SlideShare a Scribd company logo
1 of 18
Download to read offline
1/1/2011

Project Management
Processes of a Project
Section - 2

Project Management Processes of
a Project
Session Objectives…
1.
1 To understand and able to identify a
Process
2. To Identify Project Management
Processes
3. What are Project Management Process
Groups
4. To understand each project management
process group with its mapping to
project management areas

1
1/1/2011

Project Management Processes
What is a Process?
Activities in pre defined sequence
pre-defined sequence.
Inter-related.
Expected deliverables.
A PROCESS is set of interrelated activities
that are performed to achieve prepre
specified set of products, services or
results.

Project Management Processes
Project
Manager
must
consider
g
Process
Assets
and
Organizational
Enterprise Environmental Factors for every
process.
Organizational Process Assets provide
guidelines and criteria for tailoring
organizational processes to the specific
needs of th project
d f the
j t
Enterprise Environmental Factors may
constrain Project Manager’s options

2
1/1/2011

Project Management Processes
How do we accomplish?
Set of Processes
To achieve preset deliverables
Project Management Processes are
categorized as
Project Management
Processes

Product Oriented
Processes

Generally applicable
processes irrespective of
product of the project

Very specific to product of
the project

Project Management Processes
Project Management Processes are
grouped into :
Initiating Process Group.
Planning Process Group.
Executing Process Group.
Monitoring & Control Process Group
Group.
Closing Process Group.

3
1/1/2011

Process Groups
Initiating Process Group
To define new project and authorizing it
it.
Planning Process Group
Defining objectives and selecting the
best action from alternatives for
successful implementation of Project.
Executing P
E
ti Process Group
G
Coordinating people and resources to
implement the plan.

Process Groups
Monitoring & Control Process Group
Ensuring the project objectives are
met by measuring and monitoring
project progress.
Closing Process Group
Formalizing acceptance of the
g
p
project deliverables and bringing it to
an orderly end.

4
1/1/2011

Project Management Process
Groups

Process Interactions

5
1/1/2011

Initiating Process Group
Lets identify the activities at the start of a
project:project:
Business needs
Feasibility study
Project objectives defined
Alternative approaches
Initial Scope Description
Authorizing the Project

Initiating Process group (2)
(2
1.
2.

Develop Project Charter
Identify Stakeholders
Id if S k h ld

6
1/1/2011

Develop Project Charter
What do we need to develop PROJECT
CHARTER?
Lets name them
1. Project Statement of Work
2. Business Case
3. Contract
4. Organizational P
4O
l Process A
Assets
5. Enterprise Environmental Factors
We call these as INPUTS

Develop Project Charter
What do we do with these INPUTS to
develop
PROJECT CHARTER?
1. Expert Judgment
We call these as TOOLS AND
TECHNIQUES
Q
ITTO abbreviation of INPUTS,
TOOLS AND TECHNIQUES, AND
OUTPUTS

7
1/1/2011

Develop Project Charter

• 1. Contract
• 2. Project Statement of
Work
• 3. Business Case
• 4. Organizational Process
Assets
• 5. Enterprise
Environmental Factors

Tools &
Techniques
• 1. Expert Judgment

Input

• 1. Project Charter

Output

Identify Stakeholders
What do we need to identify
stakeholders?
Lets name them:
1. Project Charter
2. Procurement Documents
3. Organizational Process Assets
3
4. Enterprise Environment Factors
We call these as INPUTS

8
1/1/2011

Identify Stakeholders
What do we do with these INPUTS to
identify stakeholders?
1. Stakeholder Analysis
2. Expert Judgment
We call these as TOOLS AND
TECHNIQUES
Q

Identify Stakeholders

• 1. Project Charter
• 2. Procurement
Documents
• 3. Organizational
Process Assets
• 4. Enterprise
Environment Factors

Input

Tools &
Techniques
• 1. Stakeholder Analysis
• 2. Expert Judgment

• 1. Stakeholder register
• 2. Stakeholder
management strategy

Output

9
1/1/2011

Planning Process group (20)
(20)
1. Develop Project Management Plan
2.
2 Collect Requirements
3. Define Scope
4. Create WBS
5. Define Activities
6.
6 Sequence Activities
7. Estimate Activity Resources

