PROJ 595 Final Exam Set 1
FOR MORE CLASSES VISIT
www.proj595rank.com
Question 1. (TCOs A and B) An EVM analysis employs which
factors to evaluate risks? (Points : 5)
Question 2. (TCO G) You have completed all design drawings and
have a complete scope for your project. You need to hire a
contractor to build the product to your designs. Which type of
contract would be best in this situation? (Points : 5)
Question 3. (TCO D) In which risk response strategy is the
responsibility for the risk moved to a third party? (Points : 5)
4. (TCOs A and B) You have been appointed as a project
manager for a high-dollar project for a government agency, and
you have been asked by your boss to identify the stakeholder
groups and the individuals who make up those groups in order to
start the stakeholder analysis. Identify at least six groups of
stakeholders and the individuals who comprise those groups, and
explain when the stakeholder identification process should take
place during the planning of the project. (Points: 20)
(TCO B) Due to globalization within your industry, you have been
appointed as the project manager for an R & D project. Your
task is to create a new technologically advanced solar cell. You
want to employ the PMBOK® Guide risk management process.
Senior management would like you to briefly describe the process
and all its steps. Please create a short briefing for senior
management below. (Points : 40)
(TCO I) You are the project manager on a critical project for
your corporation. You have decided to employ fault-tree analysis
on your project. What is fault-tree analysis, and how can it be
applied to your project? (Points : 25)
(TCO H) Senior management is concerned about risk owners on
your project. What is the role of a risk owner in the risk
management process? (Points: 20)
(TCO F) You are a project manager for a large healthcare R & D
project. Senior management has asked you to utilize a sensitivity
analysis and a tornado diagram to quantify risks on your project.
Senior management‟s major concern is the price of raw materials
in the development of the new drug. Describe how to perform a
sensitivity analysis and use a tornado diagram to quantify risks to
your project. (Points : 25)
TCO G) Describe and discuss when one should use an FPEPA
contract. Compare and contrast this to a typical FP contract.
(Points: 20)
(TCO E) Senior management has just returned from a risk
management workshop. One of the topics was reserve analysis.
Management does not completely understand the concept and
asks you what the purpose is of performing reserve analysis
during the risk management process. (Points : 20)
TCO D) You are the project manager for an important
healthcare project. You are performing qualitative risk analysis.
Below are the values of probability and impact for the top six
risks that were given to you by project team. Assuming a neutral
stakeholder tolerance, which risks must be addressed proactively
if possible?(Points : 25)
TCO C) You are the project manager for a large health
information technology project. You are confronted with an
important decision on your project: How much scenario testing is
appropriate for this project? Employ decision tree analysis to
provide senior management with the best course of action for this
decision.
===========================================
===
PROJ 595 Final Exam Set 2
FOR MORE CLASSES VISIT
www.proj595rank.com
1. (TCOs A and B) Quantitative risk analysis does all of the
following, except (Points : 5)
Question 2. 2. (TCO G) You need to ensure your project is
completed by July 1 of next year. You do not have time to do all
the design work yourself, so you decide to contract out that work.
Which type of contract would likely be best in this situation?
(Points : 5)
Question 3. 3. (TCO D) Which risk response strategy is most
appropriate for risks on the watch list? (Points : 5)
Question 4. 4. (TCOs A and B) You have been appointed as a
project manager for a high-dollar project for the public sector,
and you have been asked by your boss to identify the stakeholder
groups and the individuals who make up those groups in order to
start the stakeholder analysis. Identify at least six groups of
stakeholders and the individuals who comprise those groups, and
explain when the stakeholder identification process should take
place during the planning of the project. (Points : 20)
Question 5. 5. (TCO B) Due to globalization within your
industry, you have been appointed as the project manager for an
R & D project. Your task is to create a new technologically
advanced solar cell. You want to employ the PMBOK® Guide
risk management process. Senior management would like you to
briefly describe the process and all its steps. Please create a short
briefing for senior management below. (Points : 40)
Question 6. 6. (TCO C) You are the project manager for a large
health information technology project. You are confronted with
an important decision on your project: How much posttesting of
the design is appropriate for this project? Employ decision tree
analysis to provide senior management with the best course of
action for this decision.
Question 7. 7. (TCO D) You are the project manager for an
important healthcare project. You are performing qualitative risk
analysis. Below are the values of probability and impact for the
top six risks that were given to you by project team. Assuming a
neutral stakeholder tolerance, which risks must be addressed
proactively if possible?
Question 8. 8. (TCO E) Senior management is very interested in
creating an effective risk monitoring and control system that is
tied to a performance monitoring system for your project.
Describe what a good monitoring and control and performance
measurement system for your project would look like. Be sure to
include an example to help illustrate your answer. (Points : 20)
Question 9. 9. (TCO F) You are a project manager for a large
healthcare R & D project. Senior management has asked you to
utilize a sensitivity analysis and a tornado diagram to quantify
risks on your project. Senior management‟s major concern is the
price of raw materials in the development of the new drug.
Describe how to perform a sensitivity analysis and use a tornado
