SlideShare ist ein Scribd-Unternehmen logo
1 von 16
Concurrent Engineering
Manufacturing
Systems
Presented by :
Vivek W. Nagose
Parag G. Mahajan
Shriprasad S. Kurkure
Luke Sangma
Concurrent Engineering:
Is a strategy where all the tasks involved in product development are
done in parallel.
Collaboration between all individuals, groups and departments
within a company.
• Customer research
• Designers
• Marketing
• Accounting
• Engineering
Concurrent Engineering
Concurrent Engineering
Concurrent Engineering
Concurrent Engineering
Form Design
Form Design
Functional
Design
Functional
Design
Production
Design
Production
Design
Revising and testing
prototypes
Manufacturing
Specifications
Design
Specifications
Feasibility
Study
Feasibility
Study
Idea
Generation
Idea
Generation
Suppliers R&D Customers
MarketingCompetitors
Product or Service concept
Performance Specifications
Pilot run and final
tests
Pilot run and final
tests
Final Design
and process
plans
Product Launch
Product Launch
Preliminary
Design
Commercial
Design Process
Linear Process
Concurrent Engineering
Techniques:
•Perceptual mapping
•Benchmarking
•Reverse Engineering
Concurrent Engineering
Form Design: Physical appearance of the product
Functional Design: Performance of the product
Production Design: How to manufacture product
Concurrent Engineering
Influencing Agents: the 7 Ts
Teamwork
Talents
Tools
Time
Techniques
CE
CECE
CE
CECE
CE
Tasks
Concurrent Engineering
Traditional Process = Linear
Vs
Concurrent Engineering = Team collaboration
Concurrent Engineering
Involved People
 Customers
• Users
• Marketing and sales personnel
• Operators
• Maintenance personnel
 Product manager
 Project manager
 Requirement definition engineer
 Specification engineer
 Designer
 Implementation engineer
 Test engineer
Concurrent Engineering
Concurrent Engineering
Why Concurrent Engineering?
 Pace of market change has increased
 Companies must keep pace with changing
markets
 Decisions made sooner rather than later
 Reduces/eliminates repetition of tasks
 Reduces waste and reworking of design
 Product quicker to market
 Maximises company profit
 Company operates more efficiently
Concurrent Engineering
Case study 1: Desktop computer
Design Stage:
•The design could specify the following
•Reusable components e.g. monitor, keyboard
•Recycled materials where possible
•Minimise toxic materials used
Manufacture:
•Use ethical work practices and sources for raw materials
•Use ‘clean’ manufacturing processes
•Minimise transport of components and materials
•Implement quality procedures to minimise waste etc.
Use:
•Low power consumption
•Serviceable items rather than replaceable e.g. disk drive, peripherals etc.
Disposal:
•Design for disassembly – use easily dismantled fixings etc.
•Identify materials used for recycling
•Minimise mixed materials to facilitate separation later
Concurrent Engineering
Example:
A washing machine to last for ten years in normal use.
Expected typical household use: three times a week for a wash
cycle that will last for 2 hours on average.
What type of test should be used?
How long must the machine survive during the test?
Total hours life required for the machine is:
2 hours/wash x 3 washes/week x 52 weeks/year x 10 years = 3120
hours
Use a quantitative accelerated test. Run the machine constantly for
3120 hours
Concurrent Engineering
Benefits
Reduces time from design concept by 25% or
more.
Reduces Capital investment by 20% or more.
Continuous improvement of product quality.
Increases Product Life Cycle Profitability.
Concurrent Engineering
Summary
Concurrent Engineering: Simultaneous
development of product and process.
Most important aspect is communication and
formation of teams.
Management support is vitally important.
Don’t be afraid to change current processes and
technologies.

Weitere ähnliche Inhalte

Was ist angesagt?

