1. About the Organization
•   Brief introduction to the organization
•   Mission/Vision statements
•   Products/Services offered
•   Locations
•   Problem:                      2. The Idea
     – All the metal produced in the Casthouse has to be weighed accurately to ensure customer
       satisfaction & to have precise control of the process
     – Casthouse receives molten metal from Reduction department in crucibles. The weighing of
       Hot metal supplied to the Casthouse is carried out in the SRSS using weigh scales. The
       weight of the molten metal is the difference in weights between the Full crucible weight
       less the Empty crucible weight.
     – Internal customer complaints related to molten metal discrepancies.
     – This can lead to major process parameter discrepancies & impact process efficiency due to
       wrong weight calculation for molten metal.

•   The Top Management was really concerned and they put together a cross functional
    team to resolve the issue within a time frame of 1 week.
•   The cross-team jointly discussed & brainstormed the problem & researched various
    solutions to improve the process and then an idea for capturing automatically the
    weighing & calibration verification of the weigh scale on a daily basis was raised. A
    pilot study was carried out in one of the 8 Bays.
3. People Involvement
• Cross Function team from Cast House Maintenance, Sodium
  Reduction Station, Engineering – Automation was formed
• In the morning & weekly meeting, The progress of the project
  was discussed and top management encouraged the team to
  come up with innovative ideas.
• Vice President Operations, Senior Manager Cast House &
  Senior Manager Engineering sponsored the project and
  followed the progress regularly.
• The budget and resources were identified and all the
  necessary financial support was provided by Top
  Management.
Root Causes
• No control system or interlock available which can guide SRSS
  CTV operator to ensure correct positioning of empty crucible
  for weighing purpose.
• Wrong positioning of empty crucible can lead to major
  discrepancies in metal accounting; CTV operator repeats the
  activity to reposition; unsafe with CTV to verify positioning,
  delays in production.
• No system to capture weigh scales calibration data.
4. Process
•   Our team brainstormed the problem and came up with the solution by installing
    photoelectric sensors at the exit weigh scales, to ensure accurate crucible
    positioning on weigh scale. Also, an automatic system to capture daily calibration
    data was implemented. The system is designed to generate alerts in case of out of
    calibration or discrepancies in weight.
•   Installed visual indicating lamps to guide the operator to place crucible in correct
    location
•   If the Light is OFF, the Empty crucible is not positioned correctly on the Weigh Scale
    and the system will not allow the operator to print the weight at the local HMI. The
    CTV operator has to reposition the empty crucible until the Warning Light is ON.
•   The feasibility & pilot study solution was discussed with Top Management and they
    gave the go ahead for testing.
•   The team put this new solution as a pilot study in one of the exit weigh scales for
    checking the results.
•   Necessary risk assessments were carried out to ensure there were no Health and
    Safety risks and to mitigate any other financial & operational risks.
4. Process (contd.)
•   Full Scale Implementation for both exit Weigh Scales was carried out and
    successful results were achieved.
•   After each step in the implementation, The Casthouse and Reduction
    Management Teams were informed of the improvements and daily & weekly
    reports were sent to them with accurate numbers. It increased the confidence
    level for weigh scale results and correct weight data was achieved.
•   Management monitored the improvements closely with regular meetings, They
    advised and supported the team on every step.
The Innovative Solution !
• The team proposed to show on a screen in each HMI of Bays 1 to 8 & Exit
  scales 1 & 2 the captured calibration test weight . The weight will only be
  captured if it is in the range of +/- 5 KG. Otherwise it will give wrong
  calibration & a red signal will be shown on the HMI.
• All the data for in range and out of range calibration checks will be stored
  on the system & can be seen on the Cathouse SCADA.
• 100 records of each bay can be seen at any one time on the SCADA which
  includes Time of capture, Actual weight , Deviation & standard weight.
Results!
• The plan was implemented by the team and had an immediate
  effect. Now all the scale are calibrated twice a day & data is
  captured on the SCADA .
• Operations can easily check the calibration & if any deviation
  from the Standard is found they call maintenance to calibrate
  the scale before continuing the weighing of crucibles.
• After the implementation of the project there were no
  complaints from Reduction for metal weighing discrepancies.
• This innovative solution has eliminated the problem of
  incorrect positioning of empty crucibles for metal accounting.
• The unsafe CTV manoeuvring during positioning & verification
  has been avoided by the provision of the warning light.
• CTV operator delays have been reduced. The CTV operator’s
  time is utilised more efficiently.
Results & Benefits !
• Present cost of Aluminum according to LME is in the range of
  2345 USD/tonne. Wrong metal accounting can lead to
  financial losses over time.
• By implementing these solutions management has full control
  of the internal process which will help to obtain the desired
  process efficiency.
• This solution was implemented by utilising in-house resources
  resulting in cost savings instead of contracting the project to
  an external service provider.
• This innovative solution eliminates the following wastes:
    Inventory
                    People
    Motion
                    Over processing
    Waiting
                    Transportation
• Mistake proofing in the system ensures that out of range
  crucible weights will not occur.
6. Learning
• Good Communication and Team working among
  Cross-functional team members helped in
  eliminating the problem with an innovative idea.
• Management Sponsorship & support encouraged the
  team to come up with an immediate solution & the
  team implemented it without any red tape or
  bottlenecks. Management Commitment is important
  for such improvements and this was a good example.
• Single Point Lesson: Mistake proof the system &
  process with the help of technology !
7. Way Forward
• The team were recognized at Casthouse and EMAL
  level as well, it was recognised as the “Idea of the
  Month” and team was rewarded accordingly.