diagram to quantify risks to your project. (Points : 25)
Question 10. 10. (TCO G) Describe and discuss when one should
use an FPEPA contract. Compare and contrast this to a typical
FP contract. (Points : 20)
Question 11. 11. (TCO H) You are in a status meeting with key
project stakeholders. You are discussing residual and secondary
risks in your project. The stakeholders are becoming concerned
about these concepts. The key stakeholders ask for an explanation
and example of each. How would you describe each? Provide an
example of a residual and a secondary risk. (Points : 20)
Question 12. 12. (TCO I) You are the project manager on a
complete overhaul of your corporation‟s IT infrastructure. You
have decided to employ fault-tree analysis on your project. What
is fault-tree analysis, and how can it be applied to your project?
(Points : 25)
===========================================
===
PROJ 595 Final Exam Set 3 (NEW)
FOR MORE CLASSES VISIT
www.proj595rank.com
Question 1.
(TCO A) Qualitative risk analysis
Question 2.
(TCO A) You are the project manager of a new, innovative
project. One overarching principle you adhere to is
Question 3.
(TCO B) Project assumptions are created in the scope statement.
These assumptions are revisited in which process of risk
management?
Question 4.
(TCO D) In which risk response strategies are risks guaranteed to
not occur if they are negative and guaranteed to occur if they are
positive after the response plan is initiated?
Question 5.
(TCO E) One the key functions of risk monitoring and control is
to
Question 6.
(TCO H) When using the ATOM process to manage risks, which
is the importance of an initiation meeting?
Question 7.
(TCO A) When is a risk register created? What is its importance
of a risk register to a project?
Question 8.
(TCO B) List and briefly define five specific tools and techniques
that can be used to identify risk associated with projects.
Question 9.
(TCO D) Explain avoidance as a risk response strategy, and
provide an example of its use in a project.
Question 10.
(TCO E) Describe what characteristics a performance
measurement system, to be employed in a risk monitoring and
control process for a project, should have. Include an example to
help illustrate your answer.
Question 11.
(TCO H) What is the importance of including stakeholders and
risk owners in the creation and approval of risk response plans?
===========================================
===
PROJ 595 Midterm Exam Set 2
FOR MORE CLASSES VISIT
www.proj595rank.com
1. (TCO A) A stakeholder analysis in risk management (Points :
5)
Question 2. 2. (TCO A) When using the ATOM process to
manage risks, an initiation meeting should be used for (Points : 5)
Question 3. 3. (TCO B) All of the below are risk identification
methods, except (Points : 5)
Question 4. 4. (TCO D) In risk response planning, which is the
difference between active and passive acceptance? (Points : 5)
Question 5. 5. (TCO E) A common tool for use in risk monitoring
and control is (Points : 5)
Question 6. 6. (TCO H) When using the ATOM process to
manage risks, which is the importance of an initiation meeting?
(Points : 5)
Question 7. 7. (TCO A) When is a risk register created? What is
its importance of a risk register to a project? (Points : 10)
Question 8. 8. (TCO B) You are the project manager for a major
technological project. You are concerned about doing qualitative
risk analysis. How do you ensure consistency when doing
qualitative risk analysis across all risk evaluators? (Points : 15)
Question 9. 9. (TCO D) Explain transference as a risk response
strategy, and provide an example of its use in a project. (Points :
15)
Question 10. 10. (TCO E) What is the purpose of performing
reserve analysis during the risk management process? (Points :
15)
Question 11. 11. (TCO H) You are in a status meeting with key
project stakeholders. You are discussing residual and secondary
risks in your project. The key stakeholders ask for an explanation
and example of each. How would you describe each? Provide an
example of a residual and a secondary risk. (Points : 15)
===========================================
===
PROJ 595 Risk Paper 2
FOR MORE CLASSES VISIT
www.proj595rank.com
PROJ 595 Risk Paper 2
===========================================
===
PROJ 595 Week 3 Risk Paper 1 (2 Papers)
FOR MORE CLASSES VISIT
www.proj595rank.com
This Tutorial contains 2 Papers of this Assignment
PROJ 595 Week 3 Risk Paper 1
Write a two- to four-page paper regarding a project, either real
or fictitious, where one is able to discuss how risks were
identified, ranked, and monitored. The student is also welcome to
write about a major purchase or major decision in his or her life,
such as buying a new car, buying a new home, or even the
decision to return to school to earn a degree. All of these are
considered projects or procurements that require some form of
formal or informal risk review.
Remember to cite and reference any sources that were used in the
project or in the decision-making process. At a minimum,
students should connect this assignment back to the text and
support their decision-making processes with key concepts from
the text. One of the elements of this assignment is to connect the
material from the course to actual risk decisions. You are also
welcome to use any of the checklists from the text to support the
decision-making process.
===========================================
===
PROJ 595 Week 4 Course Project (2 Project)
FOR MORE CLASSES VISIT
www.proj595rank.com
This Tutorial contains 2 Project
Course Project Part I
For this project, you may choose a project that is of interest to
you. When selecting a project, avoid picking one that is either too
big or too small. For example, do not decide to build a new
stadium for your local professional sports team (too big) or to
plant your summer garden (too small).You will only be
addressing the risk issues in the project so you will not need to be
looking at the detail required for a business plan. The scope
statement and the WBS are required in addition to the risk
management plan. It is important to pick one that you understand
so that you will be able to create the risk management plan that is
realistic with sufficient detail where your contingency plans will
