3. Development of concept, design development ,tender for both schemes
CONVENTION CENTRE : EARLIER OPTION and GFC stage, supervision of ongoing scheme
CLIENT: PONDICHERRY UNIVERSITY
LOCATION : PUDUICHERRY
MAIN USE: AUDITORIUM
AREA: 88,000 SQ.FT
COST: RS. 42 CRORES
STATUS: UNDER CONSTRUCTION
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
4. CONVENTION CENTRE : ONGOING OPTION
Excelled at designing a 2500 capacity Auditorium for Central Government , Puducherry with the Rising sun and Lotus hall concepts from their logo .
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
6. Ensaara Township Nagpur
EMJ[#%")%"0".($?8"#7-%#Y$0("%#)+$.#C"8"+-)9".(#&/('#N.U#>%-3)I#H=#]#:.*/$;## Currently heading a 312 acre integrated
CLIENT: LUXORA INFRASTRUCTURE .PVT.LTD. M8(MULJVV#[$.*01$)"#=%1'/("1(0I#=T;## township for the Luxora : AANYA Group
LOCATION : NAGPUR
PROJECT : GREEN TOWNSHIP
Y$%@"?.>#C"0/>.#("$9#CJ!VJS'GV(MJQ'TBUB#7-%#T^H==S=#YT<S_J=SE ;## under the name of Ensaara Metro Park at
Nagpur.
AREA: 312 ACRES
Effectively project managed the overall
master plan development ,.
Successfully designed the prototypes for
3000 unit apartment complexes throughout
the township.
Completing 28.5 lac sqft of Phase one
residential up to GFC stage for three types
of Villas, Lowrise midrise and Highrise and
Skyvilla.
Detail designs for 10-lac sqft. of Amenities:
Sports complex, School, Retail spaces,
Banquet, Leisure Club, Spa and Resort,
Neighbour-hood Club , COE for the CA
Institute of India, Hotel.
^#_#S#<#`#####a#_#^#T#
J'$0"#:#
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
7. S#T#H#:#C#T#^#<#:#=#[#I#`/>'#%/0"##
Concept , Detail design .
Project lead for Tender and GFC stage
S#T#H#:#C#T#^#<#:#=#[#I##H@,#8/++$#
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
8. S#T#H#:#C#T#^#<#:#=#[#I#[-&#L#%/0"## Concept , Detail design , Elevation options
Project lead for Tender and GFC stage
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
9. S#T#H#:#C#T#^#<#:#=#[#I#`$%9-./1## Concept , Detail design .
Project lead for Tender and GFC stage
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
10. S#T#H#:#C#T#^#<#:#=[#I#!/('/.#b/++$## Detail design .
Project lead for Tender and GFC stage
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
17. Detail design .
Concept.
Detail design .
^#_#^###S#T#H#:#C#T#^#<#:#=#[#I##[$@"0/*"#S"($/+#_)?-.0#
## A S H N A K A P A D I : Project Architect - Kadri Consultants Pvt. Ltd
R 2000-2012
19. Mood boards and Brochure cordination for Renders
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
20. 1000 ACRES VIJAYNAGAR VALLEY TOWNSHIP MASTER PLAN
CLIENT: M/S JSW STEEL LIMITED
LOCATION : VIJAYNAGAR, BELLARY
MAIN USE: TOWNSHIP 1000-acre township: Vidyanagar Valley, JSW Steel Plant, and Bellary.
AREA: 1000 ACRES Master plan with HOK planning group: Singapore and Hong Kong.
Phase one: Low cost housing and Residential 1bhk + 2bhk unto tender stage for 4300 homes.
Phase two: Detail proposal, 5000 homes, Retail, hotel, engineering college
Phase three: Detail proposal for 5700 homes and medical college.
