This document provides guidance on developing employee performance plans that align individual performance with organizational goals. It outlines an eight-step process for performance managers to determine work unit and individual accomplishments, write performance elements and standards, and develop measures and monitoring approaches. The goal is to create performance plans that meet regulatory requirements while focusing employee efforts on achieving organizational objectives.
3. Foreword
This handbook is designed for Federal supervi- C Chapter 1 gives the background and context
sors and employees and presents an of performance management that you will
eight-step process for developing employee need to understand before beginning the
performance plans that are aligned with and eight-step process;
support organizational goals. It also provides C Chapter 2 defines accomplishments— which
guidelines for writing performance elements and is key to using this handbook successfully;
standards that not only meet regulatory require- C Chapter 3 includes a detailed description of
ments, but also maximize the capability that the eight-step process for developing em-
performance plans have for focusing employee ployee performance plans that are aligned
efforts on achieving organizational and group with and support organizational goals.
goals. C Chapter 4 provides study tools, including a
followup quiz and a quick reference for the
The methods presented here are designed to eight-step process.
develop elements and standards that measure C The appendices contain standards intended
employee and work unit accomplishments to serve as illustrations of standards written
rather than to develop other measures that are for appraisal programs that appraise perfor-
often used in appraising performance, such as mance on elements at five, three, and two
measuring behaviors or competencies. levels.
Although this handbook includes a discussion of
the importance of balancing measures, the main After reading the instructional material, studying
focus presented here is to measure accomplish- the examples, and completing the exercises in
ments. Consequently, much of the information this book, you should be able to:
presented in the first five steps of this eight-step C develop a performance plan that aligns indi-
process applies when supervisors and employ- vidual performance to organizational goals;
ees want to measure results. However, the C use a variety of methods to determine work
material presented in Steps 6 through 8—about unit and individual accomplishments;
developing standards, monitoring performance, C determine the difference between activities
and checking the performance plan—apply to and accomplishments; and
all measurement approaches. C explain regulatory requirements for
employee performance plans.
The handbook has four chapters and
appendices:
A Handbook for Measuring Employee Performance 1
4. This page left blank.
2 Performance Management Practitioner Series
5. Chapter 1
Performance Management:
Background and Context
Remember the story about the naive student Performance management is the systematic pro-
in his first English literature course who was cess of:
worried because he didn’t know what prose
was? When he found out that prose was • planning work and setting expectations,
ordinary speech, he exclaimed, “Wow! I’ve C continually monitoring performance,
been speaking prose all my life!” • developing the capacity to perform,
• periodically rating performance in a
Managing performance well is like speaking summary fashion, and
prose. Many managers have been “speaking”
• rewarding good performance.
and practicing effective performance manage-
ment naturally all their supervisory lives, but
The revisions made in 1995 to the Govern-
don’t know it!
mentwide performance appraisal and awards
regulations support “natural” performance man-
Some people mistakenly assume that perfor-
agement. Great care was taken to ensure that
mance management is concerned only with fol-
the requirements those regulations establish
lowing regulatory requirements to appraise and
would complement and not conflict with the
rate performance. Actually, assigning ratings of
kinds of activities and actions effective managers
record is only one part of the overall process
are practicing as a matter of course.
(and perhaps the least important part).
Performance Management’s Five Key Components
A Handbook for Measuring Employee Performance 3
6. Performance Management: Background and Context
Planning. In an effective organization, work atic standards. By monitoring continually, su-
is planned out in advance. Planning means pervisors can identify unacceptable performance
setting performance expectations and goals for at any time during the appraisal period and pro-
groups and individuals to channel their efforts vide assistance to address such performance
toward achieving organizational objectives. rather than wait until the end of the period when
Getting employees involved in the planning pro- summary rating levels are assigned.
cess will help them understand the goals of the
organization, what needs to be done, why it Developing. In an effective organization,
needs to be done, and how well it should be employee developmental needs are evaluated
done. and addressed. Developing in this instance
means increasing the capacity to perform
The regulatory requirements for planning employ- through training, giving assignments that intro-
ees’ performance include establishing the ele- duce new skills or higher levels of responsibility,
ments and standards of their performance ap- improving work processes, or other methods.
praisal plans. Performance elements and stan- Providing employees with training and devel-
dards should be measurable, understandable, opmental opportunities encourages good per-
verifiable, equitable, and achievable. Through formance, strengthens job-related skills and
critical elements, employees are held account- competencies, and helps employees keep up
able as individuals for work assignments or with changes in the workplace, such as the in-
responsibilities. Employee performance plans troduction of new technology.
should be flexible so that they can be adjusted
for changing program objectives and work Carrying out the processes of performance
requirements. When used effectively, these management provides an excellent opportunity
plans can be beneficial working documents that for supervisors and employees to identify devel-
are discussed often, and not merely paperwork opmental needs. While planning and monitoring
that is filed in a drawer and seen only when work, deficiencies in performance become evi-
ratings of record are required. dent and should be addressed. Areas for
improving good performance also stand out,
Monitoring. In an effective organization, and action can be taken to help successful
assignments and projects are monitored contin- employees improve even further.
ually. Monitoring well means consistently meas-
uring performance and providing ongoing feed- Rating. From time to time, organizations find
back to employees and work groups on their it useful to summarize employee performance.
progress toward reaching their goals. This helps with comparing performance over
time or across a set of employees.
Regulatory requirements for monitoring perfor- Organizations need to know who their best
mance include conducting progress performers are.
reviews with employees where their perfor-
mance is compared against their elements and Within the context of formal performance ap-
standards. Ongoing monitoring provides the praisal requirements, rating means evaluating
supervisor the opportunity to check how well employee or group performance against the
employees are meeting predetermined standards elements and standards in an employee’s
and to make changes to unrealistic or problem- performance plan and assigning a summary rat-
4 Performance Management Practitioner Series
7. Performance Management: Background and Context
ing of record. The rating of record is assigned dards, but they also take care to develop the
according to procedures included in the organiza- skills needed to reach them. They also use for-
tion’s appraisal program. It is based on work mal and informal rewards to recognize the be-
performed during an entire appraisal period. havior and results that accomplish their mission.
The rating of record has a bearing on various All five components working together and sup-
other personnel actions, such as granting within- porting each other achieve natural, effective
grade pay increases and determining additional performance management.
retention service credit in a reduction in force.
Employee Performance Plans
Rewarding. In an effective organization,
rewards are used well. Rewarding means rec- Employees must know what they need to do to
ognizing employees, individually and as mem- perform their jobs successfully. Expectations
bers of groups, for their performance and for employee performance are established in
acknowledging their contributions to the agen- employee performance plans. Employee per-
cy’s mission. A basic principle of effective formance plans are all of the written, or other-
management is that all behavior is controlled by wise recorded, performance elements that set
its consequences. Those consequences can
and should be both formal and informal and
both positive and negative. A Note About Performance Plans:
This handbook is about developing employee
Good managers don’t wait for their organi- performance plans. However, there is
zation to solicit nominations for formal another type of performance plan that you
awards before recognizing good perfor- need to be aware of. The Government Per-
mance. Recognition is an ongoing, natural formance and Results Act of 1993 requires
part of day-to-day experience. A lot of the each agency to prepare an annual perfor-
actions that reward good performance—like mance plan covering each program activity set
saying “Thank you”—don’t require a spe- forth in its budget. These organizational per-
cific regulatory authority. Nonetheless, formance plans:
awards regulations provide a broad range of C establish program-level performance goals
forms that more formal rewards can take, that are objective, quantifiable, and mea-
such as cash, time off, and many recognition surable;
items. The regulations also cover a variety C describe the operational resources needed
of contributions that can be rewarded, from to meet those goals; and
suggestions to group accomplishments. C establish performance indicators to be used
in measuring the outcomes of each pro-
Performance Management as gram.
