SAP BW Training provided Online from USA industry expert trainers with real time project experience. Duration: 65-70hrs. Live & Video training. Ph: 515-661-4193
For More Info: Please visit, http://www.zarantech.com/course-list/sap/bw-bi
TOPICS COVERED: All New Features of SAP NetWeaver BW 7.3 including: - Graphical Data Modeling with very Complex dataflows
- Advanced Info providers (Hybrid providers,Trasit providers,Sematically Partioned Objects.
- SAP NetWeaver BW and In-Memory Technology (SAP HANA SP5 In memory Optimized cubes,In Memory Optimized DSO'S,Completely Migration Concepts Using Migration Tool)
- New SAP NetWeaver BW 7.3 Hierarchy ETL ,Uploading Hierarchy from the Faltfiles using new Hierarchy Frame Work.
- SAP NetWeaver BW 7.3 and SAP Business Objects (SBO)
- BW 7.3 Enhancements in: Process Chains,DSO'S ,MASTER DATA LOADING,TRANSFORMATIONS
- Unit and Currency Conversions in Transformations.
- ABAP Will be Covered Up to What Extent BW Consultant Required for Complex routines,Functional Modules
- Very Complex Routines,Lokup ,Return Table..For Every Dataflow " Expert Routine is Also Covered" in detail.
- Mini project " With very Complex dataflows (All realtime Project Scenarios.
- DataFlow Upgradation Tool .How to Upgrade 3.X dataflows to BW 7.X dataflows Using DataFlow Upgradation Tool.
- Integration with SAP BO DS 4.0 (ETL with SAP BO DS 4.0) SAP BW as Source using "OPENHUB Destinations" and "BW as target" in SAP BODS 4.0 all scenarios will be covered(ABAP Dataflows)
- Main project(Students have to complete END TO END Implemented project (For One Business Senario).
Cannot Attend LIVE sessions !! - Then we have another option for you. It is called Instructor led VIDEO training. See this Video for more info, youtube.com/watch?v=naPdAyKvAI0
1. SAP BW BI 7.3 Professional Competency Development Program – Session Schedule
We focus on delivering Role-Specific training rather than Product based Training
SAP BW BI Professional Role Based Training
Course Duration: 65-70 hrs + Case Studies + 3
months SAP BW BI 7.3 Server Access with ECC
Prerequisite: Knowledge of RDBMS
C
L
Timings: Weekdays & Weekends (after work hours)
Mode of Training: Live Instructor-led online training
using Cisco Webex Meeting Center tool.
How Are We Different?
We just don’t teach SAP BW 7.3 Concepts but we share our real-time implementation experiences to get
the audiences ready to face customers and Implement Solutions.
We don’t just teach SAP BW 7.3but we make them Complete & Full fledged SAP BW 7.3 Consultants by
training them on Development, Administration & Application Design with Project based real-time
scenarios and several Case Studies for practice
Our faculties are not just technical developers or trainer’s, they are industry experts and consultants for
fortune 500 companies who are highly capable of understanding the business and know how technology
can be closely connected with people and business.
Our Role-Specific training differs from any other training company in the world
h
c
L
e
T
n
a
Training Highlights:
Focus on Hands on training with lot of
assignments, practice exercises and quizzes
Assignments, Case Studies & Study Material
SAP BW 7.3 Concepts covered for better
understanding
Case Studies based on Real-time project
based Scenarios
SAP BW 7.0 Certification Guidance
Certificate of Participation at the end.
r
a
Z
Benefits:
Quality Course Material & E-books
24 x 7 Online access to trainers for Doubts
Clarification,
Project based training with hands on exp
Resume Preparation Guidance
Mock Interviews from Professional Consultants,
Marketing one-on-one with a Recruiter
Real-time Project Documents
Onsite Job assistance for 3-4 months
What will you Special Project training programs for trained
learn?
OPT’s and CPT’s
ZaranTech LLC. , http://www.zarantech.com, info@zarantech.com , (515) 309-7846, Page - 1
5550 Wild Rose Lane, Suite 400, West Des Moines IA 50266
2. SAP BW BI 7.3 Professional Competency Development Program – Session Schedule
We focus on delivering Role-Specific training rather than Product based Training
In this training, attendees learn:
I. MODELING
Unit 1: The Multi-dimensional Model in SAP BI 7.3
Unit 2: Data Extraction and Data Flow within SAP BI 7.3 NW 2004S
Unit 3: New Data source Concept of BI 7.3
Unit 4: Transformation in BI 7.3(ETL)
Unit 5: DTP (Data Transfer Process)
Unit 6: UPGRADING DATAFLOWS FROM 3.X TO BI 7.3
Unit 7: Business Content
Unit 8: Administration of InfoCubes and Aggregates
Unit 9: DSO (DATA STORE OBJECTS)
Unit 10: Virtual Cubes and Multi Providers
Unit 11: New Enhancement of SAP BW 7.3
Mini project: The student has to work on 5 dataflows given by the Instructor.
