TYPES OF
CONTRACTS
Contract Definitions
A. From a Legal Point of View :
 A mutual agreement between two or more
parties that something shall be done, an
agreement enforceable at law.
B. According to FIDIC :
 Contract means the General Conditions, the
Supplementary Conditions, the Specifications,
the Drawings, the Bill of quantities, the
Tender, the Letter of Acceptance, the Contract
Agreement.
 C. According to Method of Payment :
 The agreement of how the owner will pay the
contractor for work
 performed such as a lump-sum or cost-plus
payment.
Why Use contract in construction?
 Describe scope of work
 Establish time frame
 Establish cost and payment provision
 Set fourth obligations and relationship
 Minimize disputes
 Improve economic return of investment
Major Contract Types (traditional)
TYPES OF CONSTRUCTION
CONTRACTS
 Two broad categories:
 Price Given in Advance Contracts (Priced-based
Contracts)
 Cost Reimbursement Contracts (Cost-based
Contracts)
 Factors Influencing the Choice of the Type of Contract
 The appropriateness for providing an adequate
incentive for efficient
 performance by the contractor
 The ability to introduce changes
 The allocation of risks
 The start and completion date of the project
Lump sum contracts
 Involves a total fixed priced for all construction
related activities.
 Can include incentives or benefits for early
termination, or can also have penalties, called
liquidated damages, for a late termination.
 Preferred when a clear scope and a defined
schedule has been reviewed and agreed upon.
Lump Sum Contract( Advantages)
 Low risk on the owner, Higher risk to the
contractor
 Cost known at outset
 Contractor will assign best personnel
 Contractor selection is easy.
Lump Sum
Contract(Disadvantages)
 Changes is difficult and costly.
 Contractor is free to use the lowest cost of material
equipment, methods.
 The contractor carries much of the risks. The
tendered price may include high risk contingency.
 Competent contractors may decide not to bid to
avoid a high-risk lump sum contract.
Unit Price
 No total final price
 Quote Rates / Prices by units
 Re-negotiate for rates if the quantity or work
considerably exceeds the initial target
 Payment to contractor is based on the
measure.
 Unbalanced bids
 Higher risk to owner
 Ideal for work where quantities can not be
accurately established before construction
starts.
Unit Price contract
• Require sufficient design definition to estimate
quantities of units
• Contractors bid based on units of works
• Time & cost risk (shared)
• Owner : at risk for total quantities
• Contractor : at risk for fixed unit price.
• Large quantities changes (>15-25%) can lead
to increase or decrease of unit price.
Unit Price ( Advantages)
 Easy for contract selection.
 Early start is possible.
 Saves the heavy cost of preparing many bills
of quantities by the
contractors.
 Fair basis for competition.
 In comparing with lump-sum contract,
changes in contract documents can be made
easily by the owner.
 Lower risk for contractor.
Unit Price (Disadvantages)
 Final cost not known from the beginning (BOQ only is
estimated)
 Staff needed to measure the finished quantities and
report on the units not completed.
 Unit price sometime tend to draw unbalanced bid. (For
Unit-Price Contracts, a balanced bid is one in which each bid is priced to
carry its share of the cost of the work and also its share of the contractor’s
profit.
Contractors raise prices on certain items and make corresponding
reductions of the prices on other items ,without changing the total amount of
the bid)
Schedule of rates contract
 A Schedule of the work items without quantities
is prepared by the owner and /or A/E to be rated
by the contractor.
 The descriptions of items and the units of
measurement are similar to those used in a
normal B.O.Q., but no quantities are given.
 It is common for separate rates to be quoted for
labor, plant, and materials.
 Used for repair and maintenance works or
under conditions of urgency.
Schedule of Rates Contract
Advantages:
 1. Work can be commenced earlier than if a full
B.O.Q has been prepared.
Disadvantage :
 1. No indication of the final price of the works.
 2. Very difficult to determine which contractor
submitted the most
 advantageous offer.
 3. May cause financial problems to the public
owners
Cost Plus
1. Actual cost plus a negotiated reimbursement to
cover overheads and profit.
2. Different methods of reimbursement :
Cost + percentage
Cost + fixed fee
Cost + fixed fee + profit-sharing clause.
