SlideShare a Scribd company logo
1 of 36
GLOBAL ARC
OKOCHI KAIUN
Taiyo Sangyo Trading & Marine Service LTD.
Global Arc
SHIP PARTICULARS
KIND OF SHIP: Bulk Carrier (Lumber Carrier)
OWNER: Batanagar Shipping Corp. (Okouchi Kaiun Co., Ltd.)
OPERATOR: NYK Bulks & Projects
BUILDER & SHIP NO.: Shin Kochijyuko Co., Ltd. SNo.7275
DELIVERY: 19TH July 2013
CLASS: NIHON KAIJI KYOUKAI (NK)
GROSS TONNAGE: 21,158 Ton
NET TONNAGE: 10,765 Ton
LIGHT WEIGHT: 7,260 Ton
SHIP PARTICULARS
DATE LOCATION DETAILS
03 APR 2019 Indonesia Lashing Materials Stolen
24 SEP. 2019 Seattle No.1 Oiler Deserted at Seattle
12 OCT. 2019 Kalama Failed Hold Inspection – Shore Gang Arranged by NYK
22 OCT. 2019
No. 5 C.H. Wet cargo due to Port side bilge well
(51 MT damaged)
06 NOV. 2019
NYK Mr. Hashimoto claimed Why low retention rate, Why
deserting twice, Why so many troubles occurred by lack of
basic operation practice. Doubting crew ability and ship –
manager communication and lack of responsibility
20 DEC. 2019
No. 2 Hatch cover hydraulic oil leaking overboard at Seattle
damaged hydraulic hose at hatch cover controller
GLOBAL ARC HISTORY OF INCIDENTS
GLOBAL ARC
DATE LOCATION DETAILS
23 DEC. 2019
NYK Mr. Fujihara (Cement Team) Claimed that trouble
shooting, and reporting are very bad, Wet cargo with no
information for 2 days, Oil leak Doubted management no
information to the agent and operator at all, and crew
education and performance.
25 DEC. 2019 No. 5 Cargo Hold hose damaged during navigation
26 DEC 2019 Lifeboat (STBD) damaged during drill
GLOBAL ARC HISTORY OF INCIDENTS
GLOBAL ARC
DATE LOADING CARGO DISCHARGING
2018 RUSSIA (VOSTOCHY) COAL NAGOYA
CANADA (NANAIMO) LOG
ALASK (AFOGNAK) LOG CHINA (CAOFEIDIAN)
2019 PIPE
DEENDAYAL, DUQM, MINA SAQR,
JEBEL ALI, ABU DHABI, SHUAIBA
OMAN (SALALAH) GYPSUM INDONESIA (TANJUNG PRIOK)
INDONESIA (TANJUNG BARA) COAL PHILIPPINES (SARANGANI)
INDONESIA (TABONEO) COAL
INDONESIA (MUARA SATUI) COAL TOMAKOMAI
USA (STOCKTON) CHIP
CANADA (VANCOUVER) CHIP HIMEJI
GLOBAL ARC PORTS OF CALL
GLOBAL ARC
DATE LOADING CARGO DISCHARGING
2019 CANADA (PRINCE RUPERT)
WOOD
PELLET
ISHINOMAKI
SLAG USA (SEATTLE)
USA (KALAMA) WHEAT KOBE, HAKATA
SLAG USA (SEATTLE)
CANADA (VANCOUVER)
WOOD
PELLET
ISHINOMAKI
CANADA (STEWART) COPPER
CONCENTRATE CHINA (QINGDAO)
GLOBAL ARC PORTS OF CALL
GLOBAL ARC
Global Arc Pictures
GLOBAL ARC
WEATHER FACSIMILE (JRC)BRIDGE ECDIS (JRC)
MF/HF CONTROLLER VDR OPERATION PANEL (JRC)
FIRE CONTROL ALARM
PANEL (KASHIWA CO. LTD..)
SHIP’S OFFICEGPS (JRC) PORTABLE VHF RADIO (JRC)
CREW MESS HALL GALLEY GALLEY
GLOBAL ARC
CREW SMOKING ROOMOFFICER’S MESS HALL OFFICER’S MESS HALL
HATCH COVERS AND SHIP’S CRANE AFT MOORING DECK AFT MOORING DECK
GLOBAL ARC
PORT SIDE GANGWAY UPPER DECKGARBAGE DRUM LIFE RING WITH LINE
CARGO HOLDCARGO HOLD HATCH COAMING
GLOBAL ARC
STARBOARD SIDE GANGWAY UPPER DECKACCOMMODATION FRONT VIEW PORT SIDE UPPER DECK
PORT SIDE ANCHOR CHAIN
GLOBAL ARC
STARBOARD WINDLASSFWD MOORING WINCH FWD MOORING WINCH
FWD MOORING WINCH CROSS DECK
GLOBAL ARC
MAIN ENGINEENGINE CONTROL ROOM ENGINE ROOM CONTROL PANEL
GENERATOR ENGINE INCINERATORMAIN ENGINE LOWER SIDE
GLOBAL ARC
SEWAGE TREATMENT PLANT
CONTROL PANEL FRESH WATER GENERATOR ENGINE WORKSOP
OILY WATER SEPERATOR SEWAGE TREATMENT
PLANT CONTROL PANEL
BALLAST WATER TREATMENT
SYSTEM CONTROL PANEL
GLOBAL ARC
Deck Crane
Maintenance and
Log Bulk Operation
PICTURES OF INSPECTION
INSPECTION OF SHEAVE BY MANLIFT
INSPECTION OF HOISTING WIRE BY
USING SMALL ROPE WHILE LOWERING
INSPECTION OF
CARGO BLOCK
GLOBAL ARC
Cargo Block Condition
GLOBAL ARC
Bolt & Nut C Block Housing Intact 360 Deg. Rotating Swivels Greased up shackle/No Dent
Greased Shackle Pin Good Condition
