MEASUREMENT OF QUANTITIES




                     ● Mat Naim bin Abdullah @ Mohd Asmoni
                     ● Diploma QS (UTM), BSc. QS (Glasgow
                         Caledonian University), M.Eng. Construction
                         (UTM), PhD Facilities Management (UTM)
                     ●   matnaim@utm.my
                     ●   amn871969@yahoo.com
                     ●   C04-308
                     ●   019-7573760




        www.utm.my              innovative ● entrepreneurial ● global   1
MEASUREMENT OF QUANTITIES


Assumption No. 1:       Total land area = 10m x 10m




                                  Project Title: Construction and completion of
                                  guard house
                                  Owner: Panicsonic Sdn Bhd
                                  Architect: A to Z Sdn Bhd
                                  Drawing Title: Ground beam and foundation plan
                                  -------------------------------------------------------------------------
                                  Drawn by: Sheila
                                  Checked by: Aaron




           www.utm.my            innovative ● entrepreneurial ● global                                        2
MEASUREMENT OF QUANTITIES




        www.utm.my          innovative ● entrepreneurial ● global   3
MEASUREMENT OF QUANTITIES

                      Construction Method

 1.    Preliminaries (Initial site works) - % of total cost
 2.    Site clearance and earthwork
 3.    Foundation construction (E.g. Piling and footing)
 4.    Work below lowest floor finish
 5.    Frame
 6.    Staircase
 7.    Upper Floor
 8.    Roof
 9.    Wall and partition
 10.   Door and window
 11.   Finishes
 12.   Sundries (Built-in furniture)
 13.   Building services (M&E, ICT etc)
 14.   External works (Water reticulation, landscape etc)



              www.utm.my                  innovative ● entrepreneurial ● global   4
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

1) Site clearance

1.1) Clear the site including grubbing of Area of the site:
     trees, shrubs and demolish any       10 x 10 = 100m2
     existing structure and cart away
     and dump to the specified
     location.

      10.00
      10.00
     ----------
     100.00          100 m2
     ----------




                    www.utm.my                  innovative ● entrepreneurial ● global   5
MEASUREMENT OF QUANTITIES




        www.utm.my          innovative ● entrepreneurial ● global   6
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.1) Piling including all related works   Area of the building:
                                          Length = 3048 + 3048 = 6096
        6.10                              Width = 3048 + 3048 = 6096
        6.10
     ----------
      37.21         37 m2
     ----------




                    www.utm.my                 innovative ● entrepreneurial ● global   7
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.2) Excavation for pile cap            Size of pile cap = 1219 x 1219
                                        Depth of excavation:
     9/1.22                                1524 + 50 (lean concrete) = 1574
        1.22
        1.57
     ----------
      21.03        21 m3
     ----------




                    www.utm.my               innovative ● entrepreneurial ● global   8
MEASUREMENT OF QUANTITIES




        www.utm.my          innovative ● entrepreneurial ● global   9
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.3) Reinforced concrete Grade 30 for   Size of pile cap:
     pile cap                           Length = 1219
                                        Width = 1219
    9/1.22                              Thickness = 305
       1.22
       0.31
    ----------
       4.15       4 m3
    ----------




                   www.utm.my                 innovative ● entrepreneurial ● global   10
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.4) 50mm thick lean concrete Grade     Size of pile cap:
     15 for pile cap                    Length = 1219
                                        Width = 1219
   9 / 1.22
       1.22
    ----------
     13.40        13 m2
    ----------




                   www.utm.my                 innovative ● entrepreneurial ● global   11
MEASUREMENT OF QUANTITIES




        www.utm.my          innovative ● entrepreneurial ● global   12
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.5) Formwork for pile cap              Size of pile cap:
                                        Length = 1219
 9 / 4 /1.22                            Width = 1219
        0.31                            Thickness = 305
     ----------
       13.62      14 m2                 9/2/1.22
     ----------                              0.31 6.81

