SlideShare ist ein Scribd-Unternehmen logo
1 von 10
WOODLOCH FOREST FOUNTAINS
                      The Woodlands, Texas

          Schematic Design Package
                                 July 2008
Index

                                                  Site Renderings
                                                   Main Fountain
                                                  Runnel Fountain
                                                    Utility Memo




                                                    Prepared for:




                                                           by




2 w est oakl and avenue sui te 100 - po box 1208 - oakland, f lor ida 34760   •   407. 656. 8002   •   www. adedesign. com
Woodloch Forest Site Rendering
              Woodloch Forest Fountains | The Woodlands, Texas   3
Site




                                                              Main Fountain   Runnel Fountain



4   Woodloch Forest Fountains | The Woodlands, Texas
Woodloch Forest Site Renderings
               Woodloch Forest Fountains | The Woodlands, Texas   5
Plan View




                                                       Elevation View

6   Woodloch Forest Fountains | The Woodlands, Texas
3
    1
                                       7
                   4



                   5
    2
                                       8

                   6




Image Legend
1   Main waterwall character

2   Scupper concept

3   Waterwall lighting

4   Waterwall lighting

5   Nozzles adjacent waterwall example

6   Fog at waterfeature

7   Lighting placement at waterwall base

8   Pond floor finishes




                    Main Fountain
            Woodloch Forest Fountains | The Woodlands, Texas   7
Plan View




                                                       Elevation View

8   Woodloch Forest Fountains | The Woodlands, Texas
1                                   5

                     3




    2                                   6

                     4




Image Legend
1   Wier effect

2   Nozzle effect at upper pond

3   Shingle effect

4   Wier at pond wall

5   Pond floor finishes

6   Shingle effect side view




                  Runnel Fountain
             Woodloch Forest Fountains | The Woodlands, Texas   9
Woodloch Fountains Utility Memo
                                                        1. Water Supply Required:

                                                        The water supply design & engineering shall be provided by the Architect or his MEP
                                                        Engineer.
                                                           -- Pipe Size Desired:                                                                         2.00
                                                           -- Estimated Peak Water Demand (gpm)                                                          24.4
                                                           -- Minimum Pressure (PSI) Required:                                                            60

                                                        2. Waste Water Loads (capacity / flow):
                                                        Expected backwash flow (gpm) to sanitary sewer or other authorized outfall. The Civil
                                                        Engineer or Architect shall provide this design.
                                                           -- Backwash Flow (GPM):                                                                      105
                                                           -- Type of flow:                                                                            Gravity
                                                           -- Recommended air gap distance (in.):                                                         5

                                                        3. Electrical Requirements:
                                                        The expected electrical supply and load is noted below. The Architect or his MEP
                                                        Engineer shall provide the control wiring design as needed.
                                                          Expected power phase                                                                            3
                                                          Expected power voltage                                                                         460
                                                          Anticipated kW                                                                                 50.1
                                                             a. Includes power loads for:
                                                                 1. All pool pumps and Underwater Lights
                                                                 2. Chemical Systems with Electrical Interlocks
                                                                 3. Heater control wiring and GFI Receptacles
                                                                 4. Auto-Level systems, Therapy operation, and Safety cutoff
                                                                 5. Timers, VFD's, Programmable Interactive Controls
                                                                 6. Note: 13 kW "extra" added due to preliminary nature of info
                                                             b. These figures do NOT include power loads for:
                                                                 1. Miscellaneous utility requirements at the filter area
                                                                 2. Deck Illumination
                                                        Anticipated Peak Load (kW)                                                                       62.6

                                                        4. Ventilation / HVAC Recommendations:
                                                        We recommend that the Chemical Vault and Filtration Vault have separate ventiliation
                                                        systems to assist in preventing a corrosive atmosphere. The max. air temperature for
                                                        VFD operation will be 102-deg. F.
                                                          Filtration Room:
                                                             Recommended air change rate (times per hour) or conditioned space:                          10
                                                          Chemical Storage Room (Direct Ventilation to Outside is Recommended):
                                                             Recommended air change rate (times per hour) or conditioned space
                                                             vented outdoors:                                                                             10
                                                          Approximate BTU Load/Hour from Pumps & Capacitors:                                            14,690