SAMPLE BROKEN HOISTING WIRE FOR REPLACEMENT
SELF-INSPECTION METHOD OF
HOISTING WIRES
BROKEN
WIRES MUST
BE REPLACED
PRIOR GEAR
INSPECTION
BROKEN
WIRES MUST
BE REPLACED
PRIOR GEAR
INSPECTION
LASHING PREPARATIONS FOR
LOG LOADING
1. Ensure all deck cranes are all set to HOOK
MODE (NOT GRAB MODE), if fitted.
2. Adjust all crane limit switch to proper
settings. Canadian stevedores will refuse to
work when not properly adjusted.
3. Remove all cargo hooks (Main) from cargo
blocks prior to arrival load port as
stevedores will not use it.
GLOBAL ARC
4. Uncoil from spool all newly supplied Hog Lashing
wires and distribute number of hog lashings needed
on each hatch. Tag all hog wires which hatch it
belong. (Photo #4)
(Position all hog lashings to appropriate location
accessible on each hatch.) See Photo #1
5. Prepare number of shackles needed for each hatch.
(Suggest: pre-attach to proper pad eyes on each
stanchion post as needed prior to arrival).
GLOBAL ARC
LASHING PREPARATIONS FOR
LOG LOADING
Photo #4
Photo #1
6. Prepare number of snatch blocks needed each
hatch. (Check Lashing Plan as provided by
dockyard). Position on appropriate location for
each hatch.
7. Prepare number of turnbuckles needed each
hatch. Must be fully stretched to maximum
length. (Photo #5)
8. All foot wires must be in place on each deck pad
eyes prior to arrival load port with rope
(10/12mm diameter) attached to upper end.
(Photo #6)
GLOBAL ARC
LASHING PREPARATIONS FOR
LOG LOADING
Photo #5
Photo #6
9. Uncoil newly supplied over lashing or wiggle
wires from spool and must be accessible for
each hatch ready for use upon completion of
loading. (Suggest position over lashing wires
as shown at crane platform) Photo # 2 & 3
10. Prepare number of wire clips for each hatch
ready for use upon tightening of over lashing
wires.
GLOBAL ARC
LASHING PREPARATIONS FOR
LOG LOADING
Photo #2
Photo #3
11. Attach lashing chains to deck pad eyes with
similar rope attached same as foot wires.
12. Appropriate rachet needed to tighten wire
clips. (at least (2) two sets)
13. All foot wire and lashing chain shall be “just
coiled” and DO NOT hook on stanchion.
Stevedore will remove coil and hook on
stanchion at the timing of raising up
stanchion.
GLOBAL ARC
LASHING PREPARATIONS FOR
LOG LOADING
CRANE LIMIT TEST CHECKLIST
GLOBAL ARC
Quick
Checklist
for US Logs
GLOBAL ARC
1. Undercovering and covering hatches, including placing tarps,
plywood, nets, etc.
2. Handling lines, tie-up, let-go, and/or shifting.
3. Hoisting ship’s stores during a shift or shifts while longshoremen are
employed.
4. Handling cargo, re-stowing, shifting, mark-off, etc.
5. Hoglash/lashing, securing deck cargo and placing stanchions (flaking
chains is longshore work).
Under the Pacific Coast Longshore Contract, while your vessel is at berth, the
following duties come under the scope of the Longshore Union:
GLOBAL ARC
6. Marking and/or checking of cargo.
7. Cleaning cargo holds.
8. Lining for grain.
If any of the above is performed by your crew at the berth, the longshoremen
are entitled to and shall receive payment for the work “in lieu of time”. Such
payments will be for the ship’s account and will be based upon 4 hours pay for
each violation and will be payable to the number of longshoremen
contractually entitled to the payment.
The Longshore Labor Force in this area is monitoring any of the violations
outlined above very closely. DO NOT perform any of the above operations
while on berth.
GLOBAL ARC
Safety Criteria and Guidelines in
Longview and Olympia
Wire – wire rope (hoisting wire, slings, etc.) used for cargo handling shall be replaced if in any
