ENGI 8673 Subsea Pipeline
Engineering
Lecture 02: Pipeline Systems Engineering and
Routing Considerations
2 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Lecture 02 Objective
To provide an overview of subsea pipeline
systems engineering and key factors in
pipeline routing
3 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Pipeline Systems Primary Function
Product Transport
Liquid hydrocarbons
Natural gas
Natural gas liquids
Water
Chemicals
Key Elements
Product type
Delivery rate
Operating pressure
Distance from field development to market
Current and future demand/capacity
4 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Pipeline Transportation Systems
Flowlines
Field development to
a subsea manifold or
production facility
Gathering Lines
Connecting multiple
flowlines to a
production facility
Export Pipeline
Transport from a
production facility to
domestic or
international market
5 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Project Phases
6 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Systematic Approach
Management
Project execution plan
Technical
Development plan
Design basis
Safety plan
Auxiliary
Project summary
Economic benefits plan
Environmental impact assessment
Socio-economic impact assessment
7 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Project Execution Plan
Overview
Early stage, live document, project wide
Client objectives, drivers and risk tolerance
Primary Components
Project scope and deliverables
Organizational hierarchy, roles and responsibilities
Execution strategies for engineering, quality,
procurement, construction, commissioning and safety
Project schedule
Integrated communication protocols and decision
making processes
8 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Design Basis
Overview
Early stage, live document, project wide
Clear, complete and authoritative reference
Primary Components
Pipeline system overview
Operational parameters
Environmental and physical data
Materials engineering
Design issues and constraints
Design methodology and philosophy
9 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Major Design Issues
Product Characterization
Route Selection
Materials Selection
Hydraulic Analysis
Mechanical Design
Coatings
Components and Assemblies
Constructability and Intervention
Operation, Inspection and Repair
Decommissioning and Abandonment
10 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Major Cost Factors
Linepipe Tonnage
Material
Transportation
Length
• Alignment &
heading changes
Example
≈ US$25k / WT(mm)-D(m)-L(km)
762mm OD; 100km; 17.1mm⇒22.2mm WT
≈ US$10M differential
Ref: SEIC (2005)
11 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Major Cost Factors (cont.)
Vessel Selection
Performance
Water depth range
Tension limits
Construction Vessel Time
Alignment, heading angle
Stinger change-out
Platform, landfall approach
Crossings, interactions
Monitored, restricted
lay operations
Ref: Saipem (2006)
Castoro Sei
12 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Major Cost Factors (cont.)
Route Intervention Activities
Dredging
Trenching
Pre-sweeping
Rock dumping
Span correction
Ref: Saipem (2006)
13 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Overview
Pipeline Route Characterization
Landfall and platform approaches
Length, kilometer post and
intermediate stations
Changes in alignment and elevation
profile
System Environment
Characterization
Political and social factors
Physical and environmental factors
Engineered systems
14 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Critical Activity
Upfront Planning and Assessment
Desk study
• “Ounce of prevention >> pound of cure”
Utilize available resources
• Regulator and operator experience & lessons learned
• Government departments & agencies
• New technologies, data acquisition & historical archives
Uncertainty
• Prioritize and plan for engineering surveys
15 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Politics
Landfall and Platform Approaches
Ref: Saipem (2006)
Ref: Lanan (2007)
Ref: BHP (2005)
16 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Politics
Regional and International Scope
Political, civil or military instability
