Alarm Management Standards –
Are You Taking Them Seriously?
Executive Summary
EEMUA Publication 191 “ALARM SYSTEMS - A Guide to Design, Management, and Procurement” was first released in 1999 and is
well acknowledged as the defacto standard for Alarm Management. (A second edition was released in 2007). ISA and ANSI approved a
new standard in June, ANSI/ISA-18.2-2009 “Management of Alarm Systems for the Process Industries”.
Both of these publications have similar KPIs for alarm system performance. So what does this mean for your industry?
As an employer, irrespective of the size of the business, you have the responsibility for the day-to-day health, safety and welfare of your
employees and visitors to your workplace. This duty of care is usually set out in the occupational health and safety (OHS) legislation of
the relevant country. Companies as well as individuals from Supervisor level to CEO level have been legally prosecuted for breaches in
OH&S regulations in some countries. Duty of care usually mandates that employers of process and other automated industries must
provide a suitable alarm system that gives adequate warning of impending abnormal situations to operators so that they have time to
take action to prevent the potential consequences from occurring. Duty of care also includes the provision of a control system that does
not put the operators under undue levels of stress, which could also compromise the safety of other employees.
This paper provides information on what alarm management is and why it is important. It also provides an overview of these global
standards, and what you can do to achieve compliance.
Alarm Management Standards – Are You Taking Them Seriously? 2
Table of Contents
Executive Summary ................................................................................................................................................................... 1
Document Terminology ............................................................................................................................................................. 5
What is Alarm Management? ....................................................................................................................................................6
Definition ...................................................................................................................................................................................... 6
Layer of Protection ....................................................................................................................................................................... 6
What Else is Alarm Management? ............................................................................................................................................ 6
Continuous Lifecycle .................................................................................................................................................................... 6
Plant Maintenance/Reliability ....................................................................................................................................................... 6
Good Process Control .................................................................................................................................................................. 6
Outcome of a Risk Assessment ................................................................................................................................................... 7
Related to Equipment Failure....................................................................................................................................................... 7
Enhanced/Advanced Control........................................................................................................................................................ 7
Abnormal Situation Management (ASM) ...................................................................................................................................... 7
It Has Been Widely Ignored for a Long Time................................................................................................................................ 7
Often Used In Fault Tree Analysis (FTA)...................................................................................................................................... 7
What is a Lack of Alarm Management?.................................................................................................................................... 8
Potential Industrial Disasters........................................................................................................................................................ 8
Example Plant Incident – Swiss Cheese Risk Model. .................................................................................................................. 8
Employee Impact.......................................................................................................................................................................... 8
Employer Impact .......................................................................................................................................................................... 8
Court Case? ................................................................................................................................................................................. 8
Demystifying Standards & Guidelines...................................................................................................................................... 8
Introduction................................................................................................................................................................................... 8
Which standard do you comply with? ........................................................................................................................................... 8
Key Features of EEMUA 191 and ISA 18.2 ............................................................................................... 8
EEMUA Key Features .................................................................................................................................................................. 9
ISA 18.2 Key Features ................................................................................................................................................................. 10
EEMUA Alarm Performance KPIs ............................................................................................................................................. 10
ISA 18.2 Alarm Performance KPIs ............................................................................................................................................... 10
ISA 18.2 Lifecycle Model............................................................................................................................................................ 11
Scope of the Lifecycle Model........................................................................................................................................................ 13
Stages of the Lifecycle Model....................................................................................................................................................... 13
Philosophy.................................................................................................................................................................................... 13
Identification ................................................................................................................................................................................. 14
Rationalization.............................................................................................................................................................................. 14
Design .......................................................................................................................................................................................... 14
Implementation & Training............................................................................................................................................................ 14
Operation...................................................................................................................................................................................... 14
Maintenance................................................................................................................................................................................. 14
Monitoring & Assessment............................................................................................................................................................. 14
Management of Change............................................................................................................................................................... 14
Alarm Management Standards – Are You Taking Them Seriously? 3
Audit ............................................................................................................................................................................................. 14
Entering the Lifecycle Model ........................................................................................................................................................ 15
Lifecycle Model Loops.................................................................................................................................................................. 15
ISA 18.2 Compliance.................................................................................................................................................................... 15
What Steps Can You Take to Comply?..................................................................................................................................... 15
Conclusion.................................................................................................................................................................................. 16
References.................................................................................................................................................................................. 16
Alarm Management Standards – Are You Taking Them Seriously? 4
Table of Figures
Figure 1: Layers of Protection in a Processing Plant........................................................................................................ 5
Figure 2: Fault Tree Analysis ................................................................................................................................................6
Figure 5: Swiss Cheese Risk Model ................................................................................................................................................... 7
Figure 6: Sample EEMUA Results – Total Plant for One Month .........................................................................................10
Figure 6: ISA 18.2 Alarm Management Lifecycle .................................................................................................................11