• The same idea will be standardised and implemented
  at other weigh scales in the Casthouse to ensure
  weigh scale accuracy and mistake proofing.
Q&A
Thank You

Weitere ähnliche Inhalte

Was ist angesagt?

LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1
George Bowman
 
SumitGaur_Resume
SumitGaur_ResumeSumitGaur_Resume
SumitGaur_Resume
Sumit Gaur
 
Presentation Jerry Cotino 2010-2014
Presentation Jerry Cotino 2010-2014Presentation Jerry Cotino 2010-2014
Presentation Jerry Cotino 2010-2014
Jerry Cotino
 
Maintenance Reliability
Maintenance ReliabilityMaintenance Reliability
Maintenance Reliability
rsevenich
 

Was ist angesagt? (18)

LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1
 
Why Choose Flowmeter Remanufacturing?
Why Choose Flowmeter Remanufacturing?Why Choose Flowmeter Remanufacturing?
Why Choose Flowmeter Remanufacturing?
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
 
Glen &dimplex Process improvements
Glen &dimplex Process improvementsGlen &dimplex Process improvements
Glen &dimplex Process improvements
 
Tpm
TpmTpm
Tpm
 
TPM CYCLE D
TPM CYCLE DTPM CYCLE D
TPM CYCLE D
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
 
SumitGaur_Resume
SumitGaur_ResumeSumitGaur_Resume
SumitGaur_Resume
 
Process Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightProcess Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It Right
 
Kaizen Blitz AR coating set up reduction-October 2005
Kaizen Blitz AR coating set up reduction-October 2005Kaizen Blitz AR coating set up reduction-October 2005
Kaizen Blitz AR coating set up reduction-October 2005
 
Error-Proofing in Office & Service Environments
Error-Proofing in Office & Service Environments Error-Proofing in Office & Service Environments
Error-Proofing in Office & Service Environments
 
Presentation Jerry Cotino 2010-2014
Presentation Jerry Cotino 2010-2014Presentation Jerry Cotino 2010-2014
Presentation Jerry Cotino 2010-2014
 
Six sigma-black-belt-project-sample
Six sigma-black-belt-project-sampleSix sigma-black-belt-project-sample
Six sigma-black-belt-project-sample
 
Aberdare Cables Pietermaritzburg Lean Manufacturing turn around
Aberdare Cables Pietermaritzburg Lean Manufacturing turn aroundAberdare Cables Pietermaritzburg Lean Manufacturing turn around
Aberdare Cables Pietermaritzburg Lean Manufacturing turn around
 
Lean Six Sigma Projects
Lean Six Sigma ProjectsLean Six Sigma Projects
Lean Six Sigma Projects
 
