SlideShare ist ein Scribd-Unternehmen logo
1 von 4
List of Post Graduate Thesis
                                                                                Year of
No.                        Thesis Title                           graduation
                                                                               research
1.    Application of Expert System on Disputes of Competitive
                                                                    M.SC.       1996
      Contracts of Construction Projects.
2.    Deriving an Approximate Method of Cost Estimation.            M.SC.       1996
3.    Management of Constructability Enhancement of the
                                                                    M.SC.       1996
      Construction Industry.
4.    Management Information System (MIS) for Planning And
                                                                    Ph.D.       1996
      Schedule Control of Construction In the Iraqi Oil Sector.
5.    Integrated Construction Management System for Site Cost
      Problems And Management Evaluation with Expert                Ph.D.       1996
      System Implementation.
6.    Developing an Integrated Management System for
      Selecting Method and Equipment of Excavation Irrigation       M.SC.       1997
      Projects with Expert System Implementation.
7.    Deriving an Equation for Calculating the Productivity of
                                                                    M.SC.       1997
      Equipments for Road Projects.
8.    Using a Computer Interactive Model for Evaluating and
                                                                    M.SC.       1997
      Improving projects
9.    Expert System Application on Selection of Compaction
                                                                    M.SC.       1998
      Method and Equipment.
10.   Improving the Cost Components in the Reconstruction
      Projects that have been Executed Through The Period           M.SC.       1998
      (1991-1994).
11.   Management and Control of on-Site Construction
                                                                    Ph.D.       1999
      Material.
12.   Deriving an Equation to Calculate The Productivity of
                                                                    M.SC.       1999
      Excavation.
13.   Evaluation System for Work Progress by Standard Weights
                                                                    Ph.D.       1999
      of Construction Items.
14.   Optimal Management Solution of Estimation Cost of
                                                                    Ph.D.       1999
      Highway Project in Iraq.
15.   The Development of A management System for Controlling
                                                                    Ph.D.       1999
      and following-up Subcontractor Work.
      Developing A management Systems for Plant Management
16.                                                                 M. Sc.      1999
      with Expert System implementation.
17.   Developing an Interactive Computer Program for Evaluating
      the Performance of Construction Management at The
                                                                    M. Sc.      1999
      Execution Stage.
Year of
No.                         Thesis Title                          graduation
                                                                               research
18.   Using Value. Engineering for Studying the Possible Alter-
                                                                    M.SC.       2000
      natives for Execution The Earth Water Tanks
19.   A comparison Between The Reconstruction Mission of
                                                                    M.SC.       2000
      Service Building Projects.
20.   Developing A management Information System (MIS) for
                                                                    M.SC.       2000
      Controlling the Execution Cost of Irrigation Projects.
21.   Using Value-Engineering for Building A management
                                                                    M.SC.       2000
      System for Evaluating the Security-Projects.
22.   Integrated Management System For Site Quality Control.        M.SC.       2000
23.   Developing a knowledge Based Expert System for Building
      Management System for Decision Making Delays in               M.SC.       2000
      Construction Projects.
24.   Electing A Management System for Controlling the on-Site
                                                                    M.SC.       2000
      labour.
25.   Developing a Planning Relationship Between CPM and Line
                                                                    M.SC.       2001
      of Balance (L.O.B) Method.
26.   Project Management And Its Effect On The Quality Control
                                                                    M.SC.       2001
      in The Construction Sector.
27.   Design an Integrated Management System for Quality
                                                                    Ph.D.       2001
      Control By Using (ISO-9000) Guide.
28.   Developing Management System For Selecting The
      Constructing Method and Execution Approach Of                 M.SC.       2001
      Construction Projects By Using Expert System Technique.
29.   Design A management System For Controlling The on-Site
                                                                    M.SC.       2001
      Material Usage.
30.   Election of A management System For Identifying The
                                                                    M.SC.       2001
      Execution Weight Of Fortified Building.
31.   Developing A Management System For Planning The One-
                                                                    M.SC.       2001
      Site Material Usage.
32.   Using Value-Engineering For Designing A management
