PROJECT BRIEF
For the Construction of 12AM Cafe
Taylor's University Lakeside Campus, Subang Jaya, Selangor, Malaysia
Prepared by Taylor's Students
24th June 2013
Revision 1.1
Contents
1. Introduction
1.1 Project Description
1.2 Project Background
1.3 Project Objective
1.4 Project Scope
1.5 Success Criteria
2. Specification
2.1 Risk
2.2 Constraints
2.3 Assumptions
2.4 Timescales of the project
3. Project Management Team
3.1 Team Members
3.2 Objective
3.3 Tasks
4. Stakeholders
4.1 Primary Users
4.2 Government and Statutory Authorities
4.3 Other Community and User Groups
5. Budget
5.1 Preliminary Budget Structure
5.2 Exclusions
6. Reference Documents / Sources
6.1 Website
6.2 Meeting Minutes
1. INTRODUCTION
1.1 PROJECT DESCIRPTION
The project is named :" 12AM Cafe Construction Project", involves the construction of a cafe in
Taylor's University Lakeside Campus, Subang Jaya, Selangor, Malaysia. The land has a total
area of 68,797 square meters and it is owned and managed by Taylor's Education Group Sdn Bhd.
The cafe is built especially for the students who stay up late around 12am to 6am. This cafe
provide students a safe place to have a break while doing their assignments or a place to hang out
in this late night. Food and drinks can be prepared and provided for the students.
The cafe is planned to build inside the university land ,a 20m x 20m site area beside the three
academic blocks. It is a small open space area with green grass and some trees surrounding it.
Selected Site:
VIEW FROM FRONT
Selected Site:
VIEW FROM BACK
Site beside the
academic block E
This site has been a plain green area since 2010 without any construction. We have done some
site analysis and found that this site will be our ideal spot for the cafe for the following reason:
1. Ideal location for students from academic blocks
2. Windy area, hence good ventilation
Selected Site:
VIEW FROM SIDE 1
Selected Site:
VIEW FROM SIDE 2
3. Far from the main road, less sound pollution..
4. Good scenery because near the lake
5. Safe for students as it is within campus area.
6. The site is far from the hostel area hence would not disturb other students in the late night.
The agreement of this project brief is estimated to be signed on 29th July 2013 and the whole
construction is estimated to take about 3 months.
1.2 PROJECT BACKGROUND
Taylor's University Lakeside Campus is a Subang Jaya Lake area on the outskirts of Kuala
Lumpur has had many incarnations—first it was a tin mining field, then an illegal dumpsite,
finally it became a squatter occupied by the homeless.
After a major rehabilitation programme, the site has been transformed into an international
school in 2010—Taylor’s Lakeside Campus now sits on the banks of the lake, wrapped closely
around the water’s edge. The university takes advantage of this natural water body, formed
initially by early mining activities, to formulate its environmental strategies and revitalize it into
a key part of the campus
1.3 PROJECT OBJECTIVES:
Improve in the level of service in Taylor's University
Protect the students' safety in the late night
Provide an ideal spot for the students to relax in the midnight
Shorten the distance for the students to get food or drinks at the cafe instead of the
commercial block.
1.4 PROJECT SCOPE
1.5 SUCCESS CRITERIA
The cafe is built within the estimated time.
The cafe is built within the estimated budget.
The cafe is used fully by students who stay up late and recognize it as a new and ideal
place to get food and drinks.
The cafe is now part of the famous spot for late night activity with relaxing atmosphere
and comfortable ambience.
2. SPECIFICATIONS
2.1 RISK
Funding: In case the funding is not enough, the project will be slowed down, postpone or worst,
abandoned.
Approval: The Authority’s approval will really affect the project, in case the Authority do not
give out an approval for the project, the project cannot be carried out.
Failure to attract or retain top talent: If we cannot find the right talent for the construction,
there might be some problems that will be triggered and it might need to take a longer time that
will trigger more problems in the future, e.g. client will lose their interest in the project.
Injury to workers: In case something like this happens, problems will be triggered, e.g. the cost
of the treatment.
2.2 CONSTRAINTS
Pollution: The remnant of the construction materials will pollute the surroundings of the
construction site, during the construction work. The sound of the construction work will disturb
the activity around the construction site and will distribute to a sound pollution.
Safety: The safety around the construction site will be hard to guarantee, the construction
process and materials might endanger the safety of people passing by near the construction site.
2.3 ASSUMPTIONS
The working hours will be from 12:00am – 6:00am.
The customers will be the students that stayed up late.
The staffs are not from the campus students.
Students who usually go out of the campus area to have supper or to get a short break will
choose to stop by this place.
It will help in our campus facilities improvement.
It will help the students who stayed up late to have a place to have a break.
2.4 TIMESCALE FOR PROJECT
3. PROJECT MANAGEMENT TEAM
3.1 TEAM MEMBERS
Key Members Person-in-charge Company Contact Adress
Architect Mr. Edy Phung
Phone: (+60) 12-253-4128
E-mail: green&bold@gmail.com
G&B Sdn. Bhd. Level 3, JalanHua, No.
777, 47500,
Subang Jaya, Selangor
DarulEhsan,
Malaysia.
Landscape Architect Mr. Peh Ker Neng
Phone: (+60) 14-6170502
E-mail: kernengpeh@gmail.com
MajuTECH Landscape
Architecture Firm
8,jln mutiara emas 5/25,
taman perindustrian
mount austin,81100,
johor bahru, johor
Structural Engineer Miss Lee Jo Yee
Phone: (+60) 16-411-5000
E-mail: JadiEC@gmail.com
JADI Engineering
Consultants Sdn. Bhd.
No. 16, Jalan Scotland,
Taman Lumba Kuda,
Georgetown, Pulau
