                                       Computers and Chemical Engineering 24 (2000) 329-335
                                                                                                               www.elsevier.com/locate/compchemeng




           A model predictive framework for planning and scheduling
            problems: a case study of consumer goods supply chain
                                                       S. Bose, J.F. Pekny *
                           School of Chemical Engineering,   Purdue   University,   West Lafayette,   IN 47907-1283,   USA




Abstract

   Model Predictive Control is a well established technique for the control of processes and plants. We present a similar concept
for planning and scheduling problems. There have mainly been two approaches to solve the planning and scheduling problems.
The first approach is to model the planning and scheduling as one monolithic problem and solve it for the entire horizon. Needless
to say, this approach requires an extensive computational effort and becomes impossible to solve in the case of large-scale
scheduling problems. The other approach is to hierarchically-decompose         the problem into a planning level problem and a
scheduling level problem. This approach leads to tractable problems. Neither of these approaches provide the framework for
incorporating uncertainties in the processing time of batches, or random equipment breakdowns, or demand uncertainties in the
future. Furthermore, these approaches only provide ‘one snapshot’ of the planning problem and not a ‘walk through the timeline’.
Model predictive planning and scheduling provides a framework for studying dynamics. Model predictive planning and scheduling
requires a forecasting model and an optimization model. Both these models work in tandem in a simulation environment that
incorporates uncertainty. The similarity with the model predictive approach which is widely used in process-control is that in each
period, the forecasting model calculates the target inventory (controlled variable) in the future periods. These inventory levels
ensure desired customer service level while minimizing average inventory. The scheduling model then tries to achieve these target
inventory levels in the future periods by scheduling tasks (manipulated variables). 0 2000 Elsevier Science Ltd. All rights reserved.

Keywords:   Supply chain; Consumer; Planning and scheduling


1. Introduction                                                                instead depend critically on the relationships and inter-
                                                                               dependencies among different organizational           units.
   Operation   of a supply chain for fast moving con-                          This, in turn, translates into establishing efficient mate-
sumer goods is a challenging and difficult task. Fast                          rial and information flows across the supply chain.
moving consumer       goods are characterized by promo-                           The ongoing competitiveness of an organization is
tional demands, which take a toll on the target cus-                           linked with the dynamics of the supply chain(s) in
tomer service level as well as result in higher inventory                      which it participates, and recognition of this fact is
costs. The operation of a supply chain, in which the                           leading to considerable change in the way organizations
demands are known accurately, is tractable. So a                               interact with their supply chain partners. The interac-
difficulty in controlling a supply chain for fast moving                       tion among the parts of supply chain can be captured
consumer goods arises from the highly uncertain nature
                                                                               by studying the coordination structure of the supply
of the promotional part in the demand signal. To cope
                                                                               chain.
with the challenges of improving customer service level
                                                                                  For the purposes of this study, we shall remain
and reducing inventory costs, organizations cannot rely
                                                                               focused on the coordination between the production
solely on isolated changes to specific parts of the supply
                                                                               units and demand units of the supply chain. The key
chain, like suppliers or distributors or retailers, but
                                                                               issues that will be addressed are:
                                                                                1. What is the best organizational structure for the
  * Corresponding author. Tel.: + l-317-4947901; fax: + 1-317-
4940805.
                                                                                   effective coordination of activities between the sup-
  E-mail    addresses.. shantanu@ecn.purdue.edu    (S. Bose),                      ply and demand units (centralized control, decen-
pekny@ecn.purdue.edu (J.F. Pekny).                                                 tralized control or an intermediate form of control)?

0098-1354/00/$- see front matter 0 2000 Elsevier Science Ltd. All rights reserved.
PII: SOO98-1354(00)00469-5
330                        S. Bose, J.F. Pekny /Computers and Chemical Engineering 24 (2000) 329-335


2. What are the appropriate ways of measuring fore-                ulated variables). This is repeated till the end of the
   cast accuracy, specifically, the accuracy of forecast-          planning period. Refer to Fig. 1.
   ing promotional demand?

   To address the issues given above, one must capture             3. Coordination structure of the supply chain:
the dynamics of the supply chain by modeling each                  definitions
element of the supply chain (the supply unit and the
individual markets) and the interaction among these                   The coordination structure of a supply chain is
elements. The framework chosen for this study captures             jointly determined by its decision rights structure
the forecasting, optimization and simulation aspects of            (whether the plant or the distributors decide what to
the supply chain. One must also classify the coordina-             produce and when) and its information structure (local
tion structure by some quantifiable parameters. The                knowledge of promotions, distributor’s stock visibility,
rest of the paper explains these in detail and also                etc.). The coordination structures can be classified in
presents the results obtained from the study so far.               the following categories.
Industrial data has been used to obtain results and
draw conclusions to be sure that realistic assumptions             3.1. Centralized control
have been made about supply chain behavior.
                                                                      The quantities to be supplied to each market are
                                                                   centrally determined. The forecasts for the demands are
2. The model predictive approach                                   based on past sales and recorded data. The forecasts of
                                                                   the promotional part of the demand incorporate infor-
   Here we present a model predictive approach for                 mation that is centrally available, and do not include
solving this problem. Model predictive planning and                local knowledge of promotions. Thus, in a centralized
scheduling requires a forecasting model and an opti-               control, even though most of the promotional events
mization model. Both these models work in tandem in                are known, the actual quantity of the promotional
a simulation environment that incorporates uncertainty.            demand and the exact week of occurrence have a lot of
The similarity with the model predictive approach                  uncertainty.
which is widely used in process-control is that in each
period, the forecasting model calculates the target in-            3.2. Decentralized control
ventory (controlled variable) in the future periods.
These inventory levels ensure desired customer service                The individual markets place orders with the supply
level while minimizing average inventory. The schedul-             unit based on local promotional knowledge. Each indi-
ing model then tries to achieve these target inventory             vidual market is unaware of the capacity constraints in
levels in the future periods by scheduling tasks (manip-           the factory, as well as, demands placed by the other


                                   Output Vorlrble   flaqet Inventory)

                           mvu?
S. Bose, J.F. Pekny / Computers   and Chemical Engineering   24 (2000) 329-335                   331




markets. Thus, even though the forecast quantity                         l   Uncertainty in the actual quantity of the promo-
of promotional demands is relatively accurate, the                           tional demand.
markets   do not provide enough lead-time for                            l   Uncertainty in the actual week of occurrence of the
SUPPlY.                                                                      promotional demand.

3.3. Distributed Control                                                    For various values of the above, different forecasts
                                                                         can be generated. With each forecast, a parameter c1
   The quantities are determined using both central and                  can be associated which is defined as the fraction of the
local promotional knowledge. There is information                        total promotional demand that is expected (known).
sharing and negotiation among the supply units and
                                                                            Known Prom. Demand
individual markets.
                                                                         ’ = Total Prom Demand
                                                                         The parameter CImeasures the overall efficiency of the
4. Forecasting-optimization-simulation      framework                    business processes in the supply chain.

