CONSTRUCTUIN OF TAYLOR’S
UNIVERSITY GARDEN CARPARK
Bill of Quantity
Bill No. 1
Excavation and Interlock Work
Item
No.
Description Unit Quantity
Unit Rate
RM (letters)
Unit Rate
RM
(Numbers)
Total
Amount
RM
1/1
Demolishing of the existing store 120 m2 area according to
the approved method statement and including transfer the
rubble to approved dump yard according to the
engineer instructions.
L.S 1
Five
Thousand 5,000.00 5,000.00
1/2
Relocation and replanting of the existing trees. The
w o r k includes importing all required materials;
such as agricultural soil, fertilizer, concrete basins, etc.
And making good all according to drawings,
specifications and instructions of the Engineer.
L.S 1 Two
thousand
2,000.00 2,000.00
1/3
Clean, excavate, cut and fill the parking area and
Ramp with clean dune sand to the bottom of the sub-
base layer design level including watering, compaction
not less than
98% & CBR not less than 15%, all according to drawing
and technical specifications.
m
2 1,050.0
Two 2.00 2,100.00
1/4
Supply and lay approved sub-base material (Kurkar) of 20
cm thickness for the parking area i n one layer with CBR.>
30%, watering and compaction up to 98% maximum d r y
density according to modified proctor test. All according to
drawing and technical specifications.
m
2 1,000.0
One
forty
1.40 1,400.00
1/5
Supplying, spreading, leveling, damping and compacting
(M.D.D 100%) of 15cm base coarse material with CBR≥80
up to required` levels, according to drawing specifications
and under supervision.
m
2 1,000.0 One 1.00 1,000.00
1/6
Supply, spread, install approved colored interlock tiles
8 cm thick including 5 cm clean sand bed, compacting
and tiles testing all according to drawings, specifications
and instructions by the Engineer.
m
2 1,000.0
One thirty
two 1.32 1,320.00
Total (RM) 12,820.00
1
Item
No.
Description Unit Quantity
Unit Rate
RM
(letters)
Unit Rate
RM
(Numbers)
Total
Amount
RM
Rates of Concrete Works shall include:-
1. All form works and shuttering (new lumber for shuttering)
in any form, shape and size. Making chamfered and curved
edges, allowing for and making grooves and sleeves and
using Tie Rods (Batant) for concrete walls ; removal of
Forms and cleaning of all exposed tie wires and rods. Steel
forms must be used in shuttering the external decorations.
2. Supplying, Casting, vibrating and curing as per
specifications.
3. Approved additives and admixtures.
5. Supplying reinforcement of any grade, size and length as
detailed in the drawings, storing on site including cutting,
bending and fixing in position and providing all tying wires,
spacers, shop drawings, testing and bar bending schedules
6. Painting of exposed surfaces of underground reinforced
concrete elements with two coats of hot bituminous paint
(75/25) after primer layer, the strokes of each layer to be
opposite to each other.
7. Compaction and testing under the foundation, ground
beams, and ground slabs, the compaction must exceed 97%
of MDD.
8. All works according to specifications , drawings and
supervisor engineer instructions
- -
Ten
thousand 10,000.00 10,000.00
2/1
Supply and cast ready mix reinforced concrete B (250)
kg/cm
2
for the footings and ground beams for boundary
beams around the parking area, edge beam. The work shall
include polythene sheets under the footings and beams,
excavation, compaction and backfilling, all according to
drawings and technical specifications.
M
3 16
Ten 10.00 160.00
2/2
Ditto but for middle and copping beam as per specifications,
drawings and supervisor engineer's instructions. M
3 8
Twelve 12.00 96.00
2/3
Supply and cast ready mix reinforced concrete B (300)
kg/cm2 for columns, footing, ground beams and lintels for
guard room. Then price include the cost of used materials
equipment, and workmanship for all necessary protections
and safety measures for the excavated area, in addition to the
protection of the neighboring foundations if any.
M
3 6 One
hundred
100.00 600.00
2/4
Supply and cast ready mix reinforced concrete B (300)
kg/cm2 for retaining walls (footing, stem) stairs and retaining
beams. The price includes the cost of used materials,
equipment and workmanship for all necessary protections and
safety measures for the excavated area, in addition to the
protection of the neighboring foundations if any. all works
should be according to Drawings, Specifications and
instructions of the Engineer.
M
3 24 Twenty 20.00 480.00
Bill No. 2
Concrete Works.
2
Item
No.
Description Unit Quantity
Unit Rate
RM
(letters)
Unit Rate
RM
(Numbers)
Total
Amount
RM
2/5
Supply and cast ready mix concrete B250 for Ribbed Slabs
of 25cm thickness including reinforced steel, hollow block
(25x40x17cm), drop beams and electrical conduits and all
other materials according to Drawings, Specifications and
instructions of the Engineer.
M
2 40
Five 5.00 2,00.00
2/6
Supply and cast reinforced concrete (B-250) concrete lining
for Ground Slab, ramp and Abutment for retaining wall of
10cm. thickness including steel reinforcement ( 8 mm
diameter every 20 cm in both directions), reinforced edge
beam and polythene sheet , the rate shall include applying
well trowelled surface, all in according to drawings,
specifications and engineer's instructions.
M
2 40
Fifty 50.00 2,000.00
2/7
Ditto but 15 cm thick with 10 mm diameter of reinforcement
steel every 20 cm in both directions for cars' ramp. M
2 60
Ten 10.00 600.00
Total (RM) 14,136.00
3
Bill No. 3
Building Works.
Item
No.
Description Unit Quantity
Unit Rate
RM
(letters)
Unit Rate
RM
(Numbers)
Total
Amount
RM
The price include:
1- Supplying hollow or solid cement block from good
and approved factory in perfect dimension and build it
in good manner with a compressive strength 35 kg/cm
2
for hollow block and 60 kg/cm
2
for solid block. This
item will include cement mortars, reinforced concrete
infill (B250) between columns & block walls (10-20 cm
wide) with 2Ø8mm/40cm horizontally and 2Ø10mm
vertically according to drawings, pipes encasement, and
bituminous paper between block work and drop beams
& all requirements needed to finish the works according
to the drawings, specification and to the
s u p e r v i s i o n engineer instructions.
2- Providing samples for approval and all the required
tests.
- -
Nine
thousand
and fifty
9,050.00 9,050.00
3/1
Supply and build hollow cement block 40x20x20cm for
external walls according to the drawings, specification
and to the supervision engineer instructions.
M
2 400 Twenty 20.00 8,000.00
3/2
Supply and build solid cement block 40x20x20 cm,
underground beams, and external boundary for building
including painting the buried parts with one coat of
primer and two coats of hot bitumen according to the
drawings, specification and to the supervision engineer
instructions.
M
2 50 Ten 10.00 500.00
Total (RM) 17,550.00
4
Bill No. 4
Plaster Works.
Item
No.
Description Unit Quantity
Unit Rate
RM
(letters)
Unit Rate
RM
(Numbers)
Total
Amount
RM
All works must be according to drawings, specification and engineer
instructions. Rates shall include :
Supply of all needed materials, including galvanized angles for the
corners as well as the use of galvanized wire mesh between
concrete and block work.
Preparation works by covering all conduits of electricity, water
supplies , etc., with a galvanized wire mesh at least 20cm width
coated by mortar (1:1) cement : sand and the work includes removal
of wires and nails and cleaning of surfaces to be ready for
plastering.
Contractor shall take into consideration that all direct and indirect
works and expenses required for the completion of the coming items
are included in the unit price.
Trimming of concrete chippings, removing the wires and etc. and
cleaning of existing surfaces to be ready for plastering.
This should be done prior to commencement of plastering and after
obtaining a written approval from the supervision engineer.
Curing with water for at least three days for each coat.
- -
Ten
thousand 10,000.00 10,000.00
4/1
Supply and make internal plastering 13 mm thick for ceiling, walls
and soffits. The work includes rough primer nail rendering to form a
key with (mix 1:1) cement sand, second layer 13mm: Base-Coat
"Rendering" with (1:3:0.25) cement: sand: lime and third layer:
Finishing Coat with (1:4:0.50) cement: sand: lime . Works include
all materials needed to finish the works according to specifications,
drawings and supervisor engineer's instructions.
M
2 120
Eight 8.00 960.00
4/2
Supply and make external plastering 20mm thick to walls with
four faces : the first is the rough nail rendering (mix 1:1) cement
sand;
the second is 5mm thick mortar (mix 1: 2) cement: sand, the third
is the undercoat 13mm (mix 1: 3 :0.25) cement:sand:lime, the forth
is two coats of Tyrolean finish ( mix 1: 3) white cement to fine
aggregate (Quartiz) and all is according to specifications , drawings
