Combining Apples and Oranges to Make Juice:
    NOAA/NASA Cooperation in GOES-R




                    Barbara Pfarr
       GOES-R Program Systems Engineering Lead

                    PM Challenge
                    February 2009



                                                 1
Why the World Needs GOES
. . . Sustained Observations of the
Atmosphere, Oceans, Land and Sun




                                      2
GOES Constellation
                   Primary Requirement: Continuity of Capability


                         N                                                           GOES-11     GOES-12
         Subsatellite             Equator                                           135° West    75° West
           Point

                                     22,300
                                            M   i
                                                                                            GOES-13
                                                                                            105° West
                                                                                             (Spare)

                              S

                                                                          Two operational satellites and on-orbit spare

•   GOES I-M (8-12)* series operational since 1994
     –   GOES-10 operational at 60º W in support of South America beginning December 2, 2006
     –   GOES-11 operational as GOES West beginning June 21, 2006
     –   GOES-12 operational as GOES East beginning April 1, 2003

•   GOES N-P
     –   GOES-13 launched May 24, 2006, storage at 105º W, turned over to NOAA as of January 24, 2007
     –   GOES-O in storage; will launch no earlier than April 2009
     –   GOES-P in temporary ground storage ; will launch no earlier than December 2009

•   GOES-R series will replace the GOES-N series no earlier than 2015


    * Note: Satellites are labeled with letters on the ground and changed to numbers on-orbit
                                                                                                                          3
Continuity of GOES
                     Operational Satellite Program
Calendar Year                                                                                 As of January 5, 2009

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

               GOES 10       Backup


                                   GOES 11       GOES West


                            GOES 12       GOES East


                                                GOES 13      On-orbit Spare


                                                          GOES O *


                                                                              GOES P

                                    GOES R


                                              GOES S


                                                                                       Satellite is operational
                                                                                       beyond design life
* Launch currently projected for April 2009                                            On-orbit GOES storage
                                                                                       Operational
                                                                                                              4
GOES-R Benefits: More than
                        Continuity
• Improved tropical cyclone forecasting will result in an increased ability to
  protect property and to enable evacuation of individuals residing in the path
  of the storm, while also reducing losses to the recreational boating
  industry.
• Enhanced aviation forecasting results in decreased commercial aviation
  delays and repair costs to aircraft due to volcanic ash.
• More accurate temperature forecasting contributes to improved energy
  demand expectations and savings in the electricity and natural gas sectors.
• Enhanced forecasts will lead to more efficient irrigation of crops, resulting
  in water and energy savings.
  GOES-R Launch                                   NET FY 2015
                                                  2 Satellites (GOES R & S), with unfunded
  Program Architecture                            options for 2 (GOES T&U); 10 year operational
                                                  design life
  Program Operational Life                        FY 2017 – FY 2028
  Program Life-cycle FY 2009 President’s Budget   $7.7 billion
                                                                                              5
GOES-West
    137° West                                                                         GOES-East
                                                                                       75° West



                                                                  ta
                              Da t
                                  a
                                                             l, da
                                                         o
                                                      ntr
                                                    co




                                                                         ta
Direct                                          &




                                                                       Da
                                            d
                                         an
Readout                                mm
                                  Co
Users


                                                                                Command &
                   Remote
                                                                                control, data
                Backup Facility
                                                 NOAA
                                         Satellite Operations
                                                Facility
                                            Suitland, MD

                                                                  Command and Data Acquisition
                                                                      Station Wallops, VA


  GOES-R System Configuration
  GOES-R
06/19/2008 v2                                                                                   6 6
                                                                                                  6
GOES-R Functional Overview

                                                                  GOES East

                                               GOES West




  GOES-R Ground Segment
    Functional Elements                                         GOES-R Re-broadcast



                            Mission
                          Management




            Product
           Generation        Product
                           Distribution
                                                             User
                                                           Community

Enterprise Management


                          Archive and Access
                            (CLASS*; ESPC*)




                                                                                      7
GOES-R Program Status
• Spacecraft Contract Awarded
• Ground segment procurement source selection underway
• CONOPS baselined
• Level 1 and Level 2 Requirements Documents baselined
• Management Control Plan baselined
• Systems Engineering Processes established:
  – Requirements Management
  – Configuration Management
  – Risk Management
• Instrument development well underway
                                                         8
GOES-R Instruments
    Instrument                         Function                     Contractor                       Status
                            Primary Instrument: Provides
Advanced Baseline                                                                       CDR completed, engineering unit in
                            imagery of the Earth’s surface,         ITT, Ft Wayne IN
Imager (ABI)                                                                            development
                            atmosphere and ground cover
                                                                    Lockheed Martin
Geostationary Lightning     Detects the frequency and location      Space Systems       System definition review completed,
Mapper (GLM)                of lightning activity                      Company,         preliminary design started
                                                                      Palo Alto CA
                                                                       Assurance
                                                                                        Preliminary design review (PDR)
Space Environmental In-                                               Technology
                            Monitors the space environment                              completed, component development
Situ Suite (SEISS)                                                    Corporation,
                                                                                        underway
                                                                      Carlisle MA

Extreme Ultra Violet /                                               Laboratory for
                            Provides real time measurement of       Atmospheric and     PDR completed, component
X-Ray Irradiance Sensor                                              Space Physics      development underway
                            solar activity
(EXIS)                                                                Boulder, CO
                            Observes the sun’s emissions and        Lockheed Martin
Solar Ultra Violet Imager   provides early detection and location   Space Systems       PDR completed, component
(SUVI)                      of flares                                  Company,         development underway
                                                                      Palo Alto CA
                            Measures the magnitude and
                                                                                        To be procured as part of spacecraft
Magnetometer                direction of the Earth’s magnetic       Spacecraft Vendor
                                                                                        contract
                            field




                                                                                                                      9
Partnership born from Reality

•   The unique GOES-R partnership is a recognition of two basic
    realities:
     – GOES-R is the largest acquisition ($7.672B) ever undertaken at the
       Department of Commerce. NOAA provides 100% of the funding
         • NOAA has considerable experience operating weather satellite systems, and
         • NOAA has extensive experience developing user products from satellite
           data, yet
         • NOAA has no experience overseeing a system of this size and complexity
     – NASA has the expertise and experience to procure the satellite
       systems, with time-tested processes that have proven successful
•   GOES-R’s unique structure provides NOAA with greater
    management responsibility and oversight while leveraging NASA’s
    experience procuring satellite systems
    This briefing describes the unique GOES-R partnership between NOAA
    and NASA and identifies challenges the dual agency management
    system has created and how we are dealing with them -
    combining apples and oranges to make juice!
                                                                                 10
GOES-R High Level Acquisition
        Organizational Relationships

                          Secretary of Commerce
                        Milestone Decision Authority

                   Assistant Secretary for Administration
                           Acquisition Executive

                              Under Secretary
                        for Oceans and Atmosphere
           Milestone Decision Authority (delegated from Secretary)

                          Deputy Under Secretary
                        for Oceans and Atmosphere
                                PMC Chair


                               Assistant Administrator
GSFC                       Deputy Assistant Administrator
CMC                  Deputy Assistant Administrator (Systems)
                     Office of Satellite and Information Services


                      GOES-R System Program Director


           Flight Segment                                Ground Segment
           Project Manager                               Project Manager



                                                                           11
GOES-R
   Acquisition Strategy Evolution

                 Independent           NOAA Approved
   Original         Review               Dec 2006
  Nov 2004      Summer 2006
                                  Program System Engineering

                                NASA Lead
 One Single                     NOAA Participation
System Prime        TO          NASA processes




                                   Space               Ground
NOAA Contract                     Segment              Segment


                               NASA Contracts        NOAA Contracts



                                                                 12
NOAA/NASA
                         Roles and Responsibilities Evolution
                                                                                                                             GOES-R
     Function                   Legacy POES                        Legacy GOES
                                                                                                      Flight Project            Ground Segment Project
Requirements
                                     NOAA                                NOAA                                NOAA                             NOAA
Authority