be relevant.Since you will need to create a risk management plan,
your project should be somewhat risky.
1. Create a risk management plan for your project. To do this,
you must first create a scope and a WBS for your project.
2. Perform risk management planning as defined in the lecture.
3. Identify risks for your project, including any issues that may
impede or impair the completion of the project. You must identify
at least 5 positive and 15 negative risks.
4. Prioritize the risks by performing qualitative risk analysis.
5. Perform risk response planning for your project by creating
detailed risk response plans for those risks needing responses.
This should include both proactive responses and reactive
contingency plans as appropriate.
===========================================
===
PROJ 595 Week 5 Midterm Set 1
FOR MORE CLASSES VISIT
www.proj595rank.com
1. (TCO A) Qualitative risk analysis
2. (TCO A) When using the ATOM process to manage risks, an
initiation meeting should be used for
3. (TCO B) A watch list is a
4. (TCO D) In risk response planning, which is the difference
between active and passive acceptance?
5. (TCO E) A common tool for use in risk monitoring and control
is
6. (TCO H) When using the ATOM process to manage risks,
which is the importance of an initiation meeting?
7. (TCOA) Explain when risk breakdown structure is created,
and explain the importance of a risk breakdown structure in risk
management
8. (TCO B) Explain the qualitative risk analysis process
9. (TCO D) Explain transference as a risk response strategy, and
provide an example of its use in a project
10. (TCO E) Describe the function and process of performing a
risk audit during a project
11. (TCO H) What is the role of a risk owner in the risk
management process?
===========================================
===
PROJ 595 Week 6 Course Project Part II (2 Project)
FOR MORE CLASSES VISIT
www.proj595rank.com
This Tutorial contains 2 Project
Course Project Part II
For this part, you will be creating two decision trees concerning
specific risks or events from the project you developed in part 1.
The first one will be a decision tree used to make a decision. You
will be calculating an expected value based upon this decision
tree. The second will be for a basic risk or event where you will be
creating a fault or event tree illustrating what makes up the fault
or event. With each of these, you will need to discuss the process
and results of your tree.
The risks or events you use will be from the project you used in
the part one. You will need to start the report with a short
introduction of that project so that there is continuity and the
reader will understand the events and risks being discussed. You
do not have to include part one in your part two report.
Details:
Create one decision tree with an expected value and a fault or
event tree that would support the exploration of risk for the
project you used for part one of the course project. (That is two
trees in all.) Provide a one paragraph project description of the
part 1 project but you do not have to repeat all the other
information in this part.
•The decision tree must be created to support a major risk-related
decision likely to be faced by the project. The calculation of
expected values is a requirement of this project.
•The fault or event tree should offer at a minimum a listing of
potential risks and impacts in the event of a smaller failure.
For example, a smaller failure could be the loss of water pressure
or a fire in a construction project rather than examining what
risk was involved with the collapse of the construction project.
Write a discussion of the risks that supports the fault tree, event
tree, or decision tree that has been created. Make a separate write
up for each of these smaller risks associated with the fault tree or
event trees. Your paper should have a general introduction that
should introduce the decision tree and fault or event trees that
will be discussed, and then the paper should have a discussion
regarding each tree. See the sample outline below for details.
The part 2 paper regarding the identified risks and decision trees
should be from six to ten pages in length. Note that this page
length is a guideline.
At leastthree authoritative, outside references are required
(anonymous authors or web pages are not acceptable). These
should be referenced where used in the paper and listed on the
last page titled, Works Cited.
Risks such as “project is over budget” or “project does not meet
schedule” are too broad. Be specific.
Comments on how to create an acceptable tree and project paper
Each fault or event tree should offer at a minimum a listing of two
or more potential risks and impacts in the event of two smaller
failures. (This means for each tree you will have at a minimum
two sub-faults with multiple causes for each of them.)
Use “and” and “or” gates properly. Understand the difference.
When you use an „and‟ gate it indicates that it take both of the
conditions for the fault to occur. If either of the conditions could
cause a problem this indicates the use of an „or‟ gate.
There are examples and templates in doc sharing.
You need to select specific faults to use in the tree. General
examples of faults are too broad for the fault tree to provide a
comprehensive evaluation of the possible causes.
The graphics for the tree do not have to be artist professional
quality but they do need to be student professional. A table is not
sufficient. If you use screen shots be sure you crop them so that
only the tree is included not all the computer menus and etc.
You should have at least two options under each gate. There is no
reason for a gate if there is only one option.
When a template is provided or an example it is not meant to be
copied. If you are not doing a construction project, your headings
should not be “construction project” just because the example
says that.
This is a risk management course. The engineering solutions to
the problems on these projects are not the answer that you should
be developing. The development is of the risk management system
and process for your specific project.
===========================================
===