   This framework is developed to study the supply
chain dynamics under uncertainty. Each module of the                     5. De-convolution      of the demand signal
framework is explained below. Please refer to Fig. 2 for
the schematic diagram of ‘forecasting-optimization-sim-                     The following method is used to de-convolute the
ulation architecture’  which shows the interaction                       demand signal into a base demand and promotional
among each module of the framework.                                      demand. Since it is not known a priori what the promo-
                                                                         tional demand is and in which of the weeks it appears
4.1. Forecasting module                                                  we have to use an iterative (trial and error) method.
                                                                         This involves estimating a base demand. The estimation
   The forecasting module de-convolutes the demand                       is done by assuming the base demand to be of the
data into a base demand and a promotional demand.                        following functional     form:Base demand = A + Bt +
The de-convolution technique is explained in the next                    C sin(w x t)where A, B, C and w are the estimated
sub-section section. The promotional demand consists                     parameters and t denotes the time (measured in week in
of an expected promotional demand (with some uncer-                      this case).
tainty) and an unexpected promotional demand. As-                           Promotional demand is defined as any demand that
suming a reasonable market growth, a weekly demand                       is in excess of the base demand. Initially, all the sales
forecast is generated. This also takes into account the                  data is assumed to be base demand (i.e. no promotional
coordination structure of the supply chain. The coordi-                  demand). As a first step of the iteration, the base
nation structure is captured by the following para-                      demand parameters are fitted to the total sales. The sale
meters:                                                                  in any given week is then compared with the predicted
l How     far ahead are these promotional demands                        base demand. If the actual sales is in excess of the
    known to the factory.                                                predicted base demand by a certain value (specified by
332                             S. Bose, J.F. Pekny /Computers   and Chemical Engineering 24 (2000) 329-335


Table 1
Range of values for control parameters

Parameters                                                                            Regimes

                                                                                      Low               Medium        High

LT: lead-time for satisfying promotional demand                                       4 weeks           8 weeks       12 weeks
Q: accuracy in the quantity of promotional demands (denoted by mean Qm, and           Mean = 1.0;       Mean = 1.O;   Mean = 1.O;
  S.D. Qd)                                                                            S.D. = 0.25       S.D. = 0.25   SD. = 0
X: accuracy in the exact week of occurrence (denoted by mean Xm, and S.D. Xd)         +4 weeks          +2 weeks      *O weeks




the user as ‘Promotional Criteria’), then that week is                    5.2. Simulation module
marked as a promotional week. This is done for all the
weeks. Now the base demand estimated again to fit the                        The simulation module simulates production in the
predicted base demand to on& those weeks, which are                       factory for one week, at a time during which the
not marked as promotional. The sale for each week is                      schedule is frozen. The inventory levels at the market
compared with the predicted base demand and the                           warehouses are updated accounting for the actual de-
weeks, which meet the promotional         criterion, are                  mands and allowing time for transportation of stock
marked and added to the previous set of promotional                       keeping units.
weeks. This iteration is performed until no more weeks                       Each of the three modules is invoked for each period
can be marked as promotional weeks.                                       of the plan.

5.1. Optimization module
                                                                          6. Design of simulation runs
   The optimization module solves a Mixed Integer
Linear Program (MILP) to decide on a production                              In order to study the supply chain dynamics, it is
schedule which ensures a target customer service level                    important to perform simulation runs, which are spe-
while minimizing inventory costs at the same time. The                    cifically designed to address the key issues. The simula-
optimization considers a time horizon over which it                       tion runs should bring out the differences in the various
solves. The horizon determines how many weeks of                          possible organizational and coordination structures of
demand information are available to the optimizer.                        the supply chain. Each run must be classified as either
This production schedule is frozen for a single period (a                 Centralized Control or Decentralized Control or Dis-
week, in this case). Since detailed scheduling is a hard                  tributed Control.
problem to solve and the difficulty increases exponen-
tially with the problem size, the optimization problem                    6.1. Control parameters
does detailed scheduling only for the first week and a
rough cut capacity planning for the rest of the weeks in                     There are several control parameters that affect the
the horizon. Since only the first week is implemented,                    performance of the supply chain. They are:
the rough cut capacity planning does not pose any                          1. How far ahead in the future are the promotional
unfeasibility. The optimization module enforces the                           demands known (i.e. how much lead-time is avail-
minimum-run-length- constraint for the tasks. The opti-                       able to meet the promotional demands).
mization module also ensures that the production fre-                     2. The accuracy in the actual quantity of the promo-
quency of the stock keeping units does not exceed the                         tional demands.
stipulated production frequency as practiced by the                       3. The accuracy in the actual week of occurrence of the
plant.                                                                        promotions.

Table 2
Relation between control parameters and coordination structure

Parameters                                                             Type of coordination structure

                                                                       Centralized              De-centralized          Distributed

LT: lead-time for satisfying promotional demand                        HIGH                     LOW                     MEDIUM
Q: accuracy in the quantity of promotional demands                     LOW                      HIGH                    MEDIUM
X: accuracy in the exact week of occurrence                            LOW                      HIGH                    MEDIUM
S. Bose, J.F. Pekny / Computers and Chemical Engineering 24 (2000) 329-335                      333


                                                                           4.2. Centralized

                                                                             All the promotions originate from the supply unit,
                                                                          hence the information about the promotions is avail-
                                                                          able to the supply unit (which decides the demand
                                                                          forecasts in case of centralized coordination) well in
                                                                          advance. This means that lead-time is also high for
                                                                          centralized control. The uncertainty lies in knowing the
                                                                          actual effect of these promotions that are offered by the
                                                                          plant. Since knowledge from the local markets is not
                                                                          available to the factory, the actual orders requested by
                                                                          the markets is substantially different from what the
                                                                          factory forecasts. Hence, the ‘low’ accuracy in the exact
                                                                          quantity as well as the exact occurrence of the promo-
                                                                          tional demands. Furthermore, the individual markets
                                                                          often create unnecessary noise in the supply chain, by
                                                                          excessive hoarding or stock clearance, which reduce the
                                                                          accuracy of promotional demands even more. So, over-
                                                                          all the centralized coordination      structure promises
Fig. 3. Sensitivity of overall customer service level on the exact week
of occurrence     of promotional demands.                                 longer lead-times but loses out in the accuracy of
                                                                          forecasting promotional demands.