                          GSFC PMC, NASA HQ’s PMC,                GSFC PMC and NASA
Oversight                        NOAA PMC                             HQ’s PMC
                                                                                                   GSFC CMC and NOAA PMC            GSFC CMC and NOAA PMC


Key Program
                                                                                                         NOAA or DOC                      NOAA or DOC
Decisions (Milestones,         NASA GSFC or HQS                   NASA GSFC or HQS
                                                                                                   (depending on DOC decision)      (depending on DOC decision)
Readiness Reviews)

                           NASA HQ: Science Mission            NASA HQ: Science Mission
Source Selection                                                                                                                            NOAA DUS
                             Directorate or equivalent           Directorate or equivalent                NASA GSFC
Authority                                                                                                                            for Oceans and Atmosphere
                          (Delegated to GSFC Code 400)        (Delegated to GSFC Code 400)

                                                                       NASA GSFC
Fee Determining                    NASA GSFC                    Director of Flight Programs
                                                                                                          NASA GSFC                     NOAA NESDIS AA
Official                    Director of Flight Programs    (None for GOES N -- Firm Fixed Price
                                                                   Contract with Boeing)

Contracting Officer                   NASA                               NASA                                NASA                             NOAA

Program Office                      NASA                               NASA                       Program/Project Office staffed   Program/Project Office staffed
Composition               (NOAA Retains Resident Office)     (NOAA Retains Resident Office)       with NOAA & NASA personnel       with NOAA & NASA personnel

                                                                        NASA
Launch services                       NASA
                                                                 (For GOES N – Boeing)
                                                                                                             NASA                             NASA

Satellite Operations                 NOAA                                NOAA                                NOAA                             NOAA

Ground Systems                       NOAA                                NOAA                                NOAA                             NOAA




                                                                                                                                                        13
Co-located NOAA/NASA
             Program Office is key to
              Organization Structure

The GOES-R Program, including NOAA civil servants, NASA civil
  servants, and NOAA and NASA support contractors, is co-located
  at Goddard Space Flight Center, Building 6

•   Better coordination through daily contact between all elements of the
    Program
•   Provides easy access to GSFC experienced management for
    satellite procurement
•   Unique integrated leadership arrangement possible due to co-
    location




                                                                       14
Program Management Summary
                                                    NOAA
                      NOAA
               Program Management
                     Council

                                                    NESDIS


                                       System Program Director (SPD): NOAA                                   GSFC
Program Scientist
                                                Deputy SPD: NOAA                                      Center Management
  Lead: NOAA
                                               Assistant SPD: NASA                                          Council


                             Program Control                     Program Systems Engineering
                              Lead: NOAA                                 Lead: NASA
                                                                        Deputy: NOAA
                       Program Mission Assurance
                             Lead: NASA                                                                    GSFC
                                                                      Program Contracts
                            GOES-R Attorney                          Ground Lead: NOAA                     Code
                              Lead: DOC                               Flight Lead: NASA                     400



                           Flight Project                              Ground Segment Project
                      Project Manager: NASA                            Project Manager: NOAA
                          Deputy: NOAA                                      Deputy: NASA


                       Flight Project Contracts                    Ground Segment Project Contracts
                             Lead: NASA                                     Lead: NOAA

                                                                                                                     15
GOES-R Program System
           Engineering (PSE) – the Glue
              Between the Projects
•Program System Engineering (PSE) team is responsible for End-to-End
systems integration, and planning, coordination, and adjudication of GOES-R
Program System Engineering functions

•To accomplish this responsibility, the PSE team will implement system
engineering functions and processes, tailored to the specific needs of the
GOES-R Program.
                                                  •NOAA-NESDIS
                                                  •GOES-R Program Office
                        Program Systems           •Algorithm Working Group
                        Engineering Team          •User Community
                                                  •GSFC AETD & Center
                                                  Management




       Flight Project                      Ground Segment Project
          Systems                                 Systems
     Engineering Team                         Engineering Team




                                                                             16
Overarching Communications


•   PSE Lead and Deputy are members of the Senior Management Team which
    directly reports to the System Program Director (SPD)

•   Program System Engineering (PSE) Lead is coordinating and chairing
    coordination and planning meetings with the systems engineering team
     – Weekly PSE team meeting
     – Weekly Program/Project SE coordination meeting
     – Monthly PSE Risk Board
     – Monthly Program risk board
     – Weekly Program Engineering Change Review Board (ECRB)

•   Systems engineering team members also participate in the following project
    meetings:
     – Flight and Ground Project ECRBs
     – Project Risk Management Boards
     – Flight Instrument Design reviews and technical meetings
     – Ground system design and peer reviews
     – Weekly staff meetings, systems engineering meetings, steering group
        meetings



                                                                                 17
Program Standard Processes

•   All procured systems:
     – Will provide traceability of Requirements Verification via DOORS tool in
         DOORS database
     – Verification matrices to be provided by vendor, approved by Projects and
         Program
     – Contractors’ proposed test plans to be based on Verification Matrices and
         Government-specified schedules
     – Flight/Ground Projects will oversee factory and site testing,
     – including intra-segment interfaces
     – PSE will maintain visibility in all system activities and interfaces
•   Program-wide consistent Configuration Management (CM) Plans and
    coordinated change review processes
•   Program-wide Risk Management database with multiple levels for subsystems,
    projects and program
•   Program-wide Schedule management system will be developed and maintained
•   Working groups for Program-wide efforts
     – Will include PSE, Flight and Ground Projects, and
         Contractors as required




                                                                              18
Tailoring of SE to GOES-R
The Classic top-down System Engineering Process must be tailored to
  address the GOES-R Program
• Because of the Long Lead time required for development of a GEO
  Imager, the ABI instrument and other instruments’ designs were
  started well in advance of the spacecraft procurement. Some
  “bottom up” flow of requirements and capabilities must be carefully
  woven into the overall system to minimize cost, schedule, and
  performance impacts.
• Review and approval processes must accurately reflect
  NOAA/NASA partnership strengths and responsibilities
• Continuity with current GOES operations and data must remain as
  a top priority
• Decision to acquire two prime contractors, one for Ground and one
  for Space brings forth some new risk considerations like
  coordination of interfaces, synchronization of schedules, etc.




                                                                    19
Critical Inter-Project
                  Dependencies being
                   monitored by PSE

•   Delivery of the Level 1b processing algorithms from the five
    instrument vendors for subsequent delivery to the Ground Project
    contractor for operational implementation.
•   Delivery of telemetry and command design information from the
    satellite contractor to the ground contractor to support the design of
    that portion of the ground segment
•   Delivery of satellite simulators (from the spacecraft contractor) for
    use by the ground segment contractor for development and testing.
•   Readiness of the telemetry and command portion of the ground
    segment sufficient to support compatibility testing during the S/C
    Thermal-vacuum testing.
•   Availability of the satellite to conduct end-to-end tests with the
    ground segment.




                                                                             20
Processes Affected by
                    Partnership
1.    Program/Project Management
2.    Technical and Management Reviews
3.    Program Status Reporting
4.    Approval to Enter Acquisition and Operations Phase
5.    Configuration Control
6.    Risk Management
7.    Schedule Management
8.    Requirements Management
9.    System Integration
10.   System Acceptance


                     More players require more buy-in



                                                           21
Challenge #1 –
                 Defining the Partnership
Defining the GOES-R partnership explicitly required defining the
  responsibilities of each agency, the program office and each project
NASA and NOAA have fundamentally different cultures:
• NASA focuses more on proven processes while NOAA focuses more
  on agility/flexibility to support users
• NASA focuses more on flight hardware with high reliability for first
  time success while NOAA focuses more on evolving
  science/operational product applications that can change over time.
• The different cultures lead to
     – different sets of priorities
     – different concepts of what represent success.
•   Having the difference in cultures primarily located across the
    important boundary that is Flight and Ground enhances the
    challenge.