and supervisor engineer's instructions.
M
2 600
Eight 8.00 4,800.00
Total (RM) 15,760.00
5
Bill No. 5
Finishing work
Item
No.
Description Unit Quantity
Unit Rate
RM
(letters)
Unit Rate
RM
(Numbers)
Total
Amount
RM
5/1
Supply and install terrazzo floor tiles (grade A) size
25cm x 25cm x 2.5cm laid on 2cm mortar bed and 5
cm sand bed and terrazzo skirting 25cm x 7cm x1cm
including all materials and testing as per
specifications and drawings
M
2 35
Twenty 20.00 700.00
5/2
Supply and Paint the ceiling with one coat of Pendrole
primer and at least two coats of emulsion paint
(Polyside) as per specification and drawings
M
2 40 Fifty 50.00 2,000.00
5/3
Supply and Paint, internal walls with one coat of
Pendrole primer and at least two coats of emulsion
paint (Supercryle) as per specification and drawings
M
2 120 Five 5.00 600.00
5/4
Supply and Paint, external road mark painting for the
roof of guard room, for the cars parking and tracks
arrows with one prime coat and two finishing coats of
approved brand name painting material or equal
approved as specification and drawings
M
2 100
Ten 10.00 1,000.00
5/5
Supplying & fix (W1) (1.2X1.6 m) colored aluminum
window section 7000 with two rails, with min.
wall thick 1.5mm, glass 4 mm thick,
ironmongery , accessories and hard ware as per
specification and drawings.
No. 2
Fifty 50.00 100.00
5/6
Supply and fix colored aluminum window W2 hinged
type section 4500 type , overall size 70 x100 cm,
complete with frame, two hinges at the mid (Jack
type), glass 4mm thick, ironmongery and hardware
and as per specifications and drawings. The work shall
include applying Shatter Resistance Film to the glass.
No. 1 Five
hundred
500.00 500.00
5/7
Supply & fix Wooden Door D1 (80X220X4.5 cm)
made of wood grade “A” including frame cover
mold, architrave and at least two coats of oil paint,
hard ware locked type Walleye switch or equivalent
and brass hinges 10cm height and all other fitting
according to specification and drawings.
No. 1
Five
hundred 500.00 500.00
5/8
Supply and install white glazed wall tiles (grade A)
size 20 cm x 20cm x 6mm thick laid on mortar
backing up to lintel level including lime free cement
plaster coat (1:3) as specified in the drawing and
approved by representative engineer.
M
2 20
Four 4.00 80.00
5/9
Supply and install best quality non-slipping ceramic
floor tiles (grade A) size 20 cm x 20cm x 6mm thick
as specification and drawings.
M2 5
Twenty 20.00 100.00
5/10
Supply and install roof water proofing course
consisting of polypit sheets (4.0mm thick) and base
coat of bitumen and making good all according to
specifications and instructions by the Engineer. The
rate includes verticals parts skirting as per specific
at.
M
2 40
Forty 40.00 1,600.00
Total (RM) 7,180.00
6
Item
No.
Description Unit Quantity
Unit Rate
RM
(letters)
Unit Rate
RM
(Numbers)
Total
Amount
RM
.6/1 Supplying , fixing and erecting 3" hot galvanize steel Pipe
3 m height, with 3 mm thick hot galvanized sheet base
plate, 20×20 cm. The item shall include 4×3/4" Galv.
Steel bolts. The item shall also include outdoor street
light fixture 250 Watt lamp Gas type or equivalent with
1.5" hot galvanized arm 2 m, igniter, choke coil, starter,
capacitor, junction box , 3×2.5 sq. mm NYY cable from
junction box to the outdoor street light fixture 250 Watt
lamp, and all other materials and accessories required to
complete the job according to Drawings, Specifications
and instructions of the Engineer.
No. 7 Sixty 60.00 420.00
.6/2 Supplying, fixing and erecting wall outdoor mounted
projector. The item shall include 2×3/4" Galv. Steel
bolts , 250 Watt lamp, junction box, igniter, choke coil,
Starter, capacitor, 3×2.5 sq. mm NYY cable from junction
box to the outdoor street light fixture 250 Watt lamp, and
all other materials and accessories required to complete
the job according to Drawings, Specifications and
instructions of the Engineer.
No. 3
Eighty 80.00 240.00
.6/3 Supplying and erecting 5×10mm2 XLPE cable to connect
the MDB with the source. The item shall include
excavation, backfilling, 3" flexible conduits and warning
tape and all other materials and accessories required to
complete the job according to Drawings, Specifications
and instructions of the Engineer.
Mr 80
Twenty 20.00 1,600.00
.6/4 Supplying and erecting 5×6mm2 XLPE cable, connecting
the MDB with each junction box of the external light
Projectors. The item shall include cable channel
,excavation, backfilling, 3" flexible conduits , warning tape
and all other materials and accessories required to
complete the job according to Drawings, Specifications
and instructions of the Engineer.
Mr 120
Twenty 20.00 2,400.00
.6/5 Supplying and installing MDB box (60x40) cm (Type is
MOELLER or equivalent). Including all circuit breakers,
bus bars, accessories, and all other materials and
accessories required to complete the job according to
Drawings, Specifications and instructions of the Engineer.
LS 1
Five
hundred 500.00 500.00
.6/6 Supplying and erecting TV socket outlet including wiring
co axial cable 75 ohms and all other materials and
accessories required to complete the job according to
Drawings, Specifications and instructions of the Engineer.
No. 1
One
hundred 100.00 100.00
.6/7 Supplying and erecting telephone socket outlet including
wiring 2 pair cable from the main tel. box including sleeves
and all other materials and accessories required to
complete the job according to Drawings, Specifications
and instructions of the Engineer.
No. 2
One
hundred 100.00 200.00
.6/8 Supplying and erecting florescent light fixture 220 V, 1X36
W, 120 cm long discharge lamp, daylight, electronic
starter, wires, conduits, bolts & clamps. Type Gas or
equivalent and all other materials and accessories
required to complete the job according to Drawings,
Specifications and instructions of the Engineer.
No. 5
Two
hundred 200.00 1,000.00
Bill No. 6
ELECTRICAL WORKS
7
Item
No.
Description Unit Quantity
Unit Rate
RM
(letters)
Unit Rate
RM
(Numbers)
Total
Amount
RM
.6/9 Supplying and erecting circular wall and ceiling mounted
polycarbonate light with 60 W lamp waterproof type IP54
including wires, conduits and all other materials and
accessories required to complete the job according to
Drawings, Specifications and instructions of the Engineer.
No. 2
Five
hundred 500.00 1,000.00
.6/10 Supplying and erecting double pole switch Type Gewiss
or approved equal including wires, conduits and all other
materials and accessories required to complete the job
according to Drawings, Specifications and instructions of
the Engineer.
No. 3
Five
hundred 500.00 1,500.00
.6/11 Supplying and erecting single phase, 220V, 16 A socket
outlet including wires, conduits and all other materials
and accessories required to complete the job according
to Drawings, Specifications and instructions of the
Engineer.
No. 5
Five
hundred 500.00 2,500.00
.6/12 Supplying and erecting Oz-On A/C regulator including
wires, conduits and all other materials and accessories
required to complete the job according to Drawings,
Specifications and instructions of the Engineer.
No. 1
Five
hundred 500.00 500.00
.6/13 Supplying and erecting security lighting control panel
including one 10 A photocell, 1 three poles 3 Kw
contactor, with the needed auxiliary contacts, one toggle
switch (0,1,2), one 1×10 A MCB, 3×16 A MCB, and one
24 hour timer and all other materials a nd accessories
according to Drawings, Specifications and instructions of
the Engineer.
LS 1
Five
hundred
500.00 500.00
.6/14 Supply, install UPVC 4" pipes for electrical cable as per
drawings, the work include Excavation, backfilling on
layers 20 cm thick with compacting to 97% of MDD. And
all required accessories required to complete the job, all
according to drawings, specifications and instructions of
the Engineer.
Mr 100
Ten 10.00 1,000.00
.6/15 Supply and install 3" flexible PVC conduit with a rope
inside it for further ducts, the work include Excavation
,backfilling on layers 20 cm thick with compacting to 98 %
, and all required accessories required to complete the
job, all according to drawings, specifications and
instructions of the Engineer.
Mr 200
Ten 10.00 2,000.00
.6/16 Supply and install 60 cm internal diameter precast
circular reinforced concrete electrical manholes, complete
with B300 cast in place reinforced concrete base or
(approved precast), cast iron cover (25ton Capacity),
Frame, ring's inside , excavation in any type of soil up to
1.5m depth , backfilling with clean sand and compaction,
and all required accessories required to complete the job,
all according to drawings, specifications and instructions
of the Engineer.
No. 3
Five
hundred 500.00 1,500.00
Total (RM) 16,960.00
8
Bill No. 7
Plumbing WORKS
Item
No.
Description Unit Quantity
Unit Rate
RM
(letters)
