SlideShare ist ein Scribd-Unternehmen logo
1 von 15
Downloaden Sie, um offline zu lesen
D’Appolonia’s experience as “External Compliance Monitoring
Group”
to “Lenders’ Independent Environmental and Social Consultant” in
the private sector
Challenges and Opportunities
IAIA 15 – April 21st 2015
2000 – 2012 External Compliance Monitoring Group - Chad Cameroon pipeline
ECMG at the beginning -
Chad Cameroon
2000-2005 2006-2010 2011-to date
Commercial Banks
IFIs
Growth
2004 – ongoing ECMG BTC Pipeline, Georgia, Azebijan, Turkey
•Chad-Cameroon Export Pipeline
2001
2003
•Baku Tiblisi Ceyhan Pipeline
•Perù LNG
•Newmont Ahafo Gold Mine - Ghana
2004-2006
•Papua New Guinea LNG
•Nord Stream pipeline
•Ichthys LNG - Australia
•Socar Turcas Aegean Refinery STAR - Turkey2007-2011
•Oyu Tolgoi mine - Mongolia
•South Stream Pipeline - Black Sea
•Etileno XXI Project - Mexico
•Nacala Corridor - Mozambique
•Anadarko LNG - Mozambique
•Punta Catalina Power plant – Dominican
Republic …………
2012 - 2015
Cat A projects
2006-2014 ECMG Newmont Ahafo Mine, Ghana
Sectors
€-
€5.000.000
€10.000.000
€15.000.000
2001-2003 2003-2006 2006-2011 2011-2014 2015-2017
Infrastructures & others
Energy
Complexity
APPLICABLE STANDARDS
From a single applicable standard (“WB Pollution and prevention & abatement
handbook” and “IFC Environmental Assessment Guidelines”) to multiple and
tailored standards (IFC PS, EP, OECD Common Approaches, Specific IFIs, and
ECAs Standards…) to comply with for a specific project
BATTERY LIMITS & RISKS
The actual definition of the project area of influence, associated facilities and
the leverage, control and influence over third party’s actions
2008 – 2013 ECMG CAIRN pipeline system, India
A former ECMG team
Project Manager
Environmental
Expert
Social
Expert
Health &
Safety Expert
SPECIALIZED TEAM
 Today, a different and more complex expertise is required
 Increasing geographical specialization and technically specialized experts in
those fields as required by the projects
2009 – ongoing IESC PNG LNG, Papua New Guinea
A current IESC team
2010 – ongoing IESC Tullow Oil, Ghana
Sector specific process experts (hydro, petrochemical, heavy industry, …)
• ESMS specialist
• Biodiversity
specialist
• Marine specialist
• Air Emissions
specialist
• SEP specialist
• Human resource
specialist
• Cultural heritage
specialist
• Indigenous peoples
specialist
• Emergency
preparedness
and response
specialist
• OHS specialist
• QRA specialist
Project Manager
Environmental
Expert
Biodiversity
Specialist
Marine
Expert
Social Expert
RAP
specialist
Labor
Specialist
Health &
Safety Expert
Community
Specialist
Process safety
Specialist
Evolving Trends
 From environmentally viable projects to social, economical,
environmental sustainable projects
 Management of social impacts, gender equality, labor risks,
implementation of safety management systems are now key aspects
of the IESC evaluation
 Stakeholder engagement, Compliance of the compensation process
with EMS/RAP commitments, Resettlement and Livelihood
Restoration measures, Communication aspects importance is
increasing
2009 – 2014 IESC Nord Stream pipeline, Russia, Finland, Germany
2011 – ongoing IESC Ichthys LNG, Australia
Players
Commercial banks and Export Credit Agencies involvement add value and
bring additional challenges:
 Increasing awareness of the banking systems towards EHSS issues - IESC
to provide early warnings on issues/risks
 adapting to their decision making process and to internal procedures to
respond to the OECD Common Approaches, to the Equator Principles’
standards, to Lenders’ specific standards
2011 – ongoing IESC Socar Turcas Aegean Refinery STAR, Turkey
Commercial Banks /Export
Credit Agencies involvement
 Proactive interaction with key players
 Quickly response and timely advice to Lenders
 Integrity and Independence
 Ability to manage potential conflicts of interest perceived by
Sponsors/Lenders
 Capability to understand and manage the prevailing standards
 Training to support Sponsors on EHSS issues, as needed
Adaptive response to
changes
2012 – ongoing OHS Advisor Enerjisa Power Plant, Turkey
2012-ongoing IESC Etileno XXI, Mexico
 Streamlined Due Diligence process
 IESC involved at early stage of the process
 ESHS Company policies and procedures already in line with international
requirements (this was not the case in the past)
 Awareness of the project sponsors towards the IESC role
Think positive
(Lessons Learned)
 Growth of internal resources to cover the most specialized role(s) (Team
Leader, Project Manager)
 Outsourcing to address specific requirements through a selected roster
of freelances and local partners
 Due Diligence schedules might be unrealistic: IESC needs to be flexible
and to guarantee long lasting commitment
 IESC is the “Eyes and Ears” throughout the project lifecycle
IESC adaptation process
2014 - ongoing IESC Nacala Corridor project, Mozambique
If this is not done, future ages will
certainly look back upon us as a people so
immersed in the pursuit of wealth as to
be blind to higher considerations
Alfred Russel Wallace
Thank you
IAIA 15 – April 21st 2015
D’Appolonia S.p.A.
Via San Nazaro,19 - 16145 Genova – Italy
Tel. +39 010 3628148 Fax +39 010 3621078
E-mail: dappolonia@dappolonia.it
Alessandro Casartelli
Linkedin: https://goo.gl/SDe5iN