    Required significant discussion, review, and revision until all parties
                             were in agreement



                                                                              22
MOU and MCP Define Agency
          Roles and Responsibilities
• Memorandum of Understanding (MOU) established
  GOES-R as a NOAA led program with two projects–
  signed June 15, 2007
   – Spacecraft: NASA contract
   – Ground Segment: NOAA Contract
   – Recognized the strengths of each agency
• Management Control Plan written to implement MOU
   – Requirements mirror NPR 7120 as much as possible
   – Deviations from NPR 7120 when similar NOAA process is being
     used instead
      • i.e. NOAA independent cost estimating processes being
        utilized



                                                               23
On a Dual Agency Program,
Documents Require Unique
        Approvals
           • Memorandum of Understanding
             (MOU) between NOAA and NASA
             created GOES-R as a co-located
             Program Office with Flight and
             Ground Segment Projects.
             Approved by:
              – NOAA Deputy Under Secretary
              – NASA Associate Administrator
            • Management Control Plan (MCP)
              written to implement MOU.
              Approved by:
              – NESDIS Director
              – GSFC Director

                                               24
Challenge #2 –
                The Review Process
The GOES-R Review Process is defined in the System
  Review Plan, coordinated with both agencies
   – based on NASA standards and processes
   – NASA and NOAA independent experts on review
     panels with joint chairs
   – NASA and NOAA approvals for program milestones




   PSE worked with Goddard’s Systems Review Office to develop a
   plan that met NASA requirements but tailored to GOES-R



                                                                  25
Review Process
       PDRR                                              Acquisition and Operations
               KDP                                          Final Design          System Assembly,                  Launch /
                                                                                                                                    Disposal
                I                                           & Fabrication         Integration & Test               Operations
 CITRB         (DOC)
                         KDP                         KDP
                          IA                          II
                       (NOAA)                      Program              PGR -III   PGR -IV                             PGR -V
                                                   Baseline             Mission    Mission                            Handover
         PMC                                        (NOAA)            Integration Readiness                            Review
 I-PSR                                          PMC                   Readiness Board                                    (NESDIS)
                                        I-PSR
                                                                      (NOAA DUS) (NOAA DUS)

GSFC
         C-GRR                  C-GRR                                              MRR
                                                C-GRR            C-GRR                                            C-GRR
                                                                                  C-GRR
ASM

                          PER-B       PER-C                PER -D                                   PER -E                      PER -F
                         Concept     Project             Integration                                Launch                      End of
                         Design      Baseline            Readiness                                 Readiness                    Mission
NESDIS                   (NESDIS)    (NOAA DUS)           (NESDIS)                                     (NESDIS)                 (NESDIS)




                                                                                                FRR

                                                                            PSR
                                                                SIR                             LRR
SCR                SRR     SDR PDR                      CDR MOR
                                                              FOR           ORR            SMSR                   PLAR




                                                                                                                                        26
Challenge #3–
              The Reporting Process
Multiple levels of both agencies require periodic
 status reports
  – Challenge to create reporting templates such that
    tailoring for each report is minimized
Threshold reporting required at multiple levels




These requirements are documented in the Management Control Plan.

                                                                    27
Status Reporting Requirements
                                                              Regular Reporting
                     Type of Reporting                         Dates Scheduled                                   Reviewer
Senior Management Team (SMT) Weekly                                Weekly                                     SPD or designee
GOES-R Personnel Management Group                                  Monthly                                         DSPD
GOES-R Engineering Review Board                                  As required                                  PSE or designee
GOES-R Monthly Program Review                                      Monthly                                    SPD or designee
NOAA Program Management Council (PMC)                              Monthly                                   DUS/NOAA PMC
                                                                                             Deputy Center Director / GSFC Center Management
NASA GSFC Monthly Status Review (MSR)                              Monthly
                                                                                                              Council (CMC)
NASA GSFC Pre-MSR                                                  Monthly                            GSFC Director of Flight Projects
DOC Quarterly Program Review                                      Quarterly                                   DOC CFO/ASA
NOAA and NASA Administrator meeting to assess status
                                                            Yearly or as necessary               NOAA Administrator / NASA Administrator
and progress
NOAA/NESDIS Independent Review Team                              As required                              DUS/NESDIS designated
Standing Review Board                                            As required                             NESDIS/GSFC designated
NESDIS Weekly Program Tag Up                                       Weekly                                     NESDIS DAAS
Program Monthly Status Report                                      Monthly                                         OMB
GSFC/NESDIS Tag Up                                                 Monthly                  NESDIS AA, GSFC Deputy Center Director, Technical
NESDIS Monthly Status                                              Monthly                                     NESDIS AA
Project Monthly Status Review                                      Monthly                              Project Manager, SPD attends

Review of Award Fee Effectiveness                                  Annual                         NOAA/NASA Findings reported to DOC

                                                                                           Senate:
                                                                                           oAppropriations Committee
                                                                                           oCommittee on Commerce, Science, and Transportation
Report to Congress                                     Annually with President’s Budget,
                                                                                           House of Representatives:
                                                                                           Appropriations Committee & Committee on Science and
                                                                                           Technology
                                                                                                                                       28
Threshold Reporting
                                Requirements


                                   Threshold Reporting

Type of Reporting                  Threshold                 Required Report to:
                                      5% over cost and
Department of Commerce Threshold
                                   schedule of any program   DOC ASA/CFO
on cost and schedule
                                           element
NOAA Cost Threshold reporting
                                      10% over cost as
requirement to Deputy Under                                  DUS, NESDIS AA
                                     determined by SPD
Secretary
Congressional Cost Threshold
                                      20% over cost as       Under Secretary for Oceans and
reporting requirement to Under
                                     determined by SPD       Atmosphere
Secretary




                                                                                          29
Challenge #4 –
        Approval to Enter Acquisition and
            Operations (A&O) Phase

Approval to Enter A&O Phase, which in our case included
  permission to spend our money on our development
  contracts, was a challenge due to:
• Many layers of review and approval
• Independent Review Team recommendations that drove
  us to a conservative 80 percent budget solution
• Challenges reconciling NASA and NOAA independent
  cost estimates


GOES-R received formal approval from the Department of Commerce to
              enter the A&O Phase in December, 2007



                                                                 30
Challenge #5–
                 Configuration Control
Dual-agency configuration control is a challenge on GOES-
  R, particularly for the documents “owned” by NOAA, i.e.
  the Level 1 Requirements and Management Control
  Plan:

• All elements of the Program as well as both Agencies
  need to be a part of the review cycle
• Must carefully control requirements yet still allow for
  necessary changes



 Required significant discussion, review, and revision until all parties
                were in agreement – still being refined



                                                                           31
Configuration Management
                                                                       PMC staff                            PMC
                                                                                                                             Changes      NO         PMCBriefed
                                                            Prepares necessary documentation               Member
PMC
       / DUS




                                                                                                                             Required?               DUS signs
                                                                 for PMC review/Approval                   Review
                                                                                                                                    YES


                                           NOSC staff                     NOSC                              NO      NOSC
                                                                                           Changes
                                Prepares necessary documentation          Member                                    Chairs
NOSC




                                                                                           Required?
                                    for NOSC review/Approval              Review                                     sign
                                                                                                     YES

                                                                    YES                                               YES                            YES

                           Mod CCR Review                          SPD approves NO                                  SPD approves                 SPD approves
                                                                                                                                                                  CCB Chair
SPD




               (SPD/PMs/PSE/Prog Scientist (GORWG Chair))           For release?                              NO     For release?              NO For release?
                                                                                                                                                                  approves


                                                                                          CM makes           CM makes                     CM makes
                                                                                           changes            changes                      changes




                                                                                               YES          NOAA
                                                                                                            Owned
                                                                                                             Doc?
                                                                                                            NO




