FEMA PUBLIC ASSISTANCE PROGRAM
APPLICANT BRIEFING

Colorado Severe Storms, Flooding,
Landslides, and Mudslides
Incident Start Date: 9/11/2013
Incident End Date: 9/30/2013
Declaration: DR-4145
Declared:
9/14/2013

This Presentation was updated on 10/25/13
Agenda
 Introductions
 Be sure to sign the attendance sheet
 Applicant Briefing
 Status of declarations
 Expectation management
 The process
 Public Assistance Program
 Opportunities
 Hand in your Request for Public Assistance
Form
INTRODUCTIONS
Status: Counties
Declared as of 10/21/13




Adams, Arapahoe, Boulder, Clear
Creek, Crowley, Denver, El Paso,
Fremont, Gilpin, Jefferson, Lake,
Larimer, Lincoln, Logan, Morgan,
Sedgwick Washington, and Weld
Counties
Still reviewing other counties
Expectation
Management
1. You will not be made whole.
The FEMA Public Assistance Program
provides supplemental financial assistance to state,
local, and tribal governments, and certain private
non-profit organizations for response and recovery
activities required as the result of a declared
disaster.
Funding is cost shared at a federal share of
no less than 75% of eligible costs.
State Cost Share
The following has been determined regarding state cost share for
the FEMA Public Assistance (PA) Program:
State PA cost share with local governments, including special
districts: 12.5% (50% of the 25% non-Federal match) but if a
local government has used all its reserves and TABOR
Emergency Reserves, the state may increase cost share up
to 90% of the 25% non-Federal match. Other state agencies will
review local government finances to determine (verify) that
reserves/emergency funds have been expended. 
There is no PA cost share with non-profit organizations (PNPs).
6
2. Homeowners’
Associations
From: Public Assistance Policy Digest FEMA 321
Homeowner’s Associations often prohibit access
with gates and other security systems.
When Access is restricted, the services and
facilities cannot be considered open to the public
and therefore are not eligible for Public
Assistance funding.
Homeowners’ Associations
Removal of debris from roadways (including debris
moved to the curb) within the community to create an
emergency path of travel is eligible if performed or
contracted by an eligible local or State level
government entity with legal authority and applied for
by the eligible local or State entity.
If Homeowner’s Association meets the criteria for an
eligible PNP under the PA program, it may claim
costs for the repair of its eligible education, medical,
custodial care, emergency, and utility (except
irrigation) facilities.
Homeowners’ Associations
Repair of roadways, irrigation facilities, and
facilities that provide governmental services
other than those listed on the previous slide
are not eligible.
PNP recreation facilities are ineligible whether
the community is gated or not.
3. PNP Irrigation
Facilities





From: Public Assistance Policy Digest: FEMA 321
Irrigation Facilities are channels and associated features
generally designed and constructed for the purpose of
transporting water for agricultural use. All publicly owned
irrigation facilities generally are eligible for public assistance.
However, to be eligible for public assistance funding, a Private
Nonprofit (PNP) Irrigation Facility must provide essential
services of a governmental nature to the general public. This
means providing water for fire suppression, generating
electricity, and drinking water supply. Irrigation facilities solely
used for agricultural purposes are not eligible. Grant assistance
for eligible mixed-use facilities will be prorated based on the use
of the facility.
PNP Irrigation Facilities


Eligible components of the irrigation system include the canal
and associated features, such as siphons, pumps, retention/
collection dams, and low control gates associated with the
eligible services. The canals must be improved and
maintained; natural channels are not eligible.



Debris removal and permanent restoration are only eligible to
the point of restoring the pre-disaster hydraulic capacity.
WHERE YOU ARE IN
THE PROCESS
SUBMISSION OF
REQUEST
The Program
Factors of Eligibility


Applicant



Facility



Work



Cost
Eligible Applicants


State Government Agencies



County Governments



Municipal Governments



Tribal Governments



Special Districts



School Districts



Certain Private Nonprofit Organizations
Eligible Applicants
Private Non-profit
Organizations

 Critical
 Non-critical
Critical Services: Private
Non-Profit Organizations








Power
Water
Sewer and Wastewater
Communications
Education
Emergency Medical Care
Fire Protection/Emergency Services
Non-Critical Services:
Private Non-Profit
Organizations











Museums
Zoos
Performing Arts Facilities
Community Centers
Libraries
Homeless Shelters
Rehabilitation Facilities
Senior Citizen Centers
Shelter Workshops
Health and Safety Services of a governmental nature
Eligible Applicants
Private Non-profit
Eligible Facilities


A facility is defined as
– Any publicly-owned or PNP-owned
building, works, system, or equipment
(built or manufactured); or
– Certain improved and maintained natural
features
Eligible Work Criteria


Required as a result of the declared disaster



Located in designated disaster area



Legal responsibility of eligible applicant - An
eligible applicant must be legally responsible
for the repair of the damaged facility or the
performance of emergency services at the
time of the disaster.



No other Federal agency has specific authority
Types of
Eligible Work
1. Emergency Work
(Categories A & B)

2. Permanent Work
(Categories C - G)
Work Categories


A: Debris Removal



B: Emergency Protective Measures



C: Roads and Bridges



D: Water Control Facilities



E: Buildings And Equipment



F: Utility Systems



G: Parks, Recreational, and Other
Eligible Costs


Generally, costs that can be directly tied to the
performance of eligible work are eligible



Such costs must be:
– Reasonable and necessary to accomplish the work
– Compliant with Federal, State, and Local
requirements for competitive procurement
(including 44 CFR p. 13) and
– Reduced by all applicable credits, such as
anticipated insurance proceeds and salvage
values.
Labor Costs –
Emergency Work


Only overtime labor is eligible for:
– Permanent employees
– Seasonal employees


Both regular time and overtime labor are eligible
for non-budgeted employees assigned
specifically to perform emergency work,
including temporary employees
Labor Costs –
Permanent Work




For permanent work performed by an
eligible applicant, both regular time and
overtime are eligible for all employees.
The applicant’s pre-disaster written
policies on overtime are used in
determining cost eligibility
– Cannot be contingent on federal funding
or discretion
Force Account
Equipment








Equipment is eligible for regular time and
overtime
Standby time is ineligible
Hourly usage costs for trucks, back-hoes,
etc.
Mileage costs for automobiles
Must use FEMA cost codes or your own
cost codes, whichever is less
Materials






The cost of supplies that were purchased or
taken from an applicant’s stock and used
during performance of eligible work may be
claimed
Keep invoices and/or purchase orders
Keep all cancelled checks
Keep record of any inventory used from
stock
Donated Resources




