Introduction
When managing projects, many activities
must be controlled and completed on
time.
Missing deadlines is significant and may
result in increased costs and penalties.
That’s why project scheduling and
allocating time to each activity are
important.
Gantt Chart 2
citoolkit.com
What is a Gantt Chart?
A type of bar chart used in project planning to visually show planned and
completed work over time.
Gantt Chart 3
It is a great way to manage project schedule and display activities and milestones very clearly.
citoolkit.com
Uses
Used in project management to analyze and display the overall timeline
and milestones of a project.
They are also useful throughout the
project for monitoring progress, tracking
developments, and identifying issues
that may cause delays
Gantt charts are used early in the
project to identify and plan activities
and their expected durations
Gantt Chart 4
citoolkit.com
Uses
Serves as communication tools by showing the team their progress and
keeping management informed about the overall progress.
Gantt Chart 5
citoolkit.com
Uses
Gantt charts can be used in personal project planning
and tracking individual objectives.
For example, you can use it for things like . . .
Gantt Chart 6
Planning your fitness goals Organizing your home
renovation
citoolkit.com
Benefits
Gantt Chart 7
Effective tools for communicating
progress to the project team and
other stakeholders.
They allow to focus efforts and
reacting quickly to unexpected
situations.
Useful for scheduling project activities
and help ensuring the project stays
on course.
Allow to see how the project is
performing at a glance and help
determining the needed resources.
citoolkit.com
Applications
Gantt charts are widely applicable across industries and functions that
demand disciplined project management including:
Gantt Chart 8
Information Technology
Engineering
Construction
Problem Solving & Quality Improvement
Management Consulting
Leveraging Gantt charts proves to be very effective in managing projects of any kind.
citoolkit.com
A detailed Gantt chart can answer the following questions . . .
Gantt Chart 9
How long should they take? Which activities are on time and which are no?
In what order? What are the key stages and milestones?
What are the activities that must be
accomplished
What are the needed resources?
Who should do them?
What are the percentage of completion and
the status for each activities?
What are the relationships between the
various activities (sequential or simultaneous)?
What are the percentage of completion and
the status of the project as a whole?
citoolkit.com
Basic Structure
Project managers need to estimate the duration of each activity and assign
responsibilities for each project phase.
Gantt Chart 10
On Schedule
Lagging Behind
Ahead of Schedule
Defined Timescale
15 16 17 18
They provide an immediate
overview of the project status by
indicating activities that are on
schedule, as well as those
lagging behind or ahead.
citoolkit.com
Components
A Gantt chart may include multiple components . . .
A basic Gantt chart simply lists . . .
Other information can be included as needed such as . . .
Gantt Chart 11
When it is
needed
Who should
do it
What needs
to be done
Needed
resources
Cost estimates
Key
milestones
Relationships and
dependencies
between activities
Indicators showing the
progress of activities
citoolkit.com
Formats
A Gantt chart can be presented in various formats . . .
Gantt Chart 12
Activity 1
Activity 2
Activity 3
Activity 4
Activity 5
Activity 6
Activity 7
wk1 wk2 wk3 wk4 wk5 wk6
By looking at the chart, you can see the sequence of the activities, how long each activity
takes, compare the planned and actual progress of activities.
citoolkit.com
Creating a Gantt Chart
Gantt charts can be manually drawn or created using spreadsheet
applications.
If more advanced features are required, project management software
such as Microsoft Project can be considered.
Gantt Chart 13
citoolkit.com
Creating a Gantt Chart
Gantt Chart 14
Identify project phases and major categories
• Consider using a Work Breakdown Structure (WBS) if the project is complex.
• Record activities in the order they need to be completed.
1
1.1 1.2 1.3
citoolkit.com
Creating a Gantt Chart
Gantt Chart 15
Estimate start dates and durations for each activity
• Draw horizontal bars to indicate the activities and their durations.
Activity 1
Activity 3
Activity 2
Activity 4
Start date
Duration
WBS
summary
elements
citoolkit.com
Creating a Gantt Chart
Gantt Chart 16
Clearly assign responsibilities for each activity
• Identify key milestones, dependencies, and other information as needed.
• Allocate necessary human and material resources.
Activity 1
Activity 3
Activity 2
Activity 4
Individual 1
Role 1
Team 1
Department 1
Milestone 1
Dependency
Responsibilities Cost estimates % of completion
$$$
$$$
%
%
%
%
citoolkit.com
Creating a Gantt Chart
Gantt Chart 17
Regularly update the chart as the project progresses
• Gantt charts should also be updated to reflect changes in time estimates as well
