Safety Operating Procedure
For
Tower Crane Operators

VITAL CORP. SDN. BHD.
Contents
Forward---------------------------------------------------------------1
Qualifications---------------------------------------------------------1
Permits ---------------------------------------------------------------1
Sample Permit-----------------------------------------------------2

Training---------------------------------------------------------------2
Personal Protective Equipment-----------------------------------3
General Conduct of Operators------------------------------------3
Table 2

Shift/Operator Inspection Checks------------------------3

Table 1

Standard Hand Signals for Controlling
Overhead and Gantry Cranes-------------------------5

Inspection-------------------------------------------------------------6
Maintenance----------------------------------------------------------6

VITAL CORP. SDN. BHD.
Safety Manual for Overhead Crane Operators
Forward
An overhead crane operator’s job is very important. It is a position of responsibility that
you must be authorized to hold. There are rules and regulations you must obey and
responsibilities you must accept.
For specific rules and regulations and your responsibilities when operating an overhead
crane in Michigan, see MIOSHA General Industry Safety Standard Part 18. Overhead
and Gantry Cranes.
This manual may be used as a tool in the overall training and authorization of a
prospective overhead crane operator.
Employers and employees need to be aware that all cranes are different and may have
specific operating, safety, inspection and maintenance requirements. It is essential that
you have the manufacturers operating manuals and are familiar with your particular
crane.

Qualifications
The minimum qualifications for an employee selected to operate a crane are as follows:
•
•
•
•
•

Have corrected vision that meets the same requirements as vision for a valid
Michigan driver’s license.
Have effective use of all 4 limbs.
Be of sufficient height to operate the controls and to have an unobstructed view
over the controls into the work area.
Have coordination between eyes, hands, and feet.
Be free of known convulsive disorders and episodes of unconsciousness.

The employee must also have the ability to understand signs, labels, and instructions.
The employee must be examined for these qualifications at least once every 3 years.

Permits
You must be trained and tested before you can operate an overhead crane. Upon passing
this test and meeting other operator requirements (including demonstrating proficiency in
running the crane) a permit will be issued to you. It is to be carried by you or be
available upon request.
1
Sample Permit
CRANE OPERATOR PERMIT
(Firm Name)

Operator’s Name
Operator’s Number
Is Authorized To Operate: (Insert Type of Crane(s) Authorized)
Restrictions: (Explanation of Restrictions)
Date Issued: (Month-Day-Year)
Date Expiring (Month-Day-Year)
By Issuing Authority: _______________________________________________
Title

Training
Training of all operators will include the following:
•
•
•
•
•
•
•
•
•
•
•

Capacities of equipment and attachments.
Purpose, use and limitation of controls.
How to make daily checks.
The energizing sequences, including pneumatic, hydraulic, and electrical
sequences.
Start-up and shutdown procedures.
Emergency shutdown procedures.
General operating procedures.
All basic signaling procedures, including hand, radio, or telephone signals, where
required.
Knowledge of MIOSHA Part 18. Overhead and Gantry Cranes, and other
applicable MIOSHA standards.
Practice in operating the assigned equipment through the mechanical functions
necessary to perform the required task.
Maximum rated capacity of the crane.

Training of all riggers will include the following:
• The requirements of MIOSHA Part 18. Overhead and Gantry Cranes.
• Knowledge of MIOSHA Part 49. Slings.
• Knowledge of MIOSHA Part 33. Personal Protective Equipment.
• Maximum capacity of the crane.
• Rigging procedures.
• Company rules and regulations.

2
Personal Protective Equipment
When your employer conducts a personal protective equipment hazard assessment (as
required in Part 33. Personal Protective Equipment), they should include overhead cranes
in their review.
An operator and any employee directing a lift must use the PPE required in the area. If
the top of the load is lifted to a height greater than 5 feet, then the load is considered an
overhead hazard and head protection needs to be worn.
When an employee is performing maintenance on an overhead or gantry crane, and a
standard barrier or platform is not provided, the employee must wear an approved safety
harness and lanyard, or a fall arrest device as prescribed in Construction Safety Standard,
Part 45. Fall Protection.

