SlideShare ist ein Scribd-Unternehmen logo
1 von 84
Downloaden Sie, um offline zu lesen
The Future of Professional Practice:
The Next Generation of Integrated Delivery,
Emerging Technology and Practice Management




                          “BEYOND COLLABORATION –
                    THE BENEFITS OF INTEGRATED DELIVERY”
                                              presented by:
                              Doug Parris, Todd Buchanan, Tom Owens
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”

 • What is it?
 • Why does it Matter?
 • What is Contract Basis?
 • How do we do it?
 • Who are the Early Adopters?
 • Value
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
 Our definition:
 Integrated Delivery is a project
 approach which integrates, from
 start to finish the three major
 stakeholders (owner / user, designers
 and constructors/fabricators) around
 mutual project outcome based
 objectives.
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”




         Before Integration                After Integration
     1999 → Stagnant factory line      Today → Moving factory line
              27 days                      11 days (or less)


The Changing Marketplace: Boeing 737
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
At its best, all economic incentives
are aligned and mutual, the process
is based on open information
sharing, design through fabrication
and construction is based on the
collaborative interaction of all
parties, and no work or information
creation redundancies.
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
Traditional Team
Integrated




             Owner

                       PROGRAM/OPERATIONS   DESIGN INTENT   VIRTUAL            PHYSICAL    TURNOVER
                                                            DESIGN/CONSTRUCT   CONSTRUCT   OCCUPANCY




           Designer




 Builder/Fabricators
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
                 Traditional                                                            Integrated Delivery
 Fragmented, assembled on “just-as-needed” or
                                                                            An integrated team entity composed of all project
“minimum-necessary” basis, strongly hierarchical,
                 controlled                                Teams             lifecycle stakeholders, assembled early in the
                                                                                          process, collaborative

                                                                                Concurrent, multi-level, integrated; early
Linear, distinct, segregated; knowledge gathered
                                                                                     contributions of knowledge
          “just-as-needed”; information                    Process                          and expertise;
                      hoarded
                                                                                      information openly shared

Individually managed, transferred to the greatest
                extent possible                             Risk               Collectively managed, appropriately shared


Individually pursued; minimum effort for maximum                              Team success tied to project success; value-
         return; (usually) first-cost based         Compensation / Reward                       based

                                                                                         Digitally based, virtual,
                                                      Communications /
      Paper-based, 2 dimensional; analog                                                     4 dimensional;
                                                         Technology                  Building Information Modeling

  Minimum effort for maximum return; minimize                                Encourage, foster, promote and support open
         or transfer risk; don’t share                   Agreements            sharing and collaboration, full integration


                                                                                Team-based, integrated, collaborative;
 Individually focused, emphasis on composition            Education            technologically inclusive; a materials and
                                                                               methods focus in addition to composition
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”


 • What is it?
 • Why does it Matter?
 • What is Contract Basis?
 • How do we do it?
 • Who are the Early Adopters?
 • Value
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
Our Client’s Viewpoint:
 – Waste (30%), errors, cost, and
   schedule overruns
 – Lack of collaboration, poor
   information integration, lack of
   common goal
 – “Project organization…silos
   between design, fabrication,
   and construction or building
   operation.”
 – “Participants optimizing for its
   own interest rather than that of
   overall project.”
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
And, their observations of the
opportunities created by
collaboration were:


–“Virtual buildings created in a fully
collaborative environment.”
–“Building information models …create
the best chances for finding…mistakes;
optimizing systems, materials…reducing
cost of building and building
operations.”
–“Project teams…include designers,
contractors, suppliers, manufacturers,
facility managers… adopting a systems      August 2004            July 2006
                                           CURT Whitepaper 1202   CURT Whitepaper 1003
approach…result in true collaboration in
best interest of the project.
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”

                   Design    Cost             Construct   Operate
                    $24B              $400B                $4T


      More
       Knowledge




      Less
                   Design   Procure            Build      Manage
                                                              slide courtesy of Autodesk
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”

From Constructors Viewpoint:
 – Replace the conflict with teamwork
 – Optimize industrialized workforce – offsite
   fabrication
 – Reduce speculative crapshoot
 – Share Rewards (w/risk)
 − Early Involvement
 − Common Goals
 − Teamwork
 − Utilizing Multiple Experiences/Expertise
 − Reduced Costs
 − Best Value/Product
 − Creative Contracting
 − Operational & Maintenance Savings
 − Relationships
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
From Constructors Viewpoint:
• Impact of eliminating 10%, 15% or 20% of the waste
   – $10 to $18 million on a 500,000 sq ft replacement hospital
• Owner
   –   Be the leader. Market responds to the customer.
   –   Change your paradigms; demand more.
   –   Create a lean decision-making process.
   –   Create clear, consistent project goals for everyone.
   –   Create incentives for exceptional results.
• Industry
   –   Integrate into single-purpose colocated teams.
   –   Create strategic supply chain relationships.
   –   Common goals, shared incentives and managed risk
   –   Open cost sharing—help all participants drive costs out of their businesses.
   –   Observe, measure, improve.
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
From Constructors Viewpoint:
• Collaborative environment
   – Mutual benefit to owner, architect, contractor
     and subcontractors
   – Improved communication and understanding
• Elimination of waste
   – Better planning
   – Right materials showing up at the right time
   – Reduced rework
   – Improved communication
• Prefabrication
   – Modularization of major components
   – More off-site fabrication
   – Increased quality
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”

  From Architect’s Viewpoint:
   – Put the fun back into building
   – Replace the conflict with teamwork
   – Harness the power of the
     construction industry to deliver the
     project
   – Realize Design Vision more
     effectively and efficiently
   – Share Rewards (w/risk)
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”

From Architect’s Viewpoint:
– Transformation of process
– Become more of a learning
  organization
– Deeper immersion in the craft
– No RFI’s/change orders
– Reallocation of focus –
  research/discovery/innovation
– Speed to market
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
 • What is it?
 • Why does it Matter?
 • What is Contract Basis?
 • How do we do it?
 • Who are the Early Adopters?
 • Value
Intention / Relational Contract

• The agreement goal should be to attain high
  quality delivery of a project through elimination of
  redundancy, errors and waste.

