SlideShare ist ein Scribd-Unternehmen logo
1 von 42
From compressor to reservoir – Flow assurance
and control philosophy for CCS CO2 operation
Webinar – 15 April 2014, 1700 AEDT
Jan Uilenreef
Jan Uilenreef is Project Manager with an excellent
understanding of and long experience with process
engineering of industrial plants, and project
management of a variety of natural gas and CO2
pipelines and CO2 installations.
Since November 2010 he is responsible for the design
and engineering of the 16” CO2 pipeline that connects
the Road Capture Plant with the TAQA platform on top
of the P18-A exhausted gas field.
He was previously responsible for several new build
projects, most notably the design, engineering and construction of the OCAP
CO2 pipeline in the Netherlands and the design engineering, construction and
operation of the WarmCO2 facilities to deliver CO2 and waste heat to the
greenhouse area in Terneuzen in the Netherlands. Jan has over 40 years of
experience in the industry, including design and project development.
Dr Andy Read
Andy Read is a Project Manager with an excellent
understanding of power plant technology and the electricity
markets with the associated commercial constraints. For the
last five years, he has focused on CCS project development
leading projects at Killingholme and Kingsnorth in the UK, and
now as Capture Director for the E.ON / GDF SUEZ joint venture
at Maasvlakte, Netherlands (ROAD Project).
He has previously worked on several new build projects, most
notably the early development of the 1275MW Grain CHP plant,
and acted as interface between commercial functions (such as
Strategy and Trading) and the power plant asset managers.
Andy has 20 years of experience in the power industry, including
design and operation of supercritical coal power plant,
combustion technology and a stint on an operating coal-fired
power station.
In Andy’s current role, he is one of four directors responsible for the ROAD Project – a
250MW CCS demonstration in Rotterdam, due to be in commercial operation by 2015. He
has responsibility for the engineering, design and construction of the Capture Plant
including the interfaces with E.ON’s MPP3 Power Plant (the host for the CCS
demonstration)
QUESTIONS
 We will collect questions during
the presentation.
 Your MC will pose these
questions to the presenters
after the presentation.
 Please submit your questions
directly into the GoToWebinar
control panel.
The webinar will start shortly.
Flow Assurance & Control Philosophy
Jan Uilenreef, Project manager Transport & Storage
Webinar Global CCS Institute, 15 April 2014
Page 6
Agenda
• Project Overview
• Pipeline Routing (onshore/offshore)
• Process Chain: from stack to well
• Control Philosophy/Flow Assurance
• Research Recommendations
6
Page 7
Agenda
• Project Overview
• Pipeline Routing (onshore/offshore)
• Process Chain: from stack to well
• Control Philosophy/Flow Assurance
• Research Recommendations
7
Page 8
CO2 Streams
Impurities of CO2 mixture
N2 02 H2O Acetaldehyde Ar
350 ppmv 50 ppmw 50 ppmv 10 ppmv 7 ppmv
Page 9
Location of ROAD Project
Port of Rotterdam and North Sea
Shipping lane
crossing
Harbour
crossing
25 km
P18-A
TAQA
Page 10
Location of Capture Plant: Maasvlakte Power Plant 3
Page 11
Agenda
• Project Overview
• Pipeline Routing (onshore/offshore)
• Process Chain: from stack to well
• Control Philosophy/Flow Assurance
• Research Recommendations
11
Page 12
Design data of Road CO2-Pipeline
• Diameter : 16 ” (400 mm)
• Mechanical Design Pressure : 140 bar ga
• Mechanical Design Temperature : -10 to 90o C
• Wall thickness (approx.) : 20 mm
• Soil cover minimum : 1 m
• Insulation onshore (PUR/PE) : 50 mm
• Insulation offshore (PUR/PE) : 30 mm
• Horizontal Directional Drillings (HDD) : 2
• HDD system/steel-in-steel : 24/16 ”
• HDD insulation : vacuum
• HDD depth Yangtze Harbor : -39 m NAP (Dutch Reference level)
• HDD depth Maasgeul : -38 m NAP
Page 13
Pipeline Routing
Page 14
Onshore Pipeline Route
Page 15
Layout of Expansion Loop
Page 16
The Maasgeul Crossing
Page 17
P18 Well Locations
P18-04A2
Page 18
Final Well Design
Tail Pipe
Page 19
Agenda
• Project Overview