Pinang
Contractor Mr. Nicolas Wong
Phone: (+60) 14-882-8889
Office No: 086-338889
E-mail: nek4real@hotmail.com
Wong Xiao En Berhad No 51A, Tanjung Batu,
Jalan Tun Husseisn Onn,
97000 Bintulu, Sarawak.
Quantity Surveyor Miss Ling Hui Sim SIM Construction
Berhad
No 3,Jalan Taman
Selekoh, Lahad Datu,
Sabah.
3.2 OBJECTIVES
To completely understand the students' needs and plan, design and build a cafe for
the student.
3.3 TASKS
Architect
Observe construction of 12AM-CAFÉ to ensure that site work will meet the
specifications of construction documents when the construction have completed.
Submit modification of the design of 12AM-CAFÉ during construction to contractor.
Adapt a project to real life site conditions, correct errors and remedy omissions to the
construction documents.
Provide an estimate for the cost work of 12AM-CAFÉ. As cost requirements change,
architect has to update and refine cost estimate and share the information with contractor
and owner.
Architect recommends alternative solution to resolve any variations to original budgets.
Conduct an assessment of the site for the owner
Consider the operations and performance of the facilities and make recommendations for
maintenance and improvement.
Landscape Architect
Overseeing the design of a variety of projects, including urban regeneration schemes,
pedestrian schemes, road or retail schemes, and maintaining the character of sites of
natural beauty;
Establishing general landscape requirements with clients;
Conducting preliminary studies of the site (including contours, soil, ecology, buildings,
roads);
Assessing a site's potential to meet the client's specifications;
Carrying out environmental impact assessments;
Seeking and taking into account the views of local residents, potential users, and parties
with a vested interest in the project;
accurately preparing and presenting detailed plans and working drawings, including
applications, construction details and specifications for the project using computer-aided
design (CAD) packages or similar design software;
Presenting proposals to clients, dealing with enquiries and negotiating any amendments
to the final design;
Matching the client's wishes with your knowledge of what will work best;
Contacting and coordinating manufacturers and suppliers;
Putting work out to tender, selecting a contractor and manager (mainly for larger
projects), and leading cross-functional teams;
Making site visits;
Ensuring deadlines are met;
Liaising with other professionals on the project;
Monitoring and checking work on-site (on large projects, landscape managers may do
this type of supervisory work);
Authorising payment once work has been satisfactorily completed;
Attending public inquiries to give evidence if necessary;
Generating new business opportunities.
Structural Engineer
Design structures to withstand stresses & pressures (Do not bend, twist, collapse or
vibrate, remain strong and secure throughout their use.
Choose appropriate materials to meet design specifications
Analysis configurations of the basic structural components of 12AM-CAFÉ
Calculate pressure, stress & strains that each component (beam & lintel) will experience
from other parts of the structure due to human use or environmental pressure.
Liaising with architect to agree an safe designs and fit the aesthetic concept of
construction
Considering the strength of various material
Examining structures at risk of collapse and advising how to improve their structure
integrity
Making drawings, specifications and computer models of structures for building
contractors.
Investigating ground conditions and analysising results of site tests
Applying expert knowledge of the forces that act on various structure
Use computers and computer-aided design (CAD) technology for simulation process.
Contractor
To perform and complete a task that is assigned or created
Checking whether the clients are aware of their duties
Cooperate with other working parties
Consult with the workers in good time
Provide workers under their control with relevant information
Ensure the structure is built as per drawings
Lease with consultants, sub-traders and owner to achieve the common goal of work
being completed on time.
Quantity Surveyor
Preparation of Feasibility Studies
Estimating to define project budgets
Analysis of the effect of design changes on the project budget
Cost planning to refine the budget as the design documents develop
Preparation of Bills of Quantities to assist in the tender process
Provision of cost control services during construction
Assessment of the contractor’s progress claims
Assessment of variation and delay claims
Procurement of subcontractors and labour to carry out specialist trade works
Negotiation and settlement of accounts
Monthly forecasting and cost reporting
Monthly negotiation and agreement of payments for works carried out
Determination of the final project cost
Preparation of tax depreciation reports for investors and property owners
Expert witness reports to assist in the settlement of building disputes
4. STAKEHOLDERS
These are the stakeholders have so far been identified for the project:
4.1 PRIMARY USERS
The students of Taylor's University Lakeside Campus, especially the students from the hostel
and students who stay up late in the educational building block for their assignments, projects or
discussion.
4.2 GOVERNMENT AND STATUTORY AUTHORITIES
4.3 OTHER COMMUNITY AND USER GROUPS
5. BUDGET
5.1 PRELIMINARY BUDGET STRUCTURE
5.2 EXCLUSIONS
6. REFERENCE DOCUMENTS / SOURCES
6.1 WEBSITES
Taylor's University Background:
http://www.futurarc.com/index.cfm/projects-2013/2013-may-jun-taylors-lakeside-campus/
Sample Project Brief:
http://www.hpw.qld.gov.au/SiteCollectionDocuments/CWMFProjectDefinition.pdf
Example of the Timescale of the Project:
http://schoolsonline.swindon.gov.uk/construction_project_procedures_and_timescales
-3.pdf
6.2 MEETING MINUTES