Prose. Good managers have been speak-
ing and practicing effective performance We will be using organizational performance
management all their lives, executing each plans during Step 1 of the eight-step process
key component process well. They not only presented in this handbook. Organizational
set goals and plan work routinely, they mea- performance plans are key in the process of
sure progress toward those goals and give aligning employee performance with organi-
feedback to employees. They set high stan- zational goals.
A Handbook for Measuring Employee Performance 5
8. Performance Management: Background and Context
forth expected performance. A plan must elements, which can result in the employee’s
include all critical and non-critical elements and reassignment, removal, or reduction in grade.
their performance standards. Consequently, critical elements must describe
work assignments and responsibilities that are
Performance elements tell employees what they within the employee’s control. For most
have to do and standards tell them how well employees this means that critical elements can-
they have to do it. Developing elements and not describe a group’s performance. How-
standards that are understandable, measurable, ever, a supervisor or manager can and should
attainable, fair, and challenging is vital to the be held accountable for seeing that results mea-
effectiveness of the performance appraisal pro- sured at the group or team level are achieved.
cess and is what this handbook is all about. Critical elements assessing group performance
may be appropriate to include in the perfor-
Federal regulations define three types of ele- mance plan of a supervisor, manager, or team
ments: critical elements, non-critical elements, leader who can reasonably be expected to
and additional performance elements. Agency command the production and resources neces-
appraisal programs are required to use critical sary to achieve the results (i.e., be held individu-
elements (although the agency may choose to ally accountable).
call them something else), but the other two
types can be used at the agency’s option. Non-critical Elements. A non-critical
Before continuing further with this handbook, element is a dimension or aspect of individual,
you should contact your human resources office team, or organizational performance, exclusive
to determine the types of elements your of a critical element, that is used in assigning a
appraisal program allows. summary level. Important aspects of non-criti-
cal elements include:
Critical Elements. A critical element is an
assignment or responsibility of such importance
that unacceptable performance in that element A Note about Group or Team
would result in a determination that the employ- Performance: The term “group or
ee’s overall performance is unacceptable. Reg- team performance” can be confusing
ulations require that each employee have at least sometimes. When we say that critical ele-
one critical element in his or her performance ments cannot describe group performance,
plan. Even though no maximum number is we are saying that the group’s perfor-
placed on the number of critical elements possi- mance as a whole cannot be used as a crit-
ble, most experts in the field of performance ical element. This does not preclude de-
management agree that between three and scribing an individual’s contribution to the
seven critical elements are appropriate for most group as a critical element. The key to
work situations. distinguishing between group performance
and an individual’s contribution to the
Critical elements are the cornerstone of individ- group is that group performance is mea-
ual accountability in employee performance sured at an aggregate level, not for a single
management. Unacceptable performance is employee. An individual’s contribution to
defined in section 4301(3) of title 5, United the group is measured at the individual em-
States Code, as failure on one or more critical ployee level.
6 Performance Management Practitioner Series
9. Performance Management: Background and Context
how an appraisal program is designed, this
No Performance-based Actions. Failure on a need not be the case. Even though consider-
non-critical element cannot be used as the basis ation of non-critical elements cannot result in
for a performance-based adverse action, such assigning an Unacceptable summary level,
as a demotion or removal. Only critical ele- appraisal programs can be designed so that
ments may be used that way. Moreover, if an non-critical elements have as much weight or
employee fails on a non-critical element, the more weight than critical elements in deter-
employee’s performance cannot be summarized mining summary levels above Unacceptable.
as Unacceptable overall based on that failure. NOTE: Before you can use non-critical elements
in employee performance plans, you must deter-
C Group Performance. Non-critical mine if your appraisal program allows them.
elements are the only way an agency can
include the group’s or the team’s perfor- Additional Performance Elements. An
mance as an element in the performance plan additional performance element is a dimension
so that it counts in the summary level. For or aspect of individual, team, or organizational
example, team-structured organizations might performance that is not a critical element and is
use a non-critical element to plan, track, and not used in assigning a summary rating level.
appraise the team on achieving its goals. To The essential difference between a non-critical
do this, each team member’s performance element and an additional performance element
plan would include the “team” element (i.e., a is that non-critical elements do affect the sum-
non-critical element) and the rating for the mary level. Otherwise, the features and limita-
team on that element would be counted in the tions of non-critical elements discussed above
summary level of each team member. also apply to additional performance elements.
Opportunities for using additional performance
C When They Can’t Be Used. Non-critical elements include:
elements cannot be used in appraisal pro-
grams that use only two levels to summarize C New Work Assignment. Managers and
performance in the rating of record. This is employees may want to establish goals, track
because they would have no effect on the and measure performance, and develop
summary rating level and, by definition, they skills for an aspect of work that they do not
must affect the summary level. (That is, in a believe should count in the summary level.
two-level program, failure on non-critical ele- For example, if an employee volunteered to
ments cannot bring the summary level down work on a new project that
to Unacceptable, and assessments of non- requires new skills, an additional performance
critical elements cannot raise the summary element describing the new assignment pro-
level to Fully Successful if a critical element vides a non-threatening vehicle for planning,
is failed.) measuring, and giving feedback on the
employee’s performance without counting it in
C Can Greatly Affect the Summary Level. the summary level.
Sometimes the word “non-critical” is interpre-
ted to mean “not as important.” Prior to C Group Performance. In a two-level
1995, this interpretation was prescribed by appraisal program, additional performance
regulation. Now, however, depending on elements are the only way to include a discus-
A Handbook for Measuring Employee Performance 7
10. Performance Management: Background and Context
sion of group performance in the appraisal Additional performance elements were intro-
process. Even though the element assessment duced in the September 1995 performance
does not count when determining the sum- appraisal regulations and have not been used
mary level, managers and employees could widely, yet. We foresee their popularity ris-ing
use it to manage the group’s performance. as agencies discover the possibilities they pres-
ent for managing performance.
C Awards. Additional performance elements
can be used to establish criteria for determin- NOTE: Check the rules of your program before
ing awards eligibility, especially in a two-level including additional performance elements in
program that no longer bases awards solely your plans.
on a summary level.
Element Characteristics
Required in
Employee Credited in the Can Describe
Performance Summary a Group’s
Plans Level Performance
Critical
yes yes no*
Elements
Non-critical
no yes yes
Elements
Additional
Performance no no yes
Elements
*except when written for a
supervisor or manager who has
individual management control
over a group’s production and
resources.