                                                                    M.SC.       2001
      System For Evaluation Of Execution Irrigation Projects.
33.   Cost Evaluation Standards for Industrial Buildings.           Ph.D.       2002
34.   Quality Cost and Their Considerations in Managing The
                                                                    M.C.S       2002
      Factories Of Pre-Casting Concrete Units.
35.   Appling The Value-Engineering Approach For Controlling
                                                                    Ph.D.       2002
      The On-Site Cost Of Building Projects.
36.   Developing A management System For Controlling The
                                                                    M.SC.       2002
      Project Cost in The Construction Sector.
Year of
No.                           Thesis Title                       Graduation Researc
                                                                               h
37.   Using Standards For Evaluating The Performance Of Project
                                                                     M.SC.   2002
      Management in Preventing The Time Delay.
38.   Developing of Value Engineering Management System For
                                                                     Ph.D.   2002
      Construction Projects in Iraq.
39.   Using Value Engineering Concept For Evaluating and
      Improving The Maintenance Management of University             M.SC.   2002
      Buildings .
40.   Building an Engineering System For Quality Management on
                                                                     M.SC.   2003
      The Design Stage ( Radio Station as case study).
41.   Developing an Interactive System for Controlling
                                                                     M.SC.   2003
      Construction Plant Cost.
42.   Implementing Total Quality Management in The Productive
      Factories of the Construction Section (Al- Taje factories as   M.SC.   2003
      Case study).
43.   Design a Developed Management System For Site Usage of
                                                                     M.SC    2005
      Construction Materials.
44.   Implementation of CPM for Avoiding and Controlling Time
                                                                     M.SC    2005
      Delays in Construction Projects
45.   Evaluation of Libyan Contract Conditions And Its
                                                                     M.SC    2005
      Application On Engineering Projects
46.   Expert Systems Applications for Selection a Type of
      Contracts and Project Delivery Method for Construction         M.SC    2005
      Project.
47.   Application of Intranet As an Engineering Management
      Information System For Service Management (SMIS) of            M.SC    2005
      Drugs Distributions.
48.   Implementation of Value Management In Designing The
                                                                     M.SC    2005
      Construction Works In Respect to Cost.
49.   Establishing a Management System to Select A Type of
      Contract And Execution Approach For Construction projects      M.SC    2005
      By Implementation Expert System Technique.
50.   Applying of Engineering Management Aspects for
      Evaluation of The Availability of Implementing New             M.SC    2005
      Technologies in Constructing Road Projects
51    Expert System Application For Evaluation of The
      Engineering Projects With Earned Value System                  M.SC    2006
      Implementation
52    Developing A Resource Management System for A                  M.SC    2006
      successful Project Management
Year of
No.                           Thesis Title                         Graduation Researc
                                                                                 h
53    Implementing The Engineering Project Concepts For
      Building An Engineering Management System For Material
                                                               M.SC            2006
      Stocking ( Steel Complex in Musrata / Libya as a Case
      Study)
54    Application of Engineering Management Aspects With
      Simulation Techniques For Developing A Power Load        M.SC            2006
      Distribution System
55    Implementation of Computer Programs For Site Management
                                                               M.SC            2006
      of Engineering Projects)
56    Developing An Integrated Labor Site Cost Management
                                                               M.SC            2006
      System (ISCMS) For Construction Projects
57    Value Engineering Aspects For Improving The Projects'
                                                               M.SC            2006
      Performance at the Implementation Phase Of Oil Projects
58    Implementation of TQM Fundamentals in Constructing the
                                                               M.Sc.           2009
      Marine Projects in the States of Kuwait
59    Implementation of Value Engineering in Managing
                                                               M.Sc.           2009
      Governmental Buildings in Kuwait State
60    Changing Orders and Its Impacts on the Projects Time and
                                                               M.Sc.           2009
      Cost
61    Implementation of T.Q.M Planning and Control
      Techniques in Constructing the Marine Projects in the    M.Sc.           2009
      State of Kuwait
62    Implementations Of T.Q.M Control Techniques In Power
                                                               M.Sc.           2009
      Station In State Of Kuwait
63
      Developing a Qualification Based Selection Standard
      Model for Contractor Selection of Construction Projects in   M.Sc.       2009
      The State of Kuwait