Weitere ähnliche Inhalte

Was ist angesagt?

Risk 9-pm study project risk management-test
Risk 9-pm study project risk management-testRisk 9-pm study project risk management-test
Risk 9-pm study project risk management-testMohamed Saeed
 
Risk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ansRisk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ansMohamed Saeed
 
Risk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazRisk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazMohamed Saeed
 
Project Management - Pmi’s opm3 is an example of a __________________ model...
Project Management - Pmi’s opm3 is an example of a   __________________ model...Project Management - Pmi’s opm3 is an example of a   __________________ model...
Project Management - Pmi’s opm3 is an example of a __________________ model...Suma Kamadod
 
Project Management - To determine the cost of particular element in advance o...
Project Management - To determine the cost of particular element in advance o...Project Management - To determine the cost of particular element in advance o...
Project Management - To determine the cost of particular element in advance o...Suma Kamadod
 
Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...
Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...
Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...Suma Kamadod
 
Six Sigma Green Belt - To determine the average number of nonconforming parts...
Six Sigma Green Belt - To determine the average number of nonconforming parts...Six Sigma Green Belt - To determine the average number of nonconforming parts...
Six Sigma Green Belt - To determine the average number of nonconforming parts...Suma Kamadod
 
Project Management - A fundamental of ‘theory of constraints’ (toc) is to man...
Project Management - A fundamental of ‘theory of constraints’ (toc) is to man...Project Management - A fundamental of ‘theory of constraints’ (toc) is to man...
Project Management - A fundamental of ‘theory of constraints’ (toc) is to man...Suma Kamadod
 

Was ist angesagt? (16)

Risk 9-pm study project risk management-test
Risk 9-pm study project risk management-testRisk 9-pm study project risk management-test
Risk 9-pm study project risk management-test
 
Risk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ansRisk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ans
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
 
Pmp test 01
Pmp test 01Pmp test 01
Pmp test 01
 
Risk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazRisk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbaz
 
Pmstudy exam 3
Pmstudy exam 3Pmstudy exam 3
Pmstudy exam 3
 
Pmp test 02
Pmp test 02Pmp test 02
Pmp test 02
 
Pmstudy exam_1
Pmstudy exam_1Pmstudy exam_1
Pmstudy exam_1
 
Project Management - Pmi’s opm3 is an example of a __________________ model...
Project Management - Pmi’s opm3 is an example of a   __________________ model...Project Management - Pmi’s opm3 is an example of a   __________________ model...
Project Management - Pmi’s opm3 is an example of a __________________ model...
 
Project Management - To determine the cost of particular element in advance o...
Project Management - To determine the cost of particular element in advance o...Project Management - To determine the cost of particular element in advance o...
Project Management - To determine the cost of particular element in advance o...
 
Pmstudy exam 4
Pmstudy exam 4Pmstudy exam 4
Pmstudy exam 4
 
Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...
Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...
Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...
 
Six Sigma Green Belt - To determine the average number of nonconforming parts...
Six Sigma Green Belt - To determine the average number of nonconforming parts...Six Sigma Green Belt - To determine the average number of nonconforming parts...
Six Sigma Green Belt - To determine the average number of nonconforming parts...
 
Session 6 gdas pmp study group presentation
Session 6   gdas pmp study group presentationSession 6   gdas pmp study group presentation
Session 6 gdas pmp study group presentation
 
Session 5 gdas pmp study group presentation
Session 5   gdas pmp study group presentationSession 5   gdas pmp study group presentation
Session 5 gdas pmp study group presentation
 
Project Management - A fundamental of ‘theory of constraints’ (toc) is to man...
Project Management - A fundamental of ‘theory of constraints’ (toc) is to man...Project Management - A fundamental of ‘theory of constraints’ (toc) is to man...
Project Management - A fundamental of ‘theory of constraints’ (toc) is to man...
 