                                                                                                                                                                       32
Challenge #6 –
                         Risk Management
The GOES-R Risk Management Process follows NASA and DOD requirements
   as closely as possible while maintaining consistency with other NOAA
   programs (NPOESS, etc)
•   Characteristics of Integrated Risk Approach
     – Multi-layer approach for risk management that allows cognizant projects,
       segment organizations, contractors, teams, groups, and organizations to retain
       authority and control over risks for their areas of responsibility while supporting
       existing management and decision making processes.
     – Program risks address technical, cost, and schedule impacts related to the:
         • Successful design, development, fabrication/manufacture, integration, tests,
            deployment and operations of the GOES-R system;
         • Performance and reliability of the GOES-R Series End-to-End System.
         • Activities and resources including staff, contractors, and facilities, at NOAA
            and NASA, at other government agencies, developer organizations
     – Comprehensive approach allows early identification of potential risks



Risk Management Plan baselined. Required discussion with other NOAA
                  programs to ensure consistency



                                                                                        33
Integrated Risk Management
 Across the GOES-R Program

  Spacecraft 
  Vendor RMB                 Observatory



  Subsystem                  Systems Eng.                         Flight 
  RWGs                       & Integration                        Project
                                                                  RMB

  Instrument
  Vendors                    Instruments                                               Mission 
  RMBs                                                                                 Assurance


                             Elements 
                             Integration


                                                                   Program        Program
                             End‐to‐End 
                             Verif. & Valid.                       Integration    RMB
                                                                   RMB

                             End Product 
                             Perf.

                                                                                       Program
                                                                                       Scientist
  Working                    Systems 
  Groups                     Engineering

                                                                   Ground                          Reporting & 
                                                                   Segment                         Coordination
  IDTs/IPTs                  Segment 
  RWGs                       Devel.                                Project                         Prioritization &
                                                                   RMB                             Resources
                                                                                                   Risk‐Informed 
  AWG, OSD,                                                                                        Decision Making
                             Affiliated 
  OSDPD, etc.
                             Orgs.




   Product Development  &                      Projects & Integration            Program
   Vendors




                                                                                                                      34
Challenge #7 –
                Schedule Management
Having 2 projects each with multiple contractors adds
  complexity to the problem of developing and maintaining
  an integrated Program Schedule
   – Project Schedulers are integrating at Project Level
   – Program scheduler hired to combine project schedules at
     Program Level – at this point a manual effort
   – PSE responsible for analyzing schedules for technical
     inconsistencies and working out conflicts
   – Program Schedule Management Plan being written




Developing an initial Program Schedule required significant discussion,
review, and revision until all parties were in agreement. GOES-R is still
           developing its full integrated Program Schedule


                                                                        35
GOES-R Program Integrated Master
                                            Schedule
                                                                                                                                                                                                                   As of December 31, 2008
             Fiscal Year              FY07                  FY08                       FY09                            FY10                       FY11                       FY12                          FY13                       FY14                       FY15                    FY16
                                 Q2      Q3   Q4    Q1      Q2   Q3     Q4     Q1      Q2     Q3       Q4   Q1      Q2     Q3      Q4    Q1       Q2   Q3        Q4    Q1    Q2      Q3        Q4   Q1     Q2      Q3   Q4       Q1   Q2     Q3    Q4      Q1   Q2     Q3      Q4   Q1   Q2   Q3    Q4     Q1
                                                                      Det. of Readiness                                                                                                                                                             FRR    Launch
                                                    KDP I             to Congress     KDPI IA                   SDR                   PDR KDP II                   CDR                   MOR SIR
                                                                                                                                                                                         7/12 8/12                                           ORR    MRR Need Baseline
Program / System
                                                    12/07                    10/08     5/09                     12/09                 9/10 1/10
                                                                                                                                         1                         9/11                    7/12
                                                                                                                                                                                             8/12                                           6/14 11/14 12/14 4/15
                                                                              Time Now                                                                                                                             --------- End-to-End Tests ---------
                                                                                                                                                                                                      1       2      3              4
  Testing / Dependencies
                                                                                                                                                                                                    12/12 3/13 6/13               1/14                        1/15
                                                                                                                                                    Begin LSTO
                                                                                                                                                    Competition                          ATP                                                        Pre-VOS
Launch Vehicle
                                                                                                                                                          6/11                       6/12                                                             10/14
                                                                                                                                                                                Int.     Bus Array/Yoke
                                                                                  CA     SDR                             PDR                       CDR                        Begins Comp. CompletePER                                PSR
Spacecraft*                                                                                                                                                                                                                                               Launch Vehicle Processing
                                                                               12/08     4/09                         4/10                         4/11                            4/12   8/12         1/13 4/13        S/C I&T       2/14         8/14
                                                                                                                                                             Early FIN
                                                                                                                PTM       Delta                                                        Req'd
                                 CDR                                                     PTM TRR                Re'q FIN CDR                                                            FIN
                                                                                                                                                                                                                                                                      Notes:
  Instrument - ABI (ITT)
                                 2/07                                                         5/09                     3/10 4/10                            7/11                       6/12                                                                           ATP: Authority To Proceed
                                                                                                                                                                      Early FIN
                                                                                                                                                                                      Req'd                                                                           CA: Contract Award
                                                                                 PDR                                       CDR                                                         FIN                                                                            CDR: Critical Design Review
  Instrument - SEISS                                                                                                                                                                                                                                                  DOT Data Operations Test
                                                                                                                                                                                                                                                                      FRR: Flight Readiness Review
 (ATC)                                                                         12/08                                       5/10                                        12/11       6/12                                                                               MRR: Mission Readiness Review
                                                                                                                                                                          Early FIN
                                                                                                                                                                                    Req'd                                                                             MOR: Mission Operations Review
                                  SDR         CA                              PDR                           CDR                                                                      FIN                                                                              MOT Mission Operations Test
  Instrument - EXIS                                                                                                                                                                                                                                                   LSTO: Launch Services Task Order
                                                                                                                                                                                                                                                                      PDR: Preliminary Design Review
 (LASP)                           3/07                                        11/08                         11/09                                                            2/12        6/12                                                                         PER: Pre-Environmental Review
                                                                                                                                                                                         Early FIN                                                                    Pre-VOS: Pre-Vehicle On Stand
                                                                                                                                                                                                  Req'd
                                               CA                            PDR                                CDR                                                                                FIN                                                                PSR: Pre-Ship Review
  Instrument - SUVI                                                                                                                                                                                                                                                   PTM: ProtoType Model
                                                                                                                                                                                                                                                                      SDR: System Definition Review
 (LMSSC)                                                                     10/08                             12/09                                                                     7/12 10/12                                                                   TRR: Test Readiness Review
                                                                                                                                                                                      Req'd
                                                      CA              SDR              3/09 PDR         CDR                    PTM                                     Early FIN       FIN                                                                            *Actual dates pending IBR
  Instrument - GLM
                                                                      7/08        1/09 PDR
                                                                                     1/09               9/09                   7/10                                               4/12 6/12
                                                                                                                                                                                                                                                           Launch
                                                                                                 CA             SDR                   PDR                          CDR               Release MM           Release 1 Release 2                             Readiness
Ground Segment                                                                                                                                                                                                                                                           Launch Vehicle Processing
                                                                                       3/09     6/09            12/09                 9/10                         9/11                     8/12            3/13          9/13                              12/14
                                                                                                                         Initial Deliveries