Unit Rate
RM
(Numbers)
Total
Amount
RM
All Plumbing works include the required units and
its accessories as described in the items and the
rates include:
1- All the plumbing units should be from the best
quality and has trade mark.
2- Submitting shop drawing for water supply
and waste water networks for approval prior to
commencement of the work.
3-Submitting samples for all required material with
catalogue indicating its specifications.
4-All required tests , pressure for water network ,
hydraulic test for sewage lines
5- Cleaning and disinfecting all water pipes.
6- Insulation of all galvanized water pipes and
wrapping it with bitumen's sheets and protect pipes
located under tiles with cement mortar. In addition
to the insulation materials against heat loss for hot
water pipes.
7- All hot and cold water pipes for the points of
fixtures to the nearest distribution board.
8-All plumbing works ( wash basin, kitchen sink,
gully traps, etc…) include the connection to the
nearest trap, WC to the nearest vertical sewage
header in the typical floors and WC in the GF to the
nearest manhole and include all accessories
including PVC S and caps for all the ends of pipes
- - Six
thousand
6,000.00 6,000.00
7/1
Fix white glazed fireclay Oriental W.C. Supply and
suite (Vitra type - grade A ), or equivalent complete
with 9 liter plastic double action flushing cistern,
and fixed chromium plated tap 1/2” Tibesa type or
equivalent, including all water supply pipes
16mm (Golany) to the nearest dist. box (DB),
flushing hose sprayer, angle valves, UPVC drainage
pipe connecting to the nearest manhole or sewage
header as per specifications, drawings and
supervisor engineer instructions.
No. 1
Two
thousand
2,000.00 2,000.00
7/2 Supply and fix white glazed fire clay hand wash
basin size 55cm x45cm (Vitra type - grade A ) or
equivalent, complete with all water supply pipes
16mm (Golany) to the nearest distribution box (DB),
waste fitting, trap, plug and chain, chromium water
mixer (Tebisa ,jack, wall mounted type or
equivalent), glazed fire clay soap holder, and the
drainage line 2” to the nearest floor trap.
No. 1
One
thousand
1,000.00 1,000.00
7/3 Supply and install white glazed steel shower tray
size 70x70x7cm with shower mixer (Tebisa jack
type) including sprayer, hose, stand, glazed fire clay
soap holder, including all needed fittings, pipes, and
connections to water network to reach the
distribution box. Including cold and hot water
supply lines EPDM 16 mm to the distribution box
dia., waste fitting, trap, plug with chain and drainage
connection to the nearest manholes.
No. 1
One
thousand
1,000.00 1,000.00
9
Item
No.
Description Unit Quantity
Unit Rate
RM
(letters)
Unit Rate
RM
(Numbers)
Total
Amount
RM
7/4 Supply and fix floor trap 4inch diameter, complete
with heavy duty brass grating and 4”& 2” PVC
drainage pipe to the nearest manhole and including
S trap if needed as specification and drawings. No. 1
Five
hundred
500.00 500.00
7/5 Supply and install 3" P.V.C drainage pipes
Including all necessary bends connections and
making good all according to specifications and
instructions by the Engineer.
MR 9
Fourty one
and five
cent
41.05 369.45
7/6 Supply, paint, fix and disinfect cold water storage
plastic tank 1500 liter capacity , approved type, float
valve, overflow pipe (1”diam) and drip tray, with all
connections to the rising main and distribution pipe
work and stop valves 1”, and painted steel
foundation from welded angles 45x45x4.5mm
50cm high, 5cm new hard wood on the complete
area under the tanks, with all accessories as
specification and drawings. The rate includes
painting of the water tank.
No. 3
One
thousand
1,000.00 3,000.00
7/7 Supply and install concrete manhole of internal
diameter 60 cm ,and (50-100) cm depth according to
the required level, 12cm thick plain concrete for
walls and base, slab, with cast iron cover with frame
50cm opening, 8 ton bearing capacity, including
excavation, backfilling, hunching and making good
according to specification, drawing, and the
engineer instructions.
No. 2
One
thousand
1,000.00 2,000.00
7/8
Supply and install water distribution box
(60x65x15) cm w i t h G o l a n i P i p e s a l l
needed accessories .All lines to have Sagiv valves
and Air valves with aluminum cover as per
drawings and engineers instructions. No. 2
One
thousand
2,000.00 2,000.00
7/9 Supply and install PE pipe 20mm to connect the
Main feeder galv. steel pipe 1" to the DB in the
guard room with all required fittings and
accessories. The item includes fixing to the walls
using galvanized brackets and connecting it to the
MR 70
Fifty 50.00 3,500.00
7/10
Install Galvanized steel from the supply water
tanks on the building roof to the car bark. The
item includes fixing to the walls using galvanized
brackets and connecting it to the water tank with
all required fittings and accessories. MR 25
Fifty 50.00 1,250.00
7/11 Supply and install UPVC pipes 200mm, SN8 for
outlet drain, with sockets ,work includes
excavating of trenches (depth 0.75-1.5m), bedding,
compacted backfilling with clean sand, connecting
to the existing manholes and hydraulic test
according to the specifications and the engineer’s
MR 30
Fifty 50.00 1,500.00
7/12 Supply and construct storm water collection gullies
of length 3.0 m as detailed in drawings constructed
of reinforced concrete B300 , including cast iron
grills, cast iron curb stone , benching, excavation
and backfilling with clean sand and compaction,
remove the surplus soil to the tip as shown in the
drawings and according to the specifications and the
engineer’s instructions.
No. 3
One
thousand
1,000.00 3,000.00
Total (RM) 27,119.45
10
Bill No. 8
Metal WORKS
Item
No.
Description Unit Quantity
Unit Rate
RM
(letters)
Unit Rate
RM
(Numbers)
Total
Amount
RM
8/1
Supply and install steel door 2.20x0.9m (type SD1). The
price should include oil painting two coats, primer coat, and
Walley switch type lock, hinges and iron monger all
according to drawings, specifications and instructions by
the Engineer.
No. 1
Two
Thousand
2,000.00 2,000.00
8/2
Supply and install steel door 2.20x1.0m (type SD2). The
price should include oil painting two coats, primer coat, and
Walley switch type lock, hinges and iron monger all
according to drawings, specifications and instructions by
The Engineer.
No. 1
Four
Thousand
4,000.00 4,000.00
8/3
Supply and install steel sliding gate 2.5×5.0 m to be
mounted at the parking entrance .the unit rate shall include
painted one primer coat and two oil coats at least, the unit
rate shall include supplying ,installing and erecting an
approved complete electrical motor reducer ''DELMA ROY
6 or equivalent with electrical power capable to operate the
sliding gate ,complete with control panel , remote control,
latches, and all needed electrical cables
,wires ,and conduits and all needed parts, fittings and
accessories .The unit rate shall include all need
workmanship ,equipment , concrete to fix the gate with the
existing walls and requirement to complete the job .The
work shall be done all as per drawings, specifications
,manufacture instructions and instructions by the Engineer.
No. 1
Four
Thousand
4,000.00 4,000.00
8/4
Supply and install steel sliding gate 2.5×5.0 m to be
mounted at the emergency parking exit .the unit rate shall
include painted one primer coat and two oil coats at least,
Walley switch type lock, hinges , iron monger and
all needed parts, fittings and accessories, suspended
parbed wires .The unit rate shall include all need
workmanship ,equipment, concrete to fix the gate with the
existing walls and requirement to complete the job .The
work shall be done all as per drawings, specifications
, manufacture instructions and instructions by the Engineer.
No. 1
One
Thousand
1,000.00 1,000.00
8/5
Supply and install fence 1.5 m height including supply and
fixing steel tri - angles edge (Type ST-37 total length 2.5m)
and fixing at least 1 m from the total length in concrete
column, 40*40*4mm Wire Mesh 1.5m height , three rows
of 4mm Tension Wire, and Barbed wire 0.45m height, all
according to drawings and engineers instructions.
MR 120
Twenty
Seven
27.00 3,240.00
Total (RM) 14,240.00
11
Summary
Item Description Total (RM)
1 Excavation and Interlock works 12,820.00
2 Concrete Works 14,136.00
3 Building works 17,550.00
4 Plastering works 15,760.00
5 Finishing works 7,180.00
6 Electrical works 16,960.00
7 Plumbing works 27,119.45
8 Metal works 14,240.00
VAT (15%) 18,864.82
TOTAL (RM) 144,630.27
Total i n numbers : 144,630.27
Total i n letters : One hundred forty four thousand six hundred thirty and twenty seven cents
Name of the contractor : Jason Lee Yaue Shen
Authorized signature :
Signature and Sealing :
Title : Taylor’s Garden Carpark & Pedestrian Bridge
Telephone : 03-9076-6856
Fax : 03-9076-6857
Mobile : 012-362-5551
12

