SlideShare ist ein Scribd-Unternehmen logo
1 von 15
Downloaden Sie, um offline zu lesen
1
PRODUCING
AND
EXPLORING
ASX FIRST QUARTER
OPERATIONAL RESULTS
CONFERENCE CALL
APRIL 29, 2013
2
FORWARD LOOKING STATEMENTS
Certain information included in this presentation, including any information as to the Company’s strategy, projects, exploration programs, joint venture ownership
positions, plans, future financial or operating performance and other statements that express management’s expectations or estimates of future performance,
constitute “forward-looking statements”. The words “believe”, “expect”, “will”, “intend”, ”anticipate”, “project”, ”plan”, “estimate”, “on track” and similar expressions
identify forward looking statements. Such forward-looking statements are necessarily based upon a number of estimates, assumptions, opinions and analysis made
by management in light of its experience that, while considered reasonable, may turn out to be incorrect and involve known and unknown risks, uncertainties and
other factors, in each case that may cause the actual financial results, performance or achievements of the Company to be materially different from the Company’s
estimated future results, performance or achievements expressed or implied by those forward-looking statements. Such forward-looking statements are not
guarantees of future performance. These assumptions, risks, uncertainties and other factors include, but are not limited to: assumptions regarding general business
and economic conditions; conditions in financial markets and the future financial performance of the company; the impact of global liquidity and credit availability on
the timing of cash flows and the values of assets and liabilities based on projected future cash flows; the supply and demand for, deliveries of, and the level and
volatility of the worldwide price of gold or certain other commodities (such as silver, fuel and electricity); fluctuations in currency markets, including changes in U.S.
dollar and CFA Franc interest rates; risks arising from holding derivative instruments; adverse changes in our credit rating; level of indebtedness and liquidity; ability
to successfully complete announced transactions and integrate acquired assets; legislative, political or economic developments in the jurisdictions in which the
Company carries on business; operating or technical difficulties in connection with mining or development activities; employee relations; availability and costs
associated with mining inputs and labour; the speculative nature of exploration and development, including the risks of obtaining necessary licenses and permits and
diminishing quantities or grades of reserves; changes in costs and estimates associated with our projects; the accuracy of our reserve estimates (including with
respect to size, grade and recoverability) and the geological, operational and price assumptions on which these are based; contests over title to properties,
particularly title to undeveloped properties; the risks involved in the exploration, development and mining business, as well as other risks and uncertainties which are
more fully described in the Company's prospectus dated November 11, 2010 and in other Company filings with securities and regulatory authorities which are
available at www.sedar.com. Accordingly, readers should not place undue reliance on such forward looking statements. Teranga expressly disclaims any intention or
obligation to update or revise any forward looking statements, whether as a result of new information, future events or otherwise, except in accordance with
applicable securities laws.
This presentation is dated as of April 29, 2013. All references to the Company include its subsidiaries unless the context requires otherwise.
This presentation contains references to Teranga using the words “we”, “us”, “our” and similar words and the reader is referred to using the words “you”, “your” and
similar words.
3
FOCUSED
ON GROWTH
THROUGH:
GROWING
RESERVES
GROWING
PRODUCTION
FINANCIAL
STRENGTH
Alan R. Hill Executive Chairman
Richard Young President & CEO
Conference Call Agenda:
• Q1 2013 Operational Results
• New Equipment Finance Facility and 100% Hedge Free
• Government Agreement
• Revised 2013 Capex Guidance
ASX FIRST QUARTER OPERATIONAL
RESULTS CONFERENCE CALL
4
FOCUSED
ON GROWTH
THROUGH:
GROWING
RESERVES
GROWING
PRODUCTION
FINANCIAL
STRENGTH
Q1 2013 OPERATIONAL RESULTS
Production - 68,301oz. - 63% higher than Q1 2012
due to higher grade & higher throughput
Cash Costs - $535/oz - 18% lower than Q1 2012
while gross costs increased by 14% due
to higher mining and processing rates
Cash Position(1) - $57.1M – 27% higher than FYE 2012
Tonnes Mined - 18% higher than Q1 2012
Ounces Mined - 60% higher than Q1 2012
Tonnes Milled - 21% higher than Q1 2012
(1) Includes cash, cash receivable and $6.1 million of bullion receivable.
5
Finalized $50M equipment finance facility with Macquarie:
• Replaces the Societé Generalé finance lease facility
• Provides financing for equipment at Sabodala pit and Gora
• $22.7M outstanding at March 31, 2013 with a further $4.3M to
be drawn down in Q2 at final delivery of Sabodala equipment
• Remaining $23M reserved for future equipment drawn-downs as
required
Hedge free as of April 15, 2013:
• Enables Teranga to maximize cash margins on each ounce
produced
STRENGTHENING THE BALANCE SHEET
6
Provides for long-term partnership through:
• Price and formula to acquire Government’s additional option on
satellite deposits and to incorporate these into the existing ML and
fiscal regime
• Supporting drilling of the Niakafiri deposit on the ML
• Extending the ML by five years to 2022 and five key exploration
licenses by 18 months
• Ensuring full access to exploration targets currently occupied by
artisanal miners
• Settling all outstanding tax assessments
• Resolve the Special Contribution Tax of 5% through an increase in
royalties to 5% and accelerated dividend payments
AGREEMENT WITH GOVERNMENT
7
GOVERNMENT OPTION FORMULA - GORA
Initial Payment Example Gora
Reserves per feasibility study (oz.) 285,000
Recovery rate 95%
Recovered reserves (oz.) 270,750
Less government royalties 13,538
Recovered ounces to shareholders (oz.) 257,213
Average realized gold price last 12 months $ 1,650
Reserve payment percentage 1.00%
Reserve payment dollars per ounce $ 16.50
Payment due on production maximum $10 million $ 4,244,006
Additional payments required when:
1. Increase in the gold price
2. Increase in production
3. Exceeds $10 million cap
8
WHAT IF PRODUCTION/PRICE CHANGES?
No Change in Production/Gold Price
Year 1 Year 2 Year 3 Year 4
Cumulative production (oz.) 67,500 135,000 202,500 270,750
Less government royalties 3,375 6,750 10,125 13,538
Cumulative production to shareholders 64,125 128,250 192,375 257,213
Weighted average realized gold price ($/oz.) $ 1,650 $ 1,650 $ 1,650 $ 1,650
Reserve payment percentage 1.00% 1.00% 1.00% 1.00%
Reserve payment dollars per ounce $ 16.50 $ 16.50 $ 16.50 $ 16.50
Cumulative payment due $ 1,058,063 $ 2,116,125 $ 3,174,188 $ 4,244,006
Initial Payment / Subsequent Payments $ 4,244,006 $ 4,244,006 $ 4,244,006 $ 4,244,006
Payment due $ - $ - $ - $ -
* Cumulative production calculation performed annually after year end and if payment due, paid by June 30th of the following year.
Change Gold Price
Year 1 Year 2 Year 3 Year 4
Cumulative production (oz.) 67,500 135,000 202,500 270,750
Less government royalties 3,375 6,750 10,125 13,538
Cumulative production to shareholders 64,125 128,250 192,375 257,213
Weighted average realized gold price ($/oz.) - increase gold price $ 1,650 $ 1,700 $ 1,750 $ 1,800