Table 1: EEMUA 191 – Benchmark for Assessing Average Alarm Rates .........................................................................9
Table 2: EEMUA 191 – Guidance on Alarm Rate Following an Upset...............................................................................9
Table 3: Sample ISA 18.2 Alarm Performance KPIs .......................................................................................................... 10
Alarm Management Standards – Are You Taking Them Seriously? 5
Document Terminology
Name Definition
EEMUA Engineering Equipment Material Users Association
LOP Layers of Protection
LOPA Layers of Protection Analysis
FTA Fault Tree Analysis
SIL Safety Integrity Level
ISA 18.2 ANSI/ISA-18.2-2009
DCS Distribute Control System
ASM Abnormal Situation Management
OH&S Occupational Health and Safety
KPI Key Performance Indicator
ISA International Society of Automation
NOHSC National Occupational Health and Safety Commission
Alarm Management Standards – Are You Taking Them Seriously? 6
What is Alarm Management?
Definition
“Process by which alarms are engineered, monitored, and managed to ensure safe, reliable operations”
Layer of Protection
The concept of Layers of Protection is to provide Independent Layers of Protection around hazardous processes to reduce the risk of
undesired consequences such as fire, toxic releases etc (Refer to Figure 1).Alarms are considered to be a Layer of Protection (LOP)
and are often used in Safety Integrity Level (SIL)analysis. The intent of these alarms is to warn operators of an impending abnormal
situation, which can often have safety related consequences. In determining the average Probability of Failure on Demand for a SIL
loop that contains an alarm as a LOP, the probability of the operator failing to adequately respond to the alarm must be considered.
Some of the plants that have been reviewed by the author have had unrealistic probability of failure figures such as 0.1 (i.e. a 1 in 10
year probability), where the alarm rates have been over the “maximum manageable” as deemed in the ISA 18.2 standard. This has the
potential to make the SIL design for a loop to be inaccurate.
Figure 1: Layers of Protection in a Processing Plant
What Else is Alarm Management?
Continuous Lifecycle
Alarm management is a lifecycle process based on a continuous improvement process. If the alarms and associated plant and
equipment are not regularly maintained then it is most likely the system performance will degrade over time.
Plant Maintenance/Reliability
Good plant maintenance practices are absolutely critical in terms of plant production rates, safety, and alarm system performance. Poor
practices can result in chattering alarms, ineffective instruments, false alarms and safety related incidents.
Good Process Control
Good process control assists in minimizing the probability of abnormal situations from occurring due to interlock failure, incorrect logic
configuration or uncontrolled PID loops. Typically poor process control also results in operator actions, chattering alarms etc.
Alarm Management Standards – Are You Taking Them Seriously? 7
Outcome of a Risk Assessment
Every task that is required within a processing plant should be subject to a risk assessment, including determining the requirement to
use an alarm to minimize the risk potential. This should be considered simply good engineering practice.
Related to Equipment Failure
All manufactured equipment eventually fails with time! Unfortunately some companies rely too heavily on the higher LOPs (safety
systems, pressure relief valves etc) to protect the integrity of their plants. All safety equipment has a probability to fail on demand and
should only be employed as a last means of defence. Two recent incidents in Australia involved an explosion in a vessel that lacked the
correct PRV’s, while another involved both redundant safety system processors rebooting simultaneously.
Enhanced/Advanced Control
There have been significant developments in smart alarming techniques such as state-based alarming, model-based alarming and
predictive alarming. These techniques are used to improve the performance of the alarm system as well as minimizing the chance of
abnormal situations from occurring.
Abnormal Situation Management (ASM)
This is all about allowing the operator enough time and resources to prevent an unusual event from occurring. The ASM Consortium®
has undertaken significant research into graphics, control systems and alarm systems for abnormal situation management.
It Has Been Widely Ignored for a Long Time
On many sites the operators ignore the alarms as the systems are unusable in their current state. There are still chemical plants, coal
preparation plants, refineries, power stations, etc where this is the case!
Often Used In Fault Tree Analysis (FTA)
Fault Tree Analysis is a common method of undertaking quantitative risk assessments and is often used to determine the SIL level of a
Safety Integrity Level loop.
Figure 2: Fault Tree Analysis
FTA inputs are either frequency of an event occurring or the average probability of failure on demand. If the PFD for the operator failing
to respond to the high level alarm is changed to 0.5, the loop PFD is increased from 0.00011 to 0.00051. Also if the high level trip
system is only tested once a year (instead of twice) then the PFD is effectively doubled.
Some industrial plants have fault tree analysis results that put unrealistic targets on operators being able to detect and respond to an
alarm before the safety system takes action.
Alarm Management Standards – Are You Taking Them Seriously? 8
What is a Lack of Alarm Management?
Potential Industrial Disasters
Abnormal Situations cost industry millions of dollars every year. A number of plant incidents that have been partly attributed to poor
alarm management practices have tragically resulted in injury and death of personnel and huge financial losses. Two examples are the
Longford Gas Explosion in 1998 and the Texas City Oil Refinery Explosion in 2005.
Example Plant Incident – Swiss Cheese Risk Model.
The following scenario is based on a true incident assessed against the Swiss Cheese Risk Model (Figure 5), which was originally
developed by James Reason. Each hole in the cheese is symbolic of a potential pathway to employee exposure.
Figure 5: Swiss Cheese Risk Model
 Plant is relatively unstable. It is getting towards the end of 12hr shift: OPERATIONAL.
 A tank containing hot material reaches HH level: PROCESS.
The HH level DCS pump interlock was disabled to replace the instrument and inadvertently not reenabled: POOR MOC.
 The control room operator misses the alarm because they are overloaded and there is an alarm flood: ALARM MANAGEMENT.
 Safety level switches in the SIL loop for tripping the incoming pump power supply have not been tested for over two years and fail
to operate: MAINTENANCE
 The tank overflows with workers in close vicinity: INCIDENT
Employee Impact
What are the potential employee impacts?
 Possible Injury
 Potential Fatality
 Flow-on Family/Community effects
Employer Impact
What are the potential employer impacts?
 Operational Downtime/Loss of Production
 Investigation by the relevant authority
 Damage to reputation
 Potential for legal action
Alarm Management Standards – Are You Taking Them Seriously? 9
Court Case?
If in the above plant incident an employee was actually killed or severely injured, then it is likely that the employer would end up in
court. Two questions that a prosecution might ask the employer are:
 Did you comply with an Internationally accepted standard”?
 Did you follow known, good engineering practice”?
An Employer typically can not use the following excuses “I do not have the people” or “I wasn’t aware that such an accepted standard
existed”. This could refer to a published ANSI, IEC, or other standard, a draft standard, or even a published report/standard from a
relevant authority. In recent court cases there has been more use of expert witnesses. If an expert witness was brought in to review the
above incident, then the following is a possible response:
EEMUA 191 was released in 1999 and is a well recognized global defacto standard for Alarm Systems. ISA 18.2 has been well
publicized over the past 24 months and has just been released. Operators have complained a number of times about the state of
the alarm system. Benchmarking has determined that many of the alarm KPIs exceed what is deemed “Very unlikely to be
acceptable” in EEMUA 191 and exceeds the ”Maximum Manageable” in ISA 18.2. Management of change practices do not meet
known good engineering practices. The safety function level switches had not been tested for over two years.”
The outcome of this case would most likely not be in favor of the employer! would be in place not later than June 1, 2008. As June
quickly approaches, many pipeline operators are looking to available alarm management.
Demystifying Standards & Guidelines
Introduction
EEMUA 191 was first released in 1999 and has since been referred to as the defacto standard for alarm management. EEMUA is
written in a text book format and provides some excellent examples in the appendixes.
ISA 18.2 has been written more like a standard and has many similarities to the safety instrumented systems standards IEC 61508/11.
Which standard do you comply with?
EEMUA 191 and ISA 18.2 complement each other. In summary EEMUA describes in detail the tools and techniques for various aspects
of alarm management (e.g. rationalization, risk assessments, graphics design), whilst ISA 18.2 clearly defines the required performance
KPIs and the overall lifecycle approach to alarm management. The performance KPIs for both documents are similar, although they are
more clearly defined in Table 14 of ISA 18.2.
Key Features of EEMUA 191 and ISA 18.2
The main features of EEMUA 191 and ISA 18.2 are highlighted in this section.
EEMUA Key Features
 Good detail on alarm design, including different risk assessment approaches.
 Written in a easily readable text-book format – excellent worked examples.
 New section on Alerts.
 Philosophy, principles of alarm system design, implementation issues.
 Measuring performance and managing an improvement programme.
 Specifications for alarm systems.
 Design of field sensors.
 Design of alarm displays.
 Performance metrics and useful questionnaires.
 Alarm suppression hazard study.
 Sample risk assessments and determining priority – enhanced.
 New section on alarm management in Batch Plants.
Alarm Management Standards – Are You Taking Them Seriously? 10
 New section on alarm system improvement process.
 Complementary to ISA 18.2.
ISA 18.2 Key Features
 Large focus on an alarm system lifecycle.
 Very clear alarm system performance KPIs.
 Written like other similar standards – eg IEC AS 61511.
 Section on compliance.
 Alarm Philosophy – what must be included in table format..
 Alarm System requirements specification.
 Identification and rationalization.
 Basic alarm design, HMI design, and enhanced and advanced methods.
 Implementation, operation, and maintenance.
 Monitoring and assessment, management of change, and auditing.
 Less examples are given.
 Complementary to EEMUA 191.
EEMUA Alarm Performance KPIs
EEMUA suggests three main KPIs on a per operator basis for 10 minute time periods:
 Average Alarm Rate
 Maximum Alarm rate
 % of time Alarm rates are outside of acceptability target
Average alarm rate is defined as a level of acceptability in Table 1 below. Maximum alarm rates following a plant upset are shown in