Weitere ähnliche Inhalte

Was ist angesagt?

Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQashleyyeap
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Lee Pei Gie
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantityhlksd
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second editionBt Lee
 
Bq preamble
Bq preambleBq preamble
Bq preambleaizat76
 
Method statement for repair of concrete surface
Method statement for repair of concrete surfaceMethod statement for repair of concrete surface
Method statement for repair of concrete surfaceMinh Bui Si
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - BriefKai Yun Pang
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof coveringEst
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement methodhiewliming
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Minh Bui Si
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
Doka self climbing system
Doka self climbing systemDoka self climbing system
Doka self climbing systemKuldeep Pandit
 

Was ist angesagt? (20)

Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
Earthwork support
Earthwork supportEarthwork support
Earthwork support
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
ECA form
ECA formECA form
ECA form
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 
Bq preamble
Bq preambleBq preamble
Bq preamble
 
Method statement for repair of concrete surface
Method statement for repair of concrete surfaceMethod statement for repair of concrete surface
Method statement for repair of concrete surface
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
bs:copbs101
bs:copbs101bs:copbs101
bs:copbs101
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
Doka self climbing system
Doka self climbing systemDoka self climbing system
Doka self climbing system
 

Ähnlich wie Car park bq

Bill Of Quantities Issued For Construction
Bill Of Quantities Issued For ConstructionBill Of Quantities Issued For Construction
Bill Of Quantities Issued For ConstructionAhmed El Ashry
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfssuserd43de8
 
Road work construction proxy(2)
Road work   construction proxy(2)Road work   construction proxy(2)
Road work construction proxy(2)FeteneBefekadu
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimateimaduddin91
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Stephen Nzima
 
viewNitPdf_3777461.pdf
viewNitPdf_3777461.pdfviewNitPdf_3777461.pdf
viewNitPdf_3777461.pdfDivyanshTotla
 
07 a60105 estimatingandcosting
07 a60105 estimatingandcosting07 a60105 estimatingandcosting
07 a60105 estimatingandcostingimaduddin91
 
07 a60105 estimatingandcosting
07 a60105 estimatingandcosting07 a60105 estimatingandcosting
07 a60105 estimatingandcostingimaduddin91
 
Building Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.PBuilding Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.PVj NiroSh
 

Ähnlich wie Car park bq (20)

Bill Of Quantities Issued For Construction
Bill Of Quantities Issued For ConstructionBill Of Quantities Issued For Construction
Bill Of Quantities Issued For Construction
 
2_2._BOQ.pdf
2_2._BOQ.pdf2_2._BOQ.pdf
2_2._BOQ.pdf
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
 
Road work construction proxy(2)
Road work   construction proxy(2)Road work   construction proxy(2)
Road work construction proxy(2)
 
RR Nagar
RR NagarRR Nagar
RR Nagar
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
 
viewNitPdf_3777461.pdf
viewNitPdf_3777461.pdfviewNitPdf_3777461.pdf
viewNitPdf_3777461.pdf
 
Architecture Portfolio
Architecture PortfolioArchitecture Portfolio
Architecture Portfolio
 