Weitere ähnliche Inhalte

Was ist angesagt?

Lateral Earth Pressure
Lateral Earth PressureLateral Earth Pressure
Lateral Earth PressureFast-NU Lahore
 
Construction activities and Process
Construction activities and ProcessConstruction activities and Process
Construction activities and ProcessIbrahim Adhnan
 
Geotechnical engineering, civil engineering
Geotechnical engineering, civil engineeringGeotechnical engineering, civil engineering
Geotechnical engineering, civil engineeringSaicharan Vasala
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPTKavin Raval
 
Problems on bearing capacity of soil
Problems on bearing capacity of soilProblems on bearing capacity of soil
Problems on bearing capacity of soilLatif Hyder Wadho
 
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES SUBMITTED IN THE PARTIA...
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES    SUBMITTED IN THE PARTIA...PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES    SUBMITTED IN THE PARTIA...
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES SUBMITTED IN THE PARTIA...Rising Sher
 
Geotechnical engineering 2
Geotechnical engineering   2Geotechnical engineering   2
Geotechnical engineering 2R VIJAYAKUMAR
 
basics of civil engineering
basics of civil engineeringbasics of civil engineering
basics of civil engineeringChirag Bhanagale
 
Overview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPTOverview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPTAniket Pateriya
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating EquipmentKiran Goswami
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management pptRajeshPV12
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)y Sahaja
 
site investigation
site investigationsite investigation
site investigationolvive1208
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavementBhavik A Shah
 
Unit 3.building construction
Unit 3.building constructionUnit 3.building construction
Unit 3.building constructionChirag Bhanagale
 

Was ist angesagt? (20)

Lateral Earth Pressure
Lateral Earth PressureLateral Earth Pressure
Lateral Earth Pressure
 
Construction activities and Process
Construction activities and ProcessConstruction activities and Process
Construction activities and Process
 
Highway planning
Highway planningHighway planning
Highway planning
 
Geotechnical engineering, civil engineering
Geotechnical engineering, civil engineeringGeotechnical engineering, civil engineering
Geotechnical engineering, civil engineering
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
 
Problems on bearing capacity of soil
Problems on bearing capacity of soilProblems on bearing capacity of soil
Problems on bearing capacity of soil
 
Geotechnical Engineering
Geotechnical EngineeringGeotechnical Engineering
Geotechnical Engineering
 
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES SUBMITTED IN THE PARTIA...
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES    SUBMITTED IN THE PARTIA...PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES    SUBMITTED IN THE PARTIA...
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES SUBMITTED IN THE PARTIA...
 
Geotechnical engineering 2
Geotechnical engineering   2Geotechnical engineering   2
Geotechnical engineering 2
 
basics of civil engineering
basics of civil engineeringbasics of civil engineering
basics of civil engineering
 
Overview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPTOverview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPT
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating Equipment
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
 
Formwork
FormworkFormwork
Formwork
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
 
site investigation
site investigationsite investigation
site investigation
 
Tunnel construction
Tunnel constructionTunnel construction
Tunnel construction
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
 
Bearing capasity of soil
Bearing capasity of soilBearing capasity of soil
Bearing capasity of soil
 
Unit 3.building construction
Unit 3.building constructionUnit 3.building construction
Unit 3.building construction
 

Andere mochten auch

Readymade M Tech Thesis
Readymade M Tech ThesisReadymade M Tech Thesis
Readymade M Tech Thesise2-matrix
 
