SlideShare a Scribd company logo
1 of 45
Trepezoidal Sarda type fall
Straight glacis fall
3/20/2014 1
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
u/s wing walls :
D/s wing walls :
D/s *bed pitching :
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
2
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
3
Radius = 5 to 6 times H
= 5 x 0.83 to 6 x 0.83
= 4.15 to 4.98 m
Say R = 4.50 m
Provide u/s wing walls having
segmental portion with radius 4.5 m
and subtending an angle of 60°, at the
centre and starting from the u/s edge
of the crest wall.
3/20/2014 4
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
3/20/2014 5
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
Length of d/s wing wall with
vertical face
= 6 H • HL
= 6-7 0.83 x 1.5
= 6.70 m
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
6
3/20/2014 7
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
Length of warped wing with a splay
of 1 in 3 = height * splay = 2.5 * 3
= 7.5 m
Total length of d/s wing wall = 6.70
+ 7.5 = 14.2 m.
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
8
Length of d/s bed pitching
= 9 + 2Hl
= 9 + 2 x 1.5
= 12 m
Provide horizontal pitching up to
the end of masonry wing walls for a
length of 6.3 m and then sloping at 1
in 10 for length of 6 m.
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
9
Wingwall
103.77
12 M
PITCHING
3/18/2014 10
PREPARED BY V.H.KHOKHANI
ASSISTANT PROFESSOR, DIET
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
11
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
12
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
13
FLUMED
FALL
UNFLUMED
FALL
METER
FALL
NONMETER
FALL
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
14
1. Crest design
2. Cistern design
3. Impervious floor
4. u/s wing walls
5. d/s wing walls
6. d/s side protection
7. Roughening devices
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
15
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
16
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
17
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
18
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
19
Length of crest = width of bed (for
unflumed fall)
L = 35.0 m
For non-meter fall, narrow crest is
provided.
Discharge Q is given by :
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
20
H = 0.85 m
R.L. of crest = u/s FSL – H
= 203.5 – 0.85
= 202.65 M
height of crest above u/s bed,
= R.L.of crest – U/S bed level
= 202.65 - 201.5 = 1.15
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
21
Crest width for non meter fall
= (2/3) H
= (2/3) 0.85
= 0.57
The d/s glacis is provided in a slope of
2 : 1
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
22
Compare it with d/s bed level
because as we know cistern is
always below d/s bed level.
Ef2 can be obtained from blench
curve from available q and Hl
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
23
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
24
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
25
d/s bed level
u/s bed level
cistern level
0.25 ef2
d/s TEL = d/s FSL + Ha =202 + 0.02
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
26
d/s bed RL is 200 m which is lower
than obtained cistern level.
So provide minimum depth of
cistern = 0.25 Ef2 = 0.25 (1.40) =
0.35 m.
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
27
Length of cistern = 5 ef2 to 6 ef2
= 5(1.40) to 6 (1.40)
= 7.0 to 8.4 m
Provide length of cistern 8 .0 m
The cistern is joined to the d/s bed of
the channel with a slope of 5 : 1.
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
28
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
29
d/s bed level
u/s bed level
cistern level
0. 35 m
8.0 m
5 in 1
Assuming 0.6 m additional cutoff
depth.
u/s cutoff depth = D1/3 + 0.6
D/S cutoff depth = D2/2 + 0.6
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
30
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
31
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
32
d/s bed level
u/s bed level
cistern level
0. 35 m
8.0 m
5 in 1
0.2 m
Deflector
wall
1.6 m
1.40 m
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
33
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
34
Provide total horizontal length of
impervious flow = 20.60 m
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
35
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
36
d/s bed level = 200
u/s bed level
= 201.5
cistern level =
199.65
8.0 m
1.6 m
1.40 m
crest level =
202.65
0.5 IN 1
L = b
Lu = total length – d/s glacis – u/s glacis – crest width
Provide total horizontal length of
impervious flow = 20.60 m
crest width = 0.55 m
horizontal length of u/s glacis =
(202.65 - 201.5) x 0.5 = 0.58 m
horizontal length of d/s glacis =
(202.65 - 199.65) x 2 = 6.0 m
length of cistern = 8 m
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
37
(a) u/s cutoff wall
d{ = 1.30 m
b = 20.60 m
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
38
Assume a thickness of 0.4 m at the
end of u/s floor
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
39
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
40
(b) d/s cutoff
d2 = 1.60 m
b = 20.6 m
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
41
Assume thickness of 0.5 m at the
end of d/s floor.
Neglecting effect of mutual
interference.
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
42
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
43
ib) At 3 m from the toe of glacis :
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
44
(2) D/s wing walls :
Provide d/s wing walls upto the end of the
d/s floor and then join them to the return
walls.
Top level of wing wall = 202 + 0.5 = 202.5
m.
d/s Bed Protection :
No bed protection is required as a deflector
has been provided,
d/s Side Protection :
Length of side protection = 3D2 = 3 x 2= 6
m
Provide 20 cm thick brick side pitching
over 10 cm ballast for a length of
6 m at a slope of 1 : 1 beyond the d/s
impervious floor.
3/20/2014
PREPARED BY VIDHI H. KHOKHANI
ASST. PROF. DIET
45