Reserve payment percentage 1.00% 1.00% 1.00% 1.00%
Reserve payment dollars per ounce $ 16.50 $ 17.00 $ 17.50 $ 18.00
Cumulative payment due $ 1,058,063 $ 2,180,250 $ 3,366,563 $ 4,629,825
Initial Payment / Subsequent Payments $ 4,244,006 $ 4,244,006 $ 4,244,006 $ 4,244,006
Payment due $ - $ - $ - $ 385,819
* Cumulative production calculation performed annually after year end and if payment due, paid by June 30th of the following year.
Change in Production
Year 1 Year 2 Year 3 Year 4
Cumulative production (oz.) - increase in production 75,000 150,000 225,000 300,000
Less government royalties 3,750 7,500 11,250 15,000
Cumulative production to shareholders 71,250 142,500 213,750 285,000
Weighted average realized gold price ($/oz.) $ 1,650 $ 1,650 $ 1,650 $ 1,650
Reserve payment percentage 1.00% 1.00% 1.00% 1.00%
Reserve payment dollars per ounce $ 16.50 $ 16.50 $ 16.50 $ 16.50
Cumulative payment due $ 1,175,625 $ 2,351,250 $ 3,526,875 $ 4,702,500
Initial Payment / Subsequent Payments $ 4,244,006 $ 4,244,006 $ 4,244,006 $ 4,244,006
Payment due $ - $ - $ - $ 458,494
* Cumulative production calculation performed annually after year end and if payment due, paid by June 30th of the following year.
9
WHAT IF WE EXCEED THE $10M CAP?
Exceeds $10 million over time with gold price constant Still under cap First pay over cap Subsequent pay Subsequent pay
Cumulative production (oz.) 600,000 700,000 800,000 950,000
Less government royalties 30,000 35,000 40,000 47,500
Cumulative production to shareholders (oz.) 570,000 665,000 760,000 902,500
Weighted average realized gold price ($/oz.) $ 1,650 $ 1,650 $ 1,650 $ 1,650
Reserve payment percentage 1.00% 1.00% 1.00% 1.00%
Reserve payment dollars per ounce $ 16.50 $ 16.50 $ 16.50 $ 16.50
Cumulative payment due $ 9,405,000 $ 10,972,500 $ 12,540,000 $ 14,891,250
Initial Payment / Subsequent Payments $ 10,000,000 $ 10,000,000 $ 10,972,500 $ 12,540,000
Payment due $ - $ 972,500 $ 1,567,500 $ 2,351,250
* Cumulative production calculation performed annually after year end and if payment due, paid by June 30th of the following year.
Exceeds $10 million over time gold price increases Still under cap First pay over cap Subsequent pay Subsequent pay
Cumulative production (oz.) 600,000 700,000 800,000 950,000
Less government royalties 30,000 35,000 40,000 47,500
Cumulative production to shareholders (oz.) 570,000 665,000 760,000 902,500
Weighted average realized gold price ($/oz.) $ 1,650 $ 1,700 $ 1,750 $ 1,800
Reserve payment percentage 1.00% 1.00% 1.00% 1.00%
Reserve payment dollars per ounce $ 16.50 $ 17.00 $ 17.50 $ 18.00
Cumulative payment due $ 9,405,000 $ 11,305,000 $ 13,300,000 $ 16,245,000
Initial Payment / Subsequent Payments $ 10,000,000 $ 10,000,000 $ 11,305,000 $ 13,300,000
Payment due $ - $ 1,305,000 $ 1,995,000 $ 2,945,000
* Cumulative production calculation performed annually after year end and if payment due, paid by June 30th of the following year.
10
Reduced discretionary spending in 2013:
• Exploration expense (Regional Land Package) exploration
reduced to $3M from $10 - $15M
• Capitalized reserve development (Mine Licence) exploration
expense expected at the low end of $5 - $10M
• General & Administrative reduced to $13M from $15 - $20M
• Gora development expenditure reduced to $5 - $10M from
$45 - $50M, of which $23M was to be financed via the new
mobile equipment loan
• Capitalized deferred stripping at the Sabodala pit now
expected at the bottom end of the original range of $35 - $40M
• Mine site capex at the low end of guidance range $20 - $25M
Reiterating 2013 Guidance:
• Production: 190,000 – 210,000oz.
• Cash Costs: $650 - $700/oz.
GENERATING FREE CASH FLOW IN 2013
11
SABODALA PIT –
MAIN FLAT EXTENSION /
LOWER FLAT ZONE
DINKOKHONO
• Potential to expand gold inventory on
ML with the objective of increasing
mine life to the year 2020/25
ML EXPLORATION $5 MILLION
33km2
NIAKAFIRI & NIAKAFIRI
WEST
SOUKHOTO
12
NINYENKO
SORETO /
DIABOUGOU
1,200km2
35km from Mill
RLP EXPLORATION $3 MILLION
GOUMBOU GAMBA
TOUROKHOTO
(Main and Marougou)
13
• Agreement in Principle signed with Government
• Good first quarter operationally and financially
• Reduction in discretionary spending in 2013 to produce
free cash flow
• 100% hedge free, expect margin expansion and
increased earnings, cash flow and free cash flow
• Retaining our focus on extension of reserve life
SUMMARY SLIDE
14
COMPETENT PERSONS STATEMENT
The technical information contained in this presentation relating to the mineral reserve estimates within the Sabodala, Sutuba, Niakafiri and Gora deposits and the
Stockpiles, is based on information compiled by Julia Martin, P.Eng., MAusIMM (CP), a full time employee with AMC Mining Consultants (Canada) Ltd., is independent of
Teranga, is a “qualified person” as defined in NI 43-101 and a “competent person” as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Ms. Martin has sufficient experience relevant to the style of mineralization and type of deposit under consideration and to
the activity she is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Ms Martin has reviewed and accepts responsibility for the reserve estimates disclosed above. Ms Martin has consented to the inclusion in
the report of the matters based on her information in the form and context in which it appears in this presentation.
The technical information contained in this presentation relating to the mineral resources is based on information compiled by Ms. Patti Nakai-Lajoie, who is a Member of
the Association of Professional Geoscientists of Ontario. Ms. Patti Nakai-Lajoie is full time employee of Teranga and is not “independent” within the meaning of National
Instrument 43-101. Ms. Patti Nakai-Lajoie has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity which she is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Ms. Patti Nakai-Lajoie is a “Qualified Person” under National Instrument 43-101 Standards of Disclosure for Mineral Projects.and she
consents to the inclusion in the report of the matters based on her information in the form and context in which it appears in this presentation.
The technical information contained in this presentation relating to exploration results is based on information compiled by Mr. Martin Pawlitschek, who is a Member of the
Australian Institute of Geoscientists. Mr. Pawlitschek is a consultant of Teranga and is not “independent” within the meaning of National Instrument 43-101. Mr.
Pawlitschek has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to
qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr.
Pawlitschek is a “Qualified Person” in accordance with NI 43-101 and he consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears in this presentation.
15
APPENDIX - 2013 DISCRETIONARY SPEND
REDUCED TO GENERATE FREE CASH FLOW
Revised Guidance Original Guidance
Operating results
Production (oz) 190,000 - 210,000 190,000 - 210,000
Total cash cost (incl. royalties)1,2
($/oz sold) 650 – 700 650 – 700
Exploration and evaluation expense ($ millions) 3.0 10.0 – 15.0
Administration expenses ($ millions) 13.0 15.0 – 20.0
Capital expenditures ($ millions)
Mine site 20.0 20.0 - 25.0
Capitalized reserve development 5.0 5.0 - 10.0
Gora development costs
Mobile equipment 5.0 30.0 - 35.0
Site development 5.0 15.0 - 20.0
Total Gora development costs 10.0 45.0 - 50.0
Capitalized deferred stripping2
35.0 35.0 - 40.0
Total capital expenditures 70.0 105.0 - 125.0
2
Includes the impact of adopting IFRIC 20 – Stripping Costs in the Production Phase of a Surface Mine.
For the year ended December 31, 2013
1
Total cash cost per ounce is a non-IFRS financial measures with standard meaning under IFRS.