                                                                                                                    2/10                11/10
  L1 Algorithms - Flight                                                                                                                               Final Deliveries
                                                                                                                                    12/10
                                                                                                                                                                                  4/12
                                                                          Draft                    80% Delivery                100% Delivery
                                 Start                                                                                                             Baseline
  L2+ Algorithms - AWG
                                                                                                        Draft                     80% Delivery              100% Delivery
   Baseline / Option 2           3/07                                                                                                                                        Option 2
                                                                          9/08                          9/09                          9/10                         9/11Facilities Complete
                                                    RBU Site Selection                                                                                                                                                                 Antennas
                                                            10/08                                                                                                                                                                      Delivered
  Facilities / Antennas                                                                  3/09                                                                                3/12                                                 12/13
                                                                                                                                         CA
   Communications                                                  RBU White Paper                                                                                                                                                     Communications
                                                                   Submitted to OCAO                                                                                                                                                   Complete
                                                                                                                                        10/10                                                                                     12/13
                                                                      11/08
                                                     Start                                               CA
  Other GFP and I/Fs                                                                                                                                                                       Complete
                                                      1/08                                              10/09                                                                       5/12

                                 Start                                                          SDR
  CLASS Upgrades                                                                                                                                                                                            Ready
                                 3/07                                                           6/09                                                                                                  12/12




 Current                         Completed                   Milestone                                 Major                                    Milestone
                  FY09 Control
 Milestone                       Milestone                   Completed During                          Deliverable                              Slip
                  Milestone
                                                             Current Period                            Milestone                                                          Development                              Construction                     Integration & Testing                         Margin
                                                                                                                                                                                                                                                                                              36
Challenge #8 –
            Requirements Management
Defining GOES-R requirements was a dual-agency challenge: GOES-R
  Requirements have come from both agencies
    – Stakeholder requirements from NOAA
        • Science Product requirements
        • Operations requirements
        • User interface requirements
        • Continuity requirements
    – Process requirements from NASA
        • Spacecraft and Instrument design, development, integration
          and test requirements
• Requirements from NOAA and NASA combined into single set of
  requirements documents



ALL program elements using DOORS are part of a unified, multi-level
                    requirements database.

                                                                      37
Requirements Document
Hierarchy and Approval Authority
       Requirement       Baseline      Document Custodian &     Reviewing Body     Approving
          Level         Document          Control Process                            Body

          NOAA
                       Consolidated
        Observing                                                                   NOAA
                       Observational      NOAA Observing
         Systems                                                    NOSC           Executive
                       Requirements    Systems Council (NOSC)
       Architecture                                                              Council (NEC)
                       List (CORL)
         (NOSA)

                      GOES-R Level I                                NOSC,
                                       Final: GOES-R Program
         Level I       Requirements                               NOAA PMC,       NOAA DUS
                                             Office (GPO)
                        Documents                               NESDIS AA/DAA

                        GOES-R                                                    NESDIS AA,
                                                                NESDIS AA/DAA
         Level II      Management              GPO                                NASA/GSFC
                                                                NASA/GSFC PMC
                       Control Plan                                              Center Director

                         Mission
                                                                    GPO
        Level IIa      Requirements            GPO                                GOES-R SPD
                                                                   GORWG
                        Document


                         GOES-R
        Level III                         GOES-R Projects           GPO           GOES-R SPD
                       Project Plans


                       Project Level
                         Interface
                                                                                 GOES-R Project
        Level IIIa    Documents and       GOES-R Projects            GPO
                                                                                   Managers
                        Functional
                      Specifications

                                                                                      38
Challenge #9 –
                  System Integration
Defining the responsibilities and full process for system integration is a
  challenge in a dual-agency program:
• PSE is responsible for the overall integration of the GOES-R System
• The Flight Project is responsible for the integration of the
  instruments, spacecraft, launch vehicle, and operation of the
  spacecraft
• The Ground Project is responsible for the complete integration of the
  ground system into operations, and all interfaces to the users
• Integration is a build-up process, from subsystems to systems to
  projects and then to program




Defining System Integration is an on-going PSE challenge. Previous
 GOES process is the starting point, modified for unique GOES-R
                             structure.

                                                                      39
Challenge #10 –
               System Acceptance
Defining the full process for System Acceptance is a unique
  challenge:
• Contractors hand over to their projects for Government
  Acceptance
• Program is integrated then Program Director hands
  integrated system over to NOAA/Operations.
• Handover will be in stages – product validation will
  require longer time than spacecraft operations




    Defining System Acceptance is an ongoing PSE challenge.


                                                              40
Summary

• The Geostationary Observational Environment Satellites
  (GOES)-R is a $7 billion system of satellites, sensors
  and data processing and distribution systems being
  developed by a unique dual-agency partnership.
• This brief discussed how the partnership was formed,
  the unique challenges it faces and how Program
  Systems Engineering Group is the glue that integrates
  the Program as a whole.




                                                       41
The World Needs GOES
. . . And a joint NOAA/NASA partnership
is the best way to deliver it




                                          42
Questions?




             43

Weitere ähnliche Inhalte

Mehr von NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 

Mehr von NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Kürzlich hochgeladen

Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 

Kürzlich hochgeladen (20)

Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 

Pfarr.barbara

  • 1. Combining Apples and Oranges to Make Juice: NOAA/NASA Cooperation in GOES-R Barbara Pfarr GOES-R Program Systems Engineering Lead PM Challenge February 2009 1
  • 2. Why the World Needs GOES . . . Sustained Observations of the Atmosphere, Oceans, Land and Sun 2
  • 3. GOES Constellation Primary Requirement: Continuity of Capability N GOES-11 GOES-12 Subsatellite Equator 135° West 75° West Point 22,300 M i GOES-13 105° West (Spare) S Two operational satellites and on-orbit spare • GOES I-M (8-12)* series operational since 1994 – GOES-10 operational at 60º W in support of South America beginning December 2, 2006 – GOES-11 operational as GOES West beginning June 21, 2006 – GOES-12 operational as GOES East beginning April 1, 2003 • GOES N-P – GOES-13 launched May 24, 2006, storage at 105º W, turned over to NOAA as of January 24, 2007 – GOES-O in storage; will launch no earlier than April 2009 – GOES-P in temporary ground storage ; will launch no earlier than December 2009 • GOES-R series will replace the GOES-N series no earlier than 2015 * Note: Satellites are labeled with letters on the ground and changed to numbers on-orbit 3
  • 4. Continuity of GOES Operational Satellite Program Calendar Year As of January 5, 2009 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 GOES 10 Backup GOES 11 GOES West GOES 12 GOES East GOES 13 On-orbit Spare GOES O * GOES P GOES R GOES S Satellite is operational beyond design life * Launch currently projected for April 2009 On-orbit GOES storage Operational 4
  • 5. GOES-R Benefits: More than Continuity • Improved tropical cyclone forecasting will result in an increased ability to protect property and to enable evacuation of individuals residing in the path of the storm, while also reducing losses to the recreational boating industry. • Enhanced aviation forecasting results in decreased commercial aviation delays and repair costs to aircraft due to volcanic ash. • More accurate temperature forecasting contributes to improved energy demand expectations and savings in the electricity and natural gas sectors. • Enhanced forecasts will lead to more efficient irrigation of crops, resulting in water and energy savings. GOES-R Launch NET FY 2015 2 Satellites (GOES R & S), with unfunded Program Architecture options for 2 (GOES T&U); 10 year operational design life Program Operational Life FY 2017 – FY 2028 Program Life-cycle FY 2009 President’s Budget $7.7 billion 5
  • 6. GOES-West 137° West GOES-East 75° West ta Da t a l, da o ntr co ta Direct & Da d an Readout mm Co Users Command & Remote control, data Backup Facility NOAA Satellite Operations Facility Suitland, MD Command and Data Acquisition Station Wallops, VA GOES-R System Configuration GOES-R 06/19/2008 v2 6 6 6
  • 7. GOES-R Functional Overview GOES East GOES West GOES-R Ground Segment Functional Elements GOES-R Re-broadcast Mission Management Product Generation Product Distribution User Community Enterprise Management Archive and Access (CLASS*; ESPC*) 7
  • 8. GOES-R Program Status • Spacecraft Contract Awarded • Ground segment procurement source selection underway • CONOPS baselined • Level 1 and Level 2 Requirements Documents baselined • Management Control Plan baselined • Systems Engineering Processes established: – Requirements Management – Configuration Management – Risk Management • Instrument development well underway 8
  • 9. GOES-R Instruments Instrument Function Contractor Status Primary Instrument: Provides Advanced Baseline CDR completed, engineering unit in imagery of the Earth’s surface, ITT, Ft Wayne IN Imager (ABI) development atmosphere and ground cover Lockheed Martin Geostationary Lightning Detects the frequency and location Space Systems System definition review completed, Mapper (GLM) of lightning activity Company, preliminary design started Palo Alto CA Assurance Preliminary design review (PDR) Space Environmental In- Technology Monitors the space environment completed, component development Situ Suite (SEISS) Corporation, underway Carlisle MA Extreme Ultra Violet / Laboratory for Provides real time measurement of Atmospheric and PDR completed, component X-Ray Irradiance Sensor Space Physics development underway solar activity (EXIS) Boulder, CO Observes the sun’s emissions and Lockheed Martin Solar Ultra Violet Imager provides early detection and location Space Systems PDR completed, component (SUVI) of flares Company, development underway Palo Alto CA Measures the magnitude and To be procured as part of spacecraft Magnetometer direction of the Earth’s magnetic Spacecraft Vendor contract field 9
  • 10. Partnership born from Reality • The unique GOES-R partnership is a recognition of two basic realities: – GOES-R is the largest acquisition ($7.672B) ever undertaken at the Department of Commerce. NOAA provides 100% of the funding • NOAA has considerable experience operating weather satellite systems, and • NOAA has extensive experience developing user products from satellite data, yet • NOAA has no experience overseeing a system of this size and complexity – NASA has the expertise and experience to procure the satellite systems, with time-tested processes that have proven successful • GOES-R’s unique structure provides NOAA with greater management responsibility and oversight while leveraging NASA’s experience procuring satellite systems This briefing describes the unique GOES-R partnership between NOAA and NASA and identifies challenges the dual agency management system has created and how we are dealing with them - combining apples and oranges to make juice! 10
  • 11. GOES-R High Level Acquisition Organizational Relationships Secretary of Commerce Milestone Decision Authority Assistant Secretary for Administration Acquisition Executive Under Secretary for Oceans and Atmosphere Milestone Decision Authority (delegated from Secretary) Deputy Under Secretary for Oceans and Atmosphere PMC Chair Assistant Administrator GSFC Deputy Assistant Administrator CMC Deputy Assistant Administrator (Systems) Office of Satellite and Information Services GOES-R System Program Director Flight Segment Ground Segment Project Manager Project Manager 11
  • 12. GOES-R Acquisition Strategy Evolution Independent NOAA Approved Original Review Dec 2006 Nov 2004 Summer 2006 Program System Engineering NASA Lead One Single NOAA Participation System Prime TO NASA processes Space Ground NOAA Contract Segment Segment NASA Contracts NOAA Contracts 12
  • 13. NOAA/NASA Roles and Responsibilities Evolution GOES-R Function Legacy POES Legacy GOES Flight Project Ground Segment Project Requirements NOAA NOAA NOAA NOAA Authority GSFC PMC, NASA HQ’s PMC, GSFC PMC and NASA Oversight NOAA PMC HQ’s PMC GSFC CMC and NOAA PMC GSFC CMC and NOAA PMC Key Program NOAA or DOC NOAA or DOC Decisions (Milestones, NASA GSFC or HQS NASA GSFC or HQS (depending on DOC decision) (depending on DOC decision) Readiness Reviews) NASA HQ: Science Mission NASA HQ: Science Mission Source Selection NOAA DUS Directorate or equivalent Directorate or equivalent NASA GSFC Authority for Oceans and Atmosphere (Delegated to GSFC Code 400) (Delegated to GSFC Code 400) NASA GSFC Fee Determining NASA GSFC Director of Flight Programs NASA GSFC NOAA NESDIS AA Official Director of Flight Programs (None for GOES N -- Firm Fixed Price Contract with Boeing) Contracting Officer NASA NASA NASA NOAA Program Office NASA NASA Program/Project Office staffed Program/Project Office staffed Composition (NOAA Retains Resident Office) (NOAA Retains Resident Office) with NOAA & NASA personnel with NOAA & NASA personnel NASA Launch services NASA (For GOES N – Boeing) NASA NASA Satellite Operations NOAA NOAA NOAA NOAA Ground Systems NOAA NOAA NOAA NOAA 13
  • 14. Co-located NOAA/NASA Program Office is key to Organization Structure The GOES-R Program, including NOAA civil servants, NASA civil servants, and NOAA and NASA support contractors, is co-located at Goddard Space Flight Center, Building 6 • Better coordination through daily contact between all elements of the Program • Provides easy access to GSFC experienced management for satellite procurement • Unique integrated leadership arrangement possible due to co- location 14
  • 15. Program Management Summary NOAA NOAA Program Management Council NESDIS System Program Director (SPD): NOAA GSFC Program Scientist Deputy SPD: NOAA Center Management Lead: NOAA Assistant SPD: NASA Council Program Control Program Systems Engineering Lead: NOAA Lead: NASA Deputy: NOAA Program Mission Assurance Lead: NASA GSFC Program Contracts GOES-R Attorney Ground Lead: NOAA Code Lead: DOC Flight Lead: NASA 400 Flight Project Ground Segment Project Project Manager: NASA Project Manager: NOAA Deputy: NOAA Deputy: NASA Flight Project Contracts Ground Segment Project Contracts Lead: NASA Lead: NOAA 15
  • 16. GOES-R Program System Engineering (PSE) – the Glue Between the Projects •Program System Engineering (PSE) team is responsible for End-to-End systems integration, and planning, coordination, and adjudication of GOES-R Program System Engineering functions •To accomplish this responsibility, the PSE team will implement system engineering functions and processes, tailored to the specific needs of the GOES-R Program. •NOAA-NESDIS •GOES-R Program Office Program Systems •Algorithm Working Group Engineering Team •User Community •GSFC AETD & Center Management Flight Project Ground Segment Project Systems Systems Engineering Team Engineering Team 16
