SlideShare ist ein Scribd-Unternehmen logo
1 von 115
Presented to: Riaz Saehu From Indonesian Embassy, Washington DC  December 8 th , 2006 USAID LOGO HERE! Aceh Road / Bridge Reconstruction and Rehabilitation Project
Agenda ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
Roadway Damage
Roadway Damage
Roadway Damage
Roadway Damage
Bridge Damage
Bridge Damage
Bridge Damage
Bridge Damage
Immediate Response Government of Indonesia Military (TNI)
Immediate Response Government of Indonesia Military (TNI)
Immediate Response Government of Indonesia Military (TNI)
Immediate Response Government of Indonesia Military (TNI)
CONSTRUCTION PACKAGES LEGEND Priority Contract Task Order #1  Task Order #2     Task Order #3 JICS Alignment BANDA ACEH LAMNO CALANG MEULABOH 25 150 175 200 225 75 100 125 50 30 September 2009 Task Order No.3 30 September 2009 Task Order No.2 30 September 2009 Task Order No.1 31 December 2007 Priority Contract COMPLETION DATE CONTRACT
Priority  Construction BANDA ACEH Lambeso River Bridge 25 KM 75 Km 92 Km 50 Km SECTION 2  Km15 to Km31 ●   16 Km ●   12 Bridges  ●   19 Culverts SECTION 1A & 1B  Km 55 to Km 65  ●   10 Km  ● 3 Bridges  ● 8 Culverts SECTION 3  Km 46 to Km 47  ●   1Km ●   1 Bridge ● No Culvert SECTION 4  Km 79 to Km 92 ●   13 Km ●   8 Bridges ●   16 Culverts LAMNO Total  Length = 40 Km LEGEND : Major Bridges COMPLETION DATE: 31 DECEMBER 2007 Raba River Bridge Lhoong & Meunasah River Bridges 0 KM
 
 
 
 
 
 
 
BEFORE AFTER
 
 
 
 
LEGEND Task Order #1 Priority Contract JICS Task Order #2 Task Order #3 SECTION A  Km 5 to Km 13  ●   8 Km ●   No Bridge ● 9 Culverts SECTION B  Km 30  to Km 44  ●   14 Km ●   No Bridge ● No Culvert SECTION C  Km 47 to Km 52  ●   6 Km ●   2 Bridges ● 3 Culverts SECTION D  Km 62  to Km 78  ●   16 Km ●   5 Bridges ● 5 Culverts SECTION E  Km 92  to Km 152  ●   60 Km ●   18 Bridges ● 48 Culverts TASK ORDER NO.1 banda aceh to calang COMPLETION DATE: 30 SEPTEMBER 2009 BANDA ACEH LAMNO CALANG MEULABOH 25 150 175 200 225 75 100 125 50
[object Object],Before After November 2, 2006
[object Object],[object Object],before after
 
 
TASK ORDER NO.2 CALANG TO MEULABOH CALANG ,[object Object],[object Object],[object Object],[object Object],LEGEND Construct New Alignment JICS Alignment to remain MEULABOH COMPLETION DATE: 30 SEPTEMBER 2009 220 233 239 200 175
CONCEPT ANALYSIS – TASK ORDER #2 Proposed Bypass Alignment (Km 220) Calang – Meulaboh Scale 1 : 30000 Option 3B Option 3C
TASK ORDER NO.2 TASK ORDER NO.2  Km 220  to Km 233  ●   13 Km ●   2 Bridges ● 4 Culverts COMPLETION DATE: 30 SEPTEMBER 2009 220 233
To Meulaboh
 
 
 
