Fast & Predictable – A Lightweight Release Framework Promotes
                    Agility through Rhythm and Flow
                                      Amy Farrow; Steve Greene
                                            salesforce.com
                            afarrow@salesforce.com; sgreene@salesforce.com


                                                               Our answer to this problem was a lightweight
                       Abstract
                                                             Release Framework and the introduction of a Release
                                                             Manager for the overall product release.
  Embarking on salesforce.com's large scale
transformation to our Adaptive Development
                                                                The result is a highly effective Technology
Methodology presented many unique challenges due
                                                             organization, operating on a consistent iteration and
to the scale of the rollout as well as the need to align a
                                                             release rhythm, enabling flow of information within
large number of teams (30+) to a common release
                                                             the organization, reducing cognitive dissonance,
date, 3-4 times per year. To specifically address the
                                                             realizing organic alignment with the rhythm, and
latter challenge, we created a lightweight release
                                                             optimization of the whole of the product release.
framework in order to optimize on-time, high quality
delivery to our customers and partners.
                                                             2. Release Framework: Guiding Goals &
  The fundamentals of this framework and approach            Principles
emphasize supporting and enabling the development
teams rather than controlling them, through a release           A very clear set of goals and principles provided us
framework--simple, lightweight, unambiguous, visible         guidance us in defining the Release Framework.
everywhere. By implementing this lightweight release
framework and making it highly visible, we've                2.1. Consistent, On-Time Delivery, No
promoted rhythm and flow within and across all scrum         Exceptions
teams. In doing so, we have been able to develop a
stable rhythm for delivering on-time, high-quality              One of the founding principles of our ADM
releases in a complex environment, while not                 implementation was that we would deliver on-time,
compromising our Agile principles.                           high quality releases consistently to deliver value to
                                                             our customers and partners. To achieve this end
1. Introduction                                              required discipline within the management team to
                                                             reject any requests for exceptions in the first two
   Salesforce.com initiated a transition to the Adaptive     releases we delivered with ADM. This change
Development Methodology, based upon scrum, in                dramatically simplified the process and focused
October 2006. Shortly after the initial rollout to 30+       Product Owners on the task of prioritizing effectively
product teams it was clear that we had unleashed the         to deliver as much value as possible in the timeframe
power of our individual teams through their new found        available to them. In addition to this, in order to deliver
self-organization and focus on short sprints. However,       frequently and to converge to a common release date,
since we aggregate the work of many sprints into a           the scope of the release and the scope of work for each
single release it was also becoming clear that our           team working in the release had to be negotiable.
scrum teams were operating independently without
respect for the context of the larger release. Herding          In the process of doing this, it became readily
30+ teams working in the same codeline to a                  apparent that we needed to adopt a concept of “Scrum
predictable time-boxed release date is very challenging      Team Equality”, meaning that in the scope of the
in any traditional development model let alone an agile      release and schedule, the work that one team was doing
development model where we value self-organization           was no more important than another team’s. In the
over centralized control.                                    same respect, one feature, no matter how important,
would not cause us to delay a release of 30+ teams’          environment we were very sensitive to imposing heavy
work that was ready to go.                                   milestones on our teams. However, we still believed
                                                             that there were key milestones that would align our
                                                             teams to our on-time, high quality release objectives
2.2. Scale for Today, Tomorrow, 10x
                                                             while enhancing the agility of our teams. Those
                                                             milestones are as follows:
Salesforce.com is a consistently and rapidly growing
organization so we needed to create a framework that
                                                             1. Release Kickoff – Alignment from the Start: At the
would enable us to scale our ability to successfully
                                                             beginning of each release, which coincided with the
manage a release that today includes 30+ scrum teams
                                                             event of opening of the codeline, the Release
but tomorrow will easily surpass 60 scrum teams and
                                                             Operations team organizes an R&D wide release
beyond. We want to have a model that could give 10X
                                                             kickoff meeting. The purpose of the meeting is to
scalability. At the time we embarked on the ADM
                                                             provide visibility to the release plan for each team,
rollout, there was not a lot of experience in the industry
                                                             highlight dependencies, generate excitement about
related to enterprise agility at scale. There was little
                                                             what’s coming next and align the teams on the next
professional advice available on how to scale an agile
                                                             release rhythm.
organization like Salesforce.com with so many teams
working in the same codeline.
                                                             At this meeting our most senior executives participate
                                                             by talking about key business objectives of the release
2.3. Optimize the Whole of the Release
                                                             including exciting new innovations and how those
                                                             innovations will drive customer satisfaction. Their
We needed to ensure that the process or framework we
                                                             commitment to the success of the release is clear.
put into place would promote visibility and
optimization of the whole release, or of the suite of
                                                             In addition, each of our Chief Product Owners present
product functionality that we deliver to our customers
                                                             the release plans for their scrum teams (features,
and our partners.
                                                             architecture and infrastructure work, refactoring, etc).
                                                             In a short amount of time they are challenged to
With such a large organization working on the same
                                                             convey their plans concisely and effectively. The level
codeline, it was imperative that our global priorities
                                                             of information team members derive from the kickoff
were consistent and clear to all scrum teams in order to
                                                             enables them to be effective in planning for their own
maintain quality of the release throughout the
                                                             teams, dependencies they had on others or others had
development cycle. The priorities were as follows:
                                                             on them, and to foresee any possible impacts to plan
                                                             their time more effectively.
1.   Maintain existing functionality and quality of the
     overall codeline on a daily basis. All automation
                                                             We value the importance of the organization getting a
     regression tests must pass at a 99% passing
                                                             look into what is planned to enable them to effectively
     threshold on every checkin.
                                                             communicate and work with each other, but we also
2.   Building new functionality is secondary to
                                                             valued the time that we had to contribute to this, so we
     codeline stability.
                                                             time-boxed the kickoff to 1.5 hours.
   While each scrum team had to invest time to
                                                             After the Release Kickoff, all release plans are
maintain the quality of the codeline on a daily basis,
                                                             available for all teams working on the release and are
they also experienced benefits from it as well.
                                                             publicly shared with the entire Technology
                                                             organization.
9. Release Framework – A Blueprint
                                                             2. Feature Freeze
   The Release Framework we created became a
blueprint for all major releases which enabled Product
                                                             Feature Freeze marked the end of the product
Owners to prioritize adequately and enabled teams to
                                                             development sprints and the start of what we call the
define realistic release plans.
                                                             Release Sprint. All new product features are expected
                                                             to meet our “definition of done” at the end of each
9.1. Light on Milestones                                     sprint but also be potentially releasable at this
                                                             milestone. This milestone also coincides with the
Part of the release framework included the creation of a     beginning of the Release Sprint. Between Kickoff and
few key milestones.       In our self-organizing, agile      Feature Freeze, teams are clear on the goals they need
to meet but are able to self-organize to achieve their                              that release even though not necessarily involved in the
goals in that timeframe.                                                            release in its earlier stages. This “handoff” of
                                                                                    ownership to release managers late in the game
3.     Release Freeze                                                               exposes weaknesses in the waterfall approach
                                                                                    promoting an environment of blame and frustration
This milestone marks the end of the Release Sprint and                              when problems occur and releases are delayed.
means the overall release has moved from a potentially
releasable state to a releasable state. To differentiate                            When we introduced the Release Manager role at
the activities from the Product Development Sprints                                 salesforce.com, we believed that it was important that
and Release Sprints we clearly documented the                                       the role be engaged from the inception of the release
activities that did not contribute value when completed                             through to production deployment partnering with the
each month and actually made more sense to only                                     rest of the organization to ensure success. The Release
execute once per release.                                                           Manager provides a framework within which self-
                                                                                    organizing teams could be independent and agile while
                                                                                    at the same get a clear understanding of the context of
4. Release
                                                                                    the release with a simple escalation path if something
                                                                                    was preventing them from achieving their goals, as
The final important milestone is the release!
                                                                                    related to the release. To achieve this Release
                                                                                    Managers transformed away from a traditional role of
This was the extent of the milestones we used to create
                                                                                    “driver of the release” to a servant leader role, clearing
a release framework to promote self organization in
                                                                                    the path of systemic release issues that slowed down or
achieving the milestones to deliver a high quality, on-
                                                                                    halted team success.
time release. The rest was left to the teams.

