2. The Water Authority has consistently
supported a solution in the Bay Delta that
achieves the coequal goals of improving
water supply reliability and ecosystem
restoration
The Water Authority provided crucial support
to the effort in the Legislature to pass the
2009 Bay Delta bill package
2
3. The Board adopted Bay Delta policy
principles in February 2012 and reiterated
the principles in adopting the Legislative
Policy Guidelines in November 2012
The principles include:
◦ Encourage a Bay Delta solution that promotes
local water supply development
◦ Encourage a Bay Delta solution that is cost-
effective when compared to other sources of
water reliability
3
4. Require independent technical analysis of key
elements of the Bay Delta solution, including
real urban and agricultural demands for water
Support “right-sized” facilities to match firm
commitments to pay
Continue to support the co-equal goals of
water supply reliability and ecosystem
restoration
4
5. Continue to support the co-equal goals of
water supply reliability and ecosystem
restoration
Support a deliberative process that is
designed to ensure a meaningful dialog
among the various stakeholders
Improve the ability of water users to divert
more water in wet years, when impacts on the
ecosystem are less
5
6. Encourage the development of a statewide
water transfer market
Work with all stakeholders to ensure a
meaningful dialog and that water supply and
ecosystem restoration processes are
conducted in an open and transparent
manner
The current BDCP proposed project is not
consistent with these principles
6
7. Natural Resources Defense Council contacted
a variety of water agencies to seek support
for an alternative solution for the Bay Delta
◦ A conceptual alternative to the current proposed
project for the Bay-Delta Conservation Plan called
the “Portfolio Approach”
◦ Portfolio Approach is designed to produce
comparable or better reliability at a lower cost
Water Authority was a signatory, along with a
group of water agencies, asking that the
NRDC alternative be evaluated in the BDCP
7
8. Build a single-bore tunnel with a capacity of
3,000 cfs or more, with one intake
◦ If needed, more capacity could be added at a later
date
Instead of $14 billion for the current
proposed 9,000 cfs double-bore tunnel,
estimated cost is $5 billion to $7 billion
8
9. Best available science
Protect listed species
“Big gulp, little sip” – Take more water in wet
years and less water in dry years
Develop storage south of the Delta to
increase reliability
Average projected yield: 4.0 to 4.3 million
acre feet
9
10. Invest in local water supplies that will
decrease reliance on the Delta by
exporters
Savings in the cost of the conveyance
project could be used to grow local
supplies
10
11. Improve coordination among water agencies
to maximize use of water on a regional scale
Integrated Regional Water Management could
play major role
Water Authority, City, and County of San
Diego have an IRWM Plan that could invest
increased state funding
11
12. Add surface water and groundwater storage
South of the Delta to improve flexibility and
reliability in dry years
Current proposed project lacks sufficient
storage to take advantage of large flows in
wet years
◦ SWP pumps were halted in 2011 during high flows
due to lack of storage capacity
12
13. Levee improvements would protect the
current and future through-Delta conveyance
system from catastrophic failure
Levee improvements would provide
substantial flood-control and ecosystem
benefits to in-Delta interests, potentially
lessening resistance to the BDCP
13
14. 40,000 acres of targeted floodplain and
tidal marsh restoration could provide
greater ecosystem benefits at a lesser cost
than the larger, less-focused restoration
currently proposed
14
15. Ensure best use of objective science through
adaptive management
Independent review of science
Quantified performance objectives
Governance and adaptive management
processes
Carefully defined roles for various interests in
the Delta
15
16. The state has not yet made a business case
for the current proposed project of 9,000 cfs
A smaller conveyance project would free up
billions of dollars with a small decrease in
water yield
Investments in local supplies and storage
could provide an additional 1 million acre-
feet or more, as well as improved water
supply reliability
16
17. Encourage a Bay Delta solution that promotes local water
supply development
◦ Portfolio Approach calls for local supply development as
part of a comprehensive Bay Delta solution
Encourage a Bay Delta solution that is cost-effective when
compared to other sources of water reliability
◦ Portfolio Approach recognizes that financial resources are
not unlimited and outlines a solution that may be more
cost-effective
Require independent technical analysis of key elements of
the Bay Delta solution, including urban and agricultural real
demands
◦ BDCP has not addressed real demands to date, as the
Water Authority has consistently urged
17
18. Support “right-sized” facilities to match firm commitments to
pay
◦ Analysis of the Portfolio Approach could lead to a better
understanding of the right size for the Bay Delta solution
Continue to support the co-equal goals of water supply
reliability and ecosystem restoration
◦ Portfolio Approach is intended to be balanced approach to
achieving both the co-equal goals
Support a deliberative process that is designed to ensure a
meaningful dialog among the various stakeholders
◦ Signers of the January 16 letter, representing 22 percent of
the state’s population, are encouraging a wider dialog
18
19. Improve the ability of water users to divert more water in wet
years, when impacts on the ecosystem are less
◦ Emphasis on south of Delta storage allows the diversion and
storage of more water in wet years
Encourage the development of a statewide water transfer
market
◦ Portfolio Approach calls for greater coordination among
water agencies to make more effective use of existing
facilities, including MWD’s, for moving water to where it is
needed
Work with all stakeholders to ensure a meaningful dialog and
that water supply and ecosystem restoration processes are
conducted in an open and transparent manner
◦ The Water Authority has maintained an open dialog with a
diverse array of stakeholders in the Bay Delta solution
19