Jurisdictions &
regulations
Archaeological,
historical
significance
Examples
• Black Sea
• Europipe
• Oman–India
• Medgaz
• Vancouver
Island &
Georgia Strait
Ref: Saipem (2006)
17 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Remote Sensing
Ref: Hansen (2005)
Ref: Google (2005)
18 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Existing Data
Ref: EnCana (2002)
19 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Sensitive Areas
Environmental
Significant or sensitive ecosystem
• Wetlands, estuaries,
northern environments
Resident habitat
Breeding grounds
Migration patterns
Cumulative effects
Military Zones
Ref: EnCana (2002)
20 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Seabed Characteristics
Bathymetry & Slope
Soil Properties
Type
Index & strength
Spatial distribution
W
F
Ref: NOAA (2005)
Ref: BCOG (2001)
21 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Seabed Characteristics
Significant Features
Ref: Hydro (2005)
Ref: Hansen (2005)
22 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Seabed Characteristics
Seabed Mobility
Sediment transport
Sandwave migration
Scour
Ref: Heap (2004)
23 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Seabed Hazards
Seismic
Faulting
Liquefaction
Mass
Slides
Spreads
Falls
Flows
Subsurface
Shallow gas
• Pockmarks
• Subsidence
Subsea vents
• Pinnacles
Ref: Trifunac et al. (2002)
Ref: BCOG (2001)
24 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Physical Environment
Currents
Systems, tidal,
delta, loop
Surface
Waves
Wind induced
• Shallow water, breaking
• Bathymetry, refraction,
wave crest orthogonality
Internal
• Pycnocline [density]
ø (water temp., salinity)
Ref: NASA (2005)
25 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Physical Environment
Seabed Use and Obstacles
Oil and gas industry developments
Communications
Mobile and fixed gear fishing zones
Shipping traffic lanes
Military exercise zones
Military/civilian dumping grounds
Mining, dredging zones
Expected or anticipated future operations,
developments
Shipwrecks
26 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Physical Environment
Unique Features – Ice Gouging
27 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Physical Environment
Unique Features – Ice Gouging
28 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Physical Environment
Unique Features –
Strudel Scour
Ref: MMS (2005)
29 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Route Selection – Physical Environment
Unique Features
– Permafrost
Ref: NRCan (2005)
30 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
Reading List
1. Chaudhuri, J and Nash, I. (2005).
Medgaz: the ultra-deep pipeline. Pipeline
World, June, 10p.
[2005_Pipeline_World_06_Medgaz_Pipe
line.pdf]
31 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng.
References
BCOG (2001). BC Offshore Oil & Gas Technology Update. JWEL Project No. BCV50229,
October 19, 2001
BHP (2005). http://www.bhpbilliton.com
EnCana (2002). Development Plan – Revised Volume 2, Deep Panuke Offshore Gas
Development Project, 142p.
Google (2005). earth.google.com
Hansen, B. (2005). How Hydro’s Ormen Lange Project Can Contribute to the Development of
the Russian Arctic. Proc., IBC Arctic Oil and Gas Development Conference, Challenges and
Opportunities – The Technology Solution, London, UK.
Heap, A. (2004). “Shifting sands the clue to the vanishing seagrasses.” AusGEO, 75
September, p.32-34.
Hydro (2005). http://www.hydro.com/ormenlange/en
Lanan, G. (2007). Offshore Arctic Pipeline Operations. Proc., IBC Offshore Oil and Gas in Arctic
and Cold Waters Conference, Stavanger, Norway
Saipem (2006). http://www.saipem.eni.it/index.asp
SEIC (2005). http://www.sakhalinenergy.com/
Trifunac, M.D., A. Hayir and M.I. Todorovska (2002) “Was Grand Banks event of 1929 a slump
spreading in two directions?” Soil Dynamics and Earthquake Engineering, 22, pp.349-360.
MMS (2005). www.mms.gov
NASA (2005). http://eol.jsc.nasa.gov/
NOAA (2005). Office of Oceanic and Atmospheric Research, National Oceanic and
Atmospheric Administration, US Department of Commerce, http://www.oar.noaa.gov/
NRCan (2005). http://www.nrcan.gc.ca/inter/index_e.html