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
21. 1000 ACRES VIJAYNAGAR VALLEY TOWNSHIP
PHASE 1 200 ACRES (PROPOSAL 1)
CLIENT: M/S JSW STEEL LIMITED
LOCATION : VIJAYNAGAR, BELLARY
MAIN USE: TOWNSHIP
STATUS: PROPOSED (INITIAL PROPOSAL)
School ,Shopping complex and 1 and 2/3 bhk
housing development
School#
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
22. 1000 ACRES VIJAYNAGAR VALLEY TOWNSHIP
PHASE 1 200 ACRES (PROPOSAL 1)
CLIENT: M/S JSW STEEL LIMITED
LOCATION : VIJAYNAGAR, BELLARY
MAIN USE: TOWNSHIP
STATUS: PROPOSED (INITIAL PROPOSAL)
1000-acre township: Vidyanagar
Valley, JSW Steel Plant, and
Bellary.
Phase one: Low cost housing
and Residential 1bhk + 2bhk
unto tender stage for 4300
homes*"#
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
25. HJ=#I#M-.1")(#DC"($/+/.>#$.*#"A"13?-.##
Club Mahindra Holiday Resorts India Ltd.-
Kodagu valley resort - Coorg, Karnataka.
Started as part of a team of two architects
assisting the director,after winning the
competetion.
Currently heading design, service coordination
and site supervision of phase 1 to 5 from
2002 to 2011.
Design competition - Project brief and design for
27 acre contoured site.
Outline proposals - 200-room resort, 2.15 Lac
B.U Area sqft.
Detail Proposal - Design, tender, working
drawings and material selection and supervision
for architecture and interiors.
!
Landscape architects: Belt Collins,
Singapore.
Currently handed over a rich
wooden detailed luxury SPA as
the last phase for the Coorg
resort.
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
27. SWAASTHA SPA : Concept , Detailing and Execution of building and Interiors
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
28. SWAASTHA SPA : Concept , Detailing and Execution of building and Interiors
MAHINDRA HOLIDAY & RESORT
CLIENT: MAHINDRA HOLIDAYS & RESORTS INDIA LIMITED
LOCATION : MADIKERI,DIST,KODAGU (COORG) KARNATAKA
MAIN USE: CLUB MAHINDRA RESORTS
AREA: BUILT-UP AREA APPROX.2,15,000 SQ.FT.
COST: RS. 45.0 CRORES
STATUS: COMPLETED
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
29. SWAASTHA SPA : Concept , Detailing and Execution of building and Interiors
Refer Drawing spa-wd-8.07 for
Mumty Roof Specifications
Roof to detail: W8
spa-wd-8.09
Water Spout
W6 W6 W6 W
Refer Drawing
spa-wd-8.08 for
Railing Specifications
Upper Massage
Room Level
+ 84m lvl
W6 W6
External Finishing to
Detail
Lower Level
+ 81m lvl
Refer Drawing spa-wd-8.09 & 8.10 Refer Landscape Drawing LH- 2.5 Refer Landscape Drawing LH- 2.7
for Deck Specifications forWater Feature Specifications. for Staircase Specifications
Deck Elevation
Detail design drawings
Images of Deck for
Reference
This "drawing" is the O print for name of client content
copyright of
* Any Descripency In The Drawing Shall Be Brought To The Architects Notice Before commencement of
particular item/ job and further instructions or clarifications should be obtained. For Execution Deck Elevation
job title
kadri consultants pvt. ltd.
and shall not be used for any
* Approvals of mouldings, profiles, finishes Samples etc. should be taken before commencement of the item at
site or before site assembly/ installation.
O transmittal / letter no. MAHINDRA HOLIDAYS CLUB MAHINDRA RESORTS-COO
AND RESORTS INDIA LTD.
RASHNA KAPADI:
617 / KC / 3
purpose other than that for *Approvals of Finishing Items, etc should be taken before procurement of materials. kadri consultants pvt. ltd
which it has been loaned. O date drawn by cad file no.