Table 2. EEMUA mentions that the percentage of time alarm rates which are outside of the acceptability target of one per two minutes
(or 30 per hour) should be a small number. Once a small number is achieved then it should be based on 1 per 5 minutes to ensure
continuous improvement.
Table 1: EEMUA 191 – Benchmark for Assessing Average Alarm Rates
Alarm Management Standards – Are You Taking Them Seriously? 11
Table 2: EEMUA 191 – Guidance on Alarm Rate Following an Upset
Figure 6: Sample EEMUA Results – Total Plant for One Month
EEMUA also states that a site, which has a control system with greater than 1000 configured alarms, should be targeting fewer than 10
standing alarms and fewer than 30 shelved alarms (excluding maintenance shelved alarms). EEMUA also provides a graphical
representation for different levels of performance of an alarm system. A sample scatter graph report for a plant is shown in Figure 6.
ISA 18.2 Alarm Performance KPIs
Table 3 shows the important performance metrics listed in Figure 14 of the standard. These alarm performance metrics and target
values are very clearly defined and should be the target KPIs for your plant. While these targets may initially appear onerous, they
should be possible over time. If your plant’s alarm system performance does not meet the following KPIs, it is important that you can
demonstrate continuous improvement with the goal and processes in place to reach these targets.
A flood is defined as starting when 10 or more alarms (per operator) are received within a 10 minute period, and ends when less than 5
alarms are received in a subsequent 10 minute period. A chattering alarm is one that is on then off and on again in a short period of
time (eg 1 min). Fleeting and/or momentary alarms turn on and off very quickly, but do not necessarily repeat. Stale alarms are those
that go into alarm and do not return to the normal state for at least 24 hrs.
Alarm Management Standards – Are You Taking Them Seriously? 12
Table 3: Sample ISA 18.2 Alarm Performance KPIs
ISA 18.2 Lifecycle Model
ISA 18.2 Lifecycle Model
The lifecycle model is an excellent method of representing the overall process of alarm system management. It is an ongoing process
that is suitable for new or existing systems. It has been designed to represent sequential stages, some of which run simultaneously with
other stages that are linked horizontally (eg MOC (Stage I) must be followed for Stages B,C,D, and E).
In some cases a sequential stage may be “skipped”. For example, during a rationalization exercise the outcome may be an alarm
setting change, which may not require detailed design to implement.
Alarm Management Standards – Are You Taking Them Seriously? 13
Figure 6: ISA 18.2 Alarm Management Lifecycle
Scope of the Lifecycle Model
The lifecycle model is limited to computer based alarm systems and excludes sensors and final control elements. Safety Instrumented
Systems (SIS) are also excluded except for any alarms generated from them.
Stages of the lifecycle model
Philosophy
An Alarm Philosophy documents the site approach to alarm management and is a mandatory requirement. It includes the definitions
and principles and details of the practices and procedures for each of the remaining life cycle stages. It provides a lasting reference to
sustain an effective alarm system. A table containing the required and recommended contents of the Alarm Philosophy is provided in
the draft standard. Alarm System Functional Specifications detail the control system specific implementation related to the Alarm
Philosophy definitions.
Alarm Management Standards – Are You Taking Them Seriously? 14
Identification
Many methods are available to determine if an alarm is required. Some of these are Process Hazard Analysis (PHA), incident
investigations, HAZOPS/CHAZOPS, and alarm design/rationalization workshops. The outcome of a HAZOP might be that an alarm is
required to warn the operator of an abnormal situation (eg High Pressure). Typically a HAZOP exercise does not consider the following:
is the particular tag the most suitable to alarm, what is the ideal setting, configuration details, the potential operator workload etc. These
details are discussed in the Rationalization stage before an alarm is to be implemented. Identification and the following three stages are
closely related. Due to different terminology used in process industries, it can be somewhat confusing as to which steps in the overall
design process are undertaken in each stage.
Rationalization
Alarm rationalization is about reconciling each individual alarm against the principles and requirements of the alarm philosophy. It is
important that the relevant data for each alarm is documented to support the other stages of the life cycle. This includes the alarm
description, settings, causes of an alarm, the consequence of no action, the required operator action, response time, consequence
rating, etc. Consequences and the response time are documented and the alarm priority is determined from a matrix of the
consequence severity and response time. This matrix is defined by the alarm philosophy. The methodology in the Rationalization stage
also applies for new projects. The main difference with new projects is that typically there is no historical trends or alarm data that can
be referred to.
Design
The design phase includes the basic DCS/PLC configuration of the alarm, Human Machine Interface (HMI) for the alarm, and any
advanced methods of alarm management. These requirements are determined in the rationalization stage.
Implementation & Training
This stage involves the various other activities required to put the alarm into service. It includes testing of the alarm system functions as
well as relevant training for the operator and other personnel.
Operation
The alarm is now in service and reporting abnormal conditions to the operator.
Maintenance
Process measurement instruments, final control elements, and control systems all require periodic/predictive maintenance to ensure
their continued reliable operation. This is critical to ensure the ongoing performance of the alarm system.
Monitoring & Assessment
This stage includes the periodic collection and analysis of data from alarms. Without monitoring it is virtually impossible to maintain an
effective alarm system. Assessment should be undertaken frequently (daily or weekly) and is the primary method for determining
problems such as nuisance alarms, stale alarms, and alarm floods.
Management of Change
Management of change is a critical stage that helps ensure the ongoing integrity of the alarm system. It needs to be a structured
process of approval and authorization for any additions, modifications, and deletions of alarms from the system.
Audit
A periodic audit of the alarm system and the processes detailed in the alarm philosophy may determine the need to modify processes,
the philosophy, or the design etc. This is also the ideal stage to enter the alarm system lifecycle process. The audit may also highlight
that an organization’s discipline to follow the processes (especially MOC) may need improvement.
Alarm Management Standards – Are You Taking Them Seriously? 15
Entering the Lifecycle Model
It is possible to enter the lifecycle model from the Philosophy, Monitoring and Assessment, or Auditing stage.
For Greenfields projects it is best to start with a Philosophy before any rationalization/design is undertaken.
For existing sites the ideal entry point is usually the Monitoring and Assessment stage, which will provide a benchmark for the site
alarm system (per operator). This provides a snapshot of the health of the alarm system and can be used to justify improvement work.
Undertaking a detailed audit will highlight any deficiencies that your alarm system will have in any of the other stages (A-I).
Lifecycle Model Loops
There are three “loops” in the lifecycle model that are represented by the dotted lines in Figure 6. If an alarm issue is detected in the
Monitoring and Assessment stage then it would be resolved via the Monitoring and Maintenance Loop (eg chattering alarm) or the
Monitoring and Management of Change Loop (eg more complex issue). The monitoring and maintenance loop typically is applied for
simple maintenance related issues whereby the Monitoring and Management of Change Loop is required for any design changes.
The Auditing and Philosophy Loop basically entails the whole lifecycle process. Periodic audits of your alarm system are a requirement
of the standard.
ISA 18.2 Compliance.
The ISA 18.2 has a section on compliance (section 4.1) and a grandfather clause (section 4.2). It refers to those existing plants that
must be able to demonstrate that their alarm system “equipment is designed, maintained, inspected, tested, and operated in a
safe manner”.
What Steps Can You Take to Comply?
Now is the time to act. The following steps will help you get on the road to compliance:
 Purchase EEMUA 191 and ISA 18.2.
 Undertake some form of an audit of your alarm system. An audit will highlight the deficiencies of your alarm system and what areas
need to be improved. As an absolute minimum, undertake a benchmarking and assessment project to determine if your alarm rates
are acceptable.
 It is critical to get senior management sponsorship for an alarm system improvement project. Information that should help
management sponsor your project are operator survey results, and a benchmarking and assessment report which compares your
plant alarm system KPIs with EEMUA 191 and ISA 18.2 requirements.
 Prepare a Strategic Plan to reach compliance. This plan may contain the following:
1. Philosophy Document and then Functional Specifications.
2. Purchase of alarm database and associated software tools.
3. Top 20 and/or Classic rationalization depending on budget and the state of the alarm system.
4. Project plan for the next 12 – 24 months (including milestones).
5. Required training – engineers, technician, and operators.
 Implement the Strategic Plan!
Alarm Management Standards – Are You Taking Them Seriously? 16
For more information:
For more information about Alarm
Management visit our website
www.honeywell.com/ps or contact your
Honeywell account manager.
www.matrikon.com
am@matrikon.com
Honeywell Process Solutions
1250 West Sam Houston Parkway South
Houston, TX 77042
Lovelace Road, Southern Industrial Estate
Bracknell, Berkshire, England RG12 8WD
Shanghai City Centre, 100 Junyi Road
Shanghai, China 20051
www.honeywell.com/ps
Conclusion
The author has visited many processing plants globally over a number of years and the situation remains that many plants are still not
taking alarm management seriously enough.
Alarms form part of your plant’s layer of protection and as such should be maintained to a level stated in EEMUA 191 and ISA 18.2.
EEMUA was first released in 1999 and ISA 18.2 has also been released – if your plant’s alarm system is ineffective or even totally
ignored by the operators – then I suggest you act now!
In the future it is expected that there will be more prosecutions for OH&S breaches!
References
1. EEMUA Publication 191 “ALARM SYSTEMS - A guide to Design, Management, and Procurement”
2. ANSI/ISA-18.2-2009 “Management of Alarm Systems for the Process Industries”.
3. IEC 61508-1999 “Functional safety of electrical/electronic/programmable electronic safety-related systems”
4. IEC 61511-2004 “Functional safety - Safety instrumented systems for the process industry sector”
WP 817
August 2011
© 2011 Honeywell International Inc.

