SlideShare ist ein Scribd-Unternehmen logo
1 von 40
Project Management in Action ~in Afghanistan Daniel Harmuth, PMP Lieutenant Colonel in U.S. Army Reserves Commander, Detachment 45 NATO Training Mission - Army Technology Services Manager Kern County Sheriff ‘s Office
Mission My mission in Afghanistan during my deployment from June 2009 through Feb 2010 was to mentor and oversee the Basic Warrior Training of the Afghan National Army (ANA). Commander of a Detachment of 32 U.S. Army Drill Sergeants and 40 contractors.
5/20/2009 unclassified 3 Basic Warrior Training (BWT) Mission // Mission Essential Task Mission To instruct new soldiers in Basic, AIT & CTX and train them to high military morals, so they can rescue the Afghan people by fighting the enemies of Afghanistan and the Insurgency. METL  Provide Command and Control Plan and Conduct Individual Institutional Training to ANATC Standards Evaluate Institutional Training Support and Sustain Institutional Training Purpose… Establish ANA primacy through training every ANA Soldier on basic Infantry skills first Drill Sergeants: Build the future of ANA strength through a comprehensive drill sergeant school Remote Basic Warrior Training: Manage regional programs and MTTs country-wide to support ANA doctrine and standards Oversee an effective program to transition from Warsaw Pact weapons to NATO weapons Concentrate on overall improvement of basic rifle marksmanship 10 Week Course
Detachment Locations May 28 2009 UNCLASSIFIED-FOUO 4 Mazar E Sharif Herat KMTC Darulaman Khwost Kandahar
5/20/2009 unclassified 5 CENTCOM Gen Petraeus SHAPE Gen Craddock Gen          USFOR-A                       McChrystal    COMISAF CSTC-A MG Formica Pol-Mil BG Wolters DCOMISAF Lt Gen Dutton DCG BG Ierardi ANA Dev BG Wynnyk ANP Dev Col Yackley ISC BG Gorecki DATES BG Bingol CTAG  Brigadier Baverstock CAPTF BG Givhan CJTF Phoenix BG Huber CJ1 HQ CTAG Col Smailes CJ2 ARSIC (C) 201 Corps CJ3  ARSIC(E) 203 Corps CJ4 CFC CJ5  ARSIC(S) 205 Corps ADU  RC(N) CJ6 Log Sch  ARSIC(W) 207 Corps CJ7  RC(E) NMAA CJ8  ARSIC(N) 209 Corps CGSC/SOSC  RC(S) KMHS  ARSIC(K) Capital Division CTC-A  RC(W) Coordination KMTC ETTs OMLTs
5/20/2009 unclassified 6 KMTC Mentor Group CSTC-A TF Phoenix ANATC CTAG NCO Training Bde S3 S2 S1 TM LDR CS S6 S5 S4 PSG CS CJA Sr SGT CS Officer Training Bde Basic Warrior Training Bde Garrison Adv Combat Training Bde          KCC           CCC                 MIC                 OCS                 BOTC 1st Kandak MP Combat Arms 2nd Kandak Facilities Combat Support G Coy 1 Coy 3rd Kandak K Coy 2 Coy Medical Combat Service Support 4th Kandak M Coy 3 Coy DFAC HVY WPNS 5th Kandak X Coy Transport Maintenance Logistics Signal Engineer Artillery Mortars Infantry Remote BWT Y Coy RECON Remote BWT Remote BWT P Coy Remote BWT Remote BWT
5/20/2009 unclassified 7 KMTC Aerial To Ranges & Tng Areas KMTC Contonement Area Camp Invicta (ISAF) Camp Alamo Camp Warehouse (ISAF)
Mission Early in the mission, we were given the task (project) to increase the capacity of training such that we could increase the ANA from a 80,000 man army to 134,000 strong by Oct 2010.
Project Management Knowledge Areas Used ,[object Object]
Human Resource Management
Communications Management
Manage Stakeholders
Risk Management
Procurement Management
Implementation
Project Charter
Scope Statement
WBS
Scope Control
Activity Resource Estimating
Schedule Development
Cost Management,[object Object]
Project Charter “a document that formally authorizes a project.”  The project charter addresses important aspects of a project, and can be linked to all nine knowledge areas that are listed in the PMBOK May 28 2009 UNCLASSIFIED-FOUO 11
Project Charter Operations order from Higher HQ (Combined Security Transition Command /  NATO Training Mission - Army). Similar to Project Charter as there are strategic dependencies. Tasked to define resources and plan to achieve results
Scope Statement Inclusions: ,[object Object]
Identify base capacity growth requirements for KMTC, Herat, MeS, Khwost, and Darulaman Training Center to maximize training output
Identify Resources to include equipment
Identify ANA Leadership involvement to buy into the plan,[object Object]
Scope Statement Challenges: ,[object Object]
Improve already low ANA leadership numbers and performance
Improve training results in face of shortened schedule,[object Object],[object Object]
New Kandahar RBWT WBS
WBS Development (cont.) ,[object Object]
Turned into a spreadsheet of tasks and responsibilities as the higher HQ staff could not understand the WBS,[object Object]
Recruiting ballooned after the MoD increased the salary of ANA, and also after Ramazan,[object Object]
Quarters
Mess Halls
Ranges
Equipment
Uniforms and Initial issue equipment