4a shivsagar estates worli b
Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
* Do not measure directly from drawing 19- 12 - 08 Sudhir
30. W8
W3 W3 W4 W7 W7 W7 W7 W4
7'-8 1/2"
External Finishing
3'-7"
Salon /Gym Level (U.Fl.lvl)
+86m Ivl FGL to Detail
Upper Massage Room Lvl
Finished Gound Level +84m Ivl
+ 85.7m lvl
Side Elevation Stone Cladding D17 Elevation
(Refer Image 5) (Diya Wall)
(Gym /SalonBlock)
Refer Detail (D8)
4" 7" 4"
10"
10"
Duct 4" X 1" Thk Timber Frame
Metal Elements (Refer Image 3)
W2 W2 W2a W2a
7'-8 1/2"
Salon Level (U.Fl.lvl)
+86m Ivl FGL
Finished Gound Level
+ 85.7m lvl
Front Elevation D8 Elevation
(Gym/Salon Block) Scale 1:10
D8 Section
(Through Lamp)
Scale 1:10
D2 W7
7'-8 1/2"
RCC Coping
3"
1'-6"
Salon Level (U.Fl.lvl)
+86m Ivl FGL
Finished Gound Level 1/4" Groove
+ 85.7m lvl
Back Elevation
Rough Edged Granite
(Gym/Salon Block)
D8 Plan
Scale 1:10
for Door Window and Details Refer:
Dwg no: spa-wd-2.01/spa-wd-2.02
Images:
1. View at night For Roof Details Refer:
2. Lamp Architectural Dwg no: spa-wd-1.03
3. Detail at Architrive Structural Dwg no: 071097-SPA-413
4. Usage of lamp
1 2 3 4 5 5. Stone Cladding For Coping Details Refer:
Building Sections spa-wd-8.01 - 8.07
This "drawing" is the * Any Descripency In The Drawing Shall Be Brought To The Architects Notice Before commencement of O print for name of client content Gym + Diya Wall Elevation scale job no.
617
1:75
particular item/ job and further instructions or clarifications should be obtained. (with Details)
Detail design drawings
copyright of For Execution drg. no. rev.
kadri consultants pvt. ltd. * Approvals of mouldings, profiles, finishes Samples etc. should be taken before commencement of the item at MAHINDRA HOLIDAYS job title spa-wd-3.03 R1
O transmittal / letter no.
site or before site assembly/ installation. CLUB MAHINDRA RESORTS-COORG - PHASE 3
and shall not be used for any
purpose other than that for *Approvals of Finishing Items, etc should be taken before procurement of materials.
617 / KC / 302 AND RESORTS INDIA LTD. drawing status
For Execution
O date drawn by cad file no.
kadri consultants pvt. ltd. initial date
which it has been loaned. * Do not measure directly from drawing 4a shivsagar estates worli bombay 400 018
30- 01 - 09 Sudhir 11-03-2008
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012
31. Timber Eve (1" thk),
Refer Detail D5 Timber Column:
9"
Additional Baten to 1 1/2" x 1/2" spa-wd-8.15
allow water drain Timber Member Treated Marine 2
to conceal Ply
plywood joint. Mangalore 6" x 6' (1"thk)
Tiles Rafter (15' x 5" x 2") Timber Planks
6" x 6' (1"thk) 3" x 1" end member
Timber Planks
Image for Referance
1" thk 3" x 5" Wooden
Decoraive Metal Clamps
Metal Member @ 2'
Decorative Clamp C/C Spacing
Roofing End Condition Metallic/Wooden
Metal/Wooden
Decoraive Element
1:10 Element Metal Strips in
-No Purlins as Marine Ply fixed on the rafters grooves between
-Rafter Spacing to be taken accordingly 11° Slope Timber Planks Timber Beam