Weitere ähnliche Inhalte

Was ist angesagt?

Hazardous Area Classification.pdf
Hazardous Area Classification.pdfHazardous Area Classification.pdf
Hazardous Area Classification.pdfSMTauseef1
 
Process Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptxProcess Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptxImtiazHussain312057
 
Prestartup Safety Review (PSSR)
Prestartup Safety Review (PSSR)Prestartup Safety Review (PSSR)
Prestartup Safety Review (PSSR)TheSafetyGuru
 
Introduction to Functional Safety and SIL Certification
Introduction to Functional Safety and SIL CertificationIntroduction to Functional Safety and SIL Certification
Introduction to Functional Safety and SIL CertificationISA Boston Section
 
Functional-Safety-Overview-UL.ppt
Functional-Safety-Overview-UL.pptFunctional-Safety-Overview-UL.ppt
Functional-Safety-Overview-UL.pptssuserba01d94
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedureGerard B. Hawkins
 
Process plant troubleshooting
Process plant troubleshootingProcess plant troubleshooting
Process plant troubleshootingAnand Mishra
 
Eng handbook crosby pressure relief valve engineering handbook
Eng handbook crosby pressure relief valve engineering handbookEng handbook crosby pressure relief valve engineering handbook
Eng handbook crosby pressure relief valve engineering handbookAli Meshaikhis
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryLloyd's Register Energy
 
10 Safety Procedures in Acetylene Manufacturing Plants
10 Safety Procedures in Acetylene Manufacturing Plants10 Safety Procedures in Acetylene Manufacturing Plants
10 Safety Procedures in Acetylene Manufacturing PlantsRexarc International, Inc.
 
Safety instrumented functions (sif) safety integrity level (sil) evaluation t...
Safety instrumented functions (sif) safety integrity level (sil) evaluation t...Safety instrumented functions (sif) safety integrity level (sil) evaluation t...
Safety instrumented functions (sif) safety integrity level (sil) evaluation t...John Kingsley
 
(5) integrated management system (ims)
(5) integrated management system (ims)(5) integrated management system (ims)
(5) integrated management system (ims)ThetSu2
 
Pressure relief system_design
Pressure relief system_designPressure relief system_design
Pressure relief system_designRahul Tewari
 
Relief and blowdown in
Relief and blowdown           inRelief and blowdown           in
Relief and blowdown inAkshay Kotkar
 
Maximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best PracticesMaximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best PracticesHelen Fisher
 
Ai Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection TrainingAi Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection Trainingernestvictor
 

Was ist angesagt? (20)

Hazardous Area Classification.pdf
Hazardous Area Classification.pdfHazardous Area Classification.pdf
Hazardous Area Classification.pdf
 
Process Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptxProcess Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptx
 
Prestartup Safety Review (PSSR)
Prestartup Safety Review (PSSR)Prestartup Safety Review (PSSR)
Prestartup Safety Review (PSSR)
 
Basics of atex
Basics of atexBasics of atex
Basics of atex
 
Introduction to Functional Safety and SIL Certification
Introduction to Functional Safety and SIL CertificationIntroduction to Functional Safety and SIL Certification
Introduction to Functional Safety and SIL Certification
 
Oms
OmsOms
Oms
 
Functional-Safety-Overview-UL.ppt
Functional-Safety-Overview-UL.pptFunctional-Safety-Overview-UL.ppt
Functional-Safety-Overview-UL.ppt
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning Procedure
 
Process plant troubleshooting
Process plant troubleshootingProcess plant troubleshooting
Process plant troubleshooting
 
Eng handbook crosby pressure relief valve engineering handbook
Eng handbook crosby pressure relief valve engineering handbookEng handbook crosby pressure relief valve engineering handbook
Eng handbook crosby pressure relief valve engineering handbook
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling Industry
 
IT compliance
IT complianceIT compliance
IT compliance
 
10 Safety Procedures in Acetylene Manufacturing Plants
10 Safety Procedures in Acetylene Manufacturing Plants10 Safety Procedures in Acetylene Manufacturing Plants
10 Safety Procedures in Acetylene Manufacturing Plants
 
Safety instrumented functions (sif) safety integrity level (sil) evaluation t...
Safety instrumented functions (sif) safety integrity level (sil) evaluation t...Safety instrumented functions (sif) safety integrity level (sil) evaluation t...
Safety instrumented functions (sif) safety integrity level (sil) evaluation t...
 
(5) integrated management system (ims)
(5) integrated management system (ims)(5) integrated management system (ims)
(5) integrated management system (ims)
 
Pressure relief system_design
Pressure relief system_designPressure relief system_design
Pressure relief system_design
 
Iso 45001 2018
Iso 45001 2018Iso 45001 2018
Iso 45001 2018
 
Relief and blowdown in
Relief and blowdown           inRelief and blowdown           in
Relief and blowdown in
 
Maximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best PracticesMaximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best Practices
 
Ai Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection TrainingAi Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection Training
 

Ähnlich wie Honeywell - Alarm management standards taken seriously

A Human Factors Perspective on Alarm System Research & Development 2000 to 2010
A Human Factors Perspective on Alarm System Research & Development 2000 to 2010A Human Factors Perspective on Alarm System Research & Development 2000 to 2010
A Human Factors Perspective on Alarm System Research & Development 2000 to 2010Eric Shaver, PhD
 
Cy safe 2.0_workbook
Cy safe 2.0_workbookCy safe 2.0_workbook
Cy safe 2.0_workbookErnest Staats
 
beginning of thesis
beginning of thesisbeginning of thesis
beginning of thesisgrace davitt
 
Enisa rm deliverable2-final-version-v1.0-2006-03-30
Enisa rm deliverable2-final-version-v1.0-2006-03-30Enisa rm deliverable2-final-version-v1.0-2006-03-30
Enisa rm deliverable2-final-version-v1.0-2006-03-30pladott1
 
WhitePaperHowtoConstrucAMPlan
WhitePaperHowtoConstrucAMPlanWhitePaperHowtoConstrucAMPlan
WhitePaperHowtoConstrucAMPlanDavid Garcia
 
Scada implement secure - architecture
Scada implement secure - architectureScada implement secure - architecture
Scada implement secure - architectureFelipe Prado
 
CCPS_ProcessSafety2011_2-24-web.pdf
CCPS_ProcessSafety2011_2-24-web.pdfCCPS_ProcessSafety2011_2-24-web.pdf
CCPS_ProcessSafety2011_2-24-web.pdfssusercce40f1
 
Alarms structured management systems
Alarms structured management systemsAlarms structured management systems
Alarms structured management systemsEnrico QUERCI
 
Protectingspecialaccessprograminformationwithininformationsystemsfouo 1207161...
Protectingspecialaccessprograminformationwithininformationsystemsfouo 1207161...Protectingspecialaccessprograminformationwithininformationsystemsfouo 1207161...
Protectingspecialaccessprograminformationwithininformationsystemsfouo 1207161...dr. Roberto Polastro
 
[Oil & Gas White Paper] Control Room Management - Alarm Management
[Oil & Gas White Paper] Control Room Management - Alarm Management [Oil & Gas White Paper] Control Room Management - Alarm Management
[Oil & Gas White Paper] Control Room Management - Alarm Management Schneider Electric
 
Vss wht paper sustainable sox c ompliance made easy
Vss wht paper sustainable sox c ompliance made easyVss wht paper sustainable sox c ompliance made easy
Vss wht paper sustainable sox c ompliance made easyLaurie LeBlanc
 
Continuous monitoring strategy_guide_072712
Continuous monitoring strategy_guide_072712Continuous monitoring strategy_guide_072712
Continuous monitoring strategy_guide_072712Tuan Phan
 
NASA Software Safety Guidebook
NASA Software Safety GuidebookNASA Software Safety Guidebook
NASA Software Safety GuidebookVapula
 