II. DATA EXTRACTIONS (ETL)
ECC Extractions Using BI 7.3 Dataflows
Unit 1: Overview of ECC6.0 Extractions.
Unit 2: Generic Extractions.
Unit 3: Business Content Extractions
Unit 4: CO-PA Extractions (COST PROFITABLE ANALYSIS)
Unit 5: LO-COCK PIT Extractions (LOGISTICS)
Unit 6: FI-SL Extractions (Financial special purpose ledger)
SAP CRM Extractions.
Unit 7: Delta Management
Unit 8: Extracting Master Data from CC (Attributes, Text, Hierarchies)
Unit 9: Datasource Enhancement
Unit 10: Process Chains in Detail covering all process Types
Unit 11: Upgrading process Chains from 3.x to BI 7.3
Unit 12: APDS (Analysis Process Designers)
Unit 13: New Enhancement of SAP BW 7.3
h
c
C
L
L
e
T
n
a
III. REPORTING
Unit 1: Introduction to BI Enterprise Reporting.
Unit 2: Navigating in Reports
Unit 3: First Steps in Query Designer
Unit 4: Key Figures
Unit 5: CHARACTERSTICS
Unit 6: Attributes
Unit 7: Exceptions and Conditions.
r
a
Z
ADVANCED REPORTING Topics
Unit 8: RRI (report to report interface)
Unit 9: Bex Analyzer
Unit 10: Bex Web Analyzer
ZaranTech LLC. , http://www.zarantech.com, info@zarantech.com , (515) 309-7846, Page - 2
5550 Wild Rose Lane, Suite 400, West Des Moines IA 50266
3. SAP BW BI 7.3 Professional Competency Development Program – Session Schedule
We focus on delivering Role-Specific training rather than Product based Training
Unit 11: Overview of Information Broadcaster.
Unit 12: Web Reporting using new Web Application Designer
Unit 13: New Enhancement of SAP BW 7.3
Overview of Integrated Planning in BI 7.3 (IP)
Transporting Objects (CTO).
NEW ENHANCEMENTS OF SAP BW 7.3
UNIT 1: Hybrid provider
UNIT 2: New monitors in BW Administration cockpit
UNIT 3: Generic delta functionalities for further types of Data Sources
UNIT 4: Hierarchies
UNIT 5: Data Transfer Process (DTP)
UNIT 6: Open Hub Service
UNIT 7: Transformation
UNIT 8: SAP BODS (New ETL Tool of SAP) Integration
h
c
Main Project Will be given to the students once they finished the course.
Attendees also learn:
1.
2.
e
T
2.
3.
4.
5.
n
a
Someone who is looking to start their career in SAP
Someone who is looking for a career in SAP BW 7.3 for SAP customers
Someone who is working as a SAP consultant and wants to learn SAP BW 7.3 skills
r
a
About the trainer:
1.
L
Resume Preparation Guidelines and Tips
Mock Interviews and Interview Preparation Tips should attend?
Who should plan on joining?
C
L
More than 12 years of Consulting & Teaching experience in different modules of SAP BW versions (2.0B, 2.1,
3.0B, 3.1C, 3.5, BW 7.0 NW 2004S), BPC, CRM (5.0, CRM2007), SD, ABAP/4. Primarily SAP BI with SAP Business
Objects.
Certified SAP BO Consultant with (a) WEBI XI 3.0 level 1 & 2 (b) SAP Crystal reports level 1 & 2 Certifications
With a strong back ground in training and deep knowledge of the core subject and techniques on getting
certification successfully completed many batches in US and Canada.
Trained over 500 students and 80% of the students accomplished in getting certification in various modules.
Taught more than 50 BW/BI batches in various versions 2.X, 3.0B, 3.1, 3.5, BI 7.3 NW 2004S in US and Canada
for major Consulting companies like CGI, DELLOLITE, etc.