Volunteer labor, donated equipment, and
donated materials are eligible to offset the
State and Local portion of cost share for
emergency work (Cat A and B)
The donated services must be
documented and must include a record of
hours worked, the work site, and a
description of work
WHAT’S NEXT?
SUBMISSION OF REQUEST
FOR
PUBLIC ASSISTANCE
Applicants must submit a Request for Public
Assistance (RPA) Form by the dates below:

For Counties Declared 9/15
and 10/1 – Nov. 16
For Counties Declared 10/21 –
Nov. 20
Kickoff Meeting










FEMA will assign a Public Assistance Coordinator
(PAC)
Eligibility will be confirmed
The FEMA PAC will hold a kickoff meeting to discuss
details of the PA Program
You, the applicant, provides lists of damages and cost
estimates from the disaster
Bring a COPY of your Insurance Policy, if applicable,
Project Worksheet (PW)


Scope of work



Estimates eligible cost



Minimum PW is $1,000



Applicant’s participation is vital
PW Review Process


Project worksheet completion



FEMA PAC reviews and approves it for
submission



PW entered into electronic database



FEMA’s special consideration reviews

–
–
–
–

Insurance Requirements
Hazard Mitigation
Environmental Requirements
Historic Preservation & Cultural Resources
PW Review Process


–



–
–
–


Final Project Worksheet reviewed and approved
by Applicant – requires sign-off
Ask questions if something doesn’t make sense

Exit Briefing Form – Signature by:
FEMA PAC Crew Leader
State Applicant Liaison
Applicant Representative

Obligation of project worksheet
Grant Agreement
Process
1.

State prepares Grant Agreement between State
and Applicant - sends 2 copies to Applicant – must
be executed by Chief Elected Official

2.

Approved Project Worksheets are the exhibits to
Grant Agreement

3.

State then executes Agreement – requires
processing by Department Controller

This process takes time…..
R EIMBURSEMEN
T
Cost Share


The federal share is 75%



The remaining non-federal share is the
Grantee and Sub-grantees responsibility



The cost share is stated in the grant
agreement
Small vs. Large Projects
Public Assistance projects are processed as
either small or large projects. If the project
cost is less than the annually updated cost
threshold amount ($67,500 for FY 2013) the
project is processed as a small project. If the
project cost equals or exceeds the threshold
the project is processed as a large project.
Reimbursements – Small
Projects






Federal funding is based on the initial cost
estimate
Federal cost share will be processed by the State
upon obligation – after execution of the Grant
Agreement
All small projects must be completed in
accordance with the PW
Failure to complete a project may require that
Federal and State payments be refunded!
Reimbursements – Large
Projects





Subgrantees must submit Requests for
Reimbursement to the State as work is
accomplished, along with all required
documentation and supporting payment records.
Please submit quarterly.
State will provide further instructions on
reimbursement process after execution of the State
Grant Agreement.
Project Validation




For all large projects applicants should
submit Requests for Final Inspection
within 60 days after the physical work is
100% complete.
Final assistance is based upon actual
costs or an estimate using the Cost
Estimating Format.
Administrative Allowance
The allowance includes funding for indirect costs, any
administrative expenses and other expenses reasonably
incurred and not directly chargeable to a specific project.


Cost must be reasonable and the level of effort
reasonable for the type of work required.


Example – Pay roll personnel collecting and tracking
labor costs for staff performing emergency protective
measures.




Records must be kept on how the funds were spent.
Record Keeping

Vital To Full Reimbursement


Costs by PW for approved work



FEMA has forms that assist in
organizing and summarizing



Original documentation required
audit or program review



Keep records for 3 years after
closeout letter from State/FEMA

for
OPPORTUNITIES
Opportunities: Alternative
Procedures for Debris Removal
Discuss these with your PAC
If desirable, request Alternative Procedures for Debris Removal
-Accelerated Debris Removal-Increased Federal Cost Share
(Sliding Scale) (Large projects) (days 0-30 = 85%, 31-90 = 80%,
91-180 = 75%, 180+ days = 0% unless an extension is granted)
-Recycling Revenues (Large projects)
-Straight Time Force Account Labor (small & large projects)
http://www.fema.gov/media-library-data/20130726-1921-250451092/public_assistance_alternative_procedures_
pilot_program_guide_for_debris_removal.pdf
Opportunities: Permanent Work
Discuss this with your PAC
Participation in the permanent work pilot is based on a
Subgrantee agreeing to a fixed estimate subgrant; the pilot
includes:
 Grants Based on Fixed Estimates
 Acceptance of Subgrantee Cost Estimates
 Referral of Cost Estimates to Expert Panel
 Consolidated Subgrants
 Elimination of Alternate Project Penalty
 Use of Excess Funds
Subgrantee is responsible for costs above the fixed estimate
Subgrantee has flexibility in use of funds within the fixed
estimate

Opportunities: Mitigation
Discuss 406 with your PAC


Section 404 - Hazard Mitigation Grant Program
(HMGP) Not Public Assistance.
Assistance



Section 406 - Available as part of Public Assistance
Applies only to damaged elements eligible under PA
Permanent Work Projects determined to be “costeffective” (eliminate the future threat of damage to a
facility )
Opportunities: Improved Projects
Discuss with your PAC


An Improved Project is any project (large or small) where the
applicant chooses to make additional improvements to the
facility while making disaster repairs. Applicants performing
restoration work on a damaged facility may use the
opportunity to make additional improvements while still
restoring the facility to its pre-disaster design.



For the most part, these are projects in which the funding for
approved work cannot be tracked within the improved projects
because of physical changes or contracting arrangements.
For example, an applicant might propose laying asphalt on a
gravel road or replacing a firehouse that originally had two
bays with one that has three.
Opportunities: Alternate
Projects Discuss with your PAC


The applicant may request approval of an alternate
project from FEMA through the Grantee when an
applicant determines that the public welfare would not
be best served by either restoring a damaged facility
or by restoring the function of a damaged facility.
Either one of the two conditions must be met. See 44
CFR 206.203(d)(2).



The FEMA Regional Administrator must approve all
alternate projects prior to the start of construction.
See 44 CFR 206.203(d)(2)(v).
Applicant Common Errors
Office of Inspector General (OIG) has noted the
following frequent audit findings (see OIG report,
October 2008):
Poor Accounting Practices
Unsupported Costs
Duplication of Benefits
Excessive Equipment Charges
Excessive Labor and Fringe Benefit Charges
Unrelated Project Charges
Unapplied Credits
Poor Contracting Practices
Contracting Requirements
Federal Regulations (44 CFR 13.36) requires that Grantees and
sub-grantees comply with the following procurement standards:

Competition is almost always required. Regardless of State or local exceptions
during an emergency.