• Pipeline Routing (onshore/offshore)
• Process Chain: from stack to well
• Control Philosophy/Flow Assurance
• Research Recommendations
19
Page 21
Basic Control Flow Chart
PC
3
PC
1
FC
1
D-1
CO2 stripper
OVHD
Accumulator
C-1
CO2 Product
Compressor
E-1
CO2
Compressor
Discharge
Cooler
Inlet Guide
Vanes
CW
From
CO2
Stripper
OVHD
25 km
CO2 Pipeline
Minimum Flow Bypass
Reservoir
M
CV 2
CV 1 CV 3
Basic Control Flowchart CO2 Compression, Transport & Storage
To CO2
Absorber
TC
1
Platform
PC
2
Page 22
Typical Compressor Performance Curve
Page 23
Expected Operating Modes
The operation of the capture plant is very dependent on the operation of the power
plant as the power plant feeds directly into the capture plant and the transport and
storage system:
• The capture plant and the transport and storage operation should follow the
operation of the power plant, as there is no intermediate CO2 buffer
• The design of the transport and storage equipment and controls should take into
account the normal and emergency start-ups and shutdowns both of the power
plant and also the transport and storage system alone
In all cases of normal operation, startup and shutdowns the transport system has to
cope with safe and sound operation.
Page 24
Gravity and Friction Forces CO2 Stream
Page 25
Temperatures At Well As Function of Flow Rates
Page 26
Minimum Operating Temperature At Pipeline Inlet
Reservoir Pressure [bara]
PipelineInletTemperature[°C]
Limitation by mixed flow (no platform valve)
Limitation by min. downholeTemp (with platform valve)
Pipeline 16", 25 km
DT 80 °C, DP 140
Page 29
Mollier Diagram of CO2
4°C
40°C 80°C
Operating Envelope
4°C
Page 30
Pressure-Temperature Relation for CO2
Page 31
Temperature Along Pipeline Length
Temperature drop
across tail pipe
near bottom of
well
Page 32
Pressure Along Pipeline Length
Pressure drop
across tail pipe
near bottom of
well
Page 33
Pipeline Content After Cool-down Of Full Pipeline
Page 35
Planned Start-up After Planned Shutdown
Open PCV at
pressure slightly
above wellhead
Monitor
temperature at
wellhead (>-10oC)
and tailend (>+15oC)
Increase flow to
maximum values
after all slugs have
passed
Well-head pressure
< 40 bar
Well-head pressure
> 40 bar
Pipeline should stay
in gase phase
Pressurize pipeline
to pressure slight
above well-head
pressure. Pipeline
will contain liquid
Compress pipeline
with hot gas
Page 36
Planned Shutdown
Empty pipeline into
the well with closed
compressor
discharge valve
Close PCV before
backflow from well
may occur
Heat pipeline
content to max.
temperature (80oC)
Page 37
Planned Start-up
After Non-planned Shutdown by Platform Operation
Short repair time
expected
Long repair time is
expected
Continue to fill
pipeline with hot
CO2
Shutdown of
Capture Plant
Pipeline cannot be
emptied into the
well
After repair, restart
operation of pipeline
at low flow, speed
up after slugs are
passed
Cooldown the
pipeline content
After repair, restore
operation following
Normal start-up
Page 38
Planned Shutdown
After Emergency Shutdown by Capture Plant Operation
Shutdown of com-
pressor discharge
valve before heating
of pipeline content
Pipeline may contain
more CO2 and
cooldown may take
longer
Pipeline may contain
large amount of
liquid after cool-
down
Monitor flow and
temperatures at tail
end to avoid
vibrations
Page 39
Agenda
• Project Overview
• Pipeline Routing (onshore/offshore)
• Process Chain: from stack to well
• Control Philosophy/Flow Assurance
• Research Recommendations
39
Page 40
Research Recommendations
• It is recommended to further investigate the possibility that the CO2 can
be injected without any heating, making sure that the slugs can be
handled in the well piping
• A positive outcome will result in the possibility to transport CO2 to low
pressure field over larger distances and in pipelines without insulation
QUESTIONS / DISCUSSION
Please submit your questions in
English directly into the
GoToWebinar control panel.
The webinar will start shortly.
Please submit any feedback to: webinar@globalccsinstitute.com
Full report available: http://www.globalccsinstitute.com/publications/road-
project-flow-assurance-and-control-philosophy

