SlideShare ist ein Scribd-Unternehmen logo
1 von 62
Downloaden Sie, um offline zu lesen
Gosford City Council

Umina Beach Village
Transport Management and Accessibility Plan
and Civic Place Master Plan


Strat/Pol Presentation

19 June 2012




Umina Beach Village TMAP and Civic Place Master Plan
Outline

•   Introduction
•   Brief and study context
•   Consultation
•   Transport and Access
•   Civic Place Master Plan




Umina Beach Village TMAP and Civic Place Master Plan
Brief and Study Context

     • Strategic planning for Umina Beach Village adopted by
       Council through the Peninsula Urban Directions Study will
       change the nature of the village centre into the long term.
     • Transport study needs to be able to respond to and
       support this change.
     • Masterplan study will allow Council to ensure quality
       design for buildings, landscaping and streetscapes.
     • Library is in need of renewal.
     • Greater community focus on active street life.



Umina Beach Village TMAP and Civic Place Master Plan
Consultation – what we have heard

• Agencies
     •    Preference for two-way traffic flow system (i.e. West Street)
     •    Consider development bonuses for possible pedestrian links
     •    Encourage more bicycle use
     •    Consider potential weekend library hours
     •    Address issues with development/construction staging: need to develop
          interim car parking plan
     •    Road safety considerations
     •    Increased use of motorised scooters need consideration
     •    Need for traffic calming
     •    Changing demographics provides opportunities for higher active
          transport use
     •    Develop “ownership” within community: develop facilities that support
          community activities

Umina Beach Village TMAP and Civic Place Master Plan
Consultation – what we have heard

• Business community
     • Improvements needed but cannot diminish supply of
       public parking
     • Reservations about competition with existing business
       from additional retail, cafes etc.
     • General support for civic square
     • New civic square will need to be directly linked to West
       Street.
     • West Street should still have traffic flows.
     • Better management of traffic at peak times



Umina Beach Village TMAP and Civic Place Master Plan
Consultation – what we have heard

• General community
     •    No loss of public parking
     •     Concerns about “sale” of public assets by Council .
     •    Better links from centre to the beach
     •    West Street should continue to have street life
     •    Better pedestrian amenity at crossings
     •    Mixed views about desirability of civic square
     •    Concerns about antisocial behaviour in new civic square
     •    If square is to be created it should be larger and support a wide range of events i.e.
          markets, concerts, movies etc.
     •    Support for improved library facilities
     •    A number of traffic and pedestrian blackspots identified
     •    Support for taking through traffic off West St
     •    Public transport within the village is OK
     •    better amenities at stations and destination points to continue to support use of
          public transport and cycling

Umina Beach Village TMAP and Civic Place Master Plan
Transport and Access

• TMAP Overview and Objectives
• Key findings and issues
• Preliminary transport improvement options




Umina Beach Village TMAP and Civic Place Master Plan
TMAP Overview and Objectives

• Overview
     • Assessment of transport impacts to identify a package of
       measures
     • Consideration of full transport impacts, not just traffic
     • Measures to include infrastructure and service
       improvements as well as policy considerations.
• Objectives
     • Identify future transport and access requirements for
       Village Centre
     • Integrate master plan of proposed Civic Place


Umina Beach Village TMAP and Civic Place Master Plan
Key Transport Findings – Road Network

          Semi-grid with well-defined hierarchy
          Key north-south demand and network patterns within
          Peninsula
          Limited east-west connectivity (West Street and Bourke Road)




Umina Beach Village TMAP and Civic Place Master Plan
Key Transport Findings – Traffic

          Peak West Street flows in order of 400-500 vehicles per hour
          Traffic growth in peninsula will likely bring increased conflicts
          on West Street:
                       West Street is key E-W link
                       West Street is also main centre street
                       Developments on both sides will bring increased pedestrian crossing
                       volumes




Umina Beach Village TMAP and Civic Place Master Plan
Key Transport Findings – Parking

          Community places great importance on parking availability
          Existing Council carpark considered “heart” of village centre
          Peak parking utilisation surveyed is about 90% of capacity
          Peak average parking duration surveyed is between 1 to 2 hours




Umina Beach Village TMAP and Civic Place Master Plan
Key Transport Findings – Public Transport

          Existing bus network and services considered good
          Draft Central Coast Transport Strategy identifies strategic bus
          corridor on Ocean Beach Road




Umina Beach Village TMAP and Civic Place Master Plan
Key Transport Findings – Walking and Cycling

          Significant active transport opportunity with Peninsula’s flat
          topography
          Significant bicycle usage has been documented for Woy Woy
          station (NSW Bike Plan)
          Opportunities for linking Village Centre with the beach and
          beach activities / surf clubs
          Existing cycle route on Trafalgar Avenue provides external links
          to north, but does not continue further south to the beach
          Potential pedestrian safety issues in the future with increased
          traffic on West Street
          Existing cycle route issues on West Street (discontinuous:
          cyclists need to dismount)


Umina Beach Village TMAP and Civic Place Master Plan
Preliminary Traffic Measures