                                                                                    It was important to us when we created the release
9.2. Rhythmic Cycles
                                                                                    framework that we introduced the concept of this role
                                                                                    but needed to reset expectations around it, since we
In order to support teams in establishing and
                                                                                    were creating a new definition for this role, with the
understanding their velocity and what they would be
                                                                                    following key characteristics and responsibilities:
able to achieve in a given release, it was important to
create a consistent, reusable template for our releases
                                                                                    •   Engage throughout the lifecycle of the release,
such that they exhibited similar characteristics and
                                                                                        from inception through to deployment.
mimicked the iterative monthly cycles in iterative 4
                                                                                    •   Promote regular release visibility and keep the
month cycles.
                                                                                        health, quality and release schedule highly visible
                                                                                        to the organization.
The following diagram depicts this rhythmic cycle:
                                                                                    •   Resolve systemic release issues that that slowed
                                                                                        down or halted team success.
     Release                                           Release

                                                                                    •   Promote team/product equality with respect to the
               Sprint   Sprint   Sprint    Sprint                 Sprint   Sprint

                                                                                        overall release schedule.
           Jan          Feb      March         April             May       June

                                 Release & Sprint Rhythm

                                                                                    We initially equated this to role to “Scrum Master for
                                                                                    the Release” and this sums up what we were aiming to
The rhythmic cycle provided a mechanism for organic
                                                                                    achieve – a Servant Leader who would uphold the
self-organization across, within, and amongst teams
                                                                                    values and principles of ADM and our Release
around how to collaborate better on their work. All
                                                                                    Framework to enable the organization to deliver.
teams are on a monthly cycle with sprints and all
releases are on the same 4 month cycle. This
consistent rhythm at a daily, sprint and release level is                           10. Release Framework – In Action
very powerful for our organization reducing cognitive
dissonance and eliminating waste across teams.                                         Defining the Release Framework was an important
                                                                                    step which led to determination of some of the
9.3. Release Manager as Servant Release                                             mechanics in action that would enable and promote
Leader                                                                              this framework.