8 Performance Management Practitioner Series
11. Performance Management: Background and Context
Know your program constraints U
Again, it is important to stress that before you continue with
this handbook, you need to find out the rules established by
your appraisal program; specifically, you will need to know:
C which kinds of elements your program allows you to use;
C at how many levels your program appraises employee perfor-
mance on elements;
C how many summary levels your program uses;
C if your program allows weighting of elements (see Step 4) ; and
• whether the program requires specific elements and/or uses
generic standards.
Before continuing:
This handbook uses an organization within OPM—the Support Branch in the
Adjudication Division of the Office of Retirement Programs—as an illustration for
developing measures at the group and individual level. To be able to understand
and work through the illustration, you need to know the features of the Support
Branch’s appraisal program (i.e., the same features listed above). The Support
Branch’s appraisal program:
C uses critical, non-critical, and additional performance elements;
C appraises employee performance on elements at five levels: Unacceptable,
Minimally Successful, Fully Successful, Exceeds Fully Successful, and
Outstanding;
C uses five summary levels, which are the same as the elements’ five levels listed
above;
C allows elements to be weighted according to importance to the organization;
and
C requires no specific or generic elements.
A Handbook for Measuring Employee Performance 9
12. This page left blank.
10 Performance Management Practitioner Series
13. Chapter 2
Distinguishing Activities from
Accomplishments
Chapter 2 discusses what may be the most important concept in this handbook: the
difference between measuring activities and measuring accomplishments. The following
story illustrates this concept.
The Fable of the Beekeepers
and Their Bees
Once upon a time, approach communicated to each bee the goal of
there were two the hive—to produce more honey. The bee-
beekeepers who each keeper and his bees measured two aspects of
had a beehive. The beekeepers worked for a their performance: the amount of nectar each
company called Bees, Inc. The company’s bee brought back to the hive and the amount of
customers loved its honey and wanted the busi- honey the hive produced. The performance of
ness to produce more honey than it had the each bee and the hive’s overall performance
previous year. As a result, each beekeeper was were charted and posted on the hive’s bulletin
told to produce more honey at the same quality. board for all bees to see. The beekeeper cre-
With different ideas about how to do this, the ated a few awards for the bees that gathered the
beekeepers designed different approaches to most nectar, but he also established a hive
improve the performance of their hives. incentive program that rewarded each bee in the
hive based on the hive’s production of
The first beekeeper established a bee perfor- honey—the more honey produced the more
mance management approach that measured recognition each bee would receive.
how many flowers each bee visited. At consid-
erable cost to the beekeeper, an extensive mea- At the end of the season, the beekeepers evalu-
surement system was created to count the flow- ated their approaches. The first beekeeper
ers each bee visited. The beekeeper provided found that his hive had indeed increased the
feedback to each bee at midseason on his indi- number of flowers visited, but the amount of
vidual performance, but the bees were never honey produced by the hive had dropped. The
told about the hive’s goal to produce more Queen Bee reported that because the bees
honey so that the company could increase were so busy trying to visit as many flowers as
honey sales. The beekeeper created special possible, they limited the amount of nectar they
awards for the bees who visited the most flow- would carry so they could fly faster. Also, be-
ers. cause the bees felt they were competing against
each other for awards (since only the top per-
The second beekeeper also established a bee formers were recognized) they would not share
performance management approach, but this valuable information with each other (like the
A Handbook for Measuring Employee Performance 11
14. Distinguishing Activities from Accomplishments
location of the flower-filled fields they’d spotted bees worked together to determine the highest
on the way back to the hive) that could have nectar-yielding flowers and to create quicker
helped improve the performance of all the bees. processes for depositing the nectar they’d gath-
(After all was said and done, one of the high- ered. They also worked together to help
performing bees told the beekeeper that if he’d increase the amount of nectar gathered by the
been told that the real goal was to make more poor performers. The Queen Bee of this hive
honey rather than to visit more flowers, he reported that the poor performers either
would have done his work completely differ- improved their performance or transferred to
ently.) As the beekeeper handed out the the other hive. Because the hive had reached its
awards to individual bees, unhappy buzzing was goal, the beekeeper awarded each bee his por-
heard in the background.
tion of the hive incentive payment. The bee-
keeper was also surprised to hear a loud, happy
The second beekeeper, however, had very
buzz and a jubilant flapping of wings as he
different results. Because each bee in his hive
rewarded the individual high-performing bees
was focused on the hive’s goal of producing
more honey, the bees had concentrated their with special recognition.
efforts on gathering more nectar in order to
produce more honey than ever before. The The moral of this story is:
Measuring and recognizing accomplish-
ments rather than activities—and giving
feedback to the worker bees—often
improves the results of the hive.
12 Performance Management Practitioner Series
15. Distinguishing Activities from Accomplishments
Although it somewhat simplifies performance C file documents;
management, the beekeepers’ story illustrates C develop software programs;
the importance of measuring and recognizing C answer customer questions; and
accomplishments (the amount of honey produc-
C write reports.
tion per hive) rather than activities (visiting flow-
ers). This handbook is designed to help you
develop elements and standards that center Accomplishments (or outputs) are the
around accomplishments, not activities. products or services (the results) of employee
The chart below depicts the type of measure- and work unit activities and are generally
ment that should occur at each organizational described using nouns. The examples of out-
level and includes measurements used by the puts used in the fable include the amount of
beekeepers. nectar each bee collected and the honey
production for the hive. Other examples
Activities are the actions taken to produce include:
results and are generally described using verbs. C files that are orderly and complete;
In the beekeeper fable, the activity being mea- C a software program that works;
sured was visiting flowers. Other examples of C accurate guidance to customers; and
activities include: C a report that is complete and accurate.
A Handbook for Measuring Employee Performance 13
16. Distinguishing Activities from Accomplishments
Outcomes are the final results of an agency’s Note on the performance pyramid shown on the
products and services (and other outside factors previous page that accomplishments can be
that may affect performance). The example of measured at two levels in the organization—the
an outcome used in the beekeeper story was employee level and the work unit level.
increased sales of honey for Bees, Inc. Other Employee accomplishments can be included in
examples of outcomes could include: employee performance plans using all three
C reduce the number of transportation-related types of performance elements. Work unit
deaths; accomplishments also can be included in the
C improved fish hatcheries; appraisal process—through non-critical ele-
C a decrease in the rate of teenage alcoholism; ments if the agency desires to have work unit
and performance affect ratings (and only if the
C clean air. appraisal program uses more than two summary
levels) or through additional performance
elements if work unit performance is not to af-
A Note about Federal Efforts to fect ratings. However they are used in perfor-
Measure Outcomes and Outputs: mance appraisal, work unit as well as employee
Because of the requirements set by the accomplishments can always be recognized
Government Performance and Results Act of through an awards program.
1993 (i.e., the Results Act), Federal agencies
are measuring their organizational outcomes If supervisors, team leaders, and employees
and outputs. The Results Act requires agen- want to develop performance plans that support
cies to have strategic plans, which include the achievement of organizational outcomes,
outcome-related goals and objectives for the they might try the second beekeeper’s approach
major functions and operations of the agency. of sharing organizational goals with the hive,
Those outcome goals must be objective, measuring and rewarding accomplishments
quantifiable, and measurable. The Results Act rather than activities, and providing feedback on
also requires agencies to develop annual per- performance.
formance plans that cover each one of their
programs. Performance plans must include
performance goals, which define the annual,
often incremental, progress in achieving the
outcome goals in the strategic plan. Perfor-
mance goals are often output oriented since
they address single-year performance. We
will talk about strategic plans with their out-
come goals, and performance plans with their
output goals, much more in Chapter 3.
