SlideShare ist ein Scribd-Unternehmen logo
1 von 10
Manufacturing Cost Accounting
Outline
Cost Terms, Concepts, and
Classifications
Job Order Costing
Cost Behavior
Cost – Volume – Profit
Activity Based Costing
Profit Planning
Standard Costs
Flexible Budgets and Overhead
Product Costs - A Closer
                 Look
                             Manufacturing                  Work
     Raw Materials              Costs                    In Process

 Beginning raw               Direct materials        Beginning work in
     materials inventory   + Direct labor               process inventory
+ Raw materials            + Mfg. overhead         + Total manufacturing
     purchased             = Total manufacturing        costs
= Raw materials                 costs              = Total work in
     available for use                                  process for the
     in production                                      period
Costs associated with the goods that               – Ending work in
are completed during the period are                     process inventory
   transferred to finished goods                   = Cost of goods

             inventory.                                 manufactured.
The Contribution Format
                                 Total         Unit
Sales Revenue                  $ 100,000      $ 50
Less: Variable costs              60,000         30
Contribution margin            $ 40,000       $ 20
Less: Fixed costs                 30,000
Net income                     $ 10,000


  The contribution margin format emphasizes cost
  behavior. Contribution margin covers fixed costs
             and provides for income.
Calculating Breakeven in
            Units
Here is the information from Wind
Bicycle Co.:
                              Total    Per Unit   Percent
  Sales (500 bikes)         $250,000   $ 500         100%
  Less: variable expenses    150,000       300        60%
  Contribution margin       $100,000   $ 200          40%
  Less: fixed expenses        80,000
  Net income                $ 20,000
The Master Budget
                        Sales
                       Budget


  Ending                                     Selling and
                     Production
Inventory                                   Administrative
                       Budget
  Budget                                       Budget

 Direct                Direct               Manufacturing
Materials              Labor                  Overhead
 Budget                Budget                  Budget


                        Cash
                       Budget


            Budgeted Financial Statements
The Direct Materials Budget
                      April      May       June     Quarter
Production            26,000     46,000    29,000   101,000
Materials per unit          5         5         5         5
Production needs     130,000    230,000   145,000   505,000
Add desired
 ending inventory     23,000     14,500    11,500    11,500
Total needed         153,000    244,500   156,500   516,500
Less beginning
 inventory            13,000     23,000    14,500    13,000
Materials to be
 purchased           140,000    221,500   142,000   503,500
Labor Variances Summary
 Actual Hours         Actual Hours         Standard Hours
      ×                     ×                        ×
 Actual Rate         Standard Rate           Standard Rate
  1,550 hours         1,550 hours           1,500 hours
      ×                      ×                        ×
$6.20 per hour       $6.00 per hour         $6.00 per hour
  = $9,610           = $9,300               = $9,000


         Rate variance          Efficiency variance
       $310 unfavorable          $300 unfavorable
Flexible Budget
                       Performance Report
                            CheeseCo
                         Cost     Total
                       Formula    Fixed      Flexible   Actual
                       Per Hour   Costs       Budget    Results    Variances
Machine hours                                   8,000     8,000         0
Variable costs
   Indirect labor      $   4.00              $ 32,000   $ 34,000   $ 2,000 U
   Indirect material       3.00                24,000     25,500     1,500 U
   Power                   0.50                 4,000      3,800       200 F
Total variable costs   $   7.50              $ 60,000   $ 63,300   $ 3,300 U
Fixed Expenses
   Depreciation                   $ 12,000   $ 12,000   $ 12,000         0
   Insurance                         2,000      2,000      2,050         50 U
Total fixed costs                            $ 14,000   $ 14,050         50 U
Total overhead costs                         $ 74,000   $ 77,350   $ 3,350 U
Utilization of a Constrained
           Resource
Let’s calculate the contribution margin
per unit of the scarce resource,
machine A1.



    If there are no other considerations, the best
      plan would be to produce to meet current
    demand for Product 2 and then use remaining
             capacity to make Product 1.

Weitere ähnliche Inhalte

Was ist angesagt?