• The goal is realized by aligning the interests of
  owner, builder and designer with a mutually
  agreed definition of project success.
Integrated Delivery requires a culture of
Collaboration

• For success, design of the project must proceed with
  informed, accurate information concerning program,
  quality, cost, and schedule.

• The entire teams’ expertise will need to be integrated
  throughout the process to be attain success.

• Isolation or collaborating only at milestones will not
  achieve the benefits of integration, constant free flow of
  information, working together, is key.
Contract Concepts to Build Culture
• Align risk and reward to optimize project success
  over individual entity success

• Align risk and reward with a party's ability to
  control risk

• Require an open information environment

• Require everybody to think operate, design and
  construct
Contract Steps:

• Start with all three parties contracting together to
  eliminate “Owner in the middle.”

• A team of Owner, Builder and Designer lead the project
  with a bias toward consensus decision making.

• The program should be complete and a target price set
  agreeable to all

• All three parties agree to openly share information and
  cooperatively collaborate for the benefit of the project.

• As Trade Contractors and Design Consultants are added
  they acknowledge the new arrangement.
Contract Steps
• Engage the Builder during early design so that pricing, constructability
  and value engineering are integrated from the beginning

• Make cost and schedule design criteria

• Set appropriate contingencies, share one between Builder and
  Designer

• Put profit for both Builder and Designer at “risk for failure’ to perform
  as a team with a corresponding reward shared by both if they perform
  above the standard of care

• Engaging Trade Contractors early for the purpose of collaborating with
  their complimentary engineering discipline and driving innovation

• Major trade contractors structure, mechanical, electrical, plumbing,
  skin and drywall are selected during schematic design to facilitate an
  integrated collaborative design process.
Contract Supports Lean

• Design the process first then design the project
• Concurrent set based design, take forward
  multiple design alternatives to the last
  responsible moment
• Incorporating value as the key design proposition
• Build virtually before building physically
   –   Eliminate redundant efforts and conflicts
   –   Optimizing means and methods
   –   Maximizing off site construction
   –   Zero RFI goal
Can you use a traditional contract?

Not really.

• You can’t align risk and reward to optimize project success
  over individual entity success if the designer and builder
  are not a team

• Cultural change is hard enough with a new contract,
  without it people revert to thinking about their interests
  and controlling information

• Nearly impossible to integrate operating, design and
  construction knowledge without huge risk to the designer
Can you go part way?

Possibly.

• Find the key disciplines for the large costs on the
  project

• Find open minded designers willing to “contract
  out” construction documents

• Find open minded trade contractors willing to
  draw shops/construction documents with
  designer oversight
NBBJ’s template



http://www.nbbj.com/access/IntDelDraftNBBJ.doc
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
 • What is it?
 • Why does it Matter?
 • What is Contract Basis?
 • How do we do it?
 • Who are the Early Adopters?
 • Value
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”

 Process Design                    SUSTAINABLE    PROCESS
                                     DESIGN        DESIGN

 Integrated Design
                                         LEAN
 Integrated Fabrication                CONCEPTS     BIM


 Building Information Modeling

 Sustainable Design

                                           INTEGRATED
                                             DELIVERY
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
 Process Design:
 Creating a comprehensive road map
 For the own design construct team in
 order to navigate the limitless choices
 offered throughout the creative journey.

 The organization and ideation that
 creates the framework for outstanding
 design, execution & extraordinary
 results

 Is tailored to project success in very
 specific terms and is developed by a
 collaboration of all participants.
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
 Integrated Design:

 Engaging the broadest range of Creative
 and design disciplines in an effective
 and efficient manner from the beginning
 ensures that the solutions are as rich
 and content filled as possible.

 This engagement of behavioral, artistic
 and engineering perspectives offered at
 the earliest stages provides the
 opportunity to discover and explore new
 building typologies in a timely way.
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
 Integrated Fabrication:

 The opportunity to tap the skills and
 knowledge of the fabricate/construct
 trades and professionals in optimizing
 the methods for design realization can
 make the design tectonics better and
 more sustainable

 This approach can also eliminate
 wasteful duplication of documentation
 efforts and the errors associated with
 multiple information transfer
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
 Building Information
 Modeling (BIM):
 BIM is an evolving term generally
 referring to the broad use of 3D digital
 building models with linked parametric
 information to achieve the goal of
 integrated project data, enhanced
 visualization, and data sharing and re-
 use by various members of the building
 team. BIM is the enabler for integration
 and open information sharing
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
 (BIM) in practice:
  building design visualization
            programming, massing, cladding design, interiors, virtual
  walkthrough’s

  model intelligence
            area calculations, envelope analysis, quantity reporting, schedules,
  cost estimating

  integrated design across disciplines
           design team: architecture, interiors, lighting, structural, MEP, civil
           construct team: contractor, subcontractors, fabricators
           owner: facility managers, department user groups