3. Higher risk to owner
4. Compromise : guaranteed maximum price (GMP)
reduces risk to owner while maintain advantage of
cost plus contract.
5. By using this type of contract the contractor can start work
without a clearly defined project scope, since all costs will
be reimbursed and a profit guaranteed.
Cost + Percent of Cost
 1. The contractor is reimbursed for all his costs
with a fixed % age of costs to cover his services.
 2. Project/site overheads may be covered by the
%age or computed as one of the costs.
Cost + Percent of Cost
Fee = percentage of the
total project cost
(Cost =
$500.000,Fee = 2%)
Advantages Disadvantages
profitable for
the contractor
No incentive
to finish job
quickly
Owner does
not know total
price
Larger the
cost of the
job, the
higher the fee
the owner
pays
Cost + Percent (Advantages)
1. Construction can start before design is
completed.
2. If the contractor is efficient in the utilization of
resources then the cost to the client should
represent a fair price for the work undertaken.
Cost + Percent (Disadvantages )
1. The project total cost is completely unknown
before the project start.
2. No incentive for the contractor to be efficient in
his use of labors, materials or equipments.
3. Minimum efficiency maximizes the profit.
Cost Plus Fixed Fee
 Most common form of negotiated contracts
 COST = expenses incurred by the contractor for the
construction of the facility
 Includes: Labor, equipment, materials, and administrative
costs
 FEE = compensation for expertise
 Includes: profit
Cost + Fixed Fee
 Fee = percentage of the
original estimated total
figure
 Utilized on large multi-
year jobs
 Ex: WW treatment plant
Facility (Cost = $20
million, Fee = 1%)
 $20 Million 1% fee =
$200,000 Million
Advantages Disadvantages
Fee amount is
fixed
regardless
of price
fluctuation
Expensive
materials and
construction
techniques may
be used to
expedite
construction
Provides
incentive to
complete
the project
quickly
Cost + Fixed Fee +
Profit-Sharing Clause
 Rewards contractors who
minimize cost
 Percentage of cost under
GMP is considered profit
and shared with the
contractor
 Guaranteed Maximum Price
(GMP)
 % of profit sharing is
specified in contract
Advantag
es
Disadvantages
Provides
incentive
to the
contracto
r to save
money
Contractor
must absorb
any
amount over
the GMP
Plans & specs.
need to
detailed
Cost + Fixed Fee +
Profit-Sharing Clause
 In this type of contract the contractor is
reimbursed at cost with an agreed-upon fee
up to the GMP, which is essentially a cap;
beyond this point the contractor is responsible
for covering any additional costs within the
original project scope
 An incentive clause, which specifies that the
contractor will receive additional profit for
bringing the project in under the GMP.
Guaranteed Maximum Price contract
 In a guaranteed maximum price (GMP) contract,
the contractor estimates the cost just like in a
lump sum bid, but profit is limited to a specified
amount.
 In the event that actual costs are lower than the
estimates, the owner keeps the savings.
 In the event costs are higher, the contractor pays
the difference and profit is reduced.
Advantages
 Greater price certainty for clients as the contractor normally includes a
sum for future design development and for risks.
 GMP promotes pre-agreement of changes as its philosophy links neatly
with a contractual
requirement to pre-agree the cost and time implications of any
potential changes.
 GMP provides greater control over spending as the contractor is bound
to a maximum price.
This alerts the team to any potentially expensive items of design
development.
 GMP aligns the contractor with client and consultants encouraging
team work with mutual
trust and common goals.
 Less administration is required as changes are limited; there is quick
settlement of the final
account.
Disadvantages
 The client might pay too much as the contractor takes on greater
risk and thus includes in the price an allowance for design
development and risk. Often a competitive price is sacrificed in lieu of
appointing a contractor early.
 Contractor’s with design and build experience may have useful
knowledge.
 There is no standard form of contract for GMP so there is a greater
possibility of errors and
misunderstandings of liabilities between the parties that may result
in conflict.
 Scope changes tend to cost more, it is accepted that scope changes
to design and build are
more likely to be more expensive than with a traditional contract,
the same can also be said
for GMP contracts.