Weitere ähnliche Inhalte

Was ist angesagt?

Construction site supervision aalecture one.
Construction site supervision aalecture one.Construction site supervision aalecture one.
Construction site supervision aalecture one.
Gebeyehu Worku
 
Construction process
Construction processConstruction process
Construction process
Mazen Al-Qadi
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
Zairul Zaiky
 
Site analysis-example
Site analysis-exampleSite analysis-example
Site analysis-example
Anu PA
 

Was ist angesagt? (20)

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau Langkawi
 
Construction site supervision aalecture one.
Construction site supervision aalecture one.Construction site supervision aalecture one.
Construction site supervision aalecture one.
 
Project management assignment 1
Project management assignment 1 Project management assignment 1
Project management assignment 1
 
Construction process
Construction processConstruction process
Construction process
 
Architect as a project manager
Architect as a project managerArchitect as a project manager
Architect as a project manager
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
 
Site analysis-example
Site analysis-exampleSite analysis-example
Site analysis-example
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Site analysis
Site analysis Site analysis
Site analysis
 
pre-design phase
pre-design phasepre-design phase
pre-design phase
 
Design-Build Operate and Finance
Design-Build Operate and FinanceDesign-Build Operate and Finance
Design-Build Operate and Finance
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Architectural Design Project Design Report
Architectural Design Project Design ReportArchitectural Design Project Design Report
Architectural Design Project Design Report
 
Various Methods of Redevelopment
Various Methods of RedevelopmentVarious Methods of Redevelopment
Various Methods of Redevelopment
 
Project management
Project managementProject management
Project management
 
Development control
Development control Development control
Development control
 
Site selection and site planning
Site selection and site planningSite selection and site planning
Site selection and site planning
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...
 

