2. URBAN DEVELOPMENT DEFINITION
technical and political process concerned with the control of the
use of land and design of the urban environment, including
transportation networks, to guide and ensure the orderly
development of settlements and communities
Web definition:
Urban, city, and town planning integrates land use planning and
transportation planning to improve the built, economic and
social
3. SUSTAINABILITY IN URBAN PLANNING
involves research and analysis, strategic thinking, architecture,
urban design, public consultation, policy recommendations,
implementation and management.
A plan can take a variety of forms including:
strategic plans, comprehensive plans, neighbourhood plans,
regulatory and incentive strategies, or historic preservation
plans.
4. SUNGAI BULOH
Sungai Buloh is a subdistrict (mukim) of Petaling District in the state of
Selangor, Malaysia, bordering Gombak District
It is a 15-minute drive from Sungai Buloh to Kuala Lumpur
Education:
There are currently 2 major high schools in Sungai Buloh - SMK Bandar
Baru Sungai Buloh and SMK Bukit Rahman Putra.
Accessibility:
There is a KTM Komuter station in the middle of Sungai Buloh that
connects to the Rawang - Seremban line. Currently, plans for MRT from
Sungai Buloh to Kajang is under progress.
5.
6.
7. Road Network & Transportation
Most of the road networks are 2-lane of road
During peak hour many cars on the road lead to the traffic jam
Come out with the other option by using the KTM
Safe, fast, and can reduce the traffic jam
Latest construction on the MRT Sungai Buloh- Kajang line.
Due to the population growth,Economic growth,Demand from
the citizens
8. Slope
Mostly flat surface
Less retaining wall structure
The construction of the household area at the hill area.
Maintain the original slope/original platform level
The original slope was maintained.
Achieved the sustainability concept in the construction aspect
9. Drainage System
Drainage system involves the usage of the u-channel drain
Estimated dimension 900mm x 900mm
Locate along side of the road
The flow will discharge to the nearest river-Sungai Buloh
Problem:
Sediment problem cause the river to be shallow-erosion
embankment of the river – flood.
10. Flood affected Sg Buloh-Rawang rail stretch ready by 6am
Saturday-The Sun-16th september 2011
KUALA LUMPUR: The railway tracks and structures at Km366.5
between the Sungai Buloh and Rawang stations, which were inundated
following heavy rain last Wednesday, is expected to be ready by 6am
Saturday.
Following the flood, Keretapi Tanah Melayu Berhad (KTMB) had to
reschedule its Komuter train services, Inter-City services, cargo and the
electric train services (ETS).
11. URBAN DEVELOPMENT
Economic.
Increase the economic growth and financial of the local citizens
Set up their own business
Industrial area-factory-plastic, glass, rubber
TSB Sungai Buloh- TSB Commercial Centre possesses all the
qualities of a prime investment opportunity
Develop by the Dijaya Corperation Bhd.
Project overview
Type: 3- & 4-storey shop
offices
Total no. of units: 173
Built-up: 4,401 - 8,985 sq ft
12. Social
Health service-Hospital Sungai Buloh
Hospital Sungai Buloh is located about 25km from Kuala Lumpur
at Mukim Batu, Daerah Gombak, Selangor. In 1999, the
development of this new Sungai Buloh Hospital (covering 130
acres) has been initiated to meet the needs of the growing
population and also to reduce the influx of patients at Hospital
Kuala Lumpur. The new hospital has 620 beds, and will provide
various secondary and tertiary medical services.