Final m.tech ppt_praveen
Final m.tech ppt_praveenFinal m.tech ppt_praveen
Final m.tech ppt_praveenpraveen dwivedi
 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material ManagementPriya Ramaraj
 
MTech Seminar Presentation [IIT-Bombay]
MTech Seminar Presentation [IIT-Bombay]MTech Seminar Presentation [IIT-Bombay]
MTech Seminar Presentation [IIT-Bombay]Sagar Ahire
 
Material management on construction site
Material management on construction siteMaterial management on construction site
Material management on construction siteRonak Jain
 
List of mba project topics reports
List of  mba project topics  reportsList of  mba project topics  reports
List of mba project topics reportsBabasab Patil
 
Cost effective construction techniques
Cost effective construction techniquesCost effective construction techniques
Cost effective construction techniquesSayali Darakh
 
LinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedLinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedSlideShare
 
Thesis title presentation
Thesis title presentationThesis title presentation
Thesis title presentationArun kumar
 
Design and implementation techniques for location-based learning games
Design and implementation techniques for location-based learning gamesDesign and implementation techniques for location-based learning games
Design and implementation techniques for location-based learning gamesJavier Melero
 

Andere mochten auch (20)

M.tech thesis
M.tech thesisM.tech thesis
M.tech thesis
 
Disseration M.Tech
Disseration M.TechDisseration M.Tech
Disseration M.Tech
 
Readymade M Tech Thesis
Readymade M Tech ThesisReadymade M Tech Thesis
Readymade M Tech Thesis
 
My thesis proposal
My thesis proposalMy thesis proposal
My thesis proposal
 
M.tech thesis
M.tech thesisM.tech thesis
M.tech thesis
 
M.Tech Final Seminar
M.Tech Final SeminarM.Tech Final Seminar
M.Tech Final Seminar
 
Final m.tech ppt_praveen
Final m.tech ppt_praveenFinal m.tech ppt_praveen
Final m.tech ppt_praveen
 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material Management
 
MTech_ final_ppt
MTech_ final_pptMTech_ final_ppt
MTech_ final_ppt
 
MTech Seminar Presentation [IIT-Bombay]
MTech Seminar Presentation [IIT-Bombay]MTech Seminar Presentation [IIT-Bombay]
MTech Seminar Presentation [IIT-Bombay]
 
Thesis
ThesisThesis
Thesis
 
Material management on construction site
Material management on construction siteMaterial management on construction site
Material management on construction site
 
Thesis riza
Thesis rizaThesis riza
Thesis riza
 
Final na final thesis
Final na final thesisFinal na final thesis
Final na final thesis
 
List of mba project topics reports
List of  mba project topics  reportsList of  mba project topics  reports
List of mba project topics reports
 
Cost effective construction techniques
Cost effective construction techniquesCost effective construction techniques
Cost effective construction techniques
 
Project management
Project managementProject management
Project management
 
LinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedLinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-Presented
 
Thesis title presentation
Thesis title presentationThesis title presentation
Thesis title presentation
 
Design and implementation techniques for location-based learning games
Design and implementation techniques for location-based learning gamesDesign and implementation techniques for location-based learning games
Design and implementation techniques for location-based learning games
 

Ähnlich wie List Of Post Graduate Thesis in engineering project management

The Cruciality of MEP Coordination for Seamless Construction
The Cruciality of MEP Coordination for Seamless ConstructionThe Cruciality of MEP Coordination for Seamless Construction
The Cruciality of MEP Coordination for Seamless ConstructionMichael William
 
Flexible and Scalable Modelling in the MONDO Project: 3 Industrial Case Studi...
Flexible and Scalable Modelling in the MONDO Project: 3 Industrial Case Studi...Flexible and Scalable Modelling in the MONDO Project: 3 Industrial Case Studi...
Flexible and Scalable Modelling in the MONDO Project: 3 Industrial Case Studi...Alessandra Bagnato
 
