1. The document provides information on 9 projects led by different architectural firms including offices, museums, and theaters located in Europe, the Middle East, and Japan.
2. For each project, key details are given such as the budget, surface area, and technical coordination responsibilities which involved Building Information Modeling.
3. The projects showcase the firms' expertise in designing institutional buildings and managing complex construction documents.
EU Residence (Portugal) Golden Visa Office Tower for sale
JAPAN TOBACCO INTERNATIONAL HEADQUARTERS
1. Group8 + SOM JAPAN TOBACCO INTERNATIONAL HEADQUARTERS 1/9
Offices, conference centre, Technical and architectural coordination of the interiors including
restaurant and fitness centre mechanical, electrical, plumbing, lighting, catering and fire engineering
Conceptual & detail and de- Assistance to Skidmore, Owings and Merrill in the production of Shell
sign development phases & Core construction documents and obtaining Building Permits
Participation and organization of meetings with the contractors, the
Geneva, Switzerland consultants and the clients
Budget 190 M€ Management and design of the Building Information Model using
Surface 36.000 m2 Revit / Management of the production of the drawing sets
overall view
section view through the model showing the 45 m cantilever
2. EMA + AJN QATAR NATIONAL MUSEUM 2/9
Museum, auditorium, restau- Technical and architectural coordination of the structure and the
rant end office space complex shape of the building designed by Atelier Jean Nouvel
Construction documents Review and rationalisation of the shape of the envelope to optimise
phase cost and building feasibility
Reorganisation and management of the Building Information Model
Doha, Qatar using Digital Project
Budget 300 M€
Surface 38.000 m2
overall view showing the Old Palace and the new museum
coordination model using Digital Project
3. Skidmore, Owings & Merrill QATAR PETROLEUM HEADQUARTERS 3/9
Offices, conference centre, Design and coordination of the main site technical rooms including
restaurant and auditorium... all the basements and tunnels linking every buildings
Conceptual & detail and de- Technical coordination of the mosque, the ballroom and the clinic
sign development phases including mechanical, electrical, plumbing and structure
Design of the Building Information Model using Digital Project /
Doha, Qatar Management of the outputs (plans and data) from the model and
Budget N/A their integration in AutoCAD
Surface 400.000 m2
overall view
office tower, office buildings and mosque
4. Skidmore, Owings & Merrill QATAR PETROLEUM BEACH & BOAT CLUB 4/9
Fitness, spas, restaurants, cul- Technical coordination of the complex including, mechanical, electri-
tural facilities, boating facilities cal, plumbing, security, catering and pools & spas
Conceptual & detail and de- Management and design of the Building Information Model using
sign development phases Digital Project / Management of the outputs (plans and data) from
the model and their integration in AutoCAD
Doha, Qatar
Budget N/A
Surface 10.000 m2
overall view
pools and canopies
5. Skidmore, Owings & Merrill AL SHARQ RESIDENTIAL TOWER 5/9
360m tall residential tower with Technical coordination of the tower including, mechanical, electrical,
spas plumbing and structure
Conceptual development Management and design of the Building Information Model using
phase Digital Project / Management of the outputs (plans and data) from
the model and their integration in AutoCAD
Dubai, Dubai
Budget N/A
Surface 128.000 m2
detail of the facade and cable structure
overall view street view
6. Vasconi Associés Architecte EUROPEAN NEUROSCIENCE RESEARCH CENTRE 6/9
Offices, laboratories, clinic and Site manager responsible for the day to day supervision of the site
conference centre work during the 22 months of construction
Construction phase Responsible for the weekly coordination meeting involving 9 sepa-
rate contractors and 2 consultants
Monthly meeting with the clients to discuss progression and budget /
Saclay, France Project finished on time and on budget.
Budget 22 M€ Review and validation of construction plans and details produced by
Surface 3.800 m2 the contractors
overall view
main hall during the inauguration
7. Vasconi Associés Architecte CEA (RESEARCH CENTRE) HEADQUARTERS 7/9
Offices and conference centre Responsible for the day to day supervision of the site work during
the 10 months of construction
Detail development and con- Design and production of the detail and design development phase
struction phases
Saclay, France
Budget 16 M€
Surface 4.500 m2
overall view
main entrance
8. Architecture Studio PSYCHIATRIC HOSPITAL 8/9
Bedrooms, clinics and day care Site management / Review and validation of construction details
centre produced by the general contractor
Construction phase
Arras, France
Budget 8,5 M€
Surface 7.500 m2
main entrance
day care building
9. Architecture Studio NATIONAL THEATRE OF BAHRAIN 9/9
Two theatres (1000 and 150 Architectural assistant for the production of the conceptual develop-
seats) and exhibtion spaces ment phase
Conceptual development Responsible for the design of the main auditorium and backstage
phase and coordination with the auditorium consultant
Al Manãmah, Bahrain
Budget 31 M€
Surface 10.000 m2
front view
main auditorium