                                                                           6.3. De-centralized

                                                                              In case of de-centralized control, the forecasting is
                                                                           primarily based on demand information provided by
   Theoretically, these parameters can vary over a con-                    the individual markets. The result is high accuracy in
tinuous range of values. To perform any meaningful                         the forecast quantity of the promotional demand as
simulations, we must first set some bounds on these                        well as the exact week of occurrence. Since the markets
parameters and then divide the range between the                           can see their own stock levels, they place fairly accurate
bounds into regimes, such as low, medium and high.                         orders based on their current stock levels and local
Depending upon the coordination in the supply chain,                       promotional knowledge. But, the down side is that they
the parameter values will lie in one of the regimes.                       do not give enough lead-time for production. When the
Table 1 defines the regimes for the parameters.                            lead-time given is too small, the factory may not be
   The bounds on the parameters must be substantiated                      able to accommodate the demand because of capacity
by data and observations. From the forecast data avail-                    limitations. So, overall the de-centralized coordination
able, only the accuracy in the quantity of the promo-                      structure promises high accuracy in predicting promo-
tional demands could be verified. The corresponding                        tional demands but settles for lower lead-times.
values from the forecast data were calculated to be 0.98
(mean) and 0.45 (S.D.). The bounds for the other two                       6.4. Distributed
parameters (LT and X) are based on reasonable esti-
mates. In the case of ‘lead-time’, the upper bound of 12                     Distributed control is a mix of the centralized and
weeks is justified because it is highly unlikely to sched-                de-centralized control structures. Obviously, there is
ule for more than 12 weeks at a time. Hence, any                          trade-off between the centralized and de-centralized
demands beyond 12 weeks will not be seen by the                           types of coordination. The distributed control can ei-
scheduling-model anyway. It was also observed during                      ther be highly efficient and have the benefits of both
the simulation runs that if the lead-time is reduced to                   centralized and de-centralized control, or it can repre-
less than 4 weeks, or, if the inaccuracy in the exact                     sent a highly unsynchronized supply chain. The Ideal
week of occurrence of promotional demand is more                          Coordination Structure would be achieved when the
than + / -4 weeks, the performance of the supply                          very best of both worlds (centralized and de-central-
chain deteriorates considerably. Hence, these values                      ized) is integrated.
were assumed to be bounds. The medium regime was
assumed to be the middle value of the range, since there                   6.5. Performance      measure
is no data to suggest otherwise.
   The entries in Table 2 are explained below for each                      Each simulation run is measured by an overall cus-
coordination structure.                                                   tomer service level achieved and the overall inventory
334                               S. Bose, J.F. Pekny /Computers      and Chemical Engineering 24 (2000) 329-335


level. Obviously, increasing the inventory safety stock-                       between 0 and 1. The u values were chosen to be
levels result in higher customer service level. The aim                        0.2, 0.4, 0.6, 0.8 and 1.0, a total of five values. For
is to attain the desired customer service level of 99.7%                       each value of c1 the 27 combinations calculated above
with the minimum possible inventory.                                           were simulated. That is a total of 27 times 5, i.e. 135
                                                                               combinations. To determine the best possible customer
6.6. Computational effort                                                      service level in each run, six trials were made with
                                                                               a different inventory level in each trial. That results
   The number of simulations increases combinatori-                            in a total of 135 times 6, i.e. 810 combinations.
ally with the number of parameter and combinations                             Each run takes about 25 min for simulating 52 weeks
thereof. There are three control parameters (LT, Q                             on a Pentium II (400 MHz) processor. The total
and x), with three values each, hence, a total of 33                           simulation time for all these runs is 20 250 min, which
times 3, i.e. 27 combinations. The parameter CI,which                          is about 14 days worth of computational time. Each
was introduced as a lumped parameter for measuring                             run is dependent on a random number seed, hence
the efficiency of business processes, can take any value                       for the same values of the parameters, several runs
                                                                               should be simulated using a different random seed for
                                                                               each run. It was found that the results of the runs do
                                                                               not vary too much when a different random number
                                                                               seed is used. This is because any peculiarities of a
                                                                               random number are somewhat averaged over 52
                                                                               weeks.


                                                                               7. Results

                                                                                  There are several interesting results that can be ex-
                                                                               tracted from the simulation runs. Although there are
                                                                               many results and figures obtained from this study,
                                                                               only the important ones are being discussed below.

                                                                               7.1. Sensitivity analysis of control parameters


                                                                                  Sensitivity of overall customer service level on the
                                                                                  exact week of occurrence of promotional demands.
                                                                                  This is obtained by varying the parameter X and
Fig. 4. Sensitivity of overall customer service level on the exact                keeping all the other parameters constant. Lead-time
quantity of promotional demands.                                                  is fixed at 8 weeks and CIis set to 0.8. Refer to Fig.
                                                                                  3.
                                                                                  Sensitivity of overall customer service level on the
                                                                                  exact quantity of promotional demands. This is ob-
                                                                                  tained by varying the parameter Q and keeping all
                                                                                  the other parameters constant. Lead-time is fixed at
                                                                                  8 weeks and a is set to 0.8. Refer to Fig. 4.
                                                                                  Sensitivity of overall customer service level on lead-
                                                                                  time. This is obtained by varying lead-time and
                                                                                  keeping all other parameters constant. The uncer-
                                                                                  tainties in the exact week of occurrence and the exact
                                                                                  quantity of promotional demands are both set to 0,
                                                                                  while CIis fixed at 0.8. Refer to Fig. 5.
                                                                                  Sensitivity of overall customer service level on tl.
                                                                                  This is obtained by varying the tl and keeping all the
                                                                                  other parameters constant. The other parameters are
                                   I3
                                                                                  kept constant so that they represent a particular
            1rlhW
                                                                                  coordination structure. Fig. 6 shows the case of
Fig. 5. Sensitivity of overall customer service level on lead-time.               de-centralized coordination structure.
S. Bose, J.F. Pekny / Computers and Chemical Engineering 24 (2000) 329-335                      335


