLATORS

EARTH SWITCH
Operating Mechanism        Manual
Control                   220V DC

   SURGING ARRESTORS

   LIGHTNING ARRESTORS
BREAKER CONTROL
   Line bay breaker
   Steam Turbine Generator Transformer Bay
    Gas Turbine Generator Transformer Bay
   Local Control

    Remote Terminal Unit
    A RTU has been envisaged for facilitating the data transmission
    such as MW, MVAr, MWH and MVArH of each line to the Remote
    Load Dispatch Center through the Microwave Links, as planned and
    will be supplied by AP Transco.
   In addition, the RTU will be able to collect and communicate the
    switchyard status and data to SCADA system which will be supplied
    by APTransco. The RTU will be located in the switchyard control
    room.
   1 Line bays protection
     Main I protection
     Main II protection
   Generator Transformer bays

    Common Protections:
   For all the bays, following additional protections and relays will be
    provided.
    ◦ Local breaker backup protection (LBB)
    ◦ Trip Circuit Supervision for each trip coil
    ◦ DC supply supervision
    ◦ Pole discrepancy protection
    ◦ Anti pumping device for breaker closing
    ◦ All auxiliary relay as per system requirement
STANDBY DIESEL GENERATOR
The standby diesel generator is connected to the LV switchgear. The diesel generator is a
rated 625 KVA in order to feed the essential auxiliaries for the safe shut down of the plant
in the event of loss of normal AC power. This is used to charge the station batteries. The
standby diesel generator set is automatically started upon detection of loss of normal AC
power
PARTS OF DIESEL GENERATOR

Generator Controller


Fuel Tank


Automatic Voltage Regulator


TYPES OF DIESEL GENERATORS

The TS25 Baldor Standby Generator


The 10,000 Watt Aurora Standby Generator
DC&UPS SYSTEM

220V DC SYSTEMS:-


Each DC system consists of battery and battery charger, and associated D.C. distribution
boards. The whole battery system is sized for one (1) hour ST shut down operation. The safe
shutdown is carried out bye the DC system in conjunction with the standby diesel generator
set. For meeting this 2*50% battery banks of lead acid tubular type are provided .
UPS:-
240V AC uninterruptible power supply is provided bye two inverters with automatic static
changeover switches. During normal operation the UPS is supplied through the inverters
and the chargers which are connected to the respective low voltage switchgear.
   Here overall view of the combined cycle power plant suggests
    the best generation of power and gives better efficiency by
    using the gas and steam cycles
   Electrical equipments such as gengrators,transformers,circuit
    breakers, isolators and most of the equipments been observed
    and their workings has been observed. Finally there is a far
    distance between the practical scenario and the bookish
    knowledge and we linked between the both conditions.
ANY QUERIES   ?   ?   ?   ?




    THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Evaluation of standby power system architectures
Evaluation of standby power system architecturesEvaluation of standby power system architectures
Evaluation of standby power system architectures
michaeljmack
 

Was ist angesagt? (20)

Vocational training in ntpc rihandnagar
Vocational training in ntpc rihandnagarVocational training in ntpc rihandnagar
Vocational training in ntpc rihandnagar
 
Paralleling Switchgear
Paralleling SwitchgearParalleling Switchgear
Paralleling Switchgear
 
Supply system (Electrical Power System)
Supply system (Electrical Power System)Supply system (Electrical Power System)
Supply system (Electrical Power System)
 
Electrical Projects
Electrical ProjectsElectrical Projects
Electrical Projects
 
Power semiconductor devices
Power semiconductor devicesPower semiconductor devices
Power semiconductor devices
 
DMRC SMPS
DMRC SMPSDMRC SMPS
DMRC SMPS
 
Bs bab 1
Bs bab 1Bs bab 1
Bs bab 1
 
Automatic transfer switch (ats)
Automatic transfer switch (ats)Automatic transfer switch (ats)
Automatic transfer switch (ats)
 
Uttar Pradesh Power Corparation Ltd. Training Report
Uttar Pradesh Power Corparation Ltd. Training ReportUttar Pradesh Power Corparation Ltd. Training Report
Uttar Pradesh Power Corparation Ltd. Training Report
 
Evaluation of standby power system architectures
Evaluation of standby power system architecturesEvaluation of standby power system architectures
Evaluation of standby power system architectures
 