Weitere ähnliche Inhalte

Was ist angesagt?

Material balance Equation
  Material balance Equation  Material balance Equation
Material balance EquationAshfaq Ahmad
 
Fired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and PetrochemicalsFired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and PetrochemicalsAshutosh Garg
 
Hydrogen Plant Flowsheet - Effects of Low Steam Ratio
Hydrogen Plant Flowsheet - Effects of Low Steam RatioHydrogen Plant Flowsheet - Effects of Low Steam Ratio
Hydrogen Plant Flowsheet - Effects of Low Steam RatioGerard B. Hawkins
 
Design of Gas and Oil Separator 2023.pdf
Design of Gas and Oil Separator 2023.pdfDesign of Gas and Oil Separator 2023.pdf
Design of Gas and Oil Separator 2023.pdfAl AYAn University
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedureGerard B. Hawkins
 
Thermal methods 2020
Thermal methods 2020Thermal methods 2020
Thermal methods 2020SadeqRajabi
 
Basic-TEG Dehydration Glycol Regeneration Process
Basic-TEG Dehydration Glycol Regeneration ProcessBasic-TEG Dehydration Glycol Regeneration Process
Basic-TEG Dehydration Glycol Regeneration ProcessNgweMinThein1
 
GAS SWEETENING PROCESSES
GAS SWEETENING PROCESSESGAS SWEETENING PROCESSES
GAS SWEETENING PROCESSESRisman Hatibi
 
Steam Reforming - A Comprehensive Review
Steam Reforming - A Comprehensive ReviewSteam Reforming - A Comprehensive Review
Steam Reforming - A Comprehensive ReviewGerard B. Hawkins
 
Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations Vijay Sarathy
 
Separator sizing and droplet sizes low shear school - 2017
Separator sizing and droplet sizes   low shear school - 2017Separator sizing and droplet sizes   low shear school - 2017
Separator sizing and droplet sizes low shear school - 2017Low Shear School
 
Gas Compression Stages – Process Design & Optimization
Gas Compression Stages – Process Design & OptimizationGas Compression Stages – Process Design & Optimization
Gas Compression Stages – Process Design & OptimizationVijay Sarathy
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationJames Craig
 

Was ist angesagt? (20)

Vertical vapor liquid separator
Vertical vapor liquid separatorVertical vapor liquid separator
Vertical vapor liquid separator
 
Olga Software
Olga SoftwareOlga Software
Olga Software
 
Material balance Equation
  Material balance Equation  Material balance Equation
Material balance Equation
 
Fired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and PetrochemicalsFired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
 
Thermodynamic Property Models for Transport and Storage of CO2 - Roland Span,...
Thermodynamic Property Models for Transport and Storage of CO2 - Roland Span,...Thermodynamic Property Models for Transport and Storage of CO2 - Roland Span,...
Thermodynamic Property Models for Transport and Storage of CO2 - Roland Span,...
 
Hydrogen Plant Flowsheet - Effects of Low Steam Ratio
Hydrogen Plant Flowsheet - Effects of Low Steam RatioHydrogen Plant Flowsheet - Effects of Low Steam Ratio
Hydrogen Plant Flowsheet - Effects of Low Steam Ratio
 
Design of Gas and Oil Separator 2023.pdf
Design of Gas and Oil Separator 2023.pdfDesign of Gas and Oil Separator 2023.pdf
Design of Gas and Oil Separator 2023.pdf
 
Lecture 6
Lecture 6Lecture 6
Lecture 6
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning Procedure
 
Thermal methods 2020
Thermal methods 2020Thermal methods 2020
Thermal methods 2020
 
Basic-TEG Dehydration Glycol Regeneration Process
Basic-TEG Dehydration Glycol Regeneration ProcessBasic-TEG Dehydration Glycol Regeneration Process
Basic-TEG Dehydration Glycol Regeneration Process
 
GAS SWEETENING PROCESSES
GAS SWEETENING PROCESSESGAS SWEETENING PROCESSES
GAS SWEETENING PROCESSES
 
Tank design - word
Tank design - wordTank design - word
Tank design - word
 
Compact Reliq™
Compact Reliq™Compact Reliq™
Compact Reliq™
 
Steam Reforming - A Comprehensive Review
Steam Reforming - A Comprehensive ReviewSteam Reforming - A Comprehensive Review
Steam Reforming - A Comprehensive Review
 
Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations
 
Separator sizing and droplet sizes low shear school - 2017
Separator sizing and droplet sizes   low shear school - 2017Separator sizing and droplet sizes   low shear school - 2017
Separator sizing and droplet sizes low shear school - 2017
 
lecture 5.pdf
lecture 5.pdflecture 5.pdf
lecture 5.pdf
 
Gas Compression Stages – Process Design & Optimization
Gas Compression Stages – Process Design & OptimizationGas Compression Stages – Process Design & Optimization
Gas Compression Stages – Process Design & Optimization
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - Perforation
 

Andere mochten auch

CCS, evoluzione del quadro normativo e prospettive di filiera industriale
CCS, evoluzione del quadro normativo e prospettive di filiera industrialeCCS, evoluzione del quadro normativo e prospettive di filiera industriale
CCS, evoluzione del quadro normativo e prospettive di filiera industrialecanaleenergia
 
Global CCS Institute - Day 2 - Panel 5 - Defining and Quantifying CCS Risk an...
Global CCS Institute - Day 2 - Panel 5 - Defining and Quantifying CCS Risk an...Global CCS Institute - Day 2 - Panel 5 - Defining and Quantifying CCS Risk an...
Global CCS Institute - Day 2 - Panel 5 - Defining and Quantifying CCS Risk an...Global CCS Institute
 
CO2 transport systems development status of three large-scale European CCS de...
CO2 transport systems development status of three large-scale European CCS de...CO2 transport systems development status of three large-scale European CCS de...
CO2 transport systems development status of three large-scale European CCS de...Global CCS Institute
 
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...Global CCS Institute
 
Arenal Costa Rica Hotels
Arenal Costa Rica HotelsArenal Costa Rica Hotels
Arenal Costa Rica Hotelsluckybugcr
 
Il progetto CCS di Enel
Il progetto CCS di Enel Il progetto CCS di Enel
Il progetto CCS di Enel Enel S.p.A.
 
Research methodologies
Research methodologiesResearch methodologies
Research methodologiesMike Gunn
 
Subsea completion and control system
Subsea completion and control systemSubsea completion and control system
Subsea completion and control systemAmit Nitharwal
 
Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Emeka Ngwobia
 
Girassol field experience (OLGA UGM Paris, 2008)
Girassol field experience (OLGA UGM Paris, 2008)Girassol field experience (OLGA UGM Paris, 2008)
Girassol field experience (OLGA UGM Paris, 2008)ErichZakarian
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentationsurya3303
 

Andere mochten auch (19)

CCS, evoluzione del quadro normativo e prospettive di filiera industriale
CCS, evoluzione del quadro normativo e prospettive di filiera industrialeCCS, evoluzione del quadro normativo e prospettive di filiera industriale
CCS, evoluzione del quadro normativo e prospettive di filiera industriale
 
The Peterhead Carbon Capture and Storage Project - plenary presentation given...
The Peterhead Carbon Capture and Storage Project - plenary presentation given...The Peterhead Carbon Capture and Storage Project - plenary presentation given...
The Peterhead Carbon Capture and Storage Project - plenary presentation given...
 
Global CCS Institute - Day 2 - Panel 5 - Defining and Quantifying CCS Risk an...
Global CCS Institute - Day 2 - Panel 5 - Defining and Quantifying CCS Risk an...Global CCS Institute - Day 2 - Panel 5 - Defining and Quantifying CCS Risk an...
Global CCS Institute - Day 2 - Panel 5 - Defining and Quantifying CCS Risk an...
 
Barriers and Incentives for Deployment of Carbon Capture Utilization and Storage
Barriers and Incentives for Deployment of Carbon Capture Utilization and StorageBarriers and Incentives for Deployment of Carbon Capture Utilization and Storage
Barriers and Incentives for Deployment of Carbon Capture Utilization and Storage
 
CO2 transport systems development status of three large-scale European CCS de...
CO2 transport systems development status of three large-scale European CCS de...CO2 transport systems development status of three large-scale European CCS de...
CO2 transport systems development status of three large-scale European CCS de...
 