                                                        5. Responsibility Legend:
                                                        ADE's Client has specifically assigned several design & egnineering tasks and
                                                        responsibilities to ADE. The design tasks that are NOT assigned to ADE must be
                                                        completed by others (NOT ADE). Confirm the below Design assumptions with the
                                                        Architect and the Owner.
                                                                                                                                                     PROVIDE,
                                                                                                                                     DESIGN          INSTALL,
                                                                                                                                                    CONSTRUCT

                                                        FEATURE BACKWASH PIPING TO SANITARY OUTFALL                                CIVIL ENGINEER   CONTRACTOR
                                                        WATER SUPPLY TO POOL EQUIPMENT                                               ARCHITECT      CONTRACTOR

                                                        CONTROL WIRING                                                                 ADE          CONTRACTOR
                                                        DECK & FEATURE SURFACE ILLUMINATION                                       LANDSCAPE ARCH.   CONTRACTOR
                                                        DECK EDGE GFCI & RECEPTACLE                                                    ADE          CONTRACTOR
                                                        BONDING & GROUNDING                                                            ADE          CONTRACTOR
                                                        MOTOR STARTERS                                                                 ADE          CONTRACTOR
                                                        POWER                                                                          ADE          CONTRACTOR
                                                        VFD FOR FEATURE PUMPS                                                          ADE          CONTRACTOR
                                                        UNDERWATER LIGHTS & TRANSFORMERS                                               ADE          CONTRACTOR

                                                        AQUATICS                                                                       ADE          CONTRACTOR
                                                        CHEMICAL SYSTEMS                                                               ADE          CONTRACTOR
                                                        COPING & FINISHES                                                              ADE          CONTRACTOR
                                                        PERMITTING ACTIVITIES FOR BUILDING PERMIT APPROVAL                             N/A          CONTRACTOR
                                                        PIPING & HYDRAULICS                                                            ADE          CONTRACTOR
                                                        SELF-CONTAINED CHEMICAL STORAGE VAULT                                          ADE          CONTRACTOR
                                                        SELF-CONTAINED EQUIPMENT VAULT                                                 ADE          CONTRACTOR
                                                        STRUCTURAL - POOL CONTAINER - CONCRETE - IN GROUND (EXCEPT PILINGS)            ADE          CONTRACTOR
                                                        STRUCTURAL - PILINGS BENEATH POOL - IF NEEDED                               ARCHITECT       CONTRACTOR
                                                        WATER FEATURE                                                                  ADE          CONTRACTOR




                                                                                          EQUIPMENT UTILITY LOAD REQUIREMENTS
10   Woodloch Forest Fountains | The Woodlands, Texas

Weitere ähnliche Inhalte

Kürzlich hochgeladen

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 

Kürzlich hochgeladen (20)

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Empfohlen

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Empfohlen (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Woodloch Forrest Fountains Schematic Book