14 Performance Management Practitioner Series
17. Distinguishing Activities from Accomplishments
A Balanced Measuring System
This handbook focuses on measuring accomplishments at the
work unit and employee levels. There may be situations,
however, when activities, behaviors, or processes may be
important to include in an employee’s performance plan. This
handbook does not focus on how to develop those kinds of
measures. However, we would be remiss not to include a
discussion about the importance of balancing measures in your
measurement system. Therefore, a short description of the
balanced scorecard approach to measuring performance
follows.
Using a Balanced Scorecard Approach to
Measure Performance
Traditionally, many agencies have measured plex task of flying an airplane, pilots need de-
their organizational performance by focusing on tailed information about fuel, air speed, altitude,
internal or process performance, looking at bearing, and other indicators that summarize the
factors such as the number of full-time equiv- current and predicted environment. Reliance on
alents (FTE) allotted, the number of programs one instrument can be fatal. Similarly, the com-
controlled by the agency, or the size of the bud- plexity of managing an organization requires that
get for the fiscal year. In contrast, private sec- managers be able to view performance in sev-
tor businesses usually focus on the financial eral areas simultaneously. A balanced score-
measures of their bottom line: return-on-invest- card—or a balanced set of measures— pro-
ment, market share, and earnings-per-share. vides that valuable information.
Alone, neither of these approaches provides
the full perspective on an organization’s perfor- Four Perspectives. Kaplan and Norton
mance that a manager needs to manage effec- recommend that managers gather information
tively. But by balancing internal and process from four important perspectives:
measures with results and financial measures,
managers will have a more complete picture and C The customer’s perspective. Managers
will know where to make improvements. must know if their organization is satisfying
customer needs. They must determine the
Balancing Measures. Robert S. Kaplan answer to the question: How do customers
and David P. Norton have developed a set of see us?
measures that they refer to as “a balanced
scorecard.” These measures give top managers C The internal business perspective.
a fast but comprehensive view of the organiza- Managers need to focus on those critical
tion’s performance and include both process internal operations that enable them to sat-
and results measures. Kaplan and Norton com- isfy customer needs. They must answer the
pare the balanced scorecard to the dials and question: What must we excel at?
indicators in an airplane cockpit. For the com-
A Handbook for Measuring Employee Performance 15
18. Distinguishing Activities from Accomplishments
C The innovation and learning perspec- appraisal is an effective way of getting a com-
tive. An organization’s ability to innovate, plete look at an employee’s work performance,
improve, and learn ties directly to its value not just a partial view. Too often, employee
as an organization. Managers must answer performance plans with their elements and stan-
the question: Can we continue to create dards measure behaviors,
and improve the value of our services? actions, or processes without also measuring the
results of employees’ work. By measuring only
C The financial perspective. In the private behaviors or actions in employee performance
sector, these measures have typically fo- plans, an organization might find that most of its
cused on profit and market share. For the employees are appraised as Outstanding when
public sector, financial measures could the organization as a whole has failed to meet its
include the results-oriented measures objectives.
required by the Government Performance
and Results Act of 1993 (i.e., the Results By using balanced measures at the organiza-
Act). Managers must answer the question: tional level, and by sharing the results with
How do we look to Congress, the Presi- supervisors, teams, and employees, managers
dent, and other stakeholders? are providing the information needed to align
employee performance plans with organizational
Tie-In to Employee Performance. The goals. By balancing the measures used in
balanced scorecard philosophy need not employee performance plans, the performance
apply only at the organizational level. A bal- picture becomes complete.
anced approach to employee performance
A Word About Categories of Work
Sometimes performance plans describe ele- C customer service (greets customers with a
ments using categories of work. Categories are smile, answers the phone promptly);
classifications of work types often used to orga- C teamwork (cooperates with others, shares
nize performance elements and standards. If, information);
for example, the first beekeeper in our fable had C communications (writes well, gives presen-
used categories of work for his elements, he tations); and
might have used the broad category of “making C office duties (files papers, types reports).
honey” as the element and then included a
grouping that described all the activities the bees This handbook does NOT explain
did to make the honey, such as gather nectar, how to describe and measure cate-
report to the drones, etc. Other examples of gories of work. Here you are
categories of work and the types of activities
that are often described under these categories
asked to concentrate on measuring
include: accomplishments.
16 Performance Management Practitioner Series
19. Distinguishing Activities from Accomplishments
Exercise:
It is time to check your understanding of the differences among activities, accomplish-
ments, and categories. Please check the column that best describes each item.
Accomplishment Activity Category
Trains employees
Supervision
A completed case
Public relations
Recommendations
Customer service
HR policy interpretations
Writes agency policy
Solutions to problems
Develops software programs
Ideas and innovations
Files paperwork
Writes memos
Computer systems that work
Teamwork
A completed project
Satisfied customers
Answers the phone
Assists team members
(The answers are on the next page.)
A Handbook for Measuring Employee Performance 17
20. Distinguishing Activities from Accomplishments
Answers to page 17 Exercise:
Accomplishment Activity Category
Trains employees U
Supervision U
A completed case U
Public relations U
Recommendations U
Customer service U
HR policy interpretations U
Writes agency policy U
Solutions to problems U
Develops software programs U
Ideas and innovations U
Files paperwork U
Writes memos U
Computer systems that work U
Teamwork U
A completed project U
Satisfied customers U
Answers the phone U
Assists team members U
18 Performance Management Practitioner Series
21. Chapter 3
Developing Employee
Performance Plans
You are now going to begin an eight-step pro- and responsibilities in the position description all
cess for developing employee performance begin with a verb. They describe activities,
plans that support organizational goals. Before not accomplishments.
you begin, however, we want to briefly review a
process for developing performance plans that A performance plan for a Federal Retirement
you may have followed in the past but will NOT Benefits Specialist follows on page 21. It was
be learning here. written by copying the simplified position
description from the previous page onto the
Traditionally in some organizations, performance appraisal form. Note that by copying the activi-
plans have been developed by copying the ties from the position description onto the
activities described in an employee’s job appraisal form, the Support Branch has devel-
description onto the appraisal form. This hand- oped a performance plan that only measures
book asks that you NOT begin with the posi- activities, not accomplishments. Also, by
tion description. Even though a performance developing a performance plan without using a
plan must reflect the type of work described in process that links accomplishments to organiza-
the employee’s position description, the perfor- tional goals, the organization has lost the oppor-
mance plan does not have to mirror it. tunity to use the appraisal process to communi-
cate its goals to its employees and to align
The next two pages illustrate what happens employee efforts with its goals.
when you develop a performance plan solely
from a position description. Page 20 is a sim- (Remember that the Support Branch’s appraisal
plified position description for a Federal program appraises employee performance on
Retirement Benefits Specialist within our elements at five levels. The form on page 21
example organization—the Support Branch of shows five possible levels of performance:
the Adjudications Division, Office of Retirement Unsatisfactory (U), Minimally Successful
Programs, Retirement and Insurance Service, (MS), Fully Successful (FS), Exceeds Fully
OPM. Notice how the duties Successful (EFS), and Outstanding(O).)