                                        9/2/1.50
                                             0.31 8.37
                                                 15.18 15m2




                   www.utm.my                 innovative ● entrepreneurial ● global   13
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.6) Reinforcement bar Y12 for pile cap   Length:
                                            a                    c
 9/2/ 12/ 1.53
       ----------                                      b

       330.48m x 0.89 kg/m = 294.13kg     = a + b + c – cover
       ----------                         = 305 + 1219 + 305 – 6(50)
                            = 294 kg      = 1829 – 300
                                          = 1529

a=305-50-50=205                           No. of bars:
b=1219-50-50=1119                         = (b/100) + 1
c=305-50-50=205                           = ((1219 – 2(50)cover )/100 )+1
A+B+C=1529                                = 12 nos.



                   www.utm.my                   innovative ● entrepreneurial ● global   14
MEASUREMENT OF QUANTITIES




                     @100 c/c




        www.utm.my              innovative ● entrepreneurial ● global   15
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF                                Taker off :              Checked by:
3.1) Column stump                       Size of column stump:
3.1.1) Reinforced concrete Grade 30     Length = 229
       for column stump                 Width = 229
                                        Height = 1524 – 305 thickness of pile
    9/0.23                                         cap – (351/2) Half of beam’s
       0.23                                        thickness
       1.04                                      = 1043.50
    ----------
       0.50       1 m3
    ----------




                   www.utm.my                 innovative ● entrepreneurial ● global   16
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.1) Column stump                       Size of column stump:
3.1.2) Formwork for column stump        Length = 229
                                        Width = 229
  9/4/0.23                              Height = 1524 – 305 thickness of pile
        1.04                                       cap – (351/2) Half of beam’s
     ----------                                    thickness
       8.61       9 m2                           = 1043.50
     ----------




                   www.utm.my                innovative ● entrepreneurial ● global   17
MEASUREMENT OF QUANTITIES




               Height of column stump

                        @100 c/c




        www.utm.my                      innovative ● entrepreneurial ● global   18
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.1) Column stump                       Length = a + half beam’s thickness –
3.1.3) Reinforcement bar Y12 for        cover + 2 laps
       column stump                          lap



  9/4/2.97
     ----------                                    a

     106.92m x 0.89kg/m = 95.16kg
     ----------                                        lap
                           95kg
                                        = 1524 + (351/2) – 50 + (660x2)
                                        = 2969.50




                   www.utm.my                innovative ● entrepreneurial ● global   19
MEASUREMENT OF QUANTITIES
                     General Notes




        www.utm.my                   innovative ● entrepreneurial ● global   20
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.1) Column stump                       Length of link: (length of CS– 2cover) x
3.1.4) R6 link in for column stump      4 +hook            Hook


  9/6/0.62
     ----------
      33.48m x 0.22kg/m = 7.36kg        =(229-100)+(229-100)+(229-100)+(229-
     ----------                         100)+100=616
                           7kg
                                        No. of link:
                                        Height of column stump = 1043.50
                                        =(1043.50/229)+1
                                        = 6 nos.




                   www.utm.my                innovative ● entrepreneurial ● global   21
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                        Size of ground beam:
3.2.1) Excavation for ground beam       Length=3048+3048=6096
                                        Width = 229
  2/3/6.10                              Thickness = 351
       0.23
       0.35
     ----------
       2.95m3
     ----------
                           3m3




                   www.utm.my                innovative ● entrepreneurial ● global   22
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                          Size of ground beam:
3.2.2) Reinforced concrete Grade 30 for   Length=3048+3048=6096
        ground beam                       Width = 229
                                          Thickness = 351
  2/3/6.10
       0.23
       0.35
     ----------
       2.95m3
     ----------
                            3m3




                   www.utm.my                 innovative ● entrepreneurial ● global   23
MEASUREMENT OF QUANTITIES


Assumption No. 1:       Total land area = 10m x 10m




                                  Project Title: Construction and completion of
                                  guard house
                                  Owner: Panicsonic Sdn Bhd
                                  Architect: A to Z Sdn Bhd
                                  Drawing Title: Ground beam and foundation plan
                                  -------------------------------------------------------------------------
                                  Drawn by: Sheila
                                  Checked by: Aaron




           www.utm.my            innovative ● entrepreneurial ● global                                        24
MEASUREMENT OF QUANTITIES