  • 1. WOODLOCH FOREST FOUNTAINS The Woodlands, Texas Schematic Design Package July 2008
  • 2. Index Site Renderings Main Fountain Runnel Fountain Utility Memo Prepared for: by 2 w est oakl and avenue sui te 100 - po box 1208 - oakland, f lor ida 34760 • 407. 656. 8002 • www. adedesign. com
  • 3. Woodloch Forest Site Rendering Woodloch Forest Fountains | The Woodlands, Texas 3
  • 4. Site Main Fountain Runnel Fountain 4 Woodloch Forest Fountains | The Woodlands, Texas
  • 5. Woodloch Forest Site Renderings Woodloch Forest Fountains | The Woodlands, Texas 5
  • 6. Plan View Elevation View 6 Woodloch Forest Fountains | The Woodlands, Texas
  • 7. 3 1 7 4 5 2 8 6 Image Legend 1 Main waterwall character 2 Scupper concept 3 Waterwall lighting 4 Waterwall lighting 5 Nozzles adjacent waterwall example 6 Fog at waterfeature 7 Lighting placement at waterwall base 8 Pond floor finishes Main Fountain Woodloch Forest Fountains | The Woodlands, Texas 7
  • 8. Plan View Elevation View 8 Woodloch Forest Fountains | The Woodlands, Texas
  • 9. 1 5 3 2 6 4 Image Legend 1 Wier effect 2 Nozzle effect at upper pond 3 Shingle effect 4 Wier at pond wall 5 Pond floor finishes 6 Shingle effect side view Runnel Fountain Woodloch Forest Fountains | The Woodlands, Texas 9
  • 10. Woodloch Fountains Utility Memo 1. Water Supply Required: The water supply design & engineering shall be provided by the Architect or his MEP Engineer. -- Pipe Size Desired: 2.00 -- Estimated Peak Water Demand (gpm) 24.4 -- Minimum Pressure (PSI) Required: 60 2. Waste Water Loads (capacity / flow): Expected backwash flow (gpm) to sanitary sewer or other authorized outfall. The Civil Engineer or Architect shall provide this design. -- Backwash Flow (GPM): 105 -- Type of flow: Gravity -- Recommended air gap distance (in.): 5 3. Electrical Requirements: The expected electrical supply and load is noted below. The Architect or his MEP Engineer shall provide the control wiring design as needed. Expected power phase 3 Expected power voltage 460 Anticipated kW 50.1 a. Includes power loads for: 1. All pool pumps and Underwater Lights 2. Chemical Systems with Electrical Interlocks 3. Heater control wiring and GFI Receptacles 4. Auto-Level systems, Therapy operation, and Safety cutoff 5. Timers, VFD's, Programmable Interactive Controls 6. Note: 13 kW "extra" added due to preliminary nature of info b. These figures do NOT include power loads for: 1. Miscellaneous utility requirements at the filter area 2. Deck Illumination Anticipated Peak Load (kW) 62.6 4. Ventilation / HVAC Recommendations: We recommend that the Chemical Vault and Filtration Vault have separate ventiliation systems to assist in preventing a corrosive atmosphere. The max. air temperature for VFD operation will be 102-deg. F. Filtration Room: Recommended air change rate (times per hour) or conditioned space: 10 Chemical Storage Room (Direct Ventilation to Outside is Recommended): Recommended air change rate (times per hour) or conditioned space vented outdoors: 10 Approximate BTU Load/Hour from Pumps & Capacitors: 14,690 5. Responsibility Legend: ADE's Client has specifically assigned several design & egnineering tasks and responsibilities to ADE. The design tasks that are NOT assigned to ADE must be completed by others (NOT ADE). Confirm the below Design assumptions with the Architect and the Owner. PROVIDE, DESIGN INSTALL, CONSTRUCT FEATURE BACKWASH PIPING TO SANITARY OUTFALL CIVIL ENGINEER CONTRACTOR WATER SUPPLY TO POOL EQUIPMENT ARCHITECT CONTRACTOR CONTROL WIRING ADE CONTRACTOR DECK & FEATURE SURFACE ILLUMINATION LANDSCAPE ARCH. CONTRACTOR DECK EDGE GFCI & RECEPTACLE ADE CONTRACTOR BONDING & GROUNDING ADE CONTRACTOR MOTOR STARTERS ADE CONTRACTOR POWER ADE CONTRACTOR VFD FOR FEATURE PUMPS ADE CONTRACTOR UNDERWATER LIGHTS & TRANSFORMERS ADE CONTRACTOR AQUATICS ADE CONTRACTOR CHEMICAL SYSTEMS ADE CONTRACTOR COPING & FINISHES ADE CONTRACTOR PERMITTING ACTIVITIES FOR BUILDING PERMIT APPROVAL N/A CONTRACTOR PIPING & HYDRAULICS ADE CONTRACTOR SELF-CONTAINED CHEMICAL STORAGE VAULT ADE CONTRACTOR SELF-CONTAINED EQUIPMENT VAULT ADE CONTRACTOR STRUCTURAL - POOL CONTAINER - CONCRETE - IN GROUND (EXCEPT PILINGS) ADE CONTRACTOR STRUCTURAL - PILINGS BENEATH POOL - IF NEEDED ARCHITECT CONTRACTOR WATER FEATURE ADE CONTRACTOR EQUIPMENT UTILITY LOAD REQUIREMENTS 10 Woodloch Forest Fountains | The Woodlands, Texas