length of 8 diameters, the total number of broken wires exceeds 10% of the total number of
wires. (Rule 258 on the Pacific Coast Marine Safety Code), Three Broken wires in one strand
will automatically condemn the wire.
Excerpt from Pacific Coast Marine Safety Code
Rule258
Wire rope slings used for cargo handling shall be replaced if any length of (8) diameters, the
total number of broken wires exceeds 10% of the total number of wires or if the rope shows
the following:
a. Wear or scraping of one-third(1/3) the original diameter of outside individual wires;
GLOBAL ARC
b. There is kinking, crushing, birdcaging, or any
other damage resulting in distortion of rope
structure;
c. There are end attachments that are cracked,
deformed or worn;
d. There is corrosion of the rope or end
attachments;
e. There is more than one broken wire in the
close vicinity of a socket or swaged fitting;
Safety Criteria and Guidelines in
Longview and Olympia
GLOBAL ARC
Safety Criteria and Guidelines in
Longview and Olympia
Shackle – Pad eyes, shackles, and shackle pins that are worn in excess of 10% of the original
diameter or that are visibly unsafe from defects or deformities, shall be replaced. (Rule 264 on
the Pacific Coast Marine Safety Code) Weld-repaired shackles shall be replaced.
Excerpt from Pacific Coast Marine Safety Code
Rule264
Pad eyes, shackles, and shackle pins that are worn in excess of 10% of the original diameter or
that are visibly unsafe from defects or deformities, shall be replaced.
GLOBAL ARC
Safety Criteria and Guidelines in
Longview and Olympia
Crane Boom – Crane booms with a dent exceeding the allowance which is 1.5 x the
thickness of the steel shall be repaired.
- Covering or filling of dents not allowed.
- Proper documentation of satisfactory dents as noted by class surveyor or
repairs made should be noted in the vessels gear book and stamped by
class surveyor.
- Specific location of class surveyed dents should be clearly noted in gear book.
Limit Switch – Limit adjustment of the degree of boom angle and the height of cargo block
must be done appropriately before loading operation starts or within 30 minutes after a
request for the adjustment is notified to the ship’s crew during loading operation.
GLOBAL ARC
Safety Criteria and Guidelines in
Longview and Olympia
Cargo Block – Bolts must meet the specifications of the manufacturer.
- Blocks need to swivel properly.
- Blocks equipped with rocker pin assemblies must function properly. Frozen
cargo block is not allowed to use.
Sheave – Sheaves with deep grooving from wear or corrugated from line grooving shall be
taken out of service (Rule 266 on the Pacific Coast Marine Safety Code).
- The angle of sheaves must be in line with the ship’s design.
Excerpt from Pacific Coast Marine Safety Code
Rule266
Sheaves with deep grooving from wear corrugated from line grooving shall be taken out of
service.
GLOBAL ARC
Safety Criteria and Guidelines in
Longview and Olympia
Hatch – No odor inside of hatch.
Jumping Wire – In the case that luffing wires or hoisting wires jump out of the drum
without appropriately designed preventative guards, it is considered that the accident
happened due to the ship’s structure in principle. However, whether the cause is so called
“rough handling” or not can be discussed from several viewpoints such as experience of
the crane operator, position of the bundled logs and others.
Bearing – Bearing must be maintained appropriately to prevent failure.
General – In an effort to minimized standby time, maintaining vessels gear and equipment
to a “like new” condition is strongly recommended.
GLOBAL ARC
GLOBAL ARC
LOG BULK LOADING OPERATION VIDEO