A Handbook for Measuring Employee Performance 19
22. Developing Employee Performance Plans
Position Description:
Notice how the duties and responsibilities in the position description all begin with a verb.
They describe activities.
Position Description: #JJJ666
Federal Retirement Benefits Specialist, GS-0270-12
Introduction
The incumbent of this position serves as a Senior Federal Retirement Benefits Specialist in the Office of
Retirement Programs (ORP), Retirement and Insurance Service, Office of Personnel Management (OPM).
This is a highly-responsible position in an office accountable for the adjudication of claims for retirement and
insurance benefits arising under the Federal retirement systems administered by OPM.
The work requires the skills of an experienced, fully-trained Federal Retirement Benefits Specialist who is
responsible for the adjudication of a broad range of assigned claims, project work which he or she may lead,
monitoring workloads, and assignments to solve retirement system-related problems.
Major Duties and Responsibilities
C Adjudicate cases of unusual technical difficulty.
C Review and approve recommendations and decisions made by other Specialists, and provide advice and
assistance.
C Respond to inquiries from various customer sources and provide clear, responsive explanations of
actions taken and the bases for them.
C Provide assistance in developing formal lesson plans. Ensures adequate training is offered.
C Serve as task force leader or project coordinator for team-related initiatives in processing retirement
claims, post-retirement actions, and for special activity in response to legislation, etc.
This simplified and edited position description
describes only a few of the major duties of the
GS-12 Federal Retirement Benefits Specialist
position in OPM’s Support Branch in the
Adjudication Division, Office of Retirement
Programs, Retirement and Insurance Service.
Approving Authority Signature: Date:
20 Performance Management Practitioner Series
23. Developing Employee Performance Plans
Performance Plan:
THIS IS NOT THE TYPE OF PERFORMANCE PLAN THAT YOU WILL DEVELOP
IF YOU FOLLOW THE METHOD PRESENTED IN THIS HANDBOOK.
Employee Performance Plan
Name Effective Date
Job Title, Series, and Grade Name of Organization
Federal Retirement Benefits Specialist Office of Retirement Programs
Elements Type Standards Rating
Technical and Policy Expert Critical Fully Successful: 9U
C Adjudicates cases of unusual Cases are usually completed correctly and 9 MS
technical difficulty. in a timely fashion. 9 FS
C Reviews and approves Customer inquiries are routinely addressed 9 EFS
recommendations made by timely. 9O
other Specialists. Provides
advice.
C Responds to customer inqui-
ries.
Training Critical Fully Successful: 9U
C Ensures adequate training is Arranges for or presents high-quality train- 9 MS
offered. ing as needed. Training is specific to 9 FS
C Develops formal lesson plans. employee needs. 9 EFS
9O
Branch ombudsperson Critical Fully Successful: 9U
C Serves as task force leader or As needed, regularly leads work teams to 9 MS
project coordinator. the accomplishment of their assignments. 9 FS
9 EFS
9O
Comments:
This is a fictional employee performance plan constructed for
this handbook. It was developed by using only the simplified
position description of the Federal Retirement Benefits
Specialist position shown on the previous page. It is included
here to represent a typical performance plan that might be
used in appraisal programs. Notice the similarity to the
position description on the previous page. Also notice how the
elements describe work activities, not work
accomplishments.
Appraising Official Signature Employee Signature
A Handbook for Measuring Employee Performance 21
24. Developing Employee Performance Plans
Having reviewed how to develop a performance plan that
focuses only on activities, we will now develop a performance
plan that establishes elements and standards
addressing accomplishments that lead to organizational goal
achievement.
Each step in the eight-step process we present in this hand-
book builds upon the previous step; you cannot skip a step
and end up with good results.
22 Performance Management Practitioner Series
25. Developing Employee Performance Plans
Step 1:
Look at the overall picture.
Instead of beginning at the bottom of the organi- goals are usually more specific and often
zation with the position description to develop more output-oriented than the general out-
employee performance plans, begin the process come goals found in the strategic plan. Since
by looking at your agency’s goals and objec- performance plan goals should be used by
tives. Gather the following information: managers as they direct and oversee how a
program is carried out, these are the goals to
C What are your agency’s general outcome which employee performance plans should be
goals as outlined in its strategic plan? linked.
The Government Performance and Results
Act of 1993 (i.e., the Results Act) requires all C What are your agency’s customer ser-
agencies to develop a strategic plan that vice standards? In September 1993, Presi-
includes objective, quantifiable, and measur- dent Clinton issued Executive Order 12862,
able performance goals. Agencies submitted “Setting Customer Service Standards,” which
their first strategic plans to Congress in Sep- requires each agency to establish customer
tember 1997. You will be referring to your service standards and to measure its perfor-
agency’s strategic plan while creating mance against those standards. In most
employee performance plans. cases, these goals and standards have been
folded into the agency’s strategic plan and
C What are the specific performance goals annual performance plan, but if they have not,
established for your program area as you will need to know what they are.
outlined in your agency’s annual perfor-
mance plan? The Results Act also requires C What performance measures are already
each agency to have an annual performance in place? You should be aware of the mea-
plan that sets out measurable goals that define surement systems that you can access for
what will be accomplished during a fiscal information on performance, including mea-
year. The goals in the annual performance sures used for determining progress towards
plan describe the incremental progress to- achieving Results Act goals and customer
wards achieving the general goals and objec- satisfaction surveys.
tives in the strategic plan. Performance plan
A Handbook for Measuring Employee Performance 23
26. Developing Employee Performance Plans
Example of Organizational Goals
Again, the main example used in this handbook refers to the Federal Retirement Benefits Specialist
position in the Office of Retirement Programs (ORP), Retirement and Insurance Service, of the
Office of Personnel Management (OPM). This position is found in the Support Branch of ORP’s
Adjudication Division and handles a combination of administrative and front-line assignments.
OPM strategic, outcome-oriented goals and two of the Office of Retirement Programs’ perfor-
mance goals established in OPM’s annual performance plan serve as examples of organizational
goals. You will use this information in the next step of our eight-step process.
OPM Strategic Goals:
24 Performance Management Practitioner Series
27. Developing Employee Performance Plans
OPM’s 199X Annual Performance Plan Goals for the
Retirement and Insurance Service (RIS)
RIS Goal #14: Maintain at previous year’s levels, customer satisfaction, processing
times, and accuracy rates pertinent to processing new claims for
annuity and survivor benefits. (Directly linked to OPM’s Goal #4)
Means: (Only two means are presented here.)
C Reduce claims processing error rates by providing increased training in workplace
competencies.
C Continue to streamline work processes when such opportunities occur in order to
reduce claims processing times and improve processing accuracy.
Outcome Indicators:
1. Customers who received their first payment either before or when they expected.
(The goal is to reach 90 percent.)
2. Annuitants who indicate overall satisfaction with the handling of their retirement claims.
(The goal is to reach 95 percent.)