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
 
Arenal Costa Rica Hotels
Arenal Costa Rica HotelsArenal Costa Rica Hotels
Arenal Costa Rica Hotels
 
Il progetto CCS di Enel
Il progetto CCS di Enel Il progetto CCS di Enel
Il progetto CCS di Enel
 
Research methodologies
Research methodologiesResearch methodologies
Research methodologies
 
What is CCS Ready - Alice Gibson
What is CCS Ready - Alice GibsonWhat is CCS Ready - Alice Gibson
What is CCS Ready - Alice Gibson
 
Subsea completion and control system
Subsea completion and control systemSubsea completion and control system
Subsea completion and control system
 
Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.
 
CO2QUEST: Techno-economic Assessment of CO2 Quality Effect on its Storage and...
CO2QUEST: Techno-economic Assessment of CO2 Quality Effect on its Storage and...CO2QUEST: Techno-economic Assessment of CO2 Quality Effect on its Storage and...
CO2QUEST: Techno-economic Assessment of CO2 Quality Effect on its Storage and...
 
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
 
Hydrate formation in gas pipelines
Hydrate formation in gas pipelinesHydrate formation in gas pipelines
Hydrate formation in gas pipelines
 
Eot crane manufacturers
Eot crane manufacturersEot crane manufacturers
Eot crane manufacturers
 
Girassol field experience (OLGA UGM Paris, 2008)
Girassol field experience (OLGA UGM Paris, 2008)Girassol field experience (OLGA UGM Paris, 2008)
Girassol field experience (OLGA UGM Paris, 2008)
 
subsea
subseasubsea
subsea
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentation
 

Ähnlich wie Webinar: From compressor to reservoir – Flow assurance and control philosophy for CCS CO2 operation

“Towards net zero: extracting energy from flooded coal mines for heating and ...
“Towards net zero: extracting energy from flooded coal mines for heating and ...“Towards net zero: extracting energy from flooded coal mines for heating and ...
“Towards net zero: extracting energy from flooded coal mines for heating and ...Kyungeun Sung
 
OLADE-Slide-Deck-compressed para ver.pdf
OLADE-Slide-Deck-compressed para ver.pdfOLADE-Slide-Deck-compressed para ver.pdf
OLADE-Slide-Deck-compressed para ver.pdfHenryApaza12
 
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by TechnipProcess Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technipignitetribes
 
Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan
 
Hans Shoenmakers - Stepping stone for CCS in Europe
Hans Shoenmakers - Stepping stone for CCS in EuropeHans Shoenmakers - Stepping stone for CCS in Europe
Hans Shoenmakers - Stepping stone for CCS in EuropeGlobal CCS Institute
 
White Rose Carbon Capture and Storage Project
White Rose Carbon Capture and Storage ProjectWhite Rose Carbon Capture and Storage Project
White Rose Carbon Capture and Storage ProjectGlobal CCS Institute
 
Webinar: CO2 pipeline infrastructure: Lessons learned
Webinar: CO2 pipeline infrastructure: Lessons learnedWebinar: CO2 pipeline infrastructure: Lessons learned
Webinar: CO2 pipeline infrastructure: Lessons learnedGlobal CCS Institute
 
Apec workshop 2 presentation 6 1 compression and transport apec
Apec workshop 2 presentation 6 1  compression and transport apecApec workshop 2 presentation 6 1  compression and transport apec
Apec workshop 2 presentation 6 1 compression and transport apecGlobal CCS Institute
 
General presentation 2023 - Stella Maris CCS.pdf
General presentation 2023 - Stella Maris CCS.pdfGeneral presentation 2023 - Stella Maris CCS.pdf
General presentation 2023 - Stella Maris CCS.pdfsrogne
 
Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Robert Singleton
 
Stella Maris CCS Introduction - Original Website version.pdf
Stella Maris CCS Introduction - Original Website version.pdfStella Maris CCS Introduction - Original Website version.pdf
Stella Maris CCS Introduction - Original Website version.pdfsrogne
 
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...Global CCS Institute
 

Ähnlich wie Webinar: From compressor to reservoir – Flow assurance and control philosophy for CCS CO2 operation (20)

Peter Brownsort (SCCS) - Overview of CO2 Shipping Studies Worldwide, Plus Bri...
Peter Brownsort (SCCS) - Overview of CO2 Shipping Studies Worldwide, Plus Bri...Peter Brownsort (SCCS) - Overview of CO2 Shipping Studies Worldwide, Plus Bri...
Peter Brownsort (SCCS) - Overview of CO2 Shipping Studies Worldwide, Plus Bri...
 