as when adding or removing activities.
Activity 1
Activity 3
Activity 2
Activity 4
Milestone 1
citoolkit.com
Example – Conducting and Completing a Research Study
This is an example of a Gantt chart that outlines all activities related to a
research project.
Gantt Chart 18
Activity Week 1 Week 2 Week 3 Week 4 Week 5
Formulate Research Team
Define Research Objectives
Establish Operational Definitions
Develop a Data Collection Plan
Present Research Plan
Train Research Team
Assess Research Methods
Initiate Data Collection
Analyze and Interpret Data
Submit Research Findings
citoolkit.com
Example – Conducting and Completing a Research Study
Gantt Chart 19
Activity Week 1 Week 2 Week 3 Week 4 Week 5
Formulate Research Team
Define Research Objectives
Establish Operational Definitions
Develop a Data Collection Plan
Present Research Plan
Train Research Team
Assess Research Methods
Initiate Data Collection
Analyze and Interpret Data
Submit Research Findings
Today line
Each bar
shows
activity
duration,
start and
end dates
An activity in each row Time increments (in weeks)
Milestone
Dependency
Activities can
be categorized
under phases
or groups
Further
information
can be added
such as the
status of
activities and
responsibilities
citoolkit.com
Dependencies
Understanding dependencies helps project managers
coordinate activities more effectively.
Managing dependencies is important to ensure the smooth flow of work,
avoid bottleneck and maintain the project's overall timeline.
In general, there are four main relationships between sequential activities:
Finish-to-Finish
(FF)
Start-to-Start
(SS)
Finish-to-Start
(FS)
Start-to-Finish
(SF)
Gantt Chart 20
citoolkit.com
Types of Dependencies
Examples
You need to finish the painting in a
construction project before you can
finish the final inspection.
Other activities can't end
until preceding ones have
ended.
Finish-to-Finish
(FF) Dependency
In a quality control process, you need
to start the material inspection at the
same time you start the product
assembly.
Some activities need to start
at the same time as the
initiation of other activities.
Start-to-Start
(SS) Dependency
To finish the preparation of training
materials, you need to start the
trainee registration.
The completion of some
activities depends on the
commencement of others.
Start-to-Finish
(SF) Dependency Trainee
registration
Preparation
of materials
Final Inspection
Painting
Product Assembly
Material Inspection
If you are conducting a survey, you
need to finish the data collection
before you can start the data analysis.
Some activities will need to
be completed before
starting the next one.
Finish-to-Start
(FS) Dependency Data
Analysis
Data
Collection
Gantt Chart 21
citoolkit.com
Further Information – Other Concepts
Project scheduling involves more than just creating a Gantt
chart and managing dependencies.
It includes various concepts essential for effective project
planning and execution including but not limited to . . .
Gantt Chart 22
Buffer
management
Crashing and
fast-tracking
Activity
slack
Lead and lag
time
Critical path
citoolkit.com
Further Information – Other Concepts
Gantt Chart 23
• The sequence of activities that
determines the minimum time needed
for the completion of a project.
• Any delays along this path will directly
impact the overall timeline of the
project.
Critical Path
• The maximum allowable delay for an
activity without causing problems for
the whole project.
• Important for activities on the critical
path, which can’t be delayed at all.
• It shows which activities need close
attention.
Activity Slack
citoolkit.com
Further Information
It's always better to complete a project ahead of schedule
rather than behind schedule.
It is always helpful if there are contingency reserves (a
safety factor) which are additional time, resources, or
budget set aside to account for uncertainties, risks, and
unexpected events.
Be careful when allocating scarce resources such as
expensive equipment or highly qualified experts.
Gantt Chart 24
citoolkit.com
Further Information
Size your activities appropriate to your needs.
• If you are managing a time-critical process,
you may break down your activities into
more specific steps.
• If you want to maintain general oversight on
the project, you may have fewer activities.
Gantt Chart 25
citoolkit.com
Further Information
A good Gantt chart . . .
Gantt Chart 26
Outlines all
activities and
their order
Outlines dates,
responsibilities
& dependencies
Highlights any
needs, issues
or obstacles to
overcome
Identifies
where to focus
efforts for
greater impact
citoolkit.com
Further Information - Limitations of Gantt Charts
• Creating them for projects with many activities can be overwilling.
• Lack flexibility to consider unforeseen disruptions during the project.
• Lack flexibility to consider mistakes that may requires rework.
Gantt Chart 27
© Copyright Citoolkit.com. All Rights Reserved.
CITOOLKIT
Made with by
The Continuous Improvement Toolkit
www.citoolkit.com