Weitere ähnliche Inhalte

Was ist angesagt?

Q3 earnings call slides nov22017 v3
Q3 earnings call slides nov22017 v3Q3 earnings call slides nov22017 v3
Q3 earnings call slides nov22017 v3kirklandlakegoldltd
 
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel ConferenceBank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel ConferenceAgnico Eagle Mines
 
Q2 2016 investor deck v8.0
Q2 2016 investor deck v8.0Q2 2016 investor deck v8.0
Q2 2016 investor deck v8.0ADAESIR
 
Corporate update John Tumazos Very Independent Research March 31, 2014
Corporate update    John Tumazos Very Independent Research March 31, 2014Corporate update    John Tumazos Very Independent Research March 31, 2014
Corporate update John Tumazos Very Independent Research March 31, 2014Agnico Eagle Mines
 
Third Quarter 2016 Results Presentation
Third Quarter 2016 Results PresentationThird Quarter 2016 Results Presentation
Third Quarter 2016 Results Presentationyamanagold2016
 
Muthengi mike bamburi financial model - enhancement
Muthengi mike   bamburi financial model - enhancementMuthengi mike   bamburi financial model - enhancement
Muthengi mike bamburi financial model - enhancementMike Muthengi
 
Company website presentation October 2016
Company website presentation October 2016Company website presentation October 2016
Company website presentation October 2016AnteroResources
 
Company website presentation october 2016
Company website presentation   october 2016Company website presentation   october 2016
Company website presentation october 2016AnteroResources
 
Jp energy mlpa conference jun2016-final
Jp energy   mlpa conference jun2016-finalJp energy   mlpa conference jun2016-final
Jp energy mlpa conference jun2016-finalir_jpenergy
 
08 08-14-q2-2014-webcast-presentation
08 08-14-q2-2014-webcast-presentation08 08-14-q2-2014-webcast-presentation
08 08-14-q2-2014-webcast-presentationAuRico Gold
 
Q1 fiscal 2016 slides final
Q1 fiscal 2016 slides finalQ1 fiscal 2016 slides final
Q1 fiscal 2016 slides finalRoyalGold
 
Q2 2016 Results Conference Call & Webcast
Q2 2016 Results Conference Call & WebcastQ2 2016 Results Conference Call & Webcast
Q2 2016 Results Conference Call & WebcastKinrossGold
 
Preso q1 2018 financial results final.compressed
Preso q1 2018 financial results final.compressedPreso q1 2018 financial results final.compressed
Preso q1 2018 financial results final.compressedasanko6699
 
Management Investor Presentation - Year End 2015
Management Investor Presentation - Year End 2015Management Investor Presentation - Year End 2015
Management Investor Presentation - Year End 2015RioCan
 