Z
ZaranTech LLC. , http://www.zarantech.com, info@zarantech.com , (515) 309-7846, Page - 3
5550 Wild Rose Lane, Suite 400, West Des Moines IA 50266
4. SAP BW BI 7.3 Professional Competency Development Program – Session Schedule
We focus on delivering Role-Specific training rather than Product based Training
SAP BW 7.3 TRAINING PROGRAM
ROADMAP
SAP Overview
OLTP/OLAP/E-R
Model/MDM Model
Data Warehousing
Workbench/info
objects/infocubes
Uploading
Master/Transactional
Data
New Data Source
Concept
DSO’S in Detail
Administration of
Infocubes and
Aggregates
h
c
New SAP BW 7.3 Enhancements
Lo-cockpit Extractions
Z
SAP BODS Integration
L
e
T
Multi providers /
Infosets/Virtual Cubes
Business Content
Extractions
Process Chains
Bex Reporting
n
a
r
a
Transportations
Transformations/DTP
Financial Extractions
Generic Extractions
Query Designer/Bex
Analyzer
C
L
BW 7.3 Dataflow
Overview/Data source
WAD/Report Designer
/WEB Analyzer
Delta Management/
Apds’
Security and
Authorization
Backend/Query
Performance
Hybrid provider
Introduction to HANA
100 plus Assignments
Case Studies
SAP BW 7.0 Certification Guidance
ZaranTech LLC. , http://www.zarantech.com, info@zarantech.com , (515) 309-7846, Page - 4
5550 Wild Rose Lane, Suite 400, West Des Moines IA 50266
5. SAP BW BI 7.3 Professional Competency Development Program – Session Schedule
We focus on delivering Role-Specific training rather than Product based Training
Topics covered:
I. MODELING
Unit 1: The Multi-dimensional Model in SAP BI
1. The SAP BW Star Schema Concept
2. Data warehousing Workbench (DWB)
3. InfoObjects
4. InfoCubes
Unit 2: Data Extraction and Data Flow within SAP BI 7.3 NW 2004S
1. 3.x Dataflow
2. Overview of BI 7.3 Dataflow
3. Comparison of 3.x and BI 7.3 Data flows
4. Loading Master Data (Attributes, Texts, Hierarchies)
5. Loading Transaction Data
Unit 3: New Data source Concept of BI 7.3
1. Overview of new Datasource
2. Emulation of Data source in BI 7.3
3. Datasource Lifecycle with In BI 7.3 NW 2004S
4. Migration of 3.x data source to BI 7.3 data source
h
c
C
L
L
e
T
Unit 4: Transformation in BI 7.3(ETL)
1. In depth coverage of Transformation
2. Routines in Transformations (Start routine, End routine, Expert routine, transformation routine) with different
Real Time examples
3. Transformation Groups
4. Unit and currency Conversions
n
a
Unit 5: DTP (Data Transfer Process)
1. Overview of DTPS
2. Trouble shooting techniques in DTPS
3. Debugging ABAP routines Using DTPS
r
a
Unit 6: UPGRADING DATAFLOWS FROM 3.X TO BI 7.3
Unit 7: Business Content
1. Business Content (BCT)
Unit 8: Administration of InfoCubes and Aggregates
1. Managing Basic Cubes
2. Aggregates
3. BI Accelerators
Z
Unit 9: DSO (DATA STORE OBJECTS)
ZaranTech LLC. , http://www.zarantech.com, info@zarantech.com , (515) 309-7846, Page - 5
5550 Wild Rose Lane, Suite 400, West Des Moines IA 50266
6. SAP BW BI 7.3 Professional Competency Development Program – Session Schedule
We focus on delivering Role-Specific training rather than Product based Training
1. Data Store Objects concept
Unit 10: Virtual Cubes and Multi Providers
1. Virtual Cubes
2. Multi Providers
Mini project: The student has to work on 5 dataflows given by the Instructor.
C
L
II. DATA EXTRACTIONS (ETL)
ECC extractions using BI 7.3 Data flows.
Unit 1: Overview of ECC6.0 Extractions.
1. Types of ECC extractions
Unit 2: Generic Extractions.
1. Generic Extraction using
a. Database Table
b. View
c. Classical Infosets.
d. Functional Module.
e
T
Unit 3: Business Content Extractions
1. Overview of Business Content Extractions.
2. Examples from Financial, Logistics, HRMS modules.
Unit 4: CO-PA Extractions (COST PROFITABLE ANALYSIS)
Unit 5: LO-COCK PIT Extractions (LOGISTICS)
h
c
L
n
a
Unit 6: FI-SL Extractions (Financial special purpose ledger)
SAP CRM extractions.