Cost concepts
Cost conceptsCost concepts
Cost concepts
wolfaze
 
Material control and its techniques
Material control and its techniquesMaterial control and its techniques
Material control and its techniques
nidhikathakur
 
Financial statement analysis types & techniques
Financial statement analysis types & techniquesFinancial statement analysis types & techniques
Financial statement analysis types & techniques
Dr. Abzal Basha
 

Was ist angesagt? (20)

As 2 inventories valuation
As   2 inventories valuationAs   2 inventories valuation
As 2 inventories valuation
 
Inventory turnover Ration
Inventory turnover RationInventory turnover Ration
Inventory turnover Ration
 
Inventory valuation
Inventory valuationInventory valuation
Inventory valuation
 
Cost concepts
Cost conceptsCost concepts
Cost concepts
 
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP)
 
Cash budget
Cash budgetCash budget
Cash budget
 
Standard costing and Variance Analysis
Standard costing and Variance AnalysisStandard costing and Variance Analysis
Standard costing and Variance Analysis
 
Absorption Costing Concept
Absorption Costing ConceptAbsorption Costing Concept
Absorption Costing Concept
 
Material control and its techniques
Material control and its techniquesMaterial control and its techniques
Material control and its techniques
 
Material costing and control
Material costing and controlMaterial costing and control
Material costing and control
 
Material control
Material controlMaterial control
Material control
 
Accounting standard 2
Accounting standard 2Accounting standard 2
Accounting standard 2
 
Management Accounting
Management AccountingManagement Accounting
Management Accounting
 
Activity-Based Costing System
Activity-Based Costing SystemActivity-Based Costing System
Activity-Based Costing System
 
Financial statement analysis types & techniques
Financial statement analysis types & techniquesFinancial statement analysis types & techniques
Financial statement analysis types & techniques
 
Material cost and control
Material cost and controlMaterial cost and control
Material cost and control
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Absorption costing vs variable costing
Absorption costing  vs variable costingAbsorption costing  vs variable costing
Absorption costing vs variable costing
 
Marginal costing and break even analysis
Marginal costing and break even analysisMarginal costing and break even analysis
Marginal costing and break even analysis
 
Job costing power point show
Job costing power point showJob costing power point show
Job costing power point show
 

Andere mochten auch

Cost accounting
Cost accountingCost accounting
Cost accounting
ankit_2415
 
Business economics cost analysis
Business economics   cost analysisBusiness economics   cost analysis
Business economics cost analysis
Rachit Walia
 
10 Sectors Factsheet
10 Sectors Factsheet10 Sectors Factsheet
10 Sectors Factsheet
Hang Pham.M
 
Unit or output costing i
Unit or output costing iUnit or output costing i
Unit or output costing i
Gunjan Dhir
 

Andere mochten auch (20)

Cost analysis of project
Cost analysis of projectCost analysis of project
Cost analysis of project
 
Project on Cost Accounting Standards.
Project on Cost Accounting Standards.Project on Cost Accounting Standards.
Project on Cost Accounting Standards.
 
METHODS & TECHNIQUES OF COSTING
METHODS & TECHNIQUES OF COSTINGMETHODS & TECHNIQUES OF COSTING
METHODS & TECHNIQUES OF COSTING
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
 
SAP sample
SAP sampleSAP sample
SAP sample
 
Cost accounting
Cost accountingCost accounting
Cost accounting
 
Cost Concept
Cost ConceptCost Concept
Cost Concept
 
Cvp
CvpCvp
Cvp
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and control
 
G7 Manufacturing Plan and Costing
G7 Manufacturing Plan and Costing G7 Manufacturing Plan and Costing
G7 Manufacturing Plan and Costing
 
Marginal Costing & Profit Planning
Marginal Costing & Profit PlanningMarginal Costing & Profit Planning
Marginal Costing & Profit Planning
 
Láminas desarrollo theoretical framework[1]
Láminas desarrollo theoretical framework[1]Láminas desarrollo theoretical framework[1]
Láminas desarrollo theoretical framework[1]
 
J199 theoretical framework
J199 theoretical frameworkJ199 theoretical framework
J199 theoretical framework
 