                                                                                    By comparing results for same tl and same inventory
                                                                                    level, it is observed that medium uncertainties in the
                                                                                    occurrence and quantity of promotional demands
                                                                                    have about the same effect. But, high uncertainty in
                                                                                    occurrence is more harmful to the performance than
                                                                                    high uncertainty in quantity of promotional de-
                                                                                    mands.
                                                                                    Although the sensitivity of performance on lead-
                                                                                    time cannot be compared with any other parameter,
                                                                                    it is observed that there is a steady increase in
                                                                                    customer service level as the lead-time increases.
                                                                                    This suggests more simulation runs with still higher
                                                                                    lead-times to observe the point at which the gain in
                                                                                    service level tapers off.
                                                                                    The dependence of customer service level on inven-
                                                                                    tory level in the system is very high. This result was
     Fig. 6. Sensitivity   of overall    customer   service level on CI.            rather intuitive. The interesting fact, however, is the
                                                                                    gradient of the dependence. The gradient is very
                                                                                    high at lower inventory levels and changes to almost
                                                                                    zero gradient at higher inventory levels. This sug-
                                                                                    gests that keeping the average inventory level at
                                                                                    about 120- 150 tons gives the best performance.
                                                                                    This target inventory level is about 20% higher than
                                                                                    the current practice of inventory coverage. It is also
                                                                                    observed that the service level drops slightly when
                                                                                    target inventory levels are very high. This is not
                                                                                    immediately intuitive. The reason is that pushing the
                                                                                    plant to maintain higher inventory levels unneces-
                                                                                    sary bottlenecks in many of the weeks during the
                                                                                    52-week simulation, Hence, some products, which
                                                                                    have an immediate demand, are not produced in
         Fig. 7. Effect of various       coordination   structures.                 those weeks, since the plant is busy producing other
                                                                                    products to maintain their high target inventories.
                                                                                    This may seem more like a problem with the
7.2. Effect of coordination structure on overall
                                                                                    scheduling, but most scheduling models minimize
customer service level
                                                                                    the deviation of inventory levels from the target
                                                                                    inventory levels.
  This is the most important set of results derived from                            The dependence of customer service level on CI is
  this study. They are obtained by varying the coordi-                              also very strong. A is a lumped parameter, which
  nation structure and keeping CI constant. As de-                                  reflects the efficiency of business processes in the
  scribed before, the coordination structures fix the                               supply chain. A can be improved by better commu-
  regimes of the control parameters (LT, Q and x).                                  nications between the marketing and production
  Fig. 7 shows the effect of various coordination struc-                            units, and, better knowledge of local information at
  tures for c( = 0.8.                                                               the markets.
                                                                                    Perhaps the most important result can be drawn
                                                                                    from Fig. 5. This figure clearly demarcates the re-
  Conclusions                                                                       gions where different control structures are recom-
                                                                                    mended. For example, if we assume that the current
   One of the objectives of this study was to determine                             status of the supply chain is CI 0.8 and average
                                                                                                                        =
which of the parameters is important. This can be                                   inventory level = 115-125 tons, then we can con-
deduced from the sensitivity analysis shown in the                                  clude that the centralized coordination structure is
results. We summarize the conclusions below.                                        recommended.

Weitere ähnliche Inhalte

Was ist angesagt?

Kelly zyngier oil&gasbookchapter_july2013
Kelly zyngier oil&gasbookchapter_july2013Kelly zyngier oil&gasbookchapter_july2013
Kelly zyngier oil&gasbookchapter_july2013Jeffrey Kelly
 
Selection of Best Alternative in Manufacturing and Service Sector Using Multi...
Selection of Best Alternative in Manufacturing and Service Sector Using Multi...Selection of Best Alternative in Manufacturing and Service Sector Using Multi...
Selection of Best Alternative in Manufacturing and Service Sector Using Multi...csandit
 
Supply chain management basics
Supply chain management basicsSupply chain management basics
Supply chain management basicstibinaugustine36
 
Schumann, a modeling framework for supply chain management under uncertainty
Schumann, a modeling framework for supply chain management under uncertaintySchumann, a modeling framework for supply chain management under uncertainty
Schumann, a modeling framework for supply chain management under uncertaintySSA KPI
 
Improving hospital profitability through cost of quality
Improving hospital profitability through cost of qualityImproving hospital profitability through cost of quality
Improving hospital profitability through cost of qualityAlexander Decker
 
Applicationof markovchainsformodelingandmanagingindustrialelectronicrepairpro...
Applicationof markovchainsformodelingandmanagingindustrialelectronicrepairpro...Applicationof markovchainsformodelingandmanagingindustrialelectronicrepairpro...
Applicationof markovchainsformodelingandmanagingindustrialelectronicrepairpro...GetnetAschale1
 
Network Optimization
Network OptimizationNetwork Optimization
Network Optimizationsinghmk74
 
A03620109
A03620109A03620109
A03620109theijes
 
Pbl session 2 report
Pbl session 2 report Pbl session 2 report
Pbl session 2 report NUR Ifa
 

Was ist angesagt? (19)

Hoe k
Hoe kHoe k
Hoe k
 
5. mba 205 operations research assignment 2nd semester
5. mba 205 operations research assignment 2nd semester5. mba 205 operations research assignment 2nd semester
5. mba 205 operations research assignment 2nd semester
 
147775601 erp-1
147775601 erp-1147775601 erp-1
147775601 erp-1
 
Kelly zyngier oil&gasbookchapter_july2013
Kelly zyngier oil&gasbookchapter_july2013Kelly zyngier oil&gasbookchapter_july2013
Kelly zyngier oil&gasbookchapter_july2013
 
Selection of Best Alternative in Manufacturing and Service Sector Using Multi...
Selection of Best Alternative in Manufacturing and Service Sector Using Multi...Selection of Best Alternative in Manufacturing and Service Sector Using Multi...
Selection of Best Alternative in Manufacturing and Service Sector Using Multi...
 
Supply chain management basics
Supply chain management basicsSupply chain management basics
Supply chain management basics
 
Chopra3 ppt ch02
Chopra3 ppt ch02Chopra3 ppt ch02
Chopra3 ppt ch02
 
593176
593176593176
593176
 
Cp1 v2-018
Cp1 v2-018Cp1 v2-018
Cp1 v2-018
 
978 3-642-33980-6 56
978 3-642-33980-6 56978 3-642-33980-6 56
978 3-642-33980-6 56
 
Schumann, a modeling framework for supply chain management under uncertainty
Schumann, a modeling framework for supply chain management under uncertaintySchumann, a modeling framework for supply chain management under uncertainty
Schumann, a modeling framework for supply chain management under uncertainty
 
Improving hospital profitability through cost of quality
Improving hospital profitability through cost of qualityImproving hospital profitability through cost of quality
Improving hospital profitability through cost of quality
 
Applicationof markovchainsformodelingandmanagingindustrialelectronicrepairpro...
Applicationof markovchainsformodelingandmanagingindustrialelectronicrepairpro...Applicationof markovchainsformodelingandmanagingindustrialelectronicrepairpro...
Applicationof markovchainsformodelingandmanagingindustrialelectronicrepairpro...
 
Demand Chain Management
Demand Chain Management Demand Chain Management
Demand Chain Management
 
Network Optimization
Network OptimizationNetwork Optimization
Network Optimization
 
SCM- Basics
SCM- BasicsSCM- Basics
SCM- Basics
 
A03620109
A03620109A03620109
A03620109
 
Pbl session 2 report
Pbl session 2 report Pbl session 2 report
Pbl session 2 report
 
Contenido log
Contenido logContenido log
Contenido log
 

Andere mochten auch

What your mother did not tell you Qualitative Research can!
What your mother did not tell you Qualitative Research can!What your mother did not tell you Qualitative Research can!
What your mother did not tell you Qualitative Research can!connectingdots
 
Unique Computer Systems - Company Profile
Unique Computer Systems - Company ProfileUnique Computer Systems - Company Profile
Unique Computer Systems - Company ProfileManish Bhatia
 
Otimização de Sites com SEO - TCC IF Goiano - Campus Morrinhos
Otimização de Sites com SEO - TCC IF Goiano - Campus MorrinhosOtimização de Sites com SEO - TCC IF Goiano - Campus Morrinhos
Otimização de Sites com SEO - TCC IF Goiano - Campus MorrinhosCarloshps Webdesigner
 
