SlideShare ist ein Scribd-Unternehmen logo
1 von 39
Downloaden Sie, um offline zu lesen
MMX:
CREATING CHOICES IN SEABORNE IRON
ORE SUPPLY
Rio de Janeiro | September 2013
This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the
Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities
Exchange Act of 1934. All statements other than statements of historical facts are statements that could be deemed forward-looking
statements and are often characterized by the use of words such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”,
“estimates”, “may”, “will”, or “intends”, or by discussions or comments about our objectives, strategy, plans or intentions and results of
operations. Forward-looking statements include projections regarding our operating capacity, operating expenditures, capital expenditures
and start-up dates.
By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and
specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in
such statements may not be indicative of results or developments in future periods. We caution participants of this presentation not to
place undue reliance on these forward-looking statements as a number of factors could cause future results to differ materially from these
statements.
Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a
timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves,
and changes in economic, political and regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on
forward-looking statements to make decisions, investors should carefully consider these factors as well as other uncertainties and events.
MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell
(which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States,
or any other jurisdiction. The securities referred to herein have not been registered in any jurisdiction, and in particular, will not be
registered under the U.S. Securities Act of 1933, as amended, or any applicable state securities laws and may not be offered or sold in the
United States absent registration or an applicable exemption from such registration requirements.
This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part
without MMX’s prior written consent.
DISCLAIMER
MMX INTRODUCTION
1
MMXM3: SOLID CONTROLLING SHAREHOLDERS
Superporto
Sudeste
MMX Corumbá
Mineração MMX Sudeste
100% 100%94,52%
5,48% EBX
4
Controlling
Shareholders
59,3%
Wisco
10,5%
SK Networks
8,8%
Outros
21,4%
Serra
Azul
Bom
Sucesso
HIGH QUALITY MINING ASSETS IN TRADITIONAL
MINING DISTRICTS
5
Sudeste System
Serra Azul Unit
Bom Sucesso Unit
Corumbá System
Sudeste Superport
Two operating systems: Serra Azul and Corumbá;
Current Capacity: approximately 8 Mtpy;
Mining rights in traditional iron ore districts: Brazil
(Minas Gerais and Mato Grosso do Sul);
Production committed with strategic consumers –
China and South Korea – through long-term
contracts;
Brownfield start up in Brazil;
Expanding up to around 40 Mtpy in Brazil, through
fully integrated systems: Private port;
Strategic port location.
INGREDIENTS FOR A SUCCESSFUL IRON ORE
BUSINESS
6
Resource Base
SRK and Coffey Mining certifications (Serra Azul, Pau de Vinho e Bom Sucesso):
3,6 billion tons of mineral resources. Reserves of 1 billion tons in Serra Azul.
Competitive
Production Cost
Structure
Low stripping ratio
Competitive scale – New beneficiation plant
Energy supply contract with MPX
Infrastructure with integrated logistics
Guaranteed
Logistics
Sudeste Superport at 50 Mtpy, expandable to 100 Mtpy, provides gateway to
seaborne markets
Long Term Railway Contract with MRS
Secured Off-
take
64% of future production already committed through long-term contracts
Operational
Track Record
Experience management team with implementation and operational expertise
Current Capacity of 8 Mtpy (Serra Azul and Corumbá sites)
Sale of all shares in Minera MMX de Chile S.A. to Inversiones Cooper Mining S.A.
Hiring of financial advisors to evaluate business opportunities;
New certification of mineral resources (SRK and Coffey Mining) totaling 3.6 billion tons
considering Serra Azul Unit, Mina Pau de Vinho and Bom Sucesso;
Conclusion of the contracting of supplementary long term funding for the Sudeste Superport
with BNDES, in the sum of R$ 935 million;
Renewal of the lease contracts for mineral rights with the CEFAR, extending the terms of
validity from 2021 to 2034;
Arrival of 2 Ship Loaders in the Sudeste Superport ;
Conclusion of the capital increase in the amount of R$ 1.4 billion;
BNDES approves eligibility for a long term financing for Serra Azul;
Conclusion of the offshore civil works at the Sudeste Superport;
Issuance of debentures at the amount of R$ 600 million;
Public hearings in Itaguaí and Mangaratiba for the expansion of the Sudeste Superport to 100
Mtpy;
Beginning of construction of the Serra Azul Unit expansion;
September
2013
January
2012
A LOT HAS BEEN DELIVERED
7
FINANCIAL HIGHLIGHTS
8
204 237
284
0
50
100
150
200
250
300
2Q12 1Q13 2Q13
Net Revenue (R$ million)
113
140
186
0
50
100