07 a60105 estimatingandcosting
07 a60105 estimatingandcosting07 a60105 estimatingandcosting
07 a60105 estimatingandcosting
 
21KUIKspec
21KUIKspec21KUIKspec
21KUIKspec
 
SMM2 Explained
SMM2 ExplainedSMM2 Explained
SMM2 Explained
 
07 a60105 estimatingandcosting
07 a60105 estimatingandcosting07 a60105 estimatingandcosting
07 a60105 estimatingandcosting
 
Building Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.PBuilding Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.P
 
Studiowork submissions
Studiowork submissionsStudiowork submissions
Studiowork submissions
 
3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
 
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdfSmall House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
Niand work profile
Niand work profileNiand work profile
Niand work profile
 
smartparkannb.pdf
smartparkannb.pdfsmartparkannb.pdf
smartparkannb.pdf
 

Mehr von Preston Liew

Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Preston Liew
 
Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016Preston Liew
 
Architectural design project module outline august 2016
Architectural design project module outline august 2016Architectural design project module outline august 2016
Architectural design project module outline august 2016Preston Liew
 
PUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CYPUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CYPreston Liew
 
Site analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANISite analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANIPreston Liew
 
Project brief 2 architecture studio 5 march 2016 v3
Project brief 2 architecture studio 5 march 2016  v3Project brief 2 architecture studio 5 march 2016  v3
Project brief 2 architecture studio 5 march 2016 v3Preston Liew
 
Studio module outline
Studio module outline Studio module outline
Studio module outline Preston Liew
 
B tech report proj 2 PRESTON
B tech report proj 2 PRESTONB tech report proj 2 PRESTON
B tech report proj 2 PRESTONPreston Liew
 
Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016Preston Liew
 
Btech module outline
Btech module outlineBtech module outline
Btech module outlinePreston Liew
 
Btech brief assignment 1
Btech brief assignment 1Btech brief assignment 1
Btech brief assignment 1Preston Liew
 
Preston bsci proj 2
Preston bsci proj 2Preston bsci proj 2
Preston bsci proj 2Preston Liew
 
Light report compiled
Light report compiledLight report compiled
Light report compiledPreston Liew
 
Project 2 integration
Project 2  integrationProject 2  integration
Project 2 integrationPreston Liew
 
Project 1 performance evaluation
Project 1 performance evaluationProject 1 performance evaluation
Project 1 performance evaluationPreston Liew
 
Research questions preston liew
Research questions   preston liewResearch questions   preston liew
Research questions preston liewPreston Liew
 
Spirituality & sense of place
Spirituality & sense of placeSpirituality & sense of place
Spirituality & sense of placePreston Liew
 
Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015Preston Liew
 

Mehr von Preston Liew (20)

Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016
 
Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016
 
Architectural design project module outline august 2016
Architectural design project module outline august 2016Architectural design project module outline august 2016
Architectural design project module outline august 2016
 
PUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CYPUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CY
 
Site analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANISite analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANI
 
Project brief 2 architecture studio 5 march 2016 v3
Project brief 2 architecture studio 5 march 2016  v3Project brief 2 architecture studio 5 march 2016  v3
Project brief 2 architecture studio 5 march 2016 v3
 
Studio brief
Studio briefStudio brief
Studio brief
 
Studio module outline
Studio module outline Studio module outline
Studio module outline
 
B tech report proj 2 PRESTON
B tech report proj 2 PRESTONB tech report proj 2 PRESTON
B tech report proj 2 PRESTON
 
Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016
 
Btech module outline
Btech module outlineBtech module outline
Btech module outline
 
Btech brief assignment 1
Btech brief assignment 1Btech brief assignment 1
Btech brief assignment 1
 
Preston bsci proj 2
Preston bsci proj 2Preston bsci proj 2
Preston bsci proj 2
 
Light report compiled
Light report compiledLight report compiled
Light report compiled
 
Sound final
Sound finalSound final
Sound final
 
Project 2 integration
Project 2  integrationProject 2  integration
Project 2 integration
 
Project 1 performance evaluation
Project 1 performance evaluationProject 1 performance evaluation
Project 1 performance evaluation
 
Research questions preston liew
Research questions   preston liewResearch questions   preston liew
Research questions preston liew
 
Spirituality & sense of place
Spirituality & sense of placeSpirituality & sense of place
Spirituality & sense of place
 
Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015
 

Kürzlich hochgeladen

BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 

Kürzlich hochgeladen (20)

BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 

Car park bq

  • 1. CONSTRUCTUIN OF TAYLOR’S UNIVERSITY GARDEN CARPARK Bill of Quantity Bill No. 1 Excavation and Interlock Work Item No. Description Unit Quantity Unit Rate RM (letters) Unit Rate RM (Numbers) Total Amount RM 1/1 Demolishing of the existing store 120 m2 area according to the approved method statement and including transfer the rubble to approved dump yard according to the engineer instructions. L.S 1 Five Thousand 5,000.00 5,000.00 1/2 Relocation and replanting of the existing trees. The w o r k includes importing all required materials; such as agricultural soil, fertilizer, concrete basins, etc. And making good all according to drawings, specifications and instructions of the Engineer. L.S 1 Two thousand 2,000.00 2,000.00 1/3 Clean, excavate, cut and fill the parking area and Ramp with clean dune sand to the bottom of the sub- base layer design level including watering, compaction not less than 98% & CBR not less than 15%, all according to drawing and technical specifications. m 2 1,050.0 Two 2.00 2,100.00 1/4 Supply and lay approved sub-base material (Kurkar) of 20 cm thickness for the parking area i n one layer with CBR.> 30%, watering and compaction up to 98% maximum d r y density according to modified proctor test. All according to drawing and technical specifications. m 2 1,000.0 One forty 1.40 1,400.00 1/5 Supplying, spreading, leveling, damping and compacting (M.D.D 100%) of 15cm base coarse material with CBR≥80 up to required` levels, according to drawing specifications and under supervision. m 2 1,000.0 One 1.00 1,000.00 1/6 Supply, spread, install approved colored interlock tiles 8 cm thick including 5 cm clean sand bed, compacting and tiles testing all according to drawings, specifications and instructions by the Engineer. m 2 1,000.0 One thirty two 1.32 1,320.00 Total (RM) 12,820.00 1
  • 2. Item No. Description Unit Quantity Unit Rate RM (letters) Unit Rate RM (Numbers) Total Amount RM Rates of Concrete Works shall include:- 1. All form works and shuttering (new lumber for shuttering) in any form, shape and size. Making chamfered and curved edges, allowing for and making grooves and sleeves and using Tie Rods (Batant) for concrete walls ; removal of Forms and cleaning of all exposed tie wires and rods. Steel forms must be used in shuttering the external decorations. 2. Supplying, Casting, vibrating and curing as per specifications. 3. Approved additives and admixtures. 5. Supplying reinforcement of any grade, size and length as detailed in the drawings, storing on site including cutting, bending and fixing in position and providing all tying wires, spacers, shop drawings, testing and bar bending schedules 6. Painting of exposed surfaces of underground reinforced concrete elements with two coats of hot bituminous paint (75/25) after primer layer, the strokes of each layer to be opposite to each other. 7. Compaction and testing under the foundation, ground beams, and ground slabs, the compaction must exceed 97% of MDD. 8. All works according to specifications , drawings and supervisor engineer instructions - - Ten thousand 10,000.00 10,000.00 2/1 Supply and cast ready mix reinforced concrete B (250) kg/cm 2 for the footings and ground beams for boundary beams around the parking area, edge beam. The work shall include polythene sheets under the footings and beams, excavation, compaction and backfilling, all according to drawings and technical specifications. M 3 16 Ten 10.00 160.00 2/2 Ditto but for middle and copping beam as per specifications, drawings and supervisor engineer's instructions. M 3 8 Twelve 12.00 96.00 2/3 Supply and cast ready mix reinforced concrete B (300) kg/cm2 for columns, footing, ground beams and lintels for guard room. Then price include the cost of used materials equipment, and workmanship for all necessary protections and safety measures for the excavated area, in addition to the protection of the neighboring foundations if any. M 3 6 One hundred 100.00 600.00 2/4 Supply and cast ready mix reinforced concrete B (300) kg/cm2 for retaining walls (footing, stem) stairs and retaining beams. The price includes the cost of used materials, equipment and workmanship for all necessary protections and safety measures for the excavated area, in addition to the protection of the neighboring foundations if any. all works should be according to Drawings, Specifications and instructions of the Engineer. M 3 24 Twenty 20.00 480.00 Bill No. 2 Concrete Works. 2
  • 3. Item No. Description Unit Quantity Unit Rate RM (letters) Unit Rate RM (Numbers) Total Amount RM 2/5 Supply and cast ready mix concrete B250 for Ribbed Slabs of 25cm thickness including reinforced steel, hollow block (25x40x17cm), drop beams and electrical conduits and all other materials according to Drawings, Specifications and instructions of the Engineer. M 2 40 Five 5.00 2,00.00 2/6 Supply and cast reinforced concrete (B-250) concrete lining for Ground Slab, ramp and Abutment for retaining wall of 10cm. thickness including steel reinforcement ( 8 mm diameter every 20 cm in both directions), reinforced edge beam and polythene sheet , the rate shall include applying well trowelled surface, all in according to drawings, specifications and engineer's instructions. M 2 40 Fifty 50.00 2,000.00 2/7 Ditto but 15 cm thick with 10 mm diameter of reinforcement steel every 20 cm in both directions for cars' ramp. M 2 60 Ten 10.00 600.00 Total (RM) 14,136.00 3
  • 4. Bill No. 3 Building Works. Item No. Description Unit Quantity Unit Rate RM (letters) Unit Rate RM (Numbers) Total Amount RM The price include: 1- Supplying hollow or solid cement block from good and approved factory in perfect dimension and build it in good manner with a compressive strength 35 kg/cm 2 for hollow block and 60 kg/cm 2 for solid block. This item will include cement mortars, reinforced concrete infill (B250) between columns & block walls (10-20 cm wide) with 2Ø8mm/40cm horizontally and 2Ø10mm vertically according to drawings, pipes encasement, and bituminous paper between block work and drop beams & all requirements needed to finish the works according to the drawings, specification and to the s u p e r v i s i o n engineer instructions. 2- Providing samples for approval and all the required tests. - - Nine thousand and fifty 9,050.00 9,050.00 3/1 Supply and build hollow cement block 40x20x20cm for external walls according to the drawings, specification and to the supervision engineer instructions. M 2 400 Twenty 20.00 8,000.00 3/2 Supply and build solid cement block 40x20x20 cm, underground beams, and external boundary for building including painting the buried parts with one coat of primer and two coats of hot bitumen according to the drawings, specification and to the supervision engineer instructions. M 2 50 Ten 10.00 500.00 Total (RM) 17,550.00 4
  • 5. Bill No. 4 Plaster Works. Item No. Description Unit Quantity Unit Rate RM (letters) Unit Rate RM (Numbers) Total Amount RM All works must be according to drawings, specification and engineer instructions. Rates shall include : Supply of all needed materials, including galvanized angles for the corners as well as the use of galvanized wire mesh between concrete and block work. Preparation works by covering all conduits of electricity, water supplies , etc., with a galvanized wire mesh at least 20cm width coated by mortar (1:1) cement : sand and the work includes removal of wires and nails and cleaning of surfaces to be ready for plastering. Contractor shall take into consideration that all direct and indirect works and expenses required for the completion of the coming items are included in the unit price. Trimming of concrete chippings, removing the wires and etc. and cleaning of existing surfaces to be ready for plastering. This should be done prior to commencement of plastering and after obtaining a written approval from the supervision engineer. Curing with water for at least three days for each coat. - - Ten thousand 10,000.00 10,000.00 4/1 Supply and make internal plastering 13 mm thick for ceiling, walls and soffits. The work includes rough primer nail rendering to form a key with (mix 1:1) cement sand, second layer 13mm: Base-Coat "Rendering" with (1:3:0.25) cement: sand: lime and third layer: Finishing Coat with (1:4:0.50) cement: sand: lime . Works include all materials needed to finish the works according to specifications, drawings and supervisor engineer's instructions. M 2 120 Eight 8.00 960.00 4/2 Supply and make external plastering 20mm thick to walls with four faces : the first is the rough nail rendering (mix 1:1) cement sand; the second is 5mm thick mortar (mix 1: 2) cement: sand, the third is the undercoat 13mm (mix 1: 3 :0.25) cement:sand:lime, the forth is two coats of Tyrolean finish ( mix 1: 3) white cement to fine aggregate (Quartiz) and all is according to specifications , drawings and supervisor engineer's instructions. M 2 600 Eight 8.00 4,800.00 Total (RM) 15,760.00 5