               Height of column stump

                        @100 c/c




        www.utm.my                      innovative ● entrepreneurial ● global   25
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                        Size of ground beam:
3.2.3) Formwork for ground beam         Length=3048+3048=6096
                                        Width = 229
                                        Thickness = 351
2/3/2/6.10
       0.35
     ----------
      25.62       26m2
     ----------




                   www.utm.my                innovative ● entrepreneurial ● global   26
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                        Length = (length–2cover)+(2bend-
3.2.4) Reinforcement bar Y10 for        2cover)
       ground beam                      =(6096-(2x50))+(2x351)-(4x50)
                                        = 6498
2/3/4/6.50
     ----------
    156.00m x 0.62kg/m = 96.72kg
     ----------
                          97kg




                   www.utm.my                innovative ● entrepreneurial ● global   27
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                        Length of stirrup:
3.2.5) R6 stirrup for ground beam                            Hook


2/3/28/0.86
      ----------                        =(229-100)+(351-100)+(229-100)+(351-
     144.48m x 0.22kg/m = 31.79kg       100)+100
      ----------                        =860
                          32kg
                                        No. of stirrup:
                                        Length of grd beam= 6096
                                        =(6096/229)+1
                                        = 28 nos.




                   www.utm.my                innovative ● entrepreneurial ● global   28
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.1) Excavation for ground slab       Depth of excavation = 500mm
                                                                      150mm thick
                                                                      concrete slab

       6.10
       6.10                                                                   BRC A8


       0.50                                                                  50mm thick
                                                                                sand
      ----------                                                             300mm thick

      18.61m3                                                                  hardcore


      ----------                                          DPM

                           19 m3




                   www.utm.my               innovative ● entrepreneurial ● global          29
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.2) Reinforced concrete G30 in       Depth of excavation = 500mm
       ground slab                                                       150mm thick
                                                                         concrete slab



       6.10                                                                BRC A8

       6.10                                                                50mm thick
       0.15                                                                   sand


      ----------                                                          300mm thick
                                                                            hardcore

       5.58m3
      ----------   6 m3                                    DPM




                   www.utm.my                innovative ● entrepreneurial ● global       30
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.3) Formwork for ground slab         Depth of excavation = 500mm
                                                                         150mm thick
                                                                         concrete slab

     4/6.10
       0.15                                                                BRC A8


      ----------                                                           50mm thick
                                                                              sand
       3.66m2                                                             300mm thick

      ----------                                                            hardcore


                           4 m2                            DPM




                   www.utm.my                innovative ● entrepreneurial ● global       31
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.4) BRC A8 for ground slab           Depth of excavation = 500mm
                                                                         150mm thick
                                                                         concrete slab

       6.10
       6.10                                                                BRC A8

      ----------                                                           50mm thick
      37.21m2                                                                 sand


      ----------                                                          300mm thick
                                                                            hardcore

                           37 m2
                                                           DPM




                   www.utm.my                innovative ● entrepreneurial ● global       32
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.5) DPM for ground slab              Depth of excavation = 500mm
                                                                         150mm thick
                                                                         concrete slab

       6.10
       6.10                                                                BRC A8

      ----------                                                           50mm thick
      37.21m2                                                                 sand


      ----------                                                          300mm thick
                                                                            hardcore

                             37 m2
                                                           DPM




                   www.utm.my                innovative ● entrepreneurial ● global       33
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.6) 50mm sand blinding for ground    Depth of excavation = 500mm
       slab                                                              150mm thick
                                                                         concrete slab



       6.10                                                                BRC A8

       6.10                                                                50mm thick
      ----------                                                              sand


      37.21m2                                                             300mm thick
                                                                            hardcore

      ----------
                           37 m2                           DPM




                   www.utm.my                innovative ● entrepreneurial ● global       34
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.7) Hardcore for ground slab         Depth of excavation = 500mm
                                                                         150mm thick
                                                                         concrete slab

       6.10
       6.10                                                                BRC A8

       0.30                                                                50mm thick
      ----------                                                              sand


      11.16m3                                                             300mm thick
                                                                            hardcore

      ----------
                           11 m3                           DPM




                   www.utm.my                innovative ● entrepreneurial ● global       35

Weitere ähnliche Inhalte

Was ist angesagt?

CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
ashleyyeap
 
pihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanpihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaan
FiQahh AmiNn
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
Soh Shing
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
마 이환
 
Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Excavation 2014a-Lecture3
Excavation 2014a-Lecture3
Anne Allan
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
Est
 

Was ist angesagt? (20)

CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
pihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanpihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaan
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Cube test REPORT - DCC2042
Cube test REPORT - DCC2042Cube test REPORT - DCC2042
Cube test REPORT - DCC2042
 
Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Excavation 2014a-Lecture3
Excavation 2014a-Lecture3
 
Site Possession
Site PossessionSite Possession
Site Possession
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Cube test report
Cube test reportCube test report
Cube test report
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Earthwork support
Earthwork supportEarthwork support
Earthwork support
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
 

Ähnlich wie Sgp4813 measurement of quantities

Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
alanchong88
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
kiransuresh7
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
AJAY SHAHU
 

Ähnlich wie Sgp4813 measurement of quantities (20)

Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
 
IRJET- Design and Analysis of Residential Building
IRJET-  	  Design and Analysis of Residential BuildingIRJET-  	  Design and Analysis of Residential Building
IRJET- Design and Analysis of Residential Building
 
hochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptxhochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptx
 
Présentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptxPrésentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptx
 
DSLIP 2015 Technical Report
DSLIP 2015 Technical ReportDSLIP 2015 Technical Report
DSLIP 2015 Technical Report
 
Dslip report
Dslip reportDslip report
Dslip report
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projects
 
@ETCONp Construction Exam 8 .DOCX
@ETCONp Construction Exam 8  .DOCX@ETCONp Construction Exam 8  .DOCX
@ETCONp Construction Exam 8 .DOCX
 
Construction site
Construction siteConstruction site
Construction site
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentation
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
BUILDING CONSTRUCTION
BUILDING CONSTRUCTION BUILDING CONSTRUCTION
BUILDING CONSTRUCTION
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
 
AH15019
AH15019AH15019
AH15019
 
internship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteinternship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering institute
 

Kürzlich hochgeladen

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Kürzlich hochgeladen (20)