Development_of_Computer_Aided_Critical_Lift_Planning_Software-libre
Development_of_Computer_Aided_Critical_Lift_Planning_Software-libreDevelopment_of_Computer_Aided_Critical_Lift_Planning_Software-libre
Development_of_Computer_Aided_Critical_Lift_Planning_Software-libreSrikanth Chadalavada
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...IRJET Journal
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...IRJET Journal
 
Best Converting Point Cloud to BIM and BIM Laser Scanning.pdf
Best Converting Point Cloud to BIM and BIM Laser Scanning.pdfBest Converting Point Cloud to BIM and BIM Laser Scanning.pdf
Best Converting Point Cloud to BIM and BIM Laser Scanning.pdfRvtcad
 
Alba Rguez (July 2021) - Feasibility Study Of Using Augmented Reality In Geot...
Alba Rguez (July 2021) - Feasibility Study Of Using Augmented Reality In Geot...Alba Rguez (July 2021) - Feasibility Study Of Using Augmented Reality In Geot...
Alba Rguez (July 2021) - Feasibility Study Of Using Augmented Reality In Geot...Francisco Javier Mora Serrano
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction ManagementMd Manzoor Akhtar
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...IRJET Journal
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET Journal
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingMcKenney's Inc
 
Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in ConstructionIRJET Journal
 
The sustainable management of remote construction projects
The sustainable management of remote construction projectsThe sustainable management of remote construction projects
The sustainable management of remote construction projectsBhzad Sidawi
 
Numerical analysis historicl devpt
Numerical analysis  historicl devptNumerical analysis  historicl devpt
Numerical analysis historicl devptSHAMJITH KM
 
The Poster of Application of terrestrial 3D laser scanning in building inform...
The Poster of Application of terrestrial 3D laser scanning in building inform...The Poster of Application of terrestrial 3D laser scanning in building inform...
The Poster of Application of terrestrial 3D laser scanning in building inform...Martin Ma
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 

Ähnlich wie List Of Post Graduate Thesis in engineering project management (20)

Conquas
ConquasConquas
Conquas
 
The Cruciality of MEP Coordination for Seamless Construction
The Cruciality of MEP Coordination for Seamless ConstructionThe Cruciality of MEP Coordination for Seamless Construction
The Cruciality of MEP Coordination for Seamless Construction
 
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNGBIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
 
Flexible and Scalable Modelling in the MONDO Project: 3 Industrial Case Studi...
Flexible and Scalable Modelling in the MONDO Project: 3 Industrial Case Studi...Flexible and Scalable Modelling in the MONDO Project: 3 Industrial Case Studi...
Flexible and Scalable Modelling in the MONDO Project: 3 Industrial Case Studi...
 
Development_of_Computer_Aided_Critical_Lift_Planning_Software-libre
Development_of_Computer_Aided_Critical_Lift_Planning_Software-libreDevelopment_of_Computer_Aided_Critical_Lift_Planning_Software-libre
Development_of_Computer_Aided_Critical_Lift_Planning_Software-libre
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...
 
Best Converting Point Cloud to BIM and BIM Laser Scanning.pdf
Best Converting Point Cloud to BIM and BIM Laser Scanning.pdfBest Converting Point Cloud to BIM and BIM Laser Scanning.pdf
Best Converting Point Cloud to BIM and BIM Laser Scanning.pdf
 
Alba Rguez (July 2021) - Feasibility Study Of Using Augmented Reality In Geot...
Alba Rguez (July 2021) - Feasibility Study Of Using Augmented Reality In Geot...Alba Rguez (July 2021) - Feasibility Study Of Using Augmented Reality In Geot...
Alba Rguez (July 2021) - Feasibility Study Of Using Augmented Reality In Geot...
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction Management
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
 
EcoDomus recent Use Cases in US and Middle East
EcoDomus recent Use Cases in US and Middle EastEcoDomus recent Use Cases in US and Middle East
EcoDomus recent Use Cases in US and Middle East
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
 
Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in Construction
 
The sustainable management of remote construction projects
The sustainable management of remote construction projectsThe sustainable management of remote construction projects
The sustainable management of remote construction projects
 
Numerical analysis historicl devpt
Numerical analysis  historicl devptNumerical analysis  historicl devpt
Numerical analysis historicl devpt
 
Bim its applications
Bim   its applicationsBim   its applications
Bim its applications
 
The Poster of Application of terrestrial 3D laser scanning in building inform...
The Poster of Application of terrestrial 3D laser scanning in building inform...The Poster of Application of terrestrial 3D laser scanning in building inform...
The Poster of Application of terrestrial 3D laser scanning in building inform...
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 

List Of Post Graduate Thesis in engineering project management

  • 1. List of Post Graduate Thesis Year of No. Thesis Title graduation research 1. Application of Expert System on Disputes of Competitive M.SC. 1996 Contracts of Construction Projects. 2. Deriving an Approximate Method of Cost Estimation. M.SC. 1996 3. Management of Constructability Enhancement of the M.SC. 1996 Construction Industry. 4. Management Information System (MIS) for Planning And Ph.D. 1996 Schedule Control of Construction In the Iraqi Oil Sector. 5. Integrated Construction Management System for Site Cost Problems And Management Evaluation with Expert Ph.D. 1996 System Implementation. 6. Developing an Integrated Management System for Selecting Method and Equipment of Excavation Irrigation M.SC. 1997 Projects with Expert System Implementation. 7. Deriving an Equation for Calculating the Productivity of M.SC. 1997 Equipments for Road Projects. 8. Using a Computer Interactive Model for Evaluating and M.SC. 1997 Improving projects 9. Expert System Application on Selection of Compaction M.SC. 1998 Method and Equipment. 10. Improving the Cost Components in the Reconstruction Projects that have been Executed Through The Period M.SC. 1998 (1991-1994). 11. Management and Control of on-Site Construction Ph.D. 1999 Material. 12. Deriving an Equation to Calculate The Productivity of M.SC. 1999 Excavation. 13. Evaluation System for Work Progress by Standard Weights Ph.D. 1999 of Construction Items. 14. Optimal Management Solution of Estimation Cost of Ph.D. 1999 Highway Project in Iraq. 15. The Development of A management System for Controlling Ph.D. 1999 and following-up Subcontractor Work. Developing A management Systems for Plant Management 16. M. Sc. 1999 with Expert System implementation. 17. Developing an Interactive Computer Program for Evaluating the Performance of Construction Management at The M. Sc. 1999 Execution Stage.
  • 2. Year of No. Thesis Title graduation research 18. Using Value. Engineering for Studying the Possible Alter- M.SC. 2000 natives for Execution The Earth Water Tanks 19. A comparison Between The Reconstruction Mission of M.SC. 2000 Service Building Projects. 20. Developing A management Information System (MIS) for M.SC. 2000 Controlling the Execution Cost of Irrigation Projects. 21. Using Value-Engineering for Building A management M.SC. 2000 System for Evaluating the Security-Projects. 22. Integrated Management System For Site Quality Control. M.SC. 2000 23. Developing a knowledge Based Expert System for Building Management System for Decision Making Delays in M.SC. 2000 Construction Projects. 24. Electing A Management System for Controlling the on-Site M.SC. 2000 labour. 25. Developing a Planning Relationship Between CPM and Line M.SC. 2001 of Balance (L.O.B) Method. 26. Project Management And Its Effect On The Quality Control M.SC. 2001 in The Construction Sector. 27. Design an Integrated Management System for Quality Ph.D. 2001 Control By Using (ISO-9000) Guide. 28. Developing Management System For Selecting The Constructing Method and Execution Approach Of M.SC. 2001 Construction Projects By Using Expert System Technique. 