  • 6. Bill No. 5 Finishing work Item No. Description Unit Quantity Unit Rate RM (letters) Unit Rate RM (Numbers) Total Amount RM 5/1 Supply and install terrazzo floor tiles (grade A) size 25cm x 25cm x 2.5cm laid on 2cm mortar bed and 5 cm sand bed and terrazzo skirting 25cm x 7cm x1cm including all materials and testing as per specifications and drawings M 2 35 Twenty 20.00 700.00 5/2 Supply and Paint the ceiling with one coat of Pendrole primer and at least two coats of emulsion paint (Polyside) as per specification and drawings M 2 40 Fifty 50.00 2,000.00 5/3 Supply and Paint, internal walls with one coat of Pendrole primer and at least two coats of emulsion paint (Supercryle) as per specification and drawings M 2 120 Five 5.00 600.00 5/4 Supply and Paint, external road mark painting for the roof of guard room, for the cars parking and tracks arrows with one prime coat and two finishing coats of approved brand name painting material or equal approved as specification and drawings M 2 100 Ten 10.00 1,000.00 5/5 Supplying & fix (W1) (1.2X1.6 m) colored aluminum window section 7000 with two rails, with min. wall thick 1.5mm, glass 4 mm thick, ironmongery , accessories and hard ware as per specification and drawings. No. 2 Fifty 50.00 100.00 5/6 Supply and fix colored aluminum window W2 hinged type section 4500 type , overall size 70 x100 cm, complete with frame, two hinges at the mid (Jack type), glass 4mm thick, ironmongery and hardware and as per specifications and drawings. The work shall include applying Shatter Resistance Film to the glass. No. 1 Five hundred 500.00 500.00 5/7 Supply & fix Wooden Door D1 (80X220X4.5 cm) made of wood grade “A” including frame cover mold, architrave and at least two coats of oil paint, hard ware locked type Walleye switch or equivalent and brass hinges 10cm height and all other fitting according to specification and drawings. No. 1 Five hundred 500.00 500.00 5/8 Supply and install white glazed wall tiles (grade A) size 20 cm x 20cm x 6mm thick laid on mortar backing up to lintel level including lime free cement plaster coat (1:3) as specified in the drawing and approved by representative engineer. M 2 20 Four 4.00 80.00 5/9 Supply and install best quality non-slipping ceramic floor tiles (grade A) size 20 cm x 20cm x 6mm thick as specification and drawings. M2 5 Twenty 20.00 100.00 5/10 Supply and install roof water proofing course consisting of polypit sheets (4.0mm thick) and base coat of bitumen and making good all according to specifications and instructions by the Engineer. The rate includes verticals parts skirting as per specific at. M 2 40 Forty 40.00 1,600.00 Total (RM) 7,180.00 6
  • 7. Item No. Description Unit Quantity Unit Rate RM (letters) Unit Rate RM (Numbers) Total Amount RM .6/1 Supplying , fixing and erecting 3" hot galvanize steel Pipe 3 m height, with 3 mm thick hot galvanized sheet base plate, 20×20 cm. The item shall include 4×3/4" Galv. Steel bolts. The item shall also include outdoor street light fixture 250 Watt lamp Gas type or equivalent with 1.5" hot galvanized arm 2 m, igniter, choke coil, starter, capacitor, junction box , 3×2.5 sq. mm NYY cable from junction box to the outdoor street light fixture 250 Watt lamp, and all other materials and accessories required to complete the job according to Drawings, Specifications and instructions of the Engineer. No. 7 Sixty 60.00 420.00 .6/2 Supplying, fixing and erecting wall outdoor mounted projector. The item shall include 2×3/4" Galv. Steel bolts , 250 Watt lamp, junction box, igniter, choke coil, Starter, capacitor, 3×2.5 sq. mm NYY cable from junction box to the outdoor street light fixture 250 Watt lamp, and all other materials and accessories required to complete the job according to Drawings, Specifications and instructions of the Engineer. No. 3 Eighty 80.00 240.00 .6/3 Supplying and erecting 5×10mm2 XLPE cable to connect the MDB with the source. The item shall include excavation, backfilling, 3" flexible conduits and warning tape and all other materials and accessories required to complete the job according to Drawings, Specifications and instructions of the Engineer. Mr 80 Twenty 20.00 1,600.00 .6/4 Supplying and erecting 5×6mm2 XLPE cable, connecting the MDB with each junction box of the external light Projectors. The item shall include cable channel ,excavation, backfilling, 3" flexible conduits , warning tape and all other materials and accessories required to complete the job according to Drawings, Specifications and instructions of the Engineer. Mr 120 Twenty 20.00 2,400.00 .6/5 Supplying and installing MDB box (60x40) cm (Type is MOELLER or equivalent). Including all circuit breakers, bus bars, accessories, and all other materials and accessories required to complete the job according to Drawings, Specifications and instructions of the Engineer. LS 1 Five hundred 500.00 500.00 .6/6 Supplying and erecting TV socket outlet including wiring co axial cable 75 ohms and all other materials and accessories required to complete the job according to Drawings, Specifications and instructions of the Engineer. No. 1 One hundred 100.00 100.00 .6/7 Supplying and erecting telephone socket outlet including wiring 2 pair cable from the main tel. box including sleeves and all other materials and accessories required to complete the job according to Drawings, Specifications and instructions of the Engineer. No. 2 One hundred 100.00 200.00 .6/8 Supplying and erecting florescent light fixture 220 V, 1X36 W, 120 cm long discharge lamp, daylight, electronic starter, wires, conduits, bolts & clamps. Type Gas or equivalent and all other materials and accessories required to complete the job according to Drawings, Specifications and instructions of the Engineer. No. 5 Two hundred 200.00 1,000.00 Bill No. 6 ELECTRICAL WORKS 7
  • 8. Item No. Description Unit Quantity Unit Rate RM (letters) Unit Rate RM (Numbers) Total Amount RM .6/9 Supplying and erecting circular wall and ceiling mounted polycarbonate light with 60 W lamp waterproof type IP54 including wires, conduits and all other materials and accessories required to complete the job according to Drawings, Specifications and instructions of the Engineer. No. 2 Five hundred 500.00 1,000.00 .6/10 Supplying and erecting double pole switch Type Gewiss or approved equal including wires, conduits and all other materials and accessories required to complete the job according to Drawings, Specifications and instructions of the Engineer. No. 3 Five hundred 500.00 1,500.00 .6/11 Supplying and erecting single phase, 220V, 16 A socket outlet including wires, conduits and all other materials and accessories required to complete the job according to Drawings, Specifications and instructions of the Engineer. No. 5 Five hundred 500.00 2,500.00 .6/12 Supplying and erecting Oz-On A/C regulator including wires, conduits and all other materials and accessories required to complete the job according to Drawings, Specifications and instructions of the Engineer. No. 1 Five hundred 500.00 500.00 .6/13 Supplying and erecting security lighting control panel including one 10 A photocell, 1 three poles 3 Kw contactor, with the needed auxiliary contacts, one toggle switch (0,1,2), one 1×10 A MCB, 3×16 A MCB, and one 24 hour timer and all other materials a nd accessories according to Drawings, Specifications and instructions of the Engineer. LS 1 Five hundred 500.00 500.00 .6/14 Supply, install UPVC 4" pipes for electrical cable as per drawings, the work include Excavation, backfilling on layers 20 cm thick with compacting to 97% of MDD. And all required accessories required to complete the job, all according to drawings, specifications and instructions of the Engineer. Mr 100 Ten 10.00 1,000.00 .6/15 Supply and install 3" flexible PVC conduit with a rope inside it for further ducts, the work include Excavation ,backfilling on layers 20 cm thick with compacting to 98 % , and all required accessories required to complete the job, all according to drawings, specifications and instructions of the Engineer. Mr 200 Ten 10.00 2,000.00 .6/16 Supply and install 60 cm internal diameter precast circular reinforced concrete electrical manholes, complete with B300 cast in place reinforced concrete base or (approved precast), cast iron cover (25ton Capacity), Frame, ring's inside , excavation in any type of soil up to 1.5m depth , backfilling with clean sand and compaction, and all required accessories required to complete the job, all according to drawings, specifications and instructions of the Engineer. No. 3 Five hundred 500.00 1,500.00 Total (RM) 16,960.00 8