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 

Sgp4813 measurement of quantities

  • 1. MEASUREMENT OF QUANTITIES ● Mat Naim bin Abdullah @ Mohd Asmoni ● Diploma QS (UTM), BSc. QS (Glasgow Caledonian University), M.Eng. Construction (UTM), PhD Facilities Management (UTM) ● matnaim@utm.my ● amn871969@yahoo.com ● C04-308 ● 019-7573760 www.utm.my innovative ● entrepreneurial ● global 1
  • 2. MEASUREMENT OF QUANTITIES Assumption No. 1: Total land area = 10m x 10m Project Title: Construction and completion of guard house Owner: Panicsonic Sdn Bhd Architect: A to Z Sdn Bhd Drawing Title: Ground beam and foundation plan ------------------------------------------------------------------------- Drawn by: Sheila Checked by: Aaron www.utm.my innovative ● entrepreneurial ● global 2
  • 3. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 3
  • 4. MEASUREMENT OF QUANTITIES Construction Method 1. Preliminaries (Initial site works) - % of total cost 2. Site clearance and earthwork 3. Foundation construction (E.g. Piling and footing) 4. Work below lowest floor finish 5. Frame 6. Staircase 7. Upper Floor 8. Roof 9. Wall and partition 10. Door and window 11. Finishes 12. Sundries (Built-in furniture) 13. Building services (M&E, ICT etc) 14. External works (Water reticulation, landscape etc) www.utm.my innovative ● entrepreneurial ● global 4
  • 5. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 1) Site clearance 1.1) Clear the site including grubbing of Area of the site: trees, shrubs and demolish any 10 x 10 = 100m2 existing structure and cart away and dump to the specified location. 10.00 10.00 ---------- 100.00 100 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 5
  • 6. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 6
  • 7. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.1) Piling including all related works Area of the building: Length = 3048 + 3048 = 6096 6.10 Width = 3048 + 3048 = 6096 6.10 ---------- 37.21 37 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 7
  • 8. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.2) Excavation for pile cap Size of pile cap = 1219 x 1219 Depth of excavation: 9/1.22 1524 + 50 (lean concrete) = 1574 1.22 1.57 ---------- 21.03 21 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 8
  • 9. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 9
  • 10. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.3) Reinforced concrete Grade 30 for Size of pile cap: pile cap Length = 1219 Width = 1219 9/1.22 Thickness = 305 1.22 0.31 ---------- 4.15 4 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 10
  • 11. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.4) 50mm thick lean concrete Grade Size of pile cap: 15 for pile cap Length = 1219 Width = 1219 9 / 1.22 1.22 ---------- 13.40 13 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 11
  • 12. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 12
  • 13. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.5) Formwork for pile cap Size of pile cap: Length = 1219 9 / 4 /1.22 Width = 1219 0.31 Thickness = 305 ---------- 13.62 14 m2 9/2/1.22 ---------- 0.31 6.81 9/2/1.50 0.31 8.37 15.18 15m2 www.utm.my innovative ● entrepreneurial ● global 13
  • 14. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.6) Reinforcement bar Y12 for pile cap Length: a c 9/2/ 12/ 1.53 ---------- b 330.48m x 0.89 kg/m = 294.13kg = a + b + c – cover ---------- = 305 + 1219 + 305 – 6(50) = 294 kg = 1829 – 300 = 1529 a=305-50-50=205 No. of bars: b=1219-50-50=1119 = (b/100) + 1 c=305-50-50=205 = ((1219 – 2(50)cover )/100 )+1 A+B+C=1529 = 12 nos. www.utm.my innovative ● entrepreneurial ● global 14
  • 15. MEASUREMENT OF QUANTITIES @100 c/c www.utm.my innovative ● entrepreneurial ● global 15
  • 16. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF Taker off : Checked by: 3.1) Column stump Size of column stump: 3.1.1) Reinforced concrete Grade 30 Length = 229 for column stump Width = 229 Height = 1524 – 305 thickness of pile 9/0.23 cap – (351/2) Half of beam’s 0.23 thickness 1.04 = 1043.50 ---------- 0.50 1 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 16
  • 17. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.1) Column stump Size of column stump: 3.1.2) Formwork for column stump Length = 229 Width = 229 9/4/0.23 Height = 1524 – 305 thickness of pile 1.04 cap – (351/2) Half of beam’s ---------- thickness 8.61 9 m2 = 1043.50 ---------- www.utm.my innovative ● entrepreneurial ● global 17
  • 18. MEASUREMENT OF QUANTITIES Height of column stump @100 c/c www.utm.my innovative ● entrepreneurial ● global 18