Manufacturing Cost (2.008x Lecture Slides)
Manufacturing Cost (2.008x Lecture Slides)Manufacturing Cost (2.008x Lecture Slides)
Manufacturing Cost (2.008x Lecture Slides)
 
Business economics cost analysis
Business economics   cost analysisBusiness economics   cost analysis
Business economics cost analysis
 
Variance analysis
Variance analysisVariance analysis
Variance analysis
 
10 Sectors Factsheet
10 Sectors Factsheet10 Sectors Factsheet
10 Sectors Factsheet
 
Manufacturing planning and control systems
Manufacturing planning and control systemsManufacturing planning and control systems
Manufacturing planning and control systems
 
Calculating the Cost of Fundraising
Calculating the Cost of FundraisingCalculating the Cost of Fundraising
Calculating the Cost of Fundraising
 
Unit or output costing i
Unit or output costing iUnit or output costing i
Unit or output costing i
 

Ähnlich wie Manufacturing cost accounting ppt @ mba finance

Absorption costing vs. marginal costing
Absorption costing vs. marginal costingAbsorption costing vs. marginal costing
Absorption costing vs. marginal costing
shivpratap121
 
Actual Cost Vs Plan Projection Powerpoint Presentation Slides
Actual Cost Vs Plan Projection Powerpoint Presentation SlidesActual Cost Vs Plan Projection Powerpoint Presentation Slides
Actual Cost Vs Plan Projection Powerpoint Presentation Slides
SlideTeam
 
Actual Cost Vs Plan Projection PowerPoint Presentation Slides
Actual Cost Vs Plan Projection PowerPoint Presentation Slides Actual Cost Vs Plan Projection PowerPoint Presentation Slides
Actual Cost Vs Plan Projection PowerPoint Presentation Slides
SlideTeam
 
Absorption and marginal costing
Absorption and marginal costingAbsorption and marginal costing
Absorption and marginal costing
Khalid Aziz
 
Horngrenima14e ch13
Horngrenima14e ch13Horngrenima14e ch13
Horngrenima14e ch13
Anchit Jain
 

Ähnlich wie Manufacturing cost accounting ppt @ mba finance (20)

Cost_sample
Cost_sampleCost_sample
Cost_sample
 
Cost Sample
Cost SampleCost Sample
Cost Sample
 
2. Budget Flessibile
2. Budget Flessibile2. Budget Flessibile
2. Budget Flessibile
 
Absorption costing vs. marginal costing
Absorption costing vs. marginal costingAbsorption costing vs. marginal costing
Absorption costing vs. marginal costing
 
Actual Cost Vs Plan Projection Powerpoint Presentation Slides
Actual Cost Vs Plan Projection Powerpoint Presentation SlidesActual Cost Vs Plan Projection Powerpoint Presentation Slides
Actual Cost Vs Plan Projection Powerpoint Presentation Slides
 
Plan Vs Forecast PowerPoint Presentation Slides
Plan Vs Forecast PowerPoint Presentation SlidesPlan Vs Forecast PowerPoint Presentation Slides
Plan Vs Forecast PowerPoint Presentation Slides
 
B7 flexi budget
B7 flexi budgetB7 flexi budget
B7 flexi budget
 
Actual Cost Vs Plan Projection PowerPoint Presentation Slides
Actual Cost Vs Plan Projection PowerPoint Presentation Slides Actual Cost Vs Plan Projection PowerPoint Presentation Slides
Actual Cost Vs Plan Projection PowerPoint Presentation Slides
 
Actual Cost Vs Budget Powerpoint Presentation Slides
Actual Cost Vs Budget Powerpoint Presentation SlidesActual Cost Vs Budget Powerpoint Presentation Slides
Actual Cost Vs Budget Powerpoint Presentation Slides
 
Actual Cost Vs Budget PowerPoint Presentation Slides
Actual Cost Vs Budget PowerPoint Presentation Slides Actual Cost Vs Budget PowerPoint Presentation Slides
Actual Cost Vs Budget PowerPoint Presentation Slides
 