Weitere ähnliche Inhalte

Was ist angesagt?

Proposed Methodology Shore Approach
Proposed Methodology  Shore ApproachProposed Methodology  Shore Approach
Proposed Methodology Shore Approach
Mohd Zaini Baharum
 
Coiled Tubing Real-Time Monitoring: A New Era of Well Intervention and Worko...
Coiled Tubing Real-Time Monitoring:  A New Era of Well Intervention and Worko...Coiled Tubing Real-Time Monitoring:  A New Era of Well Intervention and Worko...
Coiled Tubing Real-Time Monitoring: A New Era of Well Intervention and Worko...
Society of Petroleum Engineers
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT Operations
HPHT Wells Summit
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
mmody4
 

Was ist angesagt? (20)

Proposed Methodology Shore Approach
Proposed Methodology  Shore ApproachProposed Methodology  Shore Approach
Proposed Methodology Shore Approach
 
Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting
 
Production optimization using gas lift technique
Production optimization using gas lift techniqueProduction optimization using gas lift technique
Production optimization using gas lift technique
 
Electrical submersible pump
Electrical submersible pumpElectrical submersible pump
Electrical submersible pump
 
Gas Pipeline Design
Gas Pipeline DesignGas Pipeline Design
Gas Pipeline Design
 
04 gas lift_equipment
04 gas lift_equipment04 gas lift_equipment
04 gas lift_equipment
 
Pipeline Construction
Pipeline ConstructionPipeline Construction
Pipeline Construction
 
workover presentation (1)
workover presentation (1)workover presentation (1)
workover presentation (1)
 
Coiled Tubing Real-Time Monitoring: A New Era of Well Intervention and Worko...
Coiled Tubing Real-Time Monitoring:  A New Era of Well Intervention and Worko...Coiled Tubing Real-Time Monitoring:  A New Era of Well Intervention and Worko...
Coiled Tubing Real-Time Monitoring: A New Era of Well Intervention and Worko...
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT Operations
 
Presentation on Calculation of Line Pack of Natural Gas Pipe using Aspen PLUS...
Presentation on Calculation of Line Pack of Natural Gas Pipe using Aspen PLUS...Presentation on Calculation of Line Pack of Natural Gas Pipe using Aspen PLUS...
Presentation on Calculation of Line Pack of Natural Gas Pipe using Aspen PLUS...
 
Well Testing
Well TestingWell Testing
Well Testing
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering SystemsUsing Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
Engineering & Design of Pipe Supports
Engineering & Design of Pipe SupportsEngineering & Design of Pipe Supports
Engineering & Design of Pipe Supports
 
Process Piping.pdf
Process Piping.pdfProcess Piping.pdf
Process Piping.pdf
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
 
Gas lift design
Gas lift designGas lift design
Gas lift design
 

Andere mochten auch

Part 5 structural design of pipelines
Part 5 structural design of pipelinesPart 5 structural design of pipelines
Part 5 structural design of pipelines
Gasforlife Polysource
 
2. pipeline materials overview
2. pipeline materials overview2. pipeline materials overview
2. pipeline materials overview
Willam Le
 
Offshore pipelines design, analysis & method
Offshore pipelines   design, analysis & methodOffshore pipelines   design, analysis & method
Offshore pipelines design, analysis & method
Thanh Tran
 
Pipe line Component & Valves
Pipe line Component & ValvesPipe line Component & Valves
Pipe line Component & Valves
Goel Scientific
 
(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS
Aiman Ali
 

Andere mochten auch (20)

Pipeline basic
Pipeline basicPipeline basic
Pipeline basic
 
Pipeline Transportation 123
Pipeline  Transportation 123Pipeline  Transportation 123
Pipeline Transportation 123
 
Part 5 structural design of pipelines
Part 5 structural design of pipelinesPart 5 structural design of pipelines
Part 5 structural design of pipelines
 
Pipeline
PipelinePipeline
Pipeline
 
2. pipeline materials overview
2. pipeline materials overview2. pipeline materials overview
2. pipeline materials overview
 
subsea
subseasubsea
subsea
 
Offshore pipelines design, analysis & method
Offshore pipelines   design, analysis & methodOffshore pipelines   design, analysis & method
Offshore pipelines design, analysis & method
 