General Conduct of Operators
At the beginning of each shift during which a crane is used, a visual inspection must be
made in accordance with Table 2 below. A visual inspection is limited to that which can
be made from a catwalk or other safe observation point. Any defects must be reported to
a supervisor.
TABLE 2
Shift/Operator Inspection Checks
Inspection Item
Tagged Crane or Hoist
Control Devices
Brakes
Hook
Hook Latch
Wire Rope
Reeving
Limit Switches
Oil Leakage
Unusual Sounds
Warning and Safety Labels
Housekeeping and Lighting

Description of Inspection Check Points
Check that crane or hoist is not tagged with an out-of-order sign.
Test run that all motions agree with control device markings.
Check that all motions do not have excessive drift and that stopping distances are
normal.
Check for damage, cracks, nicks, gouges, deformations of the throat opening, wear on
saddle or load bearing point, and twist. Refer to the manual furnished by the original
manufacturer of the crane.
If a hook latch is required, check for proper operation.
Check for broken wires, broken strands, kinks, and any deformation or damage to the
rope structure.
Check that the wire rope is properly reeved and that rope parts are not twisted about
each other.
Check that the upper limit device stops lifting motion of the hoist load block before
striking any part of the hoist or crane.
Check for any sign of oil leakage on the crane and on the floor area beneath the crane.
Check for any unusual sounds from the crane or hoist mechanism while operating the
crane or hoist.
Check that warning and other safety labels are not missing and that they are legible.
Check area for accumulation of material, trip or slip hazards, and poor lighting.

3
A hoisting limit switch on a crane or hoisting device must not be used as an operating
control, unless the crane is also equipped with a backup limit switch.
A load must not be lowered below a point where less than 2 full wraps of wire rope
remain on the hoisting drum. If there is doubt concerning the safety of a crane or hoisting
means, the operator must immediately stop the crane, and report the condition creating
the doubt to the supervisor.
In the event of power failure, the operator must place all controllers in the “off” position.
When an operator leaves a crane unattended he or she must land any attached load, place
the controllers in the “off” position, and open the main switch. Before closing a main
switch the operator must make sure all controllers are in the “off” position. The main
switch does not need to be opened on a pendant-controlled crane if the crane is left
unattended for short periods.
An operator must only respond to signals from the employee directing the lift. Except for
an emergency stop signal, which must be obeyed when given from any employee. The
signals given to an operator must conform to table 1 below.

4
Table 1
Standard Hand Signals For Controlling Overhead
And Gantry Cranes

HOIST. With forearm vertical,
forefinger pointing up, move hand in
small horizontal circle

LOWER. With arm extended
downward, forefinger pointing down,
move hand in small horizontal circle.

BRIDGE TRAVEL. Arm extended
forward, hand open and slightly
raised, make pushing motion in
direction of travel.

TROLLEY TRAVEL. Palm up,
fingers closed, thumb pointing in
direction of motion, jerk hand
horizontally.

STOP. Arm extended, palm down,
hold position rigidly.

EMERGENCY STOP. Arm
extended, palm down, move hand
rapidly right and left.

MULTIPLE TROLLEYS. Hold up
one finger for block marked “1” and
two fingers for block marked “2”.
Regular signals follow.

MOVE SLOWLY. Use one hand to
give any motion signal and place
other hand motionless in front of
hand giving the motion signal. (Hoist
Slowly shown as an example.)

MAGNET IS DISCONNECTED.
Crane operator spreads both hands
apart – palms up.

An operator must not carry a load over another person.
A crane must not be used to make a side pull (except where it has been specifically
authorized by a qualified person after making specific determinations).
Compressed gases can only be lifted by a cradle or enclosed platform.
5
An employee cannot ride a hoisting device, such as a magnet, hook, ball, or load. The
only exception is a work platform that meets all the requirements in the Construction
Safety Standard Part 10. Lifting & Digging Equipment.
When attaching or moving a load, the operator, rigger, or hooker must make sure of all of
the following:
•
•
•
•
•
•
•

The hoisting rope or chain is free of kinks or twist and not wrapped around the
load.
The load is attached to the load block hook by means of a sling or other approved
device.
The sling and load will clear all obstacles or obstructions.
The load is balanced and secured before lifting the load more than a few inches.
Multiple lines are not twisted around each other.
The hook is brought over the load in a manner to prevent swinging.
There is no sudden acceleration or deceleration of the moving load.

Inspection
The inspection procedure for cranes in regular service is divided into 2 general
classifications:
•
•

Frequent inspections are done monthly to quarterly or at intervals of 100 hours of
use, whichever comes first.
Periodic inspections are done annually or at intervals of 500 hours of use,
whichever comes first.