Planning Process group (20)
(20)
8. Estimate Activity Duration
9.
9 Schedule Development
10. Estimate Costs
11. determine Budgets
12. Plan Quality
13.
13 Develop Human Resource Plan
14. Plan Communications

10
1/1/2011

Planning Process group (20)
(20)
15. Plan Risk Management
16.
16 Identify Risks
17. Perform Qualitative Risk Analysis
18. Perform Quantitative Risk Analysis
19. Plan Risk Response
20.
20 Plan Procurements

Executing Process group (8)
(8
1. Direct and Manage Projects execution
2.
2 Perform Quality Assurance
3. Acquire Project Team
4. Develop Project Team
5. Manage Project Team
6.
6 Distribute Information
7. Manage Stakeholder expectations
8. Conduct Procurements

11
1/1/2011

Monitoring & Controlling Process
group (10)
(10)
1. Monitor and Control Project Work
2. Perform Integrated Change Control
g
g
3.Verify Scope
4. Control Scope
5. Control Schedule
6. Control Costs
7. Perform Quality Control
8. Report Performance
9. Monitor & Control Risks
10. Administer Procurements

Closing Process group (2)
(2
1. Close Project
2.
2 Close Procurements

12
1/1/2011

Processes Mapping
Project Management Integration

Processes Mapping
Project Scope Management

13
1/1/2011

Processes Mapping
Project Time Management

Processes Mapping
Project Cost Management

14
1/1/2011

Processes Mapping
Project Quality Management

Processes Mapping
Project Human Resource
Management

15
1/1/2011

Processes Mapping
Project Communications Management

Processes Mapping
Project Risk Management

16
1/1/2011

Processes Mapping
Project Procurement Management

Project Management
Processes of a Project

To Sum up….
1. Understood and are able to identify a
Process
2. We know to identify Project
Management Processes.
3. We know Project Management Process
Groups
p
4. Understood each project management
process group with its mapping to
project management areas.

17
1/1/2011

Questions ?

18

More Related Content

What's hot

Pmbok 5cartulinas
Pmbok 5cartulinasPmbok 5cartulinas
Pmbok 5cartulinasPedro Arcas
 
Brief compare of PMBOK and ISO21500 project management approaches
Brief compare of PMBOK and ISO21500 project management approachesBrief compare of PMBOK and ISO21500 project management approaches
Brief compare of PMBOK and ISO21500 project management approachesIE Private Consulting in PM & ITSM
 
PMP Knowledge Areas - PMBOK 6 (PMI) INFOGRAPHIC
PMP Knowledge Areas  - PMBOK 6  (PMI)   INFOGRAPHICPMP Knowledge Areas  - PMBOK 6  (PMI)   INFOGRAPHIC
PMP Knowledge Areas - PMBOK 6 (PMI) INFOGRAPHICJonathan Donado
 
5.1 Plan Scope Management
5.1 Plan Scope Management5.1 Plan Scope Management
5.1 Plan Scope ManagementDavidMcLachlan1
 
PMP Chapter 6 of 6 closing process group (1- Process) (Based on PMBOK 6th ed...
PMP Chapter 6 of 6  closing process group (1- Process) (Based on PMBOK 6th ed...PMP Chapter 6 of 6  closing process group (1- Process) (Based on PMBOK 6th ed...
PMP Chapter 6 of 6 closing process group (1- Process) (Based on PMBOK 6th ed...Shamil Habet
 
PMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionPMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionRicardo Viana Vargas
 
PMP chapter(4) INTEGRATION MANAGEMENT
PMP chapter(4) INTEGRATION MANAGEMENTPMP chapter(4) INTEGRATION MANAGEMENT
PMP chapter(4) INTEGRATION MANAGEMENTHisham Ali,PMP
 
Project Management Plan
Project Management Plan Project Management Plan
Project Management Plan Pracas Infosys
 
Project integration management
Project  integration managementProject  integration management
Project integration managementdeep sharma
 
