NPR 7120.7 Enhancements and
Agency IT Governance Impacts




                         Lara Petze
                   February 10, 2010
Agenda


• Background
• NPR 7120.7* Modifications Under
  Consideration
  –Project baselining and rebaselining
  –Standard Level 2 Work Breakdown Structure
   (WBS)
  –Criteria for projects to be subject to NPR 7120.7
• I-Tools
• Summary
* NPR 7120.7, NASA Information Technology
and Institutional Infrastructure Program and Project
Management Requirements                                2
Project Project Baselining And Rebaselining
        Baselining And Rebaselining




                                          3
Background


 NPR 7120.7 identifies four types of IT and
 institutional infrastructure investments:
   – Information Technology (IT)
   – Construction of Facilities (CoF)
   – Environmental Compliance and Restoration (ECR)
   – Other Mission Support Investments (OMSI)

 This briefing addresses IT investments only

 The updates that we are discussing today are in
 draft only, and must be reviewed via the Agency’s
 policy approval process


                                                      4
Background


 NPR 7120.7, Information Technology and Institutional
  Infrastructure Program and Project Management
  Requirements, was issued in November 2008

 New requirements and Agency experience with using NPR
  7120.7 has resulted in the need for modifications in several
  significant areas

 OCIO continually identifies candidate changes to NPR 7120.7
  to advance the success of the Agency’s IT programs and
  projects



                                                                 5
Project Baselining and
             Rebaselining Background

 Currently NPR 7120.7 addresses baselining (at Key Decision
  Point (KDP)-C) but does not discuss changes to elements of
  the baseline that may occur during the project’s
  implementation
 As an Agency, we recognize the need to issue policy on
  rebaselining of IT projects to manage cost, schedule, and
  scope changes
 NASA has accepted Government Accountability Office
  (GAO) recommendation that we develop a rebaselining
  policy for IT projects
 OMB has issued policy direction (M-10-27) regarding
   development of agency IT investment baseline management
   policies
                                                               6
Project Baselining and
                  Rebaselining Definitions

• Baseline - an agreed-to set of requirements, cost, schedule, designs,
  documents, etc. that will have changes controlled through a formal
  approval and monitoring process as defined by NPR 7120.7
• Re-baseline - the process by which a project formally updates or
  modifies the project baseline as a result of any approved change to
  the project’s schedule, cost, or deliverable content
• Re-baseline may result from
     1. the baseline documented at KDP-C as defined in NPR 7120.7,
       or
     2. the current baseline that was subsequently approved via the
       rebaselining process.




                                                                          7
NPR 7120.7 IT Project Lifecycle




NASA decides at each KDP whether the project
should move to the next life-cycle phase       8
Project Rebaselining Steps


• Determining when a rebaseline is warranted for
  consideration

• Developing the proposed new baseline

• Validating the proposed new baseline

• Review and Approval by management of the proposed
  new baseline

• Documenting rebaselining decisions


                                                      9
Determining When a Rebaseline is
                Warranted for Consideration: OMB
                            Direction

 Acceptable reasons for rebaselining include:
  » Significant change in investment goals (scope, requirements, objectives)
    resulting from internal or external management decisions, or changes in
    funding level or availability of funds (e.g. extended continuing resolution), or
    contracting (including contractual protests)
  » In the case where an incremental or iterative system development and
    planning lifecycle has been chosen for the investment, progressive
    elaboration may be necessary when transitioning from one iteration or
    increment to the next, as scope and objectives evolve. Such rapid evolution
    inherent to iterative development shall be approved by the Agency CIO.
  » Current baseline is no longer useful as a management tool for realistic
    performance measurement as variances are so high that they lose meaning


          Issue: how/whether to specify in policy magnitude of
          variances that will trigger rebaselining

                                                                                10
Project Rebaselining Thresholds We
                     Are Considering

 Cost
  »If the project’s cost estimate at completion exceeds the
   current baseline by 10% or more (is this too low??)
 Schedule
  »If the project’s schedule estimate at completion exceeds
   the current baseline by 10% or more (is this too
   restrictive??)
  »If a KDP is forecast to slip by more than 45 days (is this too
   restrictive)

           Many of our IT projects are of relatively low cost
           and of relatively short duration!
                                                                11
Project Rebaselining Thresholds We
                 Are Considering
 Scope
  » If the project or the customer proposes to add or modify
    functional requirements that would result in changes
    that exceed the cost and schedule thresholds noted
    above, or
  » If the project or the customer proposes to defer or
    eliminate functional requirements determined by the
    customer to be significant, even if the current cost or
    schedule baselines are not affected