Ähnlich wie PROJ 595 RANK Education Counseling--proj595rank.com

Devry proj 595 midterm exam set 2 new
Devry proj 595 midterm exam set 2 newDevry proj 595 midterm exam set 2 new
Devry proj 595 midterm exam set 2 newuopassignment
 
Risk 2 simplelearn-exam1-ans
Risk 2 simplelearn-exam1-ansRisk 2 simplelearn-exam1-ans
Risk 2 simplelearn-exam1-ansMohamed Saeed
 
Proj 420 final exam solution
Proj 420 final exam solutionProj 420 final exam solution
Proj 420 final exam solutionPhilipMendelson
 
Devry proj 595 final exam set 3
Devry proj 595 final exam set 3Devry proj 595 final exam set 3
Devry proj 595 final exam set 3uopassignment
 
CRISC Exam Questions
CRISC Exam QuestionsCRISC Exam Questions
CRISC Exam QuestionsDumpsbook
 
Risk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ansRisk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ansMohamed Saeed
 
D.Q1Information System and Enterprise Systems· Identify.docx
D.Q1Information System and Enterprise Systems· Identify.docxD.Q1Information System and Enterprise Systems· Identify.docx
D.Q1Information System and Enterprise Systems· Identify.docxtheodorelove43763
 
Managing projects
Managing projectsManaging projects
Managing projectsNovoraj Roy
 
Individual Risk Management
Individual Risk ManagementIndividual Risk Management
Individual Risk ManagementLaura Torres
 
Profittme pmp framweork questions
Profittme pmp framweork questionsProfittme pmp framweork questions
Profittme pmp framweork questionsThabet Ali
 
Project ch 3.ppt
Project ch 3.pptProject ch 3.ppt
Project ch 3.pptHabtaBela
 
Risk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ansRisk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ansMohamed Saeed
 
Question 1 According to the textbook, risk management plans ad.docx
Question 1 According to the textbook, risk management plans ad.docxQuestion 1 According to the textbook, risk management plans ad.docx
Question 1 According to the textbook, risk management plans ad.docxIRESH3
 
Bridge RectifierPre-Lab InformationRectifiers are widely used .docx
Bridge RectifierPre-Lab InformationRectifiers are widely used .docxBridge RectifierPre-Lab InformationRectifiers are widely used .docx
Bridge RectifierPre-Lab InformationRectifiers are widely used .docxAASTHA76
 
Project Management And The Major Areas Of Projects Management
Project Management And The Major Areas Of Projects ManagementProject Management And The Major Areas Of Projects Management
Project Management And The Major Areas Of Projects ManagementMiles Priar
 

Ähnlich wie PROJ 595 RANK Education Counseling--proj595rank.com (20)

Devry proj 595 midterm exam set 2 new
Devry proj 595 midterm exam set 2 newDevry proj 595 midterm exam set 2 new
Devry proj 595 midterm exam set 2 new
 
Risk 2 simplelearn-exam1-ans
Risk 2 simplelearn-exam1-ansRisk 2 simplelearn-exam1-ans
Risk 2 simplelearn-exam1-ans
 
Proj 420 final exam solution
Proj 420 final exam solutionProj 420 final exam solution
Proj 420 final exam solution
 
Devry proj 595 final exam set 3
Devry proj 595 final exam set 3Devry proj 595 final exam set 3
Devry proj 595 final exam set 3
 
CRISC Exam Questions
CRISC Exam QuestionsCRISC Exam Questions
CRISC Exam Questions
 
Pmstudy exam 2
Pmstudy exam 2Pmstudy exam 2
Pmstudy exam 2
 
Risk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ansRisk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ans
 
D.Q1Information System and Enterprise Systems· Identify.docx
D.Q1Information System and Enterprise Systems· Identify.docxD.Q1Information System and Enterprise Systems· Identify.docx
D.Q1Information System and Enterprise Systems· Identify.docx
 
Managing projects
Managing projectsManaging projects
Managing projects
 
Individual Risk Management
Individual Risk ManagementIndividual Risk Management
Individual Risk Management
 
Cpmgt 302 cpmgt302
Cpmgt 302 cpmgt302Cpmgt 302 cpmgt302
Cpmgt 302 cpmgt302
 
Profittme pmp framweork questions
Profittme pmp framweork questionsProfittme pmp framweork questions
Profittme pmp framweork questions
 
CAPM Study Session 2
CAPM Study Session 2CAPM Study Session 2
CAPM Study Session 2
 
Pm study project risk management test
Pm study project  risk management testPm study project  risk management test
Pm study project risk management test
 
Project ch 3.ppt
Project ch 3.pptProject ch 3.ppt
Project ch 3.ppt
 
Risk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ansRisk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ans
 
final (2)
final (2)final (2)
final (2)
 
Question 1 According to the textbook, risk management plans ad.docx
Question 1 According to the textbook, risk management plans ad.docxQuestion 1 According to the textbook, risk management plans ad.docx
Question 1 According to the textbook, risk management plans ad.docx
 
Bridge RectifierPre-Lab InformationRectifiers are widely used .docx
Bridge RectifierPre-Lab InformationRectifiers are widely used .docxBridge RectifierPre-Lab InformationRectifiers are widely used .docx
Bridge RectifierPre-Lab InformationRectifiers are widely used .docx
 
Project Management And The Major Areas Of Projects Management
Project Management And The Major Areas Of Projects ManagementProject Management And The Major Areas Of Projects Management
Project Management And The Major Areas Of Projects Management
 

Kürzlich hochgeladen

Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesVijayaLaxmi84
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
CHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxCHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxAneriPatwari
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseCeline George
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 