1. Marketing Extractions
2. CRM SALES Extractions
3. CRM SERVICE Extractions (CRM Extractions are Very High in demand)
r
a
Unit 7: Delta Management
Unit 8: Extracting Master Data from CC (Attributes, Text, Hierarchies)
Z
Unit 9: Datasource Enhancement
Unit 10: Process Chains in Detail covering all process Types
1. Real time examples on process Chains (Meta Chains)
ZaranTech LLC. , http://www.zarantech.com, info@zarantech.com , (515) 309-7846, Page - 6
5550 Wild Rose Lane, Suite 400, West Des Moines IA 50266
7. SAP BW BI 7.3 Professional Competency Development Program – Session Schedule
We focus on delivering Role-Specific training rather than Product based Training
Unit 11: Upgrading process Chains from 3.x to BI 7.3
Unit 12: APDS (Analysis Process Designers)
III. REPORTING
Unit 1: Introduction to BI Enterprise Reporting.
1. The SAP BI Overview
C
L
Unit 2: Navigating in Reports
Unit 3: First Steps in Query Designer
1. Query Designer
2. Info providers in query Designer
Unit 4: Key Figures
1. Restricted Key Figures
2. Calculated Key Figures
3. Properties of Key Figures
4. Structures and cells
Unit 5: CHARACTERSTICS
1. Properties and Attributes of Characteristics
2. Integrating attributes and hierarchies in reports.
Unit 6: Attributes
1. Characteristic Variables
2. Hierarchy variables
3. Hierarchy Node variables
4. Formula Variables
5. Text variables
6. Variable Processing types.
Unit 7: Exceptions and Conditions.
1. Exceptions
2. Conditions
h
c
L
e
T
n
a
r
a
ADVANCED REPORTING Topics
Unit 8: RRI (report to report interface)
Z
Unit 9: Bex Analyzer
Unit 10: Bex Web Analyzer
Unit 11: Overview of Information Broadcaster.
ZaranTech LLC. , http://www.zarantech.com, info@zarantech.com , (515) 309-7846, Page - 7
5550 Wild Rose Lane, Suite 400, West Des Moines IA 50266
8. SAP BW BI 7.3 Professional Competency Development Program – Session Schedule
We focus on delivering Role-Specific training rather than Product based Training
Unit 12: Web Reporting using new Web Application Designer
1. In depth of Web reporting using New Web Application Designer,
2. Detail Coverage of Dash Board Reports and each and every Web item of new WAD.
Overview of Integrated Planning in BI 7.3 (IP)
Transporting Objects (CTO).
C
L
NEW ENHANCEMENTS OF SAP BW 7.3
UNIT 1: Hybrid provider
UNIT 2: New monitors in BW Administration cockpit
UNIT 3: Generic delta functionalities for further types of Data Sources
L
UNIT 4: Hierarchies
a) Integration of hierarchies into process flow (DTP, Transformation)
b) Remote hierarchies for direct access to hierarchies in the source system
c) Loading hierarchies from flat file using the new Data Source and Transformation technology
h
c
UNIT 5: Data Transfer Process (DTP)
a) Data Transfer Process supports data extraction from Multi Providers
b) Option to only load the last request from a given source (available for full load DTPs)
c) Data Transfer Process supports referential integrity checks tor navigational attributes of the target
d) Enhanced load performance by possibility to Re-package small data packages within a request to bigger
packages
e
T
UNIT 6: Open Hub Service
a) SAP Net Weaver BW data can be exported in XML format
b) Possibility to change the format and length of BW data for export even into a non-SAP specific format
c) Hierarchy extraction supported by Open Hub
n
a
UNIT 7: Transformation
a) Semantic grouping possible in Transformations (in addition to semantic grouping in DTPs)
b) Possibility to select the Info Objects (fields) the user wants to use in a Start- / End routine
c) Currency and unit conversion for Data Store object and Info Source as target of a Transformation.
d) Navigation attributes of Info Cubes/Data Store objects can be used as source fields in the Transformation
and as
filter/select options in the DTP
e) Automated generation of a proposal by mapping fields of the Data Source to Info Objects
r
a
Z
UNIT 8: SAP BODS (New ETL Tool of SAP) Integration
Main Project will be given to the students once they finished the course.
ZaranTech LLC. , http://www.zarantech.com, info@zarantech.com , (515) 309-7846, Page - 8
5550 Wild Rose Lane, Suite 400, West Des Moines IA 50266
9. SAP BW BI 7.3 Professional Competency Development Program – Session Schedule
We focus on delivering Role-Specific training rather than Product based Training
CASE STUDY 1 – “Fashion Wear”
Data Warehouse Management with SAP BW for “Fashion Wear”:
C
L
Introduction: Our company produces Fashion wear and maintains a world-wide distribution of its products.