The inspections cover topics outlined in the standard or manufacturers guidelines.

Maintenance
The employer must maintain a crane and its accessories in a condition that will not
endanger an operator or other employee.
A preventative maintenance program will be established and the program will be based
on the manufacturer’s recommendations and for the application as reviewed by a
qualified person.
Before adjustments or repairs are made on a crane, all of the following precautions must
be taken:
•
•

The crane will be moved to a location where it will cause the least interference
with other moving equipment on the track or rails and operations in the area.
Controllers will be placed in the “off” position.
6
•
•
•

The main switch will be placed in the “off” position or “open” position and
LOCKED OUT, except where power is necessary to adjust or service the crane.
A warning sign or “out of order” sign will be placed at the operator control
station.
Illumination of 15 footcandles intensity will be provided while maintenance is
performed on the crane.

If any other crane uses the same runway, then a protective device must be used to prevent
interference with the idle crane undergoing repairs. If a protective device is
impracticable, then a signal person must be placed at a visual vantage point to warn the
operator of the active crane when it reaches the limit of safe distance from the idle crane.
A crane that has been adjusted or repaired must not be returned to normal operation until
all guards have been replaced, locks removed by those who installed them, or their
supervisor, safety devices reactivated, and the maintenance equipment removed.

7
•
•
•

The main switch will be placed in the “off” position or “open” position and
LOCKED OUT, except where power is necessary to adjust or service the crane.
A warning sign or “out of order” sign will be placed at the operator control
station.
Illumination of 15 footcandles intensity will be provided while maintenance is
performed on the crane.

If any other crane uses the same runway, then a protective device must be used to prevent
interference with the idle crane undergoing repairs. If a protective device is
impracticable, then a signal person must be placed at a visual vantage point to warn the
operator of the active crane when it reaches the limit of safe distance from the idle crane.
A crane that has been adjusted or repaired must not be returned to normal operation until
all guards have been replaced, locks removed by those who installed them, or their
supervisor, safety devices reactivated, and the maintenance equipment removed.

7

Weitere ähnliche Inhalte

Was ist angesagt?

10. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-210. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-2Sergio Augusto Esteves
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptKamran Zafar
 
WINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdfWINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdfssuser54b5c5
 
Lifting plan
Lifting planLifting plan
Lifting plantnsv22
 
Handbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizamHandbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizamHASNIZAM BIN MD SAAD
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputGaurav Singh Rajput
 
Lifting Equipment
Lifting Equipment Lifting Equipment
Lifting Equipment Manish Yadav
 
Safe use of hydra
Safe use of hydraSafe use of hydra
Safe use of hydraPrem kumar
 
Suspended cradle presentation
Suspended cradle presentationSuspended cradle presentation
Suspended cradle presentationMaju Thomas
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templatesDwarika Bhushan Sharma
 
Basic rigging training manual
Basic rigging training manualBasic rigging training manual
Basic rigging training manualSyam Tawakkal
 
Rigging safety 7
Rigging safety 7Rigging safety 7
Rigging safety 7vtsiri
 

Was ist angesagt? (20)

10. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-210. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-2
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.ppt
 
WINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdfWINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdf
 
Rigging and lifting
Rigging and liftingRigging and lifting
Rigging and lifting
 
Lifting plan
Lifting planLifting plan
Lifting plan
 
Crane Incident Handbook
Crane Incident Handbook Crane Incident Handbook
Crane Incident Handbook
 
Handbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizamHandbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizam
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Lifting Equipment
Lifting Equipment Lifting Equipment
Lifting Equipment
 
Safe use of hydra
Safe use of hydraSafe use of hydra
Safe use of hydra
 
Lift Plan
Lift PlanLift Plan
Lift Plan
 
Suspended cradle presentation
Suspended cradle presentationSuspended cradle presentation
Suspended cradle presentation
 
Overhead Crane Safety Course
Overhead Crane Safety CourseOverhead Crane Safety Course
Overhead Crane Safety Course
 
Lifting Operation.ppt
Lifting Operation.pptLifting Operation.ppt
Lifting Operation.ppt
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
Overhead Crane
Overhead CraneOverhead Crane
Overhead Crane
 