“Towards net zero: extracting energy from flooded coal mines for heating and ...
“Towards net zero: extracting energy from flooded coal mines for heating and ...“Towards net zero: extracting energy from flooded coal mines for heating and ...
“Towards net zero: extracting energy from flooded coal mines for heating and ...
 
PQ_SEC _2014
PQ_SEC _2014PQ_SEC _2014
PQ_SEC _2014
 
Scott Smith-CV
Scott Smith-CVScott Smith-CV
Scott Smith-CV
 
OLADE-Slide-Deck-compressed para ver.pdf
OLADE-Slide-Deck-compressed para ver.pdfOLADE-Slide-Deck-compressed para ver.pdf
OLADE-Slide-Deck-compressed para ver.pdf
 
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by TechnipProcess Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technip
 
Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16
 
Hans Shoenmakers - Stepping stone for CCS in Europe
Hans Shoenmakers - Stepping stone for CCS in EuropeHans Shoenmakers - Stepping stone for CCS in Europe
Hans Shoenmakers - Stepping stone for CCS in Europe
 
Hans Aksel Haugen (Tel-Tek) - The Crucial Role of Ships in Establishing a Nor...
Hans Aksel Haugen (Tel-Tek) - The Crucial Role of Ships in Establishing a Nor...Hans Aksel Haugen (Tel-Tek) - The Crucial Role of Ships in Establishing a Nor...
Hans Aksel Haugen (Tel-Tek) - The Crucial Role of Ships in Establishing a Nor...
 
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
 
White Rose Carbon Capture and Storage Project
White Rose Carbon Capture and Storage ProjectWhite Rose Carbon Capture and Storage Project
White Rose Carbon Capture and Storage Project
 
Webinar: CO2 pipeline infrastructure: Lessons learned
Webinar: CO2 pipeline infrastructure: Lessons learnedWebinar: CO2 pipeline infrastructure: Lessons learned
Webinar: CO2 pipeline infrastructure: Lessons learned
 
Apec workshop 2 presentation 6 1 compression and transport apec
Apec workshop 2 presentation 6 1  compression and transport apecApec workshop 2 presentation 6 1  compression and transport apec
Apec workshop 2 presentation 6 1 compression and transport apec
 
General presentation 2023 - Stella Maris CCS.pdf
General presentation 2023 - Stella Maris CCS.pdfGeneral presentation 2023 - Stella Maris CCS.pdf
General presentation 2023 - Stella Maris CCS.pdf
 
Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)
 
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
 
03_WP-CPL_0704_LR
03_WP-CPL_0704_LR03_WP-CPL_0704_LR
03_WP-CPL_0704_LR
 
Stella Maris CCS Introduction - Original Website version.pdf
Stella Maris CCS Introduction - Original Website version.pdfStella Maris CCS Introduction - Original Website version.pdf
Stella Maris CCS Introduction - Original Website version.pdf
 
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
 
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...
 

Mehr von Global CCS Institute

Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Global CCS Institute
 
Webinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSWebinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSGlobal CCS Institute
 
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Global CCS Institute
 
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Global CCS Institute
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSGlobal CCS Institute
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Global CCS Institute
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationGlobal CCS Institute
 
Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeGlobal CCS Institute
 
Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Global CCS Institute
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Global CCS Institute
 
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Global CCS Institute
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsGlobal CCS Institute
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Global CCS Institute
 
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Global CCS Institute
 
Water use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsWater use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsGlobal CCS Institute
 

Mehr von Global CCS Institute (20)

Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project
 
Webinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSWebinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCS
 
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
 
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
 
Global CCS Institute Presentation
Global CCS Institute PresentationGlobal CCS Institute Presentation
Global CCS Institute Presentation
 
ION Engineering Presentation
ION Engineering PresentationION Engineering Presentation
ION Engineering Presentation
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) Presentation
 
Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation Challenge
 
Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
 
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basins
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
 
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
 
Water use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsWater use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systems
 

Kürzlich hochgeladen

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 

Kürzlich hochgeladen (20)

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 

Webinar: From compressor to reservoir – Flow assurance and control philosophy for CCS CO2 operation