                                                          12
Project Rebaselining Thresholds We
                     Are Considering

 Program Managers
   » If a Program Manager imposes more stringent or additional
     rebaselining thresholds on a project
   » If a Program Manager deems it appropriate to reduce or remove the
     thresholds (waiver required)
 Agency IT Program Management Board (PMB)
   » If the IT PMB recommends to the NASA CIO thresholds that differ from
     those detailed in this document (and the CIO accepts the
     recommendation)


         The Agency IT PMB is the Governing Body that makes
         recommendations to the NASA CIO at each KDP whether a
         project should move forward to the next life cycle phase


                                                                     13
Standard Level 2
Work Breakdown Structure




                           14
Standard Level 2
                                 WBS Background
 Work Breakdown Structure (WBS) defined:
 (NASA WBS Handbook, January 2010)

  – A product-oriented hierarchical division of the hardware, software, services, and other work tasks
    that organizes, displays, and defines the products to be developed and/or produced and relates the
    elements of the work to be accomplished to each other and the end product(s) . The WBS should
    be accompanied by a text document referred to as a WBS Dictionary that describes the work content
    each element of the WBS in detail.

 The Standard Level 2 WBS policy will address:
  – NASA’s need, as an Agency, for a standard level 2 WBS for IT
  – Recommendations from GAO, “GAO Report 10-2; Information Technology; Agencies Need to
    Improve the Implementation and use of Earned Value Techniques to Help Manage Major System
    Acquisitions; October 2009”


 Good characteristics of a WBS (per GAO, and we agree):
  – Applies to the entire life cycle of the project.
  – Ensures that changes to the WBS be governed
  – Establishes a product-oriented WBS to allow a project to track cost and schedule by defined
    deliverables

                                                                                                  15
Standard Level 2 WBS
            For IT Projects: Business Rules

• Project name is WBS Level 1
• Title of each WBS Level 2 element can be modified to facilitate
  project-unique titles, but the content of each must remain the same
• Additional WBS elements may be added horizontally as long as the
  content does not fit into the content of any existing standard WBS
  element
• WBS Level 3 elements, Level 2 subordinate (children), are determined
  by the project
• Level 3 and lower elements may differ from project to project and must
  include only work that rolls up into the standard WBS Dictionary
  definition of the Level 2 element
• An inactive placeholder element (and inactive placeholder financial
  code) will be established if no work fits into a standard WBS element


                                                                     16
NPR 7120.5 Level 2 WBS




     Space Flight
       Projects
        WBS

                         17
NPR 7120.8 Level 2 WBS


  Research &
  Technology
Portfolio Project
      WBS




                     Technology
                    Development
                       Project
                        WBS
                                  18
NPR 7120.7 Level 2 WBS*




                           Information
                           Technology
                             Project
                               WBS

           * Courtesy of Kenneth Poole, MSFC

                                         19
Standard Level 2 WBS Benefits


 Facilitates planning and control of cost, schedule and technical
  content
 Unifies the technical and financial structures of a project
 Enables Project Manager to identify which components are
  causing cost and/or schedule overruns and mitigate the root
  cause(s) of the overrun
 Eliminates the need for Project Managers to create their own Level
  2 WBS
 Enables Earned Value Management for IT projects
 Improves financial reporting/tracking across projects


         We are considering extending the standard WBS to level 3
         but need more discussion within the Agency before doing so
                                                                       20
Criteria for Projects
to be Subject to NPR 7120.7




                              21
Criteria for Projects to be Subject to
                     NPR 7120.7

 Current criteria
  » New systems/capabilities: $500K or greater total
    development and implementation cost or affects more
    than one Center
  » Modification to or enhancement of existing IT systems
    or capabilities: $500K or greater total
    modification/enhancement cost, regardless of how
    many Centers are affected.
  » The NASA/ Center CIO deems that the NPR will apply
    (requires consultation with sponsoring organization)


                                                        22
Criteria for Projects to be Subject to
                      NPR 7120.7

 Issues with current criteria
   » Projects with modest budgets may have trouble meeting all the
     NPR requirements without submitting substantial waivers
   » Projects with short durations may have trouble accommodating all
     the required reviews without submitting substantial waivers
   » The Agency and Center IT PMBs (Governing Bodies overseeing
     projects) may not have bandwidth to conduct all the required
     reviews
 We plan to work with NPR 7120.7 stakeholders to come to
  agreement on whether the current criteria should be modified
 One possibility is to create tiers of requirements corresponding to
  project size/risk/importance/etc.