Baml presentation may 2016 final (4)
Baml presentation may 2016   final (4)Baml presentation may 2016   final (4)
Baml presentation may 2016 final (4)RoyalGold
 
Q2 fiscal 2016 slides final
Q2 fiscal 2016 slides   finalQ2 fiscal 2016 slides   final
Q2 fiscal 2016 slides finalRoyalGold
 

Was ist angesagt? (20)

Q3 earnings call slides nov22017 v3
Q3 earnings call slides nov22017 v3Q3 earnings call slides nov22017 v3
Q3 earnings call slides nov22017 v3
 
CGG presentation-2020 Q2
CGG presentation-2020 Q2CGG presentation-2020 Q2
CGG presentation-2020 Q2
 
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel ConferenceBank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
 
Q2 2016 investor deck v8.0
Q2 2016 investor deck v8.0Q2 2016 investor deck v8.0
Q2 2016 investor deck v8.0
 
Corporate update John Tumazos Very Independent Research March 31, 2014
Corporate update    John Tumazos Very Independent Research March 31, 2014Corporate update    John Tumazos Very Independent Research March 31, 2014
Corporate update John Tumazos Very Independent Research March 31, 2014
 
Bmo march42018
Bmo march42018Bmo march42018
Bmo march42018
 
Third Quarter 2016 Results Presentation
Third Quarter 2016 Results PresentationThird Quarter 2016 Results Presentation
Third Quarter 2016 Results Presentation
 
Muthengi mike bamburi financial model - enhancement
Muthengi mike   bamburi financial model - enhancementMuthengi mike   bamburi financial model - enhancement
Muthengi mike bamburi financial model - enhancement
 
Company website presentation October 2016
Company website presentation October 2016Company website presentation October 2016
Company website presentation October 2016
 
Bmo feb242018v2
Bmo feb242018v2Bmo feb242018v2
Bmo feb242018v2
 
Company website presentation october 2016
Company website presentation   october 2016Company website presentation   october 2016
Company website presentation october 2016
 
Jp energy mlpa conference jun2016-final
Jp energy   mlpa conference jun2016-finalJp energy   mlpa conference jun2016-final
Jp energy mlpa conference jun2016-final
 
Egf april2018
Egf april2018Egf april2018
Egf april2018
 
08 08-14-q2-2014-webcast-presentation
08 08-14-q2-2014-webcast-presentation08 08-14-q2-2014-webcast-presentation
08 08-14-q2-2014-webcast-presentation
 
Q1 fiscal 2016 slides final
Q1 fiscal 2016 slides finalQ1 fiscal 2016 slides final
Q1 fiscal 2016 slides final
 
Q2 2016 Results Conference Call & Webcast
Q2 2016 Results Conference Call & WebcastQ2 2016 Results Conference Call & Webcast
Q2 2016 Results Conference Call & Webcast
 
Preso q1 2018 financial results final.compressed
Preso q1 2018 financial results final.compressedPreso q1 2018 financial results final.compressed
Preso q1 2018 financial results final.compressed
 
Management Investor Presentation - Year End 2015
Management Investor Presentation - Year End 2015Management Investor Presentation - Year End 2015
Management Investor Presentation - Year End 2015
 
Baml presentation may 2016 final (4)
Baml presentation may 2016   final (4)Baml presentation may 2016   final (4)
Baml presentation may 2016 final (4)
 
Q2 fiscal 2016 slides final
Q2 fiscal 2016 slides   finalQ2 fiscal 2016 slides   final
Q2 fiscal 2016 slides final
 

Ähnlich wie Q1 conference call 29042013 final

Q3 2013 Financial Results
Q3 2013 Financial ResultsQ3 2013 Financial Results
Q3 2013 Financial ResultsAuRico Gold
 
TD Securities Mining Conference
TD Securities Mining ConferenceTD Securities Mining Conference
TD Securities Mining ConferenceAuRico Gold
 
Teranga Gold Q2 2013 Presentation
Teranga Gold Q2 2013 Presentation Teranga Gold Q2 2013 Presentation
Teranga Gold Q2 2013 Presentation Teranga Gold
 
Boston/London Marketing
Boston/London MarketingBoston/London Marketing
Boston/London MarketingAuRico Gold
 
Toronto/NYC Marketing
Toronto/NYC Marketing Toronto/NYC Marketing
Toronto/NYC Marketing AuRico Gold
 
Q1 2013 Financial Results
Q1 2013 Financial ResultsQ1 2013 Financial Results
Q1 2013 Financial ResultsAuRico Gold
 
Q1 2013 Financial Results
Q1 2013 Financial ResultsQ1 2013 Financial Results
Q1 2013 Financial ResultsAuRico Gold
 
New York Marketing
New York MarketingNew York Marketing
New York MarketingAuRico Gold
 
Denver Gold Forum 2013
Denver Gold Forum 2013Denver Gold Forum 2013
Denver Gold Forum 2013AuRico Gold
 
Mackie Sales Desk Presentation
Mackie Sales Desk PresentationMackie Sales Desk Presentation
Mackie Sales Desk PresentationAuRico Gold
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014AuRico Gold
 
Vancouver Marketing
Vancouver MarketingVancouver Marketing
Vancouver MarketingAuRico Gold
 
Producing & Exploring: Third Quarter Results Conference Call/Webcast
Producing & Exploring: Third Quarter Results Conference Call/WebcastProducing & Exploring: Third Quarter Results Conference Call/Webcast
Producing & Exploring: Third Quarter Results Conference Call/WebcastTeranga Gold
 
Q3 2016 Financial Results Presentation
Q3 2016 Financial Results PresentationQ3 2016 Financial Results Presentation
Q3 2016 Financial Results PresentationNewmarket Gold Inc.
 