The applicant must maintain records in sufficient detail to reflect the significant
history of the procurement, including the rationale for the method of
procurement, the basis for the contractor selection, and the basis for the
contract price

The applicant is prohibited from using time-and-material type contracts unless
a determination is made that no other contract is suitable, and provided that the
contract includes a ceiling price that the contractor exceeds at its own risk; and
The applicant is prohibited from using a “cost plus a percentage of cost”
contract.
TIMELINES
Timelines






Applicant has until November 16 or 20, 2013
to submit a Request for Public Assistance
(RPA) form.
Applicant has 60 days from Kick Off meeting
to identify damages
Applicant has 60 days upon notification of a
PW decision to appeal thru the State.
Timelines






FEMA has 90 days upon receipt of an
appeal to provide in writing the disposition
of the appeal or request additional
information.
Applicants have 60 days upon receipt of a
1st appeal disposition to request for a 2 nd
appeal.
FEMAs goal is to provide applicants with
the fullest reimbursement under the Stafford
Act for their PWs.
Key Points…


FEMAs goal is to complete all project
worksheets as soon as possible in order to
provide funding for Applicants.



Contact State OEM & your FEMA PAC for
any specific questions.
Helpful Websites
 http://www.fema.gov/public-assistance-local-state-

tribal-and-non-profit

 http://www.fema.gov/public-assistance-policy-and Helpful Websites

guidance

 http://www.fema.gov/pdf/government/grant/pa/fema

323_app_handbk.pdf

 http://www.fema.gov/9500-series-policy-

publications
Public Assistance
Hotline







Once assigned, reach out to your
FEMA PAC
Hotline # is 855-282-5706
Between 8 am and 6 pm
DUNS Number Hotline
– 866-705-5711
Reminder regarding FEMA’s
Individual Assistance
Program


Encourage people to sign up for IA for
private roads and driveways.



For the general public the hotline is
1-800-621-FEMA (3362)
This concludes the overview of the
Public Assistance Applicant Briefing


Please submit an RPA



If you are unable to submit today, please email
RPAs to:
 rpa_colorado@state.co.us



Kick-off meetings will be scheduled.



This briefing and other state recovery information can be
found at:
 https://sites.google.com/site/corecoverypartners/dam
age-assessment/applicant-briefings

Weitere ähnliche Inhalte

Ähnlich wie State FEMA Public Assistance Applicant Briefing October 30, 2013

State Fema Public Assistance Slides October 2013
State Fema Public Assistance Slides October 2013State Fema Public Assistance Slides October 2013
State Fema Public Assistance Slides October 2013Trost, Micki
 
Disaster Recovery: Managing and Leveraging Multiple Funding Sources
Disaster Recovery: Managing and Leveraging Multiple Funding SourcesDisaster Recovery: Managing and Leveraging Multiple Funding Sources
Disaster Recovery: Managing and Leveraging Multiple Funding SourcesCDM Smith
 
Disaster Management Project - Karnataka
Disaster Management Project - KarnatakaDisaster Management Project - Karnataka
Disaster Management Project - KarnatakaAidIQ
 
2016 - AFG Workshop by BRPC 8-14-16 FULL
2016 - AFG Workshop by BRPC 8-14-16 FULL2016 - AFG Workshop by BRPC 8-14-16 FULL
2016 - AFG Workshop by BRPC 8-14-16 FULLCindy-Lyn White
 
Public Private Partnerships in Florida
Public Private Partnerships in FloridaPublic Private Partnerships in Florida
Public Private Partnerships in Floridabeckerpoliakoff
 
Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...
Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...
Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...IRC
 
Juvenile justice delinquency prevention and treatment programs rfp (3)
Juvenile justice delinquency prevention and treatment programs rfp (3)Juvenile justice delinquency prevention and treatment programs rfp (3)
Juvenile justice delinquency prevention and treatment programs rfp (3)screaminc
 
PA DCED Renewable Energy Program GeoThermal And Wind Projects
PA DCED Renewable Energy Program GeoThermal And Wind ProjectsPA DCED Renewable Energy Program GeoThermal And Wind Projects
PA DCED Renewable Energy Program GeoThermal And Wind ProjectsEquality Pennsylvania
 
Renewable Energy Program : Geothermal and Wind Projects
Renewable Energy Program: Geothermal and Wind ProjectsRenewable Energy Program: Geothermal and Wind Projects
Renewable Energy Program : Geothermal and Wind ProjectsEquality Pennsylvania
 
Water Operations Plan
Water Operations PlanWater Operations Plan
Water Operations PlanJake Doran
 
NJ Redevelopment Forum 2020 - Giannikopoulos
NJ Redevelopment Forum 2020 - Giannikopoulos NJ Redevelopment Forum 2020 - Giannikopoulos
NJ Redevelopment Forum 2020 - Giannikopoulos New Jersey Future
 
Public Private Partnerships_JH (002)
Public Private Partnerships_JH (002)Public Private Partnerships_JH (002)
Public Private Partnerships_JH (002)Jay Hermanson
 
Session 3B Finance - Cheick Dia afd
Session 3B Finance - Cheick Dia afdSession 3B Finance - Cheick Dia afd
Session 3B Finance - Cheick Dia afdIRC
 

Ähnlich wie State FEMA Public Assistance Applicant Briefing October 30, 2013 (20)

State Fema Public Assistance Slides October 2013
State Fema Public Assistance Slides October 2013State Fema Public Assistance Slides October 2013
State Fema Public Assistance Slides October 2013
 
Disaster Recovery: Managing and Leveraging Multiple Funding Sources
Disaster Recovery: Managing and Leveraging Multiple Funding SourcesDisaster Recovery: Managing and Leveraging Multiple Funding Sources
Disaster Recovery: Managing and Leveraging Multiple Funding Sources
 
Disaster Management Project - Karnataka
Disaster Management Project - KarnatakaDisaster Management Project - Karnataka
Disaster Management Project - Karnataka
 
2016 - AFG Workshop by BRPC 8-14-16 FULL
2016 - AFG Workshop by BRPC 8-14-16 FULL2016 - AFG Workshop by BRPC 8-14-16 FULL
2016 - AFG Workshop by BRPC 8-14-16 FULL
 
Public Private Partnerships in Florida
Public Private Partnerships in FloridaPublic Private Partnerships in Florida
Public Private Partnerships in Florida
 
Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...
Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...
Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...
 