  • 9. Bill No. 7 Plumbing WORKS Item No. Description Unit Quantity Unit Rate RM (letters) Unit Rate RM (Numbers) Total Amount RM All Plumbing works include the required units and its accessories as described in the items and the rates include: 1- All the plumbing units should be from the best quality and has trade mark. 2- Submitting shop drawing for water supply and waste water networks for approval prior to commencement of the work. 3-Submitting samples for all required material with catalogue indicating its specifications. 4-All required tests , pressure for water network , hydraulic test for sewage lines 5- Cleaning and disinfecting all water pipes. 6- Insulation of all galvanized water pipes and wrapping it with bitumen's sheets and protect pipes located under tiles with cement mortar. In addition to the insulation materials against heat loss for hot water pipes. 7- All hot and cold water pipes for the points of fixtures to the nearest distribution board. 8-All plumbing works ( wash basin, kitchen sink, gully traps, etc…) include the connection to the nearest trap, WC to the nearest vertical sewage header in the typical floors and WC in the GF to the nearest manhole and include all accessories including PVC S and caps for all the ends of pipes - - Six thousand 6,000.00 6,000.00 7/1 Fix white glazed fireclay Oriental W.C. Supply and suite (Vitra type - grade A ), or equivalent complete with 9 liter plastic double action flushing cistern, and fixed chromium plated tap 1/2” Tibesa type or equivalent, including all water supply pipes 16mm (Golany) to the nearest dist. box (DB), flushing hose sprayer, angle valves, UPVC drainage pipe connecting to the nearest manhole or sewage header as per specifications, drawings and supervisor engineer instructions. No. 1 Two thousand 2,000.00 2,000.00 7/2 Supply and fix white glazed fire clay hand wash basin size 55cm x45cm (Vitra type - grade A ) or equivalent, complete with all water supply pipes 16mm (Golany) to the nearest distribution box (DB), waste fitting, trap, plug and chain, chromium water mixer (Tebisa ,jack, wall mounted type or equivalent), glazed fire clay soap holder, and the drainage line 2” to the nearest floor trap. No. 1 One thousand 1,000.00 1,000.00 7/3 Supply and install white glazed steel shower tray size 70x70x7cm with shower mixer (Tebisa jack type) including sprayer, hose, stand, glazed fire clay soap holder, including all needed fittings, pipes, and connections to water network to reach the distribution box. Including cold and hot water supply lines EPDM 16 mm to the distribution box dia., waste fitting, trap, plug with chain and drainage connection to the nearest manholes. No. 1 One thousand 1,000.00 1,000.00 9
  • 10. Item No. Description Unit Quantity Unit Rate RM (letters) Unit Rate RM (Numbers) Total Amount RM 7/4 Supply and fix floor trap 4inch diameter, complete with heavy duty brass grating and 4”& 2” PVC drainage pipe to the nearest manhole and including S trap if needed as specification and drawings. No. 1 Five hundred 500.00 500.00 7/5 Supply and install 3" P.V.C drainage pipes Including all necessary bends connections and making good all according to specifications and instructions by the Engineer. MR 9 Fourty one and five cent 41.05 369.45 7/6 Supply, paint, fix and disinfect cold water storage plastic tank 1500 liter capacity , approved type, float valve, overflow pipe (1”diam) and drip tray, with all connections to the rising main and distribution pipe work and stop valves 1”, and painted steel foundation from welded angles 45x45x4.5mm 50cm high, 5cm new hard wood on the complete area under the tanks, with all accessories as specification and drawings. The rate includes painting of the water tank. No. 3 One thousand 1,000.00 3,000.00 7/7 Supply and install concrete manhole of internal diameter 60 cm ,and (50-100) cm depth according to the required level, 12cm thick plain concrete for walls and base, slab, with cast iron cover with frame 50cm opening, 8 ton bearing capacity, including excavation, backfilling, hunching and making good according to specification, drawing, and the engineer instructions. No. 2 One thousand 1,000.00 2,000.00 7/8 Supply and install water distribution box (60x65x15) cm w i t h G o l a n i P i p e s a l l needed accessories .All lines to have Sagiv valves and Air valves with aluminum cover as per drawings and engineers instructions. No. 2 One thousand 2,000.00 2,000.00 7/9 Supply and install PE pipe 20mm to connect the Main feeder galv. steel pipe 1" to the DB in the guard room with all required fittings and accessories. The item includes fixing to the walls using galvanized brackets and connecting it to the MR 70 Fifty 50.00 3,500.00 7/10 Install Galvanized steel from the supply water tanks on the building roof to the car bark. The item includes fixing to the walls using galvanized brackets and connecting it to the water tank with all required fittings and accessories. MR 25 Fifty 50.00 1,250.00 7/11 Supply and install UPVC pipes 200mm, SN8 for outlet drain, with sockets ,work includes excavating of trenches (depth 0.75-1.5m), bedding, compacted backfilling with clean sand, connecting to the existing manholes and hydraulic test according to the specifications and the engineer’s MR 30 Fifty 50.00 1,500.00 7/12 Supply and construct storm water collection gullies of length 3.0 m as detailed in drawings constructed of reinforced concrete B300 , including cast iron grills, cast iron curb stone , benching, excavation and backfilling with clean sand and compaction, remove the surplus soil to the tip as shown in the drawings and according to the specifications and the engineer’s instructions. No. 3 One thousand 1,000.00 3,000.00 Total (RM) 27,119.45 10
  • 11. Bill No. 8 Metal WORKS Item No. Description Unit Quantity Unit Rate RM (letters) Unit Rate RM (Numbers) Total Amount RM 8/1 Supply and install steel door 2.20x0.9m (type SD1). The price should include oil painting two coats, primer coat, and Walley switch type lock, hinges and iron monger all according to drawings, specifications and instructions by the Engineer. No. 1 Two Thousand 2,000.00 2,000.00 8/2 Supply and install steel door 2.20x1.0m (type SD2). The price should include oil painting two coats, primer coat, and Walley switch type lock, hinges and iron monger all according to drawings, specifications and instructions by The Engineer. No. 1 Four Thousand 4,000.00 4,000.00 8/3 Supply and install steel sliding gate 2.5×5.0 m to be mounted at the parking entrance .the unit rate shall include painted one primer coat and two oil coats at least, the unit rate shall include supplying ,installing and erecting an approved complete electrical motor reducer ''DELMA ROY 6 or equivalent with electrical power capable to operate the sliding gate ,complete with control panel , remote control, latches, and all needed electrical cables ,wires ,and conduits and all needed parts, fittings and accessories .The unit rate shall include all need workmanship ,equipment , concrete to fix the gate with the existing walls and requirement to complete the job .The work shall be done all as per drawings, specifications ,manufacture instructions and instructions by the Engineer. No. 1 Four Thousand 4,000.00 4,000.00 8/4 Supply and install steel sliding gate 2.5×5.0 m to be mounted at the emergency parking exit .the unit rate shall include painted one primer coat and two oil coats at least, Walley switch type lock, hinges , iron monger and all needed parts, fittings and accessories, suspended parbed wires .The unit rate shall include all need workmanship ,equipment, concrete to fix the gate with the existing walls and requirement to complete the job .The work shall be done all as per drawings, specifications , manufacture instructions and instructions by the Engineer. No. 1 One Thousand 1,000.00 1,000.00 8/5 Supply and install fence 1.5 m height including supply and fixing steel tri - angles edge (Type ST-37 total length 2.5m) and fixing at least 1 m from the total length in concrete column, 40*40*4mm Wire Mesh 1.5m height , three rows of 4mm Tension Wire, and Barbed wire 0.45m height, all according to drawings and engineers instructions. MR 120 Twenty Seven 27.00 3,240.00 Total (RM) 14,240.00 11
  • 12. Summary Item Description Total (RM) 1 Excavation and Interlock works 12,820.00 2 Concrete Works 14,136.00 3 Building works 17,550.00 4 Plastering works 15,760.00 5 Finishing works 7,180.00 6 Electrical works 16,960.00 7 Plumbing works 27,119.45 8 Metal works 14,240.00 VAT (15%) 18,864.82 TOTAL (RM) 144,630.27 Total i n numbers : 144,630.27 Total i n letters : One hundred forty four thousand six hundred thirty and twenty seven cents Name of the contractor : Jason Lee Yaue Shen Authorized signature : Signature and Sealing : Title : Taylor’s Garden Carpark & Pedestrian Bridge Telephone : 03-9076-6856 Fax : 03-9076-6857 Mobile : 012-362-5551 12