          Preference for two-way system of traffic flows in line with overall
          planning and urban design objectives – one way systems create
          potential issues with connectivity, safety and urban design
          Wellington Street as alternative vehicle access/bypass
          West Street could be designated as High Pedestrian Activity Area with
          40 km/h speed limit
          Scenario modelling undertaken to date used background traffic
          growth rate to 50% of current levels, with up to 50% of West St
          through traffic diverting to Wellington St.
          Required intersection improvements to cater to future traffic with
          diversion:
              West St / Ocean Beach Rd – Roundabout
              West St / Trafalgar Ave – Roundabout with reconfigured pedestrian access and
              crossing
              Wellington St / Trafalgar Ave – Convert to roundabout
              Wellington St / Ocean Beach Rd – Convert to signals with turn lanes; impacts on
              westbound right turn from Ocean Beach Rd (may require closure).



Umina Beach Village TMAP and Civic Place Master Plan
Transport Structure

• Key traffic routes
• Key pedestrian links
  to beach




Umina Beach Village TMAP and Civic Place Master Plan
Intersection Improvements – Future
(based on 50% growth + 50% diversion scenario)

                     upgrade to signals




                                Consider signalisation of           Upgrade to
                                pedestrian crossing                 roundabout




    Retain roundabout
    configuration
                                                            Retain roundabout
                                                            configuration

Umina Beach Village TMAP and Civic Place Master Plan
Preliminary Parking Measures

          General consensus to maintain existing Council carparking
          supply
          Integrate parking provision with Civic Place Master Plan,
          including rearranged on-street parking along Alfred St and
          Bullion St.
          Consider West St bicycle route in on-street parking
          arrangements.
          Reconfigure Wellington St to allow more unrestricted on-street
          parking.
          Investigate impacts of reduced parking ratio requirements for
          future village centre developments (e.g. visitor parking for
          residential uses).


Umina Beach Village TMAP and Civic Place Master Plan
Parking                                           Install parking
                                                  information signage


                                                                        Fomalise kerbside
                                                                        parking on Wellington St


       Integrate Council
       carpark and Alfred St/
       Bullion St kerbside
       spaces with Civic Place
       Master Plan



Consider bicycle route
and 40 km/hr zone
proposals in reorganising
kerbside spaces




Maintain existing
restrictions


Umina Beach Village TMAP and Civic Place Master Plan
Preliminary Public Transport Measures

          Maintain existing bus network and frequencies
          Consider bus stop consolidation
          Improve wayfinding




Umina Beach Village TMAP and Civic Place Master Plan
Preliminary Pedestrian Measures

          Provide additional/upgraded crossings on Ocean Beach Road (Osborne
          Ave and Nowack Ave/Wellington St.)
          Integrate Trafalgar Ave pedestrian crossing with intersection upgrade
          Provide Wellington St pedestrian refuges (Alfred St, Bullion St)
          Improve pedestrian links with the beach and surf clubs, via Ocean Beach
          Rd Trafalgar Ave.
          Potential supplementary beach link via South St
          Improve footpaths along Alfred St, Bullion St between West St and
          Wellington St
          Improve Civic Place – West St pedestrian link (expand existing walkway)
          Integrate possible pedestrian links within lot amalgamations for increased
          permeability
          Improve east-west pedestrian links:
              Links to Civic Place (between Ocean Beach Road and Wellington Street)
              Pedestrian crossings on south side of West St (Berith St, South St)


Umina Beach Village TMAP and Civic Place Master Plan
Pedestrian improvements
                                        Integrate with future
                                        Wellington St/ Ocean Beach Rd
                                                                        Possible pedestrian links
                                        upgrade




                    Potential
                    raised
                    threshold




                 High Pedestrian
                 Activity Area
                 (40 km/hr zone)       Consider future
                 with entry            signalisation of
                 markers               pedestrian
                                       crossing
Umina Beach Village TMAP and Civic Place Master Plan
Preliminary Cycling Measures

          Progress current bike plan proposals
              Ocean Beach Rd
              Trafalgar Ave
              West St
              Sydney Ave
          Improve bike crossing on Wellington St.
          Formalise bicycle parking facilities in village centre
          Compliance with DCP111 bike parking requirements for
          developments.




Umina Beach Village TMAP and Civic Place Master Plan
Cycling Facilities
                                                           Existing off-
                                                           road route




Bike Plan
proposals
(on-road)


    Umina Beach Village TMAP and Civic Place Master Plan
Other Preliminary Measures

          Consider transport improvements to Bourke Rd as key E-W
          connection in peninsula (e.g. Umina-Ettalong)
          Potential traffic management diversions for special events (e.g.
          close West St to traffic on market days).