TASK ORDER NO.3 MEULABOH bypass CALANG ,[object Object],[object Object],[object Object],[object Object],LEGEND Construct New Alignment JICS Alignment to remain MEULABOH COMPLETION DATE: 30 SEPTEMBER 2009 220 233 239 200 175
TO#3 TASK ORDER NO.3 239 COMPLETION DATE: 30 SEPTEMBER 2009 243 OPTION 1 OPTION 2 Existing Road JICS Alignment
[object Object],[object Object],[object Object],[object Object],2. SURVEYORS STAKE-OUT CENTERLINE & ROW 3. GOI IDENTIFIES AFFECTED PROPERTIES, CALCULATES AREAS &  STARTS ACQUISITION PROCESS 4. GOI ISSUES SIGNED DRAWINGS  WHEN ACQUISITION COMPLETED 5. START CONSTRUCTION
GOI – LA Mechanisms ●  Laws relating to LA ●  Establishment of LAC Mechanism ●  Price determination ●  Measurements ●  Inventory / assets list ●  Appraisal ●  Landowner agreements Ratification LA Procedures LAC Pemda District Provincial BRR ●   Working Group ●  KPPN Khusus Payment ●  Verification of data ●  Order to pay ●  Direct to bank account Release of Land for Construction
LAND ACQUISITION CALANG BANDA ACEH LEGEND Land Areas & Owners  Identified Land Purchased
LAMNO LEGEND Task Order #1 Priority Contract JICS Task Order #2 PROJECT OVERVIEW Total parcels to be purchased - 963 Total purchased to date – 144  (as of 06.12.06) Remaining - 819 Priority Contract BANDA ACEH CALANG MEULABOH 25 150 175 200 225 75 100 125 50
Desa Keutapang Desa Lamjuhang Desa Mns Cot Desa Glee Bruek Desa Pudeng Desa Pasie SECTION 1 55+500 to 65+128 Pudeng river Lhoong river Desa Meunasah Lhok GOI target date: 1 December 2006 Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND N
Land Acquisition  WIKA Priority Section Section 1 Total km to be purchased   -  9.5km  (not including government land)  Total parcels to be purchased - 229 Total km purchased to date -  5.5 km  (28.11.06)  Total purchased to date - 102 Remaining  - 4km Remaining - 127 *  WIKA contract begins STA 55+500 ** Corrected for station equation 1 December 2006 14 0.977** 62+300 61+350 Lhoong Pasi 1 December 2006 41 0.850 61+350 60+500 Lhoong Pudeng 1 December 2006 24 0.925 60+500 59+575 Lhoong Glee Bruek Complete 45 2.650 64+950 62+300 Lhoong Meunasah Lhok Complete 16 1.375 59+575 58+200 Lhoong Meunasah Cot Complete 35 1.525 58+200 56+675 Lhoong Keutapang 1 December 2006 54 1.369** 56+675 51+850 Lhoong Lamjuhang* GOI target date Total parcels Distance To From Sub-District Location
Desa Lamsenia Desa Lamkruet Desa Pulot Desa Deah Mamplan Desa Layeun Desa  Meunasah Bak’U SECTION 2 15+221 to 29+593 Raba river Dutch river Sara river GOI target date: 31 January 2007 (Lhok Nga) : 15 January 2007 (Leupung) Desa Mon Ikeun Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND N
Land Acquisition  WIKA Priority Section Section 2 Total km to be purchased   - approx 16 km  Total parcels to be purchased - 352 Total km purchased to date   -  0 km   Total parcels purchased to date - 0   Remaining   - 16 km Remaining - 352 ** Corrected for station equation 15 January 2007 50 2.018 30+300 27+575 Leupung Layeun 15 January 2007 45 1.725 27+575 25+850 Leupung Pulot 15 January 2007 30 1.450 25+850 24+400 Leupung Lamsenia 15 January 2007 32 1.175 24+400 23+225 Leupung Meunasah Bak’u 15 January 2007 106 5.315** 23+225 19+525 Leupung Deah Mamplam 31 January 2007 75 3.725 19+525 15+800 Lhok Nga Mon Ikeun 31 January 2007 14 0.579 15+800 15+221 Lhok Nga Lamkruet GOI target date Total parcels Distance To From Sub-district Location
Desa Krueng Kalla SECTION 3  –  44+300 to 45+802 Kalla river GOI target date: 1 December 2006 Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND N
Land Acquisition  WIKA Priority Section Section 3 Total km to be purchased   -  approx 1.5km  Total parcels to be purchased - 60 Total km purchased to date   -  1.01 km   Total parcels purchased to date - 43   Remaining   - 0.49 km Remaining - 17 ** Corrected for station equation 1 December 2006 60 1.552** 46+150 44+300 Lhoong Krueng Kalla GOI target date Total parcels Distance To From Sub-District Location
Desa Glee Putoh Desa Meunasah Weh Desa Leupee Desa Lamme Desa Lhuet Desa Meuntara Desa Babah Dua Desa Teumareum Desa Kuala Desa Bahagia Desa Meudangghon Desa Kareung Ateuh Desa Kuala Unga SECTION 4  –  79+325 to 92+221 Lambeso river GOI target date: 31 January 2007 Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND N