150
200
2Q12 1Q13 2Q13
Gross Profit (R$ million)
7 3
413.6%
1.3%
14.6%
0%
4%
8%
12%
16%
0
10
20
30
40
50
2Q12 1Q13 2Q13
Adjusted EBITDA (R$ million)
Adjusted EBITDA
EBITDA Margin
SUDESTE SYSTEM
2
SERRA AZUL UNIT
2.1
UNIQUE INTEGRATED LOGISTICS
Since Iron ore is a bulk commodity, an integrated logistic (mine 
railway  port) is the key factor for a successful operation
Mine SuperportRailway
Serra Azul unit is near to the
MRS railway - 10 km from the
mine, a distance currently
traversed by trucks.
MMX has a long term contract
with MRS railway, which connects
the mine with the CSN’s port and
the Sudeste Superport, both
located in Itaguaí.
Sudeste Superport will have
50Mtpy iron ore shipping
capacity. The Superport will have
a depth of 20 meters, enough to
handle Capesize vessels.
Offtakers (Shareholders)
Long-Term contract (20 years) to trade
iron ore. SK will take-off part of the
Sudeste System yearly production
equivalent to its participation in MMX
Capital (14%).
Long-Term contract (20 years). Wisco
will off-take at least 50% of MMX
Sudeste production.
SK and Wisco will together
offtake 64% of total production
11
QUADRILÁTERO FERRÍFEROIron ore Quadrangle
RAILWAY
Railway access connecting MRS to the Sudeste Superport
13
Contract signed on December 28th 2011;
Long term contract through 2026;
Provides for a volume of up to 36 million tons of iron ore per year.
MRS CONTRACT
MMX signed a long term contract for railway services
14
SERRA AZUL
Expansion project with integrated logistic and pellet feed iron ore
Highlights
Production target: 29 Mtpy;
64% of production already committed through long-term contracts;
997.4 million tons of reserves already secured by SRK.
Execution Update
Beginning of construction of Serra Azul Unit expansion;
Construction license issued in April, 2012;
Acquisition of stirrers, thickeners, gyratory crushers, ball mills, SAG
mills and vertical mills for the new beneficiation plant;
Contract with CNEC WorleyParsons;
Contract with MPX to supply power for 15 years at a base-price of
R$125/MWh.
Expected Quality – Ouro Preto pilot plant test work
Fe: 66,65% P: 0,025% AL2O3: 0,54%
SiO2: 3,23% Mn: 0,018% LOI: 0,75%
15
SERRA AZUL
Growth through consolidation while leveraging existing
infrastructure
16
SERRA AZUL
Serra Azul Unit Expansion Project
New Beneficiation Plant, transmission line and water
pipelines, Stockyard and Loading Terminal
Cava
17
Serra Azul Expansion
Beneficiation Plant
Earthwork
SERRA AZUL
1
Pump House, Sump and
Thickeners
2 Construction Site
1
1
3 Beneficiation
2
3
4 Grinding
4
5 Substation
6 Grinding
7 Piles
8 Primary Crusher
5
6
7
8
9 Primary Crusher
10
Water Storage
Tank
11
Construction Site
and Warehouse
12
Water Storage
Tank Inc.
9
10
11
12
13 Main Access
14 Administrative Buildings
15 Maintenance Workshop
13 14
15
SUDESTE SUPERPORT
2.2
Sudeste Superport
Location
Nautical
Access
Offshore
Stockyard
32
Stockyard 06
Railway
Access
Sudeste Superport
Artistic View
SUDESTE SUPERPORT
Overview
Licensed to 50 Mtpy, expandable to 100 Mtpy;
Licensing for 100 Mtpy underway, public;
Hearing held on May, 2012;
Navy Approval to 100 Mtpy;
Loading: 2 ship loaders of 25 Mtpy each;
Construction works for the tunnel and offshore
infrastructure completed;
Fully funded (BNDES).
Sudeste Superport - Itaguaí
23
USIMINAS AGREEMENT
SRK resources audit : 805 million tons;
Significant synergies with current mining operations at Serra Azul;
13.5% of production at Pau de Vinho will be delivered to Usiminas;
MMX will be responsible for the licensing, CAPEX and operation for 30 years.
Volumes:
■ 12 Mpta
80% Take-or-Pay;
Usiminas can renew the contract in 2016 for 1 to 5 years.
Pau de Vinho Joint Mining
Sudeste Superport Handling
24
Sudeste Superport
Road&Railway Access
Sudeste Superport
Road&Railway Access
Sudeste Superport
Stockyard Elevation 6 m
Road
Access
Car Dumpers
Car Dumpers Control
Room
Stacker Reclaimer
Infrastructure
Stockyard 32
Stockyard 6
Stacker Reclaimer
Rolling Way
Sudeste Superport
Stockyard Elevation 6 m
Sudeste Superport
Car Dumpers
Train
Positioners
Control Room of
Car Dumpers
Sudeste Superport
Car Dumpers
Sudeste Superport
Stockyard Elevation 32 m
30
Electric Substation
Infrastructure
Tunnel Entrance
Transfer House
Structure
Sudeste Superport
Tunnel entrance
32
Sudeste Superport
Tunnel
3333
Sudeste Superport
Offshore Structure
34
Sudeste Superport
Substation Structure
Tunnel Exit
Bridge 1 (430 m)
Electric Substation
Building
Plataform
Superporto Sudeste
Estrutura Offshore
Bridge
270 m
Bridge
430 m
Pier
766 m
Sudeste Superport
Offshore Structure
36
Superporto Sudeste
Estrutura Offshore
36
Sudeste Superport
Ship Loaders
CORUMBÁ
3
CORUMBÁ
Highlights
Current Capacity: 2.1 Mtpy;
Long-term contracts signed with local and
international barge operators;
SRK audit resources report: 192 million
tons plus a potential of an additional 123
million tons.
38
Investor Relations | MMX
Carlos Gonzalez, CEO and IRO
Adriana Marques, Manager
Phone: + 55 21 2163-6197
+ 55 21 2163-6338
E-mail: ri@mmx.com.br