Andere mochten auch

The Manhattanville Student Center Pavilion
The Manhattanville Student Center PavilionThe Manhattanville Student Center Pavilion
The Manhattanville Student Center Pavilion
tirellig
 
Project brief 2 b construction 2 march 2016 1
Project brief 2 b construction 2 march 2016 1Project brief 2 b construction 2 march 2016 1
Project brief 2 b construction 2 march 2016 1
Chow Hong Da
 
Studio 4 arc60206 module outline (august 2015)
Studio 4 arc60206 module outline (august 2015)Studio 4 arc60206 module outline (august 2015)
Studio 4 arc60206 module outline (august 2015)
Anthony Chew
 
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
Chow Hong Da
 
Project 2 brief architecture studio 4 arc60206 august 2015 (1)
Project 2 brief  architecture studio 4 arc60206 august 2015 (1)Project 2 brief  architecture studio 4 arc60206 august 2015 (1)
Project 2 brief architecture studio 4 arc60206 august 2015 (1)
Anthony Chew
 
EPC Final presentation project brief
EPC Final presentation project briefEPC Final presentation project brief
EPC Final presentation project brief
ashleyyeap
 
Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015
Anthony Chew
 
Center for Student Activities & Leadership Development
Center for Student Activities & Leadership DevelopmentCenter for Student Activities & Leadership Development
Center for Student Activities & Leadership Development
Scott Millington
 

Andere mochten auch (20)

Briefing Checklist for Advisers on Construction Projects
Briefing Checklist for Advisers on Construction ProjectsBriefing Checklist for Advisers on Construction Projects
Briefing Checklist for Advisers on Construction Projects
 
The Manhattanville Student Center Pavilion
The Manhattanville Student Center PavilionThe Manhattanville Student Center Pavilion
The Manhattanville Student Center Pavilion
 
Project brief 2 b construction 2 march 2016 1
Project brief 2 b construction 2 march 2016 1Project brief 2 b construction 2 march 2016 1
Project brief 2 b construction 2 march 2016 1
 
Studio 4 arc60206 module outline (august 2015)
Studio 4 arc60206 module outline (august 2015)Studio 4 arc60206 module outline (august 2015)
Studio 4 arc60206 module outline (august 2015)
 
The Hive
The HiveThe Hive
The Hive
 
Studio project 1 brief (1)
Studio project 1 brief (1)Studio project 1 brief (1)
Studio project 1 brief (1)
 
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
 
Baku Mall Project yeni
Baku Mall Project yeniBaku Mall Project yeni
Baku Mall Project yeni
 
NITIE Center for Student Enterprises .. What it does !
NITIE Center for Student Enterprises  .. What it does ! NITIE Center for Student Enterprises  .. What it does !
NITIE Center for Student Enterprises .. What it does !
 
Project 2 brief architecture studio 4 arc60206 august 2015 (1)
Project 2 brief  architecture studio 4 arc60206 august 2015 (1)Project 2 brief  architecture studio 4 arc60206 august 2015 (1)
Project 2 brief architecture studio 4 arc60206 august 2015 (1)
 
ICI Project 3 - The Project Brief
ICI Project 3 - The Project BriefICI Project 3 - The Project Brief
ICI Project 3 - The Project Brief
 
EPC Final presentation project brief
EPC Final presentation project briefEPC Final presentation project brief
EPC Final presentation project brief
 
Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015
 
SEC (Student Employment Center)
SEC (Student Employment Center)SEC (Student Employment Center)
SEC (Student Employment Center)
 
ENBE - Experiencing Nature
ENBE - Experiencing NatureENBE - Experiencing Nature
ENBE - Experiencing Nature
 
Project brief
Project briefProject brief
Project brief
 
Center for Student Activities & Leadership Development
Center for Student Activities & Leadership DevelopmentCenter for Student Activities & Leadership Development
Center for Student Activities & Leadership Development
 