BMO Sales Desk Presentation
BMO Sales Desk PresentationBMO Sales Desk Presentation
BMO Sales Desk PresentationAuRico Gold
 
Star Bulk Carriers Q2 2013 results presentation
Star Bulk Carriers Q2 2013 results presentationStar Bulk Carriers Q2 2013 results presentation
Star Bulk Carriers Q2 2013 results presentationTradeWindsnews
 
Q3 2014 Webcast Presentation
Q3 2014 Webcast PresentationQ3 2014 Webcast Presentation
Q3 2014 Webcast PresentationAuRico Gold
 

Ähnlich wie Q1 conference call 29042013 final (20)

Q3 2013 Financial Results
Q3 2013 Financial ResultsQ3 2013 Financial Results
Q3 2013 Financial Results
 
TD Securities Mining Conference
TD Securities Mining ConferenceTD Securities Mining Conference
TD Securities Mining Conference
 
Teranga Gold Q2 2013 Presentation
Teranga Gold Q2 2013 Presentation Teranga Gold Q2 2013 Presentation
Teranga Gold Q2 2013 Presentation
 
Boston/London Marketing
Boston/London MarketingBoston/London Marketing
Boston/London Marketing
 
Toronto/NYC Marketing
Toronto/NYC Marketing Toronto/NYC Marketing
Toronto/NYC Marketing
 
Q1 2013 Financial Results
Q1 2013 Financial ResultsQ1 2013 Financial Results
Q1 2013 Financial Results
 
Q1 2013 Financial Results
Q1 2013 Financial ResultsQ1 2013 Financial Results
Q1 2013 Financial Results
 
Toronto Marketing
Toronto MarketingToronto Marketing
Toronto Marketing
 
New York Marketing
New York MarketingNew York Marketing
New York Marketing
 
Denver Gold Forum 2013
Denver Gold Forum 2013Denver Gold Forum 2013
Denver Gold Forum 2013
 
Mackie Sales Desk Presentation
Mackie Sales Desk PresentationMackie Sales Desk Presentation
Mackie Sales Desk Presentation
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
 
Vancouver Marketing
Vancouver MarketingVancouver Marketing
Vancouver Marketing
 
2015 Q3 Financial Results Final
2015 Q3 Financial Results Final2015 Q3 Financial Results Final
2015 Q3 Financial Results Final
 
Producing & Exploring: Third Quarter Results Conference Call/Webcast
Producing & Exploring: Third Quarter Results Conference Call/WebcastProducing & Exploring: Third Quarter Results Conference Call/Webcast
Producing & Exploring: Third Quarter Results Conference Call/Webcast
 
Toronto Marketing
Toronto MarketingToronto Marketing
Toronto Marketing
 
Q3 2016 Financial Results Presentation
Q3 2016 Financial Results PresentationQ3 2016 Financial Results Presentation
Q3 2016 Financial Results Presentation
 
BMO Sales Desk Presentation
BMO Sales Desk PresentationBMO Sales Desk Presentation
BMO Sales Desk Presentation
 
Star Bulk Carriers Q2 2013 results presentation
Star Bulk Carriers Q2 2013 results presentationStar Bulk Carriers Q2 2013 results presentation
Star Bulk Carriers Q2 2013 results presentation
 
Q3 2014 Webcast Presentation
Q3 2014 Webcast PresentationQ3 2014 Webcast Presentation
Q3 2014 Webcast Presentation
 

Mehr von Teranga Gold

2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketing2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketingTeranga Gold
 
Tgz q2 2018 results webcast
Tgz q2 2018 results webcastTgz q2 2018 results webcast
Tgz q2 2018 results webcastTeranga Gold
 
18 06 05 06 121 ny presentation 1x1
18 06 05 06 121 ny presentation 1x118 06 05 06 121 ny presentation 1x1
18 06 05 06 121 ny presentation 1x1Teranga Gold
 
121 singapore teranga presentation - 1x1
121 singapore   teranga presentation - 1x1121 singapore   teranga presentation - 1x1
121 singapore teranga presentation - 1x1Teranga Gold
 
121 london teranga presentation - 1x1
121 london   teranga presentation - 1x1121 london   teranga presentation - 1x1
121 london teranga presentation - 1x1Teranga Gold
 
Teranga gold agm 2018
Teranga gold   agm 2018Teranga gold   agm 2018
Teranga gold agm 2018Teranga Gold
 
Tgz q1 2018 results webcast
Tgz q1 2018 results webcastTgz q1 2018 results webcast
Tgz q1 2018 results webcastTeranga Gold
 
2018 march swiss mining lunch presentation-final
2018 march swiss mining lunch presentation-final2018 march swiss mining lunch presentation-final
2018 march swiss mining lunch presentation-finalTeranga Gold
 
2018 pdac presentation
2018 pdac presentation2018 pdac presentation
2018 pdac presentationTeranga Gold
 
Teranga gold 1x1 presentation bmo 2018
Teranga gold 1x1 presentation   bmo 2018Teranga gold 1x1 presentation   bmo 2018
Teranga gold 1x1 presentation bmo 2018Teranga Gold
 
2018 february slides 1x1-final
2018 february slides 1x1-final2018 february slides 1x1-final
2018 february slides 1x1-finalTeranga Gold
 
2018 january 1x1 investor presentation vancouver-final
2018 january 1x1 investor presentation vancouver-final2018 january 1x1 investor presentation vancouver-final
2018 january 1x1 investor presentation vancouver-finalTeranga Gold
 
Website slides november 26, 2017 - final
Website slides   november 26, 2017 - finalWebsite slides   november 26, 2017 - final
Website slides november 26, 2017 - finalTeranga Gold
 
Tgz q3 2017 results webcast final
Tgz q3 2017 results webcast   finalTgz q3 2017 results webcast   final
Tgz q3 2017 results webcast finalTeranga Gold
 
2017 beaver creek final
2017 beaver creek final2017 beaver creek final
2017 beaver creek finalTeranga Gold
 
Sprott Natural Resource Symposium
Sprott Natural Resource SymposiumSprott Natural Resource Symposium
Sprott Natural Resource SymposiumTeranga Gold
 
Sprott Natural Resource Symposium
Sprott Natural Resource Symposium Sprott Natural Resource Symposium
Sprott Natural Resource Symposium Teranga Gold
 