Output Indicators
1. Interim payment processing time (The goal is 4 days.)
2. CSRS annuity processing time (The goal is 35 days.)
3. CSRS annuity claims accuracy (The goal is no more than 4.0 percent errors.)
RIS Goal #15: Maintain at previous year’s levels, customer satisfaction with RIS
teleservices and the timeliness of written responses to inquiries.
(Directly linked to OPM’s Goal #4)
Means: (Only one mean is presented here.)
Improve the accuracy and professional appearance of complex correspondence while
reducing staff effort by developing additional PC-based “smart” letters that can be tailored to
meet different fact patterns, and personalized by retrieving information from selected
databases.
Outcome Indicators:
1. Overall satisfaction with the content and timeliness of written responses. (The goal is
90 percent for each.)
Output Indicators:
1. Percent of priority correspondence answered within 8 days. (The goal is 95 percent.)
2. Percent of regular correspondence answered within 15 days. (The goal is 95 per-
cent.)
A Handbook for Measuring Employee Performance 25
28. Developing Employee Performance Plans
Step 2:
Determine the accomplishments at the work unit
level.
The next step in this eight-step method is to Because not all types of work situations and
determine the accomplishments (i.e., the prod- structures are the same, this handbook offers
ucts or services) of the work unit. Identifying three different ways to determine what to mea-
work unit accomplishments lets you identify sure at the work unit level:
appropriate measures in the following steps of
this process. C a goal cascading method;
A work unit is a small group of employees that, C a customer-focused method; and
in a traditional work structure, is supervised by
the same first-line supervisor. Work units are C a work flow charting method.
generally the smallest organizational group on
the organizational chart and usually include be- You can use one or all three methods, depend-
tween 3 and 15 people. A work unit can also ing on what fits your situation. Whichever you
be a team—permanent or temporary—where use, remember to describe accomplishments
the team members work interdependently (using nouns) rather than activities (using verbs).
towards a common goal.
26 Performance Management Practitioner Series
29. Developing Employee Performance Plans
Method A: Cascade the agency’s goals down to the work unit level.
The goal cascading method works best for C Which agency goal(s) can the work unit
agencies with clear organizational goals and affect? Often, work units may affect only
objectives, such as those established in the stra- one agency goal, but in some situations,
tegic plans and annual performance plans that agency goals are written so broadly that
agencies have prepared under the Government work units may affect more than one.
Performance and Results Act. This method
requires answers to each of the following ques- C What product or service does the work
tions: unit produce or provide to help the
agency reach its goals? Clearly tying work
C What are the agency’s specific goals and unit products and services to organizational
objectives? These can be found in the goals is key to this process. If a work unit
agency’s annual performance plan and cus- finds it generates a product or service that
tomer service standards. (Note that this does not affect organizational goals, the work
question repeats Step 1 of the eight-step unit needs to analyze the situation. It may
process.) decide to eliminate the product or service.
Cascading Agency Goals to Work Units
A Handbook for Measuring Employee Performance 27
30. Developing Employee Performance Plans
Example of Cascading Agency Goals to a Work Unit:
An OPM OPM Goal #4:
Strategic Goal: Deliver high-quality, cost-effective human resources services
9
to Federal agencies, employees, annuitants, and the public.
Some RIS Goal #14: Maintain at previous year’s levels, customer
Retirement and satisfaction, processing times, and accuracy rates pertinent to
Insurance Service (RIS) processing new claims for annuity and survivor benefits.
Annual Performance RIS Goal #15: Maintain at previous year’s levels, customer
Plan Goals that satisfaction with RIS teleservices and the timeliness of written
Cascade from responses to inquiries.
OPM Goal #4:
9
Some a. Continue to streamline work processes when such oppor-
Office of Retirement tunities occur in order to reduce claims processing times
Programs (ORP) and improve processing accuracy (re RIS Goal #14).
Goals: b. Reduce claims processing error rates by providing
9 increased training in workplace competencies (re RIS
Goal #14).
c. Improve the accuracy and professional appearance of
complex correspondence while reducing staff effort by
developing additional PC-based “smart” letters that can be
tailored to meet different fact patterns, and personalized
by retrieving information from selected databases (re RIS
Goal #15).
ORP’s Achieve the following accomplishments:
Adjudication C accurately settled claims (re “a” above);
Division’s C competent, well-trained employees (re “b” above); and
C accurate and professional written correspondence (re “c”
Support above).
Branch
Goals : (Note: The Branch supports Adjudication Division Benefits
Specialists in reviewing and settling retirement cases. Support
is in the form of clerical support, training, consultation, guid-
28 Performance Management Practitioner Series
31. Developing Employee Performance Plans
Exercise on Cascading Goals:
In the space below, begin mapping your agency’s strategic and performance goals and how those
goals cascade or “trickle down” through your organization. Try to show how your work unit’s
products or services link to your agency’s goals. Remember to describe work unit accomplishments
in terms of products or services (i.e., the end result of all the unit’s activities.)
Your Agency’s
Goals:
Your Organization’s
Goals:
Your Work Unit’s
Products or Services:
A Handbook for Measuring Employee Performance 29
32. Developing Employee Performance Plans
Method B: Determine the products and services the work
unit provides for its customers.
The customer-focused method works well when function, most of its customers may be inter-
there are no clear agency goals and when the nal to the agency.
work unit knows who its customers are and C What products and/or services do the
what they expect. Oftentimes, this method is customers expect? Remember to describe
easier to apply to administrative work units that accomplishments, not activities.
provide support functions, such as a human
resources unit, an acquisitions unit, or a facilities One way to approach this method is to build a
maintenance unit. This method focuses on map, as shown below. Place a box representing
achieving customer satisfaction and requires the work unit in the center of a blank piece of
answers to each of the following questions: paper. List the customer groups around the box
and descibe the products or services the cus-
C Who are the customers of the work unit? tomers expect in the blank space between the
If the work unit provides a support work unit and the customer groups.
Focusing on Customer Satisfaction
30 Performance Management Practitioner Series
33. Developing Employee Performance Plans
Example of Identifying Customers and Their Expectations:
The example below diagrams the accomplishments of the Office of Retirement Programs’ Adjudica-
tion Division’s Support Branch from a customer-focused approach. Note that the accomplishments
listed are the RESULTS of the team’s work.
Retiring
Correspondents
First annuity Solutions to
payment Problems,
Information
Support
Training,
Guidance
p
A Handbook for Measuring Employee Performance 31
34. Developing Employee Performance Plans
Exercise for Identifying Customers and Their Expectations:
Use method B—the customer-focused method—to develop the product(s) or service(s) that your
work unit provides. Begin with identifying your work unit’s customers. Next, determine what
product(s) or service(s) your work unit supplies or provides to its customers.
Your
Work Unit
32 Performance Management Practitioner Series
35. Developing Employee Performance Plans
Method C: Develop a work flow chart for the work unit,
establishing key steps in the work process.