Cost Vs Budget PowerPoint Presentation Slides
Cost Vs Budget PowerPoint Presentation SlidesCost Vs Budget PowerPoint Presentation Slides
Cost Vs Budget PowerPoint Presentation Slides
 
Actual Vs Budget Variance PowerPoint Presentation Slides
Actual Vs Budget Variance PowerPoint Presentation SlidesActual Vs Budget Variance PowerPoint Presentation Slides
Actual Vs Budget Variance PowerPoint Presentation Slides
 
Absorption and marginal costing
Absorption and marginal costingAbsorption and marginal costing
Absorption and marginal costing
 
Budget Vs Actual Variance Analysis PowerPoint Presentation Slides
Budget Vs Actual Variance Analysis PowerPoint Presentation SlidesBudget Vs Actual Variance Analysis PowerPoint Presentation Slides
Budget Vs Actual Variance Analysis PowerPoint Presentation Slides
 
Horngrenima14e ch13
Horngrenima14e ch13Horngrenima14e ch13
Horngrenima14e ch13
 
Budget Variance PowerPoint Presentation Slides
Budget Variance PowerPoint Presentation SlidesBudget Variance PowerPoint Presentation Slides
Budget Variance PowerPoint Presentation Slides
 
Standard costing
Standard costingStandard costing
Standard costing
 
Fundamentals of accounting - cost value profit (cvp)
Fundamentals of accounting - cost value profit (cvp)Fundamentals of accounting - cost value profit (cvp)
Fundamentals of accounting - cost value profit (cvp)
 
Light
LightLight
Light
 
1. Budget Statico e Consuntivi
1. Budget Statico e Consuntivi1. Budget Statico e Consuntivi
1. Budget Statico e Consuntivi
 

Mehr von Babasab Patil

Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Marketing management module 2 marketing environment mba 1st sem by babasab pa...Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Babasab Patil
 
Marketing management module 4 measuring andforecasting demand mba 1st sem by...
Marketing management module 4  measuring andforecasting demand mba 1st sem by...Marketing management module 4  measuring andforecasting demand mba 1st sem by...
Marketing management module 4 measuring andforecasting demand mba 1st sem by...
Babasab Patil
 
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Babasab Patil
 
Notes managerial communication 3 business correspondence and report writing ...
Notes managerial communication  3 business correspondence and report writing ...Notes managerial communication  3 business correspondence and report writing ...
Notes managerial communication 3 business correspondence and report writing ...
Babasab Patil
 
Notes managerial communication mod 2 basic communication skills mba 1st sem ...
Notes managerial communication mod 2  basic communication skills mba 1st sem ...Notes managerial communication mod 2  basic communication skills mba 1st sem ...
Notes managerial communication mod 2 basic communication skills mba 1st sem ...
Babasab Patil
 
Notes managerial communication mod 4 the job application process mba 1st sem ...
Notes managerial communication mod 4 the job application process mba 1st sem ...Notes managerial communication mod 4 the job application process mba 1st sem ...
Notes managerial communication mod 4 the job application process mba 1st sem ...
Babasab Patil
 
Notes managerial communication mod 5 interviews mba 1st sem by babasab patil...
Notes managerial communication mod 5 interviews  mba 1st sem by babasab patil...Notes managerial communication mod 5 interviews  mba 1st sem by babasab patil...
Notes managerial communication mod 5 interviews mba 1st sem by babasab patil...
Babasab Patil
 
Notes managerial communication part 1 mba 1st sem by babasab patil (karrisatte)
Notes managerial communication part 1  mba 1st sem by babasab patil (karrisatte)Notes managerial communication part 1  mba 1st sem by babasab patil (karrisatte)
Notes managerial communication part 1 mba 1st sem by babasab patil (karrisatte)
Babasab Patil
 
Principles of marketing mba 1st sem by babasab patil (karrisatte)
Principles of marketing mba 1st sem by babasab patil (karrisatte)Principles of marketing mba 1st sem by babasab patil (karrisatte)
Principles of marketing mba 1st sem by babasab patil (karrisatte)
Babasab Patil
 