Weitere ähnliche Inhalte

Ähnlich wie D'Appolonia's Experience as an Independent Environmental and Social Consultant

QSSC Kevin McDougall
QSSC Kevin McDougallQSSC Kevin McDougall
QSSC Kevin McDougallSSSI QLD
 
2010 CRC Showcase - Workforce Development - R1.111 R1.112 & R1.113
2010 CRC Showcase - Workforce Development - R1.111 R1.112 & R1.1132010 CRC Showcase - Workforce Development - R1.111 R1.112 & R1.113
2010 CRC Showcase - Workforce Development - R1.111 R1.112 & R1.113CRC for Rail Innovation
 
syntomo profil egis 2016 en
syntomo profil egis 2016 ensyntomo profil egis 2016 en
syntomo profil egis 2016 enE.G.I.S Ltd
 
Humasol general presentation
Humasol general presentationHumasol general presentation
Humasol general presentationHumasol
 
ACCIONA Infrastructure
ACCIONA InfrastructureACCIONA Infrastructure
ACCIONA Infrastructureacciona
 
Enhancing professionalism in environment management and practice eik central
Enhancing professionalism in environment management and practice   eik centralEnhancing professionalism in environment management and practice   eik central
Enhancing professionalism in environment management and practice eik centralWanjiru Gachugi-Waweru
 
Sustainable Nigeria Information Brief
Sustainable Nigeria Information BriefSustainable Nigeria Information Brief
Sustainable Nigeria Information BriefEnergy for One World
 
Biography for Chem Industry Jul 16
Biography for Chem Industry Jul 16Biography for Chem Industry Jul 16
Biography for Chem Industry Jul 16Md.Jumadi Juki
 
Sine Skov - CV
Sine Skov  - CVSine Skov  - CV
Sine Skov - CVSine Skov
 
Dogukan.koca resume
Dogukan.koca resumeDogukan.koca resume
Dogukan.koca resumeDogukan Koca
 
Overview of Renewable Energy and Energy Efficiency Project by Segun Adaju
Overview of Renewable Energy and Energy Efficiency Project by Segun AdajuOverview of Renewable Energy and Energy Efficiency Project by Segun Adaju
Overview of Renewable Energy and Energy Efficiency Project by Segun AdajuNigeria Alternative Energy Expo
 
What are the benefits for sponsors in complying with sustainable development ...
What are the benefits for sponsors in complying with sustainable development ...What are the benefits for sponsors in complying with sustainable development ...
What are the benefits for sponsors in complying with sustainable development ...CPWF Mekong
 
Dr. Gareth Davies: Transformational Projects – the Orkney story so far
 Dr. Gareth Davies: Transformational Projects – the Orkney story so far Dr. Gareth Davies: Transformational Projects – the Orkney story so far
Dr. Gareth Davies: Transformational Projects – the Orkney story so farPMIUKChapter
 
Transformational Projects – the Orkney story so far
Transformational Projects – the Orkney story so farTransformational Projects – the Orkney story so far
Transformational Projects – the Orkney story so farPMIUKChapter
 
02 LH Ruiters Eco Innovation Pilot Project SA
02 LH Ruiters Eco Innovation Pilot Project SA02 LH Ruiters Eco Innovation Pilot Project SA
02 LH Ruiters Eco Innovation Pilot Project SA7391456
 
IEEE Educational Activities’ Pre-University Education Programs
IEEE Educational Activities’ Pre-University Education Programs IEEE Educational Activities’ Pre-University Education Programs
IEEE Educational Activities’ Pre-University Education Programs Muhammad Mustafa
 
CV Alex Mwenesi Mutiso 2015
CV Alex Mwenesi Mutiso 2015CV Alex Mwenesi Mutiso 2015
CV Alex Mwenesi Mutiso 2015Alex Mutiso
 