Basic rigging training manual
Basic rigging training manualBasic rigging training manual
Basic rigging training manual
 
Rigging safety 7
Rigging safety 7Rigging safety 7
Rigging safety 7
 

Andere mochten auch

Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Bimal Chandra Das
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessmentSimba Zhao
 
Overhead and gantry cranes safe operating procedures
Overhead and gantry cranes safe operating proceduresOverhead and gantry cranes safe operating procedures
Overhead and gantry cranes safe operating proceduresytcrane
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment templatelukemoy13
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile CranesMihajlo Stupar
 
China Coal Group railway maintenance tools
China Coal Group railway maintenance toolsChina Coal Group railway maintenance tools
China Coal Group railway maintenance toolsCelia Gao
 
Standard hand signals for controlling crane operations Rigging Information, R...
Standard hand signals for controlling crane operations Rigging Information, R...Standard hand signals for controlling crane operations Rigging Information, R...
Standard hand signals for controlling crane operations Rigging Information, R...Azmeel Contracting Company
 
studi kasus Perhitungan tower crane
studi kasus Perhitungan tower cranestudi kasus Perhitungan tower crane
studi kasus Perhitungan tower craneBung HaFied
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentSam Benzie
 
Safe Use of Tower Cranes Ahmed Assad
Safe Use of Tower Cranes Ahmed AssadSafe Use of Tower Cranes Ahmed Assad
Safe Use of Tower Cranes Ahmed Assadarab.eng
 
Safety of Mobile Cranes in Construction
Safety of Mobile Cranes in ConstructionSafety of Mobile Cranes in Construction
Safety of Mobile Cranes in ConstructionProtection
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentationNithin Dev
 
installation and commissioning
installation and commissioninginstallation and commissioning
installation and commissioningJius Bei
 
Sop overhead crane
Sop overhead craneSop overhead crane
Sop overhead craneWina Indah
 

Andere mochten auch (20)

Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
Overhead and gantry cranes safe operating procedures
Overhead and gantry cranes safe operating proceduresOverhead and gantry cranes safe operating procedures
Overhead and gantry cranes safe operating procedures
 
Keselamatan crane
Keselamatan crane Keselamatan crane
Keselamatan crane
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile Cranes
 
China Coal Group railway maintenance tools
China Coal Group railway maintenance toolsChina Coal Group railway maintenance tools
China Coal Group railway maintenance tools
 
P.way
P.wayP.way
P.way
 
Standard hand signals for controlling crane operations Rigging Information, R...
Standard hand signals for controlling crane operations Rigging Information, R...Standard hand signals for controlling crane operations Rigging Information, R...
Standard hand signals for controlling crane operations Rigging Information, R...
 
studi kasus Perhitungan tower crane
studi kasus Perhitungan tower cranestudi kasus Perhitungan tower crane
studi kasus Perhitungan tower crane
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Safe Use of Tower Cranes Ahmed Assad
Safe Use of Tower Cranes Ahmed AssadSafe Use of Tower Cranes Ahmed Assad
Safe Use of Tower Cranes Ahmed Assad
 
Safety of Mobile Cranes in Construction
Safety of Mobile Cranes in ConstructionSafety of Mobile Cranes in Construction
Safety of Mobile Cranes in Construction
 
Calculation sheet crane
Calculation sheet craneCalculation sheet crane
Calculation sheet crane
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentation
 
installation and commissioning
installation and commissioninginstallation and commissioning
installation and commissioning
 
Sop overhead crane
Sop overhead craneSop overhead crane
Sop overhead crane
 
Crane
CraneCrane
Crane
 
114 site layout
114 site layout114 site layout
114 site layout
 

Ähnlich wie Crane operator safety procedure

Overhead-Cranes safety training.ppt
Overhead-Cranes safety training.pptOverhead-Cranes safety training.ppt
Overhead-Cranes safety training.pptRazFazwan
 
1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha classBill Brown
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...AhmedAliKhan38
 
Quality Control Operator Training &.pptx
Quality Control Operator Training &.pptxQuality Control Operator Training &.pptx
Quality Control Operator Training &.pptxAizazFarhat3
 
Overhead-Cranes.ppt
Overhead-Cranes.pptOverhead-Cranes.ppt
Overhead-Cranes.pptRajaMannar6
 
Overhead-Cranes.ppt
Overhead-Cranes.pptOverhead-Cranes.ppt
Overhead-Cranes.ppthamoudahedi
 
Overhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAOverhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAAtlantic Training, LLC.
 