Weitere ähnliche Inhalte

Ă„hnlich wie Gantt Chart

Lecture 6
Lecture 6Lecture 6
Lecture 6Yasir Khan
 
GANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursingGANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursingThangamjayarani
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingHariasha
 
Communication
CommunicationCommunication
CommunicationUjjwal Joshi
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.pptMdHelalHossain6
 
What is a Gantt chart
What is a Gantt chartWhat is a Gantt chart
What is a Gantt chartYuved Technology
 
Project Management.pptx
Project Management.pptxProject Management.pptx
Project Management.pptxhosurkarabhijit
 
Events Planning - Midterm 2 quiz.docx
Events Planning - Midterm 2 quiz.docxEvents Planning - Midterm 2 quiz.docx
Events Planning - Midterm 2 quiz.docxMIkeBryanjoaquin
 
Pert and gantt chart
Pert and gantt chartPert and gantt chart
Pert and gantt chartYogesh Dengale
 
Modelingprogramstructure
ModelingprogramstructureModelingprogramstructure
Modelingprogramstructurelearnt
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysissimu_mihai
 
Project 2007 full handout
Project 2007 full handoutProject 2007 full handout
Project 2007 full handoutZenawi Mehari
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart Nicola2903
 
Project implimentation
Project implimentationProject implimentation
Project implimentationMazhar Poohlah
 
Project implimentation
Project implimentationProject implimentation
Project implimentationMazhar Poohlah
 
Lab 2 create a gantt chart and pert chart using ms project
Lab 2 create a gantt chart and pert chart using ms projectLab 2 create a gantt chart and pert chart using ms project
Lab 2 create a gantt chart and pert chart using ms projectFarah Ahmed
 

Ă„hnlich wie Gantt Chart (20)

Gantt Charts.ppt
Gantt Charts.pptGantt Charts.ppt
Gantt Charts.ppt
 
Lecture 6
Lecture 6Lecture 6
Lecture 6
 
GANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursingGANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursing
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursing
 
Communication
CommunicationCommunication
Communication
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.ppt
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 
What is a Gantt chart
What is a Gantt chartWhat is a Gantt chart
What is a Gantt chart
 
Project Management.pptx
Project Management.pptxProject Management.pptx
Project Management.pptx
 
programmed evaluation and review technique,
programmed evaluation and review technique,programmed evaluation and review technique,
programmed evaluation and review technique,
 
Events Planning - Midterm 2 quiz.docx
Events Planning - Midterm 2 quiz.docxEvents Planning - Midterm 2 quiz.docx
Events Planning - Midterm 2 quiz.docx
 
Pert and gantt chart
Pert and gantt chartPert and gantt chart
Pert and gantt chart
 
Modelingprogramstructure
ModelingprogramstructureModelingprogramstructure
Modelingprogramstructure
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysis
 
Project 2007 full handout
Project 2007 full handoutProject 2007 full handout
Project 2007 full handout
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart
 
Project time
Project timeProject time
Project time
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Lab 2 create a gantt chart and pert chart using ms project
Lab 2 create a gantt chart and pert chart using ms projectLab 2 create a gantt chart and pert chart using ms project
Lab 2 create a gantt chart and pert chart using ms project
 

Mehr von CIToolkit

Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningCIToolkit
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for LearningCIToolkit
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsCIToolkit
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingCIToolkit
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsCIToolkit
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisCIToolkit
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsCIToolkit
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementCIToolkit
 
Flowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsFlowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsCIToolkit
 
Yokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingYokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingCIToolkit
 
Value Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines ValueValue Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines ValueCIToolkit
 

Mehr von CIToolkit (20)

Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for Learning
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-Making
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data Sets
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram Analysis
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data Insights
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous Improvement
 
Flowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsFlowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of Flowcharts
 
Yokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingYokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice Sharing
 
Value Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines ValueValue Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines Value
 

KĂĽrzlich hochgeladen

CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
LPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering PresentationLPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering Presentationthomas851723
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
Training Methods and Training Objectives
Training Methods and Training ObjectivesTraining Methods and Training Objectives
Training Methods and Training Objectivesmintusiprd
 
Risk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptxRisk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptxSaujanya Jung Pandey
 
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607dollysharma2066
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
LPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System PresentationLPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System Presentationthomas851723
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 

KĂĽrzlich hochgeladen (20)

CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
LPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering PresentationLPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering Presentation
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
Training Methods and Training Objectives
Training Methods and Training ObjectivesTraining Methods and Training Objectives
Training Methods and Training Objectives
 
Risk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptxRisk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptx
 
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
LPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System PresentationLPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System Presentation
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 

Gantt Chart

  • 1. CITOOLKIT Gantt Chart Efficient Project Planning and Tracking with Gantt Charts
  • 2. citoolkit.com Introduction When managing projects, many activities must be controlled and completed on time. Missing deadlines is significant and may result in increased costs and penalties. That’s why project scheduling and allocating time to each activity are important. Gantt Chart 2
  • 3. citoolkit.com What is a Gantt Chart? A type of bar chart used in project planning to visually show planned and completed work over time. Gantt Chart 3 It is a great way to manage project schedule and display activities and milestones very clearly.
  • 4. citoolkit.com Uses Used in project management to analyze and display the overall timeline and milestones of a project. They are also useful throughout the project for monitoring progress, tracking developments, and identifying issues that may cause delays Gantt charts are used early in the project to identify and plan activities and their expected durations Gantt Chart 4
  • 5. citoolkit.com Uses Serves as communication tools by showing the team their progress and keeping management informed about the overall progress. Gantt Chart 5
  • 6. citoolkit.com Uses Gantt charts can be used in personal project planning and tracking individual objectives. For example, you can use it for things like . . . Gantt Chart 6 Planning your fitness goals Organizing your home renovation
  • 7. citoolkit.com Benefits Gantt Chart 7 Effective tools for communicating progress to the project team and other stakeholders. They allow to focus efforts and reacting quickly to unexpected situations. Useful for scheduling project activities and help ensuring the project stays on course. Allow to see how the project is performing at a glance and help determining the needed resources.
  • 8. citoolkit.com Applications Gantt charts are widely applicable across industries and functions that demand disciplined project management including: Gantt Chart 8 Information Technology Engineering Construction Problem Solving & Quality Improvement Management Consulting Leveraging Gantt charts proves to be very effective in managing projects of any kind.
  • 9. citoolkit.com A detailed Gantt chart can answer the following questions . . . Gantt Chart 9 How long should they take? Which activities are on time and which are no? In what order? What are the key stages and milestones? What are the activities that must be accomplished What are the needed resources? Who should do them? What are the percentage of completion and the status for each activities? What are the relationships between the various activities (sequential or simultaneous)? What are the percentage of completion and the status of the project as a whole?
  • 10. citoolkit.com Basic Structure Project managers need to estimate the duration of each activity and assign responsibilities for each project phase. Gantt Chart 10 On Schedule Lagging Behind Ahead of Schedule Defined Timescale 15 16 17 18 They provide an immediate overview of the project status by indicating activities that are on schedule, as well as those lagging behind or ahead.
  • 11. citoolkit.com Components A Gantt chart may include multiple components . . . A basic Gantt chart simply lists . . . Other information can be included as needed such as . . . Gantt Chart 11 When it is needed Who should do it What needs to be done Needed resources Cost estimates Key milestones Relationships and dependencies between activities Indicators showing the progress of activities
  • 12. citoolkit.com Formats A Gantt chart can be presented in various formats . . . Gantt Chart 12 Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Activity 6 Activity 7 wk1 wk2 wk3 wk4 wk5 wk6 By looking at the chart, you can see the sequence of the activities, how long each activity takes, compare the planned and actual progress of activities.
  • 13. citoolkit.com Creating a Gantt Chart Gantt charts can be manually drawn or created using spreadsheet applications. If more advanced features are required, project management software such as Microsoft Project can be considered. Gantt Chart 13
  • 14. citoolkit.com Creating a Gantt Chart Gantt Chart 14 Identify project phases and major categories • Consider using a Work Breakdown Structure (WBS) if the project is complex. • Record activities in the order they need to be completed. 1 1.1 1.2 1.3
  • 15. citoolkit.com Creating a Gantt Chart Gantt Chart 15 Estimate start dates and durations for each activity • Draw horizontal bars to indicate the activities and their durations. Activity 1 Activity 3 Activity 2 Activity 4 Start date Duration WBS summary elements