Land Acquisition   WIKA Priority Section Section 4 Total km to be purchased   - approx 13km  Total parcels to be purchased - 322 Total km purchased to date   -  0 km   Total parcels purchased to date - 0   Remaining   - 13 km Remaining - 322 *  WIKA contract begins STA 79+325  ** Corrected for station equation 31 January 2007 28 3.520** 88+720 90+700 Jaya Kuala Unga 31 January 2007 61 2.800 90+700 87+900 Jaya Kareung Ateuh 31 January 2007 54 2.000 87+900 85+900 Jaya Meudangghon 31 January 2007 10 1.100 85+900 84+800 Jaya Bahagia 31 January 2007 15 1.000 84+800 83+800 Jaya Kuala 31 January 2007 27 1.200 83+800 82+600 Jaya Teumarem 31 January 2007 10 0.375 82+600 82+225 Jaya Babah Dua 31 January 2007 19 0.300 82+225 81+925 Jaya Meuntara 31 January 2007 22 0.500 81+925 81+425 Jaya Lhuet 31 January 2007 14 0.225 81+425 81+200 Jaya Lamme 31 January 2007 18 0.625 81+200 80+575 Jaya Leupee 31 January 2007 28 0.950 80+575 79+625 Jaya Meunasah Weh 31 January 2007 16 2.841** 79+625 75+550 Jaya Glee Putoh* GOI target date Total parcels Distance To From Sub-distruct Location
LEGEND Task Order #1 Priority Contract JICS Task Order #2 PROJECT OVERVIEW Total parcels to be purchased - 2760 Total purchased to date – 354  (as of 06.12.06) Remaining - 2406 Task Order #1 BANDA ACEH LAMNO CALANG MEULABOH 25 150 175 200 225 75 100 125 50
Desa Jantang LHOONG  46+150 to 52+014 GOI target date: 1 December 2006 Desa Baroh Blang Me Desa Tengoh Blang Me Desa Lamkuta Blang Me Desa Lamgeuriheu Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND
Land Acquisition   International Contract Total km to be purchased   - approx 5.9 km  Total parcels to be purchased - 383 Total km purchased to date   -  3.4 km   Total parcels purchased to date - 225   Remaining   - 2.5 km Remaining - 158 1 December 2006 55 0.750 51+850 51+100 Lhoong Lamgeuriheu 1 December 2006 78 1.300 51+100 49+800 Lhoong Lamkuta Blang Me 1 December 2006 22 0.250 49+800 49+550 Lhoong Tengoh Blang Me 1 December 2006 89 1.750 49+550 47+800 Lhoong Baroh Blang Me 1 December 2006 139 1.650 47+800 46+150 Lhoong Jantang GOI Target Date Total Parcel Distance To From Sub-District Village
Desa Meudheun Desa Sapek Desa Lamtui Desa Glee Putoh Desa Lambaro Desa Ceunamprong JAYA  70+400 to 101+200 GOI target date: 31 January 2007 Priority Section Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND
Land Acquisition   International Contract *  Corrected for station equation Total km to be purchased   - approx 20.08 km  Total parcels to be purchased - 467 Total km purchased to date   -  0 km   Total parcels purchased to date - 0   Remaining   - 20.08 km Remaining - 467 31 January 2007 152 12.480* 101+200 88+720 Jaya Ceunamprong 31 January 2007 84 2.841* 79+625 75+550 Jaya Meulha/Glee Putoh 31 January 2007 22 0.725 75+550 74+825 Jaya Lamtui 31 January 2007 68 1.725 74+825 73+100 Jaya Lambaro 31 January 2007 34 1.100 73+100 72+000 Jaya Sapek 31 January 2007 107 1.600 72+000 70+400 Jaya Meudheun GOI Target Date Total Parcel Distance To From Sub-District Village
Desa Lhok Kruet SAMPOINIET  101+200 to 127+900 GOI target date: 15 December 2006 15 January 2007 Desa Patek Desa Blang Dalam Desa Gampong Baru Desa Kuala Bakong Desa Jeumpheuk Desa Babah Nipah Desa Kuala Ligan Desa Meunasah Kulam Desa Crak Mong Desa Krueng No Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND
Land Acquisition   International Contract * Corrected for station equation Total km to be purchased   - approx 26.655 km  Total parcels to be purchased - 676 Total km purchased to date   -  0 km   Total parcels purchased to date - 0   Remaining   - 26.655 km Remaining - 676 GOI Target Date Total Parcel Dist. To From Sub-District Village 15 January 2007 165 3.825 127+900 124+075 Sampoiniet Patek 15 January 2007 13 0.725 124+075 123+350 Sampoiniet Blang Dalam 15 January 2007 21 0.850 123+350 122+500 Sampoiniet Gampong Baru 15 January 2007 37 2.500 122+500 120+000 Sampoiniet Kuala Bakong 15 January 2007 55 1.725 120+000 118+275 Sampoiniet Jeumpheuk 15 January 2007 21 1.375 118+275 116+900 Sampoiniet Babah Nipah 15 January 2007 76 3.812* 116+900 113+100 Sampoiniet Kuala Ligan 15 January 2007 94 2.500 113+100 110+600 Sampoiniet Lhok Kruet 15 January 2007 44 1.825 110+600 108+775 Sampoiniet Meunasah Kulam 15 January 2007 65 2.175 108+775 106+600 Sampoiniet Crak Mong 15 January 2007 85 5.456* 106+600 101+200 Sampoiniet Krueng No
SETIA BAKTI & KRUENG SABEE  127+900 to 152+857 GOI target date: 20 November 2006 30 November 2006 Desa Dayah Baro Desa Gampong Blang Desa Keutapang Desa Panton Makmur Desa Lhok Buya Desa Sayeung Desa Lhok Timon Desa Geulumpang Desa Sawang Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND
Land Acquisition   International Contract * Corrected for station equation Total km to be purchased   - approx 19.729 km  Total parcels to be purchased - 1110 Total km purchased to date   -  3 km   Total parcels purchased to date - 98   Remaining   - 16.729 km Remaining - 1012 GOI Target Date Total Parcel Dist. To From Sub-District Village 20 December 2006 79 1.190 147+640 146+450 Setia Bakti Lhok Buya 20 December 2006 174 2.450 146+450 144+000 Setia Bakti Gampong Baro 20 December 2006 312 3.300 144+000 140+700 Setia Bakti Lhok Timon 20 December 2006 266 6.000 140+700 134+700 Setia Bakti Lhok Geulumpang 30 November 2006 279 6.789* 134+700 127+900 Setia Bakti Sawang