  • 19. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.1) Column stump Length = a + half beam’s thickness – 3.1.3) Reinforcement bar Y12 for cover + 2 laps column stump lap 9/4/2.97 ---------- a 106.92m x 0.89kg/m = 95.16kg ---------- lap 95kg = 1524 + (351/2) – 50 + (660x2) = 2969.50 www.utm.my innovative ● entrepreneurial ● global 19
  • 20. MEASUREMENT OF QUANTITIES General Notes www.utm.my innovative ● entrepreneurial ● global 20
  • 21. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.1) Column stump Length of link: (length of CS– 2cover) x 3.1.4) R6 link in for column stump 4 +hook Hook 9/6/0.62 ---------- 33.48m x 0.22kg/m = 7.36kg =(229-100)+(229-100)+(229-100)+(229- ---------- 100)+100=616 7kg No. of link: Height of column stump = 1043.50 =(1043.50/229)+1 = 6 nos. www.utm.my innovative ● entrepreneurial ● global 21
  • 22. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Size of ground beam: 3.2.1) Excavation for ground beam Length=3048+3048=6096 Width = 229 2/3/6.10 Thickness = 351 0.23 0.35 ---------- 2.95m3 ---------- 3m3 www.utm.my innovative ● entrepreneurial ● global 22
  • 23. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Size of ground beam: 3.2.2) Reinforced concrete Grade 30 for Length=3048+3048=6096 ground beam Width = 229 Thickness = 351 2/3/6.10 0.23 0.35 ---------- 2.95m3 ---------- 3m3 www.utm.my innovative ● entrepreneurial ● global 23
  • 24. MEASUREMENT OF QUANTITIES Assumption No. 1: Total land area = 10m x 10m Project Title: Construction and completion of guard house Owner: Panicsonic Sdn Bhd Architect: A to Z Sdn Bhd Drawing Title: Ground beam and foundation plan ------------------------------------------------------------------------- Drawn by: Sheila Checked by: Aaron www.utm.my innovative ● entrepreneurial ● global 24
  • 25. MEASUREMENT OF QUANTITIES Height of column stump @100 c/c www.utm.my innovative ● entrepreneurial ● global 25
  • 26. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Size of ground beam: 3.2.3) Formwork for ground beam Length=3048+3048=6096 Width = 229 Thickness = 351 2/3/2/6.10 0.35 ---------- 25.62 26m2 ---------- www.utm.my innovative ● entrepreneurial ● global 26
  • 27. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Length = (length–2cover)+(2bend- 3.2.4) Reinforcement bar Y10 for 2cover) ground beam =(6096-(2x50))+(2x351)-(4x50) = 6498 2/3/4/6.50 ---------- 156.00m x 0.62kg/m = 96.72kg ---------- 97kg www.utm.my innovative ● entrepreneurial ● global 27
  • 28. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Length of stirrup: 3.2.5) R6 stirrup for ground beam Hook 2/3/28/0.86 ---------- =(229-100)+(351-100)+(229-100)+(351- 144.48m x 0.22kg/m = 31.79kg 100)+100 ---------- =860 32kg No. of stirrup: Length of grd beam= 6096 =(6096/229)+1 = 28 nos. www.utm.my innovative ● entrepreneurial ● global 28
  • 29. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.1) Excavation for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 0.50 50mm thick sand ---------- 300mm thick 18.61m3 hardcore ---------- DPM 19 m3 www.utm.my innovative ● entrepreneurial ● global 29
  • 30. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.2) Reinforced concrete G30 in Depth of excavation = 500mm ground slab 150mm thick concrete slab 6.10 BRC A8 6.10 50mm thick 0.15 sand ---------- 300mm thick hardcore 5.58m3 ---------- 6 m3 DPM www.utm.my innovative ● entrepreneurial ● global 30
  • 31. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.3) Formwork for ground slab Depth of excavation = 500mm 150mm thick concrete slab 4/6.10 0.15 BRC A8 ---------- 50mm thick sand 3.66m2 300mm thick ---------- hardcore 4 m2 DPM www.utm.my innovative ● entrepreneurial ● global 31
  • 32. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.4) BRC A8 for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 ---------- 50mm thick 37.21m2 sand ---------- 300mm thick hardcore 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 32
  • 33. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.5) DPM for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 ---------- 50mm thick 37.21m2 sand ---------- 300mm thick hardcore 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 33
  • 34. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.6) 50mm sand blinding for ground Depth of excavation = 500mm slab 150mm thick concrete slab 6.10 BRC A8 6.10 50mm thick ---------- sand 37.21m2 300mm thick hardcore ---------- 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 34
  • 35. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.7) Hardcore for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 0.30 50mm thick ---------- sand 11.16m3 300mm thick hardcore ---------- 11 m3 DPM www.utm.my innovative ● entrepreneurial ● global 35