Construction safety management
Construction safety managementConstruction safety management
Construction safety management
 
Project REO: A Student Center Initiative
Project REO: A Student Center InitiativeProject REO: A Student Center Initiative
Project REO: A Student Center Initiative
 
Project Construction of 5 star hotel
Project Construction of 5 star hotelProject Construction of 5 star hotel
Project Construction of 5 star hotel
 

Ähnlich wie Project brief

Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
JamesMoy7
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
Pinky Chan
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
JamesMoy7
 
Ici project brief2
Ici project brief2Ici project brief2
Ici project brief2
itsmylifesl
 
Project brief
Project brief Project brief
Project brief
PK146
 
Project Name
 Project Name                                       Project Name
Project Name
TatianaMajor22
 
ici final project.pdf
ici final project.pdfici final project.pdf
ici final project.pdf
温 庄壁
 
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docxRUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
agnesdcarey33086
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
Hetal Visaria
 
Ici final-individual-loon-jing-wei
Ici final-individual-loon-jing-weiIci final-individual-loon-jing-wei
Ici final-individual-loon-jing-wei
Roy Loon
 

Ähnlich wie Project brief (20)

Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
 
Project background
Project backgroundProject background
Project background
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
 
ICIP2G
ICIP2GICIP2G
ICIP2G
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
 
Group Component
Group ComponentGroup Component
Group Component
 
Ici project brief2
Ici project brief2Ici project brief2
Ici project brief2
 
Project brief
Project brief Project brief
Project brief
 
Project Name
 Project Name                                       Project Name
Project Name
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1
 
Ici final project
Ici final projectIci final project
Ici final project
 
ici final project.pdf
ici final project.pdfici final project.pdf
ici final project.pdf
 
ICI final project
ICI final projectICI final project
ICI final project
 
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docxRUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
 
Student Project
Student ProjectStudent Project
Student Project
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentation
 
Project
Project Project
Project
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
 
Ici final-individual-loon-jing-wei
Ici final-individual-loon-jing-weiIci final-individual-loon-jing-wei
Ici final-individual-loon-jing-wei
 
Ici individual
Ici individualIci individual
Ici individual
 

Mehr von kerneng

Project management networking
Project management networkingProject management networking
Project management networking
kerneng
 
Final site analysis board
Final site analysis boardFinal site analysis board
Final site analysis board
kerneng
 
Merged document
Merged documentMerged document
Merged document
kerneng
 
Bscience report
Bscience reportBscience report
Bscience report
kerneng
 
Bscience board
Bscience boardBscience board
Bscience board
kerneng
 
Final bscience report compilation
Final bscience report compilationFinal bscience report compilation
Final bscience report compilation
kerneng
 
C1 (3 files merged)
C1 (3 files merged)C1 (3 files merged)
C1 (3 files merged)
kerneng
 
Sec 1 (5 files merged) (1)
Sec 1 (5 files merged) (1)Sec 1 (5 files merged) (1)
Sec 1 (5 files merged) (1)
kerneng
 
Plan 1 (6 files merged)
Plan 1 (6 files merged)Plan 1 (6 files merged)
Plan 1 (6 files merged)
kerneng
 
E1 (3 files merged)
E1 (3 files merged)E1 (3 files merged)
E1 (3 files merged)
kerneng
 
Ph 4 (9 files merged)
Ph 4 (9 files merged)Ph 4 (9 files merged)
Ph 4 (9 files merged)
kerneng
 
I1 (4 files merged)
I1 (4 files merged)I1 (4 files merged)
I1 (4 files merged)
kerneng
 
1 (4 files merged) (1)
1 (4 files merged) (1)1 (4 files merged) (1)
1 (4 files merged) (1)
kerneng
 
Theory project-2-analytical-paper
Theory project-2-analytical-paperTheory project-2-analytical-paper
Theory project-2-analytical-paper
kerneng
 
5 elements-kerneng
5 elements-kerneng5 elements-kerneng
5 elements-kerneng
kerneng
 
R1 (5 files merged)
R1 (5 files merged)R1 (5 files merged)
R1 (5 files merged)
kerneng
 

Mehr von kerneng (20)

Project management networking
Project management networkingProject management networking
Project management networking
 