ECカスタマイズ - Commerble
ECカスタマイズ - CommerbleECカスタマイズ - Commerble
ECカスタマイズ - CommerbleHiroyuki Watanabe
 
Right here, right now: come capire e intercettare i momenti cruciali di un’es...
Right here, right now: come capire e intercettare i momenti cruciali di un’es...Right here, right now: come capire e intercettare i momenti cruciali di un’es...
Right here, right now: come capire e intercettare i momenti cruciali di un’es...Ilaria Mauric
 
Agile and Design: creating and implementing products (in Italy) is possible
Agile and Design: creating and implementing products (in Italy) is possibleAgile and Design: creating and implementing products (in Italy) is possible
Agile and Design: creating and implementing products (in Italy) is possibleIlaria Mauric
 
Non destructive testing of concrete
Non destructive testing of concreteNon destructive testing of concrete
Non destructive testing of concreteiamsamrat
 

Andere mochten auch (9)

Cosa manca ad un brief
Cosa manca ad un briefCosa manca ad un brief
Cosa manca ad un brief
 
What your mother did not tell you Qualitative Research can!
What your mother did not tell you Qualitative Research can!What your mother did not tell you Qualitative Research can!
What your mother did not tell you Qualitative Research can!
 
Unique Computer Systems - Company Profile
Unique Computer Systems - Company ProfileUnique Computer Systems - Company Profile
Unique Computer Systems - Company Profile
 
Otimização de Sites com SEO - TCC IF Goiano - Campus Morrinhos
Otimização de Sites com SEO - TCC IF Goiano - Campus MorrinhosOtimização de Sites com SEO - TCC IF Goiano - Campus Morrinhos
Otimização de Sites com SEO - TCC IF Goiano - Campus Morrinhos
 
ECカスタマイズ - Commerble
ECカスタマイズ - CommerbleECカスタマイズ - Commerble
ECカスタマイズ - Commerble
 
Right here, right now: come capire e intercettare i momenti cruciali di un’es...
Right here, right now: come capire e intercettare i momenti cruciali di un’es...Right here, right now: come capire e intercettare i momenti cruciali di un’es...
Right here, right now: come capire e intercettare i momenti cruciali di un’es...
 
Agile and Design: creating and implementing products (in Italy) is possible
Agile and Design: creating and implementing products (in Italy) is possibleAgile and Design: creating and implementing products (in Italy) is possible
Agile and Design: creating and implementing products (in Italy) is possible
 
Non destructive testing of concrete
Non destructive testing of concreteNon destructive testing of concrete
Non destructive testing of concrete
 
SlideShare 101
SlideShare 101SlideShare 101
SlideShare 101
 

Ähnlich wie HarGroup Management Consultants Inc.

IRJET- Predicting Sales in Supermarkets
IRJET-  	  Predicting Sales in SupermarketsIRJET-  	  Predicting Sales in Supermarkets
IRJET- Predicting Sales in SupermarketsIRJET Journal
 
Capgemini ses - smart grid operational services - supply chain fact sheet (gr)
Capgemini   ses - smart grid operational services - supply chain fact sheet (gr)Capgemini   ses - smart grid operational services - supply chain fact sheet (gr)
Capgemini ses - smart grid operational services - supply chain fact sheet (gr)Gord Reynolds
 
Improving the alignment of strategic objectives in the outsourced projects ma...
Improving the alignment of strategic objectives in the outsourced projects ma...Improving the alignment of strategic objectives in the outsourced projects ma...
Improving the alignment of strategic objectives in the outsourced projects ma...Edilson Giffhorn
 
Trade Off Economics White Paper
Trade Off Economics White PaperTrade Off Economics White Paper
Trade Off Economics White Paperjanknopfler
 
Modelling
ModellingModelling
Modellingskarri
 
Managing Uncertainty in Fashion Supply Chains: An AI-Based Analysis of Demand...
Managing Uncertainty in Fashion Supply Chains: An AI-Based Analysis of Demand...Managing Uncertainty in Fashion Supply Chains: An AI-Based Analysis of Demand...
Managing Uncertainty in Fashion Supply Chains: An AI-Based Analysis of Demand...IRJET Journal
 
Reflections inproductionandplanning
Reflections inproductionandplanningReflections inproductionandplanning
Reflections inproductionandplanningSudhakar Suragani
 
Om0012 supply chain management
Om0012 supply chain managementOm0012 supply chain management
Om0012 supply chain managementStudy Stuff
 
worku ppt (proposal).pptx
worku ppt (proposal).pptxworku ppt (proposal).pptx
worku ppt (proposal).pptxBetshaTizazu
 
Customer churn analysis using XGBoosted decision trees
Customer churn analysis using XGBoosted decision treesCustomer churn analysis using XGBoosted decision trees
Customer churn analysis using XGBoosted decision treesnooriasukmaningtyas
 
Elements of operations management
Elements of operations managementElements of operations management
Elements of operations managementbhatmuneer
 
Empirical Research: Supply Chain and BYOD – Hand in Hand for the Future
Empirical Research: Supply Chain and BYOD – Hand in Hand for the FutureEmpirical Research: Supply Chain and BYOD – Hand in Hand for the Future
Empirical Research: Supply Chain and BYOD – Hand in Hand for the FutureRahul Bansal
 
1 s2.0-s0925527303002561-main
1 s2.0-s0925527303002561-main1 s2.0-s0925527303002561-main
1 s2.0-s0925527303002561-mainLevi Guimarães
 

Ähnlich wie HarGroup Management Consultants Inc. (20)

IRJET- Predicting Sales in Supermarkets
IRJET-  	  Predicting Sales in SupermarketsIRJET-  	  Predicting Sales in Supermarkets
IRJET- Predicting Sales in Supermarkets
 
Modeling Supply Chain
Modeling Supply ChainModeling Supply Chain
Modeling Supply Chain
 
Module-1.pptx
Module-1.pptxModule-1.pptx
Module-1.pptx
 
Capgemini ses - smart grid operational services - supply chain fact sheet (gr)
Capgemini   ses - smart grid operational services - supply chain fact sheet (gr)Capgemini   ses - smart grid operational services - supply chain fact sheet (gr)
Capgemini ses - smart grid operational services - supply chain fact sheet (gr)
 
Improving the alignment of strategic objectives in the outsourced projects ma...
Improving the alignment of strategic objectives in the outsourced projects ma...Improving the alignment of strategic objectives in the outsourced projects ma...
Improving the alignment of strategic objectives in the outsourced projects ma...
 
Trade Off Economics White Paper
Trade Off Economics White PaperTrade Off Economics White Paper
Trade Off Economics White Paper
 
Modelling
ModellingModelling
Modelling
 
Managing Uncertainty in Fashion Supply Chains: An AI-Based Analysis of Demand...
Managing Uncertainty in Fashion Supply Chains: An AI-Based Analysis of Demand...Managing Uncertainty in Fashion Supply Chains: An AI-Based Analysis of Demand...
Managing Uncertainty in Fashion Supply Chains: An AI-Based Analysis of Demand...
 