  • 16. citoolkit.com Creating a Gantt Chart Gantt Chart 16 Clearly assign responsibilities for each activity • Identify key milestones, dependencies, and other information as needed. • Allocate necessary human and material resources. Activity 1 Activity 3 Activity 2 Activity 4 Individual 1 Role 1 Team 1 Department 1 Milestone 1 Dependency Responsibilities Cost estimates % of completion $$$ $$$ % % % %
  • 17. citoolkit.com Creating a Gantt Chart Gantt Chart 17 Regularly update the chart as the project progresses • Gantt charts should also be updated to reflect changes in time estimates as well as when adding or removing activities. Activity 1 Activity 3 Activity 2 Activity 4 Milestone 1
  • 18. citoolkit.com Example – Conducting and Completing a Research Study This is an example of a Gantt chart that outlines all activities related to a research project. Gantt Chart 18 Activity Week 1 Week 2 Week 3 Week 4 Week 5 Formulate Research Team Define Research Objectives Establish Operational Definitions Develop a Data Collection Plan Present Research Plan Train Research Team Assess Research Methods Initiate Data Collection Analyze and Interpret Data Submit Research Findings
  • 19. citoolkit.com Example – Conducting and Completing a Research Study Gantt Chart 19 Activity Week 1 Week 2 Week 3 Week 4 Week 5 Formulate Research Team Define Research Objectives Establish Operational Definitions Develop a Data Collection Plan Present Research Plan Train Research Team Assess Research Methods Initiate Data Collection Analyze and Interpret Data Submit Research Findings Today line Each bar shows activity duration, start and end dates An activity in each row Time increments (in weeks) Milestone Dependency Activities can be categorized under phases or groups Further information can be added such as the status of activities and responsibilities
  • 20. citoolkit.com Dependencies Understanding dependencies helps project managers coordinate activities more effectively. Managing dependencies is important to ensure the smooth flow of work, avoid bottleneck and maintain the project's overall timeline. In general, there are four main relationships between sequential activities: Finish-to-Finish (FF) Start-to-Start (SS) Finish-to-Start (FS) Start-to-Finish (SF) Gantt Chart 20
  • 21. citoolkit.com Types of Dependencies Examples You need to finish the painting in a construction project before you can finish the final inspection. Other activities can't end until preceding ones have ended. Finish-to-Finish (FF) Dependency In a quality control process, you need to start the material inspection at the same time you start the product assembly. Some activities need to start at the same time as the initiation of other activities. Start-to-Start (SS) Dependency To finish the preparation of training materials, you need to start the trainee registration. The completion of some activities depends on the commencement of others. Start-to-Finish (SF) Dependency Trainee registration Preparation of materials Final Inspection Painting Product Assembly Material Inspection If you are conducting a survey, you need to finish the data collection before you can start the data analysis. Some activities will need to be completed before starting the next one. Finish-to-Start (FS) Dependency Data Analysis Data Collection Gantt Chart 21
  • 22. citoolkit.com Further Information – Other Concepts Project scheduling involves more than just creating a Gantt chart and managing dependencies. It includes various concepts essential for effective project planning and execution including but not limited to . . . Gantt Chart 22 Buffer management Crashing and fast-tracking Activity slack Lead and lag time Critical path
  • 23. citoolkit.com Further Information – Other Concepts Gantt Chart 23 • The sequence of activities that determines the minimum time needed for the completion of a project. • Any delays along this path will directly impact the overall timeline of the project. Critical Path • The maximum allowable delay for an activity without causing problems for the whole project. • Important for activities on the critical path, which can’t be delayed at all. • It shows which activities need close attention. Activity Slack
  • 24. citoolkit.com Further Information It's always better to complete a project ahead of schedule rather than behind schedule. It is always helpful if there are contingency reserves (a safety factor) which are additional time, resources, or budget set aside to account for uncertainties, risks, and unexpected events. Be careful when allocating scarce resources such as expensive equipment or highly qualified experts. Gantt Chart 24
  • 25. citoolkit.com Further Information Size your activities appropriate to your needs. • If you are managing a time-critical process, you may break down your activities into more specific steps. • If you want to maintain general oversight on the project, you may have fewer activities. Gantt Chart 25
  • 26. citoolkit.com Further Information A good Gantt chart . . . Gantt Chart 26 Outlines all activities and their order Outlines dates, responsibilities & dependencies Highlights any needs, issues or obstacles to overcome Identifies where to focus efforts for greater impact
  • 27. citoolkit.com Further Information - Limitations of Gantt Charts • Creating them for projects with many activities can be overwilling. • Lack flexibility to consider unforeseen disruptions during the project. • Lack flexibility to consider mistakes that may requires rework. Gantt Chart 27
  • 28. © Copyright Citoolkit.com. All Rights Reserved. CITOOLKIT Made with by The Continuous Improvement Toolkit www.citoolkit.com