Product design and value engineering (PDVE) Ch 1 introduction
Product design and value engineering (PDVE) Ch 1 introductionProduct design and value engineering (PDVE) Ch 1 introduction
Product design and value engineering (PDVE) Ch 1 introduction
Chirag Patel
 
Cnc, dnc & adaptive control
Cnc, dnc & adaptive controlCnc, dnc & adaptive control
Cnc, dnc & adaptive control
parabajinkya0070
 

Was ist angesagt? (20)

Production Planning and Process Planning
Production Planning and Process PlanningProduction Planning and Process Planning
Production Planning and Process Planning
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
Taguchi.ppt
Taguchi.pptTaguchi.ppt
Taguchi.ppt
 
Product design and value engineering (PDVE) Ch 1 introduction
Product design and value engineering (PDVE) Ch 1 introductionProduct design and value engineering (PDVE) Ch 1 introduction
Product design and value engineering (PDVE) Ch 1 introduction
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Cnc, dnc & adaptive control
Cnc, dnc & adaptive controlCnc, dnc & adaptive control
Cnc, dnc & adaptive control
 
Line balancing
Line balancingLine balancing
Line balancing
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 
Concurrent engineering
Concurrent engineeringConcurrent engineering
Concurrent engineering
 
Value analysis and value engineering
Value  analysis and value engineeringValue  analysis and value engineering
Value analysis and value engineering
 
rapid prototyping
rapid prototypingrapid prototyping
rapid prototyping
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)
 
Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).
 
Group technology, Production flow Analysis
Group technology, Production flow AnalysisGroup technology, Production flow Analysis
Group technology, Production flow Analysis
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNING
 
12 cnc & part programming
12 cnc & part programming12 cnc & part programming
12 cnc & part programming
 
Plant maintenance basics
Plant maintenance basicsPlant maintenance basics
Plant maintenance basics
 
Adaptive control System
Adaptive control SystemAdaptive control System
Adaptive control System
 
Method study
Method studyMethod study
Method study
 

Ähnlich wie Concurrent engineering

Production & opeartions management
Production & opeartions managementProduction & opeartions management
Production & opeartions management
Shimelis Mutera
 
final no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptxfinal no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptx
ssusera46859
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
Chris Baichoo
 
Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...
Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...
Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...
SUNDHARAVADIVELR1
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)
Pranshu Negi
 

Ähnlich wie Concurrent engineering (20)

3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt
 
Introduction into Mechanical Design - Reverse Engineering.pptx
Introduction into Mechanical Design - Reverse Engineering.pptxIntroduction into Mechanical Design - Reverse Engineering.pptx
Introduction into Mechanical Design - Reverse Engineering.pptx
 
Chapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGChapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERING
 
Production & opeartions management
Production & opeartions managementProduction & opeartions management
Production & opeartions management
 
Why do Users kill HPC Jobs?
Why do Users kill HPC Jobs?Why do Users kill HPC Jobs?
Why do Users kill HPC Jobs?
 
23 things a manufacturing engineer does 240 days a year
23 things a manufacturing engineer does 240 days a year23 things a manufacturing engineer does 240 days a year
23 things a manufacturing engineer does 240 days a year
 
Concurrent engineering
Concurrent engineeringConcurrent engineering
Concurrent engineering
 
Computer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionComputer Aided Design - Unit I Introduction
Computer Aided Design - Unit I Introduction
 
CAD _ UNIT 1.pptx
CAD _ UNIT 1.pptxCAD _ UNIT 1.pptx
CAD _ UNIT 1.pptx
 
final no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptxfinal no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptx
 
om chapter 3.ppt
om chapter 3.pptom chapter 3.ppt
om chapter 3.ppt
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...
Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...
Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Agile methodologies
Agile methodologiesAgile methodologies
Agile methodologies
 
Basics of Product and Process Design Management
Basics of Product and Process Design ManagementBasics of Product and Process Design Management
Basics of Product and Process Design Management
 
Teaching Product Design - Experience @ IITM
Teaching Product Design - Experience @ IITMTeaching Product Design - Experience @ IITM
Teaching Product Design - Experience @ IITM
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)
 
