Manual Plastering
What is Plaster?
Plaster is a building material used for coating walls and
ceilings. Sand-cement plaster is used extensively in building
work as a decorative or protective coating for concrete and
masonry walls .
Plaster is one of the oldest building materials, the most
primitive form was mud plaster, used to hold together
structures made of branches or wood for example. Today
internal plastering is used more as a way of smoothing out
surfaces and preparing them for decoration, it also adds
strength to the wall or ceiling and helps seal together building
materials.
Materials Required
 Cement
 Sand
 Water
 Masonry Trowel
 Smoothening Trowel
 Metal Float
 Measuring Tape
 Plumb Bob
 Mud Pan
 Chicken Mesh
 Hairs
 Recron Fibre6/9/2014
Know your Materials!
6/9/2014
Cement Sand Recron Fibre
Final Mortar mix (made from
mixing Cement,sand,water and
recron fibre) present in a Mudpan
Procedure
1. After the masonry wall made of bricks or aerated blocks is ready, it is
first cleaned properly before starting the plastering wall using brushes
and trowels.
6/9/2014
Brick wall Aerated Block wall
2. The scaffold is prepared for provide the labour a platform to stand and
materials required for plastering are transported at the site of plastering.
3. Cement Mortar is prepared by mixing cement and sand in ratio specified. For
ex-In our case the ratio specified is 1:4.So we use
1 unit volume of cement for 4 unit volume of
sand. The normal cement bag is 50 kg in mass
0.035 m3. So we prepare a container of volume
0.035 m3 and pour 4 containers of cement.
6/9/2014
Scaffolding
Container
for
measuring
sand
4. Recron fibre is added to it as it helps in avoiding cracks in plaster. We use 125
gm fibre for 1 bag of cement.
5. Water is added .As per as IS standards 0.025 m3 of water is added to 1 bag of
cement, but at site it is subjected to the workability requirements.
Note: The mortar mix should be used within it’s initial setting time = 45 min
6. Chicken mesh is used at the joint of Lintel and masonry wall to avoid cracks at
the joint in future.
6/9/2014
Chicken Mesh Labour putting Chicken Mesh
7. Making of Level Pads : Level pads are used for maintaining the thickness of
plaster coat required.They act as a reference for checking thickness of plaster.
- First we lay a reference line using rope and nails
- We check the distance of wall from this reference line and note it(say D1)
- Now we put the mortar of wall and smoothen it. We now calculate the
distance between the reference line and level pad’s surface(say D2)
D1-D2= Thickness of coat required
- If the thickness doesn’t matches then adjust the thickness of level pad
- Now make one level pad above the first level pad and check if it’s in line
with the help of plumb bob.It might happen the wall is not exactly vertical
either inwards or outwards which can be checked with help of plumb bob
hence thickness of level pad can be adjusted accordingly.
6/9/2014
6/9/2014
Labourers checking the distance of wall from reference
line
Making of level pad
6/9/2014
Level Pad
Labourers checking distance of level pad from reference
line
6/9/2014
Plumb Bob
No gap between wall and plumb
bob, signifying that wall is straight
Gap between wall and plumb
bob indicating that wall is
“Inwards”
- After checking for vertical alignment of level pads, check for horizontal
alignment with the help of a rope( pin a rope parallel to the first level pad
also vertical with adjacent wall).Adjust the level pads in thickness if the wall
is tilted sideways.
6/9/2014
Checking for vertical alignment of pads
Horizontally laid level pads
8. After making the level pads, wet the wall with help of diluted cement water slurry
to provide better adhesion with mortar.
9. The mason then applies the mortar on the walls
with the help of trowel.
6/9/2014
Masonry Trowel
10. With the help of metal float the mason creates a smooth reference plain of
required thickness by pressing the float against two vertical level pads.The
additional mortar is scrapped of with the help of float.
6/9/2014Metal Float
Reference Plain
11. The finishing of the plaster is done with the help of finishing trowel.
6/9/2014
Removing excess material with
float
Finishing Trowel
12. After smoothening, the plaster is roughened up for providing better adhesion in
case of a second coat. A hair is used for it or sometimes labour also uses chicken
mesh only.
6/9/2014
Hair used for roughening
surface
Rough Plaster coat
Challenges in Manual Plastering
1. A proper hierarchical system is not present on site. Ideally the engineer should
teach the supervisor as in what he requires and the supervisor should convey it to
the labour.But due to lack of number and agility of supervisors the engineer has
to do that part.
2. Due to above point, the engineer is not able to perform his main task efficiently
which is Quality Checks .Two examples in this regard are:-
(a) Amount of water is not as per as standards and the labour puts water
according to his will. This in turn degrades the quality of the mix.
(b) Checking of the thickness and alignment of level pads is not proper which
leads to lack of uniformity of plaster. Plumb checking is not also proper.
3. The mortar is not used within it’s initial setting time of 45 Minutes and sometimes
used beyond 4 hours. This again degrades the quality.
4. The floor is not cleaned properly before starting plaster and sacks are not always
laid down to collect the fallen mortar. So the mortar gets mixed with the mud and
is then used again which has serious implications on the quality.
6/9/2014
5. Due to lack of supervision the labour is idle for a lot of time.Also due to the fear of
loosing labour the supervisor also doesn’t say much to them as his performance is
judged by the way he handles the labourers.This leads to slow pace of work.
6/9/2014
Fallen Mortar getting mixed
with mud