Cable sizing part 2
Cable sizing part 2Cable sizing part 2
Cable sizing part 2
 
application of power electronics
application of power electronicsapplication of power electronics
application of power electronics
 
Basics of Electrical Engineering 4th Module Generation of Power
Basics of Electrical Engineering 4th Module Generation of PowerBasics of Electrical Engineering 4th Module Generation of Power
Basics of Electrical Engineering 4th Module Generation of Power
 
Subtech:Automatic Changeover,ACCL, AMF Panel, Motor Starter etc.
Subtech:Automatic Changeover,ACCL, AMF Panel, Motor Starter etc.Subtech:Automatic Changeover,ACCL, AMF Panel, Motor Starter etc.
Subtech:Automatic Changeover,ACCL, AMF Panel, Motor Starter etc.
 
Gas insulated sub station 2
Gas insulated sub station 2Gas insulated sub station 2
Gas insulated sub station 2
 
Fundamentals of substaion
Fundamentals of substaionFundamentals of substaion
Fundamentals of substaion
 
Air conditioning in indian railways PEE
Air conditioning in indian railways PEEAir conditioning in indian railways PEE
Air conditioning in indian railways PEE
 
Power supply system for Robot
Power supply system for RobotPower supply system for Robot
Power supply system for Robot
 
Power electronics application
Power electronics applicationPower electronics application
Power electronics application
 
Power components for battery applications webinar presentation
Power components for battery applications   webinar presentationPower components for battery applications   webinar presentation
Power components for battery applications webinar presentation
 

Andere mochten auch (12)

Lift
LiftLift
Lift
 
Lift Design
Lift  DesignLift  Design
Lift Design
 
Lifts
LiftsLifts
Lifts
 
BS 2 Lift presentation 4
BS 2 Lift presentation 4BS 2 Lift presentation 4
BS 2 Lift presentation 4
 
In Mall Escalators, Travelators & Arches Media Presentation 2013
In Mall Escalators, Travelators & Arches Media Presentation 2013In Mall Escalators, Travelators & Arches Media Presentation 2013
In Mall Escalators, Travelators & Arches Media Presentation 2013
 
Vertical transportation system
Vertical transportation systemVertical transportation system
Vertical transportation system
 
Travelator - Revolutionizing European Travel
Travelator - Revolutionizing European TravelTravelator - Revolutionizing European Travel
Travelator - Revolutionizing European Travel
 
Walkalator
WalkalatorWalkalator
Walkalator
 
Elevators & Escalators
Elevators & EscalatorsElevators & Escalators
Elevators & Escalators
 
Elevators and escalators
Elevators and escalatorsElevators and escalators
Elevators and escalators
 
Lifts & Escalators
Lifts & EscalatorsLifts & Escalators
Lifts & Escalators
 
SlideShare 101
SlideShare 101SlideShare 101
SlideShare 101
 

Ähnlich wie lift ppt

C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)
saurabhVEC
 
Equipments in switchyard and its protection
Equipments in switchyard and its protectionEquipments in switchyard and its protection
Equipments in switchyard and its protection
Jayashree Behera
 
Genrator Relay Protection & Logics
Genrator Relay Protection & LogicsGenrator Relay Protection & Logics
Genrator Relay Protection & Logics
Mahadev Kovalli
 
An Overview Of Agbami Fpso Electrical Power System
An Overview Of Agbami Fpso Electrical Power SystemAn Overview Of Agbami Fpso Electrical Power System
An Overview Of Agbami Fpso Electrical Power System
vkmalik
 

Ähnlich wie lift ppt (20)

Principles Control & Protection of HVDC Schemes
Principles Control & Protection of HVDC SchemesPrinciples Control & Protection of HVDC Schemes
Principles Control & Protection of HVDC Schemes
 
POWER CAR.pptx
POWER CAR.pptxPOWER CAR.pptx
POWER CAR.pptx
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
Two Quadrant chopper
Two Quadrant chopperTwo Quadrant chopper
Two Quadrant chopper
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)
 
220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar
 
牵引变流器(CI).ppt
牵引变流器(CI).ppt牵引变流器(CI).ppt
牵引变流器(CI).ppt
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)
 