Final
FinalFinal
Final
 
btech 2
btech 2btech 2
btech 2
 
Final site analysis board
Final site analysis boardFinal site analysis board
Final site analysis board
 
Merged document
Merged documentMerged document
Merged document
 
Btech
BtechBtech
Btech
 
Images
ImagesImages
Images
 
Bscience report
Bscience reportBscience report
Bscience report
 
Bscience board
Bscience boardBscience board
Bscience board
 
Final bscience report compilation
Final bscience report compilationFinal bscience report compilation
Final bscience report compilation
 
C1 (3 files merged)
C1 (3 files merged)C1 (3 files merged)
C1 (3 files merged)
 
Sec 1 (5 files merged) (1)
Sec 1 (5 files merged) (1)Sec 1 (5 files merged) (1)
Sec 1 (5 files merged) (1)
 
Plan 1 (6 files merged)
Plan 1 (6 files merged)Plan 1 (6 files merged)
Plan 1 (6 files merged)
 
E1 (3 files merged)
E1 (3 files merged)E1 (3 files merged)
E1 (3 files merged)
 
Ph 4 (9 files merged)
Ph 4 (9 files merged)Ph 4 (9 files merged)
Ph 4 (9 files merged)
 
I1 (4 files merged)
I1 (4 files merged)I1 (4 files merged)
I1 (4 files merged)
 
1 (4 files merged) (1)
1 (4 files merged) (1)1 (4 files merged) (1)
1 (4 files merged) (1)
 
Theory project-2-analytical-paper
Theory project-2-analytical-paperTheory project-2-analytical-paper
Theory project-2-analytical-paper
 
5 elements-kerneng
5 elements-kerneng5 elements-kerneng
5 elements-kerneng
 
R1 (5 files merged)
R1 (5 files merged)R1 (5 files merged)
R1 (5 files merged)
 

Kürzlich hochgeladen

Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 

Kürzlich hochgeladen (20)

Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 

Project brief

  • 1. PROJECT BRIEF For the Construction of 12AM Cafe Taylor's University Lakeside Campus, Subang Jaya, Selangor, Malaysia Prepared by Taylor's Students 24th June 2013 Revision 1.1
  • 2. Contents 1. Introduction 1.1 Project Description 1.2 Project Background 1.3 Project Objective 1.4 Project Scope 1.5 Success Criteria 2. Specification 2.1 Risk 2.2 Constraints 2.3 Assumptions 2.4 Timescales of the project 3. Project Management Team 3.1 Team Members 3.2 Objective 3.3 Tasks 4. Stakeholders 4.1 Primary Users 4.2 Government and Statutory Authorities 4.3 Other Community and User Groups 5. Budget 5.1 Preliminary Budget Structure 5.2 Exclusions 6. Reference Documents / Sources
  • 4. 1. INTRODUCTION 1.1 PROJECT DESCIRPTION The project is named :" 12AM Cafe Construction Project", involves the construction of a cafe in Taylor's University Lakeside Campus, Subang Jaya, Selangor, Malaysia. The land has a total area of 68,797 square meters and it is owned and managed by Taylor's Education Group Sdn Bhd. The cafe is built especially for the students who stay up late around 12am to 6am. This cafe provide students a safe place to have a break while doing their assignments or a place to hang out in this late night. Food and drinks can be prepared and provided for the students. The cafe is planned to build inside the university land ,a 20m x 20m site area beside the three academic blocks. It is a small open space area with green grass and some trees surrounding it. Selected Site: VIEW FROM FRONT Selected Site: VIEW FROM BACK
  • 6. This site has been a plain green area since 2010 without any construction. We have done some site analysis and found that this site will be our ideal spot for the cafe for the following reason: 1. Ideal location for students from academic blocks 2. Windy area, hence good ventilation Selected Site: VIEW FROM SIDE 1 Selected Site: VIEW FROM SIDE 2
  • 7. 3. Far from the main road, less sound pollution.. 4. Good scenery because near the lake 5. Safe for students as it is within campus area. 6. The site is far from the hostel area hence would not disturb other students in the late night. The agreement of this project brief is estimated to be signed on 29th July 2013 and the whole construction is estimated to take about 3 months. 1.2 PROJECT BACKGROUND Taylor's University Lakeside Campus is a Subang Jaya Lake area on the outskirts of Kuala Lumpur has had many incarnations—first it was a tin mining field, then an illegal dumpsite, finally it became a squatter occupied by the homeless. After a major rehabilitation programme, the site has been transformed into an international school in 2010—Taylor’s Lakeside Campus now sits on the banks of the lake, wrapped closely around the water’s edge. The university takes advantage of this natural water body, formed initially by early mining activities, to formulate its environmental strategies and revitalize it into a key part of the campus 1.3 PROJECT OBJECTIVES: Improve in the level of service in Taylor's University Protect the students' safety in the late night Provide an ideal spot for the students to relax in the midnight Shorten the distance for the students to get food or drinks at the cafe instead of the commercial block. 1.4 PROJECT SCOPE 1.5 SUCCESS CRITERIA The cafe is built within the estimated time. The cafe is built within the estimated budget. The cafe is used fully by students who stay up late and recognize it as a new and ideal place to get food and drinks. The cafe is now part of the famous spot for late night activity with relaxing atmosphere and comfortable ambience.
  • 8. 2. SPECIFICATIONS 2.1 RISK Funding: In case the funding is not enough, the project will be slowed down, postpone or worst, abandoned. Approval: The Authority’s approval will really affect the project, in case the Authority do not give out an approval for the project, the project cannot be carried out. Failure to attract or retain top talent: If we cannot find the right talent for the construction, there might be some problems that will be triggered and it might need to take a longer time that will trigger more problems in the future, e.g. client will lose their interest in the project. Injury to workers: In case something like this happens, problems will be triggered, e.g. the cost of the treatment. 2.2 CONSTRAINTS Pollution: The remnant of the construction materials will pollute the surroundings of the construction site, during the construction work. The sound of the construction work will disturb the activity around the construction site and will distribute to a sound pollution. Safety: The safety around the construction site will be hard to guarantee, the construction process and materials might endanger the safety of people passing by near the construction site. 2.3 ASSUMPTIONS The working hours will be from 12:00am – 6:00am. The customers will be the students that stayed up late. The staffs are not from the campus students. Students who usually go out of the campus area to have supper or to get a short break will choose to stop by this place. It will help in our campus facilities improvement. It will help the students who stayed up late to have a place to have a break. 2.4 TIMESCALE FOR PROJECT