Kürzlich hochgeladen (20)

Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their uses
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
CHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxCHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 

PROJ 595 RANK Education Counseling--proj595rank.com

  • 1. PROJ 595 Final Exam Set 1 FOR MORE CLASSES VISIT www.proj595rank.com Question 1. (TCOs A and B) An EVM analysis employs which factors to evaluate risks? (Points : 5) Question 2. (TCO G) You have completed all design drawings and have a complete scope for your project. You need to hire a contractor to build the product to your designs. Which type of contract would be best in this situation? (Points : 5) Question 3. (TCO D) In which risk response strategy is the responsibility for the risk moved to a third party? (Points : 5) 4. (TCOs A and B) You have been appointed as a project manager for a high-dollar project for a government agency, and you have been asked by your boss to identify the stakeholder groups and the individuals who make up those groups in order to start the stakeholder analysis. Identify at least six groups of stakeholders and the individuals who comprise those groups, and explain when the stakeholder identification process should take place during the planning of the project. (Points: 20) (TCO B) Due to globalization within your industry, you have been appointed as the project manager for an R & D project. Your task is to create a new technologically advanced solar cell. You
  • 2. want to employ the PMBOK® Guide risk management process. Senior management would like you to briefly describe the process and all its steps. Please create a short briefing for senior management below. (Points : 40) (TCO I) You are the project manager on a critical project for your corporation. You have decided to employ fault-tree analysis on your project. What is fault-tree analysis, and how can it be applied to your project? (Points : 25) (TCO H) Senior management is concerned about risk owners on your project. What is the role of a risk owner in the risk management process? (Points: 20) (TCO F) You are a project manager for a large healthcare R & D project. Senior management has asked you to utilize a sensitivity analysis and a tornado diagram to quantify risks on your project. Senior management‟s major concern is the price of raw materials in the development of the new drug. Describe how to perform a sensitivity analysis and use a tornado diagram to quantify risks to your project. (Points : 25) TCO G) Describe and discuss when one should use an FPEPA contract. Compare and contrast this to a typical FP contract. (Points: 20) (TCO E) Senior management has just returned from a risk management workshop. One of the topics was reserve analysis. Management does not completely understand the concept and
  • 3. asks you what the purpose is of performing reserve analysis during the risk management process. (Points : 20) TCO D) You are the project manager for an important healthcare project. You are performing qualitative risk analysis. Below are the values of probability and impact for the top six risks that were given to you by project team. Assuming a neutral stakeholder tolerance, which risks must be addressed proactively if possible?(Points : 25) TCO C) You are the project manager for a large health information technology project. You are confronted with an important decision on your project: How much scenario testing is appropriate for this project? Employ decision tree analysis to provide senior management with the best course of action for this decision. =========================================== === PROJ 595 Final Exam Set 2 FOR MORE CLASSES VISIT www.proj595rank.com
  • 4. 1. (TCOs A and B) Quantitative risk analysis does all of the following, except (Points : 5) Question 2. 2. (TCO G) You need to ensure your project is completed by July 1 of next year. You do not have time to do all the design work yourself, so you decide to contract out that work. Which type of contract would likely be best in this situation? (Points : 5) Question 3. 3. (TCO D) Which risk response strategy is most appropriate for risks on the watch list? (Points : 5) Question 4. 4. (TCOs A and B) You have been appointed as a project manager for a high-dollar project for the public sector, and you have been asked by your boss to identify the stakeholder groups and the individuals who make up those groups in order to start the stakeholder analysis. Identify at least six groups of stakeholders and the individuals who comprise those groups, and explain when the stakeholder identification process should take place during the planning of the project. (Points : 20) Question 5. 5. (TCO B) Due to globalization within your industry, you have been appointed as the project manager for an R & D project. Your task is to create a new technologically
  • 5. advanced solar cell. You want to employ the PMBOK® Guide risk management process. Senior management would like you to briefly describe the process and all its steps. Please create a short briefing for senior management below. (Points : 40) Question 6. 6. (TCO C) You are the project manager for a large health information technology project. You are confronted with an important decision on your project: How much posttesting of the design is appropriate for this project? Employ decision tree analysis to provide senior management with the best course of action for this decision. Question 7. 7. (TCO D) You are the project manager for an important healthcare project. You are performing qualitative risk analysis. Below are the values of probability and impact for the top six risks that were given to you by project team. Assuming a neutral stakeholder tolerance, which risks must be addressed proactively if possible? Question 8. 8. (TCO E) Senior management is very interested in creating an effective risk monitoring and control system that is tied to a performance monitoring system for your project. Describe what a good monitoring and control and performance measurement system for your project would look like. Be sure to include an example to help illustrate your answer. (Points : 20)