Weitere ähnliche Inhalte

Was ist angesagt?

Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
guestdb5e498
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
Aravind Samala
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
jagadish108
 

Was ist angesagt? (20)

Construction contract
Construction contract Construction contract
Construction contract
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Valuation part of Building
Valuation part of Building Valuation part of Building
Valuation part of Building
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Tendering
TenderingTendering
Tendering
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
 
Contracts
ContractsContracts
Contracts
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 

Andere mochten auch

Introduction to Contract Law
Introduction to Contract LawIntroduction to Contract Law
Introduction to Contract Law
theacademist
 
Contract labour in india
Contract labour in indiaContract labour in india
Contract labour in india
Suhaib Khan
 
Contracts PowerPoint Presentation
Contracts PowerPoint PresentationContracts PowerPoint Presentation
Contracts PowerPoint Presentation
mbachnak
 
Jojo obligation and contracts ppt.
Jojo obligation and contracts ppt.Jojo obligation and contracts ppt.
Jojo obligation and contracts ppt.
jojoisanan_mendoza
 
Law on obligation on contract
Law on obligation on contractLaw on obligation on contract
Law on obligation on contract
Beverly Erigan
 
Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project management
Ali Heydari
 
Law On Obligations And Contracts boa
Law On Obligations And Contracts boaLaw On Obligations And Contracts boa
Law On Obligations And Contracts boa
raileeanne
 
Obligation and cobtracts buslaw1
Obligation and cobtracts buslaw1Obligation and cobtracts buslaw1
Obligation and cobtracts buslaw1
Sheena Dingal
 

Andere mochten auch (20)

Types of contract
Types of contractTypes of contract
Types of contract
 
Types of conract
Types of conractTypes of conract
Types of conract
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Study notes contract law
Study notes   contract lawStudy notes   contract law
Study notes contract law
 
Introduction to Contract Law
Introduction to Contract LawIntroduction to Contract Law
Introduction to Contract Law
 
Contract labour in india
Contract labour in indiaContract labour in india
Contract labour in india
 
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENTOWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT
 
CIVIL ENGINEER TO ENTREPRENEUR
CIVIL ENGINEER TO ENTREPRENEURCIVIL ENGINEER TO ENTREPRENEUR
CIVIL ENGINEER TO ENTREPRENEUR
 
Vision of construction mechanizer
Vision of construction mechanizerVision of construction mechanizer
Vision of construction mechanizer
 
Law On Obligations and Contracts (midterm exam)
Law On Obligations and Contracts (midterm exam)Law On Obligations and Contracts (midterm exam)
Law On Obligations and Contracts (midterm exam)
 
Law on Obligations and Contracts
Law on Obligations and ContractsLaw on Obligations and Contracts
Law on Obligations and Contracts
 
Contracts. Types and characteristics
Contracts. Types and characteristicsContracts. Types and characteristics
Contracts. Types and characteristics
 
Contracts: characteristics and exercises
Contracts: characteristics and exercisesContracts: characteristics and exercises
Contracts: characteristics and exercises
 
Contracts PowerPoint Presentation
Contracts PowerPoint PresentationContracts PowerPoint Presentation
Contracts PowerPoint Presentation
 
Jojo obligation and contracts ppt.
Jojo obligation and contracts ppt.Jojo obligation and contracts ppt.
Jojo obligation and contracts ppt.
 
Law on obligation on contract
Law on obligation on contractLaw on obligation on contract
Law on obligation on contract
 
Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project management
 
Law On Obligations And Contracts boa
Law On Obligations And Contracts boaLaw On Obligations And Contracts boa
Law On Obligations And Contracts boa
 
Obligations and contracts
Obligations and contractsObligations and contracts
Obligations and contracts
 
Obligation and cobtracts buslaw1
Obligation and cobtracts buslaw1Obligation and cobtracts buslaw1
Obligation and cobtracts buslaw1
 

Ähnlich wie CONTRACTS AND ITS TYPES

Chapter-2 Construction Contract. Subject code:3160614ptx
Chapter-2 Construction Contract. Subject code:3160614ptxChapter-2 Construction Contract. Subject code:3160614ptx
Chapter-2 Construction Contract. Subject code:3160614ptx
sulevrunda
 

Ähnlich wie CONTRACTS AND ITS TYPES (20)

3 Type of contracts.pdf
3 Type of contracts.pdf3 Type of contracts.pdf
3 Type of contracts.pdf
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Chapter 4- Contract Management
Chapter 4- Contract ManagementChapter 4- Contract Management
Chapter 4- Contract Management
 