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industryCrane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industryRamana Reddy G
 
Crane Safety Tips for Construction Project..pdf
Crane Safety Tips for Construction Project..pdfCrane Safety Tips for Construction Project..pdf
Crane Safety Tips for Construction Project..pdfManoj Kumar
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptNeerajTiwari965955
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptGeneralCommunication1
 
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputCrane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputGaurav Singh Rajput
 
few word abour crane..pdf
few word abour crane..pdffew word abour crane..pdf
few word abour crane..pdfconstruction
 

Ähnlich wie Crane operator safety procedure (20)

Overhead-Cranes safety training.ppt
Overhead-Cranes safety training.pptOverhead-Cranes safety training.ppt
Overhead-Cranes safety training.ppt
 
1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha class
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
Rigger safety .pdf
Rigger safety                        .pdfRigger safety                        .pdf
Rigger safety .pdf
 
Rigging Course .pdf
Rigging Course                       .pdfRigging Course                       .pdf
Rigging Course .pdf
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Quality Control Operator Training &.pptx
Quality Control Operator Training &.pptxQuality Control Operator Training &.pptx
Quality Control Operator Training &.pptx
 
Overhead-Cranes.ppt
Overhead-Cranes.pptOverhead-Cranes.ppt
Overhead-Cranes.ppt
 
Overhead-Cranes.ppt
Overhead-Cranes.pptOverhead-Cranes.ppt
Overhead-Cranes.ppt
 
Overhead-Cranes (1).ppt
Overhead-Cranes (1).pptOverhead-Cranes (1).ppt
Overhead-Cranes (1).ppt
 
Overhead-Cranes.ppt
Overhead-Cranes.pptOverhead-Cranes.ppt
Overhead-Cranes.ppt
 
Aerial Lift Safety Training by ANSV
Aerial Lift Safety Training by ANSVAerial Lift Safety Training by ANSV
Aerial Lift Safety Training by ANSV
 
Overhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAOverhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCA
 
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industryCrane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
 
Aerial Lift Safety
Aerial Lift SafetyAerial Lift Safety
Aerial Lift Safety
 
Crane Safety Tips for Construction Project..pdf
Crane Safety Tips for Construction Project..pdfCrane Safety Tips for Construction Project..pdf
Crane Safety Tips for Construction Project..pdf
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
 
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputCrane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
 
few word abour crane..pdf
few word abour crane..pdffew word abour crane..pdf
few word abour crane..pdf
 

Kürzlich hochgeladen

Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesShubhangi Sonawane
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 

Kürzlich hochgeladen (20)

Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 

Crane operator safety procedure

  • 1. Safety Operating Procedure For Tower Crane Operators VITAL CORP. SDN. BHD.
  • 2. Contents Forward---------------------------------------------------------------1 Qualifications---------------------------------------------------------1 Permits ---------------------------------------------------------------1 Sample Permit-----------------------------------------------------2 Training---------------------------------------------------------------2 Personal Protective Equipment-----------------------------------3 General Conduct of Operators------------------------------------3 Table 2 Shift/Operator Inspection Checks------------------------3 Table 1 Standard Hand Signals for Controlling Overhead and Gantry Cranes-------------------------5 Inspection-------------------------------------------------------------6 Maintenance----------------------------------------------------------6 VITAL CORP. SDN. BHD.
  • 3. Safety Manual for Overhead Crane Operators Forward An overhead crane operator’s job is very important. It is a position of responsibility that you must be authorized to hold. There are rules and regulations you must obey and responsibilities you must accept. For specific rules and regulations and your responsibilities when operating an overhead crane in Michigan, see MIOSHA General Industry Safety Standard Part 18. Overhead and Gantry Cranes. This manual may be used as a tool in the overall training and authorization of a prospective overhead crane operator. Employers and employees need to be aware that all cranes are different and may have specific operating, safety, inspection and maintenance requirements. It is essential that you have the manufacturers operating manuals and are familiar with your particular crane. Qualifications The minimum qualifications for an employee selected to operate a crane are as follows: • • • • • Have corrected vision that meets the same requirements as vision for a valid Michigan driver’s license. Have effective use of all 4 limbs. Be of sufficient height to operate the controls and to have an unobstructed view over the controls into the work area. Have coordination between eyes, hands, and feet. Be free of known convulsive disorders and episodes of unconsciousness. The employee must also have the ability to understand signs, labels, and instructions. The employee must be examined for these qualifications at least once every 3 years. Permits You must be trained and tested before you can operate an overhead crane. Upon passing this test and meeting other operator requirements (including demonstrating proficiency in running the crane) a permit will be issued to you. It is to be carried by you or be available upon request. 1
  • 4. Sample Permit CRANE OPERATOR PERMIT (Firm Name) Operator’s Name Operator’s Number Is Authorized To Operate: (Insert Type of Crane(s) Authorized) Restrictions: (Explanation of Restrictions) Date Issued: (Month-Day-Year) Date Expiring (Month-Day-Year) By Issuing Authority: _______________________________________________ Title Training Training of all operators will include the following: • • • • • • • • • • • Capacities of equipment and attachments. Purpose, use and limitation of controls. How to make daily checks. The energizing sequences, including pneumatic, hydraulic, and electrical sequences. Start-up and shutdown procedures. Emergency shutdown procedures. General operating procedures. All basic signaling procedures, including hand, radio, or telephone signals, where required. Knowledge of MIOSHA Part 18. Overhead and Gantry Cranes, and other applicable MIOSHA standards. Practice in operating the assigned equipment through the mechanical functions necessary to perform the required task. Maximum rated capacity of the crane. Training of all riggers will include the following: • The requirements of MIOSHA Part 18. Overhead and Gantry Cranes. • Knowledge of MIOSHA Part 49. Slings. • Knowledge of MIOSHA Part 33. Personal Protective Equipment. • Maximum capacity of the crane. • Rigging procedures. • Company rules and regulations. 2
  • 5. Personal Protective Equipment When your employer conducts a personal protective equipment hazard assessment (as required in Part 33. Personal Protective Equipment), they should include overhead cranes in their review. An operator and any employee directing a lift must use the PPE required in the area. If the top of the load is lifted to a height greater than 5 feet, then the load is considered an overhead hazard and head protection needs to be worn. When an employee is performing maintenance on an overhead or gantry crane, and a standard barrier or platform is not provided, the employee must wear an approved safety harness and lanyard, or a fall arrest device as prescribed in Construction Safety Standard, Part 45. Fall Protection. General Conduct of Operators At the beginning of each shift during which a crane is used, a visual inspection must be made in accordance with Table 2 below. A visual inspection is limited to that which can be made from a catwalk or other safe observation point. Any defects must be reported to a supervisor. TABLE 2 Shift/Operator Inspection Checks Inspection Item Tagged Crane or Hoist Control Devices Brakes Hook Hook Latch Wire Rope Reeving Limit Switches Oil Leakage Unusual Sounds Warning and Safety Labels Housekeeping and Lighting Description of Inspection Check Points Check that crane or hoist is not tagged with an out-of-order sign. Test run that all motions agree with control device markings. Check that all motions do not have excessive drift and that stopping distances are normal. Check for damage, cracks, nicks, gouges, deformations of the throat opening, wear on saddle or load bearing point, and twist. Refer to the manual furnished by the original manufacturer of the crane. If a hook latch is required, check for proper operation. Check for broken wires, broken strands, kinks, and any deformation or damage to the rope structure. Check that the wire rope is properly reeved and that rope parts are not twisted about each other. Check that the upper limit device stops lifting motion of the hoist load block before striking any part of the hoist or crane. Check for any sign of oil leakage on the crane and on the floor area beneath the crane. Check for any unusual sounds from the crane or hoist mechanism while operating the crane or hoist. Check that warning and other safety labels are not missing and that they are legible. Check area for accumulation of material, trip or slip hazards, and poor lighting. 3