More Related Content

What's hot

Arctic-Hydrographic-Research-Vessel-Briefing
Arctic-Hydrographic-Research-Vessel-BriefingArctic-Hydrographic-Research-Vessel-Briefing
Arctic-Hydrographic-Research-Vessel-Briefing
Kevin Rahardjo
 
Shawn_Mayton_Resume__#1
Shawn_Mayton_Resume__#1Shawn_Mayton_Resume__#1
Shawn_Mayton_Resume__#1
Shawn Mayton
 
Saipem Presentation - ONGC Symposium 11-12 Nov 14
Saipem Presentation - ONGC Symposium 11-12 Nov 14Saipem Presentation - ONGC Symposium 11-12 Nov 14
Saipem Presentation - ONGC Symposium 11-12 Nov 14
Balakrishnan G Nair, AMRINA
 
Port berthing facilities & infrastructure surveyor’s prespective
Port berthing facilities & infrastructure  surveyor’s prespectivePort berthing facilities & infrastructure  surveyor’s prespective
Port berthing facilities & infrastructure surveyor’s prespective
Thiruvali Shrinivaasan
 
General Overview - June 2012
General Overview - June 2012General Overview - June 2012
General Overview - June 2012
InterMoor
 
SSCS Track Record
SSCS Track RecordSSCS Track Record
SSCS Track Record
Adam Tucker
 

What's hot (20)

Lights and shapes lrg
Lights and shapes lrgLights and shapes lrg
Lights and shapes lrg
 
Anchoring lrg
Anchoring lrgAnchoring lrg
Anchoring lrg
 
Arctic-Hydrographic-Research-Vessel-Briefing
Arctic-Hydrographic-Research-Vessel-BriefingArctic-Hydrographic-Research-Vessel-Briefing
Arctic-Hydrographic-Research-Vessel-Briefing
 
Shawn_Mayton_Resume__#1
Shawn_Mayton_Resume__#1Shawn_Mayton_Resume__#1
Shawn_Mayton_Resume__#1
 
MinDOC Photo
MinDOC PhotoMinDOC Photo
MinDOC Photo
 
Loadline
LoadlineLoadline
Loadline
 
Transocean offshore operation 2
Transocean   offshore operation 2Transocean   offshore operation 2
Transocean offshore operation 2
 
Pilotage lrg
Pilotage lrgPilotage lrg
Pilotage lrg
 
Saipem Presentation - ONGC Symposium 11-12 Nov 14
Saipem Presentation - ONGC Symposium 11-12 Nov 14Saipem Presentation - ONGC Symposium 11-12 Nov 14
Saipem Presentation - ONGC Symposium 11-12 Nov 14
 
Download
DownloadDownload
Download
 
Mi-ST
Mi-STMi-ST
Mi-ST
 
Work resume updated 05 25-2016
Work resume updated 05 25-2016Work resume updated 05 25-2016
Work resume updated 05 25-2016
 
Captain Robert Pearcey current
Captain Robert Pearcey currentCaptain Robert Pearcey current
Captain Robert Pearcey current
 
Port berthing facilities & infrastructure surveyor’s prespective
Port berthing facilities & infrastructure  surveyor’s prespectivePort berthing facilities & infrastructure  surveyor’s prespective
Port berthing facilities & infrastructure surveyor’s prespective
 
General Overview - June 2012
General Overview - June 2012General Overview - June 2012
General Overview - June 2012
 
SSCS Track Record
SSCS Track RecordSSCS Track Record
SSCS Track Record
 
Garbage
GarbageGarbage
Garbage
 
PowerLogistics Asia 2014 - Combining Experience, Know - How & Equipment - Jon...
PowerLogistics Asia 2014 - Combining Experience, Know - How & Equipment - Jon...PowerLogistics Asia 2014 - Combining Experience, Know - How & Equipment - Jon...
PowerLogistics Asia 2014 - Combining Experience, Know - How & Equipment - Jon...
 