Final types of contracts- different types of contracts
Final types of contracts- different types of contractsFinal types of contracts- different types of contracts
Final types of contracts- different types of contracts
 
Project contracting
Project contracting Project contracting
Project contracting
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
Chapter-2 Construction Contract. Subject code:3160614ptx
Chapter-2 Construction Contract. Subject code:3160614ptxChapter-2 Construction Contract. Subject code:3160614ptx
Chapter-2 Construction Contract. Subject code:3160614ptx
 
Construction practices
Construction practicesConstruction practices
Construction practices
 
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts
 
Negotiated contracts
Negotiated contractsNegotiated contracts
Negotiated contracts
 
Unit-1_Contracts
Unit-1_ContractsUnit-1_Contracts
Unit-1_Contracts
 
ACH 216 Lecture 04c (Project Award)
ACH 216 Lecture 04c (Project Award)ACH 216 Lecture 04c (Project Award)
ACH 216 Lecture 04c (Project Award)
 
ACH 231 Lecture 05 (Design Contracts Part 1)
ACH 231 Lecture 05 (Design Contracts Part 1)ACH 231 Lecture 05 (Design Contracts Part 1)
ACH 231 Lecture 05 (Design Contracts Part 1)
 
Contract account
Contract accountContract account
Contract account
 
Contracts and their types
Contracts and their typesContracts and their types
Contracts and their types
 
CON_CONTRACTS_all_till_mid. bgf uggttyy ppt
CON_CONTRACTS_all_till_mid. bgf uggttyy pptCON_CONTRACTS_all_till_mid. bgf uggttyy ppt
CON_CONTRACTS_all_till_mid. bgf uggttyy ppt
 
Types and forms of contracts
Types and forms of contracts Types and forms of contracts
Types and forms of contracts
 
Contract Negotiations
Contract NegotiationsContract Negotiations
Contract Negotiations
 
Nuclear Supply Chain Symposium - Canadian Contracting Models
Nuclear Supply Chain Symposium - Canadian Contracting ModelsNuclear Supply Chain Symposium - Canadian Contracting Models
Nuclear Supply Chain Symposium - Canadian Contracting Models
 

Mehr von Pundlik Rathod

8086 architecture basics
8086 architecture basics8086 architecture basics
8086 architecture basics
Pundlik Rathod
 
GIS and GPS - applications in civil engg
GIS and GPS - applications  in civil enggGIS and GPS - applications  in civil engg
GIS and GPS - applications in civil engg
Pundlik Rathod
 
DNA MUGSHOTS AGAINST CRIME
DNA MUGSHOTS AGAINST CRIMEDNA MUGSHOTS AGAINST CRIME
DNA MUGSHOTS AGAINST CRIME
Pundlik Rathod
 
Conversion of waste material into useful products
Conversion of waste material into useful productsConversion of waste material into useful products
Conversion of waste material into useful products
Pundlik Rathod
 

Mehr von Pundlik Rathod (8)

8086 architecture basics
8086 architecture basics8086 architecture basics
8086 architecture basics
 
Water harvesting
Water harvestingWater harvesting
Water harvesting
 
DAMS AND ITS TYPES
DAMS AND ITS TYPESDAMS AND ITS TYPES
DAMS AND ITS TYPES
 
GIS and GPS - applications in civil engg
GIS and GPS - applications  in civil enggGIS and GPS - applications  in civil engg
GIS and GPS - applications in civil engg
 
Plumbing
PlumbingPlumbing
Plumbing
 
Green buildings
Green  buildingsGreen  buildings
Green buildings
 
DNA MUGSHOTS AGAINST CRIME
DNA MUGSHOTS AGAINST CRIMEDNA MUGSHOTS AGAINST CRIME
DNA MUGSHOTS AGAINST CRIME
 
Conversion of waste material into useful products
Conversion of waste material into useful productsConversion of waste material into useful products
Conversion of waste material into useful products
 

Kürzlich hochgeladen

FULL ENJOY Call Girls In Majnu.Ka.Tilla Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu.Ka.Tilla Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu.Ka.Tilla Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu.Ka.Tilla Delhi Contact Us 8377877756
dollysharma2066
 
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
Cara Menggugurkan Kandungan 087776558899
 

Kürzlich hochgeladen (20)