Weitere ähnliche Inhalte

Was ist angesagt?

Mmx abril 2013 - ingles - v3
Mmx   abril 2013 - ingles - v3Mmx   abril 2013 - ingles - v3
Mmx abril 2013 - ingles - v3mmxriweb
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinalmmxriweb
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinalmmxriweb
 
Mmx fevereiro - en - vfinal
Mmx   fevereiro - en - vfinalMmx   fevereiro - en - vfinal
Mmx fevereiro - en - vfinalmmxriweb
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal novammxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal novammxriweb
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal novammxriweb
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinalmmxriweb
 
Mmx maio 2013 - ingles - v2
Mmx   maio 2013 - ingles - v2Mmx   maio 2013 - ingles - v2
Mmx maio 2013 - ingles - v2mmxriweb
 
Mmx maio 2013 - ingles - v2
Mmx   maio 2013 - ingles - v2Mmx   maio 2013 - ingles - v2
Mmx maio 2013 - ingles - v2mmxriweb
 
Mmx dezembro 13 - en - vfinal
Mmx   dezembro 13 - en - vfinalMmx   dezembro 13 - en - vfinal
Mmx dezembro 13 - en - vfinalmmxriweb
 
Mmx fevereiro - en - vfinal nova
Mmx   fevereiro - en - vfinal novaMmx   fevereiro - en - vfinal nova
Mmx fevereiro - en - vfinal novammxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal novammxriweb
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal novammxriweb
 

Was ist angesagt? (17)

Mmx abril 2013 - ingles - v3
Mmx   abril 2013 - ingles - v3Mmx   abril 2013 - ingles - v3
Mmx abril 2013 - ingles - v3
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinal
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinal
 
Mmx fevereiro - en - vfinal
Mmx   fevereiro - en - vfinalMmx   fevereiro - en - vfinal
Mmx fevereiro - en - vfinal
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal nova
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal nova
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinal
 