Transformers
TransformersTransformers
Transformers
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
Electric fault at forsmark nuclear power plant
Electric fault at forsmark nuclear power plantElectric fault at forsmark nuclear power plant
Electric fault at forsmark nuclear power plant
 
132 kV uppcl
132 kV uppcl132 kV uppcl
132 kV uppcl
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
Equipments in switchyard and its protection
Equipments in switchyard and its protectionEquipments in switchyard and its protection
Equipments in switchyard and its protection
 
Vacuum Arc Remelting Furnaces in Midhani
Vacuum Arc Remelting Furnaces in MidhaniVacuum Arc Remelting Furnaces in Midhani
Vacuum Arc Remelting Furnaces in Midhani
 
Genrator Relay Protection & Logics
Genrator Relay Protection & LogicsGenrator Relay Protection & Logics
Genrator Relay Protection & Logics
 
ntpc
ntpcntpc
ntpc
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
An Overview Of Agbami Fpso Electrical Power System
An Overview Of Agbami Fpso Electrical Power SystemAn Overview Of Agbami Fpso Electrical Power System
An Overview Of Agbami Fpso Electrical Power System
 

Kürzlich hochgeladen

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 

Kürzlich hochgeladen (20)

Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 

lift ppt

  • 1. PRESENTED BY: K.B.S.Gangadhar (08B21A0248) J.V.V.RamaRao (09B25A0203) R.Sekhar (08B21A0231) MD.Khader vali (08B21A0211)
  • 2. PLANT DESCRIPTION ELECRICAL EQUIPMENTS PROTECTION SCHEMES SPECIFIED RATINGS ALTERNATIVE SYSTEMS DC& UPS SYSTEM
  • 3. LOCATION : SAMALKOT  CAPACITY : 469MW  OPERATION : COMBINED CYCLE  INPUTS : RELIANCE KG BASIN  OUTPUTS : VEMAGIRI SUBSTATION APTRANSCO  EQUIPMENT : ALSTOM
  • 4. COMBINATION OF TWO CYCLES GAS CYCLE STEAM CYCLE  TWO GAS TURBINES  ONE STEAM TURBINE  TWO HRSG SYSTEMS  MORE EFFICIENT  ECO FRIENDLY  NO WASTAGE
  • 5. PRINCIPLE: In a combined cycle power plant, a gas turbine generator generates electricity and the heat in the gas turbine’s exhaust gases is used to generate steam in a Heat Recovery Steam Generator that in turns used to generate electricity with steam turbine generator which enhances the efficiency in power generation.
  • 6. PRINCIPLE  DOMINANT ROLE  CONSISTS OF STATOR AND ROTOR  NEED OF PROTECTION  GAS TURBINE GENERATOR(GTG)  STEAM TURBINE GENERATOR(STG)  RATINGS GTG STG RATED VOLTAGE 15.75 KV 11KV RATED CURRENT 7698 A 12543 A POWERFACTOR 0.8 0.8 COOLING TYPE WATER WATER
  • 7. ROTOR:  ROTATORY PART IN THE MACHINERY  SPECIFIED DETAILS OF ROTOR Diameter of body 1050 mm No. Of wound slots per half pole 8 Conductor material CuAg STATOR :  Supports armature core with laminations.  SPECIFIED DETAILS OF STATOR:  Core length 4620mm  Inside diameter of core 1150mm  No. of slots 60
  • 8.  Core losses Hysteresis losses-reversal of magnetization Eddy current losses-induced emf  Stray losses 1.Mechanical losses friction and windage losses 2.Magnetic losses Losses value( kw )  Core losses 381  Stator copper losses 230  Stray load losses 275  Rotor copper loss 422  Excitation losses 23  Windage losses 822  Bearing losses 95  Total losses 2248
  • 9. During fault and abnormal conditions  Generator Differential Protection.  Loss of excitation  Overvoltage Protection  Earth fault protection  Negative Sequence Protection  Over current/Under voltage Protection.  95% Stator Earth Fault protection  Reverse Power protection Cooling system:  CACW means circulating air circulating water.  For circulation of the air two fans are mounted on both ends of the generator rotor.
  • 10. PRINCIPLE -ELECTROMAGNETIC INDUCTION  MAGNETICAL COUPLING  DESIRED VOLTAGE LEVELS FOR MACHINERY
  • 11. Description units No. of phases 3 Rated power 210MVA No. of windings per phase 2 Rated Voltage(no load) on H.V side 400KV Rated Voltage(no load) on L.V side 15.75Kv Rated Current on H.V side 303.7A Rated Current on L.V side 7707.1A Rated frequency 50Hz