Pipeline Design Project
Pipeline Design ProjectPipeline Design Project
Pipeline Design Project
 
Design of an Export Pipeline
Design of an Export Pipeline Design of an Export Pipeline
Design of an Export Pipeline
 
Crude Oil and natural Gas Product Transportation
Crude Oil and natural Gas Product TransportationCrude Oil and natural Gas Product Transportation
Crude Oil and natural Gas Product Transportation
 
Pipe line Component & Valves
Pipe line Component & ValvesPipe line Component & Valves
Pipe line Component & Valves
 
Modes of transportation - Pipelines
Modes of transportation  - PipelinesModes of transportation  - Pipelines
Modes of transportation - Pipelines
 
Introduction to Offshore Oil and Gas Surface Facilities
Introduction to Offshore Oil and Gas Surface FacilitiesIntroduction to Offshore Oil and Gas Surface Facilities
Introduction to Offshore Oil and Gas Surface Facilities
 
Natural Gas Pipeline Proposals in Virginia (Spectra Line) --7-2-14
Natural Gas Pipeline Proposals in Virginia (Spectra Line) --7-2-14Natural Gas Pipeline Proposals in Virginia (Spectra Line) --7-2-14
Natural Gas Pipeline Proposals in Virginia (Spectra Line) --7-2-14
 
Jaimin chp-6 - transport layer- 2011 batch
Jaimin   chp-6 - transport layer- 2011 batchJaimin   chp-6 - transport layer- 2011 batch
Jaimin chp-6 - transport layer- 2011 batch
 
(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS
 
PIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORT
PIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORTPIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORT
PIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORT
 
Transport Layer Description By Varun Tiwari
Transport Layer Description By Varun TiwariTransport Layer Description By Varun Tiwari
Transport Layer Description By Varun Tiwari
 
On bottom stability design of submarine pipelines
On bottom stability design of submarine pipelinesOn bottom stability design of submarine pipelines
On bottom stability design of submarine pipelines
 
Natural Gas Pipelines and FERC
Natural Gas Pipelines and FERCNatural Gas Pipelines and FERC
Natural Gas Pipelines and FERC
 

Ähnlich wie 02 pipeline systems engineering and routing considerations

ASCE PL Div 2001 40574-017-002
ASCE PL Div 2001 40574-017-002ASCE PL Div 2001 40574-017-002
ASCE PL Div 2001 40574-017-002
William Godwin
 
MacDonald Dan Oct 1 2014 [1130 am Session A] TAC 2014 Montreal [Compat...
MacDonald Dan   Oct 1  2014 [1130 am  Session A]   TAC 2014  Montreal [Compat...MacDonald Dan   Oct 1  2014 [1130 am  Session A]   TAC 2014  Montreal [Compat...
MacDonald Dan Oct 1 2014 [1130 am Session A] TAC 2014 Montreal [Compat...
Dan MacDonald, P.Eng.
 
CE-235 EH Coursepack 2010
CE-235 EH Coursepack 2010CE-235 EH Coursepack 2010
CE-235 EH Coursepack 2010
Sajjad Ahmad
 
IDENTIFYING RISK ZONE ALONG GAIL PIPELINE IN 1
IDENTIFYING RISK ZONE ALONG GAIL PIPELINE IN 1IDENTIFYING RISK ZONE ALONG GAIL PIPELINE IN 1
IDENTIFYING RISK ZONE ALONG GAIL PIPELINE IN 1
Penchala Vineeth
 
1st phase analysis
1st phase analysis1st phase analysis
1st phase analysis
Rohit Sahai
 
Toth_PSERC_Public_Webinar_Dec2010_Slides-2
Toth_PSERC_Public_Webinar_Dec2010_Slides-2Toth_PSERC_Public_Webinar_Dec2010_Slides-2
Toth_PSERC_Public_Webinar_Dec2010_Slides-2
Janos Toth
 