Reflections inproductionandplanning
Reflections inproductionandplanningReflections inproductionandplanning
Reflections inproductionandplanning
 
Om0012 supply chain management
Om0012 supply chain managementOm0012 supply chain management
Om0012 supply chain management
 
A04950123
A04950123A04950123
A04950123
 
worku ppt (proposal).pptx
worku ppt (proposal).pptxworku ppt (proposal).pptx
worku ppt (proposal).pptx
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Customer churn analysis using XGBoosted decision trees
Customer churn analysis using XGBoosted decision treesCustomer churn analysis using XGBoosted decision trees
Customer churn analysis using XGBoosted decision trees
 
Elements of operations management
Elements of operations managementElements of operations management
Elements of operations management
 
Empirical Research: Supply Chain and BYOD – Hand in Hand for the Future
Empirical Research: Supply Chain and BYOD – Hand in Hand for the FutureEmpirical Research: Supply Chain and BYOD – Hand in Hand for the Future
Empirical Research: Supply Chain and BYOD – Hand in Hand for the Future
 
1 s2.0-s0925527303002561-main
1 s2.0-s0925527303002561-main1 s2.0-s0925527303002561-main
1 s2.0-s0925527303002561-main
 

Kürzlich hochgeladen

ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinojohnmickonozaleda
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 

Kürzlich hochgeladen (20)

ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipino
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 

HarGroup Management Consultants Inc.