OEE Interphex New York 2013
OEE Interphex New York 2013OEE Interphex New York 2013
OEE Interphex New York 2013
 
Maintenance Reliability
Maintenance ReliabilityMaintenance Reliability
Maintenance Reliability
 
GLEN &DIMPLEX LOGO
GLEN &DIMPLEX LOGOGLEN &DIMPLEX LOGO
GLEN &DIMPLEX LOGO
 

Andere mochten auch

Mia ist an der hisar schule
Mia ist an der hisar schuleMia ist an der hisar schule
Mia ist an der hisar schule
hisarschool
 
Social Media ProBook
Social Media ProBookSocial Media ProBook
Social Media ProBook
eloquan
 
Continued Rebound: Trends in Life Science M&A
Continued Rebound: Trends in Life Science M&A Continued Rebound: Trends in Life Science M&A
Continued Rebound: Trends in Life Science M&A
Silicon Valley Bank
 

Andere mochten auch (12)

Biodiesel
BiodieselBiodiesel
Biodiesel
 
Mia ist an der hisar schule
Mia ist an der hisar schuleMia ist an der hisar schule
Mia ist an der hisar schule
 
103.02 05-顾客的获取维系与增强关系-詹翔霖教授-企业家班
103.02 05-顾客的获取维系与增强关系-詹翔霖教授-企业家班103.02 05-顾客的获取维系与增强关系-詹翔霖教授-企业家班
103.02 05-顾客的获取维系与增强关系-詹翔霖教授-企业家班
 
Imposto de importação
Imposto de importaçãoImposto de importação
Imposto de importação
 
大葉大學-課程設計 餐飲業與連鎖加盟經管實務-詹翔霖教授
大葉大學-課程設計 餐飲業與連鎖加盟經管實務-詹翔霖教授大葉大學-課程設計 餐飲業與連鎖加盟經管實務-詹翔霖教授
大葉大學-課程設計 餐飲業與連鎖加盟經管實務-詹翔霖教授
 
สรุปผลสำรวจประชาพิจารณ์
สรุปผลสำรวจประชาพิจารณ์สรุปผลสำรวจประชาพิจารณ์
สรุปผลสำรวจประชาพิจารณ์
 
認清楚誰是顧客及顧客行為 詹翔霖教授-服務業的顧客關係管理及創新行銷訓練班
認清楚誰是顧客及顧客行為 詹翔霖教授-服務業的顧客關係管理及創新行銷訓練班認清楚誰是顧客及顧客行為 詹翔霖教授-服務業的顧客關係管理及創新行銷訓練班
認清楚誰是顧客及顧客行為 詹翔霖教授-服務業的顧客關係管理及創新行銷訓練班
 
Allentown presentation
Allentown presentationAllentown presentation
Allentown presentation
 
Social Media ProBook
Social Media ProBookSocial Media ProBook
Social Media ProBook
 
專業精神與自我管理 實踐大學-D3-1-詹翔霖教授
專業精神與自我管理  實踐大學-D3-1-詹翔霖教授專業精神與自我管理  實踐大學-D3-1-詹翔霖教授
專業精神與自我管理 實踐大學-D3-1-詹翔霖教授
 
Continued Rebound: Trends in Life Science M&A
Continued Rebound: Trends in Life Science M&A Continued Rebound: Trends in Life Science M&A
Continued Rebound: Trends in Life Science M&A
 
¿Qué es una fachada ventilada?
¿Qué es una fachada ventilada?¿Qué es una fachada ventilada?
¿Qué es una fachada ventilada?
 