IGARSS2011_Lee_FinalC.pptx
IGARSS2011_Lee_FinalC.pptxIGARSS2011_Lee_FinalC.pptx
IGARSS2011_Lee_FinalC.pptx
grssieee
 
Multi-technology Non-Destructive Testing of Concrete Structures
Multi-technology Non-Destructive Testing of Concrete StructuresMulti-technology Non-Destructive Testing of Concrete Structures
Multi-technology Non-Destructive Testing of Concrete Structures
Proceq - a Screening Eagle Technologies company
 

Ähnlich wie 02 pipeline systems engineering and routing considerations (20)

ASCE PL Div 2001 40574-017-002
ASCE PL Div 2001 40574-017-002ASCE PL Div 2001 40574-017-002
ASCE PL Div 2001 40574-017-002
 
The role of site investigation
The role of site investigationThe role of site investigation
The role of site investigation
 
MacDonald Dan Oct 1 2014 [1130 am Session A] TAC 2014 Montreal [Compat...
MacDonald Dan   Oct 1  2014 [1130 am  Session A]   TAC 2014  Montreal [Compat...MacDonald Dan   Oct 1  2014 [1130 am  Session A]   TAC 2014  Montreal [Compat...
MacDonald Dan Oct 1 2014 [1130 am Session A] TAC 2014 Montreal [Compat...
 
Thesis present voeng soavandara
Thesis  present  voeng soavandaraThesis  present  voeng soavandara
Thesis present voeng soavandara
 
CE-235 EH Coursepack 2010
CE-235 EH Coursepack 2010CE-235 EH Coursepack 2010
CE-235 EH Coursepack 2010
 
IDENTIFYING RISK ZONE ALONG GAIL PIPELINE IN 1
IDENTIFYING RISK ZONE ALONG GAIL PIPELINE IN 1IDENTIFYING RISK ZONE ALONG GAIL PIPELINE IN 1
IDENTIFYING RISK ZONE ALONG GAIL PIPELINE IN 1
 
1st phase analysis
1st phase analysis1st phase analysis
1st phase analysis
 
Toth_PSERC_Public_Webinar_Dec2010_Slides-2
Toth_PSERC_Public_Webinar_Dec2010_Slides-2Toth_PSERC_Public_Webinar_Dec2010_Slides-2
Toth_PSERC_Public_Webinar_Dec2010_Slides-2
 
Ce syllabi-6 s-2010
Ce syllabi-6 s-2010Ce syllabi-6 s-2010
Ce syllabi-6 s-2010
 
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
 
IGARSS2011_Lee_FinalC.pptx
IGARSS2011_Lee_FinalC.pptxIGARSS2011_Lee_FinalC.pptx
IGARSS2011_Lee_FinalC.pptx
 
Management of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructionsManagement of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructions
 
Management of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructionsManagement of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructions
 
Engineering Geology Lecture 1
Engineering Geology Lecture 1Engineering Geology Lecture 1
Engineering Geology Lecture 1
 
Multi-technology Non-Destructive Testing of Concrete Structures
Multi-technology Non-Destructive Testing of Concrete StructuresMulti-technology Non-Destructive Testing of Concrete Structures
Multi-technology Non-Destructive Testing of Concrete Structures
 
SOFT Poster 2016
SOFT Poster 2016SOFT Poster 2016
SOFT Poster 2016
 
Effect of underground tunnelling by (TBM) on foundations of existing structures
Effect of underground tunnelling by (TBM) on foundations of existing structuresEffect of underground tunnelling by (TBM) on foundations of existing structures
Effect of underground tunnelling by (TBM) on foundations of existing structures
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
 
7563
75637563
7563
 
Dammed If You Do, Damned If You Dont
Dammed If You Do, Damned If You DontDammed If You Do, Damned If You Dont
Dammed If You Do, Damned If You Dont
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