Ähnlich wie D'Appolonia's Experience as an Independent Environmental and Social Consultant (20)

E&S Risk Management
E&S Risk ManagementE&S Risk Management
E&S Risk Management
 
QSSC Kevin McDougall
QSSC Kevin McDougallQSSC Kevin McDougall
QSSC Kevin McDougall
 
2010 CRC Showcase - Workforce Development - R1.111 R1.112 & R1.113
2010 CRC Showcase - Workforce Development - R1.111 R1.112 & R1.1132010 CRC Showcase - Workforce Development - R1.111 R1.112 & R1.113
2010 CRC Showcase - Workforce Development - R1.111 R1.112 & R1.113
 
syntomo profil egis 2016 en
syntomo profil egis 2016 ensyntomo profil egis 2016 en
syntomo profil egis 2016 en
 
Humasol general presentation
Humasol general presentationHumasol general presentation
Humasol general presentation
 
ACCIONA Infrastructure
ACCIONA InfrastructureACCIONA Infrastructure
ACCIONA Infrastructure
 
Enhancing professionalism in environment management and practice eik central
Enhancing professionalism in environment management and practice   eik centralEnhancing professionalism in environment management and practice   eik central
Enhancing professionalism in environment management and practice eik central
 
Updated CV Aug 6 2015
Updated CV Aug 6 2015Updated CV Aug 6 2015
Updated CV Aug 6 2015
 
Sustainable Nigeria Information Brief
Sustainable Nigeria Information BriefSustainable Nigeria Information Brief
Sustainable Nigeria Information Brief
 
International Services
International ServicesInternational Services
International Services
 
Biography for Chem Industry Jul 16
Biography for Chem Industry Jul 16Biography for Chem Industry Jul 16
Biography for Chem Industry Jul 16
 
Sine Skov - CV
Sine Skov  - CVSine Skov  - CV
Sine Skov - CV
 
Dogukan.koca resume
Dogukan.koca resumeDogukan.koca resume
Dogukan.koca resume
 
Overview of Renewable Energy and Energy Efficiency Project by Segun Adaju
Overview of Renewable Energy and Energy Efficiency Project by Segun AdajuOverview of Renewable Energy and Energy Efficiency Project by Segun Adaju
Overview of Renewable Energy and Energy Efficiency Project by Segun Adaju
 
What are the benefits for sponsors in complying with sustainable development ...
What are the benefits for sponsors in complying with sustainable development ...What are the benefits for sponsors in complying with sustainable development ...
What are the benefits for sponsors in complying with sustainable development ...
 
Dr. Gareth Davies: Transformational Projects – the Orkney story so far
 Dr. Gareth Davies: Transformational Projects – the Orkney story so far Dr. Gareth Davies: Transformational Projects – the Orkney story so far
Dr. Gareth Davies: Transformational Projects – the Orkney story so far
 
Transformational Projects – the Orkney story so far
Transformational Projects – the Orkney story so farTransformational Projects – the Orkney story so far
Transformational Projects – the Orkney story so far
 
02 LH Ruiters Eco Innovation Pilot Project SA
02 LH Ruiters Eco Innovation Pilot Project SA02 LH Ruiters Eco Innovation Pilot Project SA
02 LH Ruiters Eco Innovation Pilot Project SA
 
IEEE Educational Activities’ Pre-University Education Programs
IEEE Educational Activities’ Pre-University Education Programs IEEE Educational Activities’ Pre-University Education Programs
IEEE Educational Activities’ Pre-University Education Programs
 
CV Alex Mwenesi Mutiso 2015
CV Alex Mwenesi Mutiso 2015CV Alex Mwenesi Mutiso 2015
CV Alex Mwenesi Mutiso 2015
 

Kürzlich hochgeladen

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 

Kürzlich hochgeladen (20)