More Related Content

What's hot (20)

Chapter 7 spillway and energy dissipators
Chapter 7 spillway and energy dissipatorsChapter 7 spillway and energy dissipators
Chapter 7 spillway and energy dissipators
 
Classification of weis new
Classification of weis newClassification of weis new
Classification of weis new
 
cut-off wall
cut-off wallcut-off wall
cut-off wall
 
Culvertdesign
CulvertdesignCulvertdesign
Culvertdesign
 
Weir and barrage lecture
Weir and barrage lectureWeir and barrage lecture
Weir and barrage lecture
 
Design of barrages
Design of barragesDesign of barrages
Design of barrages
 
Open channel design
Open channel designOpen channel design
Open channel design
 
Canal lining
Canal liningCanal lining
Canal lining
 
Stilling basin
Stilling basinStilling basin
Stilling basin
 
Spillways
SpillwaysSpillways
Spillways
 
Irrigation canals
Irrigation canalsIrrigation canals
Irrigation canals
 
Footing
FootingFooting
Footing
 
Weirs on Permeable Foundations
Weirs on Permeable FoundationsWeirs on Permeable Foundations
Weirs on Permeable Foundations
 
Coffer dams
Coffer damsCoffer dams
Coffer dams
 
Design of gravity dams
Design of gravity damsDesign of gravity dams
Design of gravity dams
 
Irrigation Channels
Irrigation ChannelsIrrigation Channels
Irrigation Channels
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Hydrology principles ragunath
Hydrology principles ragunathHydrology principles ragunath
Hydrology principles ragunath
 
Methods of Dewatering
Methods of DewateringMethods of Dewatering
Methods of Dewatering
 
SLUICE GATE
SLUICE GATESLUICE GATE
SLUICE GATE
 

Viewers also liked

Drop structure lecture 1
Drop structure lecture 1Drop structure lecture 1
Drop structure lecture 1Vidhi Khokhani
 
Drop structure lecture 3
Drop structure lecture 3Drop structure lecture 3
Drop structure lecture 3Vidhi Khokhani
 
Dam outlet works lecture 2
Dam outlet works lecture 2Dam outlet works lecture 2
Dam outlet works lecture 2Vidhi Khokhani
 
Irrigation Engineering
Irrigation EngineeringIrrigation Engineering
Irrigation EngineeringVidhi Khokhani
 
Irrigation water management
Irrigation water management Irrigation water management
Irrigation water management Vidhi Khokhani
 
project on sharda
project on shardaproject on sharda
project on shardaKTOO
 
Internship certificate
Internship certificateInternship certificate
Internship certificateSarmad Shakeel
 