Marketing management module 1 important questions of marketing mba 1st sem...
Marketing management module 1  important questions of marketing   mba 1st sem...Marketing management module 1  important questions of marketing   mba 1st sem...
Marketing management module 1 important questions of marketing mba 1st sem...
Babasab Patil
 

Mehr von Babasab Patil (20)

Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
Segmentation module 4  mba 1st sem by babasab patil (karrisatte)Segmentation module 4  mba 1st sem by babasab patil (karrisatte)
Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
 
Marketing management module 1 core concepts of marketing mba 1st sem by baba...
Marketing management module 1 core concepts of marketing  mba 1st sem by baba...Marketing management module 1 core concepts of marketing  mba 1st sem by baba...
Marketing management module 1 core concepts of marketing mba 1st sem by baba...
 
Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Marketing management module 2 marketing environment mba 1st sem by babasab pa...Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Marketing management module 2 marketing environment mba 1st sem by babasab pa...
 
Marketing management module 4 measuring andforecasting demand mba 1st sem by...
Marketing management module 4  measuring andforecasting demand mba 1st sem by...Marketing management module 4  measuring andforecasting demand mba 1st sem by...
Marketing management module 4 measuring andforecasting demand mba 1st sem by...
 
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
 
Notes managerial communication 3 business correspondence and report writing ...
Notes managerial communication  3 business correspondence and report writing ...Notes managerial communication  3 business correspondence and report writing ...
Notes managerial communication 3 business correspondence and report writing ...
 
Notes managerial communication mod 2 basic communication skills mba 1st sem ...
Notes managerial communication mod 2  basic communication skills mba 1st sem ...Notes managerial communication mod 2  basic communication skills mba 1st sem ...
Notes managerial communication mod 2 basic communication skills mba 1st sem ...
 
Notes managerial communication mod 4 the job application process mba 1st sem ...
Notes managerial communication mod 4 the job application process mba 1st sem ...Notes managerial communication mod 4 the job application process mba 1st sem ...
Notes managerial communication mod 4 the job application process mba 1st sem ...
 
Notes managerial communication mod 5 interviews mba 1st sem by babasab patil...
Notes managerial communication mod 5 interviews  mba 1st sem by babasab patil...Notes managerial communication mod 5 interviews  mba 1st sem by babasab patil...
Notes managerial communication mod 5 interviews mba 1st sem by babasab patil...
 
Notes managerial communication part 1 mba 1st sem by babasab patil (karrisatte)
Notes managerial communication part 1  mba 1st sem by babasab patil (karrisatte)Notes managerial communication part 1  mba 1st sem by babasab patil (karrisatte)
Notes managerial communication part 1 mba 1st sem by babasab patil (karrisatte)
 
Principles of marketing mba 1st sem by babasab patil (karrisatte)
Principles of marketing mba 1st sem by babasab patil (karrisatte)Principles of marketing mba 1st sem by babasab patil (karrisatte)
Principles of marketing mba 1st sem by babasab patil (karrisatte)
 
Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
Segmentation module 4  mba 1st sem by babasab patil (karrisatte)Segmentation module 4  mba 1st sem by babasab patil (karrisatte)
Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
 
Marketing management module 1 important questions of marketing mba 1st sem...
Marketing management module 1  important questions of marketing   mba 1st sem...Marketing management module 1  important questions of marketing   mba 1st sem...
Marketing management module 1 important questions of marketing mba 1st sem...
 
Discovery shuttle processing NASA before launching the rocket by babasab ...
Discovery shuttle processing  NASA   before  launching the rocket by babasab ...Discovery shuttle processing  NASA   before  launching the rocket by babasab ...
Discovery shuttle processing NASA before launching the rocket by babasab ...
 