Digital-Marketing-Into-by-Zoraiz-Ahmad.pptx
Digital-Marketing-Into-by-Zoraiz-Ahmad.pptxDigital-Marketing-Into-by-Zoraiz-Ahmad.pptx
Digital-Marketing-Into-by-Zoraiz-Ahmad.pptx
 
VIP Call Girls Dongri WhatsApp +91-9833363713, Full Night Service
VIP Call Girls Dongri WhatsApp +91-9833363713, Full Night ServiceVIP Call Girls Dongri WhatsApp +91-9833363713, Full Night Service
VIP Call Girls Dongri WhatsApp +91-9833363713, Full Night Service
 
Analysis of Sineing Website and how to fix
Analysis of Sineing Website and how to fixAnalysis of Sineing Website and how to fix
Analysis of Sineing Website and how to fix
 
2024 Social Trends Report V4 from Later.com
2024 Social Trends Report V4 from Later.com2024 Social Trends Report V4 from Later.com
2024 Social Trends Report V4 from Later.com
 
Social Media Marketing Portfolio - Maharsh Benday
Social Media Marketing Portfolio - Maharsh BendaySocial Media Marketing Portfolio - Maharsh Benday
Social Media Marketing Portfolio - Maharsh Benday
 
W.H.Bender Quote 61 -Influential restaurant and food service industry network...
W.H.Bender Quote 61 -Influential restaurant and food service industry network...W.H.Bender Quote 61 -Influential restaurant and food service industry network...
W.H.Bender Quote 61 -Influential restaurant and food service industry network...
 
20180928 Hofstede Insights Conference Milan The Power of Culture Led Brands.pptx
20180928 Hofstede Insights Conference Milan The Power of Culture Led Brands.pptx20180928 Hofstede Insights Conference Milan The Power of Culture Led Brands.pptx
20180928 Hofstede Insights Conference Milan The Power of Culture Led Brands.pptx
 
Rise and fall of Kulula.com, an airline won consumers by different marketing ...
Rise and fall of Kulula.com, an airline won consumers by different marketing ...Rise and fall of Kulula.com, an airline won consumers by different marketing ...
Rise and fall of Kulula.com, an airline won consumers by different marketing ...
 
Distribution Ad Platform_ The Role of Distribution Ad Network.pdf
Distribution Ad Platform_ The Role of  Distribution Ad Network.pdfDistribution Ad Platform_ The Role of  Distribution Ad Network.pdf
Distribution Ad Platform_ The Role of Distribution Ad Network.pdf
 
Martal Group - B2B Lead Gen Agency - Onboarding Overview
Martal Group - B2B Lead Gen Agency - Onboarding OverviewMartal Group - B2B Lead Gen Agency - Onboarding Overview
Martal Group - B2B Lead Gen Agency - Onboarding Overview
 
FULL ENJOY Call Girls In Majnu.Ka.Tilla Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu.Ka.Tilla Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu.Ka.Tilla Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu.Ka.Tilla Delhi Contact Us 8377877756
 
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
 
Busty Desi⚡Call Girls in Sector 49 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 49 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 49 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 49 Noida Escorts >༒8448380779 Escort Service
 
How consumers use technology and the impacts on their lives
How consumers use technology and the impacts on their livesHow consumers use technology and the impacts on their lives
How consumers use technology and the impacts on their lives
 
Choosing the Right White Label SEO Services to Boost Your Agency's Growth.pdf
Choosing the Right White Label SEO Services to Boost Your Agency's Growth.pdfChoosing the Right White Label SEO Services to Boost Your Agency's Growth.pdf
Choosing the Right White Label SEO Services to Boost Your Agency's Growth.pdf
 
Welcome to DataMetricks Consulting (1).pptx
Welcome to DataMetricks Consulting (1).pptxWelcome to DataMetricks Consulting (1).pptx
Welcome to DataMetricks Consulting (1).pptx
 
Enhancing Business Visibility PR Firms in San Francisco
Enhancing Business Visibility PR Firms in San FranciscoEnhancing Business Visibility PR Firms in San Francisco
Enhancing Business Visibility PR Firms in San Francisco
 
Press Release Distribution Evolving with Digital Trends.pdf
Press Release Distribution Evolving with Digital Trends.pdfPress Release Distribution Evolving with Digital Trends.pdf
Press Release Distribution Evolving with Digital Trends.pdf
 