Weitere ähnliche Inhalte

Was ist angesagt?

segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
Sravan Kumar
 
Mechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP PipelineMechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP Pipeline
Awaiz 766
 

Was ist angesagt? (20)

A PROJECT REPORT ON ANALYSIS AND DESIGN OF MULTI STOREY(G 6) RESIDENTIAL BUIL...
A PROJECT REPORT ON ANALYSIS AND DESIGN OF MULTI STOREY(G 6) RESIDENTIAL BUIL...A PROJECT REPORT ON ANALYSIS AND DESIGN OF MULTI STOREY(G 6) RESIDENTIAL BUIL...
A PROJECT REPORT ON ANALYSIS AND DESIGN OF MULTI STOREY(G 6) RESIDENTIAL BUIL...
 
Civil and Architectural Engg - an INtroduction by Prof T P Somasundaram
Civil and Architectural Engg - an INtroduction by Prof T P Somasundaram Civil and Architectural Engg - an INtroduction by Prof T P Somasundaram
Civil and Architectural Engg - an INtroduction by Prof T P Somasundaram
 
Introduction to Civil Engineering
Introduction to Civil EngineeringIntroduction to Civil Engineering
Introduction to Civil Engineering
 
Computer aided process planning
Computer aided process planningComputer aided process planning
Computer aided process planning
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
 
Automation in Manufacturing (Unit-3) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-3) by Varun Pratap Singh.pdfAutomation in Manufacturing (Unit-3) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-3) by Varun Pratap Singh.pdf
 
Structural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureStructural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructure
 
Automated Production Lines.ppt
Automated Production Lines.pptAutomated Production Lines.ppt
Automated Production Lines.ppt
 
Fab Academy 2015: CNC Milling
Fab Academy 2015: CNC MillingFab Academy 2015: CNC Milling
Fab Academy 2015: CNC Milling
 
NC Programming
NC ProgrammingNC Programming
NC Programming
 
CNC Seminar
CNC SeminarCNC Seminar
CNC Seminar
 
Staadpro learing ppt
Staadpro learing pptStaadpro learing ppt
Staadpro learing ppt
 
Infrastructure projects
Infrastructure projectsInfrastructure projects
Infrastructure projects
 
Dynamic Response
Dynamic ResponseDynamic Response
Dynamic Response
 
Automated assembly systems
Automated assembly systemsAutomated assembly systems
Automated assembly systems
 
Stereo lithography - Report
Stereo lithography - ReportStereo lithography - Report
Stereo lithography - Report
 
Development of an OpenSees model for collapse risk assessment of Italian-code...
Development of an OpenSees model for collapse risk assessment of Italian-code...Development of an OpenSees model for collapse risk assessment of Italian-code...
Development of an OpenSees model for collapse risk assessment of Italian-code...
 
Mechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP PipelineMechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP Pipeline
 
PLANNING AND ANALYSIS OF COMMERCIAL BUILDING PROJECT REPORT.pdf
PLANNING AND ANALYSIS OF COMMERCIAL BUILDING PROJECT REPORT.pdfPLANNING AND ANALYSIS OF COMMERCIAL BUILDING PROJECT REPORT.pdf
PLANNING AND ANALYSIS OF COMMERCIAL BUILDING PROJECT REPORT.pdf
 
Bridge rehabilitation
Bridge rehabilitationBridge rehabilitation
Bridge rehabilitation
 

Andere mochten auch

Andere mochten auch (9)

Scrum in 15 Minutes
Scrum in 15 MinutesScrum in 15 Minutes
Scrum in 15 Minutes
 
Frontline Execution
Frontline ExecutionFrontline Execution
Frontline Execution
 
Assiment khas 2012
Assiment khas 2012Assiment khas 2012
Assiment khas 2012
 
10 Proven Military Strategies for Breakthrough Resource Management
10 Proven Military Strategies for Breakthrough Resource Management10 Proven Military Strategies for Breakthrough Resource Management
10 Proven Military Strategies for Breakthrough Resource Management
 
Making the leap to Agile within Marketing: A practical success story
Making the leap to Agile within Marketing: A practical success storyMaking the leap to Agile within Marketing: A practical success story
Making the leap to Agile within Marketing: A practical success story
 
Practical Project Collaboration for Product Owners and Scrum Teams
Practical Project Collaboration for Product Owners and Scrum TeamsPractical Project Collaboration for Product Owners and Scrum Teams
Practical Project Collaboration for Product Owners and Scrum Teams
 
Project Management with Kanban 2.0
Project Management with Kanban 2.0Project Management with Kanban 2.0
Project Management with Kanban 2.0
 
Project Management Introduction for PMP Certification Aspirants in Indonesia
Project Management Introduction for PMP Certification Aspirants in IndonesiaProject Management Introduction for PMP Certification Aspirants in Indonesia
Project Management Introduction for PMP Certification Aspirants in Indonesia
 
Pascal
PascalPascal
Pascal
 

Ähnlich wie Project Management in Action in Afghanistan

USAF_Warrant_Officers
USAF_Warrant_OfficersUSAF_Warrant_Officers
USAF_Warrant_Officers
Mike, Esser
 
George_Williams_Resume_1
George_Williams_Resume_1George_Williams_Resume_1
George_Williams_Resume_1
George Williams
 
Crowell's Resume NOV 2014
Crowell's Resume NOV 2014Crowell's Resume NOV 2014
Crowell's Resume NOV 2014
Stephen Crowell
 
TCM-RA AAAA (FEB 15)
TCM-RA AAAA (FEB 15)TCM-RA AAAA (FEB 15)
TCM-RA AAAA (FEB 15)
Jeff White
 
Jack Meyer 2016
Jack Meyer 2016Jack Meyer 2016
Jack Meyer 2016
Jack Meyer
 
DoD_resume
DoD_resumeDoD_resume
DoD_resume
Jin Dang
 
Cole B. Seibel Resume
Cole B. Seibel ResumeCole B. Seibel Resume
Cole B. Seibel Resume
Cole Seibel
 
McCullough, Charles W. Resume
McCullough, Charles W. ResumeMcCullough, Charles W. Resume
McCullough, Charles W. Resume
Wayne McCullough
 

Ähnlich wie Project Management in Action in Afghanistan (20)

Employers Network: The Case of Network Rail
Employers Network: The Case of Network RailEmployers Network: The Case of Network Rail
Employers Network: The Case of Network Rail
 
Anand May15
Anand May15Anand May15
Anand May15
 
Guiding & Assessing Transformation in DOD
Guiding & Assessing Transformation in DODGuiding & Assessing Transformation in DOD
Guiding & Assessing Transformation in DOD
 
USAF_Warrant_Officers
USAF_Warrant_OfficersUSAF_Warrant_Officers
USAF_Warrant_Officers
 
LOA Exceptional Release - Winter 2016 pages 30-36
LOA Exceptional Release - Winter 2016 pages 30-36LOA Exceptional Release - Winter 2016 pages 30-36
LOA Exceptional Release - Winter 2016 pages 30-36
 
George_Williams_Resume_1
George_Williams_Resume_1George_Williams_Resume_1
George_Williams_Resume_1
 