Corporate lessons from__iim__calcutta by babasab patil
Corporate lessons from__iim__calcutta by babasab patil Corporate lessons from__iim__calcutta by babasab patil
Corporate lessons from__iim__calcutta by babasab patil
 
Communication problems between men and women by babasab patil
Communication problems between men and women by babasab patil Communication problems between men and women by babasab patil
Communication problems between men and women by babasab patil
 
Brasil waterfall byy babasab patil
Brasil waterfall  byy babasab patil Brasil waterfall  byy babasab patil
Brasil waterfall byy babasab patil
 
Best aviation photography_ever__bar_none by babasab patil
Best aviation photography_ever__bar_none by babasab patil Best aviation photography_ever__bar_none by babasab patil
Best aviation photography_ever__bar_none by babasab patil
 
Attitude stone cutter
Attitude stone cutterAttitude stone cutter
Attitude stone cutter
 
Attitude stone cutter
Attitude stone cutterAttitude stone cutter
Attitude stone cutter
 

Kürzlich hochgeladen

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Kürzlich hochgeladen (20)

ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 

Manufacturing cost accounting ppt @ mba finance

  • 2. Outline Cost Terms, Concepts, and Classifications Job Order Costing Cost Behavior Cost – Volume – Profit Activity Based Costing Profit Planning Standard Costs Flexible Budgets and Overhead
  • 3. Product Costs - A Closer Look Manufacturing Work Raw Materials Costs In Process Beginning raw Direct materials Beginning work in materials inventory + Direct labor process inventory + Raw materials + Mfg. overhead + Total manufacturing purchased = Total manufacturing costs = Raw materials costs = Total work in available for use process for the in production period Costs associated with the goods that – Ending work in are completed during the period are process inventory transferred to finished goods = Cost of goods inventory. manufactured.
  • 4. The Contribution Format Total Unit Sales Revenue $ 100,000 $ 50 Less: Variable costs 60,000 30 Contribution margin $ 40,000 $ 20 Less: Fixed costs 30,000 Net income $ 10,000 The contribution margin format emphasizes cost behavior. Contribution margin covers fixed costs and provides for income.
  • 5. Calculating Breakeven in Units Here is the information from Wind Bicycle Co.: Total Per Unit Percent Sales (500 bikes) $250,000 $ 500 100% Less: variable expenses 150,000 300 60% Contribution margin $100,000 $ 200 40% Less: fixed expenses 80,000 Net income $ 20,000
  • 6. The Master Budget Sales Budget Ending Selling and Production Inventory Administrative Budget Budget Budget Direct Direct Manufacturing Materials Labor Overhead Budget Budget Budget Cash Budget Budgeted Financial Statements
  • 7. The Direct Materials Budget April May June Quarter Production 26,000 46,000 29,000 101,000 Materials per unit 5 5 5 5 Production needs 130,000 230,000 145,000 505,000 Add desired ending inventory 23,000 14,500 11,500 11,500 Total needed 153,000 244,500 156,500 516,500 Less beginning inventory 13,000 23,000 14,500 13,000 Materials to be purchased 140,000 221,500 142,000 503,500
  • 8. Labor Variances Summary Actual Hours Actual Hours Standard Hours × × × Actual Rate Standard Rate Standard Rate 1,550 hours 1,550 hours 1,500 hours × × × $6.20 per hour $6.00 per hour $6.00 per hour = $9,610 = $9,300 = $9,000 Rate variance Efficiency variance $310 unfavorable $300 unfavorable
  • 9. Flexible Budget Performance Report CheeseCo Cost Total Formula Fixed Flexible Actual Per Hour Costs Budget Results Variances Machine hours 8,000 8,000 0 Variable costs Indirect labor $ 4.00 $ 32,000 $ 34,000 $ 2,000 U Indirect material 3.00 24,000 25,500 1,500 U Power 0.50 4,000 3,800 200 F Total variable costs $ 7.50 $ 60,000 $ 63,300 $ 3,300 U Fixed Expenses Depreciation $ 12,000 $ 12,000 $ 12,000 0 Insurance 2,000 2,000 2,050 50 U Total fixed costs $ 14,000 $ 14,050 50 U Total overhead costs $ 74,000 $ 77,350 $ 3,350 U
  • 10. Utilization of a Constrained Resource Let’s calculate the contribution margin per unit of the scarce resource, machine A1. If there are no other considerations, the best plan would be to produce to meet current demand for Product 2 and then use remaining capacity to make Product 1.

Hinweis der Redaktion

  1. 3