At many non-agile software development companies,
release managers own the “end game” or delivery of
automation results and incoming defect rates
10.1. Release Schedule Visibility
                                                            normalized by scrum teams and number of developers
                                                            and quality engineers. The analysis of aggregated data
A simple method that we use to expand visibility of
                                                            at a release level (with comparisons to our previous
our release schedule is posting large visually striking
                                                            releases) provides a higher level of visibility into
posters of the overall schedule throughout our
                                                            release trends and quality hot spots in the overall
workspace. The posters clearly communicate to and
                                                            codeline. This analysis has been useful for scrum
are a quick reference to the entire organization on a
                                                            teams and the management team to remove systemic
daily basis as they walk through our workspace. These
                                                            obstacles that are impacting all teams relative to the
posters help teams understand how all the release
                                                            overall release as well as providing a guide for
pieces fit together, and to give better insight into the
                                                            coaching. The Release Manager takes the lead on
overall mechanism for delivery in the SaaS model.
                                                            analyzing and providing this information along with
This simple technique has significantly increased
                                                            recommended action if any. All of this is necessary in
awareness of the key dates, milestones and rhythm of
                                                            a large scale agile environment, however, done with a
the release.
                                                            light touch to ensure that we don’t violate our
                                                            principles of self-organization for teams.
10.2. Release Health & Quality Visibility
                                                            10.4. Communication
The Release Manager promotes daily visibility of the
overall release quality and status through “Daily
                                                            Communication is a key element of our Adaptive
Drumbeats” that are made available to the entire R&D
                                                            Development Methodology. At the beginning of our
organization. Thresholds are defined across any given
                                                            transition, Scrum Team and Scrum of Scrums
day in the release cycle and thresholds are also defined
                                                            communication was effective in understanding both
at monthly intervals when the release is expected to be
                                                            progress and issues or blockers facing the teams.
potentially releasable.
                                                            However, since we had three Scrum of Scrums we
                                                            found that there were challenges with communication
Here’s a snapshot:
                                                            across Scrum of Scrums as it related to the overall
                                                            release. As a result, the model we adopted to increase
                                                            effectiveness and communication across all teams
                                                            working on the release was not for the teams to come
                                                            to the Release Manager but rather for the Release
                                                            Manager to go to the teams, through the weekly Scrum
                                                            of Scrums. This became a forum for bi-directional
The difference here is that the biggest challenge with      information sharing and issue resolution.
on-time delivery in large projects or environments
where 30+ teams are working on a release is that the        10.5. Push Decision Making to the Team -
complexity is high. Promoting regular visibility into       Scrum Teams Decide when “Release Ready”
aggregate release status while scrum masters promote
visibility of individual team status ensured that we kept   As with any release, there comes a time when we need
both the local (team) and global (release) status in our    to decide whether or not the release is ready to be
purview at all times. This framework approach also          deployed to customers. In a traditional approach, this
enabled team agility and ownership in understanding         decision is often made behind closed-doors at the
their dependencies and impacts, rather than another         executive level. We believed that this decision should
team resolving them on their behalf.                        be pushed down to the individual Scrum Teams to
                                                            promote even more agility. It was important for each
10.3. Release-by-Release Comparison Visibility              of the Scrum Teams to contribute to the release
                                                            readiness decision because they held the greatest level
Weekly reporting of release-by-release comparisons          of detail about readiness for each features. As such,
add another dimension of understanding of the current       we expanded our Sprint “Definition of Done” to create
state of the release – both how the release itself is       a Release “Definition of Done”. At the Release Freeze
progressing day by day as well as how this release on a     milestone, we expected each scrum team to
weekly basis compared to previous releases,                 communicate to the Release Manager that they had met
normalized to make the comparisons meaningful and           the Release “definition of done” criteria and that their
insightful. We regularly analyze aggregated bug debt,
product area was ready to be released. We do continue       Development Methodology, we experienced tension
to maintain release signoff and decisions at the            with a few of the Product Owners who continued to
executive level; however, the framework we have             expect the release date to be negotiable if their features
created promotes a shared level of responsibility           were not completed to their expectations. Guided by
between the individual scrum teams and the executive        our desire to deliver value to our customers and
team.                                                       partners on a regular basis (through time-boxed
                                                            releases and variable scope), we upheld the
                                                            organizational will and resisted these demands.
11. Challenges
                                                            Executive level support and commitment to both our
                                                            Adaptive Development Methodology and to our
   There were some challenges with creating this
                                                            Release Framework were the keys to overcoming this
lightweight Release Framework that are worth
                                                            challenge. Over time, this issue dissipated as teams
mentioning.
                                                            understood that release dates were not negotiable.
                                                            We’ve seen significant behavior change and this issue
11.1. Release Manager / Scrum Master Role
                                                            and is no longer part of the discussion
Confusion.
                                                            12. Conclusion
When we first introduced the Release Manager role,
there was some role confusion between the Release
                                                            A lightweight Release Framework can be very useful
Manager and the Scrum Masters for individual teams.
                                                            in scaling at the enterprise level. By providing this
Since both roles were new to the organization at the
                                                            framework we have increased the level of agility and
same time, it took some time for us to evolve the roles
                                                            self-organization throughout our organization. On the
and the relationships between them. Once we did and
                                                            vast continuum from rigid structure and control to self-
clarified the Scrum Master responsibility to the Scrum
                                                            organization, the key to success is to constantly strive
Team and the Release Manager responsibility to the
                                                            for openness and flexibility (that comes from self-
overall Release, we were able to achieve an effective
                                                            organization) and to implement a simple, lightweight
operating model within the organization.
                                                            release framework that supports and enhances those
                                                            principles of self-organization. Finding the right
11.2. Scrum Team Equality
                                                            balance is an art form and depends upon cultural issues
                                                            within the organization and requires a high level of
The concept of Scrum Team Equality was a hard one
                                                            trust.    Finding that complementary balance is
to grasp initially given the sheer number of teams and
                                                            challenging yet worthwhile as it can unleash your
Product Owner pride in the importance of their
                                                            organization’s potential.
particular product area and feature set. In the first two
agile on-time releases we delivered with our Adaptive