Crowell's Resume NOV 2014
Crowell's Resume NOV 2014Crowell's Resume NOV 2014
Crowell's Resume NOV 2014
 
cfetp3a1x1
cfetp3a1x1cfetp3a1x1
cfetp3a1x1
 
Theories in management
Theories in managementTheories in management
Theories in management
 
CV_Christopher_Fletcher-
CV_Christopher_Fletcher-CV_Christopher_Fletcher-
CV_Christopher_Fletcher-
 
TCM-RA AAAA (FEB 15)
TCM-RA AAAA (FEB 15)TCM-RA AAAA (FEB 15)
TCM-RA AAAA (FEB 15)
 
Npc force weekly 02 apr 06 apr 2012
Npc force weekly 02 apr   06 apr 2012Npc force weekly 02 apr   06 apr 2012
Npc force weekly 02 apr 06 apr 2012
 
Taylor 17 Sep 2014
Taylor 17 Sep 2014Taylor 17 Sep 2014
Taylor 17 Sep 2014
 
Jack Meyer 2016
Jack Meyer 2016Jack Meyer 2016
Jack Meyer 2016
 
DoD_resume
DoD_resumeDoD_resume
DoD_resume
 
Cole B. Seibel Resume
Cole B. Seibel ResumeCole B. Seibel Resume
Cole B. Seibel Resume
 
resume santosh
resume santoshresume santosh
resume santosh
 
Hm e1 e9 la dr jan 20131
Hm e1 e9 la dr jan 20131Hm e1 e9 la dr jan 20131
Hm e1 e9 la dr jan 20131
 
McCullough, Charles W. Resume
McCullough, Charles W. ResumeMcCullough, Charles W. Resume
McCullough, Charles W. Resume
 
Navy COOL, executive_brief
Navy COOL, executive_briefNavy COOL, executive_brief
Navy COOL, executive_brief
 

Kürzlich hochgeladen

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 

Kürzlich hochgeladen (20)

Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 

Project Management in Action in Afghanistan

Hinweis der Redaktion

  1. I was mobilized in March 2009 to head up a detachment of Army Drill SGTs to oversee and mentor the Afghan Army Basic Warrior Training. This is an enduring mission of my USAR Division since 2005.
  2. Explain mission at KMTC and 5 remote locations.
  3. In one way or another, we used these PMI Knowledge areas to take on our new taking.Some may have been used formally, and some informally. I’ll illustrate this as we go on.
  4. In the military we receive an Operations Order that is similar to a Project Charter.Project Charter Definition (click for transition)As the Project Charter authorized a project, an Operations Order signed by the Commanding General give authorization, priority of support, vision, leadership, communication, time frames, and other information.
  5. In the military we receive an Operations Order that is similar to a Project Charter.Project Charter Definition (click for transition)As the Project Charter authorized a project, an Operations Order signed by the Commanding General give authorization, priority of support, vision, leadership, communication, time frames, and other information.
  6. Based on the direction given in the OO, we had to go and determine the real scope behind the “Broad Brush” scope statements.
  7. This is a abstract of the planning spreadsheet of training classes by dates and locations that is synchronized with other operations: - Build Leadership - Unit leadership trainingUnit equipment fieldingUnit collective trainingTransporting new units to duty locations
  8. In the midst of pulling back the onion skins of developing scope, we uncovered many challenges.Many of these seemed so daunting that we were not sure the mission could be accomplished in the time frame and resource allotted.Attrition rate was 25%Cadre fills were so low we could barely complete the current mission
  9. We developed a WBS (Ghannt Chart) based on locations, facilities to increase/improve, leadership to develop,
  10. I took this to the higher HQ staff (logistics and Engineer) to discuss what needed to happen and when, based on the WBS.Because the Higher HQ staff did not have a PM background they did not want to take the time to learn how a WBS worked. These were British, French and American Officers.Thus, I turned it into a spreadsheet to brief in my meeting with the General.
  11. During the process of construction to increase capacity, the Recruiting Command initiated a signing bonus and increased the salary of all soldier ranks. This quickly ballooned the recruiting numbers and Recruiting Command had thousands of recruits in holding areas waiting for Basic Training.
  12. Estimating how long it would take to perform these tasks when we have not down these repetitively in any location in Afghanistan.Local contractors were all different in each area.We had troubles getting the current quantities of equipment to remote bases, so doubling the quantities was a concern, along with vendors that could not guarantee delivery….
  13. Our main schedule was based on the long pole in the tent, which was facility increase construction.Higher HQ completed their project schedule and briefed to the General before they secured contractors to work on the projects. By the time the contractors were secured, scheduled were already behind, and the typical response from them as to if they could complete on time was “In Shala”…Culture to never say “no”…
  14. As the plan was briefed by Higher HQ before the details came in, the budgets were too low. The issue with people that did not have to execute on the ground making the final plans.My predecessor went around the country to our various training locations and determined the resource requirements, but after I reviewed it and our mission, I figured his estimates were 50% too light. This created issues in budgets, allotting new positions for ANA Leadership and Cadre, and also U.S. Mentors. Cost over runs were a norm.
  15. Relating back to my predecessor defining resources:I was told he did not develop these with the Afghan Counterparts.We told the Afghan Leadership to develop their personnel resource requirements and we also did the same. We set-up meetings to review theirs together……By doing this we gained their trust as we wanted to hear what they wanted and they were more open to our suggestions. They also accompanied us when we had to argue with Higher HQ for the 50% more ANA personnel.The next slides are an example of what I briefed the General regularly.
  16. This slide was to display the sheer lack of ANA Cadre we had…Pay attention to the “Short” in the last column.
  17. Percentages were “Short”
  18. This was our synchronization plan to generate ANA Cadre…. Which was not the preferred method, but maybe the only one which would work due to corruption in the Corps.
  19. Early planning meeting with Coalition Partners and Staffs were without the ANA.How to make the plan “their plan”.Even though we think we control the military progress, we had to beg to get ANA MoD to issue a Directive, as the ANA would not do anything without it.
  20. Some of our Higher HQ staff would think that because the developed a plan, the ANA would follow it.We had to brief and get each level of Commander. This would have been easier for the NTM-A Commander to get MoD to issue the Directive at the beginning.Because this would affect each local Commander, I had to travel around and get each to by into the plan so they would actually execute it once the recruits started to come, and training schedules changed, etc.
  21. Needless to say, everything in Afghanistan involved Risk, aside from IEDs and being shot at.We used 3 of the 6 PMBOK Risk Mgt processesWith everything being constant or the same as previous years with seasonal changes in recruiting, we all knew that we only had a slim chance of everything aligning and the facilities being ready, recruits to fill capacity, and enough Cadre.We also identified intra-country transportation as an issue.
  22. For Risk Monitoring, we had weekly meeting across Kabul at our Higher HQ or at NTM-A to include all staff members from multiple commandsEngineersLogisticsRecruitingTrainingPersonnelMurphy’s Law
  23. Procurement management was managed at our Higher HQ (CTAG-A), and was literally a dumpster fire:Contracts were being let without us validating the requirementsContractors identified previously were getting engaged in other construction projects by other US Army CommandsHigher HQ contracts officer went on 3 weeks leave, then was relieved of logistics dutiesEveryone wanted to wash their hands of the contracts in the endWe sent 2 Drill SGTS to assist, and then everyone acted as though they were respon..
  24. In the end, everything happened as most U.S. Military operations, “not according to plan”:Remote base facilities were getting completed not in the planned order…re-route recruits…New ANA Cadre were being assigned, but those Officers either failed to report or did not exist. Took weeks to deconflict…. Kandahar base was so off schedule, that we ahd to accept the class of 1400 recruits in Kabul at KMTC in the new base gym that didn’t have the showers working yet..Recruiting was so full, Higher HQ just started shipping recruits to remote based to hold for a while until official class dates.
  25. The pushed implementation schedules of the remote base facilities started to converge on another major event – our Detachment’s impending RIPTOA.In the end, facilities were livable for the additional recruits, equipment started to arrive, Cadre started to appear out of nowhere from MoD (albeit wrong ranks), OCIE was shipping and arrive un-disturbed in containers.We were still scrambling to fix issues like inoperative showers, Cadre, vehicle shortages or going to the wrong command, new Command and Control structure for RBWTs BUT……I got a surprise Facebook notification on Aug 10, 2010….