                                                                   23
I-Tools




          24
Summary


 Continual Improvement - the Agency OCIO continually
  identifies, solicits, and implements modifications to our
  policies to advance the success of the Agency’s IT
  programs and projects

 Alignment – the Agency OCIO strives to align IT policies
  and procedures with our Human Space Flight (NPR 7120.5)
  and Research and Technology (NPR 7120.8)
  program/project management policies to maintain
  consistency across NASA


                                                              25
Questions/Discussion?




                        26

Weitere ähnliche Inhalte

Was ist angesagt?

Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
NASAPMC
 
Murphy.dar jean.jean
Murphy.dar jean.jeanMurphy.dar jean.jean
Murphy.dar jean.jean
NASAPMC
 
Harvey elliott
Harvey elliottHarvey elliott
Harvey elliott
NASAPMC
 
Sandra smalley
Sandra smalleySandra smalley
Sandra smalley
NASAPMC
 
Esker.linda
Esker.lindaEsker.linda
Esker.linda
NASAPMC
 
Weaver.ed
Weaver.edWeaver.ed
Weaver.ed
NASAPMC
 
Linda maleki
Linda malekiLinda maleki
Linda maleki
NASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
NASAPMC
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliott
NASAPMC
 
Carmichael.kevin
Carmichael.kevinCarmichael.kevin
Carmichael.kevin
NASAPMC
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
NASAPMC
 
Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1
NASAPMC
 
Ken poole
Ken pooleKen poole
Ken poole
NASAPMC
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
NASAPMC
 
Jerald kerby
Jerald kerbyJerald kerby
Jerald kerby
NASAPMC
 
Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.r
NASAPMC
 
Corcoran webster
Corcoran websterCorcoran webster
Corcoran webster
NASAPMC
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
NASAPMC
 
Healy edward
Healy edwardHealy edward
Healy edward
NASAPMC
 

Was ist angesagt? (20)

Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
Murphy.dar jean.jean
Murphy.dar jean.jeanMurphy.dar jean.jean
Murphy.dar jean.jean
 
Harvey elliott
Harvey elliottHarvey elliott
Harvey elliott
 
Sandra smalley
Sandra smalleySandra smalley
Sandra smalley
 
Esker.linda
Esker.lindaEsker.linda
Esker.linda
 
Weaver.ed
Weaver.edWeaver.ed
Weaver.ed
 
Linda maleki
Linda malekiLinda maleki
Linda maleki
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliott
 
Carmichael.kevin
Carmichael.kevinCarmichael.kevin
Carmichael.kevin
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
 
Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1
 
Ken poole
Ken pooleKen poole
Ken poole
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
 
Jerald kerby
Jerald kerbyJerald kerby
Jerald kerby
 
Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.r
 
Corcoran webster
Corcoran websterCorcoran webster
Corcoran webster
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
 
Symons
SymonsSymons
Symons
 
Healy edward
Healy edwardHealy edward
Healy edward
 

Ähnlich wie Petze.lara

Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
NASAPMC
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
NASAPMC
 
Blythe.mike
Blythe.mikeBlythe.mike
Blythe.mike
NASAPMC
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeff
NASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
NASAPMC
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
jessiehampson
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
apoorvaguptaspn27
 

Ähnlich wie Petze.lara (20)

Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
Blythe.mike
Blythe.mikeBlythe.mike
Blythe.mike
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeff
 
unit-vpart-2.ppt
unit-vpart-2.pptunit-vpart-2.ppt
unit-vpart-2.ppt
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Pep
PepPep
Pep
 
Capex opex
Capex opexCapex opex
Capex opex
 
Khan Project Scope Creep Presentationin Pdf
Khan   Project Scope Creep Presentationin PdfKhan   Project Scope Creep Presentationin Pdf
Khan Project Scope Creep Presentationin Pdf
 
Beyond the bca
Beyond the bcaBeyond the bca
Beyond the bca
 
Software management disciplines
Software management disciplinesSoftware management disciplines
Software management disciplines
 
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project Report
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
 
Building a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysBuilding a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two Days
 
Ch5 Project Scope Management xxxxxxxxx.pptx
Ch5 Project Scope Management xxxxxxxxx.pptxCh5 Project Scope Management xxxxxxxxx.pptx
Ch5 Project Scope Management xxxxxxxxx.pptx
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
 
Ch05
Ch05Ch05
Ch05
 
Presentation2_Integ and Scope.pdf
Presentation2_Integ and Scope.pdfPresentation2_Integ and Scope.pdf
Presentation2_Integ and Scope.pdf
 

Mehr von NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
NASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
NASAPMC
 
Yew manson
Yew mansonYew manson
Yew manson
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
NASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
NASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahm
NASAPMC
 
Snow lee
Snow leeSnow lee
Snow lee
NASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
NASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
NASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
NASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
NASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
NASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
NASAPMC
 
Paradis william
Paradis williamParadis william
Paradis william
NASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
NASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
NASAPMC
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
NASAPMC
 

Mehr von NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
 

Kürzlich hochgeladen

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 

Kürzlich hochgeladen (20)

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 

Petze.lara

  • 1. NPR 7120.7 Enhancements and Agency IT Governance Impacts Lara Petze February 10, 2010
  • 2. Agenda • Background • NPR 7120.7* Modifications Under Consideration –Project baselining and rebaselining –Standard Level 2 Work Breakdown Structure (WBS) –Criteria for projects to be subject to NPR 7120.7 • I-Tools • Summary * NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements 2
  • 3. Project Project Baselining And Rebaselining Baselining And Rebaselining 3
  • 4. Background  NPR 7120.7 identifies four types of IT and institutional infrastructure investments: – Information Technology (IT) – Construction of Facilities (CoF) – Environmental Compliance and Restoration (ECR) – Other Mission Support Investments (OMSI)  This briefing addresses IT investments only  The updates that we are discussing today are in draft only, and must be reviewed via the Agency’s policy approval process 4
  • 5. Background  NPR 7120.7, Information Technology and Institutional Infrastructure Program and Project Management Requirements, was issued in November 2008  New requirements and Agency experience with using NPR 7120.7 has resulted in the need for modifications in several significant areas  OCIO continually identifies candidate changes to NPR 7120.7 to advance the success of the Agency’s IT programs and projects 5
  • 6. Project Baselining and Rebaselining Background  Currently NPR 7120.7 addresses baselining (at Key Decision Point (KDP)-C) but does not discuss changes to elements of the baseline that may occur during the project’s implementation  As an Agency, we recognize the need to issue policy on rebaselining of IT projects to manage cost, schedule, and scope changes  NASA has accepted Government Accountability Office (GAO) recommendation that we develop a rebaselining policy for IT projects  OMB has issued policy direction (M-10-27) regarding development of agency IT investment baseline management policies 6
  • 7. Project Baselining and Rebaselining Definitions • Baseline - an agreed-to set of requirements, cost, schedule, designs, documents, etc. that will have changes controlled through a formal approval and monitoring process as defined by NPR 7120.7 • Re-baseline - the process by which a project formally updates or modifies the project baseline as a result of any approved change to the project’s schedule, cost, or deliverable content • Re-baseline may result from 1. the baseline documented at KDP-C as defined in NPR 7120.7, or 2. the current baseline that was subsequently approved via the rebaselining process. 7
  • 8. NPR 7120.7 IT Project Lifecycle NASA decides at each KDP whether the project should move to the next life-cycle phase 8
  • 9. Project Rebaselining Steps • Determining when a rebaseline is warranted for consideration • Developing the proposed new baseline • Validating the proposed new baseline • Review and Approval by management of the proposed new baseline • Documenting rebaselining decisions 9
  • 10. Determining When a Rebaseline is Warranted for Consideration: OMB Direction  Acceptable reasons for rebaselining include: » Significant change in investment goals (scope, requirements, objectives) resulting from internal or external management decisions, or changes in funding level or availability of funds (e.g. extended continuing resolution), or contracting (including contractual protests) » In the case where an incremental or iterative system development and planning lifecycle has been chosen for the investment, progressive elaboration may be necessary when transitioning from one iteration or increment to the next, as scope and objectives evolve. Such rapid evolution inherent to iterative development shall be approved by the Agency CIO. » Current baseline is no longer useful as a management tool for realistic performance measurement as variances are so high that they lose meaning Issue: how/whether to specify in policy magnitude of variances that will trigger rebaselining 10
  • 11. Project Rebaselining Thresholds We Are Considering  Cost »If the project’s cost estimate at completion exceeds the current baseline by 10% or more (is this too low??)  Schedule »If the project’s schedule estimate at completion exceeds the current baseline by 10% or more (is this too restrictive??) »If a KDP is forecast to slip by more than 45 days (is this too restrictive) Many of our IT projects are of relatively low cost and of relatively short duration! 11