Proses Manajemen Proyek - PMBOK Guide Fifth Edition Chapter 3
Proses Manajemen Proyek - PMBOK Guide Fifth Edition Chapter 3 Proses Manajemen Proyek - PMBOK Guide Fifth Edition Chapter 3
Proses Manajemen Proyek - PMBOK Guide Fifth Edition Chapter 3 Primaaasue
 
4.4 Manage Project Knowledge
4.4 Manage Project Knowledge4.4 Manage Project Knowledge
4.4 Manage Project KnowledgeDavidMcLachlan1
 
Program management audit checklist
Program management audit checklistProgram management audit checklist
Program management audit checklistBob Prieto
 
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)Ricardo Viana Vargas
 
foundatamp;practitioner)princeion&2aombigile
foundatamp;practitioner)princeion&2aombigilefoundatamp;practitioner)princeion&2aombigile
foundatamp;practitioner)princeion&2aombigileAnne Starr
 

What's hot (20)

9.5 Manage Team
9.5 Manage Team9.5 Manage Team
9.5 Manage Team
 
Itto pmbok guide 6th edition
Itto   pmbok guide 6th editionItto   pmbok guide 6th edition
Itto pmbok guide 6th edition
 
Pmbok 5cartulinas
Pmbok 5cartulinasPmbok 5cartulinas
Pmbok 5cartulinas
 
Brief compare of PMBOK and ISO21500 project management approaches
Brief compare of PMBOK and ISO21500 project management approachesBrief compare of PMBOK and ISO21500 project management approaches
Brief compare of PMBOK and ISO21500 project management approaches
 
PMP Knowledge Areas - PMBOK 6 (PMI) INFOGRAPHIC
PMP Knowledge Areas  - PMBOK 6  (PMI)   INFOGRAPHICPMP Knowledge Areas  - PMBOK 6  (PMI)   INFOGRAPHIC
PMP Knowledge Areas - PMBOK 6 (PMI) INFOGRAPHIC
 
5.1 Plan Scope Management
5.1 Plan Scope Management5.1 Plan Scope Management
5.1 Plan Scope Management
 
Project managment 3
Project managment 3Project managment 3
Project managment 3
 
Pmp in summary
Pmp in summaryPmp in summary
Pmp in summary
 
PMP Chapter 6 of 6 closing process group (1- Process) (Based on PMBOK 6th ed...
PMP Chapter 6 of 6  closing process group (1- Process) (Based on PMBOK 6th ed...PMP Chapter 6 of 6  closing process group (1- Process) (Based on PMBOK 6th ed...
PMP Chapter 6 of 6 closing process group (1- Process) (Based on PMBOK 6th ed...
 
PMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionPMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th Edition
 
PMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration managementPMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration management
 
PMP chapter(4) INTEGRATION MANAGEMENT
PMP chapter(4) INTEGRATION MANAGEMENTPMP chapter(4) INTEGRATION MANAGEMENT
PMP chapter(4) INTEGRATION MANAGEMENT
 
Project Management Plan
Project Management Plan Project Management Plan
Project Management Plan
 
Project integration management
Project  integration managementProject  integration management
Project integration management
 
PgMP 02 - Program Performance Domainv1
PgMP 02 - Program Performance Domainv1PgMP 02 - Program Performance Domainv1
PgMP 02 - Program Performance Domainv1
 
Proses Manajemen Proyek - PMBOK Guide Fifth Edition Chapter 3
Proses Manajemen Proyek - PMBOK Guide Fifth Edition Chapter 3 Proses Manajemen Proyek - PMBOK Guide Fifth Edition Chapter 3
Proses Manajemen Proyek - PMBOK Guide Fifth Edition Chapter 3
 
4.4 Manage Project Knowledge
4.4 Manage Project Knowledge4.4 Manage Project Knowledge
4.4 Manage Project Knowledge
 
Program management audit checklist
Program management audit checklistProgram management audit checklist
Program management audit checklist
 
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
 
foundatamp;practitioner)princeion&2aombigile
foundatamp;practitioner)princeion&2aombigilefoundatamp;practitioner)princeion&2aombigile
foundatamp;practitioner)princeion&2aombigile
 

Viewers also liked

Sixth Moment Recommendation Engines for Every Business
Sixth Moment Recommendation Engines for Every BusinessSixth Moment Recommendation Engines for Every Business
Sixth Moment Recommendation Engines for Every BusinessSixth Moment Computing
 