  • 6. Question 9. 9. (TCO F) You are a project manager for a large healthcare R & D project. Senior management has asked you to utilize a sensitivity analysis and a tornado diagram to quantify risks on your project. Senior management‟s major concern is the price of raw materials in the development of the new drug. Describe how to perform a sensitivity analysis and use a tornado diagram to quantify risks to your project. (Points : 25) Question 10. 10. (TCO G) Describe and discuss when one should use an FPEPA contract. Compare and contrast this to a typical FP contract. (Points : 20) Question 11. 11. (TCO H) You are in a status meeting with key project stakeholders. You are discussing residual and secondary risks in your project. The stakeholders are becoming concerned about these concepts. The key stakeholders ask for an explanation and example of each. How would you describe each? Provide an example of a residual and a secondary risk. (Points : 20) Question 12. 12. (TCO I) You are the project manager on a complete overhaul of your corporation‟s IT infrastructure. You have decided to employ fault-tree analysis on your project. What is fault-tree analysis, and how can it be applied to your project? (Points : 25)
  • 7. =========================================== === PROJ 595 Final Exam Set 3 (NEW) FOR MORE CLASSES VISIT www.proj595rank.com Question 1. (TCO A) Qualitative risk analysis Question 2. (TCO A) You are the project manager of a new, innovative project. One overarching principle you adhere to is Question 3. (TCO B) Project assumptions are created in the scope statement. These assumptions are revisited in which process of risk management? Question 4. (TCO D) In which risk response strategies are risks guaranteed to not occur if they are negative and guaranteed to occur if they are positive after the response plan is initiated?
  • 8. Question 5. (TCO E) One the key functions of risk monitoring and control is to Question 6. (TCO H) When using the ATOM process to manage risks, which is the importance of an initiation meeting? Question 7. (TCO A) When is a risk register created? What is its importance of a risk register to a project? Question 8. (TCO B) List and briefly define five specific tools and techniques that can be used to identify risk associated with projects. Question 9. (TCO D) Explain avoidance as a risk response strategy, and provide an example of its use in a project. Question 10. (TCO E) Describe what characteristics a performance measurement system, to be employed in a risk monitoring and
  • 9. control process for a project, should have. Include an example to help illustrate your answer. Question 11. (TCO H) What is the importance of including stakeholders and risk owners in the creation and approval of risk response plans? =========================================== === PROJ 595 Midterm Exam Set 2 FOR MORE CLASSES VISIT www.proj595rank.com 1. (TCO A) A stakeholder analysis in risk management (Points : 5) Question 2. 2. (TCO A) When using the ATOM process to manage risks, an initiation meeting should be used for (Points : 5) Question 3. 3. (TCO B) All of the below are risk identification methods, except (Points : 5) Question 4. 4. (TCO D) In risk response planning, which is the difference between active and passive acceptance? (Points : 5) Question 5. 5. (TCO E) A common tool for use in risk monitoring and control is (Points : 5)
  • 10. Question 6. 6. (TCO H) When using the ATOM process to manage risks, which is the importance of an initiation meeting? (Points : 5) Question 7. 7. (TCO A) When is a risk register created? What is its importance of a risk register to a project? (Points : 10) Question 8. 8. (TCO B) You are the project manager for a major technological project. You are concerned about doing qualitative risk analysis. How do you ensure consistency when doing qualitative risk analysis across all risk evaluators? (Points : 15) Question 9. 9. (TCO D) Explain transference as a risk response strategy, and provide an example of its use in a project. (Points : 15) Question 10. 10. (TCO E) What is the purpose of performing reserve analysis during the risk management process? (Points : 15) Question 11. 11. (TCO H) You are in a status meeting with key project stakeholders. You are discussing residual and secondary risks in your project. The key stakeholders ask for an explanation and example of each. How would you describe each? Provide an example of a residual and a secondary risk. (Points : 15) =========================================== === PROJ 595 Risk Paper 2 FOR MORE CLASSES VISIT www.proj595rank.com
  • 11. PROJ 595 Risk Paper 2 =========================================== === PROJ 595 Week 3 Risk Paper 1 (2 Papers) FOR MORE CLASSES VISIT www.proj595rank.com This Tutorial contains 2 Papers of this Assignment PROJ 595 Week 3 Risk Paper 1 Write a two- to four-page paper regarding a project, either real or fictitious, where one is able to discuss how risks were identified, ranked, and monitored. The student is also welcome to write about a major purchase or major decision in his or her life, such as buying a new car, buying a new home, or even the decision to return to school to earn a degree. All of these are considered projects or procurements that require some form of formal or informal risk review. Remember to cite and reference any sources that were used in the project or in the decision-making process. At a minimum, students should connect this assignment back to the text and support their decision-making processes with key concepts from the text. One of the elements of this assignment is to connect the material from the course to actual risk decisions. You are also welcome to use any of the checklists from the text to support the decision-making process.
  • 12. =========================================== === PROJ 595 Week 4 Course Project (2 Project) FOR MORE CLASSES VISIT www.proj595rank.com This Tutorial contains 2 Project Course Project Part I For this project, you may choose a project that is of interest to you. When selecting a project, avoid picking one that is either too big or too small. For example, do not decide to build a new stadium for your local professional sports team (too big) or to plant your summer garden (too small).You will only be addressing the risk issues in the project so you will not need to be looking at the detail required for a business plan. The scope statement and the WBS are required in addition to the risk management plan. It is important to pick one that you understand so that you will be able to create the risk management plan that is realistic with sufficient detail where your contingency plans will be relevant.Since you will need to create a risk management plan, your project should be somewhat risky. 1. Create a risk management plan for your project. To do this, you must first create a scope and a WBS for your project.