Land Acquisition   International Contract Total km to be purchased   - approx 3.910 km  Total parcels to be purchased - 124 Total km purchased to date   -  1 km   Total parcels purchased to date - 31   Remaining   - 2.91 km Remaining - 93 GOI Target Date Total Parcel Dist. To From Sub-District Village 15 January 2007 31 1.580 151+550 149+970 Krueng Sabee Keutapang 15 January 2007 22 0.690 149+970 149+280 Krueng Sabee Dayah Baro 15 January 2007 9 0.225 149+280 149+025 Krueng Sabee Gampong Blang 15 January 2007 62 1.385 149+025 147+640 Krueng Sabee Panton Makmur
Land Acquisition Tracking
LAND ACQUISITION TRACKING
Community Outreach Information and Data Coordination and Facilitation
Community Outreach ,[object Object],[object Object],[object Object],[object Object]
Coordination and Facilitation ,[object Object],[object Object],[object Object],[object Object],[object Object]
Information and Data ,[object Object],[object Object],[object Object]
Environmental Protection Aceh Road/Bridge Reconstruction And Rehabilitation Project
Summary – Mitigation includes: ,[object Object],[object Object],[object Object],[object Object]
BEST MANAGEMENT PRACTICES ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Membangun dam, bak penampungan,  energy dissipaters , dan upaya lainnya untuk mengontrol aliran air (Lihat rancangan terinci).  Jika dibutuhkan, sedimentasi akan ditampung pada kolam sementara atau permanen. Kolam tsb dirancang utk menampung aliran air utk masa 20 tahun hujan, lalu dikeringkan dan sedimentasi dikuras.  Subkontraktor akan melakukan program monitoring kualitas efluen. Build dams, settling basins, energy dissipaters, and other measures, to control downstream flows (See design details). If necessary, sediment shall be trapped in temporary or permanent sediment basins. The basins shall be designed to accommodate runoff from a local 20‑year storm and shall be pumped dry and all sediment removed after each storm.  The site subcontractor shall institute effluent quality monitoring programs. Mempersiapkan rencana pemompaan utk pekerjaan di bawah muka air. Rencana pemompaan air akan ditinjau dan disetujui oleh Pemerintah Amerika dan Pemerintah RI sebelum dimulainya konstruksi. Provide a dewatering plan for work at minus water levels.  The dewatering plan shall be reviewed and approved by the U.S. Government and the GOI prior to the beginning of construction Ya BMP-1 Untuk mengurangi erosi dan sedimentasi  Menyediakan saluran, tanggul, gorong-gorong, dan pencegahan lain utk memperlambat & mengendalikan aliran air dari lokasi konstruksi, mengendalikan air permukaan dan untuk melindungi saluran. BMP-1 to Decrease Erosion and Sediment  Provide ditches, berm, culverts, and other measures to mechanically retard and control runoff from the construction site, to control surface water and to protect drainage courses. Tahap 3 - Tentukan Praktik Pengelolaan Terbaik  Mitigasi Praktik Pengelolaan Terbaik (Tandai Kegiatan yang Sesuai): Step 3 - Prescribe Best Management Practices (BEP’s) Mitigation Best Management Practice (BMPs) (Check Appropriate Action):
EROSION CONTROL
BEST MANAGEMENT PRACTICE BMP-1  to Decrease Erosion and Sediment BMP-2  to avoid obstructing water flow/to enhance drainage pattern: BMP-3  to minimize impacts to natural resources
EROSION CONTROL REQUIRED
Brush Mattress – River Bank
Lhoong River
Lhoong River – No Siltation Fence
BEST MANAGEMENT PRACTICES ,[object Object],[object Object]
BEST MANAGEMENT PRACTICE ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
OIL SPILL – Asphalt Plant
Ponding Oil – Asphalt Plant
BEST MANAGEMENT PRACTICES ,[object Object],[object Object],[object Object]
Toilet Facilities – Tidak Boleh
Leupung toilet – Tidak Boleh Toilet facility
BEST MANAGEMENT PRACTICES ,[object Object],[object Object],[object Object]
Close-up of Sewage System
Sewage System
Constructed Wetlands
SILTATION FENCE
SEDIMENTATION PONDS - Bridge Siltation Fence Sedimentation Ponds
SEDIMENTION POND – Siltation fence needed.
Filling sand bags for Lhoong River
Waste Material – reuse for planting
BEST MANAGEMENT PRACTICES ,[object Object],[object Object]
ROAD KILL ,[object Object]
ROAD KILL  (Monitor Lizard (varanus salvator)
HOW LOUD IS TOO LOUD?    STANDARD: 70 dBA ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PEOPLE
BEST MANAGEMENT PRACTICES ,[object Object],[object Object],[object Object],[object Object]
Road Location - Compensate for wetland destroyed.
Road Construction in Wetland
ABANDONED ROAD – COMPENSATION   Take up – Reuse – Replant.
MANGROVE PLANTS - LOCAL
MANGROVE PLANTING DENSITY
SAND DUNE – BLOCKING OUTLET
FLOOD AREA – BRIDGE & 6 VILLAGES
SAND DUNE CHANNEL
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PLANS Required ,[object Object],[object Object],[object Object],[object Object]
JUST IN CASE!
[object Object]