[Expert Panel] New Google Shopping Ads Strategies Uncovered
[Expert Panel] New Google Shopping Ads Strategies Uncovered[Expert Panel] New Google Shopping Ads Strategies Uncovered
[Expert Panel] New Google Shopping Ads Strategies Uncovered
 
Micro-Choices, Max Impact Personalizing Your Journey, One Moment at a Time.pdf
Micro-Choices, Max Impact Personalizing Your Journey, One Moment at a Time.pdfMicro-Choices, Max Impact Personalizing Your Journey, One Moment at a Time.pdf
Micro-Choices, Max Impact Personalizing Your Journey, One Moment at a Time.pdf
 

CONTRACTS AND ITS TYPES

  • 2. Contract Definitions A. From a Legal Point of View :  A mutual agreement between two or more parties that something shall be done, an agreement enforceable at law. B. According to FIDIC :  Contract means the General Conditions, the Supplementary Conditions, the Specifications, the Drawings, the Bill of quantities, the Tender, the Letter of Acceptance, the Contract Agreement.
  • 3.  C. According to Method of Payment :  The agreement of how the owner will pay the contractor for work  performed such as a lump-sum or cost-plus payment.
  • 4. Why Use contract in construction?  Describe scope of work  Establish time frame  Establish cost and payment provision  Set fourth obligations and relationship  Minimize disputes  Improve economic return of investment
  • 5. Major Contract Types (traditional)
  • 6. TYPES OF CONSTRUCTION CONTRACTS  Two broad categories:  Price Given in Advance Contracts (Priced-based Contracts)  Cost Reimbursement Contracts (Cost-based Contracts)  Factors Influencing the Choice of the Type of Contract  The appropriateness for providing an adequate incentive for efficient  performance by the contractor  The ability to introduce changes  The allocation of risks  The start and completion date of the project
  • 7. Lump sum contracts  Involves a total fixed priced for all construction related activities.  Can include incentives or benefits for early termination, or can also have penalties, called liquidated damages, for a late termination.  Preferred when a clear scope and a defined schedule has been reviewed and agreed upon.
  • 8. Lump Sum Contract( Advantages)  Low risk on the owner, Higher risk to the contractor  Cost known at outset  Contractor will assign best personnel  Contractor selection is easy.
  • 9. Lump Sum Contract(Disadvantages)  Changes is difficult and costly.  Contractor is free to use the lowest cost of material equipment, methods.  The contractor carries much of the risks. The tendered price may include high risk contingency.  Competent contractors may decide not to bid to avoid a high-risk lump sum contract.
  • 10. Unit Price  No total final price  Quote Rates / Prices by units  Re-negotiate for rates if the quantity or work considerably exceeds the initial target  Payment to contractor is based on the measure.  Unbalanced bids  Higher risk to owner  Ideal for work where quantities can not be accurately established before construction starts.
  • 11. Unit Price contract • Require sufficient design definition to estimate quantities of units • Contractors bid based on units of works • Time & cost risk (shared) • Owner : at risk for total quantities • Contractor : at risk for fixed unit price. • Large quantities changes (>15-25%) can lead to increase or decrease of unit price.
  • 12. Unit Price ( Advantages)  Easy for contract selection.  Early start is possible.  Saves the heavy cost of preparing many bills of quantities by the contractors.  Fair basis for competition.  In comparing with lump-sum contract, changes in contract documents can be made easily by the owner.  Lower risk for contractor.
  • 13. Unit Price (Disadvantages)  Final cost not known from the beginning (BOQ only is estimated)  Staff needed to measure the finished quantities and report on the units not completed.  Unit price sometime tend to draw unbalanced bid. (For Unit-Price Contracts, a balanced bid is one in which each bid is priced to carry its share of the cost of the work and also its share of the contractor’s profit. Contractors raise prices on certain items and make corresponding reductions of the prices on other items ,without changing the total amount of the bid)
  • 14. Schedule of rates contract  A Schedule of the work items without quantities is prepared by the owner and /or A/E to be rated by the contractor.  The descriptions of items and the units of measurement are similar to those used in a normal B.O.Q., but no quantities are given.  It is common for separate rates to be quoted for labor, plant, and materials.  Used for repair and maintenance works or under conditions of urgency.
  • 15. Schedule of Rates Contract Advantages:  1. Work can be commenced earlier than if a full B.O.Q has been prepared. Disadvantage :  1. No indication of the final price of the works.  2. Very difficult to determine which contractor submitted the most  advantageous offer.  3. May cause financial problems to the public owners