European Gold Forum
European Gold Forum European Gold Forum
European Gold Forum Teranga Gold
 

Mehr von Teranga Gold (20)

2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketing2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketing
 
Tgz q2 2018 results webcast
Tgz q2 2018 results webcastTgz q2 2018 results webcast
Tgz q2 2018 results webcast
 
18 06 05 06 121 ny presentation 1x1
18 06 05 06 121 ny presentation 1x118 06 05 06 121 ny presentation 1x1
18 06 05 06 121 ny presentation 1x1
 
121 singapore teranga presentation - 1x1
121 singapore   teranga presentation - 1x1121 singapore   teranga presentation - 1x1
121 singapore teranga presentation - 1x1
 
121 london teranga presentation - 1x1
121 london   teranga presentation - 1x1121 london   teranga presentation - 1x1
121 london teranga presentation - 1x1
 
Teranga gold agm 2018
Teranga gold   agm 2018Teranga gold   agm 2018
Teranga gold agm 2018
 
Tgz q1 2018 results webcast
Tgz q1 2018 results webcastTgz q1 2018 results webcast
Tgz q1 2018 results webcast
 
2018 march swiss mining lunch presentation-final
2018 march swiss mining lunch presentation-final2018 march swiss mining lunch presentation-final
2018 march swiss mining lunch presentation-final
 
2018 pdac presentation
2018 pdac presentation2018 pdac presentation
2018 pdac presentation
 
Teranga gold 1x1 presentation bmo 2018
Teranga gold 1x1 presentation   bmo 2018Teranga gold 1x1 presentation   bmo 2018
Teranga gold 1x1 presentation bmo 2018
 
2018 february slides 1x1-final
2018 february slides 1x1-final2018 february slides 1x1-final
2018 february slides 1x1-final
 
2018 january 1x1 investor presentation vancouver-final
2018 january 1x1 investor presentation vancouver-final2018 january 1x1 investor presentation vancouver-final
2018 january 1x1 investor presentation vancouver-final
 
Website slides november 26, 2017 - final
Website slides   november 26, 2017 - finalWebsite slides   november 26, 2017 - final
Website slides november 26, 2017 - final
 
Tgz q3 2017 results webcast final
Tgz q3 2017 results webcast   finalTgz q3 2017 results webcast   final
Tgz q3 2017 results webcast final
 
2017 dgf final2
2017 dgf final22017 dgf final2
2017 dgf final2
 
2017 beaver creek final
2017 beaver creek final2017 beaver creek final
2017 beaver creek final
 
2017 Q2 Results
2017 Q2 Results2017 Q2 Results
2017 Q2 Results
 
Sprott Natural Resource Symposium
Sprott Natural Resource SymposiumSprott Natural Resource Symposium
Sprott Natural Resource Symposium
 
Sprott Natural Resource Symposium
Sprott Natural Resource Symposium Sprott Natural Resource Symposium
Sprott Natural Resource Symposium
 
European Gold Forum
European Gold Forum European Gold Forum
European Gold Forum
 

Kürzlich hochgeladen

Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 

Kürzlich hochgeladen (20)

Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 

Q1 conference call 29042013 final

  • 1. 1 PRODUCING AND EXPLORING ASX FIRST QUARTER OPERATIONAL RESULTS CONFERENCE CALL APRIL 29, 2013
  • 2. 2 FORWARD LOOKING STATEMENTS Certain information included in this presentation, including any information as to the Company’s strategy, projects, exploration programs, joint venture ownership positions, plans, future financial or operating performance and other statements that express management’s expectations or estimates of future performance, constitute “forward-looking statements”. The words “believe”, “expect”, “will”, “intend”, ”anticipate”, “project”, ”plan”, “estimate”, “on track” and similar expressions identify forward looking statements. Such forward-looking statements are necessarily based upon a number of estimates, assumptions, opinions and analysis made by management in light of its experience that, while considered reasonable, may turn out to be incorrect and involve known and unknown risks, uncertainties and other factors, in each case that may cause the actual financial results, performance or achievements of the Company to be materially different from the Company’s estimated future results, performance or achievements expressed or implied by those forward-looking statements. Such forward-looking statements are not guarantees of future performance. These assumptions, risks, uncertainties and other factors include, but are not limited to: assumptions regarding general business and economic conditions; conditions in financial markets and the future financial performance of the company; the impact of global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future cash flows; the supply and demand for, deliveries of, and the level and volatility of the worldwide price of gold or certain other commodities (such as silver, fuel and electricity); fluctuations in currency markets, including changes in U.S. dollar and CFA Franc interest rates; risks arising from holding derivative instruments; adverse changes in our credit rating; level of indebtedness and liquidity; ability to successfully complete announced transactions and integrate acquired assets; legislative, political or economic developments in the jurisdictions in which the Company carries on business; operating or technical difficulties in connection with mining or development activities; employee relations; availability and costs associated with mining inputs and labour; the speculative nature of exploration and development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves; changes in costs and estimates associated with our projects; the accuracy of our reserve estimates (including with respect to size, grade and recoverability) and the geological, operational and price assumptions on which these are based; contests over title to properties, particularly title to undeveloped properties; the risks involved in the exploration, development and mining business, as well as other risks and uncertainties which are more fully described in the Company's prospectus dated November 11, 2010 and in other Company filings with securities and regulatory authorities which are available at www.sedar.com. Accordingly, readers should not place undue reliance on such forward looking statements. Teranga expressly disclaims any intention or obligation to update or revise any forward looking statements, whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws. This presentation is dated as of April 29, 2013. All references to the Company include its subsidiaries unless the context requires otherwise. This presentation contains references to Teranga using the words “we”, “us”, “our” and similar words and the reader is referred to using the words “you”, “your” and similar words.
  • 3. 3 FOCUSED ON GROWTH THROUGH: GROWING RESERVES GROWING PRODUCTION FINANCIAL STRENGTH Alan R. Hill Executive Chairman Richard Young President & CEO Conference Call Agenda: • Q1 2013 Operational Results • New Equipment Finance Facility and 100% Hedge Free • Government Agreement • Revised 2013 Capex Guidance ASX FIRST QUARTER OPERATIONAL RESULTS CONFERENCE CALL
  • 4. 4 FOCUSED ON GROWTH THROUGH: GROWING RESERVES GROWING PRODUCTION FINANCIAL STRENGTH Q1 2013 OPERATIONAL RESULTS Production - 68,301oz. - 63% higher than Q1 2012 due to higher grade & higher throughput Cash Costs - $535/oz - 18% lower than Q1 2012 while gross costs increased by 14% due to higher mining and processing rates Cash Position(1) - $57.1M – 27% higher than FYE 2012 Tonnes Mined - 18% higher than Q1 2012 Ounces Mined - 60% higher than Q1 2012 Tonnes Milled - 21% higher than Q1 2012 (1) Includes cash, cash receivable and $6.1 million of bullion receivable.
  • 5. 5 Finalized $50M equipment finance facility with Macquarie: • Replaces the Societé Generalé finance lease facility • Provides financing for equipment at Sabodala pit and Gora • $22.7M outstanding at March 31, 2013 with a further $4.3M to be drawn down in Q2 at final delivery of Sabodala equipment • Remaining $23M reserved for future equipment drawn-downs as required Hedge free as of April 15, 2013: • Enables Teranga to maximize cash margins on each ounce produced STRENGTHENING THE BALANCE SHEET
  • 6. 6 Provides for long-term partnership through: • Price and formula to acquire Government’s additional option on satellite deposits and to incorporate these into the existing ML and fiscal regime • Supporting drilling of the Niakafiri deposit on the ML • Extending the ML by five years to 2022 and five key exploration licenses by 18 months • Ensuring full access to exploration targets currently occupied by artisanal miners • Settling all outstanding tax assessments • Resolve the Special Contribution Tax of 5% through an increase in royalties to 5% and accelerated dividend payments AGREEMENT WITH GOVERNMENT
  • 7. 7 GOVERNMENT OPTION FORMULA - GORA Initial Payment Example Gora Reserves per feasibility study (oz.) 285,000 Recovery rate 95% Recovered reserves (oz.) 270,750 Less government royalties 13,538 Recovered ounces to shareholders (oz.) 257,213 Average realized gold price last 12 months $ 1,650 Reserve payment percentage 1.00% Reserve payment dollars per ounce $ 16.50 Payment due on production maximum $10 million $ 4,244,006 Additional payments required when: 1. Increase in the gold price 2. Increase in production 3. Exceeds $10 million cap
  • 8. 8 WHAT IF PRODUCTION/PRICE CHANGES? No Change in Production/Gold Price Year 1 Year 2 Year 3 Year 4 Cumulative production (oz.) 67,500 135,000 202,500 270,750 Less government royalties 3,375 6,750 10,125 13,538 Cumulative production to shareholders 64,125 128,250 192,375 257,213 Weighted average realized gold price ($/oz.) $ 1,650 $ 1,650 $ 1,650 $ 1,650 Reserve payment percentage 1.00% 1.00% 1.00% 1.00% Reserve payment dollars per ounce $ 16.50 $ 16.50 $ 16.50 $ 16.50 Cumulative payment due $ 1,058,063 $ 2,116,125 $ 3,174,188 $ 4,244,006 Initial Payment / Subsequent Payments $ 4,244,006 $ 4,244,006 $ 4,244,006 $ 4,244,006 Payment due $ - $ - $ - $ - * Cumulative production calculation performed annually after year end and if payment due, paid by June 30th of the following year. Change Gold Price Year 1 Year 2 Year 3 Year 4 Cumulative production (oz.) 67,500 135,000 202,500 270,750 Less government royalties 3,375 6,750 10,125 13,538 Cumulative production to shareholders 64,125 128,250 192,375 257,213 Weighted average realized gold price ($/oz.) - increase gold price $ 1,650 $ 1,700 $ 1,750 $ 1,800 Reserve payment percentage 1.00% 1.00% 1.00% 1.00% Reserve