cv - H - 15
cv - H - 15cv - H - 15
cv - H - 15
 
Spar Platforms
Spar PlatformsSpar Platforms
Spar Platforms
 

Similar to Global arc

S1042Survey Report on Corsair
S1042Survey Report on CorsairS1042Survey Report on Corsair
S1042Survey Report on Corsair
Calin Ciufudean
 
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
Emeka Ngwobia
 
D1 mc s & m topic 3 loadline
D1 mc s & m topic 3 loadlineD1 mc s & m topic 3 loadline
D1 mc s & m topic 3 loadline
jabbar2002pk200
 
mh_saad_resume (2) - Copy
mh_saad_resume (2) - Copymh_saad_resume (2) - Copy
mh_saad_resume (2) - Copy
mohamed saad
 

Similar to Global arc (20)

S1042Survey Report on Corsair
S1042Survey Report on CorsairS1042Survey Report on Corsair
S1042Survey Report on Corsair
 
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
 
Internship Report
Internship ReportInternship Report
Internship Report
 
D1 mc s & m topic 3 loadline
D1 mc s & m topic 3 loadlineD1 mc s & m topic 3 loadline
D1 mc s & m topic 3 loadline
 
Msf safety-flash-13.09
Msf safety-flash-13.09Msf safety-flash-13.09
Msf safety-flash-13.09
 
Racking Safety Audit Report -CSCL
Racking Safety Audit Report -CSCLRacking Safety Audit Report -CSCL
Racking Safety Audit Report -CSCL
 
Sample-Survey-Sea-Ray-200.pdf
Sample-Survey-Sea-Ray-200.pdfSample-Survey-Sea-Ray-200.pdf
Sample-Survey-Sea-Ray-200.pdf
 
Navtec rigging service guidelines
Navtec rigging service guidelinesNavtec rigging service guidelines
Navtec rigging service guidelines
 
Steel boat (8m)
Steel boat (8m)Steel boat (8m)
Steel boat (8m)
 
Notes master
Notes masterNotes master
Notes master
 
COLREG 1972, A Presentation
COLREG 1972, A PresentationCOLREG 1972, A Presentation
COLREG 1972, A Presentation
 
Zre loss prevention at the sea 2010
Zre loss prevention at the sea 2010Zre loss prevention at the sea 2010
Zre loss prevention at the sea 2010
 
Aluminium boat (6m)
Aluminium boat (6m)Aluminium boat (6m)
Aluminium boat (6m)
 
Frp boat (7m)
Frp boat (7m)Frp boat (7m)
Frp boat (7m)
 
Masters Guide to Container Securing
 Masters Guide to Container Securing Masters Guide to Container Securing
Masters Guide to Container Securing
 
Dry docking operations
Dry docking operationsDry docking operations
Dry docking operations
 
mh_saad_resume (2) - Copy
mh_saad_resume (2) - Copymh_saad_resume (2) - Copy
mh_saad_resume (2) - Copy
 
F KRUGER diving cv
F KRUGER diving cvF KRUGER diving cv
F KRUGER diving cv
 
TBEA ENERGY (INDIA) PVT LTD
 TBEA   ENERGY (INDIA) PVT LTD TBEA   ENERGY (INDIA) PVT LTD
TBEA ENERGY (INDIA) PVT LTD
 
Download
DownloadDownload
Download
 

More from Valentin Bañaco (9)

Harmful effects of plastics in our marine environment
Harmful effects of plastics in our marine environmentHarmful effects of plastics in our marine environment
Harmful effects of plastics in our marine environment
 
Maritime Cyber Security Education
Maritime Cyber Security EducationMaritime Cyber Security Education
Maritime Cyber Security Education
 
Mlc and food management
Mlc and food managementMlc and food management
Mlc and food management
 
TST SMS familiarization & education
TST SMS familiarization & educationTST SMS familiarization & education
TST SMS familiarization & education
 
Si visitation machinery education
Si visitation machinery educationSi visitation machinery education
Si visitation machinery education
 
TST management procedures
TST management proceduresTST management procedures
TST management procedures
 
Global symphony
Global symphonyGlobal symphony
Global symphony
 
SI visitation machinery education
SI visitation machinery educationSI visitation machinery education
SI visitation machinery education
 
TST SI visitation crew education
TST SI visitation crew educationTST SI visitation crew education
TST SI visitation crew education
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Recently uploaded (20)

Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answers
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 