  BIM as a facility management tool
           deliver model to owner for future O&M
building information model | the model as the nucleus
visualization | building design
model intelligence | 3d libraries
model intelligence | extractions
model intelligence | live interior elevations
model intelligence | modules
model intelligence | modules
model intelligence | sustainable design
model intelligence | reporting
model intelligence | travel distance
model intelligence | medical equipment
model intelligence | doors
model intelligence | door intelligence – door schedule data (live)
model intelligence | automated door schedule
model intelligence | wall calculation
model intelligence | cost estimating
integrated design | multi-discipline coordination
SITE




integrated design | model integration
SITE
                                        CORE




integrated design | model integration
SITE
                                            CORE
                                        STRUCTURE




integrated design | model integration
SITE
                                            CORE
                                        STRUCTURE




integrated design | model integration
SITE
                                            CORE
                                        STRUCTURE
                                           SHAFTS




integrated design | model integration
SITE
                                            CORE
                                        STRUCTURE
                                           SHAFTS
                                            HVAC




integrated design | model integration
SITE
                                            CORE
                                        STRUCTURE
                                           SHAFTS
                                            HVAC
                                         PLUMBING




integrated design | model integration
SITE
                                                  CORE
                                            STRUCTURE
                                                SHAFTS
                                                  HVAC
                                              PLUMBING
                                        FIRE PROTECTION




integrated design | model integration
SITE
                                                  CORE
                                            STRUCTURE
                                                SHAFTS
                                                  HVAC
                                              PLUMBING
                                        FIRE PROTECTION
                                           TECHNOLOGY




integrated design | model integration
SITE
                                                  CORE
                                           STRUCTURAL
                                                SHAFTS
                                                  HVAC
                                              PLUMBING
                                        FIRE PROTECTION
                                           TECHNOLOGY
                                              INTERIORS




integrated design | model integration
SITE
                                                  CORE
                                           STRUCTURAL
                                                SHAFTS
                                                  HVAC
                                              PLUMBING
                                        FIRE PROTECTION
                                           TECHNOLOGY
                                              INTERIORS
                                             EQUIPMENT
                                          FOOD SERVICE




integrated design | model integration
SITE
                                                  CORE
                                           STRUCTURAL
                                                SHAFTS
                                                  HVAC
                                              PLUMBING
                                        FIRE PROTECTION
                                           TECHNOLOGY
                                              INTERIORS
                                             EQUIPMENT
                                          FOOD SERVICE
                                                 SHELL




integrated design | model integration
integrated design | the big room concept
integrated design | collision detection   above ceiling coordination
integrated design | coordination   operating room equipment booms
integrated design | virtual walk-through’s
collaboration | contractor modeling
collaboration | communication timeline
facility management | campus information model
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”


 • What is it?
 • Why does it Matter?
 • What is Contract Basis?
 • How do we do it?
 • Who are the Early Adopters?
 • Value
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”

  Integrated Delivery – the early models
  − Community Health Partners
  − Bay Park
  − Wake Medical Center

  Integrated Delivery by Contract - current
  − Sutter - PAMF (in Design Intent)
  − Virginia Mason (in negotiation)

  Integrated Delivery in Principle
  − Mass. General Hospital
  − Cleveland Clinic – Glickman Tower
  − Providence Novi
  − Swedish Orthopedic Institute
  −Wellcome Trust
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
Bay Park Community Hospital
Oregon, OH
• 23 months from beginning of
  design to move in
• SPE integrated team (design firm,
  CM, mechanical, electrical)          NBBJ


  surfaced all contingencies.
• Precise structure enabled high
  degree of off-site fabrication.
• Dramatically reduced waste
• Returned 11% of construction
  budget in added scope
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”

Sutter Healthcare
• Facility Planning and Design (FPD) hit upon the success of Toyota and
  determined that if they could apply their methodology to design and
  construction projects, the executive challenge could be met.
• In September 2004, after 2 years of research and exploration, Sutter
  Health made the decision and commitment to go Lean.
• Lean
    – Reinvent how hospitals deliver care to the patient (flow, wait time, etc) and
      how we deliver design and construction services
    – Knowing the customer
    – Work flow
    – Pull scheduling
    – Batch size and …
    – All the attendant behavior and processes to effect them
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”

Sutter Healthcare
• Sutter developed their 5 Big Ideas that are the framework for
  approaching all aspects of Sutter’s Lean Project delivery.
      Collaborate—really collaborate—throughout design, planning and execution.
      Increase relatedness among all project participants.
      Projects are networks of commitments.
      Optimize the project, not the pieces.
      Tightly couple action with learning.
“BEYOND COLLABORATION –
  THE BENEFITS OF INTEGRATED DELIVERY”

Sutter Healthcare
• FPD’s goal was to increase the reliability that projects conceptually
  approved and funded in year 1 are designed and constructed in
  year 5+:
         –      On time or early
         –      Within budget or less
         –      Without claims
         –      Safely (without creating patients)
         –      Without burning out FPD staff
• For 3 years, we have been training and collaborating with the AEC
  community.
         –      Learning the skills needed for Lean Project delivery
         –      Developing an implementation strategy
         –      Demonstrating our commitment to continually improving
         –      Openly sharing the learning in our project community
AEC = architecture, engineering and construction.
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”

Sutter Healthcare
• Our expectation now is across-the-board deployment with a “lite” version for
  smaller projects.
• We’ve tested and tried for 3 years. We’re at a point where we can coalesce the
  learning and results and develop a standardized work plan for projects to follow
  and improve on.
• The plan is to share the experiences of 4 teams currently completing project
  and business case validation and create a standard work process for this stage.
  This will be followed by standardized work plans for:
    –   Design
    –   Documentation
    –   Permitting
    –   Construction
• We’ve developed and continue to add to a stable of architects, engineers and
  contractors who are willing and able to work in this fashion.
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
 • What is it?
 • Why does it Matter?
 • What is Contract Basis?
 • How do we do it?
 • Who are the Early Adopters?
 • Value
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”


Value:
This is a relatively new approach and the first projects to use it from start to finish have
yet to be completed… however some aspects have been realized on projects which have
produced positive results.