W8 (6" x 8")
Refer spa-wd-8.07 for Mummty Roof
Details Timber Capital
1
11" Timber Column with
All Grooves
Stone Base:
1/4" thk
spa-wd-8.15
RCC Drain for
Rainwater D1 Rafter End Condition Detail
1:5
D2 Enlarged Plan D3 Enlarged Section
Timber Rafter 6" 1:10 1:10
(15' x 5" x 2") 11° Slope
Timber Beam (D4)
11"
1'-1"
8"
2'-0" Tiled Deck
Timber Strut Roof
Refer detail:D6. D7 for
1/4"
(2" x 4") Water spout Details Massage Room Passage Parapet
1 1/4"
Timber Column RCC Drain
(Refer Dwg no: 2'-0"
spa-wd-8.15) 1 1/2" 1'-4"
10'-0"
RCC Column 9" x 9"
S1
R13 Deck
1'-1"
6 1/2"
wd-3.04 D4 Timber Beam Detail RCC Drain
7'-2"
1'-3"
Elevation (6" x 8")
D18 1:5
2'-0" RCC Spout
slope
Over hang
Timber Railing Overhang
6 3/8"
(Refer Dwg no:
spa-wd-8.08)
Tiled Deck
Deck Level Roof
+ 83.85m lvl 6" Drop in Lvl
1'-7"
3" x 1" Timber Surface Clad with 2" thk T/W
Member as end Member polished as approved Grid 1" x 1" D6 Plan Showing Spout Condition D7 Elevation Showing Spout Condition
condition for flooring. 1:25 1:25
D5 Timber Eve Detail (1" thk)
5"
Beam with detail to accomodate the
Refer Deck Details: wooden beam of the deck. Refer 1:5
structural dwg: 071097-SPA-411 for 1'-5"
spa-wd-8.10
details. W8 Parapet wall
Timber Beam 6" x 8"
(Refer D4 for Detail)
RCC Drain for Rainwater
Timber Rafter
S1 (15' x 5" x 2")
Timber Column with RCC Column 12" x 12"
R27 Yoga Area
Stone Base 4'-0" 4'-0"
(Refer Dwg no:
spa-wd-8.15)
slope
Timber Beam (6" x 8")
Refer Detail B1
8'-0"
Position of columns at Deck
Timber Flooring Level
2'-9" Supporting Strut
a
(2" x 4")
Yoga Deck Level
+ 81m lvl
Layout of Treated Marine Ply
1'-6"
(8' x 4')
1'-10"
a
Fixed on Timber rafters
4'-9" x/7 x/7 x/7 x/7 x/7 x/7 x/7 y/6 y/6 y/6 y/6 y/6 y/6
Edge of Roof Tile
x y
D8 Detail of Roof
D 19 Section through Passsage 1:50
1:25
scale
This "drawing" is the * Any Descripency In The Drawing Shall Be Brought To The Architects Notice Before commencement of O print for name of client content DETAIL BUILDING SECTION as mentioned
job no.
617
copyright of particular item/ job and further instructions or clarifications should be obtained. For Execution (Through Deck) Showing Deck Details drg. no. rev.
job title
kadri consultants pvt. ltd. * Approvals of mouldings, profiles, finishes Samples etc. should be taken before commencement of the item at
site or before site assembly/ installation.
O transmittal / letter no. MAHINDRA HOLIDAYS CLUB MAHINDRA RESORTS-COORG - PHASE 3
spa-wd-8.09 R3
and shall not be used for any
purpose other than that for *Approvals of Finishing Items, etc should be taken before procurement of materials.
617 / KC / 334 AND RESORTS INDIA LTD. drawing status
For Execution
O date drawn by cad file no.
kadri consultants pvt. ltd. initial date
which it has been loaned. 29- 01 - 09 4a shivsagar estates worli bombay 400 018
Working drawings
*Do not measure directly from drawing Sudhir 11-03-2008
RASHNA KAPADI: Project Architect - Kadri Consultants Pvt. Ltd 2000-2012