payment dollars per ounce $ 16.50 $ 17.00 $ 17.50 $ 18.00 Cumulative payment due $ 1,058,063 $ 2,180,250 $ 3,366,563 $ 4,629,825 Initial Payment / Subsequent Payments $ 4,244,006 $ 4,244,006 $ 4,244,006 $ 4,244,006 Payment due $ - $ - $ - $ 385,819 * Cumulative production calculation performed annually after year end and if payment due, paid by June 30th of the following year. Change in Production Year 1 Year 2 Year 3 Year 4 Cumulative production (oz.) - increase in production 75,000 150,000 225,000 300,000 Less government royalties 3,750 7,500 11,250 15,000 Cumulative production to shareholders 71,250 142,500 213,750 285,000 Weighted average realized gold price ($/oz.) $ 1,650 $ 1,650 $ 1,650 $ 1,650 Reserve payment percentage 1.00% 1.00% 1.00% 1.00% Reserve payment dollars per ounce $ 16.50 $ 16.50 $ 16.50 $ 16.50 Cumulative payment due $ 1,175,625 $ 2,351,250 $ 3,526,875 $ 4,702,500 Initial Payment / Subsequent Payments $ 4,244,006 $ 4,244,006 $ 4,244,006 $ 4,244,006 Payment due $ - $ - $ - $ 458,494 * Cumulative production calculation performed annually after year end and if payment due, paid by June 30th of the following year.
  • 9. 9 WHAT IF WE EXCEED THE $10M CAP? Exceeds $10 million over time with gold price constant Still under cap First pay over cap Subsequent pay Subsequent pay Cumulative production (oz.) 600,000 700,000 800,000 950,000 Less government royalties 30,000 35,000 40,000 47,500 Cumulative production to shareholders (oz.) 570,000 665,000 760,000 902,500 Weighted average realized gold price ($/oz.) $ 1,650 $ 1,650 $ 1,650 $ 1,650 Reserve payment percentage 1.00% 1.00% 1.00% 1.00% Reserve payment dollars per ounce $ 16.50 $ 16.50 $ 16.50 $ 16.50 Cumulative payment due $ 9,405,000 $ 10,972,500 $ 12,540,000 $ 14,891,250 Initial Payment / Subsequent Payments $ 10,000,000 $ 10,000,000 $ 10,972,500 $ 12,540,000 Payment due $ - $ 972,500 $ 1,567,500 $ 2,351,250 * Cumulative production calculation performed annually after year end and if payment due, paid by June 30th of the following year. Exceeds $10 million over time gold price increases Still under cap First pay over cap Subsequent pay Subsequent pay Cumulative production (oz.) 600,000 700,000 800,000 950,000 Less government royalties 30,000 35,000 40,000 47,500 Cumulative production to shareholders (oz.) 570,000 665,000 760,000 902,500 Weighted average realized gold price ($/oz.) $ 1,650 $ 1,700 $ 1,750 $ 1,800 Reserve payment percentage 1.00% 1.00% 1.00% 1.00% Reserve payment dollars per ounce $ 16.50 $ 17.00 $ 17.50 $ 18.00 Cumulative payment due $ 9,405,000 $ 11,305,000 $ 13,300,000 $ 16,245,000 Initial Payment / Subsequent Payments $ 10,000,000 $ 10,000,000 $ 11,305,000 $ 13,300,000 Payment due $ - $ 1,305,000 $ 1,995,000 $ 2,945,000 * Cumulative production calculation performed annually after year end and if payment due, paid by June 30th of the following year.
  • 10. 10 Reduced discretionary spending in 2013: • Exploration expense (Regional Land Package) exploration reduced to $3M from $10 - $15M • Capitalized reserve development (Mine Licence) exploration expense expected at the low end of $5 - $10M • General & Administrative reduced to $13M from $15 - $20M • Gora development expenditure reduced to $5 - $10M from $45 - $50M, of which $23M was to be financed via the new mobile equipment loan • Capitalized deferred stripping at the Sabodala pit now expected at the bottom end of the original range of $35 - $40M • Mine site capex at the low end of guidance range $20 - $25M Reiterating 2013 Guidance: • Production: 190,000 – 210,000oz. • Cash Costs: $650 - $700/oz. GENERATING FREE CASH FLOW IN 2013
  • 11. 11 SABODALA PIT – MAIN FLAT EXTENSION / LOWER FLAT ZONE DINKOKHONO • Potential to expand gold inventory on ML with the objective of increasing mine life to the year 2020/25 ML EXPLORATION $5 MILLION 33km2 NIAKAFIRI & NIAKAFIRI WEST SOUKHOTO
  • 12. 12 NINYENKO SORETO / DIABOUGOU 1,200km2 35km from Mill RLP EXPLORATION $3 MILLION GOUMBOU GAMBA TOUROKHOTO (Main and Marougou)
  • 13. 13 • Agreement in Principle signed with Government • Good first quarter operationally and financially • Reduction in discretionary spending in 2013 to produce free cash flow • 100% hedge free, expect margin expansion and increased earnings, cash flow and free cash flow • Retaining our focus on extension of reserve life SUMMARY SLIDE
  • 14. 14 COMPETENT PERSONS STATEMENT The technical information contained in this presentation relating to the mineral reserve estimates within the Sabodala, Sutuba, Niakafiri and Gora deposits and the Stockpiles, is based on information compiled by Julia Martin, P.Eng., MAusIMM (CP), a full time employee with AMC Mining Consultants (Canada) Ltd., is independent of Teranga, is a “qualified person” as defined in NI 43-101 and a “competent person” as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Ms. Martin has sufficient experience relevant to the style of mineralization and type of deposit under consideration and to the activity she is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Ms Martin has reviewed and accepts responsibility for the reserve estimates disclosed above. Ms Martin has consented to the inclusion in the report of the matters based on her information in the form and context in which it appears in this presentation. The technical information contained in this presentation relating to the mineral resources is based on information compiled by Ms. Patti Nakai-Lajoie, who is a Member of the Association of Professional Geoscientists of Ontario. Ms. Patti Nakai-Lajoie is full time employee of Teranga and is not “independent” within the meaning of National Instrument 43-101. Ms. Patti Nakai-Lajoie has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Ms. Patti Nakai-Lajoie is a “Qualified Person” under National Instrument 43-101 Standards of Disclosure for Mineral Projects.and she consents to the inclusion in the report of the matters based on her information in the form and context in which it appears in this presentation. The technical information contained in this presentation relating to exploration results is based on information compiled by Mr. Martin Pawlitschek, who is a Member of the Australian Institute of Geoscientists. Mr. Pawlitschek is a consultant of Teranga and is not “independent” within the meaning of National Instrument 43-101. Mr. Pawlitschek has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Pawlitschek is a “Qualified Person” in accordance with NI 43-101 and he consents to the inclusion in the report of the matters based on his information in the form and context in which it appears in this presentation.
  • 15. 15 APPENDIX - 2013 DISCRETIONARY SPEND REDUCED TO GENERATE FREE CASH FLOW Revised Guidance Original Guidance Operating results Production (oz) 190,000 - 210,000 190,000 - 210,000 Total cash cost (incl. royalties)1,2 ($/oz sold) 650 – 700 650 – 700 Exploration and evaluation expense ($ millions) 3.0 10.0 – 15.0 Administration expenses ($ millions) 13.0 15.0 – 20.0 Capital expenditures ($ millions) Mine site 20.0 20.0 - 25.0 Capitalized reserve development 5.0 5.0 - 10.0 Gora development costs Mobile equipment 5.0 30.0 - 35.0 Site development 5.0 15.0 - 20.0 Total Gora development costs 10.0 45.0 - 50.0 Capitalized deferred stripping2 35.0 35.0 - 40.0 Total capital expenditures 70.0 105.0 - 125.0 2 Includes the impact of adopting IFRIC 20 – Stripping Costs in the Production Phase of a Surface Mine. For the year ended December 31, 2013 1 Total cash cost per ounce is a non-IFRS financial measures with standard meaning under IFRS.