Global arc

  • 1. GLOBAL ARC OKOCHI KAIUN Taiyo Sangyo Trading & Marine Service LTD.
  • 3. KIND OF SHIP: Bulk Carrier (Lumber Carrier) OWNER: Batanagar Shipping Corp. (Okouchi Kaiun Co., Ltd.) OPERATOR: NYK Bulks & Projects BUILDER & SHIP NO.: Shin Kochijyuko Co., Ltd. SNo.7275 DELIVERY: 19TH July 2013 CLASS: NIHON KAIJI KYOUKAI (NK) GROSS TONNAGE: 21,158 Ton NET TONNAGE: 10,765 Ton LIGHT WEIGHT: 7,260 Ton SHIP PARTICULARS
  • 4. DATE LOCATION DETAILS 03 APR 2019 Indonesia Lashing Materials Stolen 24 SEP. 2019 Seattle No.1 Oiler Deserted at Seattle 12 OCT. 2019 Kalama Failed Hold Inspection – Shore Gang Arranged by NYK 22 OCT. 2019 No. 5 C.H. Wet cargo due to Port side bilge well (51 MT damaged) 06 NOV. 2019 NYK Mr. Hashimoto claimed Why low retention rate, Why deserting twice, Why so many troubles occurred by lack of basic operation practice. Doubting crew ability and ship – manager communication and lack of responsibility 20 DEC. 2019 No. 2 Hatch cover hydraulic oil leaking overboard at Seattle damaged hydraulic hose at hatch cover controller GLOBAL ARC HISTORY OF INCIDENTS GLOBAL ARC
  • 5. DATE LOCATION DETAILS 23 DEC. 2019 NYK Mr. Fujihara (Cement Team) Claimed that trouble shooting, and reporting are very bad, Wet cargo with no information for 2 days, Oil leak Doubted management no information to the agent and operator at all, and crew education and performance. 25 DEC. 2019 No. 5 Cargo Hold hose damaged during navigation 26 DEC 2019 Lifeboat (STBD) damaged during drill GLOBAL ARC HISTORY OF INCIDENTS GLOBAL ARC
  • 6. DATE LOADING CARGO DISCHARGING 2018 RUSSIA (VOSTOCHY) COAL NAGOYA CANADA (NANAIMO) LOG ALASK (AFOGNAK) LOG CHINA (CAOFEIDIAN) 2019 PIPE DEENDAYAL, DUQM, MINA SAQR, JEBEL ALI, ABU DHABI, SHUAIBA OMAN (SALALAH) GYPSUM INDONESIA (TANJUNG PRIOK) INDONESIA (TANJUNG BARA) COAL PHILIPPINES (SARANGANI) INDONESIA (TABONEO) COAL INDONESIA (MUARA SATUI) COAL TOMAKOMAI USA (STOCKTON) CHIP CANADA (VANCOUVER) CHIP HIMEJI GLOBAL ARC PORTS OF CALL GLOBAL ARC
  • 7. DATE LOADING CARGO DISCHARGING 2019 CANADA (PRINCE RUPERT) WOOD PELLET ISHINOMAKI SLAG USA (SEATTLE) USA (KALAMA) WHEAT KOBE, HAKATA SLAG USA (SEATTLE) CANADA (VANCOUVER) WOOD PELLET ISHINOMAKI CANADA (STEWART) COPPER CONCENTRATE CHINA (QINGDAO) GLOBAL ARC PORTS OF CALL GLOBAL ARC
  • 9. GLOBAL ARC WEATHER FACSIMILE (JRC)BRIDGE ECDIS (JRC) MF/HF CONTROLLER VDR OPERATION PANEL (JRC) FIRE CONTROL ALARM PANEL (KASHIWA CO. LTD..)
  • 10. SHIP’S OFFICEGPS (JRC) PORTABLE VHF RADIO (JRC) CREW MESS HALL GALLEY GALLEY GLOBAL ARC
  • 11. CREW SMOKING ROOMOFFICER’S MESS HALL OFFICER’S MESS HALL HATCH COVERS AND SHIP’S CRANE AFT MOORING DECK AFT MOORING DECK GLOBAL ARC
  • 12. PORT SIDE GANGWAY UPPER DECKGARBAGE DRUM LIFE RING WITH LINE CARGO HOLDCARGO HOLD HATCH COAMING GLOBAL ARC
  • 13. STARBOARD SIDE GANGWAY UPPER DECKACCOMMODATION FRONT VIEW PORT SIDE UPPER DECK PORT SIDE ANCHOR CHAIN GLOBAL ARC
  • 14. STARBOARD WINDLASSFWD MOORING WINCH FWD MOORING WINCH FWD MOORING WINCH CROSS DECK GLOBAL ARC
  • 15. MAIN ENGINEENGINE CONTROL ROOM ENGINE ROOM CONTROL PANEL GENERATOR ENGINE INCINERATORMAIN ENGINE LOWER SIDE GLOBAL ARC
  • 16. SEWAGE TREATMENT PLANT CONTROL PANEL FRESH WATER GENERATOR ENGINE WORKSOP OILY WATER SEPERATOR SEWAGE TREATMENT PLANT CONTROL PANEL BALLAST WATER TREATMENT SYSTEM CONTROL PANEL GLOBAL ARC
  • 18. PICTURES OF INSPECTION INSPECTION OF SHEAVE BY MANLIFT INSPECTION OF HOISTING WIRE BY USING SMALL ROPE WHILE LOWERING INSPECTION OF CARGO BLOCK GLOBAL ARC
  • 19. Cargo Block Condition GLOBAL ARC Bolt & Nut C Block Housing Intact 360 Deg. Rotating Swivels Greased up shackle/No Dent Greased Shackle Pin Good Condition