  • 12. Project Rebaselining Thresholds We Are Considering  Scope » If the project or the customer proposes to add or modify functional requirements that would result in changes that exceed the cost and schedule thresholds noted above, or » If the project or the customer proposes to defer or eliminate functional requirements determined by the customer to be significant, even if the current cost or schedule baselines are not affected 12
  • 13. Project Rebaselining Thresholds We Are Considering  Program Managers » If a Program Manager imposes more stringent or additional rebaselining thresholds on a project » If a Program Manager deems it appropriate to reduce or remove the thresholds (waiver required)  Agency IT Program Management Board (PMB) » If the IT PMB recommends to the NASA CIO thresholds that differ from those detailed in this document (and the CIO accepts the recommendation) The Agency IT PMB is the Governing Body that makes recommendations to the NASA CIO at each KDP whether a project should move forward to the next life cycle phase 13
  • 14. Standard Level 2 Work Breakdown Structure 14
  • 15. Standard Level 2 WBS Background  Work Breakdown Structure (WBS) defined: (NASA WBS Handbook, January 2010) – A product-oriented hierarchical division of the hardware, software, services, and other work tasks that organizes, displays, and defines the products to be developed and/or produced and relates the elements of the work to be accomplished to each other and the end product(s) . The WBS should be accompanied by a text document referred to as a WBS Dictionary that describes the work content each element of the WBS in detail.  The Standard Level 2 WBS policy will address: – NASA’s need, as an Agency, for a standard level 2 WBS for IT – Recommendations from GAO, “GAO Report 10-2; Information Technology; Agencies Need to Improve the Implementation and use of Earned Value Techniques to Help Manage Major System Acquisitions; October 2009”  Good characteristics of a WBS (per GAO, and we agree): – Applies to the entire life cycle of the project. – Ensures that changes to the WBS be governed – Establishes a product-oriented WBS to allow a project to track cost and schedule by defined deliverables 15
  • 16. Standard Level 2 WBS For IT Projects: Business Rules • Project name is WBS Level 1 • Title of each WBS Level 2 element can be modified to facilitate project-unique titles, but the content of each must remain the same • Additional WBS elements may be added horizontally as long as the content does not fit into the content of any existing standard WBS element • WBS Level 3 elements, Level 2 subordinate (children), are determined by the project • Level 3 and lower elements may differ from project to project and must include only work that rolls up into the standard WBS Dictionary definition of the Level 2 element • An inactive placeholder element (and inactive placeholder financial code) will be established if no work fits into a standard WBS element 16
  • 17. NPR 7120.5 Level 2 WBS Space Flight Projects WBS 17
  • 18. NPR 7120.8 Level 2 WBS Research & Technology Portfolio Project WBS Technology Development Project WBS 18
  • 19. NPR 7120.7 Level 2 WBS* Information Technology Project WBS * Courtesy of Kenneth Poole, MSFC 19
  • 20. Standard Level 2 WBS Benefits  Facilitates planning and control of cost, schedule and technical content  Unifies the technical and financial structures of a project  Enables Project Manager to identify which components are causing cost and/or schedule overruns and mitigate the root cause(s) of the overrun  Eliminates the need for Project Managers to create their own Level 2 WBS  Enables Earned Value Management for IT projects  Improves financial reporting/tracking across projects We are considering extending the standard WBS to level 3 but need more discussion within the Agency before doing so 20
  • 21. Criteria for Projects to be Subject to NPR 7120.7 21
  • 22. Criteria for Projects to be Subject to NPR 7120.7  Current criteria » New systems/capabilities: $500K or greater total development and implementation cost or affects more than one Center » Modification to or enhancement of existing IT systems or capabilities: $500K or greater total modification/enhancement cost, regardless of how many Centers are affected. » The NASA/ Center CIO deems that the NPR will apply (requires consultation with sponsoring organization) 22
  • 23. Criteria for Projects to be Subject to NPR 7120.7  Issues with current criteria » Projects with modest budgets may have trouble meeting all the NPR requirements without submitting substantial waivers » Projects with short durations may have trouble accommodating all the required reviews without submitting substantial waivers » The Agency and Center IT PMBs (Governing Bodies overseeing projects) may not have bandwidth to conduct all the required reviews  We plan to work with NPR 7120.7 stakeholders to come to agreement on whether the current criteria should be modified  One possibility is to create tiers of requirements corresponding to project size/risk/importance/etc. 23
  • 24. I-Tools 24
  • 25. Summary  Continual Improvement - the Agency OCIO continually identifies, solicits, and implements modifications to our policies to advance the success of the Agency’s IT programs and projects  Alignment – the Agency OCIO strives to align IT policies and procedures with our Human Space Flight (NPR 7120.5) and Research and Technology (NPR 7120.8) program/project management policies to maintain consistency across NASA 25