Earth+and+rock+fill+dams
Earth+and+rock+fill+damsEarth+and+rock+fill+dams
Earth+and+rock+fill+damsMohd Danish
 
Drop structure lecture 2
Drop structure lecture 2Drop structure lecture 2
Drop structure lecture 2Vidhi Khokhani
 
Concrete dam lecture 11
Concrete dam lecture 11Concrete dam lecture 11
Concrete dam lecture 11Vidhi Khokhani
 
Introduction chapter `1
Introduction chapter `1Introduction chapter `1
Introduction chapter `1Vidhi Khokhani
 
Dam outlet works lecture 1
Dam outlet works lecture 1Dam outlet works lecture 1
Dam outlet works lecture 1Vidhi Khokhani
 
Concrete dam lecture 2
Concrete dam lecture 2Concrete dam lecture 2
Concrete dam lecture 2Vidhi Khokhani
 

Viewers also liked (20)

Canal Fall
Canal FallCanal Fall
Canal Fall
 
Drop structure lecture 1
Drop structure lecture 1Drop structure lecture 1
Drop structure lecture 1
 
Drop structure lecture 3
Drop structure lecture 3Drop structure lecture 3
Drop structure lecture 3
 
Embankment lecture 4
Embankment lecture 4Embankment lecture 4
Embankment lecture 4
 
Dam outlet works lecture 2
Dam outlet works lecture 2Dam outlet works lecture 2
Dam outlet works lecture 2
 
Embankment lecture 7
Embankment lecture 7Embankment lecture 7
Embankment lecture 7
 
Irrigation Engineering
Irrigation EngineeringIrrigation Engineering
Irrigation Engineering
 
Embankment lecture 3
Embankment lecture 3Embankment lecture 3
Embankment lecture 3
 
Embankment lecture 1
Embankment lecture 1Embankment lecture 1
Embankment lecture 1
 
Irrigation water management
Irrigation water management Irrigation water management
Irrigation water management
 
project on sharda
project on shardaproject on sharda
project on sharda
 
Internship certificate
Internship certificateInternship certificate
Internship certificate
 
Earth+and+rock+fill+dams
Earth+and+rock+fill+damsEarth+and+rock+fill+dams
Earth+and+rock+fill+dams
 
Drop structure lecture 2
Drop structure lecture 2Drop structure lecture 2
Drop structure lecture 2
 
Concrete dam lecture 11
Concrete dam lecture 11Concrete dam lecture 11
Concrete dam lecture 11
 
Embankment lecture 12
Embankment lecture 12Embankment lecture 12
Embankment lecture 12
 
Introduction chapter `1
Introduction chapter `1Introduction chapter `1
Introduction chapter `1
 
Dam outlet works lecture 1
Dam outlet works lecture 1Dam outlet works lecture 1
Dam outlet works lecture 1
 
Final Project Report
Final Project ReportFinal Project Report
Final Project Report
 
Concrete dam lecture 2
Concrete dam lecture 2Concrete dam lecture 2
Concrete dam lecture 2
 

More from Vidhi Khokhani

2. w index and 5 index
2. w index and 5 index2. w index and 5 index
2. w index and 5 indexVidhi Khokhani
 
Dam outlet works lecture 3
Dam outlet works lecture 3Dam outlet works lecture 3
Dam outlet works lecture 3Vidhi Khokhani
 
Concrete dam lecture 4
Concrete dam lecture 4Concrete dam lecture 4
Concrete dam lecture 4Vidhi Khokhani
 
Concrete dam lecture 1
Concrete dam lecture 1Concrete dam lecture 1
Concrete dam lecture 1Vidhi Khokhani
 
check basin , furrow and border strip method
check basin , furrow and border strip methodcheck basin , furrow and border strip method
check basin , furrow and border strip methodVidhi Khokhani
 