  • 1. From compressor to reservoir – Flow assurance and control philosophy for CCS CO2 operation Webinar – 15 April 2014, 1700 AEDT
  • 2. Jan Uilenreef Jan Uilenreef is Project Manager with an excellent understanding of and long experience with process engineering of industrial plants, and project management of a variety of natural gas and CO2 pipelines and CO2 installations. Since November 2010 he is responsible for the design and engineering of the 16” CO2 pipeline that connects the Road Capture Plant with the TAQA platform on top of the P18-A exhausted gas field. He was previously responsible for several new build projects, most notably the design, engineering and construction of the OCAP CO2 pipeline in the Netherlands and the design engineering, construction and operation of the WarmCO2 facilities to deliver CO2 and waste heat to the greenhouse area in Terneuzen in the Netherlands. Jan has over 40 years of experience in the industry, including design and project development.
  • 3. Dr Andy Read Andy Read is a Project Manager with an excellent understanding of power plant technology and the electricity markets with the associated commercial constraints. For the last five years, he has focused on CCS project development leading projects at Killingholme and Kingsnorth in the UK, and now as Capture Director for the E.ON / GDF SUEZ joint venture at Maasvlakte, Netherlands (ROAD Project). He has previously worked on several new build projects, most notably the early development of the 1275MW Grain CHP plant, and acted as interface between commercial functions (such as Strategy and Trading) and the power plant asset managers. Andy has 20 years of experience in the power industry, including design and operation of supercritical coal power plant, combustion technology and a stint on an operating coal-fired power station. In Andy’s current role, he is one of four directors responsible for the ROAD Project – a 250MW CCS demonstration in Rotterdam, due to be in commercial operation by 2015. He has responsibility for the engineering, design and construction of the Capture Plant including the interfaces with E.ON’s MPP3 Power Plant (the host for the CCS demonstration)
  • 4. QUESTIONS  We will collect questions during the presentation.  Your MC will pose these questions to the presenters after the presentation.  Please submit your questions directly into the GoToWebinar control panel. The webinar will start shortly.
  • 5. Flow Assurance & Control Philosophy Jan Uilenreef, Project manager Transport & Storage Webinar Global CCS Institute, 15 April 2014
  • 6. Page 6 Agenda • Project Overview • Pipeline Routing (onshore/offshore) • Process Chain: from stack to well • Control Philosophy/Flow Assurance • Research Recommendations 6
  • 7. Page 7 Agenda • Project Overview • Pipeline Routing (onshore/offshore) • Process Chain: from stack to well • Control Philosophy/Flow Assurance • Research Recommendations 7
  • 8. Page 8 CO2 Streams Impurities of CO2 mixture N2 02 H2O Acetaldehyde Ar 350 ppmv 50 ppmw 50 ppmv 10 ppmv 7 ppmv
  • 9. Page 9 Location of ROAD Project Port of Rotterdam and North Sea Shipping lane crossing Harbour crossing 25 km P18-A TAQA
  • 10. Page 10 Location of Capture Plant: Maasvlakte Power Plant 3
  • 11. Page 11 Agenda • Project Overview • Pipeline Routing (onshore/offshore) • Process Chain: from stack to well • Control Philosophy/Flow Assurance • Research Recommendations 11
  • 12. Page 12 Design data of Road CO2-Pipeline • Diameter : 16 ” (400 mm) • Mechanical Design Pressure : 140 bar ga • Mechanical Design Temperature : -10 to 90o C • Wall thickness (approx.) : 20 mm • Soil cover minimum : 1 m • Insulation onshore (PUR/PE) : 50 mm • Insulation offshore (PUR/PE) : 30 mm • Horizontal Directional Drillings (HDD) : 2 • HDD system/steel-in-steel : 24/16 ” • HDD insulation : vacuum • HDD depth Yangtze Harbor : -39 m NAP (Dutch Reference level) • HDD depth Maasgeul : -38 m NAP
  • 15. Page 15 Layout of Expansion Loop
  • 17. Page 17 P18 Well Locations P18-04A2
  • 18. Page 18 Final Well Design Tail Pipe
  • 19. Page 19 Agenda • Project Overview • Pipeline Routing (onshore/offshore) • Process Chain: from stack to well • Control Philosophy/Flow Assurance • Research Recommendations 19
  • 20.
  • 21. Page 21 Basic Control Flow Chart PC 3 PC 1 FC 1 D-1 CO2 stripper OVHD Accumulator C-1 CO2 Product Compressor E-1 CO2 Compressor Discharge Cooler Inlet Guide Vanes CW From CO2 Stripper OVHD 25 km CO2 Pipeline Minimum Flow Bypass Reservoir M CV 2 CV 1 CV 3 Basic Control Flowchart CO2 Compression, Transport & Storage To CO2 Absorber TC 1 Platform PC 2