Asse bragatto 24_feb_10
Asse bragatto 24_feb_10Asse bragatto 24_feb_10
Asse bragatto 24_feb_10Bragattop
 
capstone team_member_guide
capstone team_member_guidecapstone team_member_guide
capstone team_member_guideAnkur Mukherjee
 

Ähnlich wie Honeywell - Alarm management standards taken seriously (20)

A Human Factors Perspective on Alarm System Research & Development 2000 to 2010
A Human Factors Perspective on Alarm System Research & Development 2000 to 2010A Human Factors Perspective on Alarm System Research & Development 2000 to 2010
A Human Factors Perspective on Alarm System Research & Development 2000 to 2010
 
Cy safe 2.0_workbook
Cy safe 2.0_workbookCy safe 2.0_workbook
Cy safe 2.0_workbook
 
Alarm management at DeltaV
Alarm management at DeltaVAlarm management at DeltaV
Alarm management at DeltaV
 
Alarm_system_design_e.pdf
Alarm_system_design_e.pdfAlarm_system_design_e.pdf
Alarm_system_design_e.pdf
 
beginning of thesis
beginning of thesisbeginning of thesis
beginning of thesis
 
HSE Manual -1.pdf
HSE Manual -1.pdfHSE Manual -1.pdf
HSE Manual -1.pdf
 
Enisa rm deliverable2-final-version-v1.0-2006-03-30
Enisa rm deliverable2-final-version-v1.0-2006-03-30Enisa rm deliverable2-final-version-v1.0-2006-03-30
Enisa rm deliverable2-final-version-v1.0-2006-03-30
 
WhitePaperHowtoConstrucAMPlan
WhitePaperHowtoConstrucAMPlanWhitePaperHowtoConstrucAMPlan
WhitePaperHowtoConstrucAMPlan
 
Scada implement secure - architecture
Scada implement secure - architectureScada implement secure - architecture
Scada implement secure - architecture
 
Pub100342
Pub100342Pub100342
Pub100342
 
CCPS_ProcessSafety2011_2-24-web.pdf
CCPS_ProcessSafety2011_2-24-web.pdfCCPS_ProcessSafety2011_2-24-web.pdf
CCPS_ProcessSafety2011_2-24-web.pdf
 
Alarms structured management systems
Alarms structured management systemsAlarms structured management systems
Alarms structured management systems
 
Protectingspecialaccessprograminformationwithininformationsystemsfouo 1207161...
Protectingspecialaccessprograminformationwithininformationsystemsfouo 1207161...Protectingspecialaccessprograminformationwithininformationsystemsfouo 1207161...
Protectingspecialaccessprograminformationwithininformationsystemsfouo 1207161...
 
[Oil & Gas White Paper] Control Room Management - Alarm Management
[Oil & Gas White Paper] Control Room Management - Alarm Management [Oil & Gas White Paper] Control Room Management - Alarm Management
[Oil & Gas White Paper] Control Room Management - Alarm Management
 
Vss wht paper sustainable sox c ompliance made easy
Vss wht paper sustainable sox c ompliance made easyVss wht paper sustainable sox c ompliance made easy
Vss wht paper sustainable sox c ompliance made easy
 
Imcam166
Imcam166Imcam166
Imcam166
 
Continuous monitoring strategy_guide_072712
Continuous monitoring strategy_guide_072712Continuous monitoring strategy_guide_072712
Continuous monitoring strategy_guide_072712
 
NASA Software Safety Guidebook
NASA Software Safety GuidebookNASA Software Safety Guidebook
NASA Software Safety Guidebook
 
Asse bragatto 24_feb_10
Asse bragatto 24_feb_10Asse bragatto 24_feb_10
Asse bragatto 24_feb_10
 
capstone team_member_guide
capstone team_member_guidecapstone team_member_guide
capstone team_member_guide
 

Mehr von Robert-Emmanuel Mayssat

CSS alarm Handler (BEAST) at the EPICS Collaboration meeting 2010
CSS alarm Handler (BEAST) at the EPICS Collaboration meeting 2010CSS alarm Handler (BEAST) at the EPICS Collaboration meeting 2010
CSS alarm Handler (BEAST) at the EPICS Collaboration meeting 2010Robert-Emmanuel Mayssat
 
Sample Beamline Scientist Job Description
Sample Beamline Scientist Job DescriptionSample Beamline Scientist Job Description
Sample Beamline Scientist Job DescriptionRobert-Emmanuel Mayssat
 
The New Soft-IOC Based alarm handler at the SNS
The New Soft-IOC Based alarm handler at the SNSThe New Soft-IOC Based alarm handler at the SNS
The New Soft-IOC Based alarm handler at the SNSRobert-Emmanuel Mayssat
 
BEST, the CSS Alarm Handler - Performance Testing
BEST, the CSS Alarm Handler - Performance TestingBEST, the CSS Alarm Handler - Performance Testing
BEST, the CSS Alarm Handler - Performance TestingRobert-Emmanuel Mayssat
 
BEAST - CSS Alarm Handler Performance Tests
BEAST - CSS Alarm Handler Performance TestsBEAST - CSS Alarm Handler Performance Tests
BEAST - CSS Alarm Handler Performance TestsRobert-Emmanuel Mayssat
 

Mehr von Robert-Emmanuel Mayssat (20)

Beast alarm guideline_2013
Beast alarm guideline_2013Beast alarm guideline_2013
Beast alarm guideline_2013
 
CSS alarm Handler (BEAST) at the EPICS Collaboration meeting 2010
CSS alarm Handler (BEAST) at the EPICS Collaboration meeting 2010CSS alarm Handler (BEAST) at the EPICS Collaboration meeting 2010
CSS alarm Handler (BEAST) at the EPICS Collaboration meeting 2010
 
CSS - Alarm Management System (AMS)
CSS - Alarm Management System (AMS)CSS - Alarm Management System (AMS)
CSS - Alarm Management System (AMS)
 
Sample Beamline Scientist Job Description
Sample Beamline Scientist Job DescriptionSample Beamline Scientist Job Description
Sample Beamline Scientist Job Description
 
Sample GUI Style Guide
Sample GUI Style Guide Sample GUI Style Guide
Sample GUI Style Guide
 
ALH user guide 1.2.33 (May 2013)
ALH user guide 1.2.33 (May 2013)ALH user guide 1.2.33 (May 2013)
ALH user guide 1.2.33 (May 2013)
 
CSS Alarm Handler (BEAST) 2009
CSS Alarm Handler (BEAST) 2009CSS Alarm Handler (BEAST) 2009
CSS Alarm Handler (BEAST) 2009
 
Storytelling for startups
Storytelling for startupsStorytelling for startups
Storytelling for startups
 
The New Soft-IOC Based alarm handler at the SNS
The New Soft-IOC Based alarm handler at the SNSThe New Soft-IOC Based alarm handler at the SNS
The New Soft-IOC Based alarm handler at the SNS
 
Manual of the CSS Alarm Handler (Beast)
Manual of the CSS Alarm Handler (Beast)Manual of the CSS Alarm Handler (Beast)
Manual of the CSS Alarm Handler (Beast)
 
BEST, the CSS Alarm Handler - Performance Testing
BEST, the CSS Alarm Handler - Performance TestingBEST, the CSS Alarm Handler - Performance Testing
BEST, the CSS Alarm Handler - Performance Testing
 
CSS Alarm Handling
CSS Alarm HandlingCSS Alarm Handling
CSS Alarm Handling
 
BEAST - CSS Alarm Handler Performance Tests
BEAST - CSS Alarm Handler Performance TestsBEAST - CSS Alarm Handler Performance Tests
BEAST - CSS Alarm Handler Performance Tests
 
Web browser design template
Web browser design templateWeb browser design template
Web browser design template
 
Ipad design template
Ipad design templateIpad design template
Ipad design template
 
Iphone 5 design template
Iphone 5 design templateIphone 5 design template
Iphone 5 design template
 
Epics Qt design specification
Epics Qt design specificationEpics Qt design specification
Epics Qt design specification
 
Epics Qt requirements specification
Epics Qt requirements specificationEpics Qt requirements specification
Epics Qt requirements specification
 
