SlideShare ist ein Scribd-Unternehmen logo
1 von 29
Under Construction:
Preservation Concerns During
Construction and Renovation
LYRASIS Preservation Services
Funded in part by a grant from the National Endowment for the
Endowment for the Humanities, Division of Preservation and
Preservation and Access.
Unit 4
Unit 4
– Interruptions in service
– Communication
– Security
– Accidents
Interruptions in Service:
Consider what may be dropped
• Interruptions in services during construction
projects are inevitable. One solution is to limit
the hours when this activity might be done; try to
arrange to have interruptions during off hours to
minimize disruption to staff and patrons,
especially during exam periods for academic
institutions or during planned public events.
Sometimes, however, interruptions are
unplanned, such as when an electrical line is
accidentally cut.
Interruptions in Service:
Consider what may be dropped
• Electricity
• Telephones
• Drinking Water
• Restroom Facilities
• Sprinklers
• Internet
• HVAC
What would you do?
Interruptions in Service:
Consider what may be dropped
• Staff should be prepared for these unplanned
interruptions and have a plan in place to
compensate. Whether the interruption was
planned or unplanned, it is important to
communicate with staff and patrons about the
temporary loss of service and inform them about
when they can expect the service to return.
Communicate
with Staff and Patrons
• Communication is an essential
component of any construction project.
Let staff and patrons know as soon as
possible about potential interruptions or
closures, reduced public services or
access to materials. As well as any
HVAC issues.
Communicate
with Staff and Patrons
• Staff should be updated regularly on
the progress of the projects. Provide
them with at least a few day’s notice
when construction activity is going to
effect their work.
Communicate
with Staff and Patrons
• If you need to bring in large
construction machines or quantities of
materials, try to find routes that will not
interrupt other activities and minimize
potential hazards for people entering or
exiting the building. People are used to
following established routes, and do not
always pay attention to changes.
Communicate
with Staff and Patrons
• Construction barriers and signs should
therefore be clearly marked and easy
to see. For example, utility trenches
need proper barriers and flashing lights.
Communicate
with Staff and Patrons
• People may travel long distances to use
special collections and archival
materials; begin publicizing about
potential interruptions as early as
possible. Ask users to call and check
on status before traveling to your
institution.
How can we get the word out??
Communicate
with Staff and Patrons
• Publicize on your institution’s website,
with physical signs in and around the
building, through email, list-servs,
exhibits and local media.
Communicate
with Staff and Patrons
• Publicizing the project – even
its potential inconveniences –
can provide you with a
positive public relation
opportunity. Emphasize
how the improvements to
the institution will enhance
the user’s experience.
Communicate
with Staff and Patrons
• Finally, be aware that every
construction project takes longer than
anticipated – be prepared for this when
you publicize a “reopening” date.
Security
Security
• Cultural institutions are especially vulnerable to theft,
vandalism, and mutilation during renovation and new
construction projects. Temporary holes in walls, and the
distribution of extra keys can result in losses of bulding
supplies, furniture, or even collection materials.
• Construction personnel, architects, building planners,
inspectors, and sub contractors all move around your
building, in area where they normally wouldn’t have
access. It is hard to keep straight who should and
should not be in areas normally closed to the public.
Security
How can you protect your building and collections during
the construction project?
Security
• Know who should and should not be in construction
areas. Ensure that all construction related personnel
wear identification badges. Have workers sign in and
out and request a one-day advance listing of who will be
working at your construction site. This will provide some
consistency in workers and help you track personnel
should a security issue arise.
• Create specific lock-up procedures at the end of the
day to minimize risk of theft. Staff should do a walk-
through at the end of each day to help identify losses
and potential security issues.
Security
• You may need to hire extra security for portions of the
building that become more vulnerable to break-in. Have
security personnel or police do additional walk-throughs
on nights and weekends.
• Finally, areas containing special collections or sensitive
archival materials should be locked unless a staff
member is present to accompany construction-related
personnel.
Accidents
• These are all causes of
accidents on the job
site.
• Equipment
• Cutting Corners
• Carelessness
• Fatigue
Accidents
• Make sure that the contractor you use have mechanisms
in place to ensure that construction workers have been
appropriately trained. Failure to do so can not only risk
injury to people, but to your collections as well.
• State clearly in contracts and in conversations that your
institution houses valuable and unique collections that
are irreplaceable. Preventing accidents from occurring is
less expensive that paying for costly repairs to valuable
collections.
Accidents
• Make sure that construction personnel clean up lumber,
broken glass, loose nail, and flammable materials and
dispose of them properly.
• Fatigue is often a cause of accidents. It is far better to
have a delay in opening your new space than to have a
disaster occur because the construction company is
rushing to finish.
• Clearly articulated and enforced safety procedures will
not only prevent damage to personnel, but protect your
institution’s collections as well.
Unit 4 Quiz
What Have You Learned?
Unit 4
• Question 1: When an interruption in service
occurs, the first thing you should do is …
– A: get whatever if damaged back online.
– B: communicate.
– C: blame the service provider.
– D: panic internally, remaining calm externally.
Unit 4
• Question 1: When an interruption in service
occurs, the first thing you should do is …
– Answer: B: communicate.
• You should let staff and patrons know about
interruptions and when the service will be restored.
Unit 4
• Question 2: Proper identification badges can
help discern what construction personnel have
permission to be in specific areas of the building.
– True or False?
Unit 4
• Question 2: Proper identification badges can
help discern what construction personnel have
permission to be in specific areas of the building.
– Answer: True
• Identification badges can help, but appointed staff
and the worksite supervisor need to have presence
on the job site to oversee the construction staff and
their restriction within the building.
Unit 4
• Question 3: What is not a primary cause of
accidents on the job site?
– A: Cutting Corners
– B: Equipment Malfunction
– C: Fatigue
– D: Carefulness
Unit 4
• Question 3: What is not a primary cause of
accidents on the job site?
– Answer: D: Carefulness
• We wish that all will be careful and not careless!
Thank You!
To continue Under Construction,
View Unit 5
Contact us if you have any questions.
LYRASIS Preservation Services
preservation@lyrasis.org

Weitere ähnliche Inhalte

Ähnlich wie Preservation Concerns During Construction and Renovation

under construction unit 1
under construction unit 1under construction unit 1
under construction unit 1LYRASIS
 
Fire Life Safety- Evacuation Drills- By Richard Garrity 2015
Fire Life Safety- Evacuation Drills- By Richard Garrity 2015Fire Life Safety- Evacuation Drills- By Richard Garrity 2015
Fire Life Safety- Evacuation Drills- By Richard Garrity 2015Richard Garrity
 
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...Thorne & Derrick International
 
Construction Engineering Management Entrepreneur.pptx
Construction Engineering Management Entrepreneur.pptxConstruction Engineering Management Entrepreneur.pptx
Construction Engineering Management Entrepreneur.pptxHIRA466344
 
Autonomous Maintenance.pdf
Autonomous Maintenance.pdfAutonomous Maintenance.pdf
Autonomous Maintenance.pdfNiteshHirani
 
Disaster Shield Power Point Current 9 7 11
Disaster Shield Power Point Current 9 7 11Disaster Shield Power Point Current 9 7 11
Disaster Shield Power Point Current 9 7 11timothyford
 
Fire safety awareness sections 7 11
Fire safety awareness sections 7 11Fire safety awareness sections 7 11
Fire safety awareness sections 7 11fireawareness
 
2012 FEPA Presentation: Donald Morris
2012 FEPA Presentation: Donald Morris2012 FEPA Presentation: Donald Morris
2012 FEPA Presentation: Donald MorrisFloridaPipeTalk
 
Human-Factors-Safety-Moment-Final.pptx
Human-Factors-Safety-Moment-Final.pptxHuman-Factors-Safety-Moment-Final.pptx
Human-Factors-Safety-Moment-Final.pptxAliZaminSyed
 
Building evacuations & emergencies
Building evacuations & emergenciesBuilding evacuations & emergencies
Building evacuations & emergenciesTerry Masse
 
CISSP week 26
CISSP week 26CISSP week 26
CISSP week 26jemtallon
 
HSE-BMS-004 Supervisors Training.ppt
HSE-BMS-004 Supervisors Training.pptHSE-BMS-004 Supervisors Training.ppt
HSE-BMS-004 Supervisors Training.pptGkMechanical
 
Asbestos New Guide Lucion
Asbestos New Guide LucionAsbestos New Guide Lucion
Asbestos New Guide LucionAlan Bassett
 

Ähnlich wie Preservation Concerns During Construction and Renovation (20)

under construction unit 1
under construction unit 1under construction unit 1
under construction unit 1
 
Fire Life Safety- Evacuation Drills- By Richard Garrity 2015
Fire Life Safety- Evacuation Drills- By Richard Garrity 2015Fire Life Safety- Evacuation Drills- By Richard Garrity 2015
Fire Life Safety- Evacuation Drills- By Richard Garrity 2015
 
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
 
Advance management for civil engineering
Advance management for civil engineeringAdvance management for civil engineering
Advance management for civil engineering
 
Lone Working Policy
Lone Working Policy Lone Working Policy
Lone Working Policy
 
Construction Engineering Management Entrepreneur.pptx
Construction Engineering Management Entrepreneur.pptxConstruction Engineering Management Entrepreneur.pptx
Construction Engineering Management Entrepreneur.pptx
 
Insurance Risk
Insurance RiskInsurance Risk
Insurance Risk
 
Autonomous Maintenance.pdf
Autonomous Maintenance.pdfAutonomous Maintenance.pdf
Autonomous Maintenance.pdf
 
Lone Working Policy
Lone Working PolicyLone Working Policy
Lone Working Policy
 
Disaster Shield Power Point Current 9 7 11
Disaster Shield Power Point Current 9 7 11Disaster Shield Power Point Current 9 7 11
Disaster Shield Power Point Current 9 7 11
 
Fire safety awareness sections 7 11
Fire safety awareness sections 7 11Fire safety awareness sections 7 11
Fire safety awareness sections 7 11
 
MarathonHR Workplace Safety Program
MarathonHR Workplace Safety Program MarathonHR Workplace Safety Program
MarathonHR Workplace Safety Program
 
2012 FEPA Presentation: Donald Morris
2012 FEPA Presentation: Donald Morris2012 FEPA Presentation: Donald Morris
2012 FEPA Presentation: Donald Morris
 
Human-Factors-Safety-Moment-Final.pptx
Human-Factors-Safety-Moment-Final.pptxHuman-Factors-Safety-Moment-Final.pptx
Human-Factors-Safety-Moment-Final.pptx
 
Building evacuations & emergencies
Building evacuations & emergenciesBuilding evacuations & emergencies
Building evacuations & emergencies
 
CV BAIJU
CV  BAIJUCV  BAIJU
CV BAIJU
 
CISSP week 26
CISSP week 26CISSP week 26
CISSP week 26
 
HSE-BMS-004 Supervisors Training.ppt
HSE-BMS-004 Supervisors Training.pptHSE-BMS-004 Supervisors Training.ppt
HSE-BMS-004 Supervisors Training.ppt
 
Chris Turner
Chris TurnerChris Turner
Chris Turner
 
Asbestos New Guide Lucion
Asbestos New Guide LucionAsbestos New Guide Lucion
Asbestos New Guide Lucion
 

Mehr von LYRASIS

Preservation quick tips: Test your Disaster Plan
Preservation quick tips: Test your Disaster Plan Preservation quick tips: Test your Disaster Plan
Preservation quick tips: Test your Disaster Plan LYRASIS
 
Preparing Audiovisual Collections for Outsourced Digitization
Preparing Audiovisual Collections for Outsourced Digitization Preparing Audiovisual Collections for Outsourced Digitization
Preparing Audiovisual Collections for Outsourced Digitization LYRASIS
 
Keeping you and your library safe and secure
Keeping you and your library safe and secureKeeping you and your library safe and secure
Keeping you and your library safe and secureLYRASIS
 
Ala cspace aspace rep services demo 2015
Ala cspace aspace rep services demo 2015Ala cspace aspace rep services demo 2015
Ala cspace aspace rep services demo 2015LYRASIS
 
Know your rights
Know your rightsKnow your rights
Know your rightsLYRASIS
 
Tracking stormy weather
Tracking stormy weatherTracking stormy weather
Tracking stormy weatherLYRASIS
 
LYRASIS Mammoth materials unit2
LYRASIS Mammoth materials unit2 LYRASIS Mammoth materials unit2
LYRASIS Mammoth materials unit2 LYRASIS
 
under construction unit 3
under construction unit 3under construction unit 3
under construction unit 3LYRASIS
 
Fundamentals of Book Repair
Fundamentals of Book RepairFundamentals of Book Repair
Fundamentals of Book RepairLYRASIS
 
Preserving Family Treasures
Preserving Family TreasuresPreserving Family Treasures
Preserving Family TreasuresLYRASIS
 
Care and Handling of Library Materials
Care and Handling of Library MaterialsCare and Handling of Library Materials
Care and Handling of Library MaterialsLYRASIS
 
Developing A Grant Proposal
Developing A Grant ProposalDeveloping A Grant Proposal
Developing A Grant ProposalLYRASIS
 

Mehr von LYRASIS (12)

Preservation quick tips: Test your Disaster Plan
Preservation quick tips: Test your Disaster Plan Preservation quick tips: Test your Disaster Plan
Preservation quick tips: Test your Disaster Plan
 
Preparing Audiovisual Collections for Outsourced Digitization
Preparing Audiovisual Collections for Outsourced Digitization Preparing Audiovisual Collections for Outsourced Digitization
Preparing Audiovisual Collections for Outsourced Digitization
 
Keeping you and your library safe and secure
Keeping you and your library safe and secureKeeping you and your library safe and secure
Keeping you and your library safe and secure
 
Ala cspace aspace rep services demo 2015
Ala cspace aspace rep services demo 2015Ala cspace aspace rep services demo 2015
Ala cspace aspace rep services demo 2015
 
Know your rights
Know your rightsKnow your rights
Know your rights
 
Tracking stormy weather
Tracking stormy weatherTracking stormy weather
Tracking stormy weather
 
LYRASIS Mammoth materials unit2
LYRASIS Mammoth materials unit2 LYRASIS Mammoth materials unit2
LYRASIS Mammoth materials unit2
 
under construction unit 3
under construction unit 3under construction unit 3
under construction unit 3
 
Fundamentals of Book Repair
Fundamentals of Book RepairFundamentals of Book Repair
Fundamentals of Book Repair
 
Preserving Family Treasures
Preserving Family TreasuresPreserving Family Treasures
Preserving Family Treasures
 
Care and Handling of Library Materials
Care and Handling of Library MaterialsCare and Handling of Library Materials
Care and Handling of Library Materials
 
Developing A Grant Proposal
Developing A Grant ProposalDeveloping A Grant Proposal
Developing A Grant Proposal
 

Kürzlich hochgeladen

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 

Kürzlich hochgeladen (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 

Preservation Concerns During Construction and Renovation

  • 1. Under Construction: Preservation Concerns During Construction and Renovation LYRASIS Preservation Services Funded in part by a grant from the National Endowment for the Endowment for the Humanities, Division of Preservation and Preservation and Access. Unit 4
  • 2. Unit 4 – Interruptions in service – Communication – Security – Accidents
  • 3. Interruptions in Service: Consider what may be dropped • Interruptions in services during construction projects are inevitable. One solution is to limit the hours when this activity might be done; try to arrange to have interruptions during off hours to minimize disruption to staff and patrons, especially during exam periods for academic institutions or during planned public events. Sometimes, however, interruptions are unplanned, such as when an electrical line is accidentally cut.
  • 4. Interruptions in Service: Consider what may be dropped • Electricity • Telephones • Drinking Water • Restroom Facilities • Sprinklers • Internet • HVAC What would you do?
  • 5. Interruptions in Service: Consider what may be dropped • Staff should be prepared for these unplanned interruptions and have a plan in place to compensate. Whether the interruption was planned or unplanned, it is important to communicate with staff and patrons about the temporary loss of service and inform them about when they can expect the service to return.
  • 6. Communicate with Staff and Patrons • Communication is an essential component of any construction project. Let staff and patrons know as soon as possible about potential interruptions or closures, reduced public services or access to materials. As well as any HVAC issues.
  • 7. Communicate with Staff and Patrons • Staff should be updated regularly on the progress of the projects. Provide them with at least a few day’s notice when construction activity is going to effect their work.
  • 8. Communicate with Staff and Patrons • If you need to bring in large construction machines or quantities of materials, try to find routes that will not interrupt other activities and minimize potential hazards for people entering or exiting the building. People are used to following established routes, and do not always pay attention to changes.
  • 9. Communicate with Staff and Patrons • Construction barriers and signs should therefore be clearly marked and easy to see. For example, utility trenches need proper barriers and flashing lights.
  • 10. Communicate with Staff and Patrons • People may travel long distances to use special collections and archival materials; begin publicizing about potential interruptions as early as possible. Ask users to call and check on status before traveling to your institution. How can we get the word out??
  • 11. Communicate with Staff and Patrons • Publicize on your institution’s website, with physical signs in and around the building, through email, list-servs, exhibits and local media.
  • 12. Communicate with Staff and Patrons • Publicizing the project – even its potential inconveniences – can provide you with a positive public relation opportunity. Emphasize how the improvements to the institution will enhance the user’s experience.
  • 13. Communicate with Staff and Patrons • Finally, be aware that every construction project takes longer than anticipated – be prepared for this when you publicize a “reopening” date.
  • 15. Security • Cultural institutions are especially vulnerable to theft, vandalism, and mutilation during renovation and new construction projects. Temporary holes in walls, and the distribution of extra keys can result in losses of bulding supplies, furniture, or even collection materials. • Construction personnel, architects, building planners, inspectors, and sub contractors all move around your building, in area where they normally wouldn’t have access. It is hard to keep straight who should and should not be in areas normally closed to the public.
  • 16. Security How can you protect your building and collections during the construction project?
  • 17. Security • Know who should and should not be in construction areas. Ensure that all construction related personnel wear identification badges. Have workers sign in and out and request a one-day advance listing of who will be working at your construction site. This will provide some consistency in workers and help you track personnel should a security issue arise. • Create specific lock-up procedures at the end of the day to minimize risk of theft. Staff should do a walk- through at the end of each day to help identify losses and potential security issues.
  • 18. Security • You may need to hire extra security for portions of the building that become more vulnerable to break-in. Have security personnel or police do additional walk-throughs on nights and weekends. • Finally, areas containing special collections or sensitive archival materials should be locked unless a staff member is present to accompany construction-related personnel.
  • 19. Accidents • These are all causes of accidents on the job site. • Equipment • Cutting Corners • Carelessness • Fatigue
  • 20. Accidents • Make sure that the contractor you use have mechanisms in place to ensure that construction workers have been appropriately trained. Failure to do so can not only risk injury to people, but to your collections as well. • State clearly in contracts and in conversations that your institution houses valuable and unique collections that are irreplaceable. Preventing accidents from occurring is less expensive that paying for costly repairs to valuable collections.
  • 21. Accidents • Make sure that construction personnel clean up lumber, broken glass, loose nail, and flammable materials and dispose of them properly. • Fatigue is often a cause of accidents. It is far better to have a delay in opening your new space than to have a disaster occur because the construction company is rushing to finish. • Clearly articulated and enforced safety procedures will not only prevent damage to personnel, but protect your institution’s collections as well.
  • 22. Unit 4 Quiz What Have You Learned?
  • 23. Unit 4 • Question 1: When an interruption in service occurs, the first thing you should do is … – A: get whatever if damaged back online. – B: communicate. – C: blame the service provider. – D: panic internally, remaining calm externally.
  • 24. Unit 4 • Question 1: When an interruption in service occurs, the first thing you should do is … – Answer: B: communicate. • You should let staff and patrons know about interruptions and when the service will be restored.
  • 25. Unit 4 • Question 2: Proper identification badges can help discern what construction personnel have permission to be in specific areas of the building. – True or False?
  • 26. Unit 4 • Question 2: Proper identification badges can help discern what construction personnel have permission to be in specific areas of the building. – Answer: True • Identification badges can help, but appointed staff and the worksite supervisor need to have presence on the job site to oversee the construction staff and their restriction within the building.
  • 27. Unit 4 • Question 3: What is not a primary cause of accidents on the job site? – A: Cutting Corners – B: Equipment Malfunction – C: Fatigue – D: Carefulness
  • 28. Unit 4 • Question 3: What is not a primary cause of accidents on the job site? – Answer: D: Carefulness • We wish that all will be careful and not careless!
  • 29. Thank You! To continue Under Construction, View Unit 5 Contact us if you have any questions. LYRASIS Preservation Services preservation@lyrasis.org