  • 17. Overarching Communications • PSE Lead and Deputy are members of the Senior Management Team which directly reports to the System Program Director (SPD) • Program System Engineering (PSE) Lead is coordinating and chairing coordination and planning meetings with the systems engineering team – Weekly PSE team meeting – Weekly Program/Project SE coordination meeting – Monthly PSE Risk Board – Monthly Program risk board – Weekly Program Engineering Change Review Board (ECRB) • Systems engineering team members also participate in the following project meetings: – Flight and Ground Project ECRBs – Project Risk Management Boards – Flight Instrument Design reviews and technical meetings – Ground system design and peer reviews – Weekly staff meetings, systems engineering meetings, steering group meetings 17
  • 18. Program Standard Processes • All procured systems: – Will provide traceability of Requirements Verification via DOORS tool in DOORS database – Verification matrices to be provided by vendor, approved by Projects and Program – Contractors’ proposed test plans to be based on Verification Matrices and Government-specified schedules – Flight/Ground Projects will oversee factory and site testing, – including intra-segment interfaces – PSE will maintain visibility in all system activities and interfaces • Program-wide consistent Configuration Management (CM) Plans and coordinated change review processes • Program-wide Risk Management database with multiple levels for subsystems, projects and program • Program-wide Schedule management system will be developed and maintained • Working groups for Program-wide efforts – Will include PSE, Flight and Ground Projects, and Contractors as required 18
  • 19. Tailoring of SE to GOES-R The Classic top-down System Engineering Process must be tailored to address the GOES-R Program • Because of the Long Lead time required for development of a GEO Imager, the ABI instrument and other instruments’ designs were started well in advance of the spacecraft procurement. Some “bottom up” flow of requirements and capabilities must be carefully woven into the overall system to minimize cost, schedule, and performance impacts. • Review and approval processes must accurately reflect NOAA/NASA partnership strengths and responsibilities • Continuity with current GOES operations and data must remain as a top priority • Decision to acquire two prime contractors, one for Ground and one for Space brings forth some new risk considerations like coordination of interfaces, synchronization of schedules, etc. 19
  • 20. Critical Inter-Project Dependencies being monitored by PSE • Delivery of the Level 1b processing algorithms from the five instrument vendors for subsequent delivery to the Ground Project contractor for operational implementation. • Delivery of telemetry and command design information from the satellite contractor to the ground contractor to support the design of that portion of the ground segment • Delivery of satellite simulators (from the spacecraft contractor) for use by the ground segment contractor for development and testing. • Readiness of the telemetry and command portion of the ground segment sufficient to support compatibility testing during the S/C Thermal-vacuum testing. • Availability of the satellite to conduct end-to-end tests with the ground segment. 20
  • 21. Processes Affected by Partnership 1. Program/Project Management 2. Technical and Management Reviews 3. Program Status Reporting 4. Approval to Enter Acquisition and Operations Phase 5. Configuration Control 6. Risk Management 7. Schedule Management 8. Requirements Management 9. System Integration 10. System Acceptance More players require more buy-in 21
  • 22. Challenge #1 – Defining the Partnership Defining the GOES-R partnership explicitly required defining the responsibilities of each agency, the program office and each project NASA and NOAA have fundamentally different cultures: • NASA focuses more on proven processes while NOAA focuses more on agility/flexibility to support users • NASA focuses more on flight hardware with high reliability for first time success while NOAA focuses more on evolving science/operational product applications that can change over time. • The different cultures lead to – different sets of priorities – different concepts of what represent success. • Having the difference in cultures primarily located across the important boundary that is Flight and Ground enhances the challenge. Required significant discussion, review, and revision until all parties were in agreement 22
  • 23. MOU and MCP Define Agency Roles and Responsibilities • Memorandum of Understanding (MOU) established GOES-R as a NOAA led program with two projects– signed June 15, 2007 – Spacecraft: NASA contract – Ground Segment: NOAA Contract – Recognized the strengths of each agency • Management Control Plan written to implement MOU – Requirements mirror NPR 7120 as much as possible – Deviations from NPR 7120 when similar NOAA process is being used instead • i.e. NOAA independent cost estimating processes being utilized 23
  • 24. On a Dual Agency Program, Documents Require Unique Approvals • Memorandum of Understanding (MOU) between NOAA and NASA created GOES-R as a co-located Program Office with Flight and Ground Segment Projects. Approved by: – NOAA Deputy Under Secretary – NASA Associate Administrator • Management Control Plan (MCP) written to implement MOU. Approved by: – NESDIS Director – GSFC Director 24
  • 25. Challenge #2 – The Review Process The GOES-R Review Process is defined in the System Review Plan, coordinated with both agencies – based on NASA standards and processes – NASA and NOAA independent experts on review panels with joint chairs – NASA and NOAA approvals for program milestones PSE worked with Goddard’s Systems Review Office to develop a plan that met NASA requirements but tailored to GOES-R 25
  • 26. Review Process PDRR Acquisition and Operations KDP Final Design System Assembly, Launch / Disposal I & Fabrication Integration & Test Operations CITRB (DOC) KDP KDP IA II (NOAA) Program PGR -III PGR -IV PGR -V Baseline Mission Mission Handover PMC (NOAA) Integration Readiness Review I-PSR PMC Readiness Board (NESDIS) I-PSR (NOAA DUS) (NOAA DUS) GSFC C-GRR C-GRR MRR C-GRR C-GRR C-GRR C-GRR ASM PER-B PER-C PER -D PER -E PER -F Concept Project Integration Launch End of Design Baseline Readiness Readiness Mission NESDIS (NESDIS) (NOAA DUS) (NESDIS) (NESDIS) (NESDIS) FRR PSR SIR LRR SCR SRR SDR PDR CDR MOR FOR ORR SMSR PLAR 26
  • 27. Challenge #3– The Reporting Process Multiple levels of both agencies require periodic status reports – Challenge to create reporting templates such that tailoring for each report is minimized Threshold reporting required at multiple levels These requirements are documented in the Management Control Plan. 27
  • 28. Status Reporting Requirements Regular Reporting Type of Reporting Dates Scheduled Reviewer Senior Management Team (SMT) Weekly Weekly SPD or designee GOES-R Personnel Management Group Monthly DSPD GOES-R Engineering Review Board As required PSE or designee GOES-R Monthly Program Review Monthly SPD or designee NOAA Program Management Council (PMC) Monthly DUS/NOAA PMC Deputy Center Director / GSFC Center Management NASA GSFC Monthly Status Review (MSR) Monthly Council (CMC) NASA GSFC Pre-MSR Monthly GSFC Director of Flight Projects DOC Quarterly Program Review Quarterly DOC CFO/ASA NOAA and NASA Administrator meeting to assess status Yearly or as necessary NOAA Administrator / NASA Administrator and progress NOAA/NESDIS Independent Review Team As required DUS/NESDIS designated Standing Review Board As required NESDIS/GSFC designated NESDIS Weekly Program Tag Up Weekly NESDIS DAAS Program Monthly Status Report Monthly OMB GSFC/NESDIS Tag Up Monthly NESDIS AA, GSFC Deputy Center Director, Technical NESDIS Monthly Status Monthly NESDIS AA Project Monthly Status Review Monthly Project Manager, SPD attends Review of Award Fee Effectiveness Annual NOAA/NASA Findings reported to DOC Senate: oAppropriations Committee oCommittee on Commerce, Science, and Transportation Report to Congress Annually with President’s Budget, House of Representatives: Appropriations Committee & Committee on Science and Technology 28
  • 29. Threshold Reporting Requirements Threshold Reporting Type of Reporting Threshold Required Report to: 5% over cost and Department of Commerce Threshold schedule of any program DOC ASA/CFO on cost and schedule element NOAA Cost Threshold reporting 10% over cost as requirement to Deputy Under DUS, NESDIS AA determined by SPD Secretary Congressional Cost Threshold 20% over cost as Under Secretary for Oceans and reporting requirement to Under determined by SPD Atmosphere Secretary 29
  • 30. Challenge #4 – Approval to Enter Acquisition and Operations (A&O) Phase Approval to Enter A&O Phase, which in our case included permission to spend our money on our development contracts, was a challenge due to: • Many layers of review and approval • Independent Review Team recommendations that drove us to a conservative 80 percent budget solution • Challenges reconciling NASA and NOAA independent cost estimates GOES-R received formal approval from the Department of Commerce to enter the A&O Phase in December, 2007 30