Mmx maio 2013 - ingles - v2
Mmx   maio 2013 - ingles - v2Mmx   maio 2013 - ingles - v2
Mmx maio 2013 - ingles - v2
 
Mmx maio 2013 - ingles - v2
Mmx   maio 2013 - ingles - v2Mmx   maio 2013 - ingles - v2
Mmx maio 2013 - ingles - v2
 
Mmx dezembro 13 - en - vfinal
Mmx   dezembro 13 - en - vfinalMmx   dezembro 13 - en - vfinal
Mmx dezembro 13 - en - vfinal
 
Mmx fevereiro - en - vfinal nova
Mmx   fevereiro - en - vfinal novaMmx   fevereiro - en - vfinal nova
Mmx fevereiro - en - vfinal nova
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal nova
 

Andere mochten auch

Ecologia y medio ambiente
Ecologia y medio ambienteEcologia y medio ambiente
Ecologia y medio ambienteceleneacosta
 
Conociendo la atmosfera
Conociendo la atmosferaConociendo la atmosfera
Conociendo la atmosferaceleneacosta
 
Esteban martinez valle
Esteban martinez valleEsteban martinez valle
Esteban martinez valleestebaneloisa
 
3Q07 Conference Call Presentation
3Q07 Conference Call Presentation3Q07 Conference Call Presentation
3Q07 Conference Call PresentationJBS RI
 
Características del agua
Características del agua Características del agua
Características del agua Itzel Alaniz
 
SEF08 BDC Crash Course for ITPros
SEF08 BDC Crash Course for ITProsSEF08 BDC Crash Course for ITPros
SEF08 BDC Crash Course for ITProsPenny Coventry
 
Fondo pensione Fonchim
Fondo pensione FonchimFondo pensione Fonchim
Fondo pensione Fonchimsimoneype
 

Andere mochten auch (9)

Ecologia y medio ambiente
Ecologia y medio ambienteEcologia y medio ambiente
Ecologia y medio ambiente
 
Balance hidrico
Balance hidricoBalance hidrico
Balance hidrico
 
Conociendo la atmosfera
Conociendo la atmosferaConociendo la atmosfera
Conociendo la atmosfera
 
Esteban martinez valle
Esteban martinez valleEsteban martinez valle
Esteban martinez valle
 
Tundra
TundraTundra
Tundra
 
3Q07 Conference Call Presentation
3Q07 Conference Call Presentation3Q07 Conference Call Presentation
3Q07 Conference Call Presentation
 
Características del agua
Características del agua Características del agua
Características del agua
 
SEF08 BDC Crash Course for ITPros
SEF08 BDC Crash Course for ITProsSEF08 BDC Crash Course for ITPros
SEF08 BDC Crash Course for ITPros
 
Fondo pensione Fonchim
Fondo pensione FonchimFondo pensione Fonchim
Fondo pensione Fonchim
 

Ähnlich wie Mmx setembro 2013 - ingles - vfinal

Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx maio 2013 - ingles
Mmx   maio 2013 - inglesMmx   maio 2013 - ingles
Mmx maio 2013 - inglesmmxriweb
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal novammxriweb
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinalmmxriweb
 
Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014mmxriweb
 
Corporate Presentation - February 2012
Corporate Presentation - February 2012Corporate Presentation - February 2012
Corporate Presentation - February 2012mmxriweb
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalmmxriweb
 
Mmx webcast ingles 1 t13 v2
Mmx webcast ingles 1 t13   v2Mmx webcast ingles 1 t13   v2
Mmx webcast ingles 1 t13 v2mmxriweb
 
Mmx outubro 2012 - ingles
Mmx   outubro 2012 - inglesMmx   outubro 2012 - ingles
Mmx outubro 2012 - inglesmmxriweb
 
Mmx outubro 2012 - ingles - v2
Mmx   outubro 2012 - ingles - v2Mmx   outubro 2012 - ingles - v2
Mmx outubro 2012 - ingles - v2mmxriweb
 
Mmx outubro 2012 - ingles
Mmx   outubro 2012 - inglesMmx   outubro 2012 - ingles
Mmx outubro 2012 - inglesmmxriweb
 