  • 1. Computers &Chemical Engineering Computers and Chemical Engineering 24 (2000) 329-335 www.elsevier.com/locate/compchemeng A model predictive framework for planning and scheduling problems: a case study of consumer goods supply chain S. Bose, J.F. Pekny * School of Chemical Engineering, Purdue University, West Lafayette, IN 47907-1283, USA Abstract Model Predictive Control is a well established technique for the control of processes and plants. We present a similar concept for planning and scheduling problems. There have mainly been two approaches to solve the planning and scheduling problems. The first approach is to model the planning and scheduling as one monolithic problem and solve it for the entire horizon. Needless to say, this approach requires an extensive computational effort and becomes impossible to solve in the case of large-scale scheduling problems. The other approach is to hierarchically-decompose the problem into a planning level problem and a scheduling level problem. This approach leads to tractable problems. Neither of these approaches provide the framework for incorporating uncertainties in the processing time of batches, or random equipment breakdowns, or demand uncertainties in the future. Furthermore, these approaches only provide ‘one snapshot’ of the planning problem and not a ‘walk through the timeline’. Model predictive planning and scheduling provides a framework for studying dynamics. Model predictive planning and scheduling requires a forecasting model and an optimization model. Both these models work in tandem in a simulation environment that incorporates uncertainty. The similarity with the model predictive approach which is widely used in process-control is that in each period, the forecasting model calculates the target inventory (controlled variable) in the future periods. These inventory levels ensure desired customer service level while minimizing average inventory. The scheduling model then tries to achieve these target inventory levels in the future periods by scheduling tasks (manipulated variables). 0 2000 Elsevier Science Ltd. All rights reserved. Keywords: Supply chain; Consumer; Planning and scheduling 1. Introduction instead depend critically on the relationships and inter- dependencies among different organizational units. Operation of a supply chain for fast moving con- This, in turn, translates into establishing efficient mate- sumer goods is a challenging and difficult task. Fast rial and information flows across the supply chain. moving consumer goods are characterized by promo- The ongoing competitiveness of an organization is tional demands, which take a toll on the target cus- linked with the dynamics of the supply chain(s) in tomer service level as well as result in higher inventory which it participates, and recognition of this fact is costs. The operation of a supply chain, in which the leading to considerable change in the way organizations demands are known accurately, is tractable. So a interact with their supply chain partners. The interac- difficulty in controlling a supply chain for fast moving tion among the parts of supply chain can be captured consumer goods arises from the highly uncertain nature by studying the coordination structure of the supply of the promotional part in the demand signal. To cope chain. with the challenges of improving customer service level For the purposes of this study, we shall remain and reducing inventory costs, organizations cannot rely focused on the coordination between the production solely on isolated changes to specific parts of the supply units and demand units of the supply chain. The key chain, like suppliers or distributors or retailers, but issues that will be addressed are: 1. What is the best organizational structure for the * Corresponding author. Tel.: + l-317-4947901; fax: + 1-317- 4940805. effective coordination of activities between the sup- E-mail addresses.. shantanu@ecn.purdue.edu (S. Bose), ply and demand units (centralized control, decen- pekny@ecn.purdue.edu (J.F. Pekny). tralized control or an intermediate form of control)? 0098-1354/00/$- see front matter 0 2000 Elsevier Science Ltd. All rights reserved. PII: SOO98-1354(00)00469-5
  • 2. 330 S. Bose, J.F. Pekny /Computers and Chemical Engineering 24 (2000) 329-335 2. What are the appropriate ways of measuring fore- ulated variables). This is repeated till the end of the cast accuracy, specifically, the accuracy of forecast- planning period. Refer to Fig. 1. ing promotional demand? To address the issues given above, one must capture 3. Coordination structure of the supply chain: the dynamics of the supply chain by modeling each definitions element of the supply chain (the supply unit and the individual markets) and the interaction among these The coordination structure of a supply chain is elements. The framework chosen for this study captures jointly determined by its decision rights structure the forecasting, optimization and simulation aspects of (whether the plant or the distributors decide what to the supply chain. One must also classify the coordina- produce and when) and its information structure (local tion structure by some quantifiable parameters. The knowledge of promotions, distributor’s stock visibility, rest of the paper explains these in detail and also etc.). The coordination structures can be classified in presents the results obtained from the study so far. the following categories. Industrial data has been used to obtain results and draw conclusions to be sure that realistic assumptions 3.1. Centralized control have been made about supply chain behavior. The quantities to be supplied to each market are centrally determined. The forecasts for the demands are 2. The model predictive approach based on past sales and recorded data. The forecasts of the promotional part of the demand incorporate infor- Here we present a model predictive approach for mation that is centrally available, and do not include solving this problem. Model predictive planning and local knowledge of promotions. Thus, in a centralized scheduling requires a forecasting model and an opti- control, even though most of the promotional events mization model. Both these models work in tandem in are known, the actual quantity of the promotional a simulation environment that incorporates uncertainty. demand and the exact week of occurrence have a lot of The similarity with the model predictive approach uncertainty. which is widely used in process-control is that in each period, the forecasting model calculates the target in- 3.2. Decentralized control ventory (controlled variable) in the future periods. These inventory levels ensure desired customer service The individual markets place orders with the supply level while minimizing average inventory. The schedul- unit based on local promotional knowledge. Each indi- ing model then tries to achieve these target inventory vidual market is unaware of the capacity constraints in levels in the future periods by scheduling tasks (manip- the factory, as well as, demands placed by the other Output Vorlrble flaqet Inventory) mvu?
  • 3. S. Bose, J.F. Pekny / Computers and Chemical Engineering 24 (2000) 329-335 331 markets. Thus, even though the forecast quantity l Uncertainty in the actual quantity of the promo- of promotional demands is relatively accurate, the tional demand. markets do not provide enough lead-time for l Uncertainty in the actual week of occurrence of the SUPPlY. promotional demand. 3.3. Distributed Control For various values of the above, different forecasts can be generated. With each forecast, a parameter c1 The quantities are determined using both central and can be associated which is defined as the fraction of the local promotional knowledge. There is information total promotional demand that is expected (known). sharing and negotiation among the supply units and Known Prom. Demand individual markets. ’ = Total Prom Demand The parameter CImeasures the overall efficiency of the 4. Forecasting-optimization-simulation framework business processes in the supply chain. This framework is developed to study the supply chain dynamics under uncertainty. Each module of the 5. De-convolution of the demand signal framework is explained below. Please refer to Fig. 2 for the schematic diagram of ‘forecasting-optimization-sim- The following method is used to de-convolute the ulation architecture’ which shows the interaction demand signal into a base demand and promotional among each module of the framework. demand. Since it is not known a priori what the promo- tional demand is and in which of the weeks it appears 4.1. Forecasting module we have to use an iterative (trial and error) method. This involves estimating a base demand. The estimation The forecasting module de-convolutes the demand is done by assuming the base demand to be of the data into a base demand and a promotional demand. following functional form:Base demand = A + Bt + The de-convolution technique is explained in the next C sin(w x t)where A, B, C and w are the estimated sub-section section. The promotional demand consists parameters and t denotes the time (measured in week in of an expected promotional demand (with some uncer- this case). tainty) and an unexpected promotional demand. As- Promotional demand is defined as any demand that suming a reasonable market growth, a weekly demand is in excess of the base demand. Initially, all the sales forecast is generated. This also takes into account the data is assumed to be base demand (i.e. no promotional coordination structure of the supply chain. The coordi- demand). As a first step of the iteration, the base nation structure is captured by the following para- demand parameters are fitted to the total sales. The sale meters: in any given week is then compared with the predicted l How far ahead are these promotional demands base demand. If the actual sales is in excess of the known to the factory. predicted base demand by a certain value (specified by
  • 4. 332 S. Bose, J.F. Pekny /Computers and Chemical Engineering 24 (2000) 329-335 Table 1 Range of values for control parameters Parameters Regimes Low Medium High LT: lead-time for satisfying promotional demand 4 weeks 8 weeks 12 weeks Q: accuracy in the quantity of promotional demands (denoted by mean Qm, and Mean = 1.0; Mean = 1.O; Mean = 1.O; S.D. Qd) S.D. = 0.25 S.D. = 0.25 SD. = 0 X: accuracy in the exact week of occurrence (denoted by mean Xm, and S.D. Xd) +4 weeks +2 weeks *O weeks the user as ‘Promotional Criteria’), then that week is 5.2. Simulation module marked as a promotional week. This is done for all the weeks. Now the base demand estimated again to fit the The simulation module simulates production in the predicted base demand to on& those weeks, which are factory for one week, at a time during which the not marked as promotional. The sale for each week is schedule is frozen. The inventory levels at the market compared with the predicted base demand and the warehouses are updated accounting for the actual de- weeks, which meet the promotional criterion, are mands and allowing time for transportation of stock marked and added to the previous set of promotional keeping units. weeks. This iteration is performed until no more weeks Each of the three modules is invoked for each period can be marked as promotional weeks. of the plan. 5.1. Optimization module 6. Design of simulation runs The optimization module solves a Mixed Integer Linear Program (MILP) to decide on a production In order to study the supply chain dynamics, it is schedule which ensures a target customer service level important to perform simulation runs, which are spe- while minimizing inventory costs at the same time. The cifically designed to address the key issues. The simula- optimization considers a time horizon over which it tion runs should bring out the differences in the various solves. The horizon determines how many weeks of possible organizational and coordination structures of demand information are available to the optimizer. the supply chain. Each run must be classified as either This production schedule is frozen for a single period (a Centralized Control or Decentralized Control or Dis- week, in this case). Since detailed scheduling is a hard tributed Control. problem to solve and the difficulty increases exponen- tially with the problem size, the optimization problem 6.1. Control parameters does detailed scheduling only for the first week and a rough cut capacity planning for the rest of the weeks in There are several control parameters that affect the the horizon. Since only the first week is implemented, performance of the supply chain. They are: the rough cut capacity planning does not pose any 1. How far ahead in the future are the promotional unfeasibility. The optimization module enforces the demands known (i.e. how much lead-time is avail- minimum-run-length- constraint for the tasks. The opti- able to meet the promotional demands). mization module also ensures that the production fre- 2. The accuracy in the actual quantity of the promo- quency of the stock keeping units does not exceed the tional demands. stipulated production frequency as practiced by the 3. The accuracy in the actual week of occurrence of the plant. promotions. Table 2 Relation between control parameters and coordination structure Parameters Type of coordination structure Centralized De-centralized Distributed LT: lead-time for satisfying promotional demand HIGH LOW MEDIUM Q: accuracy in the quantity of promotional demands LOW HIGH MEDIUM X: accuracy in the exact week of occurrence LOW HIGH MEDIUM