Zones response
Zones responseZones response
Zones response
 
Juvenile justice delinquency prevention and treatment programs rfp (3)
Juvenile justice delinquency prevention and treatment programs rfp (3)Juvenile justice delinquency prevention and treatment programs rfp (3)
Juvenile justice delinquency prevention and treatment programs rfp (3)
 
PA DCED Renewable Energy Program GeoThermal And Wind Projects
PA DCED Renewable Energy Program GeoThermal And Wind ProjectsPA DCED Renewable Energy Program GeoThermal And Wind Projects
PA DCED Renewable Energy Program GeoThermal And Wind Projects
 
Renewable Energy Program : Geothermal and Wind Projects
Renewable Energy Program: Geothermal and Wind ProjectsRenewable Energy Program: Geothermal and Wind Projects
Renewable Energy Program : Geothermal and Wind Projects
 
Event safety checklist
Event safety checklistEvent safety checklist
Event safety checklist
 
Water Operations Plan
Water Operations PlanWater Operations Plan
Water Operations Plan
 
Apwa meeting nrcs_ewp_may_2017
Apwa meeting nrcs_ewp_may_2017Apwa meeting nrcs_ewp_may_2017
Apwa meeting nrcs_ewp_may_2017
 
Chapter+5 introduction+to+finance+instruments
Chapter+5 introduction+to+finance+instrumentsChapter+5 introduction+to+finance+instruments
Chapter+5 introduction+to+finance+instruments
 
NJ Redevelopment Forum 2020 - Giannikopoulos
NJ Redevelopment Forum 2020 - Giannikopoulos NJ Redevelopment Forum 2020 - Giannikopoulos
NJ Redevelopment Forum 2020 - Giannikopoulos
 
Public Relations
Public RelationsPublic Relations
Public Relations
 
Public Private Partnerships_JH (002)
Public Private Partnerships_JH (002)Public Private Partnerships_JH (002)
Public Private Partnerships_JH (002)
 
fema.pptx
fema.pptxfema.pptx
fema.pptx
 
Session 3B Finance - Cheick Dia afd
Session 3B Finance - Cheick Dia afdSession 3B Finance - Cheick Dia afd
Session 3B Finance - Cheick Dia afd
 
Distance Learning & Telemedicine Grant Program
Distance Learning & Telemedicine Grant ProgramDistance Learning & Telemedicine Grant Program
Distance Learning & Telemedicine Grant Program
 

Mehr von Trost, Micki

COVOST: Colorado Virtual Operations Support Team for #18CEMC
COVOST: Colorado Virtual Operations Support Team for #18CEMCCOVOST: Colorado Virtual Operations Support Team for #18CEMC
COVOST: Colorado Virtual Operations Support Team for #18CEMCTrost, Micki
 
Colorado Front Range Livestock Symposium Presentation: DHSEM, CLA, CDA
Colorado Front Range Livestock Symposium Presentation: DHSEM, CLA, CDAColorado Front Range Livestock Symposium Presentation: DHSEM, CLA, CDA
Colorado Front Range Livestock Symposium Presentation: DHSEM, CLA, CDATrost, Micki
 
Colorado Emergency Management Overview
Colorado Emergency Management OverviewColorado Emergency Management Overview
Colorado Emergency Management OverviewTrost, Micki
 
Colorado DHSEM: A look inside emergency management from a regional field mana...
Colorado DHSEM: A look inside emergency management from a regional field mana...Colorado DHSEM: A look inside emergency management from a regional field mana...
Colorado DHSEM: A look inside emergency management from a regional field mana...Trost, Micki
 
COVOST 2017 Overview Presentation
COVOST 2017 Overview PresentationCOVOST 2017 Overview Presentation
COVOST 2017 Overview PresentationTrost, Micki
 
Crisis Communication and Teamwork. What We Have Learned 5 Years Later
Crisis Communication and Teamwork. What We Have Learned 5 Years LaterCrisis Communication and Teamwork. What We Have Learned 5 Years Later
Crisis Communication and Teamwork. What We Have Learned 5 Years LaterTrost, Micki
 
Colorado fire chiefs presentation micki trost 2017
Colorado fire chiefs presentation micki trost 2017Colorado fire chiefs presentation micki trost 2017
Colorado fire chiefs presentation micki trost 2017Trost, Micki
 
Social Media: Situational Awareness & Anonymous Apps
Social Media: Situational Awareness & Anonymous AppsSocial Media: Situational Awareness & Anonymous Apps
Social Media: Situational Awareness & Anonymous AppsTrost, Micki
 
Alabama Governor's Conference: Colorado Floods
Alabama Governor's Conference: Colorado FloodsAlabama Governor's Conference: Colorado Floods
Alabama Governor's Conference: Colorado FloodsTrost, Micki
 
Public Safety Communications System Needs Analysis Update
Public Safety Communications System Needs Analysis Update Public Safety Communications System Needs Analysis Update
Public Safety Communications System Needs Analysis Update Trost, Micki
 
Colorado Public Safety DTR System Assessment Project Update
Colorado Public Safety DTR System Assessment Project Update Colorado Public Safety DTR System Assessment Project Update
Colorado Public Safety DTR System Assessment Project Update Trost, Micki
 
Fast Fast and Consistent Communication: A look back at public information eff...
Fast Fast and Consistent Communication: A look back at public information eff...Fast Fast and Consistent Communication: A look back at public information eff...
Fast Fast and Consistent Communication: A look back at public information eff...Trost, Micki
 
Colorado DHSEM: Understanding Social Media and Using it to Your Advantage
Colorado DHSEM:  Understanding Social Media and Using it to Your AdvantageColorado DHSEM:  Understanding Social Media and Using it to Your Advantage
Colorado DHSEM: Understanding Social Media and Using it to Your AdvantageTrost, Micki
 
DHSEM Presentation to Local Officials and Staff for Flood Recovery
DHSEM Presentation to Local Officials and Staff for Flood RecoveryDHSEM Presentation to Local Officials and Staff for Flood Recovery
DHSEM Presentation to Local Officials and Staff for Flood RecoveryTrost, Micki
 
DHSEM Strategic Plan
DHSEM Strategic PlanDHSEM Strategic Plan
DHSEM Strategic PlanTrost, Micki
 
Social Media during Disaster and Recovery
Social Media during Disaster and RecoverySocial Media during Disaster and Recovery
Social Media during Disaster and RecoveryTrost, Micki
 
Colorado Emergency Management Conference Survey Results
Colorado Emergency Management Conference Survey ResultsColorado Emergency Management Conference Survey Results
Colorado Emergency Management Conference Survey ResultsTrost, Micki
 
ESF15 Information Management -PIO Awareness
ESF15 Information Management -PIO AwarenessESF15 Information Management -PIO Awareness
ESF15 Information Management -PIO AwarenessTrost, Micki
 
Garfield county jis10.12
Garfield county jis10.12Garfield county jis10.12
Garfield county jis10.12Trost, Micki
 

Mehr von Trost, Micki (20)

COVOST: Colorado Virtual Operations Support Team for #18CEMC
COVOST: Colorado Virtual Operations Support Team for #18CEMCCOVOST: Colorado Virtual Operations Support Team for #18CEMC
COVOST: Colorado Virtual Operations Support Team for #18CEMC
 
Colorado Front Range Livestock Symposium Presentation: DHSEM, CLA, CDA
Colorado Front Range Livestock Symposium Presentation: DHSEM, CLA, CDAColorado Front Range Livestock Symposium Presentation: DHSEM, CLA, CDA
Colorado Front Range Livestock Symposium Presentation: DHSEM, CLA, CDA
 
Colorado Emergency Management Overview
Colorado Emergency Management OverviewColorado Emergency Management Overview
Colorado Emergency Management Overview
 
Colorado DHSEM: A look inside emergency management from a regional field mana...
Colorado DHSEM: A look inside emergency management from a regional field mana...Colorado DHSEM: A look inside emergency management from a regional field mana...
Colorado DHSEM: A look inside emergency management from a regional field mana...
 