Weitere ähnliche Inhalte

Ähnlich wie Ppt 8 12 2006

Dwarka expressway road of opportunies and abundance
Dwarka expressway  road of opportunies and abundanceDwarka expressway  road of opportunies and abundance
Dwarka expressway road of opportunies and abundanceEthical Consulting
 
Demolition UKM HOSTEL.pptx
Demolition UKM HOSTEL.pptxDemolition UKM HOSTEL.pptx
Demolition UKM HOSTEL.pptxpaintsjr
 
Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanLakshman R
 
Brand NEW Office Tower for Sale
Brand  NEW Office Tower for SaleBrand  NEW Office Tower for Sale
Brand NEW Office Tower for SaleB SUGANDI
 
2015 First Quarter Budget Review
2015 First Quarter Budget Review2015 First Quarter Budget Review
2015 First Quarter Budget ReviewGibson Ali Holemba
 

Ähnlich wie Ppt 8 12 2006 (6)

Dwarka expressway road of opportunies and abundance
Dwarka expressway  road of opportunies and abundanceDwarka expressway  road of opportunies and abundance
Dwarka expressway road of opportunies and abundance
 
Demolition UKM HOSTEL.pptx
Demolition UKM HOSTEL.pptxDemolition UKM HOSTEL.pptx
Demolition UKM HOSTEL.pptx
 
Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.Plan
 
Brand NEW Office Tower for Sale
Brand  NEW Office Tower for SaleBrand  NEW Office Tower for Sale
Brand NEW Office Tower for Sale
 
Mineral mapping
Mineral mappingMineral mapping
Mineral mapping
 
2015 First Quarter Budget Review
2015 First Quarter Budget Review2015 First Quarter Budget Review
2015 First Quarter Budget Review
 

Kürzlich hochgeladen

Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Scott Andery
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 

Kürzlich hochgeladen (20)

Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 

Ppt 8 12 2006

  • 1. Presented to: Riaz Saehu From Indonesian Embassy, Washington DC December 8 th , 2006 USAID LOGO HERE! Aceh Road / Bridge Reconstruction and Rehabilitation Project
  • 2.
  • 3.  
  • 12. Immediate Response Government of Indonesia Military (TNI)
  • 13. Immediate Response Government of Indonesia Military (TNI)
  • 14. Immediate Response Government of Indonesia Military (TNI)
  • 15. Immediate Response Government of Indonesia Military (TNI)
  • 16. CONSTRUCTION PACKAGES LEGEND Priority Contract Task Order #1 Task Order #2 Task Order #3 JICS Alignment BANDA ACEH LAMNO CALANG MEULABOH 25 150 175 200 225 75 100 125 50 30 September 2009 Task Order No.3 30 September 2009 Task Order No.2 30 September 2009 Task Order No.1 31 December 2007 Priority Contract COMPLETION DATE CONTRACT
  • 17. Priority Construction BANDA ACEH Lambeso River Bridge 25 KM 75 Km 92 Km 50 Km SECTION 2 Km15 to Km31 ● 16 Km ● 12 Bridges ● 19 Culverts SECTION 1A & 1B Km 55 to Km 65 ● 10 Km ● 3 Bridges ● 8 Culverts SECTION 3 Km 46 to Km 47 ● 1Km ● 1 Bridge ● No Culvert SECTION 4 Km 79 to Km 92 ● 13 Km ● 8 Bridges ● 16 Culverts LAMNO Total Length = 40 Km LEGEND : Major Bridges COMPLETION DATE: 31 DECEMBER 2007 Raba River Bridge Lhoong & Meunasah River Bridges 0 KM
  • 18.  
  • 19.  
  • 20.  
  • 21.  
  • 22.  
  • 23.  
  • 24.  
  • 26.  
  • 27.  
  • 28.  
  • 29.  
  • 30. LEGEND Task Order #1 Priority Contract JICS Task Order #2 Task Order #3 SECTION A Km 5 to Km 13 ● 8 Km ● No Bridge ● 9 Culverts SECTION B Km 30 to Km 44 ● 14 Km ● No Bridge ● No Culvert SECTION C Km 47 to Km 52 ● 6 Km ● 2 Bridges ● 3 Culverts SECTION D Km 62 to Km 78 ● 16 Km ● 5 Bridges ● 5 Culverts SECTION E Km 92 to Km 152 ● 60 Km ● 18 Bridges ● 48 Culverts TASK ORDER NO.1 banda aceh to calang COMPLETION DATE: 30 SEPTEMBER 2009 BANDA ACEH LAMNO CALANG MEULABOH 25 150 175 200 225 75 100 125 50
  • 31.
  • 32.
  • 33.  
  • 34.  
  • 35.
  • 36. CONCEPT ANALYSIS – TASK ORDER #2 Proposed Bypass Alignment (Km 220) Calang – Meulaboh Scale 1 : 30000 Option 3B Option 3C
  • 37. TASK ORDER NO.2 TASK ORDER NO.2 Km 220 to Km 233 ● 13 Km ● 2 Bridges ● 4 Culverts COMPLETION DATE: 30 SEPTEMBER 2009 220 233
  • 39.  
  • 40.  
  • 41.  
  • 42.
  • 43. TO#3 TASK ORDER NO.3 239 COMPLETION DATE: 30 SEPTEMBER 2009 243 OPTION 1 OPTION 2 Existing Road JICS Alignment
  • 44.
  • 45. GOI – LA Mechanisms ● Laws relating to LA ● Establishment of LAC Mechanism ● Price determination ● Measurements ● Inventory / assets list ● Appraisal ● Landowner agreements Ratification LA Procedures LAC Pemda District Provincial BRR ● Working Group ● KPPN Khusus Payment ● Verification of data ● Order to pay ● Direct to bank account Release of Land for Construction
  • 46. LAND ACQUISITION CALANG BANDA ACEH LEGEND Land Areas & Owners Identified Land Purchased
  • 47. LAMNO LEGEND Task Order #1 Priority Contract JICS Task Order #2 PROJECT OVERVIEW Total parcels to be purchased - 963 Total purchased to date – 144 (as of 06.12.06) Remaining - 819 Priority Contract BANDA ACEH CALANG MEULABOH 25 150 175 200 225 75 100 125 50
  • 48. Desa Keutapang Desa Lamjuhang Desa Mns Cot Desa Glee Bruek Desa Pudeng Desa Pasie SECTION 1 55+500 to 65+128 Pudeng river Lhoong river Desa Meunasah Lhok GOI target date: 1 December 2006 Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND N
  • 49. Land Acquisition WIKA Priority Section Section 1 Total km to be purchased - 9.5km (not including government land) Total parcels to be purchased - 229 Total km purchased to date - 5.5 km (28.11.06) Total purchased to date - 102 Remaining - 4km Remaining - 127 * WIKA contract begins STA 55+500 ** Corrected for station equation 1 December 2006 14 0.977** 62+300 61+350 Lhoong Pasi 1 December 2006 41 0.850 61+350 60+500 Lhoong Pudeng 1 December 2006 24 0.925 60+500 59+575 Lhoong Glee Bruek Complete 45 2.650 64+950 62+300 Lhoong Meunasah Lhok Complete 16 1.375 59+575 58+200 Lhoong Meunasah Cot Complete 35 1.525 58+200 56+675 Lhoong Keutapang 1 December 2006 54 1.369** 56+675 51+850 Lhoong Lamjuhang* GOI target date Total parcels Distance To From Sub-District Location
  • 50. Desa Lamsenia Desa Lamkruet Desa Pulot Desa Deah Mamplan Desa Layeun Desa Meunasah Bak’U SECTION 2 15+221 to 29+593 Raba river Dutch river Sara river GOI target date: 31 January 2007 (Lhok Nga) : 15 January 2007 (Leupung) Desa Mon Ikeun Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND N
  • 51. Land Acquisition WIKA Priority Section Section 2 Total km to be purchased - approx 16 km Total parcels to be purchased - 352 Total km purchased to date - 0 km Total parcels purchased to date - 0 Remaining - 16 km Remaining - 352 ** Corrected for station equation 15 January 2007 50 2.018 30+300 27+575 Leupung Layeun 15 January 2007 45 1.725 27+575 25+850 Leupung Pulot 15 January 2007 30 1.450 25+850 24+400 Leupung Lamsenia 15 January 2007 32 1.175 24+400 23+225 Leupung Meunasah Bak’u 15 January 2007 106 5.315** 23+225 19+525 Leupung Deah Mamplam 31 January 2007 75 3.725 19+525 15+800 Lhok Nga Mon Ikeun 31 January 2007 14 0.579 15+800 15+221 Lhok Nga Lamkruet GOI target date Total parcels Distance To From Sub-district Location
  • 52. Desa Krueng Kalla SECTION 3 – 44+300 to 45+802 Kalla river GOI target date: 1 December 2006 Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND N
