2. 2013 Water System Improvements
• Replace Waterline & Improve Stormwater
• Lincoln Street (Brook to Elm)
• Daniels Street (Lincoln to Lenox)
• Replace Waterline:
• Kathleen Drive (DPW Crews)
• Fannie Way (DPW Crews)
• Harborwood Drive
• Betten Court
• Corrine Road
3. 2013 Water System Improvements
• Clean Interior of Tank & Add Agitator
• FIP & Forge Hill Tanks
• Water System
• Master Plan
4. 2013 Highway Improvements
• Reconstruct Roadway & Sidewalks:
• Crescent Street & Garfield Street
• East Street & West Street
• Reconstruct Roadway & Improve Stormwater
• Pyne Road
• Island Road
• Overlay Road
• Grove Street (near railroad tracks)
• Ledge Street (between Hill and Uncas)
• Beaver Street Recycling Center
5. 2013 Highway Improvements
• Finish Stormwater Improvements
• Miller Street, Green Street, Wylie Road
• Prospect Street
• Culvert Repair (near Overlook Drive)
• Construct Sidewalk
• Panther Way
• Improve Pedestrian Crossing
• Parmenter School
• Crack, Chip & Seal
• Various roadways
6. 2013 Sewer System Improvements
• Install New Grinder Pumps
• Jefferson Road
• Milliken Road
• I and I Program
• Metering of Beaver Street Interceptor
• Explore areas for improvement
• CRPCD
• Monitor and Assist Proposed
Reconstruction of Sewer Treatment Plant
8. 2013 Administration and Engineering
• Downtown Reconstruction
• HPP Project (140 / Main Street)
• Finish Reconstruction
• Delcarte Dams (Pleasant Street)
• Lincoln Street Bridge Phase One
• Bridge Repairs
• Construct New Hayward Street
DPW Entrance
9. 2013 Administration and Engineering
• Evaluate Sign Inventory and Establish Plan
• Town wide
• Improve / Create Turning Lane
• Panther Way/East Central Street
• Construct New Building for Storage
• 247 Fisher Street
10. 2013 DPW Wide
• Finish Construction:
• Panther Way Park (off Panther Way)
• Recycling Center (off Beaver Street)
• Design and Construct New Playground/Parking/Walkway
• Delcarte Playground (Pleasant Street)
• Public Works “Touch-A-Truck” and Library Book Sale(s)
• Open House (257 Fisher Street)
• Public Outreach
• Earth Day / Arbor Day (Beaver Street Park)
11. 2014
• Replace Waterline & Improve Stormwater
• Anthony Road, Conlyn Avenue & Carmine Drive
• Summer Street (Rt. 140 to King St)
• Lewis Street
• Reconstruct Roadway, One Sidewalk & Improve Stormwater
• Lincoln Street (Brook to Elm)
• Reconstruct Roadway & Improve Stormwater
• Kathleen Drive (DPW Crews)
• Fannie Way (DPW Crews)
• Harborwood Drive
• Bettoen Court
• Corrine Road
• Demolition
• Old DPW Garage; 257 Fisher Street
12. 2015
• Reconstruct Roadway & Improve Stormwater
• Anthony Road, Conlyn Avenue & Carmine Drive
• Oak Street (near High School)
• Reconstruct Roadway, One Sidewalk & Improve Stormwater
• Summer Street (Rt. 140 to King Street)
• Lewis Street