Lecture 1-aerial photogrammetry
Lecture 1-aerial photogrammetryLecture 1-aerial photogrammetry
Lecture 1-aerial photogrammetryVidhi Khokhani
 
irrigation water management
irrigation water managementirrigation water management
irrigation water managementVidhi Khokhani
 
Design of Hydraulic Structure
Design of Hydraulic StructureDesign of Hydraulic Structure
Design of Hydraulic StructureVidhi Khokhani
 
Irrigation water management
Irrigation water managementIrrigation water management
Irrigation water managementVidhi Khokhani
 
Chapter 2 part 1 sprinkler
Chapter 2 part 1 sprinklerChapter 2 part 1 sprinkler
Chapter 2 part 1 sprinklerVidhi Khokhani
 

More from Vidhi Khokhani (12)

2. w index and 5 index
2. w index and 5 index2. w index and 5 index
2. w index and 5 index
 
ogee design
ogee designogee design
ogee design
 
Dam outlet works lecture 3
Dam outlet works lecture 3Dam outlet works lecture 3
Dam outlet works lecture 3
 
Concrete dam lecture 4
Concrete dam lecture 4Concrete dam lecture 4
Concrete dam lecture 4
 
Concrete dam lecture 1
Concrete dam lecture 1Concrete dam lecture 1
Concrete dam lecture 1
 
check basin , furrow and border strip method
check basin , furrow and border strip methodcheck basin , furrow and border strip method
check basin , furrow and border strip method
 
Lecture 1-aerial photogrammetry
Lecture 1-aerial photogrammetryLecture 1-aerial photogrammetry
Lecture 1-aerial photogrammetry
 
Embankment lecture 2
Embankment lecture 2Embankment lecture 2
Embankment lecture 2
 
irrigation water management
irrigation water managementirrigation water management
irrigation water management
 
Design of Hydraulic Structure
Design of Hydraulic StructureDesign of Hydraulic Structure
Design of Hydraulic Structure
 
Irrigation water management
Irrigation water managementIrrigation water management
Irrigation water management
 
Chapter 2 part 1 sprinkler
Chapter 2 part 1 sprinklerChapter 2 part 1 sprinkler
Chapter 2 part 1 sprinkler
 

Recently uploaded

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Recently uploaded (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 