02 pipeline systems engineering and routing considerations

  • 1. Shawn Kenny, Ph.D., P.Eng. Assistant Professor Faculty of Engineering and Applied Science Memorial University of Newfoundland spkenny@engr.mun.ca ENGI 8673 Subsea Pipeline Engineering Lecture 02: Pipeline Systems Engineering and Routing Considerations
  • 2. 2 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Lecture 02 Objective To provide an overview of subsea pipeline systems engineering and key factors in pipeline routing
  • 3. 3 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Pipeline Systems Primary Function Product Transport Liquid hydrocarbons Natural gas Natural gas liquids Water Chemicals Key Elements Product type Delivery rate Operating pressure Distance from field development to market Current and future demand/capacity
  • 4. 4 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Pipeline Transportation Systems Flowlines Field development to a subsea manifold or production facility Gathering Lines Connecting multiple flowlines to a production facility Export Pipeline Transport from a production facility to domestic or international market
  • 5. 5 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Project Phases
  • 6. 6 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Systematic Approach Management Project execution plan Technical Development plan Design basis Safety plan Auxiliary Project summary Economic benefits plan Environmental impact assessment Socio-economic impact assessment
  • 7. 7 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Project Execution Plan Overview Early stage, live document, project wide Client objectives, drivers and risk tolerance Primary Components Project scope and deliverables Organizational hierarchy, roles and responsibilities Execution strategies for engineering, quality, procurement, construction, commissioning and safety Project schedule Integrated communication protocols and decision making processes
  • 8. 8 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Design Basis Overview Early stage, live document, project wide Clear, complete and authoritative reference Primary Components Pipeline system overview Operational parameters Environmental and physical data Materials engineering Design issues and constraints Design methodology and philosophy
  • 9. 9 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Major Design Issues Product Characterization Route Selection Materials Selection Hydraulic Analysis Mechanical Design Coatings Components and Assemblies Constructability and Intervention Operation, Inspection and Repair Decommissioning and Abandonment
  • 10. 10 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Major Cost Factors Linepipe Tonnage Material Transportation Length • Alignment & heading changes Example ≈ US$25k / WT(mm)-D(m)-L(km) 762mm OD; 100km; 17.1mm⇒22.2mm WT ≈ US$10M differential Ref: SEIC (2005)
  • 11. 11 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Major Cost Factors (cont.) Vessel Selection Performance Water depth range Tension limits Construction Vessel Time Alignment, heading angle Stinger change-out Platform, landfall approach Crossings, interactions Monitored, restricted lay operations Ref: Saipem (2006) Castoro Sei
  • 12. 12 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Major Cost Factors (cont.) Route Intervention Activities Dredging Trenching Pre-sweeping Rock dumping Span correction Ref: Saipem (2006)
  • 13. 13 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Overview Pipeline Route Characterization Landfall and platform approaches Length, kilometer post and intermediate stations Changes in alignment and elevation profile System Environment Characterization Political and social factors Physical and environmental factors Engineered systems
  • 14. 14 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Critical Activity Upfront Planning and Assessment Desk study • “Ounce of prevention >> pound of cure” Utilize available resources • Regulator and operator experience & lessons learned • Government departments & agencies • New technologies, data acquisition & historical archives Uncertainty • Prioritize and plan for engineering surveys
  • 15. 15 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Politics Landfall and Platform Approaches Ref: Saipem (2006) Ref: Lanan (2007) Ref: BHP (2005)