Ähnlich wie WQD2011 - INNOVATION - EMAL - SRSS Weigh Scale Optimisation

Operational Readiness and Importance of Operator Training
Operational Readiness and Importance of Operator TrainingOperational Readiness and Importance of Operator Training
Operational Readiness and Importance of Operator Training
Juan Jorge
 
Stanley Lindsay Resume 2016
Stanley Lindsay Resume 2016Stanley Lindsay Resume 2016
Stanley Lindsay Resume 2016
Neil Lindsay
 
ppt-project-final.ppt
ppt-project-final.pptppt-project-final.ppt
ppt-project-final.ppt
steel14
 
Continuous Improvement - The Westside Story
Continuous Improvement - The Westside StoryContinuous Improvement - The Westside Story
Continuous Improvement - The Westside Story
Jaideep Chandrasekharan
 
'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt
TEST Huddle
 
Reliability Through Correlation and Colaboration
Reliability Through Correlation and ColaborationReliability Through Correlation and Colaboration
Reliability Through Correlation and Colaboration
Chad Broussard
 

Ähnlich wie WQD2011 - INNOVATION - EMAL - SRSS Weigh Scale Optimisation (20)

From Waterfall to Weekly Releases: A Case Study in using Evo and Kanban (2004...
From Waterfall to Weekly Releases: A Case Study in using Evo and Kanban (2004...From Waterfall to Weekly Releases: A Case Study in using Evo and Kanban (2004...
From Waterfall to Weekly Releases: A Case Study in using Evo and Kanban (2004...
 
Project Review Presentation (2)
Project Review Presentation (2)Project Review Presentation (2)
Project Review Presentation (2)
 
Moving The OEE Needle -Tips for Surpassing 85%
Moving The OEE Needle -Tips for Surpassing 85% Moving The OEE Needle -Tips for Surpassing 85%
Moving The OEE Needle -Tips for Surpassing 85%
 
Key steps in transforming a calibration program slideshare
Key steps in transforming a calibration program slideshareKey steps in transforming a calibration program slideshare
Key steps in transforming a calibration program slideshare
 
Operational Readiness and Importance of Operator Training
Operational Readiness and Importance of Operator TrainingOperational Readiness and Importance of Operator Training
Operational Readiness and Importance of Operator Training
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
Stanley Lindsay Resume 2016
Stanley Lindsay Resume 2016Stanley Lindsay Resume 2016
Stanley Lindsay Resume 2016
 
QUALITY CONTROL TOTAL QUALITY CONTROL.pptx
QUALITY CONTROL  TOTAL QUALITY CONTROL.pptxQUALITY CONTROL  TOTAL QUALITY CONTROL.pptx
QUALITY CONTROL TOTAL QUALITY CONTROL.pptx
 
8D problem solving for NCR management: Beginners training
8D problem solving for NCR management: Beginners training 8D problem solving for NCR management: Beginners training
8D problem solving for NCR management: Beginners training
 
SHASHANK CV
SHASHANK CVSHASHANK CV
SHASHANK CV
 
ppt-project-final.ppt
ppt-project-final.pptppt-project-final.ppt
ppt-project-final.ppt
 
Continuous Improvement - The Westside Story
Continuous Improvement - The Westside StoryContinuous Improvement - The Westside Story
Continuous Improvement - The Westside Story
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
Change Management Process
Change Management ProcessChange Management Process
Change Management Process
 
'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt
 
EngManagement - Lecture 8.pptx
EngManagement - Lecture 8.pptxEngManagement - Lecture 8.pptx
EngManagement - Lecture 8.pptx
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industry
 
Reliability Through Correlation and Colaboration
Reliability Through Correlation and ColaborationReliability Through Correlation and Colaboration
Reliability Through Correlation and Colaboration
 
Ppt total quality management
Ppt total quality managementPpt total quality management
Ppt total quality management
 
Resume akhilesh singh re-1
Resume akhilesh singh re-1Resume akhilesh singh re-1
Resume akhilesh singh re-1
 

Mehr von Dubai Quality Group

Mehr von Dubai Quality Group (20)

Idea of the Year Competition 2012 - Productivity Category Winner- Dubal
Idea of the Year Competition 2012 - Productivity Category Winner- DubalIdea of the Year Competition 2012 - Productivity Category Winner- Dubal
Idea of the Year Competition 2012 - Productivity Category Winner- Dubal
 
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
 
Idea of the Year Competition 2012 - Health & Safety Category Winner - Dubal
Idea of the Year Competition 2012 - Health & Safety Category Winner - DubalIdea of the Year Competition 2012 - Health & Safety Category Winner - Dubal
Idea of the Year Competition 2012 - Health & Safety Category Winner - Dubal
 