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 

D'Appolonia's Experience as an Independent Environmental and Social Consultant

  • 1. D’Appolonia’s experience as “External Compliance Monitoring Group” to “Lenders’ Independent Environmental and Social Consultant” in the private sector Challenges and Opportunities IAIA 15 – April 21st 2015
  • 2. 2000 – 2012 External Compliance Monitoring Group - Chad Cameroon pipeline ECMG at the beginning - Chad Cameroon 2000-2005 2006-2010 2011-to date Commercial Banks IFIs
  • 3. Growth 2004 – ongoing ECMG BTC Pipeline, Georgia, Azebijan, Turkey •Chad-Cameroon Export Pipeline 2001 2003 •Baku Tiblisi Ceyhan Pipeline •Perù LNG •Newmont Ahafo Gold Mine - Ghana 2004-2006 •Papua New Guinea LNG •Nord Stream pipeline •Ichthys LNG - Australia •Socar Turcas Aegean Refinery STAR - Turkey2007-2011 •Oyu Tolgoi mine - Mongolia •South Stream Pipeline - Black Sea •Etileno XXI Project - Mexico •Nacala Corridor - Mozambique •Anadarko LNG - Mozambique •Punta Catalina Power plant – Dominican Republic ………… 2012 - 2015 Cat A projects
  • 4. 2006-2014 ECMG Newmont Ahafo Mine, Ghana Sectors €- €5.000.000 €10.000.000 €15.000.000 2001-2003 2003-2006 2006-2011 2011-2014 2015-2017 Infrastructures & others Energy
  • 5. Complexity APPLICABLE STANDARDS From a single applicable standard (“WB Pollution and prevention & abatement handbook” and “IFC Environmental Assessment Guidelines”) to multiple and tailored standards (IFC PS, EP, OECD Common Approaches, Specific IFIs, and ECAs Standards…) to comply with for a specific project BATTERY LIMITS & RISKS The actual definition of the project area of influence, associated facilities and the leverage, control and influence over third party’s actions 2008 – 2013 ECMG CAIRN pipeline system, India
  • 6. A former ECMG team Project Manager Environmental Expert Social Expert Health & Safety Expert SPECIALIZED TEAM  Today, a different and more complex expertise is required  Increasing geographical specialization and technically specialized experts in those fields as required by the projects 2009 – ongoing IESC PNG LNG, Papua New Guinea
  • 7. A current IESC team 2010 – ongoing IESC Tullow Oil, Ghana Sector specific process experts (hydro, petrochemical, heavy industry, …) • ESMS specialist • Biodiversity specialist • Marine specialist • Air Emissions specialist • SEP specialist • Human resource specialist • Cultural heritage specialist • Indigenous peoples specialist • Emergency preparedness and response specialist • OHS specialist • QRA specialist Project Manager Environmental Expert Biodiversity Specialist Marine Expert Social Expert RAP specialist Labor Specialist Health & Safety Expert Community Specialist Process safety Specialist
  • 8. Evolving Trends  From environmentally viable projects to social, economical, environmental sustainable projects  Management of social impacts, gender equality, labor risks, implementation of safety management systems are now key aspects of the IESC evaluation  Stakeholder engagement, Compliance of the compensation process with EMS/RAP commitments, Resettlement and Livelihood Restoration measures, Communication aspects importance is increasing 2009 – 2014 IESC Nord Stream pipeline, Russia, Finland, Germany
  • 9. 2011 – ongoing IESC Ichthys LNG, Australia Players
  • 10. Commercial banks and Export Credit Agencies involvement add value and bring additional challenges:  Increasing awareness of the banking systems towards EHSS issues - IESC to provide early warnings on issues/risks  adapting to their decision making process and to internal procedures to respond to the OECD Common Approaches, to the Equator Principles’ standards, to Lenders’ specific standards 2011 – ongoing IESC Socar Turcas Aegean Refinery STAR, Turkey Commercial Banks /Export Credit Agencies involvement
  • 11.  Proactive interaction with key players  Quickly response and timely advice to Lenders  Integrity and Independence  Ability to manage potential conflicts of interest perceived by Sponsors/Lenders  Capability to understand and manage the prevailing standards  Training to support Sponsors on EHSS issues, as needed Adaptive response to changes 2012 – ongoing OHS Advisor Enerjisa Power Plant, Turkey
  • 12. 2012-ongoing IESC Etileno XXI, Mexico  Streamlined Due Diligence process  IESC involved at early stage of the process  ESHS Company policies and procedures already in line with international requirements (this was not the case in the past)  Awareness of the project sponsors towards the IESC role Think positive (Lessons Learned)
  • 13.  Growth of internal resources to cover the most specialized role(s) (Team Leader, Project Manager)  Outsourcing to address specific requirements through a selected roster of freelances and local partners  Due Diligence schedules might be unrealistic: IESC needs to be flexible and to guarantee long lasting commitment  IESC is the “Eyes and Ears” throughout the project lifecycle IESC adaptation process 2014 - ongoing IESC Nacala Corridor project, Mozambique
  • 14. If this is not done, future ages will certainly look back upon us as a people so immersed in the pursuit of wealth as to be blind to higher considerations Alfred Russel Wallace
  • 15. Thank you IAIA 15 – April 21st 2015 D’Appolonia S.p.A. Via San Nazaro,19 - 16145 Genova – Italy Tel. +39 010 3628148 Fax +39 010 3621078 E-mail: dappolonia@dappolonia.it Alessandro Casartelli Linkedin: https://goo.gl/SDe5iN