Weitere ähnliche Inhalte

Mehr von Steve Greene

Stanford Case Study - Salesforce.com Transformation
Stanford Case Study - Salesforce.com TransformationStanford Case Study - Salesforce.com Transformation
Stanford Case Study - Salesforce.com TransformationSteve Greene
 
Agile 2010 conference - a holistic approach to scaling agile at salesforce
Agile 2010 conference - a holistic approach to scaling agile at salesforceAgile 2010 conference - a holistic approach to scaling agile at salesforce
Agile 2010 conference - a holistic approach to scaling agile at salesforceSteve Greene
 
Dreamforce 2009: IT Success with Agile Development Processes
Dreamforce 2009: IT Success with Agile Development ProcessesDreamforce 2009: IT Success with Agile Development Processes
Dreamforce 2009: IT Success with Agile Development ProcessesSteve Greene
 
Dreamforce 2009: Behind-the-Scenes at Salesforce.com: Delivering 3 Major Rele...
Dreamforce 2009: Behind-the-Scenes at Salesforce.com: Delivering 3 Major Rele...Dreamforce 2009: Behind-the-Scenes at Salesforce.com: Delivering 3 Major Rele...
Dreamforce 2009: Behind-the-Scenes at Salesforce.com: Delivering 3 Major Rele...Steve Greene
 
Weird Myths In Business
Weird Myths In BusinessWeird Myths In Business
Weird Myths In BusinessSteve Greene
 
Unleashing The Fossa Agile Leadership Summit 2009
Unleashing The Fossa   Agile Leadership Summit 2009Unleashing The Fossa   Agile Leadership Summit 2009
Unleashing The Fossa Agile Leadership Summit 2009Steve Greene
 
Dependency Management In A Large Agile Environment
Dependency Management In A Large Agile EnvironmentDependency Management In A Large Agile Environment
Dependency Management In A Large Agile EnvironmentSteve Greene
 
Q Con 2008 - Unleashing the Fossa
Q Con 2008 - Unleashing the FossaQ Con 2008 - Unleashing the Fossa
Q Con 2008 - Unleashing the FossaSteve Greene
 
Dreamforce 2008 : Transforming IT Success with Agile Development Processes
Dreamforce 2008 : Transforming IT Success with Agile Development ProcessesDreamforce 2008 : Transforming IT Success with Agile Development Processes
Dreamforce 2008 : Transforming IT Success with Agile Development ProcessesSteve Greene
 
Agile Leadership Summit: Unleashing The Fossa : Scaling Agile in an Ambitious...
Agile Leadership Summit: Unleashing The Fossa : Scaling Agile in an Ambitious...Agile Leadership Summit: Unleashing The Fossa : Scaling Agile in an Ambitious...
Agile Leadership Summit: Unleashing The Fossa : Scaling Agile in an Ambitious...Steve Greene
 
Dreamforce 2008 : Behind-the-Scenes @ Salesforce.com R&D: How We Deliver 3 Ma...
Dreamforce 2008 : Behind-the-Scenes @ Salesforce.com R&D: How We Deliver 3 Ma...Dreamforce 2008 : Behind-the-Scenes @ Salesforce.com R&D: How We Deliver 3 Ma...
Dreamforce 2008 : Behind-the-Scenes @ Salesforce.com R&D: How We Deliver 3 Ma...Steve Greene
 
Scrum Gathering 2008 Stockholm - Salesforce.com
Scrum Gathering 2008 Stockholm - Salesforce.comScrum Gathering 2008 Stockholm - Salesforce.com
Scrum Gathering 2008 Stockholm - Salesforce.comSteve Greene
 
Writing within an Agile Development Environment
Writing within an Agile Development EnvironmentWriting within an Agile Development Environment
Writing within an Agile Development EnvironmentSteve Greene
 