Drop structure lecture 4

  • 1. Trepezoidal Sarda type fall Straight glacis fall 3/20/2014 1 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET
  • 2. u/s wing walls : D/s wing walls : D/s *bed pitching : 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 2
  • 3. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 3
  • 4. Radius = 5 to 6 times H = 5 x 0.83 to 6 x 0.83 = 4.15 to 4.98 m Say R = 4.50 m Provide u/s wing walls having segmental portion with radius 4.5 m and subtending an angle of 60°, at the centre and starting from the u/s edge of the crest wall. 3/20/2014 4 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET
  • 5. 3/20/2014 5 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET
  • 6. Length of d/s wing wall with vertical face = 6 H • HL = 6-7 0.83 x 1.5 = 6.70 m 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 6
  • 7. 3/20/2014 7 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET
  • 8. Length of warped wing with a splay of 1 in 3 = height * splay = 2.5 * 3 = 7.5 m Total length of d/s wing wall = 6.70 + 7.5 = 14.2 m. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 8
  • 9. Length of d/s bed pitching = 9 + 2Hl = 9 + 2 x 1.5 = 12 m Provide horizontal pitching up to the end of masonry wing walls for a length of 6.3 m and then sloping at 1 in 10 for length of 6 m. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 9
  • 10. Wingwall 103.77 12 M PITCHING 3/18/2014 10 PREPARED BY V.H.KHOKHANI ASSISTANT PROFESSOR, DIET
  • 11. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 11
  • 12. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 12
  • 13. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 13
  • 15. 1. Crest design 2. Cistern design 3. Impervious floor 4. u/s wing walls 5. d/s wing walls 6. d/s side protection 7. Roughening devices 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 15
  • 16. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 16
  • 17. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 17
  • 18. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 18
  • 19. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 19
  • 20. Length of crest = width of bed (for unflumed fall) L = 35.0 m For non-meter fall, narrow crest is provided. Discharge Q is given by : 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 20
  • 21. H = 0.85 m R.L. of crest = u/s FSL – H = 203.5 – 0.85 = 202.65 M height of crest above u/s bed, = R.L.of crest – U/S bed level = 202.65 - 201.5 = 1.15 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 21
  • 22. Crest width for non meter fall = (2/3) H = (2/3) 0.85 = 0.57 The d/s glacis is provided in a slope of 2 : 1 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 22
  • 23. Compare it with d/s bed level because as we know cistern is always below d/s bed level. Ef2 can be obtained from blench curve from available q and Hl 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 23
  • 24. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 24
  • 25. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 25 d/s bed level u/s bed level cistern level 0.25 ef2
  • 26. d/s TEL = d/s FSL + Ha =202 + 0.02 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 26
  • 27. d/s bed RL is 200 m which is lower than obtained cistern level. So provide minimum depth of cistern = 0.25 Ef2 = 0.25 (1.40) = 0.35 m. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 27
  • 28. Length of cistern = 5 ef2 to 6 ef2 = 5(1.40) to 6 (1.40) = 7.0 to 8.4 m Provide length of cistern 8 .0 m The cistern is joined to the d/s bed of the channel with a slope of 5 : 1. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 28
  • 29. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 29 d/s bed level u/s bed level cistern level 0. 35 m 8.0 m 5 in 1
  • 30. Assuming 0.6 m additional cutoff depth. u/s cutoff depth = D1/3 + 0.6 D/S cutoff depth = D2/2 + 0.6 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 30
  • 31. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 31
  • 32. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 32 d/s bed level u/s bed level cistern level 0. 35 m 8.0 m 5 in 1 0.2 m Deflector wall 1.6 m 1.40 m
  • 33. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 33
  • 34. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 34
  • 35. Provide total horizontal length of impervious flow = 20.60 m 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 35
  • 36. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 36 d/s bed level = 200 u/s bed level = 201.5 cistern level = 199.65 8.0 m 1.6 m 1.40 m crest level = 202.65 0.5 IN 1 L = b Lu = total length – d/s glacis – u/s glacis – crest width
  • 37. Provide total horizontal length of impervious flow = 20.60 m crest width = 0.55 m horizontal length of u/s glacis = (202.65 - 201.5) x 0.5 = 0.58 m horizontal length of d/s glacis = (202.65 - 199.65) x 2 = 6.0 m length of cistern = 8 m 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 37
  • 38. (a) u/s cutoff wall d{ = 1.30 m b = 20.60 m 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 38
  • 39. Assume a thickness of 0.4 m at the end of u/s floor 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 39
  • 40. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 40
  • 41. (b) d/s cutoff d2 = 1.60 m b = 20.6 m 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 41
  • 42. Assume thickness of 0.5 m at the end of d/s floor. Neglecting effect of mutual interference. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 42
  • 43. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 43
  • 44. ib) At 3 m from the toe of glacis : 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 44
  • 45. (2) D/s wing walls : Provide d/s wing walls upto the end of the d/s floor and then join them to the return walls. Top level of wing wall = 202 + 0.5 = 202.5 m. d/s Bed Protection : No bed protection is required as a deflector has been provided, d/s Side Protection : Length of side protection = 3D2 = 3 x 2= 6 m Provide 20 cm thick brick side pitching over 10 cm ballast for a length of 6 m at a slope of 1 : 1 beyond the d/s impervious floor. 3/20/2014 PREPARED BY VIDHI H. KHOKHANI ASST. PROF. DIET 45