The work flow charting method works well for a work process or project. It begins with the
work units that are responsible for a complete first step of the work process, maps out each
work process, such as the processing of a case, successive step, and ends with the final product
the writing of a report, or the production of a or service. To illustrate a simple work flow
customer information package. This method chart, the figure below depicts a work process
asks work units to develop work flow charts. A for building a house.
work flow chart is a picture of the major steps in
Some Key Steps in Building a House
A Handbook for Measuring Employee Performance 33
36. Developing Employee Performance Plans
To help you build your work flow chart, As you map out the process, you may find your-
answer these questions: self describing activities. Try to group the activi-
ties into key steps by describing the results of
C How does the work unit produce its those activities as one step in the process. As an
products or services? List the most basic example, the activities described in the following
steps in the process. For this purpose, you columns are all the activities that a publication
do not need to list all the activities required. team described when it was trying to create a
(If you were analyzing the work to find ways work flow chart for the process of developing a
of improving the process, you would need to newsletter. By grouping the related activities
list every activity.) into the same columns, it was easier for the team
to determine the results of those activities.
C Which are the most important steps in Those results are written at the top of the column
the process? By determining these steps, and became the key steps in the work flow
you highlight areas for performance measure- chart.
ment.
The plan for the The draft version of The edited version The camera-ready
next issue. the articles. of the articles. art mechanical.
--brainstorm ideas --interview contacts --review articles for --crop pictures
errors
--meet to discuss --get contact review --make suggestions --develop the original
ideas and edits of article for improvements graphics
--research various --get pictures or --make necessary --create layout
resources for ideas graphics, if used changes boards
--get management --write article --consider the overall --format issue
approval of proposed effect of the
plan entire issue
Plan for Draft Edited Art
Next Issue ¾ Articles ¾ Articles ¾ Mechanical
34 Performance Management Practitioner Series
37. Developing Employee Performance Plans
Another Example of Work Flow Charting:
This example of the results of method C—which focuses on the work flow and the key steps in the
work process—uses a work flow chart developed by the Office of Retirement Programs. The work
flow chart below maps the key steps in processing retirement claims. Notice that the steps are
described as products. In other words, all the activities to complete the steps are not listed
individually but have been grouped and described as products. These key steps are good candi-
dates for measurement.
Nondisability Annuity
û
Case Received Computation
ü
An authorized
1st annuity An updated
payment annuity roll
û
for master record
Treasury to
disperse
ü
A completed and
filed case
A Handbook for Measuring Employee Performance 35
38. Developing Employee Performance Plans
Exercise on Work Flow Charting:
Select a product or service that your work unit provides. As best you can, map out the work
process your unit uses. Focus on the major categories or steps of the work. You may need to first
list the smaller steps of the work and then group them into sub-products. Remember to describe
products and services when you can, not activities.
36 Performance Management Practitioner Series
39. Developing Employee Performance Plans
Step 3:
Determine individual accomplishments
that support work unit goals.
The performance elements that will be measured must produce to support the unit’s
in the overall employee performance plan can accomplishments. To build the matrix, list the
include both individual and group assignments work unit’s products or services across the top
and responsibilities. The most important, row of a table. List each member of the work
results-oriented aspects of a unit’s performance unit or each job position down the left column of
(which are its products or services) were identi- the matrix. For each cell of the table, ask this
fied in Step 2. (Other types of processes that question: What must this unit member produce
work units may want to measure and include as or perform (i.e., accomplish) in order to support
elements in their plans—but which are not prod- this particular work unit product or service? List
ucts or services and would not be identified those employee products or services (i.e.,
through Step 2— include internal group dynam- accomplishments) in the appropriate cell. The
ics processes, such as decision-making or products or service you list for each unit member
problem solving processes, or group/team are possible performance elements that might be
development.) included in the employee’s performance plan.
All performance elements should be either
Elements that address individual accomplish- quantifiable or verifiable and should be
ments can be identified using a role-results described as accomplishments (nouns), not
matrix. A role-results matrix is simply a table activities (verbs).
that identifies the results each work unit member
A Role-Results Matrix
Unit Unit Product Unit Product Unit Product Unit Product
Employees or Service or Service or Service or Service
Employee 1 Accomplishment Accomplishment Accomplishment Accomplishment
Employee 2 Accomplishment Accomplishment Accomplishment *N/A
Employee 3 Accomplishment *N/A Accomplishment Accomplishment
Employee 4 *N/A Accomplishment Accomplishment Accomplishment
*The employee had no part in this work unit product or service.
A Handbook for Measuring Employee Performance 37
40. Developing Employee Performance Plans
Example
An example of a role-results matrix is shown the work unit level or the individual level that you
below. It was built for a work team that pro- may not be able to measure (i.e, the effect a
duces a bimonthly policy newsletter. The team human resources program has on organizational
has five members: the editor, three writers, and performance) or over which the unit or the
a graphic artist. The final product or output is employee has no control (i.e., a portion of the
the newsletter. (The expected outcome is better product must be completed by someone outside
educated Federal employees.) The team cre- the work unit). Also, certain aspects of perfor-
ated a work flow chart, which identified four key mance may cost too much to measure or the
steps in the work process. The team then used agency may not have the resources to measure
these key steps to build the matrix and will use it them. You should not include these aspects of
to develop performance elements. performance as elements in the performance
plan but they are still legitimate parts of the role-
Note that the main steps of the work process results matrix.
are laid out along the top of the matrix. The
team members are listed down the left hand A role-results matrix is a valuable management
column. Accomplishments are listed for each tool. When supervisors involve employees in the
team member. Also, note that not all members process of completing the matrix, everyone’s
have assignments or responsibilities for every role in the work unit is very clear, which is
team accomplishment. (This often will occur in important to the successful performance of the
cross-functional work units that include a variety group. The whole process of determining work
of different job series.) unit products and services, and then completing
a role-results matrix, is a beneficial team-building
When building a role-results matrix, you may exercise.
identify certain aspects of performance at either
A Role-Results Matrix for a Newsletter Team:
Team Accomplishments±
The draft The edited The
Team The plan for the version of version of the camera-ready
Members next issue the articles articles mechanical
Editor Topics to be cov- Articles that have
ered been edited
Writer A Recommendations A draft
for articles article(s)
Writer B Recommendations A draft
for articles article(s)
Writer C Recommendations A draft
for articles article(s)
Graphic Recommendations A completed
Artist for layout mechanical
38 Performance Management Practitioner Series
41. Developing Employee Performance Plans
Another Example of a Role-Results Matrix:
The example below uses the data gathered the top of the matrix. Employees are listed
for the Office of Retirement Programs’ down the left side of the matrix. Work accom-
Adjudication Division Support Branch plishments are included in each cell. Notice that
using the cascading method as described on the work responsibilities are described (in ital-
pages 27-28. Note that the products or ser- ics) as accomplishments (i.e., products or ser-
vices (i.e., the accomplishments) identified vices) rather than activities or behaviors.
through the process of Step 2 are shown along
Role-Results Matrix for ORP’s Adjudication Division Support Branch
Employees Work Unit Products or Services $
Branch Accurate and Pro-
Chief Accurately Settled Competent Division fessional Corre-
Claims Employees spondence
Team C An efficient adjudi- C ORP training needs C A correspondence
Leader cation process. assessment. review and com-
C ORP training plan. plaint resolution
process.