Weitere ähnliche Inhalte

Was ist angesagt?

Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
Zairul Zaiky
 
Presentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringPresentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and Plastering
Abontee
 
2. testing of cement ppt
2. testing of cement ppt2. testing of cement ppt
2. testing of cement ppt
Bhaswati Sharma
 
Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)
KHUSHBU SHAH
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
ALI HYDER GADHI
 

Was ist angesagt? (20)

BRICK MASONRY
BRICK MASONRYBRICK MASONRY
BRICK MASONRY
 
Ground and upper floor
Ground and upper floorGround and upper floor
Ground and upper floor
 
CONSTRUCTION TECHNOLOGY
CONSTRUCTION TECHNOLOGY CONSTRUCTION TECHNOLOGY
CONSTRUCTION TECHNOLOGY
 
Types of cement
Types of cementTypes of cement
Types of cement
 
Bricks
BricksBricks
Bricks
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
 
Presentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringPresentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and Plastering
 
Building construction materials
Building construction materialsBuilding construction materials
Building construction materials
 
Formwork
FormworkFormwork
Formwork
 
2. testing of cement ppt
2. testing of cement ppt2. testing of cement ppt
2. testing of cement ppt
 
Foundation
FoundationFoundation
Foundation
 
MORTAR BUILDING MATERIALS
MORTAR BUILDING MATERIALSMORTAR BUILDING MATERIALS
MORTAR BUILDING MATERIALS
 
Placing of concrete
Placing of concretePlacing of concrete
Placing of concrete
 
Masonry construction (Building Construction)
Masonry construction (Building Construction)Masonry construction (Building Construction)
Masonry construction (Building Construction)
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Mortar
MortarMortar
Mortar
 
Brickwork and plastering
Brickwork and plasteringBrickwork and plastering
Brickwork and plastering
 
Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Bricks
BricksBricks
Bricks
 

Ähnlich wie Manual plastering

Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)
Chan Yifung
 
project on multistoried infrastructure
project on multistoried infrastructureproject on multistoried infrastructure
project on multistoried infrastructure
Rohan chansoriya
 
Ct & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportCt & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall report
Sheng Zhe
 

Ähnlich wie Manual plastering (20)

Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)
 
abcreport
abcreportabcreport
abcreport
 
Laboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersLaboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil Engineers
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bm
 
Construction basic SIP
Construction basic SIPConstruction basic SIP
Construction basic SIP
 
project on multistoried infrastructure
project on multistoried infrastructureproject on multistoried infrastructure
project on multistoried infrastructure
 
cereamic
cereamiccereamic
cereamic
 
educational program cob, lime and straw
educational program cob, lime and straweducational program cob, lime and straw
educational program cob, lime and straw
 
Brickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdfBrickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdf
 
paving_.pdf
paving_.pdfpaving_.pdf
paving_.pdf
 
Ct & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportCt & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall report
 
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay BricksComparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptx
 
house construction
house constructionhouse construction
house construction
 
HALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptxHALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptx
 
Finishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningFinishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinning
 
Everything you need to know about sheet piles
Everything you need to know about sheet pilesEverything you need to know about sheet piles
Everything you need to know about sheet piles
 

Kürzlich hochgeladen

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Kürzlich hochgeladen (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 