Mmx outubro 2012 - ingles
Mmx   outubro 2012 - inglesMmx   outubro 2012 - ingles
Mmx outubro 2012 - inglesmmxriweb
 

Ähnlich wie Mmx setembro 2013 - ingles - vfinal (14)

Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx maio 2013 - ingles
Mmx   maio 2013 - inglesMmx   maio 2013 - ingles
Mmx maio 2013 - ingles
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal nova
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinal
 
Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014
 
Corporate Presentation - February 2012
Corporate Presentation - February 2012Corporate Presentation - February 2012
Corporate Presentation - February 2012
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinal
 
Mmx webcast ingles 1 t13 v2
Mmx webcast ingles 1 t13   v2Mmx webcast ingles 1 t13   v2
Mmx webcast ingles 1 t13 v2
 
Mmx outubro 2012 - ingles
Mmx   outubro 2012 - inglesMmx   outubro 2012 - ingles
Mmx outubro 2012 - ingles
 
Mmx outubro 2012 - ingles - v2
Mmx   outubro 2012 - ingles - v2Mmx   outubro 2012 - ingles - v2
Mmx outubro 2012 - ingles - v2
 
Mmx outubro 2012 - ingles
Mmx   outubro 2012 - inglesMmx   outubro 2012 - ingles
Mmx outubro 2012 - ingles
 
Mmx outubro 2012 - ingles
Mmx   outubro 2012 - inglesMmx   outubro 2012 - ingles
Mmx outubro 2012 - ingles
 

Mehr von mmxriweb

Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014mmxriweb
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal novammxriweb
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1mmxriweb
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vfmmxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal novammxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal novammxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal novammxriweb
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalmmxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal novammxriweb
 
Mmx fevereiro - pt - vfinal nova
Mmx   fevereiro - pt - vfinal novaMmx   fevereiro - pt - vfinal nova
Mmx fevereiro - pt - vfinal novammxriweb
 
Mmx fevereiro - pt - vfinal
Mmx   fevereiro - pt - vfinalMmx   fevereiro - pt - vfinal
Mmx fevereiro - pt - vfinalmmxriweb
 
Mmx fevereiro - pt - vfinal2
Mmx   fevereiro - pt - vfinal2Mmx   fevereiro - pt - vfinal2
Mmx fevereiro - pt - vfinal2mmxriweb
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinalmmxriweb
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinalmmxriweb
 

Mehr von mmxriweb (18)

Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal nova
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vf
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal nova
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinal
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx fevereiro - pt - vfinal nova
Mmx   fevereiro - pt - vfinal novaMmx   fevereiro - pt - vfinal nova
Mmx fevereiro - pt - vfinal nova
 
Mmx fevereiro - pt - vfinal
Mmx   fevereiro - pt - vfinalMmx   fevereiro - pt - vfinal
Mmx fevereiro - pt - vfinal
 
Mmx fevereiro - pt - vfinal2
Mmx   fevereiro - pt - vfinal2Mmx   fevereiro - pt - vfinal2
Mmx fevereiro - pt - vfinal2
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinal
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinal
 

Kürzlich hochgeladen

Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 

Kürzlich hochgeladen (20)

Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 

Mmx setembro 2013 - ingles - vfinal

  • 1. MMX: CREATING CHOICES IN SEABORNE IRON ORE SUPPLY Rio de Janeiro | September 2013
  • 2. This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities Exchange Act of 1934. All statements other than statements of historical facts are statements that could be deemed forward-looking statements and are often characterized by the use of words such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, “may”, “will”, or “intends”, or by discussions or comments about our objectives, strategy, plans or intentions and results of operations. Forward-looking statements include projections regarding our operating capacity, operating expenditures, capital expenditures and start-up dates. By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in such statements may not be indicative of results or developments in future periods. We caution participants of this presentation not to place undue reliance on these forward-looking statements as a number of factors could cause future results to differ materially from these statements. Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves, and changes in economic, political and regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on forward-looking statements to make decisions, investors should carefully consider these factors as well as other uncertainties and events. MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell (which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States, or any other jurisdiction. The securities referred to herein have not been registered in any jurisdiction, and in particular, will not be registered under the U.S. Securities Act of 1933, as amended, or any applicable state securities laws and may not be offered or sold in the United States absent registration or an applicable exemption from such registration requirements. This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MMX’s prior written consent. DISCLAIMER
  • 4. MMXM3: SOLID CONTROLLING SHAREHOLDERS Superporto Sudeste MMX Corumbá Mineração MMX Sudeste 100% 100%94,52% 5,48% EBX 4 Controlling Shareholders 59,3% Wisco 10,5% SK Networks 8,8% Outros 21,4% Serra Azul Bom Sucesso
  • 5. HIGH QUALITY MINING ASSETS IN TRADITIONAL MINING DISTRICTS 5 Sudeste System Serra Azul Unit Bom Sucesso Unit Corumbá System Sudeste Superport Two operating systems: Serra Azul and Corumbá; Current Capacity: approximately 8 Mtpy; Mining rights in traditional iron ore districts: Brazil (Minas Gerais and Mato Grosso do Sul); Production committed with strategic consumers – China and South Korea – through long-term contracts; Brownfield start up in Brazil; Expanding up to around 40 Mtpy in Brazil, through fully integrated systems: Private port; Strategic port location.
  • 6. INGREDIENTS FOR A SUCCESSFUL IRON ORE BUSINESS 6 Resource Base SRK and Coffey Mining certifications (Serra Azul, Pau de Vinho e Bom Sucesso): 3,6 billion tons of mineral resources. Reserves of 1 billion tons in Serra Azul. Competitive Production Cost Structure Low stripping ratio Competitive scale – New beneficiation plant Energy supply contract with MPX Infrastructure with integrated logistics Guaranteed Logistics Sudeste Superport at 50 Mtpy, expandable to 100 Mtpy, provides gateway to seaborne markets Long Term Railway Contract with MRS Secured Off- take 64% of future production already committed through long-term contracts Operational Track Record Experience management team with implementation and operational expertise Current Capacity of 8 Mtpy (Serra Azul and Corumbá sites)
  • 7. Sale of all shares in Minera MMX de Chile S.A. to Inversiones Cooper Mining S.A. Hiring of financial advisors to evaluate business opportunities; New certification of mineral resources (SRK and Coffey Mining) totaling 3.6 billion tons considering Serra Azul Unit, Mina Pau de Vinho and Bom Sucesso; Conclusion of the contracting of supplementary long term funding for the Sudeste Superport with BNDES, in the sum of R$ 935 million; Renewal of the lease contracts for mineral rights with the CEFAR, extending the terms of validity from 2021 to 2034; Arrival of 2 Ship Loaders in the Sudeste Superport ; Conclusion of the capital increase in the amount of R$ 1.4 billion; BNDES approves eligibility for a long term financing for Serra Azul; Conclusion of the offshore civil works at the Sudeste Superport; Issuance of debentures at the amount of R$ 600 million; Public hearings in Itaguaí and Mangaratiba for the expansion of the Sudeste Superport to 100 Mtpy; Beginning of construction of the Serra Azul Unit expansion; September 2013 January 2012 A LOT HAS BEEN DELIVERED 7
