Workers poured concrete for a new at-grade slab that will serve as the floor for Amtrak baggage and office space at the station. Wooden frames were used to create openings for connecting the slab to underground piles and future plaza structural steel above. Photos documented the pouring process over a long day, showing concrete being supplied via crane and the surface being finished smooth.