Will it save money?
•Per industry estimates 30% or more is at stake
•Sutter Health expects minimum 5% return based on experience with MEP systems alone
•Among other areas Mortenson reports significant savings in structural alone

Will it save time?
•Overall likely about the same, but likely less time in construction due to
 virtual construction, 4D construction planning and off-site fabrication
•This can improve cash flow, reduce cost risk once construction initiated
“BEYOND COLLABORATION –
 THE BENEFITS OF INTEGRATED DELIVERY”

Value:
Will it eliminate material waste?
•Experience of NBBJ at Harborview virtually elliminated any waste scraps from
 sheetmetal, piping, conduit,cable tray
•Mortenson reports achieving virtually zero structural steel waste

Will it be green ?
•Integrated analysis of green alternatives from beginning to end
makes cost effective green more likely
•4D construction planning improves potential for minimizing
construction waste ( scaffolding, formwork, drywall timeframe)

Will it improve quality?
•Total team (Client/Designer/Builder) engagement in process ensures
“appropriate” quality choices
•Engagement of real fabricators in detailing ensures best quality/price
alignment
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
US Architecture Engineering Construction Waste
• Total ’05 US Construction Industry $1.03 Trillion
• 30% Waste* = $309 Billion
• Non Residential Building =$275 Billion
• 30% Waste*=$85 Billion

Global Annual Cost of Poverty Elimination,
Carbon Reduction
• Poverty =$75 B (Sachs)
• Carbon=$10B (@4%)


Our Industry has the ability to
Fund the Changes
through Integration…




 *CURT
“BEYOND COLLABORATION –
THE BENEFITS OF INTEGRATED DELIVERY”
Currently, there is and abundance of resource and reference information
available on the internet. The following are several websites of interest:

• AIA Integrated Practice Website http://aia.org/ip.default
• Construction Users Roundtable (CURT) http://www.curt.org
• Associated General Contractors of America (AGC) http://www.agc.org/index.ww
• Design-Build Institute of America (DBIA) http://www.dbia.org/
• Lean Construction Institute (LCI) http://www.leanconstruction.org/
• Construction Industry Institute (CII) http://www.construction-institute.org
• NBBJ Integrated Delivery Contract –
  http://www.nbbj.com/access/IntDelDraftNBBJ.doc
• Refabricating Architecture – Stephen Kieran and James Timberlake
• Product Development for the Lean Enterprise – James Kennedy
The Future of Professional Practice:
The Next Generation of Integrated Delivery,
Emerging Technology and Practice Management




                          “BEYOND COLLABORATION –
                    THE BENEFITS OF INTEGRATED DELIVERY”
                                              presented by:
                              Doug Parris, Todd Buchanan, Tom Owens



                                   Questions & Discussion

Weitere ähnliche Inhalte

Was ist angesagt?

Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 

Was ist angesagt? (20)

Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
Dissertation BIM
Dissertation BIMDissertation BIM
Dissertation BIM
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
BIM
BIMBIM
BIM
 
Agile and Lean for Construction
Agile and Lean for ConstructionAgile and Lean for Construction
Agile and Lean for Construction
 
Tekla Structures 21.0
Tekla Structures 21.0Tekla Structures 21.0
Tekla Structures 21.0
 
A gentle introduction to BIM
A gentle introduction to BIMA gentle introduction to BIM
A gentle introduction to BIM
 
Introduction to Building Information Modeling
Introduction to Building Information Modeling Introduction to Building Information Modeling
Introduction to Building Information Modeling
 
Integrated Project Delivery White Paper
Integrated Project Delivery   White PaperIntegrated Project Delivery   White Paper
Integrated Project Delivery White Paper
 
RIBA plan of work
RIBA plan of workRIBA plan of work
RIBA plan of work
 
Understanding "BOT" projects
Understanding "BOT" projectsUnderstanding "BOT" projects
Understanding "BOT" projects
 
Alliance Contracting
Alliance ContractingAlliance Contracting
Alliance Contracting
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement Methods
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
Role of building information modelling bim in quantity surveying practice
Role of building information modelling bim in quantity surveying practiceRole of building information modelling bim in quantity surveying practice
Role of building information modelling bim in quantity surveying practice
 
Construction contract
Construction contractConstruction contract
Construction contract
 

Ähnlich wie Integrated Project Delivery

Crowdsourced Documentation
Crowdsourced DocumentationCrowdsourced Documentation
Crowdsourced Documentation
Mark Fidelman
 
15-MOR-101_IPDWhitepaper
15-MOR-101_IPDWhitepaper15-MOR-101_IPDWhitepaper
15-MOR-101_IPDWhitepaper
Todd Sullivan
 
Collaborative Knowledge Platform Ckp Some Key Slides
Collaborative Knowledge Platform Ckp Some Key SlidesCollaborative Knowledge Platform Ckp Some Key Slides
Collaborative Knowledge Platform Ckp Some Key Slides
Joep Wijman
 
Dare Sessions: Organisation 3.0
Dare Sessions: Organisation 3.0Dare Sessions: Organisation 3.0
Dare Sessions: Organisation 3.0
teamsocial
 
Value added socialnetwork-bk (1)
Value added socialnetwork-bk (1)Value added socialnetwork-bk (1)
Value added socialnetwork-bk (1)
Dr. Paul Gromball
 
Collaborative Knowledge Base
Collaborative Knowledge BaseCollaborative Knowledge Base
Collaborative Knowledge Base
Mark Fidelman
 

Ähnlich wie Integrated Project Delivery (20)

Softjoe Webinar 092512
Softjoe Webinar 092512Softjoe Webinar 092512
Softjoe Webinar 092512
 