  • 16. 16 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Politics Regional and International Scope Political, civil or military instability Jurisdictions & regulations Archaeological, historical significance Examples • Black Sea • Europipe • Oman–India • Medgaz • Vancouver Island & Georgia Strait Ref: Saipem (2006)
  • 17. 17 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Remote Sensing Ref: Hansen (2005) Ref: Google (2005)
  • 18. 18 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Existing Data Ref: EnCana (2002)
  • 19. 19 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Sensitive Areas Environmental Significant or sensitive ecosystem • Wetlands, estuaries, northern environments Resident habitat Breeding grounds Migration patterns Cumulative effects Military Zones Ref: EnCana (2002)
  • 20. 20 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Seabed Characteristics Bathymetry & Slope Soil Properties Type Index & strength Spatial distribution W F Ref: NOAA (2005) Ref: BCOG (2001)
  • 21. 21 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Seabed Characteristics Significant Features Ref: Hydro (2005) Ref: Hansen (2005)
  • 22. 22 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Seabed Characteristics Seabed Mobility Sediment transport Sandwave migration Scour Ref: Heap (2004)
  • 23. 23 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Seabed Hazards Seismic Faulting Liquefaction Mass Slides Spreads Falls Flows Subsurface Shallow gas • Pockmarks • Subsidence Subsea vents • Pinnacles Ref: Trifunac et al. (2002) Ref: BCOG (2001)
  • 24. 24 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Physical Environment Currents Systems, tidal, delta, loop Surface Waves Wind induced • Shallow water, breaking • Bathymetry, refraction, wave crest orthogonality Internal • Pycnocline [density] ø (water temp., salinity) Ref: NASA (2005)
  • 25. 25 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Physical Environment Seabed Use and Obstacles Oil and gas industry developments Communications Mobile and fixed gear fishing zones Shipping traffic lanes Military exercise zones Military/civilian dumping grounds Mining, dredging zones Expected or anticipated future operations, developments Shipwrecks
  • 26. 26 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Physical Environment Unique Features – Ice Gouging
  • 27. 27 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Physical Environment Unique Features – Ice Gouging
  • 28. 28 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Physical Environment Unique Features – Strudel Scour Ref: MMS (2005)
  • 29. 29 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Route Selection – Physical Environment Unique Features – Permafrost Ref: NRCan (2005)
  • 30. 30 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. Reading List 1. Chaudhuri, J and Nash, I. (2005). Medgaz: the ultra-deep pipeline. Pipeline World, June, 10p. [2005_Pipeline_World_06_Medgaz_Pipe line.pdf]
  • 31. 31 ENGI 8673 Subsea Pipeline Engineering – Lecture 02© 2008 S. Kenny, Ph.D., P.Eng. References BCOG (2001). BC Offshore Oil & Gas Technology Update. JWEL Project No. BCV50229, October 19, 2001 BHP (2005). http://www.bhpbilliton.com EnCana (2002). Development Plan – Revised Volume 2, Deep Panuke Offshore Gas Development Project, 142p. Google (2005). earth.google.com Hansen, B. (2005). How Hydro’s Ormen Lange Project Can Contribute to the Development of the Russian Arctic. Proc., IBC Arctic Oil and Gas Development Conference, Challenges and Opportunities – The Technology Solution, London, UK. Heap, A. (2004). “Shifting sands the clue to the vanishing seagrasses.” AusGEO, 75 September, p.32-34. Hydro (2005). http://www.hydro.com/ormenlange/en Lanan, G. (2007). Offshore Arctic Pipeline Operations. Proc., IBC Offshore Oil and Gas in Arctic and Cold Waters Conference, Stavanger, Norway Saipem (2006). http://www.saipem.eni.it/index.asp SEIC (2005). http://www.sakhalinenergy.com/ Trifunac, M.D., A. Hayir and M.I. Todorovska (2002) “Was Grand Banks event of 1929 a slump spreading in two directions?” Soil Dynamics and Earthquake Engineering, 22, pp.349-360. MMS (2005). www.mms.gov NASA (2005). http://eol.jsc.nasa.gov/ NOAA (2005). Office of Oceanic and Atmospheric Research, National Oceanic and Atmospheric Administration, US Department of Commerce, http://www.oar.noaa.gov/ NRCan (2005). http://www.nrcan.gc.ca/inter/index_e.html