Three product groups are offered – Jeans, Boots, and Bags. Each product group comprises of a number of
products. Company’s organization is divided into one production plant and four areas of distribution.
Each area consists of two or more regions, which again has their own distribution centers.
The company’s customers are resellers who are grouped into following customer types: web shop, specialized
store, retail store, shopping clubs.
Customers are attributed to at least one distribution centre.
Company’s cost controlling differentiates three cost groups - variable costs, partly fixed costs, and fixed costs.
L
Responsibility: You are employed as a consultant to design and implement a data warehouse for our company
according to the information given Star Schema.
h
c
Tasks: You should create a Info Cube FW00_SA in the following info area where “00” stands for the user
number: Info Area – FASHION_WEAR_00.
The cube has five dimensions with three navigation attributes, which can be seen from star schema. Additional
it should have key figures according to data file. The dimension organization has a hierarchy, which will be
retrieved from the master data. It is not time-dependent. The dimension time should have following
characteristics. Any further required information can be extracted from data file structure. The source system
and application component should be named as follows. The data will be manually imported from a flat file
system. The info sources shall have the same notation as the info objects. The transfer data shall be directly
imported into the data warehouse. The sequence of transfer data can be reviewed in flat file. Data flow can be
seen in figure below: Source system: FW00_SOSY, Application component: FW00_APPCOMP
e
T
n
a
Data Flow Chart:
r
a
Z
ZaranTech LLC. , http://www.zarantech.com, info@zarantech.com , (515) 309-7846, Page - 9
5550 Wild Rose Lane, Suite 400, West Des Moines IA 50266
10. SAP BW BI 7.3 Professional Competency Development Program – Session Schedule
We focus on delivering Role-Specific training rather than Product based Training
CASE STUDY 2 – “Inventory Disposal Planning System”
Develop an “Inventory Disposal Planning System” for a global:
C
L
The Client: A large consumer products company with major manufacturing facilities in the US and Europe, and
operating in 200 countries.
The Challenge: The client wanted to improve upon its SKU Management process for the disposal of inventory,
to be able to identify its slow-moving products and make timely decisions as to when an item must be taken off
the shelf and disposed off.
L
The Solution: Company partnered with the client to carry out end-to-end development of a monitoring tool
with pre-defined reports needed to support the process of tracking and execute the process of disposal of
rationalized SKUs. The SKU management process utilizes a simplified market level profit valuation of the
demand plan of the individual SKU. This profitability is aggregated across all markets within a region to
determine the regional profitability of the SKU. If the regional profitability of the SKU overtime does not meet
the defined hurdle rate, then the SKU must be identified for elimination. Company’s solution involved
generating reports and trigger processes that would help make critical decisions and take action at the
appropriate time to reduce or manage the inventory of SKUs. The reports are as follows:
h
c
e
T
Action Report: It lists all rationalized SKUs that require the set up of a disposal plan. Disposal plans include
sell off, break down, disposal, charity, transfer, etc. They have a clearly defined execution period by which all
remaining inventory should be disposed off.
Monitor Report: This ensures the follow-through and completion of the disposal process. It indicates the
progress against each planned disposal.
Escalations Enabled Report: Failures to adhere to the applied disposal plan or to meet the deadline are
identified from the Monitor Report and escalations enabled using this report.
Slow-moving Report: This report identifies the slow-moving SKUs and lists demand, inventory and months of
forward coverage.
Non-working Inventory Summary Report: This report is used by Management at the regional and higher
levels within the global value chain organization, to understand the exposure the company has in the form of
inactive and potentially inactive inventory. The report is also used by financial organizations in preparing and
tracking inventory reserves.
n
a
r
a
The Benefits:
1. Quick ramp-up to meet various technology skill requirements, at relatively lower costs
Significant reduction in IT spending by having key resources onsite and coordinating with the offshore
team through the offshore model
End-to-end project responsibility resulting in a single vendor contact.
2. Rationalization to provide USD 3m in annualized carrying cost-savings
3. Process will enforce disposal of promotional goods within one quarter of completion of the promotion. This is
much faster than the current practice and will result in an additional USD 1.3m generated from reduced
carrying costs.
Z
The Technology: SAP BW, Front End - BeX, Database- Oracle 8.1, Autosys.
ZaranTech LLC. , http://www.zarantech.com, info@zarantech.com , (515) 309-7846, Page - 10
5550 Wild Rose Lane, Suite 400, West Des Moines IA 50266