1301 open innovation j friedrich
1301 open innovation j friedrich1301 open innovation j friedrich
1301 open innovation j friedrich
 
Meshworking For Sustainability 090320 Kopie
Meshworking For Sustainability 090320 KopieMeshworking For Sustainability 090320 Kopie
Meshworking For Sustainability 090320 Kopie
 
Crowdsourced Documentation
Crowdsourced DocumentationCrowdsourced Documentation
Crowdsourced Documentation
 
Driving Creative Innovation
Driving Creative InnovationDriving Creative Innovation
Driving Creative Innovation
 
Enterprise social networking for collaboration andre dan - challengy - snc2010
Enterprise social networking for collaboration   andre dan - challengy - snc2010Enterprise social networking for collaboration   andre dan - challengy - snc2010
Enterprise social networking for collaboration andre dan - challengy - snc2010
 
Knowledge Management in Complex Projects by Professor Charles Egbu
Knowledge Management in Complex Projects by Professor Charles EgbuKnowledge Management in Complex Projects by Professor Charles Egbu
Knowledge Management in Complex Projects by Professor Charles Egbu
 
2011 National BDPA Tech Conf Presenation Final
2011 National BDPA Tech Conf Presenation Final2011 National BDPA Tech Conf Presenation Final
2011 National BDPA Tech Conf Presenation Final
 
Creating Business Value Through User Experience
Creating Business Value Through User ExperienceCreating Business Value Through User Experience
Creating Business Value Through User Experience
 
15-MOR-101_IPDWhitepaper
15-MOR-101_IPDWhitepaper15-MOR-101_IPDWhitepaper
15-MOR-101_IPDWhitepaper
 
The Changing Role of the Developer in HE
The Changing Role of the Developer in HEThe Changing Role of the Developer in HE
The Changing Role of the Developer in HE
 
Infosys - Aerospace Web 2.0 Social Computing | Digital Consumer Ecommerce
Infosys - Aerospace Web 2.0 Social Computing | Digital Consumer EcommerceInfosys - Aerospace Web 2.0 Social Computing | Digital Consumer Ecommerce
Infosys - Aerospace Web 2.0 Social Computing | Digital Consumer Ecommerce
 
Idea Management Tools and Cases
Idea Management Tools and CasesIdea Management Tools and Cases
Idea Management Tools and Cases
 
eAccess-12 roundtable: Case Studies of Implementing BS 88878
eAccess-12 roundtable: Case Studies of Implementing BS 88878eAccess-12 roundtable: Case Studies of Implementing BS 88878
eAccess-12 roundtable: Case Studies of Implementing BS 88878
 
Kreeo - collaborate for knowledge (Kreeo)
Kreeo - collaborate for knowledge (Kreeo)Kreeo - collaborate for knowledge (Kreeo)
Kreeo - collaborate for knowledge (Kreeo)
 
Collaborative Knowledge Platform Ckp Some Key Slides
Collaborative Knowledge Platform Ckp Some Key SlidesCollaborative Knowledge Platform Ckp Some Key Slides
Collaborative Knowledge Platform Ckp Some Key Slides
 
Dare Sessions: Organisation 3.0
Dare Sessions: Organisation 3.0Dare Sessions: Organisation 3.0
Dare Sessions: Organisation 3.0
 
Value added socialnetwork-bk (1)
Value added socialnetwork-bk (1)Value added socialnetwork-bk (1)
Value added socialnetwork-bk (1)
 
Implementing Intelligent Content Solutions (Joe Gollner - Intelligent Content...
Implementing Intelligent Content Solutions (Joe Gollner - Intelligent Content...Implementing Intelligent Content Solutions (Joe Gollner - Intelligent Content...
Implementing Intelligent Content Solutions (Joe Gollner - Intelligent Content...
 
Collaborative Knowledge Base
Collaborative Knowledge BaseCollaborative Knowledge Base
Collaborative Knowledge Base
 

Mehr von Mike Purdy

Best Value Contracting for Public Works
Best Value Contracting for Public WorksBest Value Contracting for Public Works
Best Value Contracting for Public Works
Mike Purdy
 

Mehr von Mike Purdy (9)

Presidential History News
Presidential History NewsPresidential History News
Presidential History News
 
Washington State Legislative Updates
Washington State Legislative UpdatesWashington State Legislative Updates
Washington State Legislative Updates
 
ARRA Implementation
ARRA ImplementationARRA Implementation
ARRA Implementation
 
Design Build Requirements In Washington State By Michael E Purdy
Design Build Requirements In Washington State   By Michael E PurdyDesign Build Requirements In Washington State   By Michael E Purdy
Design Build Requirements In Washington State By Michael E Purdy
 
2009 Construction Industry Strategy Survey By Fmi
2009 Construction Industry Strategy Survey By Fmi2009 Construction Industry Strategy Survey By Fmi
2009 Construction Industry Strategy Survey By Fmi
 
2009 Legislation Affecting Washington State Public Works Contracting
2009 Legislation Affecting Washington State Public Works Contracting2009 Legislation Affecting Washington State Public Works Contracting
2009 Legislation Affecting Washington State Public Works Contracting
 
Writing Effective Technical Specifications
Writing Effective Technical SpecificationsWriting Effective Technical Specifications
Writing Effective Technical Specifications
 
Retainage Law Changes In Washington State
Retainage Law Changes In Washington StateRetainage Law Changes In Washington State
Retainage Law Changes In Washington State
 
Best Value Contracting for Public Works
Best Value Contracting for Public WorksBest Value Contracting for Public Works
Best Value Contracting for Public Works
 

Kürzlich hochgeladen

Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 

Kürzlich hochgeladen (20)

Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 

Integrated Project Delivery

  • 1. The Future of Professional Practice: The Next Generation of Integrated Delivery, Emerging Technology and Practice Management “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” presented by: Doug Parris, Todd Buchanan, Tom Owens
  • 2. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” • What is it? • Why does it Matter? • What is Contract Basis? • How do we do it? • Who are the Early Adopters? • Value
  • 3. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Our definition: Integrated Delivery is a project approach which integrates, from start to finish the three major stakeholders (owner / user, designers and constructors/fabricators) around mutual project outcome based objectives.
  • 4. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Before Integration After Integration 1999 → Stagnant factory line Today → Moving factory line 27 days 11 days (or less) The Changing Marketplace: Boeing 737
  • 5. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” At its best, all economic incentives are aligned and mutual, the process is based on open information sharing, design through fabrication and construction is based on the collaborative interaction of all parties, and no work or information creation redundancies.
  • 6. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY”
  • 7. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Traditional Team Integrated Owner PROGRAM/OPERATIONS DESIGN INTENT VIRTUAL PHYSICAL TURNOVER DESIGN/CONSTRUCT CONSTRUCT OCCUPANCY Designer Builder/Fabricators
  • 8. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Traditional Integrated Delivery Fragmented, assembled on “just-as-needed” or An integrated team entity composed of all project “minimum-necessary” basis, strongly hierarchical, controlled Teams lifecycle stakeholders, assembled early in the process, collaborative Concurrent, multi-level, integrated; early Linear, distinct, segregated; knowledge gathered contributions of knowledge “just-as-needed”; information Process and expertise; hoarded information openly shared Individually managed, transferred to the greatest extent possible Risk Collectively managed, appropriately shared Individually pursued; minimum effort for maximum Team success tied to project success; value- return; (usually) first-cost based Compensation / Reward based Digitally based, virtual, Communications / Paper-based, 2 dimensional; analog 4 dimensional; Technology Building Information Modeling Minimum effort for maximum return; minimize Encourage, foster, promote and support open or transfer risk; don’t share Agreements sharing and collaboration, full integration Team-based, integrated, collaborative; Individually focused, emphasis on composition Education technologically inclusive; a materials and methods focus in addition to composition
  • 9. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” • What is it? • Why does it Matter? • What is Contract Basis? • How do we do it? • Who are the Early Adopters? • Value
  • 10. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Our Client’s Viewpoint: – Waste (30%), errors, cost, and schedule overruns – Lack of collaboration, poor information integration, lack of common goal – “Project organization…silos between design, fabrication, and construction or building operation.” – “Participants optimizing for its own interest rather than that of overall project.”
  • 11. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” And, their observations of the opportunities created by collaboration were: –“Virtual buildings created in a fully collaborative environment.” –“Building information models …create the best chances for finding…mistakes; optimizing systems, materials…reducing cost of building and building operations.” –“Project teams…include designers, contractors, suppliers, manufacturers, facility managers… adopting a systems August 2004 July 2006 CURT Whitepaper 1202 CURT Whitepaper 1003 approach…result in true collaboration in best interest of the project.
  • 12. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Design Cost Construct Operate $24B $400B $4T More Knowledge Less Design Procure Build Manage slide courtesy of Autodesk
  • 13. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” From Constructors Viewpoint: – Replace the conflict with teamwork – Optimize industrialized workforce – offsite fabrication – Reduce speculative crapshoot – Share Rewards (w/risk) − Early Involvement − Common Goals − Teamwork − Utilizing Multiple Experiences/Expertise − Reduced Costs − Best Value/Product − Creative Contracting − Operational & Maintenance Savings − Relationships
  • 14. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” From Constructors Viewpoint: • Impact of eliminating 10%, 15% or 20% of the waste – $10 to $18 million on a 500,000 sq ft replacement hospital • Owner – Be the leader. Market responds to the customer. – Change your paradigms; demand more. – Create a lean decision-making process. – Create clear, consistent project goals for everyone. – Create incentives for exceptional results. • Industry – Integrate into single-purpose colocated teams. – Create strategic supply chain relationships. – Common goals, shared incentives and managed risk – Open cost sharing—help all participants drive costs out of their businesses. – Observe, measure, improve.
  • 15. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” From Constructors Viewpoint: • Collaborative environment – Mutual benefit to owner, architect, contractor and subcontractors – Improved communication and understanding • Elimination of waste – Better planning – Right materials showing up at the right time – Reduced rework – Improved communication • Prefabrication – Modularization of major components – More off-site fabrication – Increased quality
  • 16. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY”
  • 17. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” From Architect’s Viewpoint: – Put the fun back into building – Replace the conflict with teamwork – Harness the power of the construction industry to deliver the project – Realize Design Vision more effectively and efficiently – Share Rewards (w/risk)
  • 18. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” From Architect’s Viewpoint: – Transformation of process – Become more of a learning organization – Deeper immersion in the craft – No RFI’s/change orders – Reallocation of focus – research/discovery/innovation – Speed to market
  • 19. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” • What is it? • Why does it Matter? • What is Contract Basis? • How do we do it? • Who are the Early Adopters? • Value
  • 20. Intention / Relational Contract • The agreement goal should be to attain high quality delivery of a project through elimination of redundancy, errors and waste. • The goal is realized by aligning the interests of owner, builder and designer with a mutually agreed definition of project success.