  • 22. Page 22 Typical Compressor Performance Curve
  • 23. Page 23 Expected Operating Modes The operation of the capture plant is very dependent on the operation of the power plant as the power plant feeds directly into the capture plant and the transport and storage system: • The capture plant and the transport and storage operation should follow the operation of the power plant, as there is no intermediate CO2 buffer • The design of the transport and storage equipment and controls should take into account the normal and emergency start-ups and shutdowns both of the power plant and also the transport and storage system alone In all cases of normal operation, startup and shutdowns the transport system has to cope with safe and sound operation.
  • 24. Page 24 Gravity and Friction Forces CO2 Stream
  • 25. Page 25 Temperatures At Well As Function of Flow Rates
  • 26. Page 26 Minimum Operating Temperature At Pipeline Inlet Reservoir Pressure [bara] PipelineInletTemperature[°C] Limitation by mixed flow (no platform valve) Limitation by min. downholeTemp (with platform valve) Pipeline 16", 25 km DT 80 °C, DP 140
  • 27.
  • 28.
  • 29. Page 29 Mollier Diagram of CO2 4°C 40°C 80°C Operating Envelope 4°C
  • 31. Page 31 Temperature Along Pipeline Length Temperature drop across tail pipe near bottom of well
  • 32. Page 32 Pressure Along Pipeline Length Pressure drop across tail pipe near bottom of well
  • 33. Page 33 Pipeline Content After Cool-down Of Full Pipeline
  • 34.
  • 35. Page 35 Planned Start-up After Planned Shutdown Open PCV at pressure slightly above wellhead Monitor temperature at wellhead (>-10oC) and tailend (>+15oC) Increase flow to maximum values after all slugs have passed Well-head pressure < 40 bar Well-head pressure > 40 bar Pipeline should stay in gase phase Pressurize pipeline to pressure slight above well-head pressure. Pipeline will contain liquid Compress pipeline with hot gas
  • 36. Page 36 Planned Shutdown Empty pipeline into the well with closed compressor discharge valve Close PCV before backflow from well may occur Heat pipeline content to max. temperature (80oC)
  • 37. Page 37 Planned Start-up After Non-planned Shutdown by Platform Operation Short repair time expected Long repair time is expected Continue to fill pipeline with hot CO2 Shutdown of Capture Plant Pipeline cannot be emptied into the well After repair, restart operation of pipeline at low flow, speed up after slugs are passed Cooldown the pipeline content After repair, restore operation following Normal start-up
  • 38. Page 38 Planned Shutdown After Emergency Shutdown by Capture Plant Operation Shutdown of com- pressor discharge valve before heating of pipeline content Pipeline may contain more CO2 and cooldown may take longer Pipeline may contain large amount of liquid after cool- down Monitor flow and temperatures at tail end to avoid vibrations
  • 39. Page 39 Agenda • Project Overview • Pipeline Routing (onshore/offshore) • Process Chain: from stack to well • Control Philosophy/Flow Assurance • Research Recommendations 39
  • 40. Page 40 Research Recommendations • It is recommended to further investigate the possibility that the CO2 can be injected without any heating, making sure that the slugs can be handled in the well piping • A positive outcome will result in the possibility to transport CO2 to low pressure field over larger distances and in pipelines without insulation
  • 41. QUESTIONS / DISCUSSION Please submit your questions in English directly into the GoToWebinar control panel. The webinar will start shortly.
  • 42. Please submit any feedback to: webinar@globalccsinstitute.com Full report available: http://www.globalccsinstitute.com/publications/road- project-flow-assurance-and-control-philosophy

Hinweis der Redaktion

  1. I think that you can say it, but please do not put it into the slides.   The idea that the plant will come off at high electricity price is politically sensitive.  The intent is only to come off when there is a real shortage of capacity on the system, so for periods of only a few hours during cold winter mornings or evenings.  Thus we help make the electricity system more secure.  We do not want to give the impression that the CCS plant won’t run much.   However, given the possibility of capacity shortages, we need to be able to turn the CCS plant on and off rapidly, and be able to stop and start at will. We are not designing for many starts and stops as a base assumption; we are designing to be able to start and stop whenever we need to.  Whether we actually do lots of starts will depend on the market and the funding.