  • 53. Land Acquisition WIKA Priority Section Section 3 Total km to be purchased - approx 1.5km Total parcels to be purchased - 60 Total km purchased to date - 1.01 km Total parcels purchased to date - 43 Remaining - 0.49 km Remaining - 17 ** Corrected for station equation 1 December 2006 60 1.552** 46+150 44+300 Lhoong Krueng Kalla GOI target date Total parcels Distance To From Sub-District Location
  • 54. Desa Glee Putoh Desa Meunasah Weh Desa Leupee Desa Lamme Desa Lhuet Desa Meuntara Desa Babah Dua Desa Teumareum Desa Kuala Desa Bahagia Desa Meudangghon Desa Kareung Ateuh Desa Kuala Unga SECTION 4 – 79+325 to 92+221 Lambeso river GOI target date: 31 January 2007 Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND N
  • 55. Land Acquisition WIKA Priority Section Section 4 Total km to be purchased - approx 13km Total parcels to be purchased - 322 Total km purchased to date - 0 km Total parcels purchased to date - 0 Remaining - 13 km Remaining - 322 * WIKA contract begins STA 79+325 ** Corrected for station equation 31 January 2007 28 3.520** 88+720 90+700 Jaya Kuala Unga 31 January 2007 61 2.800 90+700 87+900 Jaya Kareung Ateuh 31 January 2007 54 2.000 87+900 85+900 Jaya Meudangghon 31 January 2007 10 1.100 85+900 84+800 Jaya Bahagia 31 January 2007 15 1.000 84+800 83+800 Jaya Kuala 31 January 2007 27 1.200 83+800 82+600 Jaya Teumarem 31 January 2007 10 0.375 82+600 82+225 Jaya Babah Dua 31 January 2007 19 0.300 82+225 81+925 Jaya Meuntara 31 January 2007 22 0.500 81+925 81+425 Jaya Lhuet 31 January 2007 14 0.225 81+425 81+200 Jaya Lamme 31 January 2007 18 0.625 81+200 80+575 Jaya Leupee 31 January 2007 28 0.950 80+575 79+625 Jaya Meunasah Weh 31 January 2007 16 2.841** 79+625 75+550 Jaya Glee Putoh* GOI target date Total parcels Distance To From Sub-distruct Location
  • 56. LEGEND Task Order #1 Priority Contract JICS Task Order #2 PROJECT OVERVIEW Total parcels to be purchased - 2760 Total purchased to date – 354 (as of 06.12.06) Remaining - 2406 Task Order #1 BANDA ACEH LAMNO CALANG MEULABOH 25 150 175 200 225 75 100 125 50
  • 57. Desa Jantang LHOONG 46+150 to 52+014 GOI target date: 1 December 2006 Desa Baroh Blang Me Desa Tengoh Blang Me Desa Lamkuta Blang Me Desa Lamgeuriheu Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND
  • 58. Land Acquisition International Contract Total km to be purchased - approx 5.9 km Total parcels to be purchased - 383 Total km purchased to date - 3.4 km Total parcels purchased to date - 225 Remaining - 2.5 km Remaining - 158 1 December 2006 55 0.750 51+850 51+100 Lhoong Lamgeuriheu 1 December 2006 78 1.300 51+100 49+800 Lhoong Lamkuta Blang Me 1 December 2006 22 0.250 49+800 49+550 Lhoong Tengoh Blang Me 1 December 2006 89 1.750 49+550 47+800 Lhoong Baroh Blang Me 1 December 2006 139 1.650 47+800 46+150 Lhoong Jantang GOI Target Date Total Parcel Distance To From Sub-District Village
  • 59. Desa Meudheun Desa Sapek Desa Lamtui Desa Glee Putoh Desa Lambaro Desa Ceunamprong JAYA 70+400 to 101+200 GOI target date: 31 January 2007 Priority Section Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND
  • 60. Land Acquisition International Contract * Corrected for station equation Total km to be purchased - approx 20.08 km Total parcels to be purchased - 467 Total km purchased to date - 0 km Total parcels purchased to date - 0 Remaining - 20.08 km Remaining - 467 31 January 2007 152 12.480* 101+200 88+720 Jaya Ceunamprong 31 January 2007 84 2.841* 79+625 75+550 Jaya Meulha/Glee Putoh 31 January 2007 22 0.725 75+550 74+825 Jaya Lamtui 31 January 2007 68 1.725 74+825 73+100 Jaya Lambaro 31 January 2007 34 1.100 73+100 72+000 Jaya Sapek 31 January 2007 107 1.600 72+000 70+400 Jaya Meudheun GOI Target Date Total Parcel Distance To From Sub-District Village
  • 61. Desa Lhok Kruet SAMPOINIET 101+200 to 127+900 GOI target date: 15 December 2006 15 January 2007 Desa Patek Desa Blang Dalam Desa Gampong Baru Desa Kuala Bakong Desa Jeumpheuk Desa Babah Nipah Desa Kuala Ligan Desa Meunasah Kulam Desa Crak Mong Desa Krueng No Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND
  • 62. Land Acquisition International Contract * Corrected for station equation Total km to be purchased - approx 26.655 km Total parcels to be purchased - 676 Total km purchased to date - 0 km Total parcels purchased to date - 0 Remaining - 26.655 km Remaining - 676 GOI Target Date Total Parcel Dist. To From Sub-District Village 15 January 2007 165 3.825 127+900 124+075 Sampoiniet Patek 15 January 2007 13 0.725 124+075 123+350 Sampoiniet Blang Dalam 15 January 2007 21 0.850 123+350 122+500 Sampoiniet Gampong Baru 15 January 2007 37 2.500 122+500 120+000 Sampoiniet Kuala Bakong 15 January 2007 55 1.725 120+000 118+275 Sampoiniet Jeumpheuk 15 January 2007 21 1.375 118+275 116+900 Sampoiniet Babah Nipah 15 January 2007 76 3.812* 116+900 113+100 Sampoiniet Kuala Ligan 15 January 2007 94 2.500 113+100 110+600 Sampoiniet Lhok Kruet 15 January 2007 44 1.825 110+600 108+775 Sampoiniet Meunasah Kulam 15 January 2007 65 2.175 108+775 106+600 Sampoiniet Crak Mong 15 January 2007 85 5.456* 106+600 101+200 Sampoiniet Krueng No
  • 63. SETIA BAKTI & KRUENG SABEE 127+900 to 152+857 GOI target date: 20 November 2006 30 November 2006 Desa Dayah Baro Desa Gampong Blang Desa Keutapang Desa Panton Makmur Desa Lhok Buya Desa Sayeung Desa Lhok Timon Desa Geulumpang Desa Sawang Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND
  • 64. Land Acquisition International Contract * Corrected for station equation Total km to be purchased - approx 19.729 km Total parcels to be purchased - 1110 Total km purchased to date - 3 km Total parcels purchased to date - 98 Remaining - 16.729 km Remaining - 1012 GOI Target Date Total Parcel Dist. To From Sub-District Village 20 December 2006 79 1.190 147+640 146+450 Setia Bakti Lhok Buya 20 December 2006 174 2.450 146+450 144+000 Setia Bakti Gampong Baro 20 December 2006 312 3.300 144+000 140+700 Setia Bakti Lhok Timon 20 December 2006 266 6.000 140+700 134+700 Setia Bakti Lhok Geulumpang 30 November 2006 279 6.789* 134+700 127+900 Setia Bakti Sawang
  • 65. Land Acquisition International Contract Total km to be purchased - approx 3.910 km Total parcels to be purchased - 124 Total km purchased to date - 1 km Total parcels purchased to date - 31 Remaining - 2.91 km Remaining - 93 GOI Target Date Total Parcel Dist. To From Sub-District Village 15 January 2007 31 1.580 151+550 149+970 Krueng Sabee Keutapang 15 January 2007 22 0.690 149+970 149+280 Krueng Sabee Dayah Baro 15 January 2007 9 0.225 149+280 149+025 Krueng Sabee Gampong Blang 15 January 2007 62 1.385 149+025 147+640 Krueng Sabee Panton Makmur
  • 68. Community Outreach Information and Data Coordination and Facilitation
  • 69.
  • 70.
  • 71.
  • 72. Environmental Protection Aceh Road/Bridge Reconstruction And Rehabilitation Project
  • 73.
  • 74.
  • 75. Membangun dam, bak penampungan, energy dissipaters , dan upaya lainnya untuk mengontrol aliran air (Lihat rancangan terinci). Jika dibutuhkan, sedimentasi akan ditampung pada kolam sementara atau permanen. Kolam tsb dirancang utk menampung aliran air utk masa 20 tahun hujan, lalu dikeringkan dan sedimentasi dikuras. Subkontraktor akan melakukan program monitoring kualitas efluen. Build dams, settling basins, energy dissipaters, and other measures, to control downstream flows (See design details). If necessary, sediment shall be trapped in temporary or permanent sediment basins. The basins shall be designed to accommodate runoff from a local 20‑year storm and shall be pumped dry and all sediment removed after each storm. The site subcontractor shall institute effluent quality monitoring programs. Mempersiapkan rencana pemompaan utk pekerjaan di bawah muka air. Rencana pemompaan air akan ditinjau dan disetujui oleh Pemerintah Amerika dan Pemerintah RI sebelum dimulainya konstruksi. Provide a dewatering plan for work at minus water levels. The dewatering plan shall be reviewed and approved by the U.S. Government and the GOI prior to the beginning of construction Ya BMP-1 Untuk mengurangi erosi dan sedimentasi Menyediakan saluran, tanggul, gorong-gorong, dan pencegahan lain utk memperlambat & mengendalikan aliran air dari lokasi konstruksi, mengendalikan air permukaan dan untuk melindungi saluran. BMP-1 to Decrease Erosion and Sediment Provide ditches, berm, culverts, and other measures to mechanically retard and control runoff from the construction site, to control surface water and to protect drainage courses. Tahap 3 - Tentukan Praktik Pengelolaan Terbaik Mitigasi Praktik Pengelolaan Terbaik (Tandai Kegiatan yang Sesuai): Step 3 - Prescribe Best Management Practices (BEP’s) Mitigation Best Management Practice (BMPs) (Check Appropriate Action):
  • 77. BEST MANAGEMENT PRACTICE BMP-1 to Decrease Erosion and Sediment BMP-2 to avoid obstructing water flow/to enhance drainage pattern: BMP-3 to minimize impacts to natural resources
  • 79. Brush Mattress – River Bank
  • 81. Lhoong River – No Siltation Fence
  • 82.
  • 83.
  • 84. OIL SPILL – Asphalt Plant
  • 85. Ponding Oil – Asphalt Plant
  • 86.
  • 87. Toilet Facilities – Tidak Boleh
  • 88. Leupung toilet – Tidak Boleh Toilet facility
  • 89.
  • 94. SEDIMENTATION PONDS - Bridge Siltation Fence Sedimentation Ponds
  • 95. SEDIMENTION POND – Siltation fence needed.
  • 96. Filling sand bags for Lhoong River
  • 97. Waste Material – reuse for planting
  • 98.
  • 99.
  • 100. ROAD KILL (Monitor Lizard (varanus salvator)
  • 101.
  • 102. PEOPLE
  • 103.
  • 104. Road Location - Compensate for wetland destroyed.
  • 106. ABANDONED ROAD – COMPENSATION Take up – Reuse – Replant.
  • 109. SAND DUNE – BLOCKING OUTLET
  • 110. FLOOD AREA – BRIDGE & 6 VILLAGES
  • 112.
  • 113.
  • 115.

Hinweis der Redaktion

  1. Government Land STA 64+900 - 65+128 (Geureute)
  2. This map will need to be updated when we know signatures have been collected (both from pemilik tanah and tokoh pemda) for Gleebruk and Pudeng. Pasi still has a way to go I think. Also re the government land that is indicated in the map for Mns Lhok, Yuswar has to check this land in the field but it seems as though we made a mistake and should not have coloured in 62+300 - 62 +650 on the maps we sent to BRR!
  3. Measurements have only begun in Deah mamplan. The other areas should remain white.
  4. Coordination with Parsons to prioritize villages for consultation either in WIKA priority areas or other areas where construction will begin upon signing of contract and ROW. Develop appropriate outreach materials including location of road alignment in individual villages, renderings of road, information provided by BRR regarding the land acquisition process, and the construction process.