Manual plastering

  • 2. What is Plaster? Plaster is a building material used for coating walls and ceilings. Sand-cement plaster is used extensively in building work as a decorative or protective coating for concrete and masonry walls . Plaster is one of the oldest building materials, the most primitive form was mud plaster, used to hold together structures made of branches or wood for example. Today internal plastering is used more as a way of smoothing out surfaces and preparing them for decoration, it also adds strength to the wall or ceiling and helps seal together building materials.
  • 3. Materials Required  Cement  Sand  Water  Masonry Trowel  Smoothening Trowel  Metal Float  Measuring Tape  Plumb Bob  Mud Pan  Chicken Mesh  Hairs  Recron Fibre6/9/2014
  • 4. Know your Materials! 6/9/2014 Cement Sand Recron Fibre Final Mortar mix (made from mixing Cement,sand,water and recron fibre) present in a Mudpan
  • 5. Procedure 1. After the masonry wall made of bricks or aerated blocks is ready, it is first cleaned properly before starting the plastering wall using brushes and trowels. 6/9/2014 Brick wall Aerated Block wall
  • 6. 2. The scaffold is prepared for provide the labour a platform to stand and materials required for plastering are transported at the site of plastering. 3. Cement Mortar is prepared by mixing cement and sand in ratio specified. For ex-In our case the ratio specified is 1:4.So we use 1 unit volume of cement for 4 unit volume of sand. The normal cement bag is 50 kg in mass 0.035 m3. So we prepare a container of volume 0.035 m3 and pour 4 containers of cement. 6/9/2014 Scaffolding Container for measuring sand
  • 7. 4. Recron fibre is added to it as it helps in avoiding cracks in plaster. We use 125 gm fibre for 1 bag of cement. 5. Water is added .As per as IS standards 0.025 m3 of water is added to 1 bag of cement, but at site it is subjected to the workability requirements. Note: The mortar mix should be used within it’s initial setting time = 45 min 6. Chicken mesh is used at the joint of Lintel and masonry wall to avoid cracks at the joint in future. 6/9/2014 Chicken Mesh Labour putting Chicken Mesh
  • 8. 7. Making of Level Pads : Level pads are used for maintaining the thickness of plaster coat required.They act as a reference for checking thickness of plaster. - First we lay a reference line using rope and nails - We check the distance of wall from this reference line and note it(say D1) - Now we put the mortar of wall and smoothen it. We now calculate the distance between the reference line and level pad’s surface(say D2) D1-D2= Thickness of coat required - If the thickness doesn’t matches then adjust the thickness of level pad - Now make one level pad above the first level pad and check if it’s in line with the help of plumb bob.It might happen the wall is not exactly vertical either inwards or outwards which can be checked with help of plumb bob hence thickness of level pad can be adjusted accordingly. 6/9/2014
  • 9. 6/9/2014 Labourers checking the distance of wall from reference line Making of level pad
  • 10. 6/9/2014 Level Pad Labourers checking distance of level pad from reference line
  • 11. 6/9/2014 Plumb Bob No gap between wall and plumb bob, signifying that wall is straight Gap between wall and plumb bob indicating that wall is “Inwards”
  • 12. - After checking for vertical alignment of level pads, check for horizontal alignment with the help of a rope( pin a rope parallel to the first level pad also vertical with adjacent wall).Adjust the level pads in thickness if the wall is tilted sideways. 6/9/2014 Checking for vertical alignment of pads Horizontally laid level pads
  • 13. 8. After making the level pads, wet the wall with help of diluted cement water slurry to provide better adhesion with mortar. 9. The mason then applies the mortar on the walls with the help of trowel. 6/9/2014 Masonry Trowel
  • 14. 10. With the help of metal float the mason creates a smooth reference plain of required thickness by pressing the float against two vertical level pads.The additional mortar is scrapped of with the help of float. 6/9/2014Metal Float Reference Plain
  • 15. 11. The finishing of the plaster is done with the help of finishing trowel. 6/9/2014 Removing excess material with float Finishing Trowel
  • 16. 12. After smoothening, the plaster is roughened up for providing better adhesion in case of a second coat. A hair is used for it or sometimes labour also uses chicken mesh only. 6/9/2014 Hair used for roughening surface Rough Plaster coat
  • 17. Challenges in Manual Plastering 1. A proper hierarchical system is not present on site. Ideally the engineer should teach the supervisor as in what he requires and the supervisor should convey it to the labour.But due to lack of number and agility of supervisors the engineer has to do that part. 2. Due to above point, the engineer is not able to perform his main task efficiently which is Quality Checks .Two examples in this regard are:- (a) Amount of water is not as per as standards and the labour puts water according to his will. This in turn degrades the quality of the mix. (b) Checking of the thickness and alignment of level pads is not proper which leads to lack of uniformity of plaster. Plumb checking is not also proper. 3. The mortar is not used within it’s initial setting time of 45 Minutes and sometimes used beyond 4 hours. This again degrades the quality. 4. The floor is not cleaned properly before starting plaster and sacks are not always laid down to collect the fallen mortar. So the mortar gets mixed with the mud and is then used again which has serious implications on the quality. 6/9/2014
  • 18. 5. Due to lack of supervision the labour is idle for a lot of time.Also due to the fear of loosing labour the supervisor also doesn’t say much to them as his performance is judged by the way he handles the labourers.This leads to slow pace of work. 6/9/2014 Fallen Mortar getting mixed with mud