  • 5. S. Bose, J.F. Pekny / Computers and Chemical Engineering 24 (2000) 329-335 333 4.2. Centralized All the promotions originate from the supply unit, hence the information about the promotions is avail- able to the supply unit (which decides the demand forecasts in case of centralized coordination) well in advance. This means that lead-time is also high for centralized control. The uncertainty lies in knowing the actual effect of these promotions that are offered by the plant. Since knowledge from the local markets is not available to the factory, the actual orders requested by the markets is substantially different from what the factory forecasts. Hence, the ‘low’ accuracy in the exact quantity as well as the exact occurrence of the promo- tional demands. Furthermore, the individual markets often create unnecessary noise in the supply chain, by excessive hoarding or stock clearance, which reduce the accuracy of promotional demands even more. So, over- all the centralized coordination structure promises Fig. 3. Sensitivity of overall customer service level on the exact week of occurrence of promotional demands. longer lead-times but loses out in the accuracy of forecasting promotional demands. 6.3. De-centralized In case of de-centralized control, the forecasting is primarily based on demand information provided by Theoretically, these parameters can vary over a con- the individual markets. The result is high accuracy in tinuous range of values. To perform any meaningful the forecast quantity of the promotional demand as simulations, we must first set some bounds on these well as the exact week of occurrence. Since the markets parameters and then divide the range between the can see their own stock levels, they place fairly accurate bounds into regimes, such as low, medium and high. orders based on their current stock levels and local Depending upon the coordination in the supply chain, promotional knowledge. But, the down side is that they the parameter values will lie in one of the regimes. do not give enough lead-time for production. When the Table 1 defines the regimes for the parameters. lead-time given is too small, the factory may not be The bounds on the parameters must be substantiated able to accommodate the demand because of capacity by data and observations. From the forecast data avail- limitations. So, overall the de-centralized coordination able, only the accuracy in the quantity of the promo- structure promises high accuracy in predicting promo- tional demands could be verified. The corresponding tional demands but settles for lower lead-times. values from the forecast data were calculated to be 0.98 (mean) and 0.45 (S.D.). The bounds for the other two 6.4. Distributed parameters (LT and X) are based on reasonable esti- mates. In the case of ‘lead-time’, the upper bound of 12 Distributed control is a mix of the centralized and weeks is justified because it is highly unlikely to sched- de-centralized control structures. Obviously, there is ule for more than 12 weeks at a time. Hence, any trade-off between the centralized and de-centralized demands beyond 12 weeks will not be seen by the types of coordination. The distributed control can ei- scheduling-model anyway. It was also observed during ther be highly efficient and have the benefits of both the simulation runs that if the lead-time is reduced to centralized and de-centralized control, or it can repre- less than 4 weeks, or, if the inaccuracy in the exact sent a highly unsynchronized supply chain. The Ideal week of occurrence of promotional demand is more Coordination Structure would be achieved when the than + / -4 weeks, the performance of the supply very best of both worlds (centralized and de-central- chain deteriorates considerably. Hence, these values ized) is integrated. were assumed to be bounds. The medium regime was assumed to be the middle value of the range, since there 6.5. Performance measure is no data to suggest otherwise. The entries in Table 2 are explained below for each Each simulation run is measured by an overall cus- coordination structure. tomer service level achieved and the overall inventory
  • 6. 334 S. Bose, J.F. Pekny /Computers and Chemical Engineering 24 (2000) 329-335 level. Obviously, increasing the inventory safety stock- between 0 and 1. The u values were chosen to be levels result in higher customer service level. The aim 0.2, 0.4, 0.6, 0.8 and 1.0, a total of five values. For is to attain the desired customer service level of 99.7% each value of c1 the 27 combinations calculated above with the minimum possible inventory. were simulated. That is a total of 27 times 5, i.e. 135 combinations. To determine the best possible customer 6.6. Computational effort service level in each run, six trials were made with a different inventory level in each trial. That results The number of simulations increases combinatori- in a total of 135 times 6, i.e. 810 combinations. ally with the number of parameter and combinations Each run takes about 25 min for simulating 52 weeks thereof. There are three control parameters (LT, Q on a Pentium II (400 MHz) processor. The total and x), with three values each, hence, a total of 33 simulation time for all these runs is 20 250 min, which times 3, i.e. 27 combinations. The parameter CI,which is about 14 days worth of computational time. Each was introduced as a lumped parameter for measuring run is dependent on a random number seed, hence the efficiency of business processes, can take any value for the same values of the parameters, several runs should be simulated using a different random seed for each run. It was found that the results of the runs do not vary too much when a different random number seed is used. This is because any peculiarities of a random number are somewhat averaged over 52 weeks. 7. Results There are several interesting results that can be ex- tracted from the simulation runs. Although there are many results and figures obtained from this study, only the important ones are being discussed below. 7.1. Sensitivity analysis of control parameters Sensitivity of overall customer service level on the exact week of occurrence of promotional demands. This is obtained by varying the parameter X and Fig. 4. Sensitivity of overall customer service level on the exact keeping all the other parameters constant. Lead-time quantity of promotional demands. is fixed at 8 weeks and CIis set to 0.8. Refer to Fig. 3. Sensitivity of overall customer service level on the exact quantity of promotional demands. This is ob- tained by varying the parameter Q and keeping all the other parameters constant. Lead-time is fixed at 8 weeks and a is set to 0.8. Refer to Fig. 4. Sensitivity of overall customer service level on lead- time. This is obtained by varying lead-time and keeping all other parameters constant. The uncer- tainties in the exact week of occurrence and the exact quantity of promotional demands are both set to 0, while CIis fixed at 0.8. Refer to Fig. 5. Sensitivity of overall customer service level on tl. This is obtained by varying the tl and keeping all the other parameters constant. The other parameters are I3 kept constant so that they represent a particular 1rlhW coordination structure. Fig. 6 shows the case of Fig. 5. Sensitivity of overall customer service level on lead-time. de-centralized coordination structure.
  • 7. S. Bose, J.F. Pekny / Computers and Chemical Engineering 24 (2000) 329-335 335 By comparing results for same tl and same inventory level, it is observed that medium uncertainties in the occurrence and quantity of promotional demands have about the same effect. But, high uncertainty in occurrence is more harmful to the performance than high uncertainty in quantity of promotional de- mands. Although the sensitivity of performance on lead- time cannot be compared with any other parameter, it is observed that there is a steady increase in customer service level as the lead-time increases. This suggests more simulation runs with still higher lead-times to observe the point at which the gain in service level tapers off. The dependence of customer service level on inven- tory level in the system is very high. This result was Fig. 6. Sensitivity of overall customer service level on CI. rather intuitive. The interesting fact, however, is the gradient of the dependence. The gradient is very high at lower inventory levels and changes to almost zero gradient at higher inventory levels. This sug- gests that keeping the average inventory level at about 120- 150 tons gives the best performance. This target inventory level is about 20% higher than the current practice of inventory coverage. It is also observed that the service level drops slightly when target inventory levels are very high. This is not immediately intuitive. The reason is that pushing the plant to maintain higher inventory levels unneces- sary bottlenecks in many of the weeks during the 52-week simulation, Hence, some products, which have an immediate demand, are not produced in Fig. 7. Effect of various coordination structures. those weeks, since the plant is busy producing other products to maintain their high target inventories. This may seem more like a problem with the 7.2. Effect of coordination structure on overall scheduling, but most scheduling models minimize customer service level the deviation of inventory levels from the target inventory levels. This is the most important set of results derived from The dependence of customer service level on CI is this study. They are obtained by varying the coordi- also very strong. A is a lumped parameter, which nation structure and keeping CI constant. As de- reflects the efficiency of business processes in the scribed before, the coordination structures fix the supply chain. A can be improved by better commu- regimes of the control parameters (LT, Q and x). nications between the marketing and production Fig. 7 shows the effect of various coordination struc- units, and, better knowledge of local information at tures for c( = 0.8. the markets. Perhaps the most important result can be drawn from Fig. 5. This figure clearly demarcates the re- Conclusions gions where different control structures are recom- mended. For example, if we assume that the current One of the objectives of this study was to determine status of the supply chain is CI 0.8 and average = which of the parameters is important. This can be inventory level = 115-125 tons, then we can con- deduced from the sensitivity analysis shown in the clude that the centralized coordination structure is results. We summarize the conclusions below. recommended.