  • 9. 3. PROJECT MANAGEMENT TEAM 3.1 TEAM MEMBERS Key Members Person-in-charge Company Contact Adress Architect Mr. Edy Phung Phone: (+60) 12-253-4128 E-mail: green&bold@gmail.com G&B Sdn. Bhd. Level 3, JalanHua, No. 777, 47500, Subang Jaya, Selangor DarulEhsan, Malaysia. Landscape Architect Mr. Peh Ker Neng Phone: (+60) 14-6170502 E-mail: kernengpeh@gmail.com MajuTECH Landscape Architecture Firm 8,jln mutiara emas 5/25, taman perindustrian mount austin,81100, johor bahru, johor Structural Engineer Miss Lee Jo Yee Phone: (+60) 16-411-5000 E-mail: JadiEC@gmail.com JADI Engineering Consultants Sdn. Bhd. No. 16, Jalan Scotland, Taman Lumba Kuda, Georgetown, Pulau Pinang Contractor Mr. Nicolas Wong Phone: (+60) 14-882-8889 Office No: 086-338889 E-mail: nek4real@hotmail.com Wong Xiao En Berhad No 51A, Tanjung Batu, Jalan Tun Husseisn Onn, 97000 Bintulu, Sarawak. Quantity Surveyor Miss Ling Hui Sim SIM Construction Berhad No 3,Jalan Taman Selekoh, Lahad Datu, Sabah. 3.2 OBJECTIVES To completely understand the students' needs and plan, design and build a cafe for the student. 3.3 TASKS Architect Observe construction of 12AM-CAFÉ to ensure that site work will meet the specifications of construction documents when the construction have completed. Submit modification of the design of 12AM-CAFÉ during construction to contractor. Adapt a project to real life site conditions, correct errors and remedy omissions to the construction documents. Provide an estimate for the cost work of 12AM-CAFÉ. As cost requirements change, architect has to update and refine cost estimate and share the information with contractor and owner. Architect recommends alternative solution to resolve any variations to original budgets. Conduct an assessment of the site for the owner
  • 10. Consider the operations and performance of the facilities and make recommendations for maintenance and improvement. Landscape Architect Overseeing the design of a variety of projects, including urban regeneration schemes, pedestrian schemes, road or retail schemes, and maintaining the character of sites of natural beauty; Establishing general landscape requirements with clients; Conducting preliminary studies of the site (including contours, soil, ecology, buildings, roads); Assessing a site's potential to meet the client's specifications; Carrying out environmental impact assessments; Seeking and taking into account the views of local residents, potential users, and parties with a vested interest in the project; accurately preparing and presenting detailed plans and working drawings, including applications, construction details and specifications for the project using computer-aided design (CAD) packages or similar design software; Presenting proposals to clients, dealing with enquiries and negotiating any amendments to the final design; Matching the client's wishes with your knowledge of what will work best; Contacting and coordinating manufacturers and suppliers; Putting work out to tender, selecting a contractor and manager (mainly for larger projects), and leading cross-functional teams; Making site visits; Ensuring deadlines are met; Liaising with other professionals on the project; Monitoring and checking work on-site (on large projects, landscape managers may do this type of supervisory work); Authorising payment once work has been satisfactorily completed; Attending public inquiries to give evidence if necessary; Generating new business opportunities. Structural Engineer Design structures to withstand stresses & pressures (Do not bend, twist, collapse or vibrate, remain strong and secure throughout their use. Choose appropriate materials to meet design specifications Analysis configurations of the basic structural components of 12AM-CAFÉ
  • 11. Calculate pressure, stress & strains that each component (beam & lintel) will experience from other parts of the structure due to human use or environmental pressure. Liaising with architect to agree an safe designs and fit the aesthetic concept of construction Considering the strength of various material Examining structures at risk of collapse and advising how to improve their structure integrity Making drawings, specifications and computer models of structures for building contractors. Investigating ground conditions and analysising results of site tests Applying expert knowledge of the forces that act on various structure Use computers and computer-aided design (CAD) technology for simulation process. Contractor To perform and complete a task that is assigned or created Checking whether the clients are aware of their duties Cooperate with other working parties Consult with the workers in good time Provide workers under their control with relevant information Ensure the structure is built as per drawings Lease with consultants, sub-traders and owner to achieve the common goal of work being completed on time. Quantity Surveyor Preparation of Feasibility Studies Estimating to define project budgets Analysis of the effect of design changes on the project budget Cost planning to refine the budget as the design documents develop Preparation of Bills of Quantities to assist in the tender process Provision of cost control services during construction Assessment of the contractor’s progress claims Assessment of variation and delay claims Procurement of subcontractors and labour to carry out specialist trade works Negotiation and settlement of accounts Monthly forecasting and cost reporting Monthly negotiation and agreement of payments for works carried out Determination of the final project cost
  • 12. Preparation of tax depreciation reports for investors and property owners Expert witness reports to assist in the settlement of building disputes 4. STAKEHOLDERS These are the stakeholders have so far been identified for the project: 4.1 PRIMARY USERS
  • 13. The students of Taylor's University Lakeside Campus, especially the students from the hostel and students who stay up late in the educational building block for their assignments, projects or discussion. 4.2 GOVERNMENT AND STATUTORY AUTHORITIES 4.3 OTHER COMMUNITY AND USER GROUPS 5. BUDGET 5.1 PRELIMINARY BUDGET STRUCTURE 5.2 EXCLUSIONS
  • 14. 6. REFERENCE DOCUMENTS / SOURCES 6.1 WEBSITES Taylor's University Background: http://www.futurarc.com/index.cfm/projects-2013/2013-may-jun-taylors-lakeside-campus/ Sample Project Brief: http://www.hpw.qld.gov.au/SiteCollectionDocuments/CWMFProjectDefinition.pdf Example of the Timescale of the Project: