SlideShare ist ein Scribd-Unternehmen logo
1 von 66
Planning of the energy saving and efficiency interventions and of the use of renewable energy resources for the municipal administration of Padua Assessorato all’Ambiente Comune di Padova
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Introduction   Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Introduction   Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables
[object Object],[object Object],[object Object],[object Object],Quality of the plants (environmental advantages) Management  system (environmental advantages) Supply contract High Poor Excellent Absent Very bad Good Introduction   Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables
[object Object],Introduction   Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables Total consumer  bodies 270 575 33 50 Magazzini, laboratori, banchi mercato, servizi ambulanti e altre utenze Various sectors - 18 Illuminazione, giardini, irrigazione Open spaces, parks and gardens - 175 Illuminazione, insegne luminose, semafori Mobility and traffic 5 14 Uffici, autorimesse, telecamere Police 30 35 Uffici Institutions, judicial services, municipal and residential buildings, Monuments and other sectors 3 22 Uffici, cimiteri Demographical services - 20 Illuminazione, pompe, impianti di sollevamento Infrastructures e sport plants 5 25 Uffici, altri impianti sportivi 10 15 Campi sportivi 8 9 Stadi, palazzetti, palestre Sport facilities 17 21 Uffici, centri civici, centri di quartiere Decentration 23 42 Uffici, centri sociali, centri polifunzionali Social services 4 5 Biblioteche 7 10 Musei Museums and libraries 1 13 Teatro Verdi, mostre, manifestazioni Cultural activities 33 23 Scuole medie 54 47 Scuole elementari 22 16 Scuole materne 15 15 Asili nido Schools Ut. termiche Ut. elettriche Tipologia utenza
[object Object],Introduction   Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables 100% 2.107.716,29 100% 15.363.182 6% 116.938,90 5% 796.825 Other 2% 48.010,70 2% 323.083 Cemetery services 1% 20.077,28 1% 86.721 Open spaces, parks and gardens 14% 298.914,72 14% 2.085.021 Sports facilities 7% 139.927,59 9% 1.445.667 Mobility and traffic 1% 14.164,10 1% 104.408 Municipal Police  4% 88.584,65 4% 551.422 Social and neighbourhood services 15% 316.882,45 16% 2.428.070 Cultural services 13% 266.919,65 13% 1.963.965 Judicial services 17% 357.986,60 17% 2.627.785 Technical and administration services 21% 439.309,65 19% 2.950.215 Schools Expenses %  Total expenses (€) Energy %  Total energy cons. (kWh)
[object Object],[object Object],Introduction   Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables
[object Object],[object Object],Introduction   Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables
[object Object],Quality of the plants (Environmental advantages) System Management (Environmental advantages) Supply contracts Very bad Good Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables
[object Object],Quality of the plants system Management Supply contract Very bad Good Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables
[object Object],system Management Supply contract Very bad Good Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables Quality of the plants
[object Object],system Management Supply contract Very bad Good Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables Quality of the plants BT via dei livello 2 Teatro verdi 15 MT c.so Australia sn Foro Boario 14 BT via Aleardi 30 Ex dormitori pubblici 13 BT via Pierobon 19B Sc. media Briosco succ. 12 BT p.le azzurri D'italia 11 Palazzetto sport 11 BT via Cassan 9 Uffici Amministrativi 10 MT via S. Marco sn  Palasport S. Lazzaro 9 BT p.to della Valle 97 Ex caserma VV.F. 8 BT via Gozzi sn Uffici vari  7 BT via VIII febbraio Uffici vari 6 MT via F. P. Sarpi 2 Uffici vari 5 MT via Prospero Alpino Stadio Euganeo 4 BT via due palazzi  Aula giudiziaria 3 MT via Tommaseo 55 Nuovo tribunale 2 MT p.zza eremitani sn Museo Eremitani 1 BT via del Cimitero Cimitero 21 BT via Lippi Scuola media 20 BT via Pelosa Impianto sportivo 19 BT p.zza Capitaniato Ufficio anagrafe 18 BT galleria Pedrocchi Sala Rossini 17 BT sottopasso della Stua Sottopasso 16
6. IMPOSTE   (dipendono dalle disposizioni fiscali in essere e dal regime fiscale del punto di prelievo) Negotiable part of the final price 1. ENERGY 4. TRASPORTO 5. MAGGIORAZIONI 2. PERDITE  3. DISPACCIAMENTO Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables 0 10 20 30 40 50 60 70 80 90 100
[object Object],[object Object],[object Object],[object Object],system Management Supply contract Very bad Good Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables Quality of the plants
[object Object],Quality of the plants Management System Supply contract High Poor Excellent Absent Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables
Quality of the plants system Management Supply contract High Poor ,[object Object],Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables € 1.725.000 Annual cost of electrical energy W 153 Average unit power of the operating lamps kW 4.391 Total electrical power requested by the system h/anno 4.100 Average annual lighting hours (11 h/day) € /lamp. ~  60 Annual maintainance cost per operating lamp € /lamp. ~  60 Annual cost of electrical energy per operating lamp € 1.725.000 Annual system maintainance cost  € /kWh 0,0958 Unit price of electrical energy kWh 18.000.000 Annual consumption of electrical energy 10.000 Number of yearly replaced lamps 6.534 Number of serial lamps 22.206 Number of derivation lamps 28.740 Total number of operating lamps
Qualità degli impianti system Management Supply contract High Poor ,[object Object],Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables 100 28.740 Total lamps 2,8 805 Sodio altissima pressione 0,1 29 Sodio bassa pressione 25,8 7.415 Sodio alta pressione (tubolare) 10,2 2.931 Sodio alta pressione (ellissoidale) 38,0 10.921 Vapori di mercurio 0,5 144 Ioduri metallici 5,6 1.609 Fluorescenza 17,0 4.886 Incandescenza % Nr. of lamps Lamp Typology
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Quality of the plants system Management Supply contract High Poor ,[object Object],Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables
Quality of the plants system Management Supply contract High Poor ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Excellent Absent Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables
Quality of the plants system Management Supply contract High Poor Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables 113,0 Mlm 1.106 kW Total emitted power and luminous flux 45,8 Mlm 316 kW 5.269 lampade al sodio a bassa pressione (potenza media di 60 W ed eff. luminosa pari a 145 lm/W) 67,2 Mlm 790 kW 10.538 lampade al sodio ad alta pressione (potenza media di 75 W ed eff. luminosa pari a 85 lm/W) After the intervention 77,2 Mlm 2.530 kW Total emitted power and luminous flux 58,9 Mlm 1.310 kW 10.921 lampade ai vapori di mercurio (potenza media di 120 W ed eff. luminosa pari a 45 lm/W) 18,3 Mlm 1.220 kW 4.886 lampade ad incandescenza (potenza media di 250 W ed eff. luminosa pari a 15 lm/W) Before the intervention Luminous flux  Power Number and technical data of the installed lamps 3.853 t 560.000 € 5.838.000 kWh 35,8 Mlm 1.424 kW = 0,66 t/MWh x 5.838 MWh Annually spared CO 2  emissions  = 5.838.000 kWh x 0,0958 €/kWh Annual energy cost saving = 1.424 kW x 4.100 h Annual electricity saving = 113,0 Mlm – 77,2 Mlm Increase of the luminous flux = 2.530 kW – 1.106 kW Reduction of used power
Qualità degli impianti system Management Supply contract High Poor ,[object Object],Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables 9 MT Santa Chiara 78 (+10) Totale trasformatori 10 MT Trasformatori di riserva 5 MT Palermo 7 MT Scardeone 13 MT Codalunga 9 MT Crescini 4 MT Cave 9 MT Santa Croce 8 MT San Giovanni 5 MT Arco Valaresso 5 MT Piacentino 2 BT Valmarana 2 BT Portello N. trasf. Tensione Cabina di alimentazione in serie
Qualità degli impianti system Management Supply contract High Poor ,[object Object],[object Object],[object Object],[object Object],Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables =   0,66 t/MWh x 235 MWh =   235.000 kWh x 0,0958 €/kWh = 0,085 x 2.765.000 kWh 155 t Annual avoided emissions of CO 2 22.500 € Annual energy expense saving 235.000 kWh Annual energy savings
Qualità degli impianti system Management Supply contract High Poor ,[object Object],[object Object],[object Object],[object Object],[object Object],Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables =   0,66 t/MWh x 470 MWh =   469.850 kWh x 0,0958 €/kWh = 0,05 x 9.397.000 kWh 310 t Annual avoided emissions of CO 2 45.000 € Annual energy expense saving 469.850 kWh Annual energy savings
Quality of the plants system Management Supply contract High Poor ,[object Object],Introduction  Supply Contracts Public lighting  Traffic lights  Buildings  Transport  Renewables = 850 kW x 150 €/kW 127.500 € Installazione dei regolatori di flusso = 30 x 17.000 €/conv. 510.000 € Sostituzione dei trasf. serie con 30 regolatori statici 4.327.500 € Total costs = 12.300 x 300 €/arm. 3.690.000 € Sostituzione di 12.300 armature comprensive di lampada Investment costs 5 years Return time of the investment 4.318 t  CO 2 6.543 MWh 874.700 € Total benefits ----- ----- 200.000 € Riduzione dei costi di manutenzione (-12%) 310 t CO 2 470 MWh 45.000 € Installazione 100 regolatori di flusso ----- ----- 47.200 € Titoli di efficienza energetica (472 TEP) 155 t CO 2 235 MWh 22.500 € Sostituzione trasf. con regolatori statici Minor consumo per lampade a maggior efficienza Annual economic and environment benefits 3.853 t CO 2 5.838 MWh 560.000 €
[object Object],Quality of the plants system Management Supply contract High Poor Introduction  Supply Contracts Public lighting Traffic lights   Buildings   Transport  Renewables
Qualità degli impianti system Management Supply contract High Poor ,[object Object],[object Object],Introduction  Supply Contracts Public lighting Traffic lights   Buildings   Transport  Renewables
Quality of the plants system Management Supply contract High Poor ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights   Buildings   Transport  Renewables kWh 440.190 Total annual consumption 327.761 278.460 140 49.301 0,112 88.038 352.152 60,30 1.989 600 1.389 € Total annual expense € Total annual maintainance expenses € Total annual lamp maintainance expenses € Total annual electricity expense € /kWh Average electricity price kWh Total annual consumption (23:00-7:00) kWh Total annual consumption (7:00-23:00) kW Totale power Total lamps Number of lamps diam. 200 mm (70 W) Number of lamps diam. 300 mm (100 W)
[object Object],Introduction  Supply Contracts Public lighting Traffic lights   Buildings   Transport  Renewables 102.908 97.230 70 5.678 0,112 10,14 40.560 50.700 7 15 1.389 LED kWh 338.000 Total annual consumption 232.315 194.460 140 37.855 0,112 68.000 270.000 46 100 1.389 Incandesc. € Total annual expense € Total annual maintainance expenses € Total annual lamp maintainance expenses € Total annual electricity expense € /kWh Average electricity price kWh Total annual consumption (23:00-7:00) kWh Total annual consumption (7:00-23:00) kW Total power W Power of each lamp Number of lamps diam. 300 mm (100 W)
Quality of the plants system Management Supply contract High Poor ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights   Buildings   Transport  Renewables 463.000 € Total costs = 463 x 1.000 €/lamp 463.000 € Replacement of 463 traffic lights diam. 300 mm, including supply and installation Investment costs 3,5 years Return time of the investment 190 t  CO 2 287 MWh 135.907 € Total benefits ----- ----- 97.230 € Reduced maintainance costs ----- ----- 6.500 € Energy efficiency certificates (65 TEP) Reduced electricity consumption Annual economic and environment benefits 190 t CO 2 287 MWh 32.177 €
[object Object],Quality of the plants System management Supply contract High Poor Excellent Absent Very bad Good Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Quality of the plants Management system Supply contract Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Electricity consumption Quality of the plants Supply contract ,[object Object],Management system Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Quality of the plants Supply contract ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Management system Electricity consumption Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Electricity Consumption Quality of the plants Supply contract ,[object Object],Management system Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables 13,0% 48.262 287.271 371.435 22,3 (Average value) 2.210.925 78 Total 13,5% 17.621 104.888 130.957 14,8 779.508 18 Scuole medie 13,2% 21.607 128.616 163.969 15,4 976.004 39 Scuole elementari 14,1% 7.728 46.002 54.991 27,7 327.326 15 Scuole materne 6,1% 1.305 7.765 21.519 31,3 128.087 6 Asili nido % saving Economic saving (€/year) Energy saving (kWh/year) Energy expenses (€/year) Average specific electricity consumption (kWh/m 2 /year) Electricity consumption (kWh/year) Nr. users
Consumi elettrici ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Consumi elettrici ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Consumi elettrici ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Consumi elettrici ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Electricity consumption Quality of the plants Supply contract ,[object Object],Management system Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables 22,1% 8.694 51.752 39.382 28,0 (Average value) 234.415 11 Total 15,1% 847 5.041 5.611 39,2 33.399 4 Campi sportivi 23,2% 7.847 46.711 33.771 16,8 201.016 7 Palestre % saving Economic saving (€/year) Energy saving (kWh/year) Energy expenses (€/year) Average specific electricity consumption (kWh/m 2 /year) Electricity consumption (kWh/year) Nr. users
Consumi elettrici ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Consumi elettrici ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Quality of the plants Supply contract ,[object Object],Management system Thermal consumption Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Consumi termici ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Consumi termici ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
[object Object],Consumi termici Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
[object Object],Consumi termici Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Consumi termici ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Consumi termici ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables
Thermal consumption ,[object Object],Quality of the plants system Management Supply contract  Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables ton 5.270 ton 7.670 g/kWh 200 ton 12.940 g/kWh 270 CO 2 kg 154 kg 19 mg/kWh 0,5 kg 173 mg/kWh 3,6 Polveri Emissioni annue evitate Emissioni totali annue Emissioni specifiche Emissioni totali annue Emissioni specifiche    METHANE BOILERS FUEL BOILERS
Thermal consumption ,[object Object],Quality of the plants system Management Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport  Renewables Supply contract  € 411.233 € 1.397.888 € 1.809.120 Total cost (2003/2004) W/mc 26 W/mc 30 W/mc 56 Average power heated mc kW 116 kW 165 kW 280 kcal/h 99.535 kcal/h 141.573 kcal/h 241.109 Average boiler power kW 7.518 kW 10.693 kW 18.211 kcal/h 6.469.788 kcal/h 9.202.272 kcal/h 15.672.060 Total power       65   65 Nr. boilers SAVINGS METHANE BOILERS FUEL BOILERS
[object Object],Quality of the plants System Management High Poor Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport   Renewables Supply contract
[object Object],Quality of the plants Management system High Poor Excellent Absent Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport   Renewables Supply contract
[object Object],Quality of the plants Management system High Poor Excellent Absent Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport   Renewables Supply contract  100,0 414 Total motor vehicles 1,4 6 Quadricicli 2,2 9 Rimorchi 2,2 9 Autocarri pesanti 2,7 11 Veicoli speciali 2,9 12 Motocarri 3,1 13 Ciclomotori 7,0 29 Macchine operatrici 11,1 46 Motocicli 16,2 67 Autocarri leggeri 51,2 212 Autovetture % vehicles Nr. vehicles  Motor vehicle typology
[object Object],Quality of the plants Management system High Poor Excellent Absent Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport   Renewables Supply contract  100,0 414 Total motor vehicles 21,5 89 Altro 2,9 12 Servizi sociali 3,1 13 Provveditorato 3,9 16 Protezione civile 4,3 18 Organi istituz. e affari generali 7,0 29 Verde, parchi, giardini e arr. urb. 9,4 39 Servizi demografici 18,1 75 Manutenzioni 29,7 123 Polizia municipale % vehicles Nr. vehicles Sector
[object Object],Quality of the plants Management system High Poor Excellent Absent Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport   Renewables Supply contract  100,0 414 Total motor vehicles  2,2 9 Nessun carburante (rimorchi) 7,2 30 Non precisato (macch. operatrici) 0,2 1 Benzina e metano 0,2 1 Motore elettrico 3,1 13 Miscela 11,8 49 Gasolio 14,7 61 GPL 60,4 250 Benzina % vehicles Nr. vehicles Fuel tipology
[object Object],Quality of the plants Management system High Poor Excellent Absent Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport   Renewables Supply contract  1,4 6 Non precisato 42,5 176 2000-2005 32,9 136 1995-1999 13,3 55 1990-1994 6,8 28 1985-1989 3,1 13 1980-1984 % mezzi Nr. vehicles Registration period
[object Object],Quality of the plants Management system High Poor Excellent Absent Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport   Renewables Supply contract  100,0 563.173 Spesa totale 2,0 11.091 Car wash 6,2 34.983 Taxes 12,7 71.658 Insurance 38,3 215.728 Maintainance 40,8 229.713 Fuel % spesa Spesa (€) Voci di spesa
[object Object],Quality of the plants Management system High Poor Excellent Absent Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport   Renewables Supply contract  100,0 229.713 Total expense 1,0 2.281 Miscela 14,3 32.890 GPL 17,6 40.433 Gasolio 67,1 154.109 Benzina % spesa Expense (€) Fuel typology
[object Object],Quality of the plants Management system High Poor Excellent Absent Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport   Renewables Supply contract  7.020 0,111 66 Total lorries 7.780 0,095 21 Autocarri a gpl 7.630 0,137 19 Autocarri a gasolio 5.650 0,117 26 Autocarri a benzina 7.230 0,100 212 Total cars 5.120 0,084 40 Autovetture a gpl 11.290 0,083 12 Autovetture a gasolio 7.620 0,104 160 Autovetture a benzina Average annual distance covered (km) Average fuel cost (€/km) Nr. vehicles Motor vehicle type
[object Object],Quality of the plants Management system High Poor Excellent Absent ,[object Object],Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport   Renewables Supply contract  - 2 70 0,08 Elettrico 35 0 140 0,60 Metano 90 0 175 0,75 GPL 80 60 170 0,45 Gasolio 160 2 190 2,40 Benzina Ozono (mg/km) PM 10  (mg/km) CO 2  (g/km) CO (g/km)
[object Object],Quality of the plants Management system High Poor Excellent Absent Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport   Renewables Supply contract  1,3 years 1,7 years 2,2 years 3,3 years Return time 1.475 € 1.180 € 885 € 590 € Risparmio economico 1.125 € 900 € 675 € 450 € Costo a metano (0,045 €/km) 2.600 € 2.080 € 1.560 € 1.040 € Costo a benzina (0,104 €/km) 25.000 km 20.000 km 15.000 km 10.000 km CARS 1,2 years 1,5 years 2 years 3 years Return time 1.675 € 1.340 € 1.005 € 670 € Risparmio economico 1.250 € 1.000 € 750 € 500 € Costo a metano (0,050 €/km) 2.925 € 2.340 € 1.755 € 1.170 € Costo a benzina (0,117 €/km) 25.000 km 20.000 km 15.000 km 10.000 km LORRIES
[object Object],Quality of the plants Management system High Poor Excellent Absent Introduction  Supply Contracts Public lighting Traffic lights  Buildings   Transport   Renewables Supply contract  38 600 14 540 Annually spared emissions -80% -100% -26% -75% Variation 10 0 42 180 Motor cars on methane 48 600 56 720 Motor cars on petrol Ozon (kg) PM 10  (g) CO 2  (t) CO (kg)
[object Object],Quality of the plants Management system Supply contract High Poor Excellent Absent Very bad Good Introduction  Supply Contracts Public lighting Traffic lights  Buildings  Transport  Renewables
[object Object],[object Object],[object Object],Introduction  Supply Contracts Public lighting Traffic lights  Buildings  Transport  Renewables
Conclusion ,[object Object],40.000 € Contract renewal for electrical energy on the free market 2 years 20.000 € 40.000 € Transport 4,6 years 1.481.607 € 6.830.500  €   5 years 411.000 € 2.000.000 € Buildings (replacement 65 boilers) 3,5 years 135.907 € 463.000 € Traffic lights 5 years 874.700 € 4.327.500 € Public lighting Return time Annual saving Intervention costs
Conclusioni ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Weitere ähnliche Inhalte

Andere mochten auch (20)

Biblioteca Infantil do Iacs
Biblioteca Infantil do IacsBiblioteca Infantil do Iacs
Biblioteca Infantil do Iacs
 
Myeik Presentation1
Myeik  Presentation1Myeik  Presentation1
Myeik Presentation1
 
Comunicare sempre e comunque: dalla newsletter al blog passando per il refere...
Comunicare sempre e comunque: dalla newsletter al blog passando per il refere...Comunicare sempre e comunque: dalla newsletter al blog passando per il refere...
Comunicare sempre e comunque: dalla newsletter al blog passando per il refere...
 
Urban Blog e Informazione Locale
Urban Blog e Informazione LocaleUrban Blog e Informazione Locale
Urban Blog e Informazione Locale
 
C1_Seifried
C1_SeifriedC1_Seifried
C1_Seifried
 
A1_Strasser
A1_StrasserA1_Strasser
A1_Strasser
 
P4_Boonstra
P4_BoonstraP4_Boonstra
P4_Boonstra
 
D2_Daschner
D2_DaschnerD2_Daschner
D2_Daschner
 
P5_Vans
P5_VansP5_Vans
P5_Vans
 
B2_Waldmann
B2_WaldmannB2_Waldmann
B2_Waldmann
 
A3_Ehrlén
A3_EhrlénA3_Ehrlén
A3_Ehrlén
 
D1_Hewitt
D1_HewittD1_Hewitt
D1_Hewitt
 
P8_Zimmermann
P8_ZimmermannP8_Zimmermann
P8_Zimmermann
 
D3_Guiavarch
D3_GuiavarchD3_Guiavarch
D3_Guiavarch
 
P3_Heves
P3_HevesP3_Heves
P3_Heves
 
D1_Hoppe
D1_HoppeD1_Hoppe
D1_Hoppe
 
A3_Papetti
A3_PapettiA3_Papetti
A3_Papetti
 
C2_Buschmann
C2_BuschmannC2_Buschmann
C2_Buschmann
 
P7_Sonntag-O'brien
P7_Sonntag-O'brienP7_Sonntag-O'brien
P7_Sonntag-O'brien
 
P1_VanBegin
P1_VanBeginP1_VanBegin
P1_VanBegin
 

Ähnlich wie P5_Bicciato

Copper combat climate_change_webinar_april_11_v3
Copper combat climate_change_webinar_april_11_v3Copper combat climate_change_webinar_april_11_v3
Copper combat climate_change_webinar_april_11_v3
Minera Alumbrera YMAD - UTE
 
street lighting
street lightingstreet lighting
street lighting
mykirklees
 
European Power Quality Survey
European Power Quality SurveyEuropean Power Quality Survey
European Power Quality Survey
Leonardo ENERGY
 

Ähnlich wie P5_Bicciato (20)

Copper combat climate_change_webinar_april_11_v3
Copper combat climate_change_webinar_april_11_v3Copper combat climate_change_webinar_april_11_v3
Copper combat climate_change_webinar_april_11_v3
 
Copper's Contribution to Combat Climate Change
Copper's Contribution to Combat Climate ChangeCopper's Contribution to Combat Climate Change
Copper's Contribution to Combat Climate Change
 
street lighting
street lightingstreet lighting
street lighting
 
street lighting
street lightingstreet lighting
street lighting
 
street lighting
street lightingstreet lighting
street lighting
 
Integrating energy action planning and energy management systems Centralized...
 Integrating energy action planning and energy management systems Centralized... Integrating energy action planning and energy management systems Centralized...
Integrating energy action planning and energy management systems Centralized...
 
Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...
Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...
Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...
 
Hutt
HuttHutt
Hutt
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.
 
Energy Generation and Transmission
Energy Generation and Transmission Energy Generation and Transmission
Energy Generation and Transmission
 
Network Theory Integrated Life Cycle Assessment for an Electric Power System
Network Theory Integrated Life Cycle Assessment for an Electric Power SystemNetwork Theory Integrated Life Cycle Assessment for an Electric Power System
Network Theory Integrated Life Cycle Assessment for an Electric Power System
 
European Power Quality Survey
European Power Quality SurveyEuropean Power Quality Survey
European Power Quality Survey
 
IOT HEMANT 1
IOT HEMANT 1IOT HEMANT 1
IOT HEMANT 1
 
The European Energy Infrastructure Challenge. Alberto Pototschnig
The European Energy Infrastructure Challenge. Alberto PototschnigThe European Energy Infrastructure Challenge. Alberto Pototschnig
The European Energy Infrastructure Challenge. Alberto Pototschnig
 
Electrolysers and Electrofuels in Smart Energy Systems and Smart Energy Markets
Electrolysers and Electrofuels in Smart Energy Systems and Smart Energy MarketsElectrolysers and Electrofuels in Smart Energy Systems and Smart Energy Markets
Electrolysers and Electrofuels in Smart Energy Systems and Smart Energy Markets
 
ECA Conference Session 2: Patrick Gurian
ECA Conference Session 2: Patrick GurianECA Conference Session 2: Patrick Gurian
ECA Conference Session 2: Patrick Gurian
 
Tp Case Study L
Tp Case Study LTp Case Study L
Tp Case Study L
 
Energy efficient street lighting guidelines
Energy efficient street lighting guidelinesEnergy efficient street lighting guidelines
Energy efficient street lighting guidelines
 
Energy savings and safety on electirical.pptx
Energy savings and safety on electirical.pptxEnergy savings and safety on electirical.pptx
Energy savings and safety on electirical.pptx
 
The Role of Storage in Smart Energy Systems | Henrik Lund
The Role of Storage in Smart Energy Systems | Henrik LundThe Role of Storage in Smart Energy Systems | Henrik Lund
The Role of Storage in Smart Energy Systems | Henrik Lund
 

Mehr von ICLEI_ITC (20)

E-Posters Slide Show_COP 15
E-Posters Slide Show_COP 15E-Posters Slide Show_COP 15
E-Posters Slide Show_COP 15
 
Spirit of Sevilla
Spirit of SevillaSpirit of Sevilla
Spirit of Sevilla
 
P2_Helsinki
P2_HelsinkiP2_Helsinki
P2_Helsinki
 
P2_Baffioni
P2_BaffioniP2_Baffioni
P2_Baffioni
 
P9_Zimmermann
P9_ZimmermannP9_Zimmermann
P9_Zimmermann
 
P9_Zahler
P9_ZahlerP9_Zahler
P9_Zahler
 
P9_Hoppe
P9_HoppeP9_Hoppe
P9_Hoppe
 
P9_Hansen_1
P9_Hansen_1P9_Hansen_1
P9_Hansen_1
 
P6_Gupta
P6_GuptaP6_Gupta
P6_Gupta
 
P6_DeAltin
P6_DeAltinP6_DeAltin
P6_DeAltin
 
P4_Schneider
P4_SchneiderP4_Schneider
P4_Schneider
 
P7_Baddley
P7_BaddleyP7_Baddley
P7_Baddley
 
P3_Witter_b
P3_Witter_bP3_Witter_b
P3_Witter_b
 
P3_Papetti
P3_PapettiP3_Papetti
P3_Papetti
 
P3_Witter_a
P3_Witter_aP3_Witter_a
P3_Witter_a
 
P3_Hebling
P3_HeblingP3_Hebling
P3_Hebling
 
P3_Hansen
P3_HansenP3_Hansen
P3_Hansen
 
P2_Karjalainen
P2_KarjalainenP2_Karjalainen
P2_Karjalainen
 
P2_DeAltin
P2_DeAltinP2_DeAltin
P2_DeAltin
 
P3_Aaro
P3_AaroP3_Aaro
P3_Aaro
 

Kürzlich hochgeladen

Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Kürzlich hochgeladen (20)

Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 

P5_Bicciato

  • 1. Planning of the energy saving and efficiency interventions and of the use of renewable energy resources for the municipal administration of Padua Assessorato all’Ambiente Comune di Padova
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. 6. IMPOSTE (dipendono dalle disposizioni fiscali in essere e dal regime fiscale del punto di prelievo) Negotiable part of the final price 1. ENERGY 4. TRASPORTO 5. MAGGIORAZIONI 2. PERDITE 3. DISPACCIAMENTO Introduction Supply Contracts Public lighting Traffic lights Buildings Transport Renewables 0 10 20 30 40 50 60 70 80 90 100
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20. Quality of the plants system Management Supply contract High Poor Introduction Supply Contracts Public lighting Traffic lights Buildings Transport Renewables 113,0 Mlm 1.106 kW Total emitted power and luminous flux 45,8 Mlm 316 kW 5.269 lampade al sodio a bassa pressione (potenza media di 60 W ed eff. luminosa pari a 145 lm/W) 67,2 Mlm 790 kW 10.538 lampade al sodio ad alta pressione (potenza media di 75 W ed eff. luminosa pari a 85 lm/W) After the intervention 77,2 Mlm 2.530 kW Total emitted power and luminous flux 58,9 Mlm 1.310 kW 10.921 lampade ai vapori di mercurio (potenza media di 120 W ed eff. luminosa pari a 45 lm/W) 18,3 Mlm 1.220 kW 4.886 lampade ad incandescenza (potenza media di 250 W ed eff. luminosa pari a 15 lm/W) Before the intervention Luminous flux Power Number and technical data of the installed lamps 3.853 t 560.000 € 5.838.000 kWh 35,8 Mlm 1.424 kW = 0,66 t/MWh x 5.838 MWh Annually spared CO 2 emissions = 5.838.000 kWh x 0,0958 €/kWh Annual energy cost saving = 1.424 kW x 4.100 h Annual electricity saving = 113,0 Mlm – 77,2 Mlm Increase of the luminous flux = 2.530 kW – 1.106 kW Reduction of used power
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66.