The Integrated Master Plan and Integrated Master Schedule are homes for the Measures of Effectiveness (MOE), Measures of Performance (MOP), and Technical Performance Measures (TPM) for the program Each measure is derived from the Systems Engineering processes guided by the Systems Engineering Management Plan (SEMP) and the decomposition of the program's technical architecture. INCOSE Systems Engineering Handbook and ISO 15288 provide the framework for this decomposition.