  • 12. TYPES OF TRANSFORMERS  step-up transformer  step-down transformer  current transformer  potential transformer  ideal transformer Cooling system  Oil Forced Air Forced unit  Five units coolers each having 25% cooling capacity  4 working and 1 standby with selective switching Protection system  Differential Protection Buchhlolz Relay  Over current Earth Fault Protection
  • 13. Mv system:  Bus-duct of GT generator via station service transformer with 6.6kv  low resistance earthed system  Vaccum circuit breaker(VCB)  Microprocessor based protection system Lv system :  Rating up to maximum 250 KW, including the UPS system, chargers & batteries.  Automatic dead-bus changeover  motors rated 160-250 KW CB are provided motors rated < 160 KW, contactor-controlled feeders
  • 14. ONE AND HALF BREAKER SWITCHING SCHEME  400 KV SWITCHYARD  STARTUP POWER SUPPLY FOR BACK CHARGING
  • 15. INTERCONNECTION PURPOSE Loads and source of electrical power systems Generators and main transformer Types of bus bars according to voltages Voltage levels Bus bars Low Rigid Medium Rigid, insulated phase,sf6 High Rigid,strain,sf6
  • 16.
  • 17.  CIRCUIT BREAKERS SF6 CIRCUIT BREAKER Rated voltage 420v Normal current 2000A  ISOLATORS EARTH SWITCH Operating Mechanism Manual Control 220V DC  SURGING ARRESTORS  LIGHTNING ARRESTORS
  • 18. BREAKER CONTROL  Line bay breaker  Steam Turbine Generator Transformer Bay  Gas Turbine Generator Transformer Bay  Local Control Remote Terminal Unit  A RTU has been envisaged for facilitating the data transmission such as MW, MVAr, MWH and MVArH of each line to the Remote Load Dispatch Center through the Microwave Links, as planned and will be supplied by AP Transco.  In addition, the RTU will be able to collect and communicate the switchyard status and data to SCADA system which will be supplied by APTransco. The RTU will be located in the switchyard control room.
  • 19. 1 Line bays protection Main I protection Main II protection  Generator Transformer bays Common Protections:  For all the bays, following additional protections and relays will be provided. ◦ Local breaker backup protection (LBB) ◦ Trip Circuit Supervision for each trip coil ◦ DC supply supervision ◦ Pole discrepancy protection ◦ Anti pumping device for breaker closing ◦ All auxiliary relay as per system requirement
  • 20. STANDBY DIESEL GENERATOR The standby diesel generator is connected to the LV switchgear. The diesel generator is a rated 625 KVA in order to feed the essential auxiliaries for the safe shut down of the plant in the event of loss of normal AC power. This is used to charge the station batteries. The standby diesel generator set is automatically started upon detection of loss of normal AC power
  • 21. PARTS OF DIESEL GENERATOR Generator Controller Fuel Tank Automatic Voltage Regulator TYPES OF DIESEL GENERATORS The TS25 Baldor Standby Generator The 10,000 Watt Aurora Standby Generator
  • 22. DC&UPS SYSTEM 220V DC SYSTEMS:- Each DC system consists of battery and battery charger, and associated D.C. distribution boards. The whole battery system is sized for one (1) hour ST shut down operation. The safe shutdown is carried out bye the DC system in conjunction with the standby diesel generator set. For meeting this 2*50% battery banks of lead acid tubular type are provided .
  • 23. UPS:- 240V AC uninterruptible power supply is provided bye two inverters with automatic static changeover switches. During normal operation the UPS is supplied through the inverters and the chargers which are connected to the respective low voltage switchgear.
  • 24. Here overall view of the combined cycle power plant suggests the best generation of power and gives better efficiency by using the gas and steam cycles  Electrical equipments such as gengrators,transformers,circuit breakers, isolators and most of the equipments been observed and their workings has been observed. Finally there is a far distance between the practical scenario and the bookish knowledge and we linked between the both conditions.
  • 25. ANY QUERIES ? ? ? ? THANK YOU