  • 20. SAMPLE BROKEN HOISTING WIRE FOR REPLACEMENT SELF-INSPECTION METHOD OF HOISTING WIRES BROKEN WIRES MUST BE REPLACED PRIOR GEAR INSPECTION BROKEN WIRES MUST BE REPLACED PRIOR GEAR INSPECTION
  • 21. LASHING PREPARATIONS FOR LOG LOADING 1. Ensure all deck cranes are all set to HOOK MODE (NOT GRAB MODE), if fitted. 2. Adjust all crane limit switch to proper settings. Canadian stevedores will refuse to work when not properly adjusted. 3. Remove all cargo hooks (Main) from cargo blocks prior to arrival load port as stevedores will not use it. GLOBAL ARC
  • 22. 4. Uncoil from spool all newly supplied Hog Lashing wires and distribute number of hog lashings needed on each hatch. Tag all hog wires which hatch it belong. (Photo #4) (Position all hog lashings to appropriate location accessible on each hatch.) See Photo #1 5. Prepare number of shackles needed for each hatch. (Suggest: pre-attach to proper pad eyes on each stanchion post as needed prior to arrival). GLOBAL ARC LASHING PREPARATIONS FOR LOG LOADING Photo #4 Photo #1
  • 23. 6. Prepare number of snatch blocks needed each hatch. (Check Lashing Plan as provided by dockyard). Position on appropriate location for each hatch. 7. Prepare number of turnbuckles needed each hatch. Must be fully stretched to maximum length. (Photo #5) 8. All foot wires must be in place on each deck pad eyes prior to arrival load port with rope (10/12mm diameter) attached to upper end. (Photo #6) GLOBAL ARC LASHING PREPARATIONS FOR LOG LOADING Photo #5 Photo #6
  • 24. 9. Uncoil newly supplied over lashing or wiggle wires from spool and must be accessible for each hatch ready for use upon completion of loading. (Suggest position over lashing wires as shown at crane platform) Photo # 2 & 3 10. Prepare number of wire clips for each hatch ready for use upon tightening of over lashing wires. GLOBAL ARC LASHING PREPARATIONS FOR LOG LOADING Photo #2 Photo #3
  • 25. 11. Attach lashing chains to deck pad eyes with similar rope attached same as foot wires. 12. Appropriate rachet needed to tighten wire clips. (at least (2) two sets) 13. All foot wire and lashing chain shall be “just coiled” and DO NOT hook on stanchion. Stevedore will remove coil and hook on stanchion at the timing of raising up stanchion. GLOBAL ARC LASHING PREPARATIONS FOR LOG LOADING
  • 26. CRANE LIMIT TEST CHECKLIST GLOBAL ARC
  • 28. 1. Undercovering and covering hatches, including placing tarps, plywood, nets, etc. 2. Handling lines, tie-up, let-go, and/or shifting. 3. Hoisting ship’s stores during a shift or shifts while longshoremen are employed. 4. Handling cargo, re-stowing, shifting, mark-off, etc. 5. Hoglash/lashing, securing deck cargo and placing stanchions (flaking chains is longshore work). Under the Pacific Coast Longshore Contract, while your vessel is at berth, the following duties come under the scope of the Longshore Union: GLOBAL ARC
  • 29. 6. Marking and/or checking of cargo. 7. Cleaning cargo holds. 8. Lining for grain. If any of the above is performed by your crew at the berth, the longshoremen are entitled to and shall receive payment for the work “in lieu of time”. Such payments will be for the ship’s account and will be based upon 4 hours pay for each violation and will be payable to the number of longshoremen contractually entitled to the payment. The Longshore Labor Force in this area is monitoring any of the violations outlined above very closely. DO NOT perform any of the above operations while on berth. GLOBAL ARC