The Doctor is “In” : Using the Office Hours Concept to Make Limited Resources...
The Doctor is “In” : Using the Office Hours Concept to Make Limited Resources...The Doctor is “In” : Using the Office Hours Concept to Make Limited Resources...
The Doctor is “In” : Using the Office Hours Concept to Make Limited Resources...Steve Greene
 
Dependency Management In A Large Agile Organization
Dependency Management In A Large Agile OrganizationDependency Management In A Large Agile Organization
Dependency Management In A Large Agile OrganizationSteve Greene
 
FAST & PREDICTABLE : Lightweight Release Framework promotes Rhythm & Flow
FAST & PREDICTABLE : Lightweight Release Framework promotes Rhythm & FlowFAST & PREDICTABLE : Lightweight Release Framework promotes Rhythm & Flow
FAST & PREDICTABLE : Lightweight Release Framework promotes Rhythm & FlowSteve Greene
 
Postcard Patterns : An Agile User Interface Pattern Creation Process
Postcard Patterns : An Agile User Interface Pattern Creation ProcessPostcard Patterns : An Agile User Interface Pattern Creation Process
Postcard Patterns : An Agile User Interface Pattern Creation ProcessSteve Greene
 
Tips n' Tricks - Sprint Review
Tips n' Tricks - Sprint ReviewTips n' Tricks - Sprint Review
Tips n' Tricks - Sprint ReviewSteve Greene
 
Death by Project (and the simple choice)
Death by Project (and the simple choice)Death by Project (and the simple choice)
Death by Project (and the simple choice)Steve Greene
 

Mehr von Steve Greene (20)

Stanford Case Study - Salesforce.com Transformation
Stanford Case Study - Salesforce.com TransformationStanford Case Study - Salesforce.com Transformation
Stanford Case Study - Salesforce.com Transformation
 
Agile 2010 conference - a holistic approach to scaling agile at salesforce
Agile 2010 conference - a holistic approach to scaling agile at salesforceAgile 2010 conference - a holistic approach to scaling agile at salesforce
Agile 2010 conference - a holistic approach to scaling agile at salesforce
 
Dreamforce 2009: IT Success with Agile Development Processes
Dreamforce 2009: IT Success with Agile Development ProcessesDreamforce 2009: IT Success with Agile Development Processes
Dreamforce 2009: IT Success with Agile Development Processes
 
Dreamforce 2009: Behind-the-Scenes at Salesforce.com: Delivering 3 Major Rele...
Dreamforce 2009: Behind-the-Scenes at Salesforce.com: Delivering 3 Major Rele...Dreamforce 2009: Behind-the-Scenes at Salesforce.com: Delivering 3 Major Rele...
Dreamforce 2009: Behind-the-Scenes at Salesforce.com: Delivering 3 Major Rele...
 
Weird Myths In Business
Weird Myths In BusinessWeird Myths In Business
Weird Myths In Business
 
Unleashing The Fossa Agile Leadership Summit 2009
Unleashing The Fossa   Agile Leadership Summit 2009Unleashing The Fossa   Agile Leadership Summit 2009
Unleashing The Fossa Agile Leadership Summit 2009
 
Dependency Management In A Large Agile Environment
Dependency Management In A Large Agile EnvironmentDependency Management In A Large Agile Environment
Dependency Management In A Large Agile Environment
 
Q Con 2008 - Unleashing the Fossa
Q Con 2008 - Unleashing the FossaQ Con 2008 - Unleashing the Fossa
Q Con 2008 - Unleashing the Fossa
 
Dreamforce 2008 : Transforming IT Success with Agile Development Processes
Dreamforce 2008 : Transforming IT Success with Agile Development ProcessesDreamforce 2008 : Transforming IT Success with Agile Development Processes
Dreamforce 2008 : Transforming IT Success with Agile Development Processes
 
Agile Leadership Summit: Unleashing The Fossa : Scaling Agile in an Ambitious...
Agile Leadership Summit: Unleashing The Fossa : Scaling Agile in an Ambitious...Agile Leadership Summit: Unleashing The Fossa : Scaling Agile in an Ambitious...
Agile Leadership Summit: Unleashing The Fossa : Scaling Agile in an Ambitious...
 
Dreamforce 2008 : Behind-the-Scenes @ Salesforce.com R&D: How We Deliver 3 Ma...
Dreamforce 2008 : Behind-the-Scenes @ Salesforce.com R&D: How We Deliver 3 Ma...Dreamforce 2008 : Behind-the-Scenes @ Salesforce.com R&D: How We Deliver 3 Ma...
Dreamforce 2008 : Behind-the-Scenes @ Salesforce.com R&D: How We Deliver 3 Ma...
 
Scrum Gathering 2008 Stockholm - Salesforce.com
Scrum Gathering 2008 Stockholm - Salesforce.comScrum Gathering 2008 Stockholm - Salesforce.com
Scrum Gathering 2008 Stockholm - Salesforce.com
 
Writing within an Agile Development Environment
Writing within an Agile Development EnvironmentWriting within an Agile Development Environment
Writing within an Agile Development Environment
 
The Doctor is “In” : Using the Office Hours Concept to Make Limited Resources...
The Doctor is “In” : Using the Office Hours Concept to Make Limited Resources...The Doctor is “In” : Using the Office Hours Concept to Make Limited Resources...
The Doctor is “In” : Using the Office Hours Concept to Make Limited Resources...
 