  • 21. Integrated Delivery requires a culture of Collaboration • For success, design of the project must proceed with informed, accurate information concerning program, quality, cost, and schedule. • The entire teams’ expertise will need to be integrated throughout the process to be attain success. • Isolation or collaborating only at milestones will not achieve the benefits of integration, constant free flow of information, working together, is key.
  • 22. Contract Concepts to Build Culture • Align risk and reward to optimize project success over individual entity success • Align risk and reward with a party's ability to control risk • Require an open information environment • Require everybody to think operate, design and construct
  • 23. Contract Steps: • Start with all three parties contracting together to eliminate “Owner in the middle.” • A team of Owner, Builder and Designer lead the project with a bias toward consensus decision making. • The program should be complete and a target price set agreeable to all • All three parties agree to openly share information and cooperatively collaborate for the benefit of the project. • As Trade Contractors and Design Consultants are added they acknowledge the new arrangement.
  • 24. Contract Steps • Engage the Builder during early design so that pricing, constructability and value engineering are integrated from the beginning • Make cost and schedule design criteria • Set appropriate contingencies, share one between Builder and Designer • Put profit for both Builder and Designer at “risk for failure’ to perform as a team with a corresponding reward shared by both if they perform above the standard of care • Engaging Trade Contractors early for the purpose of collaborating with their complimentary engineering discipline and driving innovation • Major trade contractors structure, mechanical, electrical, plumbing, skin and drywall are selected during schematic design to facilitate an integrated collaborative design process.
  • 25. Contract Supports Lean • Design the process first then design the project • Concurrent set based design, take forward multiple design alternatives to the last responsible moment • Incorporating value as the key design proposition • Build virtually before building physically – Eliminate redundant efforts and conflicts – Optimizing means and methods – Maximizing off site construction – Zero RFI goal
  • 26. Can you use a traditional contract? Not really. • You can’t align risk and reward to optimize project success over individual entity success if the designer and builder are not a team • Cultural change is hard enough with a new contract, without it people revert to thinking about their interests and controlling information • Nearly impossible to integrate operating, design and construction knowledge without huge risk to the designer
  • 27. Can you go part way? Possibly. • Find the key disciplines for the large costs on the project • Find open minded designers willing to “contract out” construction documents • Find open minded trade contractors willing to draw shops/construction documents with designer oversight
  • 29. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” • What is it? • Why does it Matter? • What is Contract Basis? • How do we do it? • Who are the Early Adopters? • Value
  • 30. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Process Design SUSTAINABLE PROCESS DESIGN DESIGN Integrated Design LEAN Integrated Fabrication CONCEPTS BIM Building Information Modeling Sustainable Design INTEGRATED DELIVERY
  • 31. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Process Design: Creating a comprehensive road map For the own design construct team in order to navigate the limitless choices offered throughout the creative journey. The organization and ideation that creates the framework for outstanding design, execution & extraordinary results Is tailored to project success in very specific terms and is developed by a collaboration of all participants.
  • 32. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Integrated Design: Engaging the broadest range of Creative and design disciplines in an effective and efficient manner from the beginning ensures that the solutions are as rich and content filled as possible. This engagement of behavioral, artistic and engineering perspectives offered at the earliest stages provides the opportunity to discover and explore new building typologies in a timely way.
  • 33. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Integrated Fabrication: The opportunity to tap the skills and knowledge of the fabricate/construct trades and professionals in optimizing the methods for design realization can make the design tectonics better and more sustainable This approach can also eliminate wasteful duplication of documentation efforts and the errors associated with multiple information transfer
  • 34. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Building Information Modeling (BIM): BIM is an evolving term generally referring to the broad use of 3D digital building models with linked parametric information to achieve the goal of integrated project data, enhanced visualization, and data sharing and re- use by various members of the building team. BIM is the enabler for integration and open information sharing
  • 35. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” (BIM) in practice: building design visualization programming, massing, cladding design, interiors, virtual walkthrough’s model intelligence area calculations, envelope analysis, quantity reporting, schedules, cost estimating integrated design across disciplines design team: architecture, interiors, lighting, structural, MEP, civil construct team: contractor, subcontractors, fabricators owner: facility managers, department user groups BIM as a facility management tool deliver model to owner for future O&M
  • 36. building information model | the model as the nucleus
  • 38. model intelligence | 3d libraries
  • 39. model intelligence | extractions
  • 40. model intelligence | live interior elevations
  • 43. model intelligence | sustainable design
  • 44. model intelligence | reporting
  • 45. model intelligence | travel distance
  • 46. model intelligence | medical equipment
  • 48. model intelligence | door intelligence – door schedule data (live)
  • 49. model intelligence | automated door schedule
  • 50. model intelligence | wall calculation
  • 51. model intelligence | cost estimating
  • 52. integrated design | multi-discipline coordination
  • 53. SITE integrated design | model integration
  • 54. SITE CORE integrated design | model integration
  • 55. SITE CORE STRUCTURE integrated design | model integration
  • 56. SITE CORE STRUCTURE integrated design | model integration
  • 57. SITE CORE STRUCTURE SHAFTS integrated design | model integration
  • 58. SITE CORE STRUCTURE SHAFTS HVAC integrated design | model integration
  • 59. SITE CORE STRUCTURE SHAFTS HVAC PLUMBING integrated design | model integration
  • 60. SITE CORE STRUCTURE SHAFTS HVAC PLUMBING FIRE PROTECTION integrated design | model integration
  • 61. SITE CORE STRUCTURE SHAFTS HVAC PLUMBING FIRE PROTECTION TECHNOLOGY integrated design | model integration
  • 62. SITE CORE STRUCTURAL SHAFTS HVAC PLUMBING FIRE PROTECTION TECHNOLOGY INTERIORS integrated design | model integration
  • 63. SITE CORE STRUCTURAL SHAFTS HVAC PLUMBING FIRE PROTECTION TECHNOLOGY INTERIORS EQUIPMENT FOOD SERVICE integrated design | model integration