  • 16. Cost Plus 1. Actual cost plus a negotiated reimbursement to cover overheads and profit. 2. Different methods of reimbursement : Cost + percentage Cost + fixed fee Cost + fixed fee + profit-sharing clause. 3. Higher risk to owner 4. Compromise : guaranteed maximum price (GMP) reduces risk to owner while maintain advantage of cost plus contract. 5. By using this type of contract the contractor can start work without a clearly defined project scope, since all costs will be reimbursed and a profit guaranteed.
  • 17. Cost + Percent of Cost  1. The contractor is reimbursed for all his costs with a fixed % age of costs to cover his services.  2. Project/site overheads may be covered by the %age or computed as one of the costs.
  • 18. Cost + Percent of Cost Fee = percentage of the total project cost (Cost = $500.000,Fee = 2%) Advantages Disadvantages profitable for the contractor No incentive to finish job quickly Owner does not know total price Larger the cost of the job, the higher the fee the owner pays
  • 19. Cost + Percent (Advantages) 1. Construction can start before design is completed. 2. If the contractor is efficient in the utilization of resources then the cost to the client should represent a fair price for the work undertaken.
  • 20. Cost + Percent (Disadvantages ) 1. The project total cost is completely unknown before the project start. 2. No incentive for the contractor to be efficient in his use of labors, materials or equipments. 3. Minimum efficiency maximizes the profit.
  • 21. Cost Plus Fixed Fee  Most common form of negotiated contracts  COST = expenses incurred by the contractor for the construction of the facility  Includes: Labor, equipment, materials, and administrative costs  FEE = compensation for expertise  Includes: profit
  • 22. Cost + Fixed Fee  Fee = percentage of the original estimated total figure  Utilized on large multi- year jobs  Ex: WW treatment plant Facility (Cost = $20 million, Fee = 1%)  $20 Million 1% fee = $200,000 Million Advantages Disadvantages Fee amount is fixed regardless of price fluctuation Expensive materials and construction techniques may be used to expedite construction Provides incentive to complete the project quickly
  • 23. Cost + Fixed Fee + Profit-Sharing Clause  Rewards contractors who minimize cost  Percentage of cost under GMP is considered profit and shared with the contractor  Guaranteed Maximum Price (GMP)  % of profit sharing is specified in contract Advantag es Disadvantages Provides incentive to the contracto r to save money Contractor must absorb any amount over the GMP Plans & specs. need to detailed
  • 24. Cost + Fixed Fee + Profit-Sharing Clause  In this type of contract the contractor is reimbursed at cost with an agreed-upon fee up to the GMP, which is essentially a cap; beyond this point the contractor is responsible for covering any additional costs within the original project scope  An incentive clause, which specifies that the contractor will receive additional profit for bringing the project in under the GMP.
  • 25. Guaranteed Maximum Price contract  In a guaranteed maximum price (GMP) contract, the contractor estimates the cost just like in a lump sum bid, but profit is limited to a specified amount.  In the event that actual costs are lower than the estimates, the owner keeps the savings.  In the event costs are higher, the contractor pays the difference and profit is reduced.
  • 26. Advantages  Greater price certainty for clients as the contractor normally includes a sum for future design development and for risks.  GMP promotes pre-agreement of changes as its philosophy links neatly with a contractual requirement to pre-agree the cost and time implications of any potential changes.  GMP provides greater control over spending as the contractor is bound to a maximum price. This alerts the team to any potentially expensive items of design development.  GMP aligns the contractor with client and consultants encouraging team work with mutual trust and common goals.  Less administration is required as changes are limited; there is quick settlement of the final account.
  • 27. Disadvantages  The client might pay too much as the contractor takes on greater risk and thus includes in the price an allowance for design development and risk. Often a competitive price is sacrificed in lieu of appointing a contractor early.  Contractor’s with design and build experience may have useful knowledge.  There is no standard form of contract for GMP so there is a greater possibility of errors and misunderstandings of liabilities between the parties that may result in conflict.  Scope changes tend to cost more, it is accepted that scope changes to design and build are more likely to be more expensive than with a traditional contract, the same can also be said for GMP contracts.