Dependency Management In A Large Agile Organization
Dependency Management In A Large Agile OrganizationDependency Management In A Large Agile Organization
Dependency Management In A Large Agile Organization
 
FAST & PREDICTABLE : Lightweight Release Framework promotes Rhythm & Flow
FAST & PREDICTABLE : Lightweight Release Framework promotes Rhythm & FlowFAST & PREDICTABLE : Lightweight Release Framework promotes Rhythm & Flow
FAST & PREDICTABLE : Lightweight Release Framework promotes Rhythm & Flow
 
Postcard Patterns : An Agile User Interface Pattern Creation Process
Postcard Patterns : An Agile User Interface Pattern Creation ProcessPostcard Patterns : An Agile User Interface Pattern Creation Process
Postcard Patterns : An Agile User Interface Pattern Creation Process
 
Blue
BlueBlue
Blue
 
Tips n' Tricks - Sprint Review
Tips n' Tricks - Sprint ReviewTips n' Tricks - Sprint Review
Tips n' Tricks - Sprint Review
 
Death by Project (and the simple choice)
Death by Project (and the simple choice)Death by Project (and the simple choice)
Death by Project (and the simple choice)
 

Kürzlich hochgeladen

What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 

Kürzlich hochgeladen (20)

What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 

Fast & Predictable A Lightweight Release Framework Promotes Agility Through Rhythm And Flow