Umina Beach Village TMAP and Civic Place Master Plan
Civic Place Master Plan




Umina Beach Village TMAP and Civic Place Master Plan
Gosford City Council

Umina Beach Village
Transport Management and Accessibility Plan
and Civic Place Master Plan


Strat/Pol Presentation

19 June 2012




Umina Beach Village TMAP and Civic Place Master Plan
Location




Umina Beach Village TMAP and Civic Place Master Plan
Umina Beach Civic Place Master Plan

Key Principles

•   Working within the Draft Gosford LEP Controls
•   No loss of public car parking spaces (retain 169 spaces)
•   Improved public domain
•   New civic space in Umina Beach with relocation of library, new
    community facilities and public square




Umina Beach Village TMAP and Civic Place Master Plan
Umina Beach Civic Place Master Plan

In addition, a balanced approach was taken for the Civic
Place Master Plan, this includes:


•   Urban design
•   Public domain
•   Built form
•   Economical development
•   Transport and traffic




Umina Beach Village TMAP and Civic Place Master Plan
Draft Gosford LEP 2009
• Land Zoning - B2 Local Centre
• Floor Space Ratio - 1.8:1*
• Height of Building - 14.25m*




*(min. frontage and lot areas required)




  Umina Beach Village TMAP and Civic Place Master Plan
Umina Beach




Umina Beach Village TMAP and Civic Place Master Plan
BUILDING ENVELOPES

Note: The proposed Public Domain plan and Master Plans show building envelopes.
The building envelopes are not buildings. The envelopes define the space within which
quality buildings can occur.




 Umina Beach Village TMAP and Civic Place Master Plan
Public Domain Plan

•      Pedestrian link of
       Umina Village Centre, Surf Club’s
       and Beach
•      Pedestrian footpaths
•      Street trees
•      On street parking
•      Street furniture
•      Bicycle paths / bicycle lock up rails




    Umina Beach Village TMAP and Civic Place Master Plan
Pedestrian Link

•      Pedestrian link of Umina Village

       Centre, Surf Clubs and Beach




    Umina Beach Village TMAP and Civic Place Master Plan
Pedestrian Link
Paving




Umina Beach Village TMAP and Civic Place Master Plan
Pedestrian Link
Public art




Umina Beach Village TMAP and Civic Place Master Plan
Pedestrian Link
Street trees




Umina Beach Village TMAP and Civic Place Master Plan
Public Domain
On-street carparking




Umina Beach Village TMAP and Civic Place Master Plan
Public Domain
Street furniture




Umina Beach Village TMAP and Civic Place Master Plan
Public Domain
Street furniture




Umina Beach Village TMAP and Civic Place Master Plan
Public Domain
Laneways




Umina Beach Village TMAP and Civic Place Master Plan
Public Domain
Laneways




Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 1 Proposal                        GROUND FLOOR PLAN

-Retain 169 public car park
spaces

Public square

Proposed relocation of
library

- Pedestrian link to West St /
Public square / Civic Place




   Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 1 Proposal                        OVERALL FLOOR PLAN

-Retain 169 public car park
spaces

Public square

Proposed relocation of
library

- Pedestrian link to West St /
Public square / Civic Place




   Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 1 Proposal                      SECTION AA




 Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 1 Proposal                      SECTION BB




 Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 1 Proposal
PUBLIC DOMAIN PLAN



-Retain 169 public car park
spaces

Public square

Proposed relocation of
library

- Pedestrian link to West St /
Public square / Civic Place




   Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 2 Proposal                        GROUND FLOOR PLAN

-Retain 169 public car park
spaces

Public square

Proposed relocation of
library

Pedestrian link to West St /
Public square / Civic Place

Included are 2 lots to the
north within the proposal




   Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 2 Proposal                        OVERALL FLOOR PLAN

-Retain 169 public car park
spaces

Public square

Proposed relocation of
library

Pedestrian link to West St /
Public square / Civic Place

Included are 2 lots to the
north within the proposal




   Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 2 Proposal                      SECTION AA




 Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 2 Proposal                      SECTION BB




 Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 2 Proposal
PUBLIC DOMAIN PLAN


-Retain 169 public car park
spaces

Public square

Proposed relocation of
library

Pedestrian link to West St /
Public square / Civic Place

Included are 2 lots to the
north within the proposal




   Umina Beach Village TMAP and Civic Place Master Plan
Public Domain
Public spaces / squares examples




Umina Beach Village TMAP and Civic Place Master Plan
Public Domain
Public spaces / squares examples




Umina Beach Village TMAP and Civic Place Master Plan
Built Form
Built form examples




Umina Beach Village TMAP and Civic Place Master Plan
Built Form
Built form examples




Umina Beach Village TMAP and Civic Place Master Plan
Built Form
Built form examples




Umina Beach Village TMAP and Civic Place Master Plan
Indicative Sketches
Indicative retail & residential street character




Umina Beach Village TMAP and Civic Place Master Plan
Indicative Sketches
Indicative laneway character




Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 3 NO CHANGE

- Public car park to remain
as existing




   Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 3 NO CHANGE




                                                        Rear of shops and laneway




     Laneway and public carpark                         Public carpark
 Umina Beach Village TMAP and Civic Place Master Plan
Proposed Civic Place Master Plan Options
Option 3 NO CHANGE
PUBLIC DOMAIN PLAN
- Public car park to remain
as existing




   Umina Beach Village TMAP and Civic Place Master Plan

Weitere ähnliche Inhalte

Was ist angesagt?

Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]knelischer
 
PCC Sustainable Transport funding success
PCC Sustainable Transport funding successPCC Sustainable Transport funding success
PCC Sustainable Transport funding successJohn Smith
 
Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Samantha Coren
 
Belcrest Road Phasing Program
Belcrest Road Phasing ProgramBelcrest Road Phasing Program
Belcrest Road Phasing ProgramJose Carlos Ayala
 
Re imagining yonge street mcea study - pic 2 display panels low res
Re imagining yonge street mcea study - pic 2 display panels low resRe imagining yonge street mcea study - pic 2 display panels low res
Re imagining yonge street mcea study - pic 2 display panels low resknelischer
 
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Toronto Public Consultation Unit
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open houseCrosstown TO
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open houseCrosstown TO
 
Reimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsReimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsknelischer
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house Crosstown TO
 
Cts tradeshow remarks
Cts tradeshow remarksCts tradeshow remarks
Cts tradeshow remarksCrosstown TO
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house Crosstown TO
 

Was ist angesagt? (20)

Janwani - LAPP JM Rd
Janwani - LAPP JM RdJanwani - LAPP JM Rd
Janwani - LAPP JM Rd
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
 
PCC Sustainable Transport funding success
PCC Sustainable Transport funding successPCC Sustainable Transport funding success
PCC Sustainable Transport funding success
 
Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12
 
Sectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing PresentationSectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing Presentation
 
Belcrest Road Phasing Program
Belcrest Road Phasing ProgramBelcrest Road Phasing Program
Belcrest Road Phasing Program
 
Civic master plan overview presentation - March 20, 2013
Civic master plan overview presentation - March 20, 2013Civic master plan overview presentation - March 20, 2013
Civic master plan overview presentation - March 20, 2013
 
Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1
 
Beaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentationBeaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentation
 
Re imagining yonge street mcea study - pic 2 display panels low res
Re imagining yonge street mcea study - pic 2 display panels low resRe imagining yonge street mcea study - pic 2 display panels low res
Re imagining yonge street mcea study - pic 2 display panels low res
 
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open house
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open house
 
Reimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsReimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panels
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
 
14 04-09 complete streets overview
14 04-09 complete streets overview14 04-09 complete streets overview
14 04-09 complete streets overview
 
Cts tradeshow remarks
Cts tradeshow remarksCts tradeshow remarks
Cts tradeshow remarks
 
Windsor Siding Master Plan
Windsor Siding Master PlanWindsor Siding Master Plan
Windsor Siding Master Plan
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house
 

Andere mochten auch

DRAFT Central Coast Regional Transport Strategy
DRAFT Central Coast Regional Transport StrategyDRAFT Central Coast Regional Transport Strategy
DRAFT Central Coast Regional Transport StrategyTransport Planning
 
HSR (Phase1 Report) Executive Summary
HSR (Phase1 Report) Executive SummaryHSR (Phase1 Report) Executive Summary
HSR (Phase1 Report) Executive SummaryTransport Planning
 
Masterplan presentation options 1 to 3
Masterplan presentation options 1 to 3Masterplan presentation options 1 to 3
Masterplan presentation options 1 to 3Transport Planning
 
Erina study area capability overview
Erina study area capability overviewErina study area capability overview
Erina study area capability overviewTransport Planning
 

Andere mochten auch (7)

DRAFT Central Coast Regional Transport Strategy
DRAFT Central Coast Regional Transport StrategyDRAFT Central Coast Regional Transport Strategy
DRAFT Central Coast Regional Transport Strategy
 
REVISED FACT SHEET
REVISED FACT SHEETREVISED FACT SHEET
REVISED FACT SHEET
 
Tmap presentation
Tmap presentationTmap presentation
Tmap presentation
 
Gosford city centre TMAP
Gosford city centre TMAPGosford city centre TMAP
Gosford city centre TMAP
 
HSR (Phase1 Report) Executive Summary
HSR (Phase1 Report) Executive SummaryHSR (Phase1 Report) Executive Summary
HSR (Phase1 Report) Executive Summary
 
Masterplan presentation options 1 to 3
Masterplan presentation options 1 to 3Masterplan presentation options 1 to 3
Masterplan presentation options 1 to 3
 
Erina study area capability overview
Erina study area capability overviewErina study area capability overview
Erina study area capability overview
 

Ähnlich wie 120619ppt 12 s1084000 council stratpol presentation

East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014onthewight
 
Movement for Liveable London Street Talks - Ben Kennedy 22nd January 2014
Movement for Liveable London Street Talks - Ben Kennedy 22nd January 2014Movement for Liveable London Street Talks - Ben Kennedy 22nd January 2014
Movement for Liveable London Street Talks - Ben Kennedy 22nd January 2014Movement for Liveable London
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snydernjbikeped
 
Transit And Transformation Ne Wire January 2009 (Final)
Transit And Transformation Ne Wire January 2009 (Final)Transit And Transformation Ne Wire January 2009 (Final)
Transit And Transformation Ne Wire January 2009 (Final)Rob May
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingCirculateSD
 
Summit Parkline Presentation to City Council
Summit Parkline Presentation to City CouncilSummit Parkline Presentation to City Council
Summit Parkline Presentation to City CouncilGabriela Kappes
 
Planning for the South West Corridor by Eric Lumsden
Planning for the South West Corridor by Eric LumsdenPlanning for the South West Corridor by Eric Lumsden
Planning for the South West Corridor by Eric LumsdenEngineers Australia
 
Glasgow City Centre Transport Strategy presentation
Glasgow City Centre Transport Strategy presentationGlasgow City Centre Transport Strategy presentation
Glasgow City Centre Transport Strategy presentationSTEP_scotland
 
Mona Vale Town Centre - Balancing Place Making and Traffic Engineering
Mona Vale Town Centre - Balancing Place Making and Traffic EngineeringMona Vale Town Centre - Balancing Place Making and Traffic Engineering
Mona Vale Town Centre - Balancing Place Making and Traffic EngineeringJumpingJaq
 
GM Symposium 2016: Brendhan Zubricki, Essex
GM Symposium 2016: Brendhan Zubricki, EssexGM Symposium 2016: Brendhan Zubricki, Essex
GM Symposium 2016: Brendhan Zubricki, Essexgreenbelt82
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCrosstown TO
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxfordshireCC
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017City of Toronto Planning
 
Parramatta city river strategy
Parramatta city river strategyParramatta city river strategy
Parramatta city river strategyKaustubh Umekar
 
Urban design ppt - 21 09-16
Urban design ppt - 21 09-16Urban design ppt - 21 09-16
Urban design ppt - 21 09-16Jayati Chhabra
 

Ähnlich wie 120619ppt 12 s1084000 council stratpol presentation (20)

Portsmouth transport and health seminar, October 2014
Portsmouth transport and health seminar, October 2014Portsmouth transport and health seminar, October 2014
Portsmouth transport and health seminar, October 2014
 
CWSC Chairs' Presentation to Planning Board
CWSC Chairs' Presentation to Planning BoardCWSC Chairs' Presentation to Planning Board
CWSC Chairs' Presentation to Planning Board
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014
 
Movement for Liveable London Street Talks - Ben Kennedy 22nd January 2014
Movement for Liveable London Street Talks - Ben Kennedy 22nd January 2014Movement for Liveable London Street Talks - Ben Kennedy 22nd January 2014
Movement for Liveable London Street Talks - Ben Kennedy 22nd January 2014
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snyder
 
Transit And Transformation Ne Wire January 2009 (Final)
Transit And Transformation Ne Wire January 2009 (Final)Transit And Transformation Ne Wire January 2009 (Final)
Transit And Transformation Ne Wire January 2009 (Final)
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
 
Summit Parkline Presentation to City Council
Summit Parkline Presentation to City CouncilSummit Parkline Presentation to City Council
Summit Parkline Presentation to City Council
 
Planning for the South West Corridor by Eric Lumsden
Planning for the South West Corridor by Eric LumsdenPlanning for the South West Corridor by Eric Lumsden
Planning for the South West Corridor by Eric Lumsden
 
Glasgow City Centre Transport Strategy presentation
Glasgow City Centre Transport Strategy presentationGlasgow City Centre Transport Strategy presentation
Glasgow City Centre Transport Strategy presentation
 
TTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC StreetcarTTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC Streetcar
 
Mona Vale Town Centre - Balancing Place Making and Traffic Engineering
Mona Vale Town Centre - Balancing Place Making and Traffic EngineeringMona Vale Town Centre - Balancing Place Making and Traffic Engineering
Mona Vale Town Centre - Balancing Place Making and Traffic Engineering
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
GM Symposium 2016: Brendhan Zubricki, Essex
GM Symposium 2016: Brendhan Zubricki, EssexGM Symposium 2016: Brendhan Zubricki, Essex
GM Symposium 2016: Brendhan Zubricki, Essex
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm Strategy
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017
 
Parramatta city river strategy
Parramatta city river strategyParramatta city river strategy
Parramatta city river strategy
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Urban design ppt - 21 09-16
Urban design ppt - 21 09-16Urban design ppt - 21 09-16
Urban design ppt - 21 09-16
 

Mehr von Transport Planning

Mehr von Transport Planning (7)

Terigal parking consultation report phase 1
Terigal parking consultation report phase 1Terigal parking consultation report phase 1
Terigal parking consultation report phase 1
 
Draft Gosford Strategic Parking Study
Draft Gosford Strategic Parking StudyDraft Gosford Strategic Parking Study
Draft Gosford Strategic Parking Study
 
FACT
FACT FACT
FACT
 
Fact Sheet
Fact SheetFact Sheet
Fact Sheet
 
Full bk bike strategy 2011 12 sept opt2
Full bk bike strategy 2011 12 sept opt2Full bk bike strategy 2011 12 sept opt2
Full bk bike strategy 2011 12 sept opt2
 
Gosford Cycleway Network
Gosford Cycleway NetworkGosford Cycleway Network
Gosford Cycleway Network
 
Preview: Full Doc Bikeplan2011
Preview: Full Doc Bikeplan2011Preview: Full Doc Bikeplan2011
Preview: Full Doc Bikeplan2011
 

Kürzlich hochgeladen

Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 

Kürzlich hochgeladen (20)

Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 

120619ppt 12 s1084000 council stratpol presentation

  • 1. Gosford City Council Umina Beach Village Transport Management and Accessibility Plan and Civic Place Master Plan Strat/Pol Presentation 19 June 2012 Umina Beach Village TMAP and Civic Place Master Plan
  • 2. Outline • Introduction • Brief and study context • Consultation • Transport and Access • Civic Place Master Plan Umina Beach Village TMAP and Civic Place Master Plan
  • 3. Brief and Study Context • Strategic planning for Umina Beach Village adopted by Council through the Peninsula Urban Directions Study will change the nature of the village centre into the long term. • Transport study needs to be able to respond to and support this change. • Masterplan study will allow Council to ensure quality design for buildings, landscaping and streetscapes. • Library is in need of renewal. • Greater community focus on active street life. Umina Beach Village TMAP and Civic Place Master Plan
  • 4. Consultation – what we have heard • Agencies • Preference for two-way traffic flow system (i.e. West Street) • Consider development bonuses for possible pedestrian links • Encourage more bicycle use • Consider potential weekend library hours • Address issues with development/construction staging: need to develop interim car parking plan • Road safety considerations • Increased use of motorised scooters need consideration • Need for traffic calming • Changing demographics provides opportunities for higher active transport use • Develop “ownership” within community: develop facilities that support community activities Umina Beach Village TMAP and Civic Place Master Plan
  • 5. Consultation – what we have heard • Business community • Improvements needed but cannot diminish supply of public parking • Reservations about competition with existing business from additional retail, cafes etc. • General support for civic square • New civic square will need to be directly linked to West Street. • West Street should still have traffic flows. • Better management of traffic at peak times Umina Beach Village TMAP and Civic Place Master Plan
  • 6. Consultation – what we have heard • General community • No loss of public parking • Concerns about “sale” of public assets by Council . • Better links from centre to the beach • West Street should continue to have street life • Better pedestrian amenity at crossings • Mixed views about desirability of civic square • Concerns about antisocial behaviour in new civic square • If square is to be created it should be larger and support a wide range of events i.e. markets, concerts, movies etc. • Support for improved library facilities • A number of traffic and pedestrian blackspots identified • Support for taking through traffic off West St • Public transport within the village is OK • better amenities at stations and destination points to continue to support use of public transport and cycling Umina Beach Village TMAP and Civic Place Master Plan
  • 7. Transport and Access • TMAP Overview and Objectives • Key findings and issues • Preliminary transport improvement options Umina Beach Village TMAP and Civic Place Master Plan
  • 8. TMAP Overview and Objectives • Overview • Assessment of transport impacts to identify a package of measures • Consideration of full transport impacts, not just traffic • Measures to include infrastructure and service improvements as well as policy considerations. • Objectives • Identify future transport and access requirements for Village Centre • Integrate master plan of proposed Civic Place Umina Beach Village TMAP and Civic Place Master Plan
  • 9. Key Transport Findings – Road Network Semi-grid with well-defined hierarchy Key north-south demand and network patterns within Peninsula Limited east-west connectivity (West Street and Bourke Road) Umina Beach Village TMAP and Civic Place Master Plan
  • 10. Key Transport Findings – Traffic Peak West Street flows in order of 400-500 vehicles per hour Traffic growth in peninsula will likely bring increased conflicts on West Street: West Street is key E-W link West Street is also main centre street Developments on both sides will bring increased pedestrian crossing volumes Umina Beach Village TMAP and Civic Place Master Plan
  • 11. Key Transport Findings – Parking Community places great importance on parking availability Existing Council carpark considered “heart” of village centre Peak parking utilisation surveyed is about 90% of capacity Peak average parking duration surveyed is between 1 to 2 hours Umina Beach Village TMAP and Civic Place Master Plan
  • 12. Key Transport Findings – Public Transport Existing bus network and services considered good Draft Central Coast Transport Strategy identifies strategic bus corridor on Ocean Beach Road Umina Beach Village TMAP and Civic Place Master Plan
  • 13. Key Transport Findings – Walking and Cycling Significant active transport opportunity with Peninsula’s flat topography Significant bicycle usage has been documented for Woy Woy station (NSW Bike Plan) Opportunities for linking Village Centre with the beach and beach activities / surf clubs Existing cycle route on Trafalgar Avenue provides external links to north, but does not continue further south to the beach Potential pedestrian safety issues in the future with increased traffic on West Street Existing cycle route issues on West Street (discontinuous: cyclists need to dismount) Umina Beach Village TMAP and Civic Place Master Plan
  • 14. Preliminary Traffic Measures Preference for two-way system of traffic flows in line with overall planning and urban design objectives – one way systems create potential issues with connectivity, safety and urban design Wellington Street as alternative vehicle access/bypass West Street could be designated as High Pedestrian Activity Area with 40 km/h speed limit Scenario modelling undertaken to date used background traffic growth rate to 50% of current levels, with up to 50% of West St through traffic diverting to Wellington St. Required intersection improvements to cater to future traffic with diversion: West St / Ocean Beach Rd – Roundabout West St / Trafalgar Ave – Roundabout with reconfigured pedestrian access and crossing Wellington St / Trafalgar Ave – Convert to roundabout Wellington St / Ocean Beach Rd – Convert to signals with turn lanes; impacts on westbound right turn from Ocean Beach Rd (may require closure). Umina Beach Village TMAP and Civic Place Master Plan
  • 15. Transport Structure • Key traffic routes • Key pedestrian links to beach Umina Beach Village TMAP and Civic Place Master Plan
  • 16. Intersection Improvements – Future (based on 50% growth + 50% diversion scenario) upgrade to signals Consider signalisation of Upgrade to pedestrian crossing roundabout Retain roundabout configuration Retain roundabout configuration Umina Beach Village TMAP and Civic Place Master Plan
  • 17. Preliminary Parking Measures General consensus to maintain existing Council carparking supply Integrate parking provision with Civic Place Master Plan, including rearranged on-street parking along Alfred St and Bullion St. Consider West St bicycle route in on-street parking arrangements. Reconfigure Wellington St to allow more unrestricted on-street parking. Investigate impacts of reduced parking ratio requirements for future village centre developments (e.g. visitor parking for residential uses). Umina Beach Village TMAP and Civic Place Master Plan
  • 18. Parking Install parking information signage Fomalise kerbside parking on Wellington St Integrate Council carpark and Alfred St/ Bullion St kerbside spaces with Civic Place Master Plan Consider bicycle route and 40 km/hr zone proposals in reorganising kerbside spaces Maintain existing restrictions Umina Beach Village TMAP and Civic Place Master Plan
  • 19. Preliminary Public Transport Measures Maintain existing bus network and frequencies Consider bus stop consolidation Improve wayfinding Umina Beach Village TMAP and Civic Place Master Plan
  • 20. Preliminary Pedestrian Measures Provide additional/upgraded crossings on Ocean Beach Road (Osborne Ave and Nowack Ave/Wellington St.) Integrate Trafalgar Ave pedestrian crossing with intersection upgrade Provide Wellington St pedestrian refuges (Alfred St, Bullion St) Improve pedestrian links with the beach and surf clubs, via Ocean Beach Rd Trafalgar Ave. Potential supplementary beach link via South St Improve footpaths along Alfred St, Bullion St between West St and Wellington St Improve Civic Place – West St pedestrian link (expand existing walkway) Integrate possible pedestrian links within lot amalgamations for increased permeability Improve east-west pedestrian links: Links to Civic Place (between Ocean Beach Road and Wellington Street) Pedestrian crossings on south side of West St (Berith St, South St) Umina Beach Village TMAP and Civic Place Master Plan
  • 21. Pedestrian improvements Integrate with future Wellington St/ Ocean Beach Rd Possible pedestrian links upgrade Potential raised threshold High Pedestrian Activity Area (40 km/hr zone) Consider future with entry signalisation of markers pedestrian crossing Umina Beach Village TMAP and Civic Place Master Plan
  • 22. Preliminary Cycling Measures Progress current bike plan proposals Ocean Beach Rd Trafalgar Ave West St Sydney Ave Improve bike crossing on Wellington St. Formalise bicycle parking facilities in village centre Compliance with DCP111 bike parking requirements for developments. Umina Beach Village TMAP and Civic Place Master Plan
  • 23. Cycling Facilities Existing off- road route Bike Plan proposals (on-road) Umina Beach Village TMAP and Civic Place Master Plan
  • 24. Other Preliminary Measures Consider transport improvements to Bourke Rd as key E-W connection in peninsula (e.g. Umina-Ettalong) Potential traffic management diversions for special events (e.g. close West St to traffic on market days). Umina Beach Village TMAP and Civic Place Master Plan
  • 25. Civic Place Master Plan Umina Beach Village TMAP and Civic Place Master Plan
  • 26. Gosford City Council Umina Beach Village Transport Management and Accessibility Plan and Civic Place Master Plan Strat/Pol Presentation 19 June 2012 Umina Beach Village TMAP and Civic Place Master Plan
  • 27. Location Umina Beach Village TMAP and Civic Place Master Plan
  • 28. Umina Beach Civic Place Master Plan Key Principles • Working within the Draft Gosford LEP Controls • No loss of public car parking spaces (retain 169 spaces) • Improved public domain • New civic space in Umina Beach with relocation of library, new community facilities and public square Umina Beach Village TMAP and Civic Place Master Plan