Salvador espriu i castelló
Salvador espriu i castellóSalvador espriu i castelló
Salvador espriu i castellóIsabel Marco
 
AI for a Smaller Smarter Military SDADTC December 17 2013
AI for a Smaller Smarter Military SDADTC December 17 2013AI for a Smaller Smarter Military SDADTC December 17 2013
AI for a Smaller Smarter Military SDADTC December 17 2013Boulder Equity Analytics
 
Портфоліо вчителя початкових класів Бишівської ЗОШ І-ІІІ ст. Бойко Людмили Ми...
Портфоліо вчителя початкових класів Бишівської ЗОШ І-ІІІ ст. Бойко Людмили Ми...Портфоліо вчителя початкових класів Бишівської ЗОШ І-ІІІ ст. Бойко Людмили Ми...
Портфоліо вчителя початкових класів Бишівської ЗОШ І-ІІІ ст. Бойко Людмили Ми...Tetiana Taranchuk
 

Viewers also liked (7)

Project managment 9
Project managment  9Project managment  9
Project managment 9
 
Sixth Moment Recommendation Engines for Every Business
Sixth Moment Recommendation Engines for Every BusinessSixth Moment Recommendation Engines for Every Business
Sixth Moment Recommendation Engines for Every Business
 
Salvador espriu i castelló
Salvador espriu i castellóSalvador espriu i castelló
Salvador espriu i castelló
 
Lukas
LukasLukas
Lukas
 
Project managment 10
Project managment  10Project managment  10
Project managment 10
 
AI for a Smaller Smarter Military SDADTC December 17 2013
AI for a Smaller Smarter Military SDADTC December 17 2013AI for a Smaller Smarter Military SDADTC December 17 2013
AI for a Smaller Smarter Military SDADTC December 17 2013
 
Портфоліо вчителя початкових класів Бишівської ЗОШ І-ІІІ ст. Бойко Людмили Ми...
Портфоліо вчителя початкових класів Бишівської ЗОШ І-ІІІ ст. Бойко Людмили Ми...Портфоліо вчителя початкових класів Бишівської ЗОШ І-ІІІ ст. Бойко Людмили Ми...
Портфоліо вчителя початкових класів Бишівської ЗОШ І-ІІІ ст. Бойко Людмили Ми...
 

Similar to Project managment 2

PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management FrameworkAarti Dahiya PMP
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration managementIrefuser1
 
PMBOK 5th Edition Study Notes
PMBOK 5th Edition Study NotesPMBOK 5th Edition Study Notes
PMBOK 5th Edition Study NotesAtul Gaur PMP
 
PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementMohamed Loey
 
13.0 Project Stakeholder Management Overview
13.0 Project Stakeholder Management Overview13.0 Project Stakeholder Management Overview
13.0 Project Stakeholder Management OverviewDavidMcLachlan1
 
PECB Webinar: Aligning ISO 21500 and PRINCE2
PECB Webinar: Aligning ISO 21500 and PRINCE2PECB Webinar: Aligning ISO 21500 and PRINCE2
PECB Webinar: Aligning ISO 21500 and PRINCE2PECB
 
2.04 integration management
2.04 integration management2.04 integration management
2.04 integration managementreddvise
 
The Program Management Framework—What's New?
The Program Management Framework—What's New? The Program Management Framework—What's New?
The Program Management Framework—What's New? ILRI
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesMohamed Loey
 
11.0 Project Risk Management Overview
11.0 Project Risk Management Overview11.0 Project Risk Management Overview
11.0 Project Risk Management OverviewDavidMcLachlan1
 
Project integration management
Project integration management Project integration management
Project integration management KU Leuven
 
2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...Arlene Smith
 
Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Amr Miqdadi
 
Pm610 1103 b-02-schwappach-loren-p1-ip1
Pm610 1103 b-02-schwappach-loren-p1-ip1Pm610 1103 b-02-schwappach-loren-p1-ip1
Pm610 1103 b-02-schwappach-loren-p1-ip1Loren Schwappach
 