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
 
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
 
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
 
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
 
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
 
'Innovation and Communication' by Prof. Ujjwal K Chowdhury
'Innovation and Communication' by Prof. Ujjwal K Chowdhury'Innovation and Communication' by Prof. Ujjwal K Chowdhury
'Innovation and Communication' by Prof. Ujjwal K Chowdhury
 
'Role of Technology in Innovation' by Capt. Khalid bin Mediya
'Role of Technology in Innovation' by Capt. Khalid bin Mediya'Role of Technology in Innovation' by Capt. Khalid bin Mediya
'Role of Technology in Innovation' by Capt. Khalid bin Mediya
 
'Suggestion Schemes can Improve quality and service to external and internal ...
'Suggestion Schemes can Improve quality and service to external and internal ...'Suggestion Schemes can Improve quality and service to external and internal ...
'Suggestion Schemes can Improve quality and service to external and internal ...
 
"Benchmarking - the UAE Style" by Zillay Ahmed
"Benchmarking - the UAE Style" by Zillay Ahmed"Benchmarking - the UAE Style" by Zillay Ahmed
"Benchmarking - the UAE Style" by Zillay Ahmed
 
"Customer Service Excellence" by Terry Pilcher
"Customer Service Excellence" by Terry Pilcher"Customer Service Excellence" by Terry Pilcher
"Customer Service Excellence" by Terry Pilcher
 
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
 
"Megatrends for the Future" by Oliver Riebartsch
"Megatrends for the Future" by Oliver Riebartsch"Megatrends for the Future" by Oliver Riebartsch
"Megatrends for the Future" by Oliver Riebartsch
 
"AsiaBenchmark" by Khashayar Ataie
"AsiaBenchmark" by Khashayar Ataie"AsiaBenchmark" by Khashayar Ataie
"AsiaBenchmark" by Khashayar Ataie
 
"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann
 
"Views on 2030" by Dr. Holger Kohl
"Views on 2030" by Dr. Holger Kohl"Views on 2030" by Dr. Holger Kohl
"Views on 2030" by Dr. Holger Kohl
 
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
 
"Findings on the future by GBN research" by Bruce Searles
"Findings on the future by GBN research" by Bruce Searles"Findings on the future by GBN research" by Bruce Searles
"Findings on the future by GBN research" by Bruce Searles
 

Kürzlich hochgeladen

Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 

Kürzlich hochgeladen (20)

Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 

WQD2011 - INNOVATION - EMAL - SRSS Weigh Scale Optimisation

  • 1. Innovation Storyboard [Emirates Aluminum] [SRSS Weigh Scale Optimisation] [May 2011 - July 2011] [Amit Parikh, Mohan Kumar M.V, Vilas Sangle, Kishore Bhatt, Boopathy Jayaraman, Shaji Kuruvilla]
  • 2. 1. About the Organization • Brief introduction to the organization • Mission/Vision statements • Products/Services offered • Locations
  • 3. Problem: 2. The Idea – All the metal produced in the Casthouse has to be weighed accurately to ensure customer satisfaction & to have precise control of the process – Casthouse receives molten metal from Reduction department in crucibles. The weighing of Hot metal supplied to the Casthouse is carried out in the SRSS using weigh scales. The weight of the molten metal is the difference in weights between the Full crucible weight less the Empty crucible weight. – Internal customer complaints related to molten metal discrepancies. – This can lead to major process parameter discrepancies & impact process efficiency due to wrong weight calculation for molten metal. • The Top Management was really concerned and they put together a cross functional team to resolve the issue within a time frame of 1 week. • The cross-team jointly discussed & brainstormed the problem & researched various solutions to improve the process and then an idea for capturing automatically the weighing & calibration verification of the weigh scale on a daily basis was raised. A pilot study was carried out in one of the 8 Bays.
  • 4. 3. People Involvement • Cross Function team from Cast House Maintenance, Sodium Reduction Station, Engineering – Automation was formed • In the morning & weekly meeting, The progress of the project was discussed and top management encouraged the team to come up with innovative ideas. • Vice President Operations, Senior Manager Cast House & Senior Manager Engineering sponsored the project and followed the progress regularly. • The budget and resources were identified and all the necessary financial support was provided by Top Management.
  • 5. Root Causes • No control system or interlock available which can guide SRSS CTV operator to ensure correct positioning of empty crucible for weighing purpose. • Wrong positioning of empty crucible can lead to major discrepancies in metal accounting; CTV operator repeats the activity to reposition; unsafe with CTV to verify positioning, delays in production. • No system to capture weigh scales calibration data.
  • 6. 4. Process • Our team brainstormed the problem and came up with the solution by installing photoelectric sensors at the exit weigh scales, to ensure accurate crucible positioning on weigh scale. Also, an automatic system to capture daily calibration data was implemented. The system is designed to generate alerts in case of out of calibration or discrepancies in weight. • Installed visual indicating lamps to guide the operator to place crucible in correct location • If the Light is OFF, the Empty crucible is not positioned correctly on the Weigh Scale and the system will not allow the operator to print the weight at the local HMI. The CTV operator has to reposition the empty crucible until the Warning Light is ON. • The feasibility & pilot study solution was discussed with Top Management and they gave the go ahead for testing. • The team put this new solution as a pilot study in one of the exit weigh scales for checking the results. • Necessary risk assessments were carried out to ensure there were no Health and Safety risks and to mitigate any other financial & operational risks.
  • 7. 4. Process (contd.) • Full Scale Implementation for both exit Weigh Scales was carried out and successful results were achieved. • After each step in the implementation, The Casthouse and Reduction Management Teams were informed of the improvements and daily & weekly reports were sent to them with accurate numbers. It increased the confidence level for weigh scale results and correct weight data was achieved. • Management monitored the improvements closely with regular meetings, They advised and supported the team on every step.
  • 8. The Innovative Solution ! • The team proposed to show on a screen in each HMI of Bays 1 to 8 & Exit scales 1 & 2 the captured calibration test weight . The weight will only be captured if it is in the range of +/- 5 KG. Otherwise it will give wrong calibration & a red signal will be shown on the HMI. • All the data for in range and out of range calibration checks will be stored on the system & can be seen on the Cathouse SCADA. • 100 records of each bay can be seen at any one time on the SCADA which includes Time of capture, Actual weight , Deviation & standard weight.
  • 9.
  • 10. Results! • The plan was implemented by the team and had an immediate effect. Now all the scale are calibrated twice a day & data is captured on the SCADA . • Operations can easily check the calibration & if any deviation from the Standard is found they call maintenance to calibrate the scale before continuing the weighing of crucibles. • After the implementation of the project there were no complaints from Reduction for metal weighing discrepancies. • This innovative solution has eliminated the problem of incorrect positioning of empty crucibles for metal accounting. • The unsafe CTV manoeuvring during positioning & verification has been avoided by the provision of the warning light. • CTV operator delays have been reduced. The CTV operator’s time is utilised more efficiently.
  • 11. Results & Benefits ! • Present cost of Aluminum according to LME is in the range of 2345 USD/tonne. Wrong metal accounting can lead to financial losses over time. • By implementing these solutions management has full control of the internal process which will help to obtain the desired process efficiency. • This solution was implemented by utilising in-house resources resulting in cost savings instead of contracting the project to an external service provider. • This innovative solution eliminates the following wastes:  Inventory  People  Motion  Over processing  Waiting  Transportation • Mistake proofing in the system ensures that out of range crucible weights will not occur.
  • 12. 6. Learning • Good Communication and Team working among Cross-functional team members helped in eliminating the problem with an innovative idea. • Management Sponsorship & support encouraged the team to come up with an immediate solution & the team implemented it without any red tape or bottlenecks. Management Commitment is important for such improvements and this was a good example. • Single Point Lesson: Mistake proof the system & process with the help of technology !
  • 13. 7. Way Forward • The team were recognized at Casthouse and EMAL level as well, it was recognised as the “Idea of the Month” and team was rewarded accordingly. • The same idea will be standardised and implemented at other weigh scales in the Casthouse to ensure weigh scale accuracy and mistake proofing.