  • 64. SITE CORE STRUCTURAL SHAFTS HVAC PLUMBING FIRE PROTECTION TECHNOLOGY INTERIORS EQUIPMENT FOOD SERVICE SHELL integrated design | model integration
  • 65. integrated design | the big room concept
  • 66. integrated design | collision detection above ceiling coordination
  • 67. integrated design | coordination operating room equipment booms
  • 68. integrated design | virtual walk-through’s
  • 71. facility management | campus information model
  • 72. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” • What is it? • Why does it Matter? • What is Contract Basis? • How do we do it? • Who are the Early Adopters? • Value
  • 73. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Integrated Delivery – the early models − Community Health Partners − Bay Park − Wake Medical Center Integrated Delivery by Contract - current − Sutter - PAMF (in Design Intent) − Virginia Mason (in negotiation) Integrated Delivery in Principle − Mass. General Hospital − Cleveland Clinic – Glickman Tower − Providence Novi − Swedish Orthopedic Institute −Wellcome Trust
  • 74. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Bay Park Community Hospital Oregon, OH • 23 months from beginning of design to move in • SPE integrated team (design firm, CM, mechanical, electrical) NBBJ surfaced all contingencies. • Precise structure enabled high degree of off-site fabrication. • Dramatically reduced waste • Returned 11% of construction budget in added scope
  • 75. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Sutter Healthcare • Facility Planning and Design (FPD) hit upon the success of Toyota and determined that if they could apply their methodology to design and construction projects, the executive challenge could be met. • In September 2004, after 2 years of research and exploration, Sutter Health made the decision and commitment to go Lean. • Lean – Reinvent how hospitals deliver care to the patient (flow, wait time, etc) and how we deliver design and construction services – Knowing the customer – Work flow – Pull scheduling – Batch size and … – All the attendant behavior and processes to effect them
  • 76. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Sutter Healthcare • Sutter developed their 5 Big Ideas that are the framework for approaching all aspects of Sutter’s Lean Project delivery. Collaborate—really collaborate—throughout design, planning and execution. Increase relatedness among all project participants. Projects are networks of commitments. Optimize the project, not the pieces. Tightly couple action with learning.
  • 77. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Sutter Healthcare • FPD’s goal was to increase the reliability that projects conceptually approved and funded in year 1 are designed and constructed in year 5+: – On time or early – Within budget or less – Without claims – Safely (without creating patients) – Without burning out FPD staff • For 3 years, we have been training and collaborating with the AEC community. – Learning the skills needed for Lean Project delivery – Developing an implementation strategy – Demonstrating our commitment to continually improving – Openly sharing the learning in our project community AEC = architecture, engineering and construction.
  • 78. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Sutter Healthcare • Our expectation now is across-the-board deployment with a “lite” version for smaller projects. • We’ve tested and tried for 3 years. We’re at a point where we can coalesce the learning and results and develop a standardized work plan for projects to follow and improve on. • The plan is to share the experiences of 4 teams currently completing project and business case validation and create a standard work process for this stage. This will be followed by standardized work plans for: – Design – Documentation – Permitting – Construction • We’ve developed and continue to add to a stable of architects, engineers and contractors who are willing and able to work in this fashion.
  • 79. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” • What is it? • Why does it Matter? • What is Contract Basis? • How do we do it? • Who are the Early Adopters? • Value
  • 80. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Value: This is a relatively new approach and the first projects to use it from start to finish have yet to be completed… however some aspects have been realized on projects which have produced positive results. Will it save money? •Per industry estimates 30% or more is at stake •Sutter Health expects minimum 5% return based on experience with MEP systems alone •Among other areas Mortenson reports significant savings in structural alone Will it save time? •Overall likely about the same, but likely less time in construction due to virtual construction, 4D construction planning and off-site fabrication •This can improve cash flow, reduce cost risk once construction initiated
  • 81. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Value: Will it eliminate material waste? •Experience of NBBJ at Harborview virtually elliminated any waste scraps from sheetmetal, piping, conduit,cable tray •Mortenson reports achieving virtually zero structural steel waste Will it be green ? •Integrated analysis of green alternatives from beginning to end makes cost effective green more likely •4D construction planning improves potential for minimizing construction waste ( scaffolding, formwork, drywall timeframe) Will it improve quality? •Total team (Client/Designer/Builder) engagement in process ensures “appropriate” quality choices •Engagement of real fabricators in detailing ensures best quality/price alignment
  • 82. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” US Architecture Engineering Construction Waste • Total ’05 US Construction Industry $1.03 Trillion • 30% Waste* = $309 Billion • Non Residential Building =$275 Billion • 30% Waste*=$85 Billion Global Annual Cost of Poverty Elimination, Carbon Reduction • Poverty =$75 B (Sachs) • Carbon=$10B (@4%) Our Industry has the ability to Fund the Changes through Integration… *CURT
  • 83. “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” Currently, there is and abundance of resource and reference information available on the internet. The following are several websites of interest: • AIA Integrated Practice Website http://aia.org/ip.default • Construction Users Roundtable (CURT) http://www.curt.org • Associated General Contractors of America (AGC) http://www.agc.org/index.ww • Design-Build Institute of America (DBIA) http://www.dbia.org/ • Lean Construction Institute (LCI) http://www.leanconstruction.org/ • Construction Industry Institute (CII) http://www.construction-institute.org • NBBJ Integrated Delivery Contract – http://www.nbbj.com/access/IntDelDraftNBBJ.doc • Refabricating Architecture – Stephen Kieran and James Timberlake • Product Development for the Lean Enterprise – James Kennedy
  • 84. The Future of Professional Practice: The Next Generation of Integrated Delivery, Emerging Technology and Practice Management “BEYOND COLLABORATION – THE BENEFITS OF INTEGRATED DELIVERY” presented by: Doug Parris, Todd Buchanan, Tom Owens Questions & Discussion