Pitch anything webinar
Pitch anything webinarPitch anything webinar
Pitch anything webinar
 
Qtc managed-runtimes
Qtc managed-runtimesQtc managed-runtimes
Qtc managed-runtimes
 

Kürzlich hochgeladen

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Kürzlich hochgeladen (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 

Honeywell - Alarm management standards taken seriously

  • 1. Alarm Management Standards – Are You Taking Them Seriously? Executive Summary EEMUA Publication 191 “ALARM SYSTEMS - A Guide to Design, Management, and Procurement” was first released in 1999 and is well acknowledged as the defacto standard for Alarm Management. (A second edition was released in 2007). ISA and ANSI approved a new standard in June, ANSI/ISA-18.2-2009 “Management of Alarm Systems for the Process Industries”. Both of these publications have similar KPIs for alarm system performance. So what does this mean for your industry? As an employer, irrespective of the size of the business, you have the responsibility for the day-to-day health, safety and welfare of your employees and visitors to your workplace. This duty of care is usually set out in the occupational health and safety (OHS) legislation of the relevant country. Companies as well as individuals from Supervisor level to CEO level have been legally prosecuted for breaches in OH&S regulations in some countries. Duty of care usually mandates that employers of process and other automated industries must provide a suitable alarm system that gives adequate warning of impending abnormal situations to operators so that they have time to take action to prevent the potential consequences from occurring. Duty of care also includes the provision of a control system that does not put the operators under undue levels of stress, which could also compromise the safety of other employees. This paper provides information on what alarm management is and why it is important. It also provides an overview of these global standards, and what you can do to achieve compliance.
  • 2. Alarm Management Standards – Are You Taking Them Seriously? 2 Table of Contents Executive Summary ................................................................................................................................................................... 1 Document Terminology ............................................................................................................................................................. 5 What is Alarm Management? ....................................................................................................................................................6 Definition ...................................................................................................................................................................................... 6 Layer of Protection ....................................................................................................................................................................... 6 What Else is Alarm Management? ............................................................................................................................................ 6 Continuous Lifecycle .................................................................................................................................................................... 6 Plant Maintenance/Reliability ....................................................................................................................................................... 6 Good Process Control .................................................................................................................................................................. 6 Outcome of a Risk Assessment ................................................................................................................................................... 7 Related to Equipment Failure....................................................................................................................................................... 7 Enhanced/Advanced Control........................................................................................................................................................ 7 Abnormal Situation Management (ASM) ...................................................................................................................................... 7 It Has Been Widely Ignored for a Long Time................................................................................................................................ 7 Often Used In Fault Tree Analysis (FTA)...................................................................................................................................... 7 What is a Lack of Alarm Management?.................................................................................................................................... 8 Potential Industrial Disasters........................................................................................................................................................ 8 Example Plant Incident – Swiss Cheese Risk Model. .................................................................................................................. 8 Employee Impact.......................................................................................................................................................................... 8 Employer Impact .......................................................................................................................................................................... 8 Court Case? ................................................................................................................................................................................. 8 Demystifying Standards & Guidelines...................................................................................................................................... 8 Introduction................................................................................................................................................................................... 8 Which standard do you comply with? ........................................................................................................................................... 8 Key Features of EEMUA 191 and ISA 18.2 ............................................................................................... 8 EEMUA Key Features .................................................................................................................................................................. 9 ISA 18.2 Key Features ................................................................................................................................................................. 10 EEMUA Alarm Performance KPIs ............................................................................................................................................. 10 ISA 18.2 Alarm Performance KPIs ............................................................................................................................................... 10 ISA 18.2 Lifecycle Model............................................................................................................................................................ 11 Scope of the Lifecycle Model........................................................................................................................................................ 13 Stages of the Lifecycle Model....................................................................................................................................................... 13 Philosophy.................................................................................................................................................................................... 13 Identification ................................................................................................................................................................................. 14 Rationalization.............................................................................................................................................................................. 14 Design .......................................................................................................................................................................................... 14 Implementation & Training............................................................................................................................................................ 14 Operation...................................................................................................................................................................................... 14 Maintenance................................................................................................................................................................................. 14 Monitoring & Assessment............................................................................................................................................................. 14 Management of Change............................................................................................................................................................... 14
  • 3. Alarm Management Standards – Are You Taking Them Seriously? 3 Audit ............................................................................................................................................................................................. 14 Entering the Lifecycle Model ........................................................................................................................................................ 15 Lifecycle Model Loops.................................................................................................................................................................. 15 ISA 18.2 Compliance.................................................................................................................................................................... 15 What Steps Can You Take to Comply?..................................................................................................................................... 15 Conclusion.................................................................................................................................................................................. 16 References.................................................................................................................................................................................. 16
  • 4. Alarm Management Standards – Are You Taking Them Seriously? 4 Table of Figures Figure 1: Layers of Protection in a Processing Plant........................................................................................................ 5 Figure 2: Fault Tree Analysis ................................................................................................................................................6 Figure 5: Swiss Cheese Risk Model ................................................................................................................................................... 7 Figure 6: Sample EEMUA Results – Total Plant for One Month .........................................................................................10 Figure 6: ISA 18.2 Alarm Management Lifecycle .................................................................................................................11 Table 1: EEMUA 191 – Benchmark for Assessing Average Alarm Rates .........................................................................9 Table 2: EEMUA 191 – Guidance on Alarm Rate Following an Upset...............................................................................9 Table 3: Sample ISA 18.2 Alarm Performance KPIs .......................................................................................................... 10