  • 1. Fast & Predictable – A Lightweight Release Framework Promotes Agility through Rhythm and Flow Amy Farrow; Steve Greene salesforce.com afarrow@salesforce.com; sgreene@salesforce.com Our answer to this problem was a lightweight Abstract Release Framework and the introduction of a Release Manager for the overall product release. Embarking on salesforce.com's large scale transformation to our Adaptive Development The result is a highly effective Technology Methodology presented many unique challenges due organization, operating on a consistent iteration and to the scale of the rollout as well as the need to align a release rhythm, enabling flow of information within large number of teams (30+) to a common release the organization, reducing cognitive dissonance, date, 3-4 times per year. To specifically address the realizing organic alignment with the rhythm, and latter challenge, we created a lightweight release optimization of the whole of the product release. framework in order to optimize on-time, high quality delivery to our customers and partners. 2. Release Framework: Guiding Goals & The fundamentals of this framework and approach Principles emphasize supporting and enabling the development teams rather than controlling them, through a release A very clear set of goals and principles provided us framework--simple, lightweight, unambiguous, visible guidance us in defining the Release Framework. everywhere. By implementing this lightweight release framework and making it highly visible, we've 2.1. Consistent, On-Time Delivery, No promoted rhythm and flow within and across all scrum Exceptions teams. In doing so, we have been able to develop a stable rhythm for delivering on-time, high-quality One of the founding principles of our ADM releases in a complex environment, while not implementation was that we would deliver on-time, compromising our Agile principles. high quality releases consistently to deliver value to our customers and partners. To achieve this end 1. Introduction required discipline within the management team to reject any requests for exceptions in the first two Salesforce.com initiated a transition to the Adaptive releases we delivered with ADM. This change Development Methodology, based upon scrum, in dramatically simplified the process and focused October 2006. Shortly after the initial rollout to 30+ Product Owners on the task of prioritizing effectively product teams it was clear that we had unleashed the to deliver as much value as possible in the timeframe power of our individual teams through their new found available to them. In addition to this, in order to deliver self-organization and focus on short sprints. However, frequently and to converge to a common release date, since we aggregate the work of many sprints into a the scope of the release and the scope of work for each single release it was also becoming clear that our team working in the release had to be negotiable. scrum teams were operating independently without respect for the context of the larger release. Herding In the process of doing this, it became readily 30+ teams working in the same codeline to a apparent that we needed to adopt a concept of “Scrum predictable time-boxed release date is very challenging Team Equality”, meaning that in the scope of the in any traditional development model let alone an agile release and schedule, the work that one team was doing development model where we value self-organization was no more important than another team’s. In the over centralized control. same respect, one feature, no matter how important,
  • 2. would not cause us to delay a release of 30+ teams’ environment we were very sensitive to imposing heavy work that was ready to go. milestones on our teams. However, we still believed that there were key milestones that would align our teams to our on-time, high quality release objectives 2.2. Scale for Today, Tomorrow, 10x while enhancing the agility of our teams. Those milestones are as follows: Salesforce.com is a consistently and rapidly growing organization so we needed to create a framework that 1. Release Kickoff – Alignment from the Start: At the would enable us to scale our ability to successfully beginning of each release, which coincided with the manage a release that today includes 30+ scrum teams event of opening of the codeline, the Release but tomorrow will easily surpass 60 scrum teams and Operations team organizes an R&D wide release beyond. We want to have a model that could give 10X kickoff meeting. The purpose of the meeting is to scalability. At the time we embarked on the ADM provide visibility to the release plan for each team, rollout, there was not a lot of experience in the industry highlight dependencies, generate excitement about related to enterprise agility at scale. There was little what’s coming next and align the teams on the next professional advice available on how to scale an agile release rhythm. organization like Salesforce.com with so many teams working in the same codeline. At this meeting our most senior executives participate by talking about key business objectives of the release 2.3. Optimize the Whole of the Release including exciting new innovations and how those innovations will drive customer satisfaction. Their We needed to ensure that the process or framework we commitment to the success of the release is clear. put into place would promote visibility and optimization of the whole release, or of the suite of In addition, each of our Chief Product Owners present product functionality that we deliver to our customers the release plans for their scrum teams (features, and our partners. architecture and infrastructure work, refactoring, etc). In a short amount of time they are challenged to With such a large organization working on the same convey their plans concisely and effectively. The level codeline, it was imperative that our global priorities of information team members derive from the kickoff were consistent and clear to all scrum teams in order to enables them to be effective in planning for their own maintain quality of the release throughout the teams, dependencies they had on others or others had development cycle. The priorities were as follows: on them, and to foresee any possible impacts to plan their time more effectively. 1. Maintain existing functionality and quality of the overall codeline on a daily basis. All automation We value the importance of the organization getting a regression tests must pass at a 99% passing look into what is planned to enable them to effectively threshold on every checkin. communicate and work with each other, but we also 2. Building new functionality is secondary to valued the time that we had to contribute to this, so we codeline stability. time-boxed the kickoff to 1.5 hours. While each scrum team had to invest time to After the Release Kickoff, all release plans are maintain the quality of the codeline on a daily basis, available for all teams working on the release and are they also experienced benefits from it as well. publicly shared with the entire Technology organization. 9. Release Framework – A Blueprint 2. Feature Freeze The Release Framework we created became a blueprint for all major releases which enabled Product Feature Freeze marked the end of the product Owners to prioritize adequately and enabled teams to development sprints and the start of what we call the define realistic release plans. Release Sprint. All new product features are expected to meet our “definition of done” at the end of each 9.1. Light on Milestones sprint but also be potentially releasable at this milestone. This milestone also coincides with the Part of the release framework included the creation of a beginning of the Release Sprint. Between Kickoff and few key milestones. In our self-organizing, agile Feature Freeze, teams are clear on the goals they need
  • 3. to meet but are able to self-organize to achieve their that release even though not necessarily involved in the goals in that timeframe. release in its earlier stages. This “handoff” of ownership to release managers late in the game 3. Release Freeze exposes weaknesses in the waterfall approach promoting an environment of blame and frustration This milestone marks the end of the Release Sprint and when problems occur and releases are delayed. means the overall release has moved from a potentially releasable state to a releasable state. To differentiate When we introduced the Release Manager role at the activities from the Product Development Sprints salesforce.com, we believed that it was important that and Release Sprints we clearly documented the the role be engaged from the inception of the release activities that did not contribute value when completed through to production deployment partnering with the each month and actually made more sense to only rest of the organization to ensure success. The Release execute once per release. Manager provides a framework within which self- organizing teams could be independent and agile while at the same get a clear understanding of the context of 4. Release the release with a simple escalation path if something was preventing them from achieving their goals, as The final important milestone is the release! related to the release. To achieve this Release Managers transformed away from a traditional role of This was the extent of the milestones we used to create “driver of the release” to a servant leader role, clearing a release framework to promote self