29. Design A management System For Controlling The on-Site M.SC. 2001 Material Usage. 30. Election of A management System For Identifying The M.SC. 2001 Execution Weight Of Fortified Building. 31. Developing A Management System For Planning The One- M.SC. 2001 Site Material Usage. 32. Using Value-Engineering For Designing A management M.SC. 2001 System For Evaluation Of Execution Irrigation Projects. 33. Cost Evaluation Standards for Industrial Buildings. Ph.D. 2002 34. Quality Cost and Their Considerations in Managing The M.C.S 2002 Factories Of Pre-Casting Concrete Units. 35. Appling The Value-Engineering Approach For Controlling Ph.D. 2002 The On-Site Cost Of Building Projects. 36. Developing A management System For Controlling The M.SC. 2002 Project Cost in The Construction Sector.
  • 3. Year of No. Thesis Title Graduation Researc h 37. Using Standards For Evaluating The Performance Of Project M.SC. 2002 Management in Preventing The Time Delay. 38. Developing of Value Engineering Management System For Ph.D. 2002 Construction Projects in Iraq. 39. Using Value Engineering Concept For Evaluating and Improving The Maintenance Management of University M.SC. 2002 Buildings . 40. Building an Engineering System For Quality Management on M.SC. 2003 The Design Stage ( Radio Station as case study). 41. Developing an Interactive System for Controlling M.SC. 2003 Construction Plant Cost. 42. Implementing Total Quality Management in The Productive Factories of the Construction Section (Al- Taje factories as M.SC. 2003 Case study). 43. Design a Developed Management System For Site Usage of M.SC 2005 Construction Materials. 44. Implementation of CPM for Avoiding and Controlling Time M.SC 2005 Delays in Construction Projects 45. Evaluation of Libyan Contract Conditions And Its M.SC 2005 Application On Engineering Projects 46. Expert Systems Applications for Selection a Type of Contracts and Project Delivery Method for Construction M.SC 2005 Project. 47. Application of Intranet As an Engineering Management Information System For Service Management (SMIS) of M.SC 2005 Drugs Distributions. 48. Implementation of Value Management In Designing The M.SC 2005 Construction Works In Respect to Cost. 49. Establishing a Management System to Select A Type of Contract And Execution Approach For Construction projects M.SC 2005 By Implementation Expert System Technique. 50. Applying of Engineering Management Aspects for Evaluation of The Availability of Implementing New M.SC 2005 Technologies in Constructing Road Projects 51 Expert System Application For Evaluation of The Engineering Projects With Earned Value System M.SC 2006 Implementation 52 Developing A Resource Management System for A M.SC 2006 successful Project Management
  • 4. Year of No. Thesis Title Graduation Researc h 53 Implementing The Engineering Project Concepts For Building An Engineering Management System For Material M.SC 2006 Stocking ( Steel Complex in Musrata / Libya as a Case Study) 54 Application of Engineering Management Aspects With Simulation Techniques For Developing A Power Load M.SC 2006 Distribution System 55 Implementation of Computer Programs For Site Management M.SC 2006 of Engineering Projects) 56 Developing An Integrated Labor Site Cost Management M.SC 2006 System (ISCMS) For Construction Projects 57 Value Engineering Aspects For Improving The Projects' M.SC 2006 Performance at the Implementation Phase Of Oil Projects 58 Implementation of TQM Fundamentals in Constructing the M.Sc. 2009 Marine Projects in the States of Kuwait 59 Implementation of Value Engineering in Managing M.Sc. 2009 Governmental Buildings in Kuwait State 60 Changing Orders and Its Impacts on the Projects Time and M.Sc. 2009 Cost 61 Implementation of T.Q.M Planning and Control Techniques in Constructing the Marine Projects in the M.Sc. 2009 State of Kuwait 62 Implementations Of T.Q.M Control Techniques In Power M.Sc. 2009 Station In State Of Kuwait 63 Developing a Qualification Based Selection Standard Model for Contractor Selection of Construction Projects in M.Sc. 2009 The State of Kuwait