  • 5. Alarm Management Standards – Are You Taking Them Seriously? 5 Document Terminology Name Definition EEMUA Engineering Equipment Material Users Association LOP Layers of Protection LOPA Layers of Protection Analysis FTA Fault Tree Analysis SIL Safety Integrity Level ISA 18.2 ANSI/ISA-18.2-2009 DCS Distribute Control System ASM Abnormal Situation Management OH&S Occupational Health and Safety KPI Key Performance Indicator ISA International Society of Automation NOHSC National Occupational Health and Safety Commission
  • 6. Alarm Management Standards – Are You Taking Them Seriously? 6 What is Alarm Management? Definition “Process by which alarms are engineered, monitored, and managed to ensure safe, reliable operations” Layer of Protection The concept of Layers of Protection is to provide Independent Layers of Protection around hazardous processes to reduce the risk of undesired consequences such as fire, toxic releases etc (Refer to Figure 1).Alarms are considered to be a Layer of Protection (LOP) and are often used in Safety Integrity Level (SIL)analysis. The intent of these alarms is to warn operators of an impending abnormal situation, which can often have safety related consequences. In determining the average Probability of Failure on Demand for a SIL loop that contains an alarm as a LOP, the probability of the operator failing to adequately respond to the alarm must be considered. Some of the plants that have been reviewed by the author have had unrealistic probability of failure figures such as 0.1 (i.e. a 1 in 10 year probability), where the alarm rates have been over the “maximum manageable” as deemed in the ISA 18.2 standard. This has the potential to make the SIL design for a loop to be inaccurate. Figure 1: Layers of Protection in a Processing Plant What Else is Alarm Management? Continuous Lifecycle Alarm management is a lifecycle process based on a continuous improvement process. If the alarms and associated plant and equipment are not regularly maintained then it is most likely the system performance will degrade over time. Plant Maintenance/Reliability Good plant maintenance practices are absolutely critical in terms of plant production rates, safety, and alarm system performance. Poor practices can result in chattering alarms, ineffective instruments, false alarms and safety related incidents. Good Process Control Good process control assists in minimizing the probability of abnormal situations from occurring due to interlock failure, incorrect logic configuration or uncontrolled PID loops. Typically poor process control also results in operator actions, chattering alarms etc.
  • 7. Alarm Management Standards – Are You Taking Them Seriously? 7 Outcome of a Risk Assessment Every task that is required within a processing plant should be subject to a risk assessment, including determining the requirement to use an alarm to minimize the risk potential. This should be considered simply good engineering practice. Related to Equipment Failure All manufactured equipment eventually fails with time! Unfortunately some companies rely too heavily on the higher LOPs (safety systems, pressure relief valves etc) to protect the integrity of their plants. All safety equipment has a probability to fail on demand and should only be employed as a last means of defence. Two recent incidents in Australia involved an explosion in a vessel that lacked the correct PRV’s, while another involved both redundant safety system processors rebooting simultaneously. Enhanced/Advanced Control There have been significant developments in smart alarming techniques such as state-based alarming, model-based alarming and predictive alarming. These techniques are used to improve the performance of the alarm system as well as minimizing the chance of abnormal situations from occurring. Abnormal Situation Management (ASM) This is all about allowing the operator enough time and resources to prevent an unusual event from occurring. The ASM Consortium® has undertaken significant research into graphics, control systems and alarm systems for abnormal situation management. It Has Been Widely Ignored for a Long Time On many sites the operators ignore the alarms as the systems are unusable in their current state. There are still chemical plants, coal preparation plants, refineries, power stations, etc where this is the case! Often Used In Fault Tree Analysis (FTA) Fault Tree Analysis is a common method of undertaking quantitative risk assessments and is often used to determine the SIL level of a Safety Integrity Level loop. Figure 2: Fault Tree Analysis FTA inputs are either frequency of an event occurring or the average probability of failure on demand. If the PFD for the operator failing to respond to the high level alarm is changed to 0.5, the loop PFD is increased from 0.00011 to 0.00051. Also if the high level trip system is only tested once a year (instead of twice) then the PFD is effectively doubled. Some industrial plants have fault tree analysis results that put unrealistic targets on operators being able to detect and respond to an alarm before the safety system takes action.
  • 8. Alarm Management Standards – Are You Taking Them Seriously? 8 What is a Lack of Alarm Management? Potential Industrial Disasters Abnormal Situations cost industry millions of dollars every year. A number of plant incidents that have been partly attributed to poor alarm management practices have tragically resulted in injury and death of personnel and huge financial losses. Two examples are the Longford Gas Explosion in 1998 and the Texas City Oil Refinery Explosion in 2005. Example Plant Incident – Swiss Cheese Risk Model. The following scenario is based on a true incident assessed against the Swiss Cheese Risk Model (Figure 5), which was originally developed by James Reason. Each hole in the cheese is symbolic of a potential pathway to employee exposure. Figure 5: Swiss Cheese Risk Model  Plant is relatively unstable. It is getting towards the end of 12hr shift: OPERATIONAL.  A tank containing hot material reaches HH level: PROCESS. The HH level DCS pump interlock was disabled to replace the instrument and inadvertently not reenabled: POOR MOC.  The control room operator misses the alarm because they are overloaded and there is an alarm flood: ALARM MANAGEMENT.  Safety level switches in the SIL loop for tripping the incoming pump power supply have not been tested for over two years and fail to operate: MAINTENANCE  The tank overflows with workers in close vicinity: INCIDENT Employee Impact What are the potential employee impacts?  Possible Injury  Potential Fatality  Flow-on Family/Community effects Employer Impact What are the potential employer impacts?  Operational Downtime/Loss of Production  Investigation by the relevant authority  Damage to reputation  Potential for legal action
  • 9. Alarm Management Standards – Are You Taking Them Seriously? 9 Court Case? If in the above plant incident an employee was actually killed or severely injured, then it is likely that the employer would end up in court. Two questions that a prosecution might ask the employer are:  Did you comply with an Internationally accepted standard”?  Did you follow known, good engineering practice”? An Employer typically can not use the following excuses “I do not have the people” or “I wasn’t aware that such an accepted standard existed”. This could refer to a published ANSI, IEC, or other standard, a draft standard, or even a published report/standard from a relevant authority. In recent court cases there has been more use of expert witnesses. If an expert witness was brought in to review the above incident, then the following is a possible response: EEMUA 191 was released in 1999 and is a well recognized global defacto standard for Alarm Systems. ISA 18.2 has been well publicized over the past 24 months and has just been released. Operators have complained a number of times about the state of the alarm system. Benchmarking has determined that many of the alarm KPIs exceed what is deemed “Very unlikely to be acceptable” in EEMUA 191 and exceeds the ”Maximum Manageable” in ISA 18.2. Management of change practices do not meet known good engineering practices. The safety function level switches had not been tested for over two years.” The outcome of this case would most likely not be in favor of the employer! would be in place not later than June 1, 2008. As June quickly approaches, many pipeline operators are looking to available alarm management. Demystifying Standards & Guidelines Introduction EEMUA 191 was first released in 1999 and has since been referred to as the defacto standard for alarm management. EEMUA is written in a text book format and provides some excellent examples in the appendixes. ISA 18.2 has been written more like a standard and has many similarities to the safety instrumented systems standards IEC 61508/11. Which standard do you comply with? EEMUA 191 and ISA 18.2 complement each other. In summary EEMUA describes in detail the tools and techniques for various aspects of alarm management (e.g. rationalization, risk assessments, graphics design), whilst ISA 18.2 clearly defines the required performance KPIs and the overall lifecycle approach to alarm management. The performance KPIs for both documents are similar, although they are more clearly defined in Table 14 of ISA 18.2. Key Features of EEMUA 191 and ISA 18.2 The main features of EEMUA 191 and ISA 18.2 are highlighted in this section. EEMUA Key Features  Good detail on alarm design, including different risk assessment approaches.  Written in a easily readable text-book format – excellent worked examples.  New section on Alerts.  Philosophy, principles of alarm system design, implementation issues.  Measuring performance and managing an improvement programme.  Specifications for alarm systems.  Design of field sensors.  Design of alarm displays.  Performance metrics and useful questionnaires.  Alarm suppression hazard study.  Sample risk assessments and determining priority – enhanced.  New section on alarm management in Batch Plants.
  • 10. Alarm Management Standards – Are You Taking Them Seriously? 10  New section on alarm system improvement process.  Complementary to ISA 18.2. ISA 18.2 Key Features  Large focus on an alarm system lifecycle.  Very clear alarm system performance KPIs.  Written like other similar standards – eg IEC AS 61511.  Section on compliance.  Alarm Philosophy – what must be included in table format..  Alarm System requirements specification.  Identification and rationalization.  Basic alarm design, HMI design, and enhanced and advanced methods.  Implementation, operation, and maintenance.  Monitoring and assessment, management of change, and auditing.  Less examples are given.  Complementary to EEMUA 191. EEMUA Alarm Performance KPIs EEMUA suggests three main KPIs on a per operator basis for 10 minute time periods:  Average Alarm Rate  Maximum Alarm rate  % of time Alarm rates are outside of acceptability target Average alarm rate is defined as a level of acceptability in Table 1 below. Maximum alarm rates following a plant upset are shown in Table 2. EEMUA mentions that the percentage of time alarm rates which are outside of the acceptability target of one per two minutes (or 30 per hour) should be a small number. Once a small number is achieved then it should be based on 1 per 5 minutes to ensure continuous improvement. Table 1: EEMUA 191 – Benchmark for Assessing Average Alarm Rates