organization in the path of systemic release issues that slowed down or achieving the milestones to deliver a high quality, on- halted team success. time release. The rest was left to the teams. It was important to us when we created the release 9.2. Rhythmic Cycles framework that we introduced the concept of this role but needed to reset expectations around it, since we In order to support teams in establishing and were creating a new definition for this role, with the understanding their velocity and what they would be following key characteristics and responsibilities: able to achieve in a given release, it was important to create a consistent, reusable template for our releases • Engage throughout the lifecycle of the release, such that they exhibited similar characteristics and from inception through to deployment. mimicked the iterative monthly cycles in iterative 4 • Promote regular release visibility and keep the month cycles. health, quality and release schedule highly visible to the organization. The following diagram depicts this rhythmic cycle: • Resolve systemic release issues that that slowed down or halted team success. Release Release • Promote team/product equality with respect to the Sprint Sprint Sprint Sprint Sprint Sprint overall release schedule. Jan Feb March April May June Release & Sprint Rhythm We initially equated this to role to “Scrum Master for the Release” and this sums up what we were aiming to The rhythmic cycle provided a mechanism for organic achieve – a Servant Leader who would uphold the self-organization across, within, and amongst teams values and principles of ADM and our Release around how to collaborate better on their work. All Framework to enable the organization to deliver. teams are on a monthly cycle with sprints and all releases are on the same 4 month cycle. This consistent rhythm at a daily, sprint and release level is 10. Release Framework – In Action very powerful for our organization reducing cognitive dissonance and eliminating waste across teams. Defining the Release Framework was an important step which led to determination of some of the 9.3. Release Manager as Servant Release mechanics in action that would enable and promote Leader this framework. At many non-agile software development companies, release managers own the “end game” or delivery of
  • 4. automation results and incoming defect rates 10.1. Release Schedule Visibility normalized by scrum teams and number of developers and quality engineers. The analysis of aggregated data A simple method that we use to expand visibility of at a release level (with comparisons to our previous our release schedule is posting large visually striking releases) provides a higher level of visibility into posters of the overall schedule throughout our release trends and quality hot spots in the overall workspace. The posters clearly communicate to and codeline. This analysis has been useful for scrum are a quick reference to the entire organization on a teams and the management team to remove systemic daily basis as they walk through our workspace. These obstacles that are impacting all teams relative to the posters help teams understand how all the release overall release as well as providing a guide for pieces fit together, and to give better insight into the coaching. The Release Manager takes the lead on overall mechanism for delivery in the SaaS model. analyzing and providing this information along with This simple technique has significantly increased recommended action if any. All of this is necessary in awareness of the key dates, milestones and rhythm of a large scale agile environment, however, done with a the release. light touch to ensure that we don’t violate our principles of self-organization for teams. 10.2. Release Health & Quality Visibility 10.4. Communication The Release Manager promotes daily visibility of the overall release quality and status through “Daily Communication is a key element of our Adaptive Drumbeats” that are made available to the entire R&D Development Methodology. At the beginning of our organization. Thresholds are defined across any given transition, Scrum Team and Scrum of Scrums day in the release cycle and thresholds are also defined communication was effective in understanding both at monthly intervals when the release is expected to be progress and issues or blockers facing the teams. potentially releasable. However, since we had three Scrum of Scrums we found that there were challenges with communication Here’s a snapshot: across Scrum of Scrums as it related to the overall release. As a result, the model we adopted to increase effectiveness and communication across all teams working on the release was not for the teams to come to the Release Manager but rather for the Release Manager to go to the teams, through the weekly Scrum of Scrums. This became a forum for bi-directional The difference here is that the biggest challenge with information sharing and issue resolution. on-time delivery in large projects or environments where 30+ teams are working on a release is that the 10.5. Push Decision Making to the Team - complexity is high. Promoting regular visibility into Scrum Teams Decide when “Release Ready” aggregate release status while scrum masters promote visibility of individual team status ensured that we kept As with any release, there comes a time when we need both the local (team) and global (release) status in our to decide whether or not the release is ready to be purview at all times. This framework approach also deployed to customers. In a traditional approach, this enabled team agility and ownership in understanding decision is often made behind closed-doors at the their dependencies and impacts, rather than another executive level. We believed that this decision should team resolving them on their behalf. be pushed down to the individual Scrum Teams to promote even more agility. It was important for each 10.3. Release-by-Release Comparison Visibility of the Scrum Teams to contribute to the release readiness decision because they held the greatest level Weekly reporting of release-by-release comparisons of detail about readiness for each features. As such, add another dimension of understanding of the current we expanded our Sprint “Definition of Done” to create state of the release – both how the release itself is a Release “Definition of Done”. At the Release Freeze progressing day by day as well as how this release on a milestone, we expected each scrum team to weekly basis compared to previous releases, communicate to the Release Manager that they had met normalized to make the comparisons meaningful and the Release “definition of done” criteria and that their insightful. We regularly analyze aggregated bug debt,
  • 5. product area was ready to be released. We do continue Development Methodology, we experienced tension to maintain release signoff and decisions at the with a few of the Product Owners who continued to executive level; however, the framework we have expect the release date to be negotiable if their features created promotes a shared level of responsibility were not completed to their expectations. Guided by between the individual scrum teams and the executive our desire to deliver value to our customers and team. partners on a regular basis (through time-boxed releases and variable scope), we upheld the organizational will and resisted these demands. 11. Challenges Executive level support and commitment to both our Adaptive Development Methodology and to our There were some challenges with creating this Release Framework were the keys to overcoming this lightweight Release Framework that are worth challenge. Over time, this issue dissipated as teams mentioning. understood that release dates were not negotiable. We’ve seen significant behavior change and this issue 11.1. Release Manager / Scrum Master Role and is no longer part of the discussion Confusion. 12. Conclusion When we first introduced the Release Manager role, there was some role confusion between the Release A lightweight Release Framework can be very useful Manager and the Scrum Masters for individual teams. in scaling at the enterprise level. By providing this Since both roles were new to the organization at the framework we have increased the level of agility and same time, it took some time for us to evolve the roles self-organization throughout our organization. On the and the relationships between them. Once we did and vast continuum from rigid structure and control to self- clarified the Scrum Master responsibility to the Scrum organization, the key to success is to constantly strive Team and the Release Manager responsibility to the for openness and flexibility (that comes from self- overall Release, we were able to achieve an effective organization) and to implement a simple, lightweight operating model within the organization. release framework that supports and enhances those principles of self-organization. Finding the right 11.2. Scrum Team Equality balance is an art form and depends upon cultural issues within the organization and requires a high level of The concept of Scrum Team Equality was a hard one trust. Finding that complementary balance is to grasp initially given the sheer number of teams and challenging yet worthwhile as it can unleash your Product Owner pride in the importance of their organization’s potential. particular product area and feature set. In the first two agile on-time releases we delivered with our Adaptive