OM CHAPTER lecture notes - Introduction,
OM CHAPTER lecture notes - Introduction,OM CHAPTER lecture notes - Introduction,
OM CHAPTER lecture notes - Introduction,
 
PRODUCTION MANAGEMENT , PRODUCT DESIGNES.pptx
PRODUCTION MANAGEMENT , PRODUCT DESIGNES.pptxPRODUCTION MANAGEMENT , PRODUCT DESIGNES.pptx
PRODUCTION MANAGEMENT , PRODUCT DESIGNES.pptx
 

Kürzlich hochgeladen

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Kürzlich hochgeladen (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 

Concurrent engineering

  • 1. Concurrent Engineering Manufacturing Systems Presented by : Vivek W. Nagose Parag G. Mahajan Shriprasad S. Kurkure Luke Sangma
  • 2. Concurrent Engineering: Is a strategy where all the tasks involved in product development are done in parallel. Collaboration between all individuals, groups and departments within a company. • Customer research • Designers • Marketing • Accounting • Engineering Concurrent Engineering
  • 5. Concurrent Engineering Form Design Form Design Functional Design Functional Design Production Design Production Design Revising and testing prototypes Manufacturing Specifications Design Specifications Feasibility Study Feasibility Study Idea Generation Idea Generation Suppliers R&D Customers MarketingCompetitors Product or Service concept Performance Specifications Pilot run and final tests Pilot run and final tests Final Design and process plans Product Launch Product Launch Preliminary Design Commercial Design Process Linear Process
  • 7. Concurrent Engineering Form Design: Physical appearance of the product Functional Design: Performance of the product Production Design: How to manufacture product
  • 8. Concurrent Engineering Influencing Agents: the 7 Ts Teamwork Talents Tools Time Techniques CE CECE CE CECE CE Tasks
  • 9. Concurrent Engineering Traditional Process = Linear Vs Concurrent Engineering = Team collaboration
  • 10. Concurrent Engineering Involved People  Customers • Users • Marketing and sales personnel • Operators • Maintenance personnel  Product manager  Project manager  Requirement definition engineer  Specification engineer  Designer  Implementation engineer  Test engineer
  • 12. Concurrent Engineering Why Concurrent Engineering?  Pace of market change has increased  Companies must keep pace with changing markets  Decisions made sooner rather than later  Reduces/eliminates repetition of tasks  Reduces waste and reworking of design  Product quicker to market  Maximises company profit  Company operates more efficiently
  • 13. Concurrent Engineering Case study 1: Desktop computer Design Stage: •The design could specify the following •Reusable components e.g. monitor, keyboard •Recycled materials where possible •Minimise toxic materials used Manufacture: •Use ethical work practices and sources for raw materials •Use ‘clean’ manufacturing processes •Minimise transport of components and materials •Implement quality procedures to minimise waste etc. Use: •Low power consumption •Serviceable items rather than replaceable e.g. disk drive, peripherals etc. Disposal: •Design for disassembly – use easily dismantled fixings etc. •Identify materials used for recycling •Minimise mixed materials to facilitate separation later
  • 14. Concurrent Engineering Example: A washing machine to last for ten years in normal use. Expected typical household use: three times a week for a wash cycle that will last for 2 hours on average. What type of test should be used? How long must the machine survive during the test? Total hours life required for the machine is: 2 hours/wash x 3 washes/week x 52 weeks/year x 10 years = 3120 hours Use a quantitative accelerated test. Run the machine constantly for 3120 hours
  • 15. Concurrent Engineering Benefits Reduces time from design concept by 25% or more. Reduces Capital investment by 20% or more. Continuous improvement of product quality. Increases Product Life Cycle Profitability.
  • 16. Concurrent Engineering Summary Concurrent Engineering: Simultaneous development of product and process. Most important aspect is communication and formation of teams. Management support is vitally important. Don’t be afraid to change current processes and technologies.