  • 8. FINANCIAL HIGHLIGHTS 8 204 237 284 0 50 100 150 200 250 300 2Q12 1Q13 2Q13 Net Revenue (R$ million) 113 140 186 0 50 100 150 200 2Q12 1Q13 2Q13 Gross Profit (R$ million) 7 3 413.6% 1.3% 14.6% 0% 4% 8% 12% 16% 0 10 20 30 40 50 2Q12 1Q13 2Q13 Adjusted EBITDA (R$ million) Adjusted EBITDA EBITDA Margin
  • 11. UNIQUE INTEGRATED LOGISTICS Since Iron ore is a bulk commodity, an integrated logistic (mine  railway  port) is the key factor for a successful operation Mine SuperportRailway Serra Azul unit is near to the MRS railway - 10 km from the mine, a distance currently traversed by trucks. MMX has a long term contract with MRS railway, which connects the mine with the CSN’s port and the Sudeste Superport, both located in Itaguaí. Sudeste Superport will have 50Mtpy iron ore shipping capacity. The Superport will have a depth of 20 meters, enough to handle Capesize vessels. Offtakers (Shareholders) Long-Term contract (20 years) to trade iron ore. SK will take-off part of the Sudeste System yearly production equivalent to its participation in MMX Capital (14%). Long-Term contract (20 years). Wisco will off-take at least 50% of MMX Sudeste production. SK and Wisco will together offtake 64% of total production 11
  • 13. RAILWAY Railway access connecting MRS to the Sudeste Superport 13
  • 14. Contract signed on December 28th 2011; Long term contract through 2026; Provides for a volume of up to 36 million tons of iron ore per year. MRS CONTRACT MMX signed a long term contract for railway services 14
  • 15. SERRA AZUL Expansion project with integrated logistic and pellet feed iron ore Highlights Production target: 29 Mtpy; 64% of production already committed through long-term contracts; 997.4 million tons of reserves already secured by SRK. Execution Update Beginning of construction of Serra Azul Unit expansion; Construction license issued in April, 2012; Acquisition of stirrers, thickeners, gyratory crushers, ball mills, SAG mills and vertical mills for the new beneficiation plant; Contract with CNEC WorleyParsons; Contract with MPX to supply power for 15 years at a base-price of R$125/MWh. Expected Quality – Ouro Preto pilot plant test work Fe: 66,65% P: 0,025% AL2O3: 0,54% SiO2: 3,23% Mn: 0,018% LOI: 0,75% 15
  • 16. SERRA AZUL Growth through consolidation while leveraging existing infrastructure 16
  • 17. SERRA AZUL Serra Azul Unit Expansion Project New Beneficiation Plant, transmission line and water pipelines, Stockyard and Loading Terminal Cava 17
  • 19. Earthwork SERRA AZUL 1 Pump House, Sump and Thickeners 2 Construction Site 1 1 3 Beneficiation 2 3 4 Grinding 4 5 Substation 6 Grinding 7 Piles 8 Primary Crusher 5 6 7 8 9 Primary Crusher 10 Water Storage Tank 11 Construction Site and Warehouse 12 Water Storage Tank Inc. 9 10 11 12 13 Main Access 14 Administrative Buildings 15 Maintenance Workshop 13 14 15
  • 23. SUDESTE SUPERPORT Overview Licensed to 50 Mtpy, expandable to 100 Mtpy; Licensing for 100 Mtpy underway, public; Hearing held on May, 2012; Navy Approval to 100 Mtpy; Loading: 2 ship loaders of 25 Mtpy each; Construction works for the tunnel and offshore infrastructure completed; Fully funded (BNDES). Sudeste Superport - Itaguaí 23
  • 24. USIMINAS AGREEMENT SRK resources audit : 805 million tons; Significant synergies with current mining operations at Serra Azul; 13.5% of production at Pau de Vinho will be delivered to Usiminas; MMX will be responsible for the licensing, CAPEX and operation for 30 years. Volumes: ■ 12 Mpta 80% Take-or-Pay; Usiminas can renew the contract in 2016 for 1 to 5 years. Pau de Vinho Joint Mining Sudeste Superport Handling 24
  • 25. Sudeste Superport Road&Railway Access Sudeste Superport Road&Railway Access
  • 26. Sudeste Superport Stockyard Elevation 6 m Road Access Car Dumpers Car Dumpers Control Room Stacker Reclaimer Infrastructure Stockyard 32 Stockyard 6 Stacker Reclaimer Rolling Way
  • 30. Sudeste Superport Stockyard Elevation 32 m 30 Electric Substation Infrastructure Tunnel Entrance Transfer House Structure
  • 34. 34 Sudeste Superport Substation Structure Tunnel Exit Bridge 1 (430 m) Electric Substation Building Plataform
  • 35. Superporto Sudeste Estrutura Offshore Bridge 270 m Bridge 430 m Pier 766 m Sudeste Superport Offshore Structure
  • 38. CORUMBÁ Highlights Current Capacity: 2.1 Mtpy; Long-term contracts signed with local and international barge operators; SRK audit resources report: 192 million tons plus a potential of an additional 123 million tons. 38
  • 39. Investor Relations | MMX Carlos Gonzalez, CEO and IRO Adriana Marques, Manager Phone: + 55 21 2163-6197 + 55 21 2163-6338 E-mail: ri@mmx.com.br