  • 11. Alarm Management Standards – Are You Taking Them Seriously? 11 Table 2: EEMUA 191 – Guidance on Alarm Rate Following an Upset Figure 6: Sample EEMUA Results – Total Plant for One Month EEMUA also states that a site, which has a control system with greater than 1000 configured alarms, should be targeting fewer than 10 standing alarms and fewer than 30 shelved alarms (excluding maintenance shelved alarms). EEMUA also provides a graphical representation for different levels of performance of an alarm system. A sample scatter graph report for a plant is shown in Figure 6. ISA 18.2 Alarm Performance KPIs Table 3 shows the important performance metrics listed in Figure 14 of the standard. These alarm performance metrics and target values are very clearly defined and should be the target KPIs for your plant. While these targets may initially appear onerous, they should be possible over time. If your plant’s alarm system performance does not meet the following KPIs, it is important that you can demonstrate continuous improvement with the goal and processes in place to reach these targets. A flood is defined as starting when 10 or more alarms (per operator) are received within a 10 minute period, and ends when less than 5 alarms are received in a subsequent 10 minute period. A chattering alarm is one that is on then off and on again in a short period of time (eg 1 min). Fleeting and/or momentary alarms turn on and off very quickly, but do not necessarily repeat. Stale alarms are those that go into alarm and do not return to the normal state for at least 24 hrs.
  • 12. Alarm Management Standards – Are You Taking Them Seriously? 12 Table 3: Sample ISA 18.2 Alarm Performance KPIs ISA 18.2 Lifecycle Model ISA 18.2 Lifecycle Model The lifecycle model is an excellent method of representing the overall process of alarm system management. It is an ongoing process that is suitable for new or existing systems. It has been designed to represent sequential stages, some of which run simultaneously with other stages that are linked horizontally (eg MOC (Stage I) must be followed for Stages B,C,D, and E). In some cases a sequential stage may be “skipped”. For example, during a rationalization exercise the outcome may be an alarm setting change, which may not require detailed design to implement.
  • 13. Alarm Management Standards – Are You Taking Them Seriously? 13 Figure 6: ISA 18.2 Alarm Management Lifecycle Scope of the Lifecycle Model The lifecycle model is limited to computer based alarm systems and excludes sensors and final control elements. Safety Instrumented Systems (SIS) are also excluded except for any alarms generated from them. Stages of the lifecycle model Philosophy An Alarm Philosophy documents the site approach to alarm management and is a mandatory requirement. It includes the definitions and principles and details of the practices and procedures for each of the remaining life cycle stages. It provides a lasting reference to sustain an effective alarm system. A table containing the required and recommended contents of the Alarm Philosophy is provided in the draft standard. Alarm System Functional Specifications detail the control system specific implementation related to the Alarm Philosophy definitions.
  • 14. Alarm Management Standards – Are You Taking Them Seriously? 14 Identification Many methods are available to determine if an alarm is required. Some of these are Process Hazard Analysis (PHA), incident investigations, HAZOPS/CHAZOPS, and alarm design/rationalization workshops. The outcome of a HAZOP might be that an alarm is required to warn the operator of an abnormal situation (eg High Pressure). Typically a HAZOP exercise does not consider the following: is the particular tag the most suitable to alarm, what is the ideal setting, configuration details, the potential operator workload etc. These details are discussed in the Rationalization stage before an alarm is to be implemented. Identification and the following three stages are closely related. Due to different terminology used in process industries, it can be somewhat confusing as to which steps in the overall design process are undertaken in each stage. Rationalization Alarm rationalization is about reconciling each individual alarm against the principles and requirements of the alarm philosophy. It is important that the relevant data for each alarm is documented to support the other stages of the life cycle. This includes the alarm description, settings, causes of an alarm, the consequence of no action, the required operator action, response time, consequence rating, etc. Consequences and the response time are documented and the alarm priority is determined from a matrix of the consequence severity and response time. This matrix is defined by the alarm philosophy. The methodology in the Rationalization stage also applies for new projects. The main difference with new projects is that typically there is no historical trends or alarm data that can be referred to. Design The design phase includes the basic DCS/PLC configuration of the alarm, Human Machine Interface (HMI) for the alarm, and any advanced methods of alarm management. These requirements are determined in the rationalization stage. Implementation & Training This stage involves the various other activities required to put the alarm into service. It includes testing of the alarm system functions as well as relevant training for the operator and other personnel. Operation The alarm is now in service and reporting abnormal conditions to the operator. Maintenance Process measurement instruments, final control elements, and control systems all require periodic/predictive maintenance to ensure their continued reliable operation. This is critical to ensure the ongoing performance of the alarm system. Monitoring & Assessment This stage includes the periodic collection and analysis of data from alarms. Without monitoring it is virtually impossible to maintain an effective alarm system. Assessment should be undertaken frequently (daily or weekly) and is the primary method for determining problems such as nuisance alarms, stale alarms, and alarm floods. Management of Change Management of change is a critical stage that helps ensure the ongoing integrity of the alarm system. It needs to be a structured process of approval and authorization for any additions, modifications, and deletions of alarms from the system. Audit A periodic audit of the alarm system and the processes detailed in the alarm philosophy may determine the need to modify processes, the philosophy, or the design etc. This is also the ideal stage to enter the alarm system lifecycle process. The audit may also highlight that an organization’s discipline to follow the processes (especially MOC) may need improvement.
  • 15. Alarm Management Standards – Are You Taking Them Seriously? 15 Entering the Lifecycle Model It is possible to enter the lifecycle model from the Philosophy, Monitoring and Assessment, or Auditing stage. For Greenfields projects it is best to start with a Philosophy before any rationalization/design is undertaken. For existing sites the ideal entry point is usually the Monitoring and Assessment stage, which will provide a benchmark for the site alarm system (per operator). This provides a snapshot of the health of the alarm system and can be used to justify improvement work. Undertaking a detailed audit will highlight any deficiencies that your alarm system will have in any of the other stages (A-I). Lifecycle Model Loops There are three “loops” in the lifecycle model that are represented by the dotted lines in Figure 6. If an alarm issue is detected in the Monitoring and Assessment stage then it would be resolved via the Monitoring and Maintenance Loop (eg chattering alarm) or the Monitoring and Management of Change Loop (eg more complex issue). The monitoring and maintenance loop typically is applied for simple maintenance related issues whereby the Monitoring and Management of Change Loop is required for any design changes. The Auditing and Philosophy Loop basically entails the whole lifecycle process. Periodic audits of your alarm system are a requirement of the standard. ISA 18.2 Compliance. The ISA 18.2 has a section on compliance (section 4.1) and a grandfather clause (section 4.2). It refers to those existing plants that must be able to demonstrate that their alarm system “equipment is designed, maintained, inspected, tested, and operated in a safe manner”. What Steps Can You Take to Comply? Now is the time to act. The following steps will help you get on the road to compliance:  Purchase EEMUA 191 and ISA 18.2.  Undertake some form of an audit of your alarm system. An audit will highlight the deficiencies of your alarm system and what areas need to be improved. As an absolute minimum, undertake a benchmarking and assessment project to determine if your alarm rates are acceptable.  It is critical to get senior management sponsorship for an alarm system improvement project. Information that should help management sponsor your project are operator survey results, and a benchmarking and assessment report which compares your plant alarm system KPIs with EEMUA 191 and ISA 18.2 requirements.  Prepare a Strategic Plan to reach compliance. This plan may contain the following: 1. Philosophy Document and then Functional Specifications. 2. Purchase of alarm database and associated software tools. 3. Top 20 and/or Classic rationalization depending on budget and the state of the alarm system. 4. Project plan for the next 12 – 24 months (including milestones). 5. Required training – engineers, technician, and operators.  Implement the Strategic Plan!
  • 16. Alarm Management Standards – Are You Taking Them Seriously? 16 For more information: For more information about Alarm Management visit our website www.honeywell.com/ps or contact your Honeywell account manager. www.matrikon.com am@matrikon.com Honeywell Process Solutions 1250 West Sam Houston Parkway South Houston, TX 77042 Lovelace Road, Southern Industrial Estate Bracknell, Berkshire, England RG12 8WD Shanghai City Centre, 100 Junyi Road Shanghai, China 20051 www.honeywell.com/ps Conclusion The author has visited many processing plants globally over a number of years and the situation remains that many plants are still not taking alarm management seriously enough. Alarms form part of your plant’s layer of protection and as such should be maintained to a level stated in EEMUA 191 and ISA 18.2. EEMUA was first released in 1999 and ISA 18.2 has also been released – if your plant’s alarm system is ineffective or even totally ignored by the operators – then I suggest you act now! In the future it is expected that there will be more prosecutions for OH&S breaches! References 1. EEMUA Publication 191 “ALARM SYSTEMS - A guide to Design, Management, and Procurement” 2. ANSI/ISA-18.2-2009 “Management of Alarm Systems for the Process Industries”. 3. IEC 61508-1999 “Functional safety of electrical/electronic/programmable electronic safety-related systems” 4. IEC 61511-2004 “Functional safety - Safety instrumented systems for the process industry sector” WP 817 August 2011 © 2011 Honeywell International Inc.