  • 30. Safety Criteria and Guidelines in Longview and Olympia Wire – wire rope (hoisting wire, slings, etc.) used for cargo handling shall be replaced if in any length of 8 diameters, the total number of broken wires exceeds 10% of the total number of wires. (Rule 258 on the Pacific Coast Marine Safety Code), Three Broken wires in one strand will automatically condemn the wire. Excerpt from Pacific Coast Marine Safety Code Rule258 Wire rope slings used for cargo handling shall be replaced if any length of (8) diameters, the total number of broken wires exceeds 10% of the total number of wires or if the rope shows the following: a. Wear or scraping of one-third(1/3) the original diameter of outside individual wires; GLOBAL ARC
  • 31. b. There is kinking, crushing, birdcaging, or any other damage resulting in distortion of rope structure; c. There are end attachments that are cracked, deformed or worn; d. There is corrosion of the rope or end attachments; e. There is more than one broken wire in the close vicinity of a socket or swaged fitting; Safety Criteria and Guidelines in Longview and Olympia GLOBAL ARC
  • 32. Safety Criteria and Guidelines in Longview and Olympia Shackle – Pad eyes, shackles, and shackle pins that are worn in excess of 10% of the original diameter or that are visibly unsafe from defects or deformities, shall be replaced. (Rule 264 on the Pacific Coast Marine Safety Code) Weld-repaired shackles shall be replaced. Excerpt from Pacific Coast Marine Safety Code Rule264 Pad eyes, shackles, and shackle pins that are worn in excess of 10% of the original diameter or that are visibly unsafe from defects or deformities, shall be replaced. GLOBAL ARC
  • 33. Safety Criteria and Guidelines in Longview and Olympia Crane Boom – Crane booms with a dent exceeding the allowance which is 1.5 x the thickness of the steel shall be repaired. - Covering or filling of dents not allowed. - Proper documentation of satisfactory dents as noted by class surveyor or repairs made should be noted in the vessels gear book and stamped by class surveyor. - Specific location of class surveyed dents should be clearly noted in gear book. Limit Switch – Limit adjustment of the degree of boom angle and the height of cargo block must be done appropriately before loading operation starts or within 30 minutes after a request for the adjustment is notified to the ship’s crew during loading operation. GLOBAL ARC
  • 34. Safety Criteria and Guidelines in Longview and Olympia Cargo Block – Bolts must meet the specifications of the manufacturer. - Blocks need to swivel properly. - Blocks equipped with rocker pin assemblies must function properly. Frozen cargo block is not allowed to use. Sheave – Sheaves with deep grooving from wear or corrugated from line grooving shall be taken out of service (Rule 266 on the Pacific Coast Marine Safety Code). - The angle of sheaves must be in line with the ship’s design. Excerpt from Pacific Coast Marine Safety Code Rule266 Sheaves with deep grooving from wear corrugated from line grooving shall be taken out of service. GLOBAL ARC
  • 35. Safety Criteria and Guidelines in Longview and Olympia Hatch – No odor inside of hatch. Jumping Wire – In the case that luffing wires or hoisting wires jump out of the drum without appropriately designed preventative guards, it is considered that the accident happened due to the ship’s structure in principle. However, whether the cause is so called “rough handling” or not can be discussed from several viewpoints such as experience of the crane operator, position of the bundled logs and others. Bearing – Bearing must be maintained appropriately to prevent failure. General – In an effort to minimized standby time, maintaining vessels gear and equipment to a “like new” condition is strongly recommended. GLOBAL ARC
  • 36. GLOBAL ARC LOG BULK LOADING OPERATION VIDEO