COVOST 2017 Overview Presentation
COVOST 2017 Overview PresentationCOVOST 2017 Overview Presentation
COVOST 2017 Overview Presentation
 
Crisis Communication and Teamwork. What We Have Learned 5 Years Later
Crisis Communication and Teamwork. What We Have Learned 5 Years LaterCrisis Communication and Teamwork. What We Have Learned 5 Years Later
Crisis Communication and Teamwork. What We Have Learned 5 Years Later
 
Colorado fire chiefs presentation micki trost 2017
Colorado fire chiefs presentation micki trost 2017Colorado fire chiefs presentation micki trost 2017
Colorado fire chiefs presentation micki trost 2017
 
Social Media: Situational Awareness & Anonymous Apps
Social Media: Situational Awareness & Anonymous AppsSocial Media: Situational Awareness & Anonymous Apps
Social Media: Situational Awareness & Anonymous Apps
 
Alabama Governor's Conference: Colorado Floods
Alabama Governor's Conference: Colorado FloodsAlabama Governor's Conference: Colorado Floods
Alabama Governor's Conference: Colorado Floods
 
Public Safety Communications System Needs Analysis Update
Public Safety Communications System Needs Analysis Update Public Safety Communications System Needs Analysis Update
Public Safety Communications System Needs Analysis Update
 
Colorado Public Safety DTR System Assessment Project Update
Colorado Public Safety DTR System Assessment Project Update Colorado Public Safety DTR System Assessment Project Update
Colorado Public Safety DTR System Assessment Project Update
 
Fast Fast and Consistent Communication: A look back at public information eff...
Fast Fast and Consistent Communication: A look back at public information eff...Fast Fast and Consistent Communication: A look back at public information eff...
Fast Fast and Consistent Communication: A look back at public information eff...
 
Colorado DHSEM: Understanding Social Media and Using it to Your Advantage
Colorado DHSEM:  Understanding Social Media and Using it to Your AdvantageColorado DHSEM:  Understanding Social Media and Using it to Your Advantage
Colorado DHSEM: Understanding Social Media and Using it to Your Advantage
 
DHSEM Presentation to Local Officials and Staff for Flood Recovery
DHSEM Presentation to Local Officials and Staff for Flood RecoveryDHSEM Presentation to Local Officials and Staff for Flood Recovery
DHSEM Presentation to Local Officials and Staff for Flood Recovery
 
DHSEM Strategic Plan
DHSEM Strategic PlanDHSEM Strategic Plan
DHSEM Strategic Plan
 
Social Media during Disaster and Recovery
Social Media during Disaster and RecoverySocial Media during Disaster and Recovery
Social Media during Disaster and Recovery
 
Debris briefing
Debris briefingDebris briefing
Debris briefing
 
Colorado Emergency Management Conference Survey Results
Colorado Emergency Management Conference Survey ResultsColorado Emergency Management Conference Survey Results
Colorado Emergency Management Conference Survey Results
 
ESF15 Information Management -PIO Awareness
ESF15 Information Management -PIO AwarenessESF15 Information Management -PIO Awareness
ESF15 Information Management -PIO Awareness
 
Garfield county jis10.12
Garfield county jis10.12Garfield county jis10.12
Garfield county jis10.12
 

Kürzlich hochgeladen

ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 

Kürzlich hochgeladen (20)

ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 

State FEMA Public Assistance Applicant Briefing October 30, 2013

  • 1. FEMA PUBLIC ASSISTANCE PROGRAM APPLICANT BRIEFING Colorado Severe Storms, Flooding, Landslides, and Mudslides Incident Start Date: 9/11/2013 Incident End Date: 9/30/2013 Declaration: DR-4145 Declared: 9/14/2013 This Presentation was updated on 10/25/13
  • 2. Agenda  Introductions  Be sure to sign the attendance sheet  Applicant Briefing  Status of declarations  Expectation management  The process  Public Assistance Program  Opportunities  Hand in your Request for Public Assistance Form
  • 4. Status: Counties Declared as of 10/21/13   Adams, Arapahoe, Boulder, Clear Creek, Crowley, Denver, El Paso, Fremont, Gilpin, Jefferson, Lake, Larimer, Lincoln, Logan, Morgan, Sedgwick Washington, and Weld Counties Still reviewing other counties
  • 5. Expectation Management 1. You will not be made whole. The FEMA Public Assistance Program provides supplemental financial assistance to state, local, and tribal governments, and certain private non-profit organizations for response and recovery activities required as the result of a declared disaster. Funding is cost shared at a federal share of no less than 75% of eligible costs.
  • 6. State Cost Share The following has been determined regarding state cost share for the FEMA Public Assistance (PA) Program: State PA cost share with local governments, including special districts: 12.5% (50% of the 25% non-Federal match) but if a local government has used all its reserves and TABOR Emergency Reserves, the state may increase cost share up to 90% of the 25% non-Federal match. Other state agencies will review local government finances to determine (verify) that reserves/emergency funds have been expended.  There is no PA cost share with non-profit organizations (PNPs). 6
  • 7. 2. Homeowners’ Associations From: Public Assistance Policy Digest FEMA 321 Homeowner’s Associations often prohibit access with gates and other security systems. When Access is restricted, the services and facilities cannot be considered open to the public and therefore are not eligible for Public Assistance funding.
  • 8. Homeowners’ Associations Removal of debris from roadways (including debris moved to the curb) within the community to create an emergency path of travel is eligible if performed or contracted by an eligible local or State level government entity with legal authority and applied for by the eligible local or State entity. If Homeowner’s Association meets the criteria for an eligible PNP under the PA program, it may claim costs for the repair of its eligible education, medical, custodial care, emergency, and utility (except irrigation) facilities.
  • 9. Homeowners’ Associations Repair of roadways, irrigation facilities, and facilities that provide governmental services other than those listed on the previous slide are not eligible. PNP recreation facilities are ineligible whether the community is gated or not.
  • 10. 3. PNP Irrigation Facilities    From: Public Assistance Policy Digest: FEMA 321 Irrigation Facilities are channels and associated features generally designed and constructed for the purpose of transporting water for agricultural use. All publicly owned irrigation facilities generally are eligible for public assistance. However, to be eligible for public assistance funding, a Private Nonprofit (PNP) Irrigation Facility must provide essential services of a governmental nature to the general public. This means providing water for fire suppression, generating electricity, and drinking water supply. Irrigation facilities solely used for agricultural purposes are not eligible. Grant assistance for eligible mixed-use facilities will be prorated based on the use of the facility.
  • 11. PNP Irrigation Facilities  Eligible components of the irrigation system include the canal and associated features, such as siphons, pumps, retention/ collection dams, and low control gates associated with the eligible services. The canals must be improved and maintained; natural channels are not eligible.  Debris removal and permanent restoration are only eligible to the point of restoring the pre-disaster hydraulic capacity.
  • 12. WHERE YOU ARE IN THE PROCESS
  • 16. Eligible Applicants  State Government Agencies  County Governments  Municipal Governments  Tribal Governments  Special Districts  School Districts  Certain Private Nonprofit Organizations
  • 18. Critical Services: Private Non-Profit Organizations        Power Water Sewer and Wastewater Communications Education Emergency Medical Care Fire Protection/Emergency Services
  • 19. Non-Critical Services: Private Non-Profit Organizations           Museums Zoos Performing Arts Facilities Community Centers Libraries Homeless Shelters Rehabilitation Facilities Senior Citizen Centers Shelter Workshops Health and Safety Services of a governmental nature
  • 21. Eligible Facilities  A facility is defined as – Any publicly-owned or PNP-owned building, works, system, or equipment (built or manufactured); or – Certain improved and maintained natural features
  • 22. Eligible Work Criteria  Required as a result of the declared disaster  Located in designated disaster area  Legal responsibility of eligible applicant - An eligible applicant must be legally responsible for the repair of the damaged facility or the performance of emergency services at the time of the disaster.  No other Federal agency has specific authority
  • 23. Types of Eligible Work 1. Emergency Work (Categories A & B) 2. Permanent Work (Categories C - G)
  • 24. Work Categories  A: Debris Removal  B: Emergency Protective Measures  C: Roads and Bridges  D: Water Control Facilities  E: Buildings And Equipment  F: Utility Systems  G: Parks, Recreational, and Other
  • 25. Eligible Costs  Generally, costs that can be directly tied to the performance of eligible work are eligible  Such costs must be: – Reasonable and necessary to accomplish the work – Compliant with Federal, State, and Local requirements for competitive procurement (including 44 CFR p. 13) and – Reduced by all applicable credits, such as anticipated insurance proceeds and salvage values.
  • 26. Labor Costs – Emergency Work  Only overtime labor is eligible for: – Permanent employees – Seasonal employees  Both regular time and overtime labor are eligible for non-budgeted employees assigned specifically to perform emergency work, including temporary employees
  • 27. Labor Costs – Permanent Work   For permanent work performed by an eligible applicant, both regular time and overtime are eligible for all employees. The applicant’s pre-disaster written policies on overtime are used in determining cost eligibility – Cannot be contingent on federal funding or discretion
  • 28. Force Account Equipment      Equipment is eligible for regular time and overtime Standby time is ineligible Hourly usage costs for trucks, back-hoes, etc. Mileage costs for automobiles Must use FEMA cost codes or your own cost codes, whichever is less
  • 29. Materials     The cost of supplies that were purchased or taken from an applicant’s stock and used during performance of eligible work may be claimed Keep invoices and/or purchase orders Keep all cancelled checks Keep record of any inventory used from stock
  • 30. Donated Resources   Volunteer labor, donated equipment, and donated materials are eligible to offset the State and Local portion of cost share for emergency work (Cat A and B) The donated services must be documented and must include a record of hours worked, the work site, and a description of work
  • 32. SUBMISSION OF REQUEST FOR PUBLIC ASSISTANCE Applicants must submit a Request for Public Assistance (RPA) Form by the dates below: For Counties Declared 9/15 and 10/1 – Nov. 16 For Counties Declared 10/21 – Nov. 20
  • 33. Kickoff Meeting      FEMA will assign a Public Assistance Coordinator (PAC) Eligibility will be confirmed The FEMA PAC will hold a kickoff meeting to discuss details of the PA Program You, the applicant, provides lists of damages and cost estimates from the disaster Bring a COPY of your Insurance Policy, if applicable,
  • 34. Project Worksheet (PW)  Scope of work  Estimates eligible cost  Minimum PW is $1,000  Applicant’s participation is vital
  • 35. PW Review Process  Project worksheet completion  FEMA PAC reviews and approves it for submission  PW entered into electronic database  FEMA’s special consideration reviews – – – – Insurance Requirements Hazard Mitigation Environmental Requirements Historic Preservation & Cultural Resources