  • 6. A hoisting limit switch on a crane or hoisting device must not be used as an operating control, unless the crane is also equipped with a backup limit switch. A load must not be lowered below a point where less than 2 full wraps of wire rope remain on the hoisting drum. If there is doubt concerning the safety of a crane or hoisting means, the operator must immediately stop the crane, and report the condition creating the doubt to the supervisor. In the event of power failure, the operator must place all controllers in the “off” position. When an operator leaves a crane unattended he or she must land any attached load, place the controllers in the “off” position, and open the main switch. Before closing a main switch the operator must make sure all controllers are in the “off” position. The main switch does not need to be opened on a pendant-controlled crane if the crane is left unattended for short periods. An operator must only respond to signals from the employee directing the lift. Except for an emergency stop signal, which must be obeyed when given from any employee. The signals given to an operator must conform to table 1 below. 4
  • 7. Table 1 Standard Hand Signals For Controlling Overhead And Gantry Cranes HOIST. With forearm vertical, forefinger pointing up, move hand in small horizontal circle LOWER. With arm extended downward, forefinger pointing down, move hand in small horizontal circle. BRIDGE TRAVEL. Arm extended forward, hand open and slightly raised, make pushing motion in direction of travel. TROLLEY TRAVEL. Palm up, fingers closed, thumb pointing in direction of motion, jerk hand horizontally. STOP. Arm extended, palm down, hold position rigidly. EMERGENCY STOP. Arm extended, palm down, move hand rapidly right and left. MULTIPLE TROLLEYS. Hold up one finger for block marked “1” and two fingers for block marked “2”. Regular signals follow. MOVE SLOWLY. Use one hand to give any motion signal and place other hand motionless in front of hand giving the motion signal. (Hoist Slowly shown as an example.) MAGNET IS DISCONNECTED. Crane operator spreads both hands apart – palms up. An operator must not carry a load over another person. A crane must not be used to make a side pull (except where it has been specifically authorized by a qualified person after making specific determinations). Compressed gases can only be lifted by a cradle or enclosed platform. 5
  • 8. An employee cannot ride a hoisting device, such as a magnet, hook, ball, or load. The only exception is a work platform that meets all the requirements in the Construction Safety Standard Part 10. Lifting & Digging Equipment. When attaching or moving a load, the operator, rigger, or hooker must make sure of all of the following: • • • • • • • The hoisting rope or chain is free of kinks or twist and not wrapped around the load. The load is attached to the load block hook by means of a sling or other approved device. The sling and load will clear all obstacles or obstructions. The load is balanced and secured before lifting the load more than a few inches. Multiple lines are not twisted around each other. The hook is brought over the load in a manner to prevent swinging. There is no sudden acceleration or deceleration of the moving load. Inspection The inspection procedure for cranes in regular service is divided into 2 general classifications: • • Frequent inspections are done monthly to quarterly or at intervals of 100 hours of use, whichever comes first. Periodic inspections are done annually or at intervals of 500 hours of use, whichever comes first. The inspections cover topics outlined in the standard or manufacturers guidelines. Maintenance The employer must maintain a crane and its accessories in a condition that will not endanger an operator or other employee. A preventative maintenance program will be established and the program will be based on the manufacturer’s recommendations and for the application as reviewed by a qualified person. Before adjustments or repairs are made on a crane, all of the following precautions must be taken: • • The crane will be moved to a location where it will cause the least interference with other moving equipment on the track or rails and operations in the area. Controllers will be placed in the “off” position. 6
  • 9. • • • The main switch will be placed in the “off” position or “open” position and LOCKED OUT, except where power is necessary to adjust or service the crane. A warning sign or “out of order” sign will be placed at the operator control station. Illumination of 15 footcandles intensity will be provided while maintenance is performed on the crane. If any other crane uses the same runway, then a protective device must be used to prevent interference with the idle crane undergoing repairs. If a protective device is impracticable, then a signal person must be placed at a visual vantage point to warn the operator of the active crane when it reaches the limit of safe distance from the idle crane. A crane that has been adjusted or repaired must not be returned to normal operation until all guards have been replaced, locks removed by those who installed them, or their supervisor, safety devices reactivated, and the maintenance equipment removed. 7
  • 10. • • • The main switch will be placed in the “off” position or “open” position and LOCKED OUT, except where power is necessary to adjust or service the crane. A warning sign or “out of order” sign will be placed at the operator control station. Illumination of 15 footcandles intensity will be provided while maintenance is performed on the crane. If any other crane uses the same runway, then a protective device must be used to prevent interference with the idle crane undergoing repairs. If a protective device is impracticable, then a signal person must be placed at a visual vantage point to warn the operator of the active crane when it reaches the limit of safe distance from the idle crane. A crane that has been adjusted or repaired must not be returned to normal operation until all guards have been replaced, locks removed by those who installed them, or their supervisor, safety devices reactivated, and the maintenance equipment removed. 7