  • 29. Umina Beach Civic Place Master Plan In addition, a balanced approach was taken for the Civic Place Master Plan, this includes: • Urban design • Public domain • Built form • Economical development • Transport and traffic Umina Beach Village TMAP and Civic Place Master Plan
  • 30. Draft Gosford LEP 2009 • Land Zoning - B2 Local Centre • Floor Space Ratio - 1.8:1* • Height of Building - 14.25m* *(min. frontage and lot areas required) Umina Beach Village TMAP and Civic Place Master Plan
  • 31. Umina Beach Umina Beach Village TMAP and Civic Place Master Plan
  • 32. BUILDING ENVELOPES Note: The proposed Public Domain plan and Master Plans show building envelopes. The building envelopes are not buildings. The envelopes define the space within which quality buildings can occur. Umina Beach Village TMAP and Civic Place Master Plan
  • 33. Public Domain Plan • Pedestrian link of Umina Village Centre, Surf Club’s and Beach • Pedestrian footpaths • Street trees • On street parking • Street furniture • Bicycle paths / bicycle lock up rails Umina Beach Village TMAP and Civic Place Master Plan
  • 34. Pedestrian Link • Pedestrian link of Umina Village Centre, Surf Clubs and Beach Umina Beach Village TMAP and Civic Place Master Plan
  • 35. Pedestrian Link Paving Umina Beach Village TMAP and Civic Place Master Plan
  • 36. Pedestrian Link Public art Umina Beach Village TMAP and Civic Place Master Plan
  • 37. Pedestrian Link Street trees Umina Beach Village TMAP and Civic Place Master Plan
  • 38. Public Domain On-street carparking Umina Beach Village TMAP and Civic Place Master Plan
  • 39. Public Domain Street furniture Umina Beach Village TMAP and Civic Place Master Plan
  • 40. Public Domain Street furniture Umina Beach Village TMAP and Civic Place Master Plan
  • 41. Public Domain Laneways Umina Beach Village TMAP and Civic Place Master Plan
  • 42. Public Domain Laneways Umina Beach Village TMAP and Civic Place Master Plan
  • 43. Proposed Civic Place Master Plan Options Option 1 Proposal GROUND FLOOR PLAN -Retain 169 public car park spaces Public square Proposed relocation of library - Pedestrian link to West St / Public square / Civic Place Umina Beach Village TMAP and Civic Place Master Plan
  • 44. Proposed Civic Place Master Plan Options Option 1 Proposal OVERALL FLOOR PLAN -Retain 169 public car park spaces Public square Proposed relocation of library - Pedestrian link to West St / Public square / Civic Place Umina Beach Village TMAP and Civic Place Master Plan
  • 45. Proposed Civic Place Master Plan Options Option 1 Proposal SECTION AA Umina Beach Village TMAP and Civic Place Master Plan
  • 46. Proposed Civic Place Master Plan Options Option 1 Proposal SECTION BB Umina Beach Village TMAP and Civic Place Master Plan
  • 47. Proposed Civic Place Master Plan Options Option 1 Proposal PUBLIC DOMAIN PLAN -Retain 169 public car park spaces Public square Proposed relocation of library - Pedestrian link to West St / Public square / Civic Place Umina Beach Village TMAP and Civic Place Master Plan
  • 48. Proposed Civic Place Master Plan Options Option 2 Proposal GROUND FLOOR PLAN -Retain 169 public car park spaces Public square Proposed relocation of library Pedestrian link to West St / Public square / Civic Place Included are 2 lots to the north within the proposal Umina Beach Village TMAP and Civic Place Master Plan
  • 49. Proposed Civic Place Master Plan Options Option 2 Proposal OVERALL FLOOR PLAN -Retain 169 public car park spaces Public square Proposed relocation of library Pedestrian link to West St / Public square / Civic Place Included are 2 lots to the north within the proposal Umina Beach Village TMAP and Civic Place Master Plan
  • 50. Proposed Civic Place Master Plan Options Option 2 Proposal SECTION AA Umina Beach Village TMAP and Civic Place Master Plan
  • 51. Proposed Civic Place Master Plan Options Option 2 Proposal SECTION BB Umina Beach Village TMAP and Civic Place Master Plan
  • 52. Proposed Civic Place Master Plan Options Option 2 Proposal PUBLIC DOMAIN PLAN -Retain 169 public car park spaces Public square Proposed relocation of library Pedestrian link to West St / Public square / Civic Place Included are 2 lots to the north within the proposal Umina Beach Village TMAP and Civic Place Master Plan
  • 53. Public Domain Public spaces / squares examples Umina Beach Village TMAP and Civic Place Master Plan
  • 54. Public Domain Public spaces / squares examples Umina Beach Village TMAP and Civic Place Master Plan
  • 55. Built Form Built form examples Umina Beach Village TMAP and Civic Place Master Plan
  • 56. Built Form Built form examples Umina Beach Village TMAP and Civic Place Master Plan
  • 57. Built Form Built form examples Umina Beach Village TMAP and Civic Place Master Plan
  • 58. Indicative Sketches Indicative retail & residential street character Umina Beach Village TMAP and Civic Place Master Plan
  • 59. Indicative Sketches Indicative laneway character Umina Beach Village TMAP and Civic Place Master Plan
  • 60. Proposed Civic Place Master Plan Options Option 3 NO CHANGE - Public car park to remain as existing Umina Beach Village TMAP and Civic Place Master Plan
  • 61. Proposed Civic Place Master Plan Options Option 3 NO CHANGE Rear of shops and laneway Laneway and public carpark Public carpark Umina Beach Village TMAP and Civic Place Master Plan
  • 62. Proposed Civic Place Master Plan Options Option 3 NO CHANGE PUBLIC DOMAIN PLAN - Public car park to remain as existing Umina Beach Village TMAP and Civic Place Master Plan