Senior C Guidance and C Recommendations C Responses contain-
Federal technical assis- for training needs as- ing requested infor-
Retirement tance to lower- sessment. mation or solutions
Benefits graded Specialists. C Lesson plans that to customer
Specialists C Recommendations meet training needs. complaints.
for improvements to C Workbooks and
work process and course handouts.
ADP systems. C Effective training
C Cases of unusual course(s).
technical difficulty
that are completed.
Clerk C Decisions that are C Workbooks and C Correspondence
Typist formatted and handouts that are that is formatted,
typed. formatted, typed, and mailed, and filed.
C Case files that are xeroxed.
organized effec-
tively.
A Handbook for Measuring Employee Performance 39
42. Developing Employee Performance Plans
Exercise for Building a Role-Results Matrix
Fill in the role-results matrix for your work unit. Place the work unit products or services that you
developed in Step 2 along the top of the matrix. Fill in the names or the job titles of the work unit’s
employees in the left-hand column. Then fill in the employees’ accomplishments that contribute to
each work unit accomplishment.
Work Unit Products or Services
$
Employees
Organiza-
tional
Chief
40 Performance Management Practitioner Series
43. Developing Employee Performance Plans
Step 4:
Convert expected accomplishments into perfor-
mance elements, indicating type and priority.
In Steps 2 and 3 of the process presented in this the element would result in a determination that
handbook, you developed the expected accom- an employee’s overall performance is unaccept-
plishments for the work unit and the unit’s able. Defining critical elements must be done
employees. Now, in Step 4, you will: thoughtfully because an employee’s unaccept-
C identify which accomplishment(s) should be able performance on any critical element could
included as elements in the performance plan; be the basis for an adverse action. To help
C select which type of element to use; and decide whether an element should be classified
C assign weights or priorities. as critical or not, answer the following questions:
All employees must have at least one critical C Is the element a major component of the
element in their performance plan. Critical ele- work? If you answered “yes,” the element
ments must address individual performance only, might be critical.
except in the case of supervisors who may be C Does the element address individual per-
held responsible for a work unit’s products or formance only? Elements measuring group
services. Work unit performance can be performance cannot be critical
addressed through non-critical or additional elements, except as explained for supervisors
performance elements. In appraisal programs and only under certain circumstances.
with only two summary levels, work unit perfor- C If the employee performed unacceptably
mance can be addressed only through additional on the element, would there be serious
performance elements. consequences to completing the work of
the organization? If employee error on the
Once you have classified elements as either criti- element affects the work unit’s accomplish-
cal, non-critical, or additional, and if ments, the element may be critical.
your appraisal program allows, prioritize them so C Does the element require a significant
that work units and employees know which amount of the employee’s time? If you
elements are most important. One way to do answered “yes,” the element might be critical.
this is to distribute 100 percentage points across
the elements based upon each one’s importance
to the organization. (Programs usually allocate Unless prescribed by your appraisal program,
weights in 5 percent increments.) there is no fixed or uniform number of critical
elements to be included in the performance plan;
How can you determine which the number varies with the work assignments
elements are critical? and may vary from year to year in
response to changing program emphases. How-
Remember that critical elements are work ever, every employee must have at least one
assignments or responsibilities of such critical element.
importance that unacceptable performance on
A Handbook for Measuring Employee Performance 41
44. Developing Employee Performance Plans
Example of Identifying Elements:
The Support Branch of the Office of Retirement (2) Because the Branch decided to use the
Programs’ (ORP) Adjudication Division has non-critical group element for “Competent
been used on the following page as an example Division Employees,” it also decided not to
of identifying elements. (This example does include the individual accomplishments
not represent actual elements currently in under that cell of the matrix. It was not
use; it was developed for this handbook practical or logical to measure this perfor-
only.) The expected accomplishments of the mance at the individual level. The matrix
Senior Federal Retirement Benefits Specialist shows that those four elements have been
(as outlined in the role-results matrix on page crossed out and will therefore not be
39) are listed down the left-hand side of the included in the performance plan.
matrix on the next page. A work unit accom- (3) The Branch decided that “Recommenda-
plishment for the Support Branch is also listed. tions for Improvements” should not affect
The next column shows how the branch chief the summary level, but the Branch wanted
and employees designated elements as critical, to track and measure the value of the rec-
non-critical, or additional. Finally, priority points ommendations for awards purposes.
are assigned to each element to give them rela- Therefore, it was included as an additional
tive weights. (Remember that ORP’s appraisal element and given a weight of 0. The
program uses five levels to appraise employee Branch plans to use the results of perfor-
performance on elements and summarizes per- mance on this element as a criterion for
formance overall at five levels and that non-criti- awards recognizing innovation within ORP.
cal and additional performance elements are (4) The Branch determined the priority of each
allowed.) element by distributing 100 points across
the elements. The priority points let
Note the following in the matrix on page 43: employees know which elements are more
(1) The Branch concluded that the work important to the organization. Priority
accomplishment of “Competent Division points also are used in this example to
Employees” was so interdependent that it affect how the summary level will be deter-
was not practical or logical to measure per- mined. Note that the non-critical group
formance at the individual level for this element “Competent Division Employees”
accomplishment. As a result, the Branch was given more priority points (25) than the
decided to include “Competent Division critical “Adjudicated Cases” element (10),
Employees” as a group element and to even though failure on the critical element
measure performance at the group level causes performance to be determined to be
only. Since this Branch is under a five-level Unacceptable. Using this method allows
appraisal program and it wants to count this non-critical elements to count significantly in
element in the appraisal process, this group the summary level determination. (Failure
element will be a non-critical element. (If it on the non-critical element would not cause
were under a two-level appraisal program, performance to be Unacceptable; it would
the group element would have to be an merely count as 0 priority points and could
additional performance element.) The other lower the summary level—but not to
group products and services will not be Unacceptable.)
included in employee performance plans.
42 Performance Management Practitioner Series
45. Developing Employee Performance Plans
Example:
ORP Adjudication Division Support Branch
Senior Federal Retirement Benefits Specialist
Employee Assignments and Priority
Responsibilities Type of Element Points
C Guidance and technical assis-
tance to lower-graded Special- Critical (CE) 40
ists.
C Recommendations for
improvements to work process Additional (AE) 0
and ADP systems.
• Cases of unusual technical diffi- Critical (CE) 10
culty that were completed.
C Recommendations for training
needs assessment.
C Lesson plans that meet training
needs.
C Workbooks and course hand-
outs.
C Effective training course(s).
C Responses containing requested Critical (CE) 25
information or solutions to cus-
tomer complaints.
Support Branch Work Products
or Services:
Accurately settled claims
Competent Division Employees Non-critical (NC) 25
Accurate and Professional Corre-
spondence
A Handbook for Measuring Employee Performance 43
46. Developing Employee Performance Plans
Exercise on Identifying Elements:
Based on the accomplishments that you identified for your job in the role-results matrix that you
made on page 40, and working within the rules established by your appraisal program, identify
appropriate elements and categorize them as critical, non-critical, and, if appropriate, additional
performance elements. (If you have a two-level appraisal program—that is, a pass/fail pro-
gram—you can not use non-critical elements.) If applicable, prioritize the elements by distributing
100 points among the elements, giving more points to elements that are more important.
Individual or Group Products or
Services Type of Element Priority Points
44 Performance Management Practitioner Series