  • 31. Challenge #5– Configuration Control Dual-agency configuration control is a challenge on GOES- R, particularly for the documents “owned” by NOAA, i.e. the Level 1 Requirements and Management Control Plan: • All elements of the Program as well as both Agencies need to be a part of the review cycle • Must carefully control requirements yet still allow for necessary changes Required significant discussion, review, and revision until all parties were in agreement – still being refined 31
  • 32. Configuration Management PMC staff PMC Changes NO PMCBriefed Prepares necessary documentation Member PMC / DUS Required? DUS signs for PMC review/Approval Review YES NOSC staff NOSC NO NOSC Changes Prepares necessary documentation Member Chairs NOSC Required? for NOSC review/Approval Review sign YES YES YES YES Mod CCR Review SPD approves NO SPD approves SPD approves CCB Chair SPD (SPD/PMs/PSE/Prog Scientist (GORWG Chair)) For release? NO For release? NO For release? approves CM makes CM makes CM makes changes changes changes YES NOAA Owned Doc? NO 32
  • 33. Challenge #6 – Risk Management The GOES-R Risk Management Process follows NASA and DOD requirements as closely as possible while maintaining consistency with other NOAA programs (NPOESS, etc) • Characteristics of Integrated Risk Approach – Multi-layer approach for risk management that allows cognizant projects, segment organizations, contractors, teams, groups, and organizations to retain authority and control over risks for their areas of responsibility while supporting existing management and decision making processes. – Program risks address technical, cost, and schedule impacts related to the: • Successful design, development, fabrication/manufacture, integration, tests, deployment and operations of the GOES-R system; • Performance and reliability of the GOES-R Series End-to-End System. • Activities and resources including staff, contractors, and facilities, at NOAA and NASA, at other government agencies, developer organizations – Comprehensive approach allows early identification of potential risks Risk Management Plan baselined. Required discussion with other NOAA programs to ensure consistency 33
  • 34. Integrated Risk Management Across the GOES-R Program Spacecraft  Vendor RMB Observatory Subsystem  Systems Eng.  Flight  RWGs & Integration Project RMB Instrument Vendors Instruments Mission  RMBs Assurance Elements  Integration Program  Program End‐to‐End  Verif. & Valid. Integration RMB RMB End Product  Perf. Program Scientist Working  Systems  Groups  Engineering Ground  Reporting &  Segment  Coordination IDTs/IPTs  Segment  RWGs Devel. Project Prioritization & RMB Resources Risk‐Informed  AWG, OSD,  Decision Making Affiliated  OSDPD, etc. Orgs. Product Development  &  Projects & Integration  Program Vendors 34
  • 35. Challenge #7 – Schedule Management Having 2 projects each with multiple contractors adds complexity to the problem of developing and maintaining an integrated Program Schedule – Project Schedulers are integrating at Project Level – Program scheduler hired to combine project schedules at Program Level – at this point a manual effort – PSE responsible for analyzing schedules for technical inconsistencies and working out conflicts – Program Schedule Management Plan being written Developing an initial Program Schedule required significant discussion, review, and revision until all parties were in agreement. GOES-R is still developing its full integrated Program Schedule 35
  • 36. GOES-R Program Integrated Master Schedule As of December 31, 2008 Fiscal Year FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Det. of Readiness FRR Launch KDP I to Congress KDPI IA SDR PDR KDP II CDR MOR SIR 7/12 8/12 ORR MRR Need Baseline Program / System 12/07 10/08 5/09 12/09 9/10 1/10 1 9/11 7/12 8/12 6/14 11/14 12/14 4/15 Time Now --------- End-to-End Tests --------- 1 2 3 4 Testing / Dependencies 12/12 3/13 6/13 1/14 1/15 Begin LSTO Competition ATP Pre-VOS Launch Vehicle 6/11 6/12 10/14 Int. Bus Array/Yoke CA SDR PDR CDR Begins Comp. CompletePER PSR Spacecraft* Launch Vehicle Processing 12/08 4/09 4/10 4/11 4/12 8/12 1/13 4/13 S/C I&T 2/14 8/14 Early FIN PTM Delta Req'd CDR PTM TRR Re'q FIN CDR FIN Notes: Instrument - ABI (ITT) 2/07 5/09 3/10 4/10 7/11 6/12 ATP: Authority To Proceed Early FIN Req'd CA: Contract Award PDR CDR FIN CDR: Critical Design Review Instrument - SEISS DOT Data Operations Test FRR: Flight Readiness Review (ATC) 12/08 5/10 12/11 6/12 MRR: Mission Readiness Review Early FIN Req'd MOR: Mission Operations Review SDR CA PDR CDR FIN MOT Mission Operations Test Instrument - EXIS LSTO: Launch Services Task Order PDR: Preliminary Design Review (LASP) 3/07 11/08 11/09 2/12 6/12 PER: Pre-Environmental Review Early FIN Pre-VOS: Pre-Vehicle On Stand Req'd CA PDR CDR FIN PSR: Pre-Ship Review Instrument - SUVI PTM: ProtoType Model SDR: System Definition Review (LMSSC) 10/08 12/09 7/12 10/12 TRR: Test Readiness Review Req'd CA SDR 3/09 PDR CDR PTM Early FIN FIN *Actual dates pending IBR Instrument - GLM 7/08 1/09 PDR 1/09 9/09 7/10 4/12 6/12 Launch CA SDR PDR CDR Release MM Release 1 Release 2 Readiness Ground Segment Launch Vehicle Processing 3/09 6/09 12/09 9/10 9/11 8/12 3/13 9/13 12/14 Initial Deliveries 2/10 11/10 L1 Algorithms - Flight Final Deliveries 12/10 4/12 Draft 80% Delivery 100% Delivery Start Baseline L2+ Algorithms - AWG Draft 80% Delivery 100% Delivery Baseline / Option 2 3/07 Option 2 9/08 9/09 9/10 9/11Facilities Complete RBU Site Selection Antennas 10/08 Delivered Facilities / Antennas 3/09 3/12 12/13 CA Communications RBU White Paper Communications Submitted to OCAO Complete 10/10 12/13 11/08 Start CA Other GFP and I/Fs Complete 1/08 10/09 5/12 Start SDR CLASS Upgrades Ready 3/07 6/09 12/12 Current Completed Milestone Major Milestone FY09 Control Milestone Milestone Completed During Deliverable Slip Milestone Current Period Milestone Development Construction Integration & Testing Margin 36
  • 37. Challenge #8 – Requirements Management Defining GOES-R requirements was a dual-agency challenge: GOES-R Requirements have come from both agencies – Stakeholder requirements from NOAA • Science Product requirements • Operations requirements • User interface requirements • Continuity requirements – Process requirements from NASA • Spacecraft and Instrument design, development, integration and test requirements • Requirements from NOAA and NASA combined into single set of requirements documents ALL program elements using DOORS are part of a unified, multi-level requirements database. 37
  • 38. Requirements Document Hierarchy and Approval Authority Requirement Baseline Document Custodian & Reviewing Body Approving Level Document Control Process Body NOAA Consolidated Observing NOAA Observational NOAA Observing Systems NOSC Executive Requirements Systems Council (NOSC) Architecture Council (NEC) List (CORL) (NOSA) GOES-R Level I NOSC, Final: GOES-R Program Level I Requirements NOAA PMC, NOAA DUS Office (GPO) Documents NESDIS AA/DAA GOES-R NESDIS AA, NESDIS AA/DAA Level II Management GPO NASA/GSFC NASA/GSFC PMC Control Plan Center Director Mission GPO Level IIa Requirements GPO GOES-R SPD GORWG Document GOES-R Level III GOES-R Projects GPO GOES-R SPD Project Plans Project Level Interface GOES-R Project Level IIIa Documents and GOES-R Projects GPO Managers Functional Specifications 38
  • 39. Challenge #9 – System Integration Defining the responsibilities and full process for system integration is a challenge in a dual-agency program: • PSE is responsible for the overall integration of the GOES-R System • The Flight Project is responsible for the integration of the instruments, spacecraft, launch vehicle, and operation of the spacecraft • The Ground Project is responsible for the complete integration of the ground system into operations, and all interfaces to the users • Integration is a build-up process, from subsystems to systems to projects and then to program Defining System Integration is an on-going PSE challenge. Previous GOES process is the starting point, modified for unique GOES-R structure. 39
  • 40. Challenge #10 – System Acceptance Defining the full process for System Acceptance is a unique challenge: • Contractors hand over to their projects for Government Acceptance • Program is integrated then Program Director hands integrated system over to NOAA/Operations. • Handover will be in stages – product validation will require longer time than spacecraft operations Defining System Acceptance is an ongoing PSE challenge. 40
  • 41. Summary • The Geostationary Observational Environment Satellites (GOES)-R is a $7 billion system of satellites, sensors and data processing and distribution systems being developed by a unique dual-agency partnership. • This brief discussed how the partnership was formed, the unique challenges it faces and how Program Systems Engineering Group is the glue that integrates the Program as a whole. 41
  • 42. The World Needs GOES . . . And a joint NOAA/NASA partnership is the best way to deliver it 42