  • 13. 2. Perform risk management planning as defined in the lecture. 3. Identify risks for your project, including any issues that may impede or impair the completion of the project. You must identify at least 5 positive and 15 negative risks. 4. Prioritize the risks by performing qualitative risk analysis. 5. Perform risk response planning for your project by creating detailed risk response plans for those risks needing responses. This should include both proactive responses and reactive contingency plans as appropriate. =========================================== === PROJ 595 Week 5 Midterm Set 1 FOR MORE CLASSES VISIT www.proj595rank.com 1. (TCO A) Qualitative risk analysis 2. (TCO A) When using the ATOM process to manage risks, an initiation meeting should be used for 3. (TCO B) A watch list is a 4. (TCO D) In risk response planning, which is the difference between active and passive acceptance? 5. (TCO E) A common tool for use in risk monitoring and control is
  • 14. 6. (TCO H) When using the ATOM process to manage risks, which is the importance of an initiation meeting? 7. (TCOA) Explain when risk breakdown structure is created, and explain the importance of a risk breakdown structure in risk management 8. (TCO B) Explain the qualitative risk analysis process 9. (TCO D) Explain transference as a risk response strategy, and provide an example of its use in a project 10. (TCO E) Describe the function and process of performing a risk audit during a project 11. (TCO H) What is the role of a risk owner in the risk management process? =========================================== === PROJ 595 Week 6 Course Project Part II (2 Project) FOR MORE CLASSES VISIT www.proj595rank.com This Tutorial contains 2 Project Course Project Part II
  • 15. For this part, you will be creating two decision trees concerning specific risks or events from the project you developed in part 1. The first one will be a decision tree used to make a decision. You will be calculating an expected value based upon this decision tree. The second will be for a basic risk or event where you will be creating a fault or event tree illustrating what makes up the fault or event. With each of these, you will need to discuss the process and results of your tree. The risks or events you use will be from the project you used in the part one. You will need to start the report with a short introduction of that project so that there is continuity and the reader will understand the events and risks being discussed. You do not have to include part one in your part two report. Details: Create one decision tree with an expected value and a fault or event tree that would support the exploration of risk for the project you used for part one of the course project. (That is two trees in all.) Provide a one paragraph project description of the part 1 project but you do not have to repeat all the other information in this part. •The decision tree must be created to support a major risk-related decision likely to be faced by the project. The calculation of expected values is a requirement of this project. •The fault or event tree should offer at a minimum a listing of potential risks and impacts in the event of a smaller failure. For example, a smaller failure could be the loss of water pressure or a fire in a construction project rather than examining what risk was involved with the collapse of the construction project. Write a discussion of the risks that supports the fault tree, event tree, or decision tree that has been created. Make a separate write up for each of these smaller risks associated with the fault tree or event trees. Your paper should have a general introduction that
  • 16. should introduce the decision tree and fault or event trees that will be discussed, and then the paper should have a discussion regarding each tree. See the sample outline below for details. The part 2 paper regarding the identified risks and decision trees should be from six to ten pages in length. Note that this page length is a guideline. At leastthree authoritative, outside references are required (anonymous authors or web pages are not acceptable). These should be referenced where used in the paper and listed on the last page titled, Works Cited. Risks such as “project is over budget” or “project does not meet schedule” are too broad. Be specific. Comments on how to create an acceptable tree and project paper Each fault or event tree should offer at a minimum a listing of two or more potential risks and impacts in the event of two smaller failures. (This means for each tree you will have at a minimum two sub-faults with multiple causes for each of them.) Use “and” and “or” gates properly. Understand the difference. When you use an „and‟ gate it indicates that it take both of the conditions for the fault to occur. If either of the conditions could cause a problem this indicates the use of an „or‟ gate. There are examples and templates in doc sharing. You need to select specific faults to use in the tree. General examples of faults are too broad for the fault tree to provide a comprehensive evaluation of the possible causes. The graphics for the tree do not have to be artist professional quality but they do need to be student professional. A table is not sufficient. If you use screen shots be sure you crop them so that only the tree is included not all the computer menus and etc.
  • 17. You should have at least two options under each gate. There is no reason for a gate if there is only one option. When a template is provided or an example it is not meant to be copied. If you are not doing a construction project, your headings should not be “construction project” just because the example says that. This is a risk management course. The engineering solutions to the problems on these projects are not the answer that you should be developing. The development is of the risk management system and process for your specific project. =========================================== ===