Project Management Body of Knowledge (Integration)
Project Management Body of Knowledge (Integration)Project Management Body of Knowledge (Integration)
Project Management Body of Knowledge (Integration)Jeffrey Cheah
 

Similar to Project managment 2 (20)

PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management Framework
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
Stepwise planning
Stepwise planningStepwise planning
Stepwise planning
 
PMBOK 5th Edition Study Notes
PMBOK 5th Edition Study NotesPMBOK 5th Edition Study Notes
PMBOK 5th Edition Study Notes
 
PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration Management
 
13.0 Project Stakeholder Management Overview
13.0 Project Stakeholder Management Overview13.0 Project Stakeholder Management Overview
13.0 Project Stakeholder Management Overview
 
PECB Webinar: Aligning ISO 21500 and PRINCE2
PECB Webinar: Aligning ISO 21500 and PRINCE2PECB Webinar: Aligning ISO 21500 and PRINCE2
PECB Webinar: Aligning ISO 21500 and PRINCE2
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
Day 1 framework
Day 1 frameworkDay 1 framework
Day 1 framework
 
2.04 integration management
2.04 integration management2.04 integration management
2.04 integration management
 
The Program Management Framework—What's New?
The Program Management Framework—What's New? The Program Management Framework—What's New?
The Program Management Framework—What's New?
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
11.0 Project Risk Management Overview
11.0 Project Risk Management Overview11.0 Project Risk Management Overview
11.0 Project Risk Management Overview
 
Project integration management
Project integration management Project integration management
Project integration management
 
2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...
 
Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3
 
Pm610 1103 b-02-schwappach-loren-p1-ip1
Pm610 1103 b-02-schwappach-loren-p1-ip1Pm610 1103 b-02-schwappach-loren-p1-ip1
Pm610 1103 b-02-schwappach-loren-p1-ip1
 
Project Management Body of Knowledge (Integration)
Project Management Body of Knowledge (Integration)Project Management Body of Knowledge (Integration)
Project Management Body of Knowledge (Integration)
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
 

More from Абдулазіз Мухаммед (6)

Project managment 8
Project managment  8Project managment  8
Project managment 8
 
Project managment 7
Project managment  7Project managment  7
Project managment 7
 
Project managment 6 (a)
Project managment 6 (a)Project managment 6 (a)
Project managment 6 (a)
 
Project managment 6
Project managment 6Project managment 6
Project managment 6
 
Project managment 4
Project managment 4Project managment 4
Project managment 4
 
Project managment 1
Project managment 1Project managment 1
Project managment 1
 

Recently uploaded

Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 

Recently uploaded (20)

Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 

Project managment 2

  • 1. 1/1/2011 Project Management Processes of a Project Section - 2 Project Management Processes of a Project Session Objectives… 1. 1 To understand and able to identify a Process 2. To Identify Project Management Processes 3. What are Project Management Process Groups 4. To understand each project management process group with its mapping to project management areas 1
  • 2. 1/1/2011 Project Management Processes What is a Process? Activities in pre defined sequence pre-defined sequence. Inter-related. Expected deliverables. A PROCESS is set of interrelated activities that are performed to achieve prepre specified set of products, services or results. Project Management Processes Project Manager must consider g Process Assets and Organizational Enterprise Environmental Factors for every process. Organizational Process Assets provide guidelines and criteria for tailoring organizational processes to the specific needs of th project d f the j t Enterprise Environmental Factors may constrain Project Manager’s options 2
  • 3. 1/1/2011 Project Management Processes How do we accomplish? Set of Processes To achieve preset deliverables Project Management Processes are categorized as Project Management Processes Product Oriented Processes Generally applicable processes irrespective of product of the project Very specific to product of the project Project Management Processes Project Management Processes are grouped into : Initiating Process Group. Planning Process Group. Executing Process Group. Monitoring & Control Process Group Group. Closing Process Group. 3
  • 4. 1/1/2011 Process Groups Initiating Process Group To define new project and authorizing it it. Planning Process Group Defining objectives and selecting the best action from alternatives for successful implementation of Project. Executing P E ti Process Group G Coordinating people and resources to implement the plan. Process Groups Monitoring & Control Process Group Ensuring the project objectives are met by measuring and monitoring project progress. Closing Process Group Formalizing acceptance of the g p project deliverables and bringing it to an orderly end. 4
  • 6. 1/1/2011 Initiating Process Group Lets identify the activities at the start of a project:project: Business needs Feasibility study Project objectives defined Alternative approaches Initial Scope Description Authorizing the Project Initiating Process group (2) (2 1. 2. Develop Project Charter Identify Stakeholders Id if S k h ld 6
  • 7. 1/1/2011 Develop Project Charter What do we need to develop PROJECT CHARTER? Lets name them 1. Project Statement of Work 2. Business Case 3. Contract 4. Organizational P 4O l Process A Assets 5. Enterprise Environmental Factors We call these as INPUTS Develop Project Charter What do we do with these INPUTS to develop PROJECT CHARTER? 1. Expert Judgment We call these as TOOLS AND TECHNIQUES Q ITTO abbreviation of INPUTS, TOOLS AND TECHNIQUES, AND OUTPUTS 7
  • 8. 1/1/2011 Develop Project Charter • 1. Contract • 2. Project Statement of Work • 3. Business Case • 4. Organizational Process Assets • 5. Enterprise Environmental Factors Tools & Techniques • 1. Expert Judgment Input • 1. Project Charter Output Identify Stakeholders What do we need to identify stakeholders? Lets name them: 1. Project Charter 2. Procurement Documents 3. Organizational Process Assets 3 4. Enterprise Environment Factors We call these as INPUTS 8
  • 9. 1/1/2011 Identify Stakeholders What do we do with these INPUTS to identify stakeholders? 1. Stakeholder Analysis 2. Expert Judgment We call these as TOOLS AND TECHNIQUES Q Identify Stakeholders • 1. Project Charter • 2. Procurement Documents • 3. Organizational Process Assets • 4. Enterprise Environment Factors Input Tools & Techniques • 1. Stakeholder Analysis • 2. Expert Judgment • 1. Stakeholder register • 2. Stakeholder management strategy Output 9
  • 10. 1/1/2011 Planning Process group (20) (20) 1. Develop Project Management Plan 2. 2 Collect Requirements 3. Define Scope 4. Create WBS 5. Define Activities 6. 6 Sequence Activities 7. Estimate Activity Resources Planning Process group (20) (20) 8. Estimate Activity Duration 9. 9 Schedule Development 10. Estimate Costs 11. determine Budgets 12. Plan Quality 13. 13 Develop Human Resource Plan 14. Plan Communications 10
  • 11. 1/1/2011 Planning Process group (20) (20) 15. Plan Risk Management 16. 16 Identify Risks 17. Perform Qualitative Risk Analysis 18. Perform Quantitative Risk Analysis 19. Plan Risk Response 20. 20 Plan Procurements Executing Process group (8) (8 1. Direct and Manage Projects execution 2. 2 Perform Quality Assurance 3. Acquire Project Team 4. Develop Project Team 5. Manage Project Team 6. 6 Distribute Information 7. Manage Stakeholder expectations 8. Conduct Procurements 11
  • 12. 1/1/2011 Monitoring & Controlling Process group (10) (10) 1. Monitor and Control Project Work 2. Perform Integrated Change Control g g 3.Verify Scope 4. Control Scope 5. Control Schedule 6. Control Costs 7. Perform Quality Control 8. Report Performance 9. Monitor & Control Risks 10. Administer Procurements Closing Process group (2) (2 1. Close Project 2. 2 Close Procurements 12
  • 13. 1/1/2011 Processes Mapping Project Management Integration Processes Mapping Project Scope Management 13
  • 14. 1/1/2011 Processes Mapping Project Time Management Processes Mapping Project Cost Management 14
  • 15. 1/1/2011 Processes Mapping Project Quality Management Processes Mapping Project Human Resource Management 15
  • 16. 1/1/2011 Processes Mapping Project Communications Management Processes Mapping Project Risk Management 16
  • 17. 1/1/2011 Processes Mapping Project Procurement Management Project Management Processes of a Project To Sum up…. 1. Understood and are able to identify a Process 2. We know to identify Project Management Processes. 3. We know Project Management Process Groups p 4. Understood each project management process group with its mapping to project management areas. 17