  • 36. PW Review Process  –  – – –  Final Project Worksheet reviewed and approved by Applicant – requires sign-off Ask questions if something doesn’t make sense Exit Briefing Form – Signature by: FEMA PAC Crew Leader State Applicant Liaison Applicant Representative Obligation of project worksheet
  • 37. Grant Agreement Process 1. State prepares Grant Agreement between State and Applicant - sends 2 copies to Applicant – must be executed by Chief Elected Official 2. Approved Project Worksheets are the exhibits to Grant Agreement 3. State then executes Agreement – requires processing by Department Controller This process takes time…..
  • 39. Cost Share  The federal share is 75%  The remaining non-federal share is the Grantee and Sub-grantees responsibility  The cost share is stated in the grant agreement
  • 40. Small vs. Large Projects Public Assistance projects are processed as either small or large projects. If the project cost is less than the annually updated cost threshold amount ($67,500 for FY 2013) the project is processed as a small project. If the project cost equals or exceeds the threshold the project is processed as a large project.
  • 41. Reimbursements – Small Projects     Federal funding is based on the initial cost estimate Federal cost share will be processed by the State upon obligation – after execution of the Grant Agreement All small projects must be completed in accordance with the PW Failure to complete a project may require that Federal and State payments be refunded!
  • 42. Reimbursements – Large Projects    Subgrantees must submit Requests for Reimbursement to the State as work is accomplished, along with all required documentation and supporting payment records. Please submit quarterly. State will provide further instructions on reimbursement process after execution of the State Grant Agreement.
  • 43. Project Validation   For all large projects applicants should submit Requests for Final Inspection within 60 days after the physical work is 100% complete. Final assistance is based upon actual costs or an estimate using the Cost Estimating Format.
  • 44. Administrative Allowance The allowance includes funding for indirect costs, any administrative expenses and other expenses reasonably incurred and not directly chargeable to a specific project.  Cost must be reasonable and the level of effort reasonable for the type of work required.  Example – Pay roll personnel collecting and tracking labor costs for staff performing emergency protective measures.   Records must be kept on how the funds were spent.
  • 45. Record Keeping Vital To Full Reimbursement  Costs by PW for approved work  FEMA has forms that assist in organizing and summarizing  Original documentation required audit or program review  Keep records for 3 years after closeout letter from State/FEMA for
  • 47. Opportunities: Alternative Procedures for Debris Removal Discuss these with your PAC If desirable, request Alternative Procedures for Debris Removal -Accelerated Debris Removal-Increased Federal Cost Share (Sliding Scale) (Large projects) (days 0-30 = 85%, 31-90 = 80%, 91-180 = 75%, 180+ days = 0% unless an extension is granted) -Recycling Revenues (Large projects) -Straight Time Force Account Labor (small & large projects) http://www.fema.gov/media-library-data/20130726-1921-250451092/public_assistance_alternative_procedures_ pilot_program_guide_for_debris_removal.pdf
  • 48. Opportunities: Permanent Work Discuss this with your PAC Participation in the permanent work pilot is based on a Subgrantee agreeing to a fixed estimate subgrant; the pilot includes:  Grants Based on Fixed Estimates  Acceptance of Subgrantee Cost Estimates  Referral of Cost Estimates to Expert Panel  Consolidated Subgrants  Elimination of Alternate Project Penalty  Use of Excess Funds Subgrantee is responsible for costs above the fixed estimate Subgrantee has flexibility in use of funds within the fixed estimate 
  • 49. Opportunities: Mitigation Discuss 406 with your PAC  Section 404 - Hazard Mitigation Grant Program (HMGP) Not Public Assistance. Assistance  Section 406 - Available as part of Public Assistance Applies only to damaged elements eligible under PA Permanent Work Projects determined to be “costeffective” (eliminate the future threat of damage to a facility )
  • 50. Opportunities: Improved Projects Discuss with your PAC  An Improved Project is any project (large or small) where the applicant chooses to make additional improvements to the facility while making disaster repairs. Applicants performing restoration work on a damaged facility may use the opportunity to make additional improvements while still restoring the facility to its pre-disaster design.  For the most part, these are projects in which the funding for approved work cannot be tracked within the improved projects because of physical changes or contracting arrangements. For example, an applicant might propose laying asphalt on a gravel road or replacing a firehouse that originally had two bays with one that has three.
  • 51. Opportunities: Alternate Projects Discuss with your PAC  The applicant may request approval of an alternate project from FEMA through the Grantee when an applicant determines that the public welfare would not be best served by either restoring a damaged facility or by restoring the function of a damaged facility. Either one of the two conditions must be met. See 44 CFR 206.203(d)(2).  The FEMA Regional Administrator must approve all alternate projects prior to the start of construction. See 44 CFR 206.203(d)(2)(v).
  • 52. Applicant Common Errors Office of Inspector General (OIG) has noted the following frequent audit findings (see OIG report, October 2008): Poor Accounting Practices Unsupported Costs Duplication of Benefits Excessive Equipment Charges Excessive Labor and Fringe Benefit Charges Unrelated Project Charges Unapplied Credits Poor Contracting Practices
  • 53. Contracting Requirements Federal Regulations (44 CFR 13.36) requires that Grantees and sub-grantees comply with the following procurement standards: Competition is almost always required. Regardless of State or local exceptions during an emergency. The applicant must maintain records in sufficient detail to reflect the significant history of the procurement, including the rationale for the method of procurement, the basis for the contractor selection, and the basis for the contract price The applicant is prohibited from using time-and-material type contracts unless a determination is made that no other contract is suitable, and provided that the contract includes a ceiling price that the contractor exceeds at its own risk; and The applicant is prohibited from using a “cost plus a percentage of cost” contract.
  • 55. Timelines    Applicant has until November 16 or 20, 2013 to submit a Request for Public Assistance (RPA) form. Applicant has 60 days from Kick Off meeting to identify damages Applicant has 60 days upon notification of a PW decision to appeal thru the State.
  • 56. Timelines    FEMA has 90 days upon receipt of an appeal to provide in writing the disposition of the appeal or request additional information. Applicants have 60 days upon receipt of a 1st appeal disposition to request for a 2 nd appeal. FEMAs goal is to provide applicants with the fullest reimbursement under the Stafford Act for their PWs.
  • 57. Key Points…  FEMAs goal is to complete all project worksheets as soon as possible in order to provide funding for Applicants.  Contact State OEM & your FEMA PAC for any specific questions.
  • 58. Helpful Websites  http://www.fema.gov/public-assistance-local-state- tribal-and-non-profit  http://www.fema.gov/public-assistance-policy-and Helpful Websites guidance  http://www.fema.gov/pdf/government/grant/pa/fema 323_app_handbk.pdf  http://www.fema.gov/9500-series-policy- publications
  • 59. Public Assistance Hotline     Once assigned, reach out to your FEMA PAC Hotline # is 855-282-5706 Between 8 am and 6 pm DUNS Number Hotline – 866-705-5711
  • 60. Reminder regarding FEMA’s Individual Assistance Program  Encourage people to sign up for IA for private roads and driveways.  For the general public the hotline is 1-800-621-FEMA (3362)
  • 61. This concludes the overview of the Public Assistance Applicant Briefing  Please submit an RPA  If you are unable to submit today, please email RPAs to:  rpa_colorado@state.co.us  Kick-off meetings will be scheduled.  This briefing and other state recovery information can be found at:  https://sites.google.com/site/corecoverypartners/dam age-assessment/applicant-briefings

Hinweis der Redaktion

  1. And for Private Non-Profit Applicants we have: Educational Institutions Utilities Emergency Services Medical Care And Custodial
  2. And for Private Non-Profit Applicants we have: Educational Institutions Utilities Emergency Services Medical Care And Custodial
  3. And for Private Non-Profit Applicants we have: Educational Institutions Utilities Emergency Services Medical Care And Custodial
  4. The main purpose of today’s meeting is to make sure all of you know how to submit a Request for Public Assistance Keep on mind the RPA should be submitted 30 days after the declaration day. In this case you must submit a Request for Public Assistance by XX/XX/XXXX
  5. Some examples of applicants that are eligible for Public Assistance are: State Governments County Governments Municipal Governments Tribal Governments Special Purpose Districts School Districts
  6. Some examples of applicants that are eligible for Public Assistance are: State Governments County Governments Municipal Governments Tribal Governments Special Purpose Districts School Districts
  7. And for Private Non-Profit Applicants we have: Educational Institutions Utilities Emergency Services Medical Care And Custodial
  8. There are 2 types of Private Non-Profit Organizations… The first type is Critical Services which includes: Power Water Sewer Communications Emergency Medical Care And Fire and Rescue All critical services can apply directly to FEMA for public assistance funding for Emergency and Permanent work
  9. There are 2 types of Private Non-Profit Organizations… The first type is Critical Services which includes: Power Water Sewer Communications Emergency Medical Care And Fire and Rescue All critical services can apply directly to FEMA for public assistance funding for Emergency and Permanent work
  10. And for Private Non-Profit Applicants we have: Educational Institutions Utilities Emergency Services Medical Care And Custodial
  11. For work to be eligible, the work must be: The result of the Disaster Located in the designated disaster area Be the legal responsibility of an eligible applicant And no other Federal Agency has specific authority over the project An example of this would be assistance for federally aided roads; you would need to request reimbursement through the Department of Transportation on those projects
  12. All Projects Fall into 2 types of work: Emergency Work which includes: Debris Removal And Emergency Protective Measures Emergency Work must eliminate or reduce immediate threats to: Life Health Safety Or Improved Property Permanent Work includes: Permanent Repair Or Restoration of Eligible Facilities Again work must be the result of the Declared Disaster and in the areas the President has designated
  13. When formulating your project worksheets, you should be aware of the 7 different Categories of Work Category A: deals with Debris Removal and is eligible: When it is the legal responsibility of an eligible applicant When it eliminates an immediate threat to life, health, and safety And when it eliminates an immediate threat of significant damage to improved property... Which ensures economic recovery of the community and provides a benefit for the community-at-large Category B: is Emergency Protective Measures taken by a community before, during, and after a disaster in order to: Save lives, Protect public health and safety, Or eliminate an immediate threat of significant damage to things such as improved property and private property through cost effective measuresCategories C through G covers Permanent work For Permanent work the applicant must: Repair, Restore, Or Replace the Facility to the Pre-disaster Condition Also Facilities must be restored to pre-disaster: Design, Capacity, And Function in accordance with local Codes and Standards
  14. The main purpose of today’s meeting is to make sure all of you know how to submit a Request for Public Assistance You must submit a Request for Public Assistance within 30 DAYS from declaration DATE
  15. Once you have submitted the Request for Public Assistance and it has been approved, FEMA and the State will each assign you a Public Assistance Coordinator (PAC) The PACs will contact you to set-up a kickoff meeting in order to begin the documentation process Once again it is very important for you to make sure that ALL personnel who are familiar with the projects attend this meeting, some examples are: administrative staff, finance & accounting staff, engineers, etc Also at the kickoff meeting you will need to present a list of damages This list will be the basis for developing project worksheets, which are used to obligate funds Make sure you also bring a copy of your insurance policy.
  16. The Project Worksheet (PW) is used to document the Scope of work And a Cost Estimate for the Project The total eligible amount for a PW at least 1,000 dollars When formulating PW’s, you will need: Location - to include longitude and latitude whenever possible A written description of the damages Dimensions of the damaged element And financial records Your participation is vital to all project formulations
  17. This illustrates the steps that the Project Worksheet must go through before you can receive funding for a project: The PW is written and submitted to the Disaster Field Office A Deputy Public Assistance Officer reviews the PW and approves it for submission The PW is then entered into NEMIS (National Emergency Management Information System) Then the review process begins. From initial to final review, there can be between 4 and 7 steps. The PW may need to be reviewed by: Insurance Cost Share Hazard Mitigation (reduce or eliminate threat of future damage)….and others Once the review process is complete, the PW becomes obligated (FEMA has given funds to US the State and we are ready to disburse)
  18. This illustrates the steps that the Project Worksheet must go through before you can receive funding for a project: The PW is written and submitted to the Disaster Field Office A Deputy Public Assistance Officer reviews the PW and approves it for submission The PW is then entered into NEMIS (National Emergency Management Information System) Then the review process begins. From initial to final review, there can be between 4 and 7 steps. The PW may need to be reviewed by: Insurance Cost Share Hazard Mitigation (reduce or eliminate threat of future damage)….and others Once the review process is complete, the PW becomes obligated (FEMA has given funds to US the State and we are ready to disburse)
  19. Once a project is obligated by FEMA, the State can begin the Payment Process The first review is by a Financial Specialist The payment is then verified by a Financial Supervisor Once approved by the Program Manager, it is forwarded to the Governor’s Authorized Representative for approval The payment then goes to the Division of Finance and Accounting where it goes through processing and acceptance And finally, the payment is then sent to you by mail or by electronic funds transfer.
  20. The minimum Federal Cost Share is 75% The Non-Federal Share can be covered by: The State The Applicant Or a combination of both Typically, the state will split the non-Federal share with applicants However, Private Non-Profit Organizations do not qualify to receive any State funding and will only be reimbursed the Federal share (NEXT SLIDE)
  21. WHAT DETERMINES A SMALL OR LARGE PROJECT? The term large project and small project relates to the cost threshold to complete work This cost threshold is defined by federal legislation and is adjusted annually (October 1) For fiscal year 2011, the threshold for small projects has been set at less than $63,900 Anything under this amount is considered a small project and is processed differently by the State
  22. The reimbursement process on small projects is different from the process of large projects On small projects, you can prepare your own Project Worksheets if you have the resources to do so; if not, the Public Assistance Coordinator, or Project Officer assigned by the PAC, will assist in the preparation of Project Worksheets Upon obligation of funds, the state can automatically disburse the funds to you This process is approximately 3-weeks from the point of obligation
  23. The reimbursement process for large projects is more detailed Before any payments can be processed, you must submit a Request for Reimbursement And a Summary of Documentation
  24. You must document all costs for approved work on Project Worksheets FEMA does offer forms to help organize and summarize expenses… Time cards, payroll registers, material invoices, ads for bids, contracts, invoices and cancelled checks are all examples of criteria that are subject to audits or program reviews You will need to keep records for 5 years after the closeout letter from FEMA is received (Please note: FEMA only requires you to keep records for 3 years, however, the State requires 5 years)
  25. The Stafford Act provides 2 types of Hazard Mitigation: Section 404 Hazard Mitigation is NOT part of the Public Assistance Program Section 406 Hazard Mitigation IS part of the Public Assistance Program and applies only to damaged elements eligible under PA It is a funding source for cost-effective measures that would reduce or eliminate the future threat of damage to a facility that was damaged during the present disaster We encourage the use of 406 Hazard Mitigation Currently, there is no limit to funding under this program
  26. The Stafford Act provides 2 types of Hazard Mitigation: Section 404 Hazard Mitigation is NOT part of the Public Assistance Program Section 406 Hazard Mitigation IS part of the Public Assistance Program and applies only to damaged elements eligible under PA It is a funding source for cost-effective measures that would reduce or eliminate the future threat of damage to a facility that was damaged during the present disaster We encourage the use of 406 Hazard Mitigation Currently, there is no limit to funding under this program
  27. Also Remember to: Complete all Project Worksheets as accurately as possible Submit a Request for